2
2
PAGU ANGGARAN TA. 2019
SATKER P2JN NTT
Alokasi
Sumber Dana
(Rp)
Rupiah Murni 67.998.531.000
PHLN 0.00
Pagu
RMP 0.00
Awal SBSN 0.00
TOTAL 67.998.531.000
Alokasi
Sumber Dana
(Rp)
Rupiah Murni 67.883.063.000
PHLN 0.00
Usulan
RMP 0.00
Revisi 1 SBSN 0.00
TOTAL 67.883.063.000
3
3
STRUKTUR ANGGARAN TA. 2019
SATKER P2JN NTT
Target Pagu Anggaran
Kode Nama Output/Kegiatan
Layanan Perencanaan, Pengendalian Dan Pengawasan
2409.014 3 Layanan 64.427.494.000
Preservasi Dan Peningkatan Kapasitas Jalan Nasional
307 Perencanaan Teknik / DED 14.078.620.000
Pagu 309 Pengawasan Teknik / Supervisi 47.375.060.000
SIRUP DAN BELUM PENGUMUMAN EVALUASI PENETAPAN TTD KONTRAK SISA LELANG
SATKER/NAMA JUMLAH PAGU
No. LELANG LELANG PENAWARAN PEMENANG
PAKET PAKET (Ribuan)
SATKER
PERENCANAAN
DAN
I PENGAWASAN - - - - - - 1 2.473.140 21 55.832.322 21 5.335.338
22 63,640,800
JALAN
NASIONAL
PROVINSI NTT
Masa
Nilai Nilai
Pelaksanaa Tangal Akhir
Kontrak Addendum Tanggal (No) Tanggal Tanggal
No. Nama Paket n Masa Keterangan
(Rp. X (Rp. X 1000) SPPBJ Kontrak (No. SPMK)
(hari Pelaksanaan
1000)
kalender)
1. KOORDINATOR TIM 7.379.000 7.843.742 12-03-2019 14-03-2019 14-03-2019 293 31-12-2019
PERENCANAAN DAN
PENGAWASAN
TEKNIK JALAN DAN
JEMBATAN
PROVINSI NTT
2. PR-01 2.417.000 2.054.220 27-03-2019 27-03-2019 27-03-2019 195 30-09-2019
PERENCANAAN
TEKNIK JEMBATAN
DIPROV. NTT
3. PR-02 4.198.000 3.551.024 02-07-2019 02-07-2019 02-07-2019 165 14-12-2019
PERENCANAAN
TEKNIK PRESERVASI
JALAN NASIONAL
Nilai Nilai
Masa Tangal Akhir
Kontrak Addendum Tanggal (No) Tanggal Tanggal
No. Nama Paket Pelaksanaan Masa Keterangan
(Rp. X (Rp. X 1000) SPPBJ Kontrak (No. SPMK)
(hari kalender) Pelaksanaan
1000)
13. PW-13 PENGAWASAN 2.520.820 2.391.424 19-03-2019 22-03-2019 22-03-2019 285 31-12-2019
TEKNIK JALAN DAN
JEMBATAN BTS KAB
MANGGARAI-GAKO
14. PW-14 PENGAWASAN 2.605.820 2.711.948 19-03-2019 22-03-2019 22-03-2019 285 31-12-2019
TEKNIK JALAN DAN
JEMBATAN GAKO -
AEGELA -
MARAPOKOT DAN
AEGELA - BTS KOTA
ENDE
10
10
Data Pelaksanaan Pekerjaan Kontraktual
PPK 6.2 Provinsi NTT SATKER P2JN NTT TA 2019
11
11
PAKET MULTIYEARS TA. 2019
SATKER P2JN NTT
PT. WESITAN
KONSULTAN
PEMBANGUNAN (JO)
PAKET PENGAWASAN TEKNIK PEMBANGUNAN
1 1 670,000.00 582,406.00 493.510 HK.02.03 / 332/ PPK-PW
JEMBATAN SAHAN (KOLBANO-BOKING) MYC / P2JN-NTT / XI / 2018,
Tanggal : 16 Nopember
2018
PT. WESITAN
KONSULTAN
PAKET PENGAWASAN TEKNIK PEMBANGUNAN PEMBANGUNAN (JO)
2 JEMBATAN BAUKAMA HAESMETAN (CAUSEWAY 1 803,000.00 688,415.50 595.141 HK.02.03 / 329 / PPK-PW
BRIDGE) MYC / P2JN-NTT / XI / 2018,
Tanggal : 16 Nopember
2018
12
12
PAGU ANGGARAN & LELANG DINI
TA 2020
13
13
PAGU ANGGARAN TA. 2020
SATKER P2JN NTT
Alokasi
Sumber Dana
(Rp)
Rupiah Murni 82.660.171.000
14
14
STRUKTUR ANGGARAN TA. 2020
SATKER P2JN NTT
Target Pagu Anggaran
Kode Nama Output/Kegiatan
Layanan Perencanaan, Pengendalian Dan Pengawasan
2409.014 3 Layanan 78.804.834.000
Preservasi Dan Peningkatan Kapasitas Jalan Nasional
307 Perencanaan Teknik / DED 21.756.620.000
309 Pengawasan Teknik / Supervisi 52.665.678.000
401 Monitoring dan Evaluasi 4.392.536.000
2409.970 Layanan Dukungan Manajemen Unit Kerja 1 Layanan 2.536.925.000
2409.951 Layanan Sarana dan Prasarana Internal 1 Layanan 412.890.000
2409.994 Layanan Perkantoran 1 Layanan 885.522.000
TOTAL SELURUH 82.660.171.000
15
15
REKAPITULASI MONITORING LELANG PAKET TA. 2020
SATKER P2JN NTT
KETERANGAN
SATKER/NAMA JUMLAH SYC MYC OKTOBER JANUARI
No. PAGU
PAKET PAKET
SATKER
PERENCANAAN
DAN
I 22 18 68,846.862 4 5.565.436 17 64.648.862 5 9.763.436
PENGAWASAN 74.412.298
JALAN NASIONAL
PROVINSI NTT
22
74.412.298
16
16
PAKET PERENCANAAN TA. 2020
SATKER P2JN NTT
NO
NAMA PAKET NILAI PAGU (Rp.) PPK CATATAN
.
