HPS SDN 18 Sungai Asam
HPS SDN 18 Sungai Asam
Ps)
1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.000 60,000.00
2 Tukang Kayu OH 120,000.00 2.000 240,000.00
3 Kepala Tukang OH 175,000.00 0.200 35,000.00
4 Mandor OH 230,000.00 0.050 11,500.00
Jumlah 346,500.00
B BAHAN
1 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg 31,600.00 1.250 39,500.00
2 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m M3 3,610,300.00 0.186 671,515.80
3 Paku Seng Kg 40,000.00 0.300 12,000.00
4 Seng Gelombang Bjls 20 Lbr 71,900.00 1.500 107,850.00
5 Triplek t uk 3 mm Lbr 76,400.00 1.3500 103,140.00
Jumlah 934,005.80
C JUMLAH A + B 1,280,505.80
D HARGA SATUAN 1,280,505.80
Acuan : SNI : 2001 - 2002 (6.9)
Menggali 1m3 Tanah Biasa sedalam 1 meter (P.T. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.750 45,000.00
2 Mandor OH 230,000.00 0.025 5,750.00
Jumlah 50,750.00
B JUMLAH A 50,750.00
C HARGA SATUAN 50,750.00
Acuan : SNI 2835:2008 (6.1)
Menggali 1m3 Tanah Biasa sedalam 2 meter (P.T. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.900 54,000.00
2 Mandor OH 230,000.00 0.045 10,350.00
Jumlah 64,350.00
B JUMLAH A 64,350.00
C HARGA SATUAN 64,350.00
Acuan : SNI 2835:2008 (6.2)
Mengurug Kembali 1m3 Galian (P.T. 09)
Mengurug kembali 1m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.250 15,000.00
2 Mandor OH 230,000.00 0.0083 1,916.67
Jumlah 16,916.67
B JUMLAH A 16,916.67
C HARGA SATUAN 16,916.67
Acuan : SNI 2835:2008 (6.9)
Mengurug 1m3 Pasir Urug (P.T. 11)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.300 18,000.00
2 Mandor OH 230,000.00 0.010 2,300.00
Jumlah 20,300.00
B BAHAN
1 Pasir Urug M3 144,000.00 1.200 172,800.00
Jumlah 172,800.00
B JUMLAH A 193,100.00
C HARGA SATUAN 193,100.00
Acuan : SNI 2835:2008 (6.11)
1 m3 Urugan Tanah Datang (P.T. 12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.250 15,000.00
2 Mandor OH 230,000.00 0.010 2,300.00
Jumlah 17,300.00
B BAHAN
1 Tanah Datang M3 42,000.00 1.200 50,400.00
Jumlah 50,400.00
C JUMLAH A + B 67,700.00
D HARGA SATUAN 67,700.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya pekerjaan BOW - A.16 (1)
C. PEKERJAAN PONDASI BATU (P.PB.)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I (P.K. 12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 7.000 420,000.00
2 Tukang Kayu OH 120,000.00 21.000 2,520,000.00
3 Kepala Tukang OH 175,000.00 2.100 367,500.00
4 Mandor OH 230,000.00 0.350 80,500.00
Jumlah 3,388,000.00
B BAHAN
1 Kayu Kelas 1 uk. 5/10 (Ketam) M3 5,551,000.00 1.100 6,106,100.00
2 Paku kg 27,000.00 1.250 33,750.00
3 Lem Kayu kg 84,000.00 1.000 84,000.00
Jumlah 6,223,850.00
C Jumlah A + B 9,611,850.00
D Harga Satuan 9,611,850.00
Acuan : SNI 3434:2008 (6.1)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu Belian (P.K. 12.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 7.000 420,000.00
2 Tukang Kayu OH 120,000.00 21.000 2,520,000.00
3 Kepala Tukang OH 175,000.00 2.100 367,500.00
4 Mandor OH 230,000.00 0.350 80,500.00
Jumlah 3,388,000.00
B BAHAN
1 Kayu Belian M3 12,292,800.00 1.100 13,522,080.00
2 Paku 10 cm kg 27,000.00 1.250 33,750.00
3 Lem Kayu kg 84,000.00 1.000 84,000.00
Jumlah 13,639,830.00
C Jumlah A + B 17,027,830.00
D Harga Satuan 17,027,830.00
Acuan : SNI 3434:2008 (6.1)
Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas I (P.K. 14)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.000 60,000.00
2 Tukang Kayu OH 120,000.00 3.000 360,000.00
3 Kepala Tukang OH 175,000.00 0.300 52,500.00
4 Mandor OH 230,000.00 0.050 11,500.00
Jumlah 484,000.00
B BAHAN
1 Papan kayu klas I ketam M3 6,149,100.00 0.040 245,964.00
2 Lem Kayu kg 84,000.00 0.500 42,000.00
Jumlah 287,964.00
C Jumlah A + B 771,964.00
D Harga Satuan 771,964.00
Acuan : SNI 3434:2008 (6.5)
Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu belian (P.K. 14.i)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.000 60,000.00
2 Tukang Kayu OH 120,000.00 3.000 360,000.00
3 Kepala Tukang OH 175,000.00 0.300 52,500.00
4 Mandor OH 230,000.00 0.050 11,500.00
Jumlah 484,000.00
B BAHAN
1 Papan kayu belian ketam M3 30,850,800.00 0.040 1,234,032.00
2 Lem Kayu kg 84,000.00 0.500 42,000.00
Jumlah 1,276,032.00
C Jumlah A + B 1,760,032.00
D Harga Satuan 1,760,032.00
Acuan : SNI 3434:2008 (6.5)
1m2 Pemasangan Ventilasi Kaca. Setiap luas 1 m2 bidang daun ventilasi, luas kacanya adalah 0.60 m2 (P.K.
19)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.280 16,800.00
2 Tukang Kayu OH 120,000.00 0.800 96,000.00
3 Kepala Tukang OH 175,000.00 0.080 14,000.00
4 Mandor OH 230,000.00 0.014 3,220.00
Jumlah 130,020.00
B BAHAN
1 List Kayu M' 8,000.00 8.000 64,000.00
2 Kaca Polos tebal 5 mm M2 239,500.00 0.600 143,700.00
3 Paku triplek Kg 53,000.00 0.050 2,650.00
Jumlah 210,350.00
C Jumlah A + B 340,370.00
D Harga Satuan 340,370.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.37.c
Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas II Bentang 6 m (P.K. 20.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 4.000 240,000.00
2 Tukang Kayu OH 120,000.00 12.000 1,440,000.00
3 Kepala Tukang OH 175,000.00 1.200 210,000.00
4 Mandor OH 230,000.00 0.200 46,000.00
Jumlah 1,936,000.00
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 3,610,300.00 1.100 3,971,330.00
2 Besi Strip Kg 124,000.00 15.000 1,860,000.00
3 Paku 12 cm Kg 27,000.00 5.600 151,200.00
Jumlah 5,982,530.00
C Jumlah A + B 7,918,530.00
D Harga Satuan 7,918,530.00
Acuan : SNI 3434:2008 (6.13)
Memasang 1m3 Konstruksi Gordeng, Kayu Kelas II (P.K. 22)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 2.400 144,000.00
2 Tukang Kayu OH 120,000.00 7.200 864,000.00
3 Kepala Tukang OH 175,000.00 0.720 126,000.00
4 Mandor OH 230,000.00 0.120 27,600.00
Jumlah 1,161,600.00
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 3,610,300.00 1.100 3,971,330.00
2 Besi Strip Btg 124,000.00 15.000 1,860,000.00
3 Paku 12 cm Kg 27,000.00 3.000 81,000.00
Jumlah 5,912,330.00
C Jumlah A + B 7,073,930.00
D Harga Satuan 7,073,930.00
Acuan : SNI 3434:2008 (6.15)
Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III (P.K. 29)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.200 12,000.00
2 Tukang Kayu OH 120,000.00 0.300 36,000.00
3 Kepala Tukang OH 175,000.00 0.030 5,250.00
4 Mandor OH 230,000.00 0.010 2,300.00
Jumlah 55,550.00
B BAHAN
1 Kaso-kaso (5x7) cm M3 3,610,300.00 0.0163 58,847.89
2 Paku 7 cm - 10 cm Kg 27,000.00 0.250 6,750.00
Jumlah 65,597.89
C Jumlah A + B 121,147.89
D Harga Satuan 121,147.89
Acuan : SNI 3434:2008 (6.20)
Membuat 1 M2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku (P.BA 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 55,000.00 0.060 3,300.00
2 Tukang las OH 65,000.00 0.060 3,900.00
3 Kepala Tukang OH 70,000.00 0.006 420.00
4 Mandor OH 70,000.00 0.003 210.00
Jumlah 7,830.00
B BAHAN
1 Besi siku L 30.30.3 kg 19,500.00 15.000 292,500.00
2 Besi plat baja kg 18,800.00 32.800 616,640.00
3 Kawat las kg 115,000.00 0.050 5,750.00
Jumlah 914,890.00
C JUMLAH A + B 922,720.00
D HARGA SATUAN 922,720.00
Acuan : SNI 7393:2008 (6.4)
1m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Dengan Cat Mutu Baik. (P.Ct.
