(RAB)
No. Jenis Pekerjaan Sat Volume Harga Satuan Jumlah Harga (Rp)
Rp
A PEKERJAAN PERSIAPAN
1 Pas. Bouwplank ls 1.00 500,000.00 500,000.00
B PEKERJAAN STRUKTUR
1 Pas. Batu karang Pondasi m3 3.30 580,000.00 1,914,000.00
2 Urugan Pasir m3 1.20 250,000.00 300,000.00
3 Beton rabat m3 1.20 850,000.00 1,020,000.00
4 Pas. Atap Kanopi m2 24.00 750,000.00 18,000,000.00
- Tiang Pipa 2"
- Rangka Atap Hollow 4x8
- Atap Trimdek
5 Pas. Atap Alang-alang Ls 1.00 1,000,000.00 1,000,000.00
6 Pas. Dinding Bedeg Ls 1.00 500,000.00 500,000.00
TOTAL 23,234,000.00
DIBULATKAN 23,234,000.00
I G. N. A. ARI KUMARANATA
Kontraktor Pelaksana