(2) (3) (4) (5)
(1)]
PR-01 PERENCANAAN TEKNIK LONGSORAN DAN GEOMETRIK DI RENCANA DI LELANGKAN PADA BULAN
1 2.800.000.000,00 PPK PERENCANAAN
PROVINSI NTT OKTOBER
PR-02 PERENCANAAN TEKNIK JALAN DAN JEMBATAN DI PROVINSI RENCANA DI LELANGKAN PADA BULAN
2 2.500.000.000,00 PPK PERENCANAAN
NTT OKTOBER
PR-03 PERENCANAAN TEKNIK PRESERVASI JALAN NASIONAL DI RENCANA DI LELANGKAN PADA BULAN
3 4.198.000.000,00 PPK PERENCANAAN
PROVINSI NTT JANUARI
INDEPENDENT CHECKER PEMBANGUNAN JEMBATAN DI PROVINSI RENCANA DI LELANGKAN PADA BULAN
4 3.595.133.000,00 PPK PERENCANAAN
NTT OKTOBER
KOORDINATOR TIM PERENCANAAN DAN PENGAWASAN TEKNIK RENCANA DI LELANGKAN PADA BULAN
5 8.663.487.000,00 PPK PERENCANAAN
JALAN DAN JEMBATAN DI PROVINSI NTT OKTOBER
17
17
PAKET PENGAWASAN (SYC)TA. 2020
SATKER P2JN NTT
NO
NAMA PAKET NILAI PAGU (Rp.) PPK CATATAN
.
(2) (3) (4) (5)
(1)
PW-01 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
1 3.946.528.000,00 PPK PENGAWASAN
KOTA KUPANG, KAB. KUPANG DAN TTS OKTOBER
PW-02 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
2 2.553.198.000,00 PPK PENGAWASAN
KABUPATEN ROTE NDAO DAN SABU RAIJUA OKTOBER
PW-03 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
3 5.082.775.000,00 PPK PENGAWASAN
SUMBA TIMUR (02) OKTOBER
PW-04 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
4 4.045.006.000,00 PPK PENGAWASAN
KABUPATEN TTS DAN TTU OKTOBER
PW-05 = PENGAWASAN TEKNIK JALAN PERBATASAN DI RENCANA DI LELANGKAN PADA BULAN
5 3.382.663.000,00 PPK PENGAWASAN
PULAU TIMOR OKTOBER
PW-06 = PENGAWASAN TEKNIK JEMBATAN PERBATASAN DI RENCANA DI LELANGKAN PADA BULAN
6 3.412.049.000,00 PPK PENGAWASAN
PULAU TIMOR OKTOBER
PW-07 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
7 2.528.287.000,00 PPK PENGAWASAN
KABUPATEN ALOR OKTOBER
PW-08 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
8 3.168.900.000,00 PPK PENGAWASAN
MANGGARAI BARAT (01) OKTOBER
PW-09 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
9 3.707.383.000,00 PPK PENGAWASAN
MANGGARAI BARAT (02) OKTOBER
PW-10 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
10 3.962.038.000,00 PPK PENGAWASAN
KABUPATEN MANGGARAI DAN NGADA OKTOBER
PW-11 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
11 4.536.700.000,00 PPK PENGAWASAN
KABUPATEN ENDE (01) OKTOBER
PW-12 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
12 3.492.443.000,00 PPK PENGAWASAN
KABUPATEN SIKKA DAN FLORES TIMUR OKTOBER
PW-13 = PENGAWASAN TEKNIK JALAN DAN JEMBATAN DI RENCANA DI LELANGKAN PADA BULAN
13 3.272.272.000,00 PPK PENGAWASAN
KABUPATEN FLORES TIMUR OKTOBER
18
18
PAKET PENGAWASAN (MYC)TA. 2020
SATKER P2JN NTT
NO. NAMA PAKET NILAI PAGU (Rp.) PPK CATATAN
(1) (2) (3) (4) (5)
19
19
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL X KUPANG