12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.028 1,680.00
2 Tukang Cat OH 120,000.00 0.042 5,040.00
3 Kepala Tukang OH 175,000.00 0.0042 735.00
4 Mandor OH 230,000.00 0.0025 575.00
Jumlah 8,030.00
B BAHAN
1 Cat Dasar tembok Kg 51,000.00 0.120 6,120.00
2 Cat Tembok Penutup 2 x Kg 62,000.00 0.180 11,160.00
17,280.00
C Jumlah A + B 25,310.00
D Harga Satuan 25,310.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.15
A. UPAH DAN BAHAN BANGUNAN
1 2 3 4 5 6
III JASA PELAYANAN
A Bahan Pasir, Batu dan Tanah ( Sand, Stone dan Soil )
1 Batu Belah Ukuran 10 - 15 cm M3 Rp 1,010,000
Ukuran 7 - 10 cm M3
Ukuran 5 - 7 cm M3
Ukuran 3 - 5 cm M3
Ukuran 2 - 3 cm M3
2 Batu Pecah Ukuran 2 - 3 cm stone crusher M3 Rp 1,488,000
Ukuran 1 - 2 cm stone crusher M3 Rp 1,606,000
Ukuran 0,5 - 1 cm stone crusher M3 Rp 1,638,000
3 Batako Cetak Ukr. 7 x 15 x 30 Buah Rp 2,000
4 Bata Merah Ukr. 5 x 11 x 22 cm Buah Rp 2,000
5 Batu Gunung atau Batu Quari - M3
6 Batu Quari Royalti - M3
7 Gorong-gorong Beton Diameter 40 cm M1 Rp 626,000
Diameter 60 cm M1 Rp 860,000
Diameter 80 cm M1 Rp 1,201,000
Diameter 100 cm M1 Rp 1,462,000
8 Ijuk - Kg Rp 27,000
9 Kapur Bakar - M3
10 Kerikil Galian Royalti - M3 Rp 367,000
11 Kerikil Sungai Royalti - M3 Rp 1,075,000
12 Pasir Beton / Pasang - M3 Rp 147,000
13 Pasir Urug / Timbun - M3 Rp 144,000
14 Pasir Batu / Sirtu (Tidak Ayak) - M3 Rp 265,000
15 Paving Block - Buah Rp 4,200
16 Sirtu Royalti - M3 Rp 768,000
17 Stone Dust - M3 Rp 1,638,000
18 Tanah Humus / Tanah Bakar - Karung
19 Tanah Urug / Timbunan Pilihan - M3 Rp 42,000
20 Terawang / Rooster Batako - Buah Rp 6,350
21 Lempengan / Gebalan Rumput
Manila - M²
22 Timbunan Pilihan Setempat - M3 Rp 33,000
A. UPAH
1 Mandor Lapangan L 061 Hari 70,000.00 1. Harga Tahun 2011
2 Mekanik L 071 Hari 70,000.00 Harga Belum
3 Mekanik Pembantu L 072 Hari 65,000.00 Termasuk PPn
4 Kepala Tukang L 073 Hari 70,000.00
5 Tukang L 079 Hari 65,000.00
6 Operator Terlatih *) L 081 Hari 65,000.00
7 Operator Kurang Terlatih **) L 082 Hari 60,000.00
8 Pembantu Operator L 083 Hari 55,000.00
9 Supir Material / Truck L 091 Hari 60,000.00
10 Supir Personil L 092 Hari 60,000.00
11 Pembantu Supir / Kernet L 099 Hari 55,000.00
12 Buruh Lapangan Terlatih L 106 Hari 65,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 60,000.00
14 Buruh Lapangan Tak Terlatih L 101 Hari 55,000.00
15 Penjaga Api - Hari 45,000.00
16 Penjaga Malam - Hari 55,000.00
HARGA
NO JENIS BAHAN KODE SATUAN KETERANGAN
(Rp)
1 2 3 4 5 6
B. BAHAN PENGISI
1 Batu Kong M.101 M³ 165,000.00 1. Harga Tahun 2011
2 Batu Sap Pinang - M³ 184,000.00 Harga Belum
3 Batu pecah 15-20 cm - M³ 268,000.00 Termasuk PPn
4 Batu pecah 10-15 cm M.020 M³ 184,000.00
5 Batu pecah 5-7 cm M.022 M³ 203,200.00
6 Batu pecah 3-5 cm M.023 M³ 230,000.00 2. Harga ini berlaku untuk
7 Batu pecah 2-3 cm M.024 M³ 287,500.00 Wilayah I :
8 Batu pecah 1-2 cm M.025 M³ 394,300.00 Kec. Sungai Kunyit
9 Batu pecah 1-1 cm - M³ 428,100.00 Kec. Mempawah Hilir
10 Batu pecah 0,5 cm M.026 M³ 427,400.00 Kec. Mempawah Timur
11 Stone Dust - M³ 394,400.00 Kec. Sungai Pinyuh
12 Aspal Bitumen 60/70 - Kg 11,500.00 Kec.Segedong
13 Pasir M.040 M³ 115,000.00 Kec.Siantan
14 Semen PC M.080 Zak 73,600.00 dan daerah lain yang
15 Semen PC - Kg 1,500.00 memiliki kesamaan
16 Timbunan Pilihan (Tanah Datang) M.050.a M³ 63,300.00 karakteristik wilayah yang
17 Paving Block - Buah 2,600.00 mempengaruhi harga
18 Paving Stone - Buah 4,200.00 satuan.
19 Batu Bata 5 cm x 11 cm x 22 cm Buah 2,700.00
20 Batako 7 cm x 15 cm x 30 cm - Buah 1,300.00 3. Harga satuan merupakan
21 Batako 6 cm x 15 cm x 30 cm - Buah 1,300.00 harga on side (di lapangan)
22 Batako 7 cm x 20 cm x 40 cm (press) - Buah 2,500.00
23 Batako 9 cm x 20 cm x 40 cm (press) - Buah 2,700.00
24 Bata terawang ( roster ) uk.18 cm x 18 cm - Buah 3,500.00
25 Bata terawang uk.20 cm x 20 cm - Buah 2,000.00 4. Untuk penentuan harga
26 Bata terawang press ( roster ) uk.30 x 30 cm - Buah 27,600.00 satuan yang dipergunakan
27 Bata terawang keramik uk.30 x 30 cm - Buah 54,700.00 dipengaruhi oleh asumsi
28 Keramik uk. 10 cm x 20 cm - Kotak 54,100.00 perencanaan yang dipakai.
29 Keramik uk. 20 cm x 20 cm - Kotak 48,300.00
30 Keramik uk. 20 cm x 20 cm ( Corak ) - Kotak 55,200.00
31 Keramik uk. 20 cm x 25 cm - Kotak 57,400.00
32 Keramik uk. 30 cm x 30 cm (biasa) - Kotak 41,400.00
33 Keramik uk. 30 cm x 30 cm Unpolished - Kotak 57,000.00
34 Keramik uk. 30 cm x 30 cm Artistik - Kotak 67,100.00
35 Keramik uk. 40 cm x 40 cm (biasa) - Kotak 48,300.00
36 Keramik uk. 40 cm x 40 cm Polished (setaraf Indogress) - Kotak 131,700.00
37 Keramik uk. 40 cm x 40 cm Polished (setaraf Decogress) - Kotak 124,900.00
38 Keramik uk. 40 cm x 40 cm Unpolished (setaraf Indogress) - Kotak 147,800.00
39 Keramik uk. 40 cm x 40 cm Unpolished (setaraf Decogress) - Kotak 126,700.00
40 Keramik uk. 60 cm x 60 cm Polished (setaraf Indogress) - Kotak 289,800.00
41 Keramik uk. 60 cm x 60 cm Polished (setaraf Decogress) - Kotak 219,200.00
42 Granito uk. 40 cm x 40 cm - Kotak 198,100.00
43 Marmer - M² 474,400.00
44 Wood Flooring - M² 287,500.00
45 List Keramik uk 2 cm x 5 cm - Bh 900.00
46 List Keramik WC. Uk. 8 cm x 20 cm - Bh 5,500.00
47 Plint Kayu uk. 2 x 10 cm - Bh 48,900.00
48 Batu Tempel Hitam uk.5 x 10 cm - M² 149,500.00
49 Batu Paras uk. 5 x 10 cm - M² 149,500.00
50 Floor Hardener - Kg 8,700.00
51 Beton Ready Mix B 0 - M³ 793,500.00
52 Beton Ready Mix 125 - M³ 833,800.00
53 Beton Ready Mix 175 - M³ 897,000.00
54 Beton Ready Mix 225 - M³ 994,800.00
55 Beton Ready Mix 300 - M³ 1,086,800.00
56 Additive Ready Mix - Liter 46,000.00
57 Karung Goni Curing Beton ( 0.7m² ) - Lembar 12,100.00
58 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m - Btg 1,207,500.00
59 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m - Btg 1,587,000.00
60 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m - Btg 1,035,000.00
61 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m - Btg 1,155,800.00
62 Papan Turap Uk. 15/50 - 5m - K 300 - Kpg 920,000.00
1 2 3 4 5 6
63 Papan Turap Uk. 15/50 - 6m - K 300 - Kpg 1,173,000.00
64 Pemancangan Mini Pile - 6m - Btg 138,000.00
65 Sewa Pompa Ready Mix (Min. 100 M³) - M³ 57,500.00
66 Bahan Plastik Cor Beton - M² 4,100.00
C. BAHAN KAYU
1 Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m - M³ 9,767,300.00
2 Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m - M³ 12,945,200.00
3 Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m - M³ 10,888,100.00
4 Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m - M³ 9,587,900.00
5 Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m - M³ 6,289,100.00
6 Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m - M³ 8,970,000.00
7 Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m - M³ 9,200,000.00
8 Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m - M³ 9,970,500.00
9 Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m - M³ 10,810,000.00
10 Kayu Belian Tidak Ketam uk.18 cm x 18 cm x 4 m - M³ 7,705,900.00
11 Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m - M³ 8,625,000.00
12 Kayu Belian Ketam uk. 6 cm x 6 cm x 4 m - M³ 15,175,700.00
13 Kayu Belian Ketam uk. 7 cm x 7 cm x 4 m - M³ 12,866,400.00
14 Kayu Belian Ketam uk. 8 cm x 8 cm x 4 m - M³ 11,885,300.00
15 Kayu Belian Ketam uk. 3 cm x 7 cm x 4 m - M³ 15,395,700.00
16 Kayu Belian Ketam uk. 4 cm x 8 cm x 4 m - M³ 12,653,000.00
17 Kayu Belian Ketam uk. 5 cm x 10 cm x 4 m - M³ 11,260,800.00
18 Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m M.181.d M³ 14,839,400.00
19 Papan Belian Ketam uk. 2 cm x 16 cm x 4 m M.181.e M³ 17,659,700.00
20 Kayu kls I Bengkirai Tidak Ketam uk. 7 cm x 7 cm x 4 m - M³ 4,840,600.00
21 Kayu kls I Bengkirai Tidak Ketam uk. 8 cm x 8 cm x 4 m M.181.g M³ 11,810,800.00
22 Papan kls I Tidak Ketam - M³ 9,463,600.00
23 Kayu kls I Bengkirai Ketam uk. 7 cm x 7 cm x 4 m - M³ 6,307,500.00
24 Kayu kls I Bengkirai Ketam uk. 8 cm x 8 cm x 4 m M.181.f M³ 6,963,000.00
25 Papan kls I Ketam - M³ 7,906,300.00
26 Kayu kls I Bengkirai Ketam uk. 5 cm x 10 cm x 4 m ( untuk kusen ) - M³ 12,075,000.00
27 Kusen Kayu Kelas I Bangkirai uk. 5/10 - M³ 86,300.00
28 Kayu kls II Tidak Ketam uk.3 cm x 5 cm x 4 m - M³ 3,818,000.00
29 Kayu kls II Tidak Ketam uk.4 cm x 6 cm x 4 m - M³ 3,348,800.00
30 Kayu kls II Tidak Ketam uk.4 cm x 8 cm x 4 m - M³ 3,834,700.00
31 Kayu kls II Tidak Ketam uk.5 cm x 7 cm x 4 m - M³ 3,674,300.00
32 Kayu kls II Tidak Ketam uk.5 cm x 10 cm x 4 m - M³ 3,737,500.00
33 Kayu kls II Tidak Ketam uk.6 cm x 10 cm x 4 m - M³ 3,391,500.00
34 Kayu kls II Tidak Ketam uk.6 cm x 12 cm x 4 m - M³ 3,284,400.00
35 Kayu kls II Tidak Ketam uk.7 cm x 7 cm x 4 m - M³ 3,812,300.00
36 Kayu kls II Tidak Ketam uk.8 cm x 8 cm x 4 m - M³ 3,363,800.00
37 Kayu kls II Tidak Ketam uk.8 cm x 12 cm x 4 m - M³ 3,532,000.00
38 Kayu kls II Tidak Ketam uk.8 cm x 15 cm x 4 m - M³ 2,635,500.00
39 Kayu kls II Tidak Ketam uk.10 cm x 10 cm x 4 m - M³ 3,593,800.00
40 Papan kls II Tidak Ketam uk.2,5 cm x 20 cm x 4 m M.181.j M³ 3,881,300.00
41 Kayu kls II Ketam uk.5 cm x 10 cm x 4 m - M³ 4,528,200.00
42 Kayu kls II Ketam uk.8 cm x 8 cm x 4 m - M³ 4,288,800.00
43 Kayu kls II Ketam uk.7 cm x 7 cm x 4 m - M³ 4,692,000.00
44 Kayu kls II Ketam uk.6 cm x 6 cm x 4 m - M³ 5,554,500.00
45 Kayu kls II Ketam uk.3 cm x 7 cm x 4 m - M³ 5,884,600.00
46 Kayu kls II Ketam uk.3 cm x 5 cm x 4 m - M³ 5,917,900.00
47 Papan kls II Ketam uk.1,8 cm x 18 cm x 4 m M.181.k M³ 5,479,100.00
48 Papan kls II Ketam uk.1 cm x 7 cm x 4 m M.181.k M³ 7,851,800.00
49 Kayu kls III Tidak Ketam uk.3 cm x 5 cm x 4 m - M³ 2,290,800.00
50 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m - M³ 2,266,100.00
51 Kayu kls III Tidak Ketam uk.5 cm x 7 cm x 4 m - M³ 1,796,300.00
52 Kayu kls III Tidak Ketam uk.5 cm x 10 cm x 4 m - M³ 2,070,000.00
53 Kayu kls III Tidak Ketam uk.6 cm x 12 cm x 4 m - M³ 1,979,500.00
54 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m - M³ 2,018,300.00
55 Kayu kls III Tidak Ketam uk.8 cm x 12 cm x 4 m - M³ 2,093,000.00
56 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M.181.l M³ 2,380,500.00
57 Papan Simpiran - M³ 1,102,100.00
58 Renglat kayu klas I uk 1/8 cm - Btg 44,700.00
59 Kayu profil 10 cm - Btg 21,700.00
60 Profil Kayu Klas II L = 7 cm Pjg 4 m - Keping 28,800.00
61 Kayu cerucuk /dolken ø 4 - 6 - Pj. 4 M - Batang 5,900.00
62 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M - Batang 8,700.00
63 Kayu cerucuk /dolken ø 8 - 10 - Pj. 4 M - Batang 11,000.00
64 Kayu cerucuk /dolken ø12 - Pj. 12 M - Batang 80,500.00
65 Kayu cerucuk /dolken ø 15 - Pj. 12 M - Batang 97,800.00
66 Kayu untuk Perancah - M³ 983,300.00
67 Kayu Simpiran - M³ 952,200.00
68 Kayu Bakar - M³ 69,000.00
69 Alat-alat Bantu - Set 102,300.00
70 Alas laci - Btg 17,300.00
71 Wood Plank - M' 57,500.00
D. BAHAN CAT
1 Amplas Besi - Lembar 2,500.00
2 Amplas Kayu - Lembar 1,400.00
3 Minyak Cat - Liter 29,300.00
4 Plamur - Kg 30,900.00
5 Cat Dasar - Kg 29,400.00
6 Cat Kilat - Kg 46,000.00
7 Cat Tembok - Kg 15,000.00
8 Cat tembok type weather shield - Kg 103,500.00
9 Cat tembok type weather coat (acrylic) - Kg 165,400.00
10 Cat seng - Kg 112,100.00
11 Dempul - Kg 29,300.00
12 Plitur - Kg 52,500.00
13 Thiner M.090.f Ltr 24,100.00
14 Thiner ND - Ltr 34,000.00
15 Cat Melamic - Kg 61,000.00
16 Cat Pilox - Klg 23,000.00
17 Meni - Kg 46,300.00
18 Teer - Liter 12,700.00
19 Vernis - Liter 38,600.00
20 Oker Warna ( Induk ) - Kg 58,700.00
21 Oker Warna ( Biasa ) - Kg 15,000.00
22 Lem Fox ( Putih ) - Kg 36,300.00
23 Lem Fox ( Kuning ) - Kg 42,600.00
24 Sealent - Tube 143,800.00
1 2 3 4 5 6
25 Soda Api - Kg 12,700.00
26 Sabun / cream pembersih kotoran - Kg 21,300.00
27 Teak Oil - Liter 46,000.00
28 Kuas 4" - Buah 18,600.00
29 Road Line Paint ( Cat Marka ) M.090.e Liter 103,500.00
30 Glass Bit M.090.g Kg 42,000.00
31 Weatherbond Emulsion ( cat kerb ) M.090.h Kg 103,500.00
32 Termoplast - Kg 39,300.00
33 Water Proofing - M² 55,500.00
F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC - Buah 316,300.00
2 Engsel Kupu-kupu 4" ( biasa ) - Kotak 9,200.00
3 Engsel Kupu-kupu 4" ( Stainles ) - Kotak 31,100.00
4 Engsel Kupu-kupu 3" ( biasa ) - Kotak 8,700.00
5 Engsel Kupu-kupu 3" ( Stainles ) - Kotak 23,000.00
6 Slot Jendela ( Biasa ) - Buah 2,300.00
7 Slot Jendela ( Stainles ) - Buah 5,800.00
8 Slot Pintu ( Biasa ) - Buah 4,600.00
9 Slot Pintu ( Stainles ) - Buah 23,000.00
10 Kunci tanam 2 slag (setaraf Belluci) - Buah 192,700.00
11 Kunci tanam 1 slag - Buah 123,700.00
12 Kunci tanam antik - Buah 187,200.00
13 Kunci tanam biasa - Buah 90,900.00
14 Kunci silinder - Buah 112,200.00
15 Kunci Tanam Kecil - Buah 89,700.00
16 Door Closer - Buah 171,100.00
17 Door Stoper - Buah 80,500.00
18 Pegangan Pintu ( Biasa ) - Buah 80,500.00
19 Pegangan Pintu ( Stainles ) - Buah 149,500.00
20 Pegangan Jendela ( Biasa ) - Buah 2,900.00
21 Pegangan Jendela ( Stainles ) - Buah 6,900.00
22 Kait angin ( Biasa ) - Buah 3,500.00
23 Kait angin ( Stainles ) - Buah 9,200.00
24 Paku Campuran M.166.b Kg 21,900.00
25 Paku Seng M.166.a Kg 25,700.00
26 Paku Atap Seng M.166.c Kg 23,000.00
27 Paku Atap Metal - Kg 40,300.00
28 Paku GRC - kg 30,200.00
29 Paku / sekrup Gypsum - Buah 200.00
30 Paku triplek - Kg 30,200.00
31 Paku Asbes - Kg 30,200.00
32 Paku Beton - Kg 28,800.00
33 Sekrup fixer - Buah 1,800.00
34 Sekrup Steel Sheet - Buah 500.00
35 Sekrup Zincalume Buah 600.00
36 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm - Unit 4,600,000.00
37 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm - Unit 2,300,000.00
38 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm - Unit 1,725,000.00
39 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) - Unit 690,000.00
40 Kusen Alumunium - M' 80,500.00
G. BAHAN ATAP
1 Sirap belian - Lembar 5,800.00
2 Asbes - Lembar 59,300.00
3 Eternit - M² 74,800.00
4 Atap Metal 0,30 mm 2 Gelombang uk.70 x 80 cm - Lembar 44,900.00
5 Atap Metal 0,30 mm 4 Gelombang uk.120 x 80 cm - Lembar 82,300.00
6 Atap Metal 0,25 mm 2 Gelombang uk.70 x 80 cm - Lembar 39,100.00
7 Atap Metal 0,25 mm 4 Gelombang uk.120 x 80 cm - Lembar 75,900.00
8 Genteng Metal Type Prima 0.35 - Lembar 72,800.00
9 Genteng Metal Type Royal 0.35 - Lembar 72,800.00
1 2 3 4 5 6
10 Genteng Metal Type Classic 0.35 - Lembar 70,400.00
11 Genteng Metal Stone ( Type Classic 0.35 ) - Lembar 93,000.00
12 Genteng Metal Stone ( Type Prima 0.35 ) - Lembar 93,000.00
13 Atap Metal Supersheet 0.35 (polos) - M' 97,800.00
14 Atap Metal Supersheet 0.35 (polos) - M² 122,300.00
15 Atap Trim Deck 0.3 (polos) - M² 109,300.00
16 Atap Trim Deck 0.33 (color) - M² 122,800.00
17 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) - Buah 74,800.00
18 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) - Buah 92,000.00
19 Nok bubungan genteng metal kotak 0.35 - M' 89,300.00
20 Nok bubungan genteng metal stone kotak 0.35 - M' 105,800.00
21 Nok bubungan Trim Deck (polos) - M' 119,600.00
22 Nok bubungan Trim Deck (color) - M' 134,600.00
23 Nok bubungan Steel Sheet 0.33 (color) (pj 50 cm) - M' 48,300.00
24 Nok bubungan Steel Sheet 0.43 (color) (pj 50 cm) - M' 55,200.00
25 Nok bubungan Steel Sheet 0.35 (polos) (pj 50 cm) - M' 44,900.00
26 Nok bubungan Steel Sheet 0.40 (polos) (pj 50 cm) - M' 48,300.00
27 Seng Gelombang Bjls 30 - Lembar 74,700.00
28 Seng Gelombang Bjls 20 - Lembar 53,800.00
29 Seng Plat Bjls 20 - Lembar 55,200.00
30 Seng Plat Bjls 30 - Lembar 74,800.00
31 Seng Plat Bjls 30 (lebar 45 cm) - M' 21,900.00
32 Plat Datar Color 0.35 - Lembar 63,300.00
33 Zincalume Gelombang Persegi 0.35 (polos) - M² 131,300.00
34 Zincalume Gelombang Persegi 0.30 (polos) - M² 115,500.00
35 Zincalume Gelombang Persegi 0.35 (color) - M² 147,100.00
36 Zincalume Gelombang Persegi 0.30 (color) - M² 131,300.00
37 Zincalume Plat 0.2 - Lembar 136,900.00
38 Aluminium Foil - M² 57,500.00
39 Atap Steel Sheet 0.33 (color) - M² 121,800.00
40 Atap Steel Sheet 0.40 (polos) - M² 121,800.00
41 Alumunium Plat BJLS 0,25 - Lembar 55,200.00
42 Alumunium Plat BJLS 0,30 - Lembar 61,000.00
43 Atap Fiberglass Gelombang - Lembar 57,500.00
44 Atap Plastik Gelombang - Lembar 57,500.00
H. BAHAN KACA
1 Kaca Bening uk 12 mm - M² 575,000.00
2 Kaca Bening uk. 5 mm - M² 126,500.00
3 Kaca Bening uk. 3 mm - M² 107,600.00
4 Kaca Bening uk. 2 mm - M² 74,800.00
5 Kaca Rayban uk. 5 mm - M² 153,000.00
6 Kaca Rayban uk. 3 mm - M² 120,800.00
7 Kaca Cermin uk. 2 mm - M² 241,500.00
8 Kaca Patri - M² 2,875,000.00
9 Nako + Bingkai (80 x 15) x 10 daun polos - Buah 266,800.00
10 Nako + Bingkai (80 x 15) x 10 daun rayben - Buah 294,400.00
11 Kaca Es - M² 174,800.00
I. BAHAN TRIPLEK
1 Triplek t uk 3 mm - Lembar 63,300.00
2 Triplek t uk 6 mm - Lembar 139,200.00
3 Triplek t uk 9 mm - Lembar 172,500.00
4 Multiplek t uk 10 mm - Lembar 195,500.00
5 Multiplek t uk 12 mm - Lembar 232,300.00
6 Poliwood uk 3 mm x 122 cm x 244 cm - Lembar 74,800.00
7 Poliwood 4' x 8' x 4mm - Lembar 114,400.00
8 Teak Wood - Lembar 103,500.00
9 Papan GRC uk 3 mm x 122 cm x 244 cm - Lembar 54,100.00
10 Papan GRC uk 4 mm x 122 cm x 244 cm - Lembar 59,800.00
11 Panel GRC 120 x 240 x 40 - Lembar 67,900.00
12 Gypsum Board uk. 9 x 120 x 240 cm - Lembar 62,100.00
13 Tepung Gypsum - Kg 5,800.00
14 Asbes Polos uk. 1 m x 1 m - Lembar 20,200.00
J. BAHAN SANITASI
1 Kloset duduk monoblok - Buah 1,782,500.00
2 Kloset duduk putih (setaraf TOTO) - Buah 2,242,500.00
3 Kloset duduk warna (setaraf TOTO) - Buah 2,449,500.00
4 Kloset jongkok (setaraf TOTO) - Buah 213,900.00
5 Kloset jongkok (setaraf INA) - Buah 143,800.00
6 Wastafel Alumunium - Buah 195,500.00
7 Wastafel Keramik - Buah 287,500.00
8 Bak Cuci Stainles 1 Lubang - Buah 184,000.00
9 Bak Cuci Stainles 2 lubang - Buah 379,500.00
10 Keran air 1/2" (RRC) - Buah 28,800.00
11 Keran air 1/2" (Lokal) - Buah 15,000.00
12 Seal Tape - Buah 2,300.00
13 Lem PVC - Tube 6,900.00
14 Floor Drain - Buah 9,200.00
15 Pipa GIV Dia 1/2" Panjang 6 m - Batang 92,000.00
16 Pipa GIV Dia 3/4" Panjang 6 m - Batang 115,000.00
17 Pipa GIV Dia 1 " Panjang 6 m - Batang 143,800.00
18 Pipa GIV Dia 1 1/2" Panjang 6 m - Batang 230,000.00
19 Pipa GIV 2"/Btg - 6 M Tebal 1,8 - Batang 299,000.00
20 Pipa GIV 2"/Btg - 6 M Tebal 2 - Batang 494,500.00
21 Pipa GIV 3"/Btg - 6 M Tebal 2,3 - Batang 575,000.00
22 Pipa GIV 4"/Btg - 6 M Tebal 2,3 - Batang 920,000.00
23 Pipa Paralon PVC uk. 1/2" (AW) Panjang : 4 M - Batang 17,300.00
24 Pipa paralon PVC uk. 3/4" (AW)Panjang : 4 M - Batang 21,900.00
25 Pipa Paralon PVC uk.1" (AW) Panjang : 4 M - Batang 32,800.00
26 Pipa Paralon PVC uk.1.5" (AW) Panjang : 4 M - Batang 57,500.00
27 Pipa Paralon PVC uk.2" (AW) Panjang : 4 M - Batang 65,600.00
28 Pipa Paralon PVC uk.2.5" (AW) Panjang :4 M - Batang 103,500.00
29 Pipa Paralon PVC uk.3" (AW) Panjang : 4 M - Batang 132,300.00
30 Pipa Paralon PVC uk.4" (AW) Panjang : 4 M - Batang 218,500.00
31 Pipa Paralon PVC uk.5" (AW) Panjang : - Batang 310,500.00
32 Pipa Paralon PVC uk.6" (AW) Panjang : - Batang 425,500.00
33 Pipa Paralon PVC uk.1/2" ( C ) Panjang : 4 M - Batang 13,800.00
34 Pipa Paralon PVC uk.3/4" ( C ) Panjang : 4 M - Batang 19,000.00
35 Pipa Paralon PVC uk.1" ( C ) Panjang : 4 M - Batang 26,500.00
36 Pipa Paralon PVC uk.1.5" ( D ) Panjang : 4 M - Batang 28,800.00
37 Pipa Paralon PVC uk.2" ( D ) Panjang : 4 M - Batang 38,000.00
1 2 3 4 5 6
38 Pipa Paralon PVC uk.2.5" ( D ) Panjang : 4 M - Batang 51,800.00
39 Pipa Paralon PVC uk.3" ( D ) Panjang : 4 M - Batang 66,700.00
40 Pipa Paralon PVC uk.4" ( D ) Panjang : 4 M - Batang 102,400.00
41 Pipa Paralon PVC uk.5" ( D ) Panjang : 4 M - Batang 166,800.00
42 Pipa Paralon PVC uk.6" ( D ) Panjang : 4 M - Batang 402,500.00
43 Pipa S.12,5 PVC/RRJ Ø 150 MM/6 " Panjang : 6 M - Batang 970,000.00
44 Pipa S.12,5 PVC/RRJ Ø 100 MM/4 " Panjang : 6 M - Batang 453,100.00
45 Pipa S.12,5 PVC/RRJ Ø 75 MM/3 " Panjang : 6 M - Batang 310,800.00
46 Pipa S.12,5 PVC/RRJ Ø 50 MM/2 " Panjang : 6 M - Batang 149,900.00
47 ALL SOCKET TEE PVC/RRJ Ø 200 X 100 MM - Buah 1,885,500.00
48 ALL SOCKET TEE PVC/RRJ Ø 200 X 75 MM - Buah 1,915,700.00
49 ALL SOCKET TEE PVC/RRJ Ø 200 X 50 MM - Buah 2,106,700.00
50 ALL SOCKET TEE PVC/RRJ Ø 150 X 100 MM - Buah 942,600.00
51 ALL SOCKET TEE PVC/RRJ Ø 150 X 75 MM - Buah 904,200.00
52 ALL SOCKET TEE PVC/RRJ Ø 150 X 50 MM - Buah 853,400.00
53 ALL SOCKET TEE PVC/RRJ Ø 100 X 100 MM - Buah 463,000.00
54 ALL SOCKET TEE PVC/RRJ Ø 100 X 75 MM - Buah 432,800.00
55 ALL SOCKET TEE PVC/RRJ Ø 100 X 50 MM - Buah 409,300.00
56 ALL SOCKET TEE PVC/RRJ Ø 75 X 75 MM - Buah 293,700.00
57 ALL SOCKET TEE PVC/RRJ Ø 75 X 50 MM - Buah 265,700.00
58 ALL SOCKET TEE PVC/RRJ Ø 50 X 50 MM - Buah 169,600.00
59 ALL SOCKET REDUCER PVC/RRJ Ø 100 X 75 MM - Buah 143,800.00
60 ALL SOCKET REDUCER PVC/RRJ Ø 100 X 50 MM - Buah 107,400.00
61 ALL SOCKET REDUCER PVC/RRJ Ø 75 X 50 MM - Buah 81,100.00
62 ALL BELL BEND 90º PVC/RRJ Ø 150 MM - Buah 397,700.00
63 ALL BELL BEND 90º PVC/RRJ Ø 100 MM - Buah 156,900.00
64 ALL BELL BEND 90º PVC/RRJ Ø 75 MM - Buah 100,500.00
65 ALL BELL BEND 90º PVC/RRJ Ø 50 MM - Buah 49,200.00
66 ALL BELL BEND 45º PVC/RRJ Ø 150 MM - Buah 380,500.00
67 ALL BELL BEND 45º PVC/RRJ Ø 100 MM - Buah 156,700.00
68 ALL BELL BEND 45º PVC/RRJ Ø 75 MM - Buah 100,500.00
69 ALL BELL BEND 45º PVC/RRJ Ø 50 MM - Buah 49,200.00
70 ALL BELL BEND 22,5º PVC/RRJ Ø 150 MM - Buah 296,900.00
71 ALL BELL BEND 22,5º PVC/RRJ Ø 100 MM - Buah 146,800.00
72 ALL BELL BEND 22,5º PVC/RRJ Ø 75 MM - Buah 93,000.00
73 ALL BELL BEND 22,5º PVC/RRJ Ø 50 MM - Buah 39,300.00
74 DOP PVC/RRJ Ø 150 MM - Buah 251,900.00
75 DOP PVC/RRJ Ø 100 MM - Buah 154,800.00
76 DOP PVC/RRJ Ø 75 MM - Buah 78,000.00
77 DOP PVC/RRJ Ø 50 MM - Buah 43,300.00
78 FLANGE SOCKET PVC/RRJ Ø 150 MM - Buah 571,500.00
79 FLANGE SOCKET PVC/RRJ Ø 100 MM - Buah 314,900.00
80 FLANGE SOCKET PVC/RRJ Ø 75 MM - Buah 237,300.00
81 FLANGE SOCKET PVC/RRJ Ø 50 MM - Buah 169,300.00
82 FLANGE SPIGOT PVC/RRJ Ø 150 MM - Buah 480,500.00
83 FLANGE SPIGOT PVC/RRJ Ø 100 MM - Buah 238,600.00
84 FLANGE SPIGOT PVC/RRJ Ø 75 MM - Buah 179,600.00
85 FLANGE SPIGOT PVC/RRJ Ø 50 MM - Buah 126,700.00
86 FLANGE LAS (STELL) 150 MM - Buah 146,000.00
87 FLANGE LAS (STELL) Ø 100 MM - Buah 74,800.00
88 FLANGE LAS (STELL) Ø 75 MM - Buah 63,900.00
89 FLANGE LAS (STELL) Ø 50 MM - Buah 47,600.00
90 SPIGOT BEND 45º (SP) Ø 150 MM - Buah 250,800.00
91 SPIGOT BEND 45º (SP) Ø 100 MM - Buah 109,300.00
92 SPIGOT BEND 45º (SP) Ø 75 MM - Buah 63,000.00
93 SPIGOT BEND 45º (SP) Ø 50 MM - Buah 40,000.00
94 GIBOULT JOINT (CI) Ø 150 MM - Buah 528,800.00
95 GIBOULT JOINT (CI) Ø 100 MM - Buah 340,900.00
96 GIBOULT JOINT (CI) Ø 75 MM - Buah 269,500.00
97 GIBOULT JOINT (CI) Ø 50 MM - Buah 174,000.00
98 ALL FLANGE GATE VALVE (CI) Ø 150 MM - Buah 2,201,100.00
99 ALL FLANGE GATE VALVE (CI) Ø 100 MM - Buah 1,062,600.00
100 ALL FLANGE GATE VALVE (CI) Ø 75 MM - Buah 829,200.00
101 ALL FLANGE GATE VALVE (CI) Ø 50 MM - Buah 591,400.00
102 AIR RELIEF VALVE (CI) Ø 100 MM - Buah 1,518,000.00
103 AIR RELIEF VALVE (CI) Ø 75 MM - Buah 1,889,800.00
104 AIR RELIEF VALVE (CI) Ø 50 MM - Buah 1,410,500.00
105 Piber Glas 0,5 M3 - Buah 822,300.00
106 Piber Glas 1 M3 - Buah 1,201,800.00
107 Piber Glas 1,5 M3 - Buah 2,087,300.00
108 Piber Glas 2 M3 - Buah 2,340,300.00
109 Piber Glas 3 M3 - Buah 3,415,500.00
110 Meteran Air Ø 16 mm - Unit 316,300.00
111 Ball Valve Ø 16 mm - Buah 20,700.00
112 Double Niple GI Ø 16 mm - Buah 6,300.00
113 F. Elbouw PVC Ø 16 mm - Buah 11,300.00
114 Elbouw PVC Ø 16 mm - Buah 4,100.00
115 Reducer PVC Ø 20 x 16 mm - Buah 5,800.00
116 DOV PVC Ø 16 mm - Buah 2,100.00
K. BAHAN MINYAK
1 Minyak Tanah Non Subsidi M 065 Liter 9,200.00
2 Minyak Diesel/Solar M 183 Liter 4,500.00
3 Minyak Diesel/Solar Industri M 183 Liter 8,100.00
4 Bensin Premium M 184 Liter 4,500.00
5 Minyak Pelumas M 185 Liter 26,250.00
6 Grease - Kg 47,250.00
7 Oli BEO 154W40/Cat - Liter 48,980.00
8 Gas Elpiji - Kg 8,710.00
9 Alat-alat bantu M.170 Set 59,850.00
10 Sewa Alat Untuk Pengelasan - Jam 65,620.00
11 Sewa Molen - Set 157,500.00
12 Sewa kuali termasuk angkutan - Set 66,460.00
1 2 3 4 5 6
M. TANAMAN HIAS
1 Palm Ponik - Batang 45,400.00
2 Palm Raja 2,5 m - Batang 130,600.00
3 Palm Raja 2 m - Batang 171,900.00
4 Palm Raja 1 m - Batang 268,000.00
5 Palm Raja 1,5 m - Batang 364,300.00
6 Palm Raja 0,5 m - Batang 391,700.00
7 Palm Ekor Tupai 2,5 m - Batang 254,300.00
8 Palm Ekor Tupai 2 m - Batang 426,200.00
9 Palm Ekor Tupai 1 m - Batang 446,700.00
10 Palm Ekor Tupai 0,5 m - Batang 556,600.00
11 Palm Kamdoria 1 m - Batang 158,000.00
12 Palm Kamdoria - Batang 89,300.00
13 Palm Putri 1,5 m - Batang 364,300.00
14 Serut 2 m - Batang 4,129,900.00
15 Serut 1,5 m - Batang 2,755,500.00
16 Serut 1 m - Batang 1,367,500.00
17 Cemara Udang 2 m - Batang 4,129,900.00
18 Cemara Udang 1,5 m - Batang 2,755,500.00
19 Cemara Udang 1 m - Batang 1,367,500.00
20 Cemara Tiang 2 m - Batang 226,800.00
1 2 3 4 5 6
21 Cemara Tiang 1,5 m - Batang 171,900.00
22 Cemara Tiang 1 m - Batang 130,600.00
23 Cemara Mas 80 cm - Batang 364,300.00
24 Cemara Mas 50 cm - Batang 116,900.00
25 Cemara Norflok 70 cm - Batang 116,900.00
26 Cemara Norflok 1 m - Batang 199,300.00
27 Cemara Pinus 1,5 m - Batang 226,800.00
28 Cemara Pinus 1 m - Batang 144,300.00
29 Bougenvil - Batang 158,000.00
30 Nolima 2 m - Batang 900,300.00
31 Nolima 1 m - Batang 446,700.00
32 Sirlon 120 cm - Batang 309,200.00
33 Sirlon 60 cm - Batang 97,600.00
34 Tri Color - Batang 41,200.00
35 Asoka - Batang 20,600.00
36 Sambangdara - Batang 61,800.00
37 Pedang - Pedangan - Batang 17,200.00
38 Ki Hujan Bongkol - Batang 158,000.00
39 Ki Hujan Bulat - Batang 28,200.00
40 Nusa Indah - Batang 15,100.00
41 Sikas 1 m - Batang 1,931,000.00
42 Sikas 50 cm - Batang 1,243,800.00
43 Sikas 30 cm - Batang 625,300.00
44 Agave - Batang 96,200.00
45 Wali Songo - Batang 762,800.00
46 Lantana - Batang 12,400.00
47 Rambusa - Batang 48,100.00
48 Miramta - Batang 20,600.00
49 Asam Keranji - Batang 27,500.00
50 Heli Konia - Batang 13,800.00
51 Song Of India - Batang 61,800.00
52 Beringin Korea - Batang 3,030,400.00
53 Tombak Raja - Batang 254,300.00
54 Pandan Bali Persit - Batang 391,700.00
55 Pandan Bali Cabang - Batang 762,800.00
56 Pandan Kuning - Batang 19,200.00
57 Tanjung 1 m - Batang 17,900.00
58 Tanjung 2 m - Batang 96,200.00
59 Tanjung 3 m - Batang 226,800.00
60 Sapu Tangan 2 m - Batang 130,600.00
61 Kasia Golden 1,5 m - Batang 110,000.00
62 Rumput Golf - M2 24,100.00
63 Rumput Manila - M2 27,500.00
64 Puring - Batang 23,400.00
65 Melati Kosta - Batang 110,000.00
66 Anggrek Tanah - Batang 19,200.00
67 Lili Bombai - Batang 20,600.00
68 Lili Bakung - Batang 19,200.00
69 Lili Paris Putih - Batang 15,100.00
70 Nanas Merah - Batang 27,500.00
71 Amander - Batang 20,600.00
72 Puring Z - Batang 27,500.00
73 Anjuang - Batang 13,800.00
74 Pakis Kelabang - Batang 13,800.00
75 Lidah Mertua - Batang 13,800.00
76 Lapender - Batang 20,600.00
77 Batavia - Batang 27,500.00
78 Sambang Dara - Batang 34,300.00
79 Pillo Denrum - Batang 20,600.00
80 Evorria - Batang 27,500.00
81 Bayam - bayaman - Batang 11,000.00
82 Aglonema Lokal - Batang 34,300.00
83 Katus Kodok - Batang 12,400.00
84 Kipranrus - Batang 34,300.00
85 Siklok Besar - Batang 116,800.00
86 Siklok Kecil - Batang 61,800.00
87 Helokomin - Batang 13,800.00
88 Pisang Betet - Batang 20,600.00
89 Kana - Batang 13,800.00
90 Adenium - Batang 75,600.00
91 Bromedia - Batang 13,800.00
92 Echinacea/pucuk merah 50 cm - Batang 57,500.00
O. LAIN-LAIN
1 Pintu Air Sorong Uk. 0,40 s/d 0,60 m - Unit 2,300,000.00
2 Pintu Air Ulir Uk. 0,60 s/d 0,80 m - Unit 4,830,000.00
3 Pintu Air Ulir Uk. 0,90 s/d 1,20 m - Unit 5,175,000.00
4 Gorong2 Beton 60 cm Tanpa Tulang M 031 M1 287,500.00
5 Gorong2 Beton 80 cm Tanpa Tulang M 033 M1 402,500.00
6 Gorong2 Beton 100 cm Tanpa Tulang M 035 M1 517,500.00
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
2 P.Ps. 02 1m1 Pengukuran dan Pemasangan Bouwplank (P.Ps. 02) Acuan : SNI : 2001 - 2002 (6.4) Rp 84,217.30
3 P.Ps. 03 1m2 Membersihkan Lapangan dan Perataan (P.Ps. 03) Acuan : SNI : 2001 - 2002 (6.8) Rp 17,500.00
4 P.Ps. 03.a 1m2 Membersihkan Lapangan (P.Ps. 03.a) Acuan : SNI : 2001 - 2002 (6.8) Rp 2,181.82
2 P.T. 02 Menggali 1m3 Tanah Biasa sedalam 2 meter (P.T. 02) Acuan : SNI 2835:2008 (6.2) Rp 64,350.00
3 P.T. 03 Menggali 1m3 Tanah Biasa sedalam 3 meter (P.T. 03) Acuan : SNI 2835:2008 (6.3) Rp 78,410.00
4 P.T. 04 Menggali 1m3 Tanah Keras sedalam 1 meter (P.T. 04) Acuan : SNI 2835:2008 (6.4) Rp 67,360.00
5 P.T. 05 Menggali 1m3 Tanah Cadas sedalam 1 meter (P.T. 05) Acuan : SNI 2835:2008 (6.5) Rp 103,800.00
6 P.T. 06 Menggali 1m3 Tanah Lumpur sedalam 1 meter (P.T. 06) Acuan : SNI 2835:2008 (6.6) Rp 82,350.00
7 P.T. 07 Mengerjakan 1m2 Stripping Tebing setinggi 1 meter (P.T. 07) Acuan : SNI 2835:2008 (6.7) Rp 4,150.00
8 P.T. 08 Membuang 1m3 Tanah Sejauh 30 meter (P.T. 08) Acuan : SNI 2835:2008 (6.8) Rp 22,100.00
9 P.T. 09 Mengurug Kembali 1m3 Galian (P.T. 09) Acuan : SNI 2835:2008 (6.9) Rp 16,916.67
10 P.T. 10 Memadatkan 1m3 Tanah (per 20 cm) (P.T. 10) Acuan : SNI 2835:2008 (6.10) Rp 41,500.00
11 P.T. 11 Mengurug 1m3 Pasir Urug (P.T. 11) Acuan : SNI 2835:2008 (6.11) Rp 193,100.00
2 P.PB. 02 Memasang 1m3 Pondasi Batu Belah, Campuran 1 PC : 4 PP (P.PB. 02) Acuan : SNI 2836:2008 (6.2) Rp 666,850.00
Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.7)
6 P.BB. 05 Rp 2,415,678.22
= 0,58 (P.BB. 05)
7 P.BB. 05.a Membeli dan Mengerjakan 1m3 Beton Ready Mix K 225 (P.BB. 05.a) Acuan : SNI DT 91-0008-2007 Rp 1,111,195.00
Membuat 1m3 Beton Mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.8)
8 P.BB. 06 Rp 1,052,702.82
= 0,56 (P.BB. 06)
Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.10)
9 P.BB. 07 Rp 1,090,041.92
= 0,52 (P.BB. 07)
10 P.BB. 07.a Membeli dan Mengerjakan 1m3 Beton Ready Mix K 300 (P.BB. 07.a) Acuan : SNI DT 91-0008-2007 Rp 1,203,195.00
11 P.BB. 08 Pembesian 10 Kg dengan Besi Polos atau Ulir (P.BB. 08) Acuan : SNI 7394:2008 (6.17) Rp 17,914.50
12 P.BB. 09 Memasang 10 Kg Jaring Kawat Baja/Wire Mesh (P.BB. 09) Acuan : SNI 7394:2008 (6.19) Rp 16,950.50
13 P.BB. 10 Memasang 1m2 Bekisting untuk Pondasi (P.BB. 10) Acuan : SNI 7394:2008 (6.20) Rp 170,594.00
14 P.BB. 10.A Memasang 1m2 Bekisting untuk Pondasi (P.BB. 10.a) Acuan : SNI 7394:2008 (6.20) Rp 167,182.10
15 P.BB. 11 Memasang 1m2 Bekisting untuk Sloof (P.BB. 11) Acuan : SNI 7394:2008 (6.21) Rp 183,035.00
16 P.BB. 12 Memasang 1m2 Bekisting untuk Kolom (P.BB. 12) Acuan : SNI 7394:2008 (6.22) Rp 262,517.00
17 P.BB. 12.b Memasang 1m2 Bekisting untuk Kolom (P.BB. 12.b) Acuan : SNI 7394:2008 (6.22) Rp 250,862.00
18 P.BB. 12.a Memasang 1m2 Bekisting untuk Kolom (P.BB. 12.a) Acuan : SNI 7394:2008 (6.22) Rp 270,136.50
19 P.BB. 12.c Memasang 1m2 Bekisting untuk Kolom (P.BB. 12.c) Acuan : SNI 7394:2008 (6.22) Rp 283,955.20
19 P.BB. 13 Memasang 1m2 Bekisting untuk Balok (P.BB. 13) Acuan : SNI 7394:2008 (6.23) Rp 305,327.40
20 P.BB. 13.a Memasang 1m2 Bekisting untuk Balok (P.BB. 13.a) Acuan : SNI 7394:2008 (6.23) Rp 358,205.20
21 P.BB. 13.b Memasang 1m2 Bekisting untuk Balok (P.BB. 13.b) Acuan : SNI 7394:2008 (6.23) Rp 293,672.40
22 P.BB. 14 Memasang 1m2 Bekisting untuk Lantai (P.BB. 14) Acuan : SNI 7394:2008 (6.24) Rp 339,281.00
23 P.BB. 14.a Memasang 1m2 Bekisting untuk Lantai (P.BB. 14.a) Acuan : SNI 7394:2008 (6.24) Rp 414,655.20
24 P.BB. 15 Memasang 1m2 Bekisting untuk Tangga (P.BB. 15) Acuan : SNI 7394:2008 (6.26) Rp 272,395.00
25 P.BB. 16 Memasang 1m2 Jembatan untuk Pengecoran Beton (P.BB. 16) Acuan : SNI 7394:2008 (6.27) Rp 90,875.04
Membuat 1m3 Pondasi Beton Bertulang (150 kg besi + bekisting) (P.BB. Acuan : SNI 7394:2008 (6.28)
26 P.BB. 17 Rp 4,483,718.00
17)
27 P.BB. 18 Membuat 1m3 Sloof Beton Bertulang (200 kg besi + bekisting) (P.BB. 18) Acuan : SNI 7394:2008 (6.29) Rp 5,589,075.00
29 P.BB. 20 Membuat 1m3 Balok Beton Bertulang (200 kg besi + bekisting) (P.BB. 20) Acuan : SNI 7394:2008 (6.31) Rp 6,908,492.00
30 P.BB. 21 Membuat 1m3 Plat Beton Bertulang (150 kg besi + bekisting) (P.BB. 21) Acuan : SNI 7394:2008 (6.32) Rp 6,035,346.00
32 P.BB. 24 Membuat 1m' Kolom Praktis Beton Bertulang (11 x 11) cm (P.BB. 24) Acuan : SNI 7394:2008 (6.35) Rp 87,559.90
34 P.BB. 25 Membuat 1m' Ring Balok Beton Bertulang (10 x 15) cm (P.BB. 25) Acuan : SNI 7394:2008 (6.36) Rp 106,615.80
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
E P.Dnd. PEKERJAAN DINDING
Acuan : ABK Bangunan Gedung dan
1 P.D.nd. 01 Memasang 1m2 Dinding Batako 7 cm x 15 cm x 30 cm (P.Dnd. 01) Perumahan 6.20 Rp 103,389.00
2 P.Pls. 02 Memasang 1m2 Plesteran 1 PC : 3 PP, Tebal 15 mm (P.Pls.02) Acuan : SNI 2837:2008 (6.3) Rp 65,175.94
3 P.Pls. 03 Memasang 1m2 Plesteran 1 PC : 4 PP, Tebal 15 mm (P.Pls. 03) Acuan : SNI 2837:2008 (6.4) Rp 61,427.64
4 P.Pls. 04 Memasang 1m2 Plesteran 1 PC : 5 PP, Tebal 15 mm (P.Pls. 04) Acuan : SNI 2837:2008 (6.5) Rp 59,043.62
5 P.Pls. 05 Memasang 1m2 Plesteran 1 PC : 2 PP, Tebal 20 mm (P.Pls. 05) Acuan : SNI 2837:2008 (6.13) Rp 61,493.00
P.Pls. 05.a Memasang 1m2 Plesteran tekstur (P.Pls. 05.a) Acuan : SNI 2837:2008 (6.13) Rp 95,099.75
6 P.Pls. 06 Memasang 1m2 Plesteran 1 PC : 3 PP, Tebal 20 mm (P.Pls.06) Acuan : SNI 2837:2008 (6.14) Rp 48,727.00
7 P.Pls. 07 Memasang 1m2 Plesteran 1 PC : 4 PP, Tebal 20 mm (P.Pls. 07) Acuan : SNI 2837:2008 (6.15) Rp 54,100.00
8 P.Pls. 08 Memasang 1m2 Berapen 1 PC : 5 PP, Tebal 15 mm (P.Pls. 08) Acuan : SNI 2837:2008 (6.19) Rp 25,011.00
9 P.Pls. 09 Memasang 1m2 Skoning 1 PC : 2 PP, Tebal 10 mm (P.Pls. 09) Acuan : SNI 2837:2008 (6.20) Rp 35,725.00
11 P.Pls. 11 Memasang 1m2 Acian (P.Pls. 11) Acuan : SNI 2837:2008 (6.27) Rp 36,292.00
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air
Acuan : Harga Satuan Bahan, Upah dan
2 P.K. 02 Pada Barau, Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Analisa Biaya Pekerjaan BOW - F.3 Rp 12,402,400.00
Menggunakan Kayu Belian Uk. 10/10 (P.K. 02)
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air
Acuan : Harga Satuan Bahan, Upah dan
3 P.K. 03 Pada Barau, Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Analisa Biaya Pekerjaan BOW - F.3 Rp 14,173,400.00
Menggunakan Kayu Belian Uk. 12/12 - 15/15 (P.K. 03)
1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air
Acuan : Harga Satuan Bahan, Upah dan
4 P.K. 04 Pada Barau, Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Analisa Biaya Pekerjaan BOW - F.3 Rp 10,758,890.00
Menggunakan Kayu Belian Uk. 18/18 - 20/20 (P.K. 04)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu
13 P.K. 12 Acuan : SNI 3434:2008 (6.1) Rp 9,611,850.00
Kelas I (P.K. 12)
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu
14 P.K. 12.a Acuan : SNI 3434:2008 (6.1) Rp 17,027,830.00
Belian (P.K. 12.a)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu
15 P.K. 13 Acuan : SNI 3434:2008 (6.2) Rp 6,195,675.00
Kelas II (P.K. 13)
16 P.K. 14 Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas I (P.K. 14) Acuan : SNI 3434:2008 (6.5) Rp 771,964.00
P.K. 14.i Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu belian (P.K. 14.i) Acuan : SNI 3434:2008 (6.5) Rp 1,760,032.00
Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas II (P.K.
17 P.K. 14.a Acuan : SNI 3434:2008 (6.5) Rp 511,814.00
14.a)
Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas I
18 P.K. 15 Acuan : SNI 3434:2008 (6.7) Rp 798,653.20
(P.K. 15)
Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas II
19 P.K. 15.a Acuan : SNI 3434:2008 (6.7) Rp 795,165.20
(P.K. 15.a)
23 P.K. 18 Membuat 1m2 Jalusi Kusen, Kayu Kelas I (P.K. 18) Acuan : SNI 3434:2008 (6.10) Rp 681,963.00
24 P.K. 18.a Membuat 1m2 Jalusi Kusen, Kayu Kelas II (P.K. 18.a) Acuan : SNI 3434:2008 (6.10) Rp 678,693.00
1m2 Pemasangan Ventilasi Kaca. Setiap luas 1 m2 bidang daun ventilasi, Acuan : Harga Satuan Bahan, Upah dan
25 P.K. 19 Rp 340,370.00
luas kacanya adalah 0.60 m2 (P.K. 19) Analisa Biaya Pekerjaan BOW - F.37.c
28 P.K. 21 Memasang 1m3 Konstruksi Kuda-kuda Expose, Kayu Kelas I (P.K. 21) Acuan : SNI 3434:2008 (6.14) Rp 8,375,010.00
29 P.K. 22 Memasang 1m3 Konstruksi Gordeng, Kayu Kelas II (P.K. 22) Acuan : SNI 3434:2008 (6.15) Rp 7,073,930.00
30 P.K. 22.a Memasang 1m3 Konstruksi Gordeng, Kayu Kelas I (P.K. 22.a) Acuan : SNI 3434:2008 (6.15) Rp 6,653,660.00
31 P.K. 22.b Memasang 1m3 Konstruksi Gordeng, Kayu Belian (P.K. 22.b) Acuan : SNI 3434:2008 (6.15) Rp 13,305,910.00
32 P.K. 23 Memasang 1m2 Rangka Atap Genteng Keramik, Kayu Kelas II (P.K. 23) Acuan : SNI 3434:2008 (6.16) Rp 78,212.08
33 P.K. 24 Memasang 1m2 Rangka Atap Genteng Beton, Kayu Kelas II (P.K. 24) Acuan : SNI 3434:2008 (6.17) Rp 86,458.96
34 P.K. 25 Memasang 1m2 Rangka Atap Sirap, Kayu Kelas II (P.K. 25) Acuan : SNI 3434:2008 (6.18) Rp 649,069.50
Memasang 1m2 Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau
37 P.K. 28 Acuan : SNI 3434:2008 (6.19) Rp 96,064.22
III (P.K. 28)
Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III Acuan : SNI 3434:2008 (6.20)
38 P.K. 29 Rp 121,147.89
(P.K. 29)
Acuan : ABK Bangunan Gedung dan
39 P.K. 30 1m2 Pasang Rangka Langit-langit (30 x 60)cm Kayu Kelas II (P.K. 30) Perumahan - 6.41 Rp 124,267.90
41 P.K. 32 Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas I (P.K. 32) Acuan : SNI 3434:2008 (6.21) Rp 107,828.04
42 P.K. 32.a Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas II (P.K. 32.a) Acuan : SNI 3434:2008 (6.21) Rp 107,239.44
50 P.K. 38 Memasang 1m2 Dinding Lambriziring dari Papan Kayu Kelas I (P.K. 38) Acuan : SNI 3434:2008 (6.26) Rp 232,584.10
51 P.K. 38.a Memasang 1m2 Dinding Lambriziring dari Papan Kayu Belian (P.K. 38.a) Acuan : SNI 3434:2008 (6.26) Rp 301,547.90
1m1 Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m1 (P.PA. Acuan : Harga Satuan Bahan, Upah dan
7 P.PA. 07 Rp 69,319.36
07) Analisa Biaya Pekerjaan BOW - H.10
1m1 Pasang Nok / Bumbungan Genteng Metal 1/2 Lingkaran 0.35 (P.PA. Acuan : ABK Bangunan Gedung dan
8 P.PA. 08 Rp 213,555.00
08) Perumahan - 6.36
1m1 Pasang Nok / Bumbungan Genteng Metal Stone Kotak 0.35 (P.PA. Acuan : ABK Bangunan Gedung dan
10 P.PA. 10 Rp 105,965.00
10) Perumahan - 6.36
4 P.Pf. 04 Memasang 1 m2 Langit - Langit Lambrizing Kayu, Tebal 9 mm (P.Pf. 04) Acuan : SNI 2839:2008 (6.6) Rp 107,289.50
6 P.Pf. 06 Memasang 1 m1 List Plafond Gypsum Profil (P.Pf.06) Acuan : SNI 2839:2008 (6.8) Rp 36,510.00
7 P.Pf. 07 Memasang 1 m' list langit-langit kayu profil (P.Pf. 07) Acuan : SNI 2839:2008 (6.10) Rp 27,635.00
2 P.Snt. 02 Pemasangan Kloset Jongkok Keramik (P.Snt. 02) Acuan : SNI : 2001 - 2002 (6.2) Rp 1,088,680.00
3 P.Snt. 03 Pemasangan Wastafel (P.Snt. 03) Acuan : SNI : 2001 - 2002 (6.5) Rp 1,195,337.28
4 P.Snt. 04 Memasang 1m1 Pipa Galvanis Ø 1/2" (P.Snt. 04) Acuan : SNI : 2001 - 2002 (6.19) Rp 35,106.67
5 P.Snt. 05 Memasang 1m1 Pipa Galvanis Ø 3/4" (P. Snt. 05) Acuan : SNI : 2001 - 2002 (6.20) Rp 41,048.33
6 P.Snt. 06 Memasang 1m1 Pipa Galvanis Ø 1" (P.Snt. 06) Acuan : SNI : 2001 - 2002 (6.21) Rp 48,488.33
7 P.Snt. 07 Memasang 1m1 Pipa Galvanis Ø 11/2" (P.Snt. 07) Acuan : SNI : 2001 - 2002 (6.22) Rp 78,694.67
8 P.Snt. 08 Memasang 1m1 Pipa Galvanis Ø 3" (P.Snt. 08) Acuan : SNI : 2001 - 2002 (6.23) Rp 167,819.67
9 P.Snt. 09 Memasang 1m1 Pipa Galvanis Ø 4" (P.Snt. 09) Acuan : SNI : 2001 - 2002 (6.24) Rp 261,767.67
10 P.Snt. 10 Memasang 1m1 Pipa PVC Tipe AW Ø 1/2" (P.Snt. 10) Acuan : SNI : 2001 - 2002 (6.25) Rp 13,129.75
11 P.Snt. 11 Memasang 1m1 Pipa PVC Tipe AW Ø 3/4" (P.Snt. 11) Acuan : SNI : 2001 - 2002 (6.26) Rp 14,912.25
12 P.Snt. 12 Memasang 1m1 Pipa PVC Tipe AW Ø 1" (P.Snt. 12) Acuan : SNI : 2001 - 2002 (6.27) Rp 26,324.00
13 P.Snt. 13 Memasang 1m1 Pipa PVC Tipe AW Ø 2" (P.Snt. 13) Acuan : SNI : 2001 - 2002 (6.29) Rp 35,059.00
14 P.Snt. 14 Memasang 1m1 Pipa PVC Tipe AW Ø 3" (P.Snt. 14) Acuan : SNI : 2001 - 2002 (6.31) Rp 65,728.25
15 P.Snt. 15 Memasang 1m1 Pipa PVC Tipe AW Ø 4" (P.Snt. 15) Acuan : SNI : 2001 - 2002 (6.32) Rp 97,732.17
16 P.Snt. 16 Memasang 1 Buah Bak Cuci Piring Stainles Steel (P.Snt. 16) Acuan : SNI : 2001 - 2002 (6.33) Rp 502,855.00
17 P.Snt. 17 Memasang 1 Buah Kran Air Ø 3/4" atau Ø 1/2" (P.Snt. 17) Acuan : SNI : 2001 - 2002 (6.35) Rp 49,133.00
18 P.Snt. 18 Memasang 1 Buah Floor Drain (P.Snt. 18) Acuan : SNI : 2001 - 2002 (6.36) Rp 42,783.00
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
K P.BA PEKERJAAN BESI DAN ALUMUNIUM
1 P.BA. 01 Memasang 1 Kg Besi Profil (P.BA. 01) Acuan : SNI 7393:2008 (6.1) Rp 29,450.00
2 P.BA. 02 Memasang 1 Kg Rangka Kuda - Kuda Baja IWF (P.BA. 02) Acuan : SNI 7393:2008 (6.2) Rp 29,450.00
3 P.BA. 03 Mengerjakan 100 kg pekerjaan perakitan (P. BA 03) Acuan : SNI 7393:2008 (6.3) Rp 72,041.00
Membuat 1 M2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Acuan : SNI 7393:2008 (6.4)
4 P.BA. 04 Rp 922,720.00
(P.BA 04)
5 P.BA. 05 Mengerjakan 10 cm pengelasan dengan las listrik (P. BA 05) Acuan : SNI 7393:2008 (6.5) Rp 63,335.40
6 P.BA. 05.a Mengerjakan pengelasan dengan las listrik / Titik (P. BA 05.a) Acuan : SNI 7393:2008 (6.5) Rp 1,266.71
7 P.BA. 06 Memasang 1 m2 Pintu Rolling Door Besi (P.BA. 06) Acuan : SNI 7393:2008 (6.7)
8 P.BA. 07 Memasang 1 m2 Pintu Lipat (Folding Door) (P.BA. 07) Acuan : SNI 7393:2008 (6.8) Rp 632,420.00
9 P.BA. 08 Memasang 1 m2 Sunscreen Alluminium (P.BA. 08) Acuan : SNI 7393:2008 (6.9)
10 P.BA. 09 Memasang 1m Kusen Pintu Alluminium (P. BA. 09) Acuan : SNI 7393:2008 (6.11) Rp 112,766.00
11 P.BA. 10 Memasang 1 m2 Pintu Alluminum Strip Lebar 8 cm (P.BA. 10) Acuan : SNI 7393:2008 (6.12)
12 P.BA. 11 Memasang 1 m2 Pintu Kaca Rangka Alluminium (P.BA. 11) Acuan : SNI 7393:2008 (6.13)
13 P.BA. 12 Memasang 1 m2 Terali Besi Strip (2 x 3) mm (P.BA. 12) Acuan : SNI 7393:2008 (6.15)
14 P.BA. 13 Memasang 1 m2 Kawat Nyamuk Plastik (P.BA. 13) Acuan : SNI 7393:2008 (6.16) Rp 27,749.34
15 P.BA. 13.a Memasang 1 m2 Kawat Nyamuk Besi (P.BA. 13.a.) Acuan : SNI 7393:2008 (6.16)
18 P.BA. 16 Memasang 1 m2 Jendela Nako dan Tralis (P.BA. 16) Acuan : SNI 7393:2008 (6.17) Rp 318,950.00
19 P.BA. 17 Memasang 1 m1 Talang Datar / Jurai Alumunium BJLS 30 (P.BA. 17) Acuan : SNI 7393:2008 (6.18) Rp 152,014.50
Memasang 1m1 Talang 1/2 Lingkaran D-15 cm, Seng Plat BJLS 30 Lebar Acuan : SNI 7393:2008 (6.19)
20 P.BA. 18 Rp 99,579.00
45 cm (P.BA. 18)
Acuan : ABK Bangunan Gedung dan
21 P.BA. 19 1m2 Pasang Talang Datar Seng BJLS 30 / Talang Sembunyi (P.BA.19) Perumahan - 6.18 Rp 122,651.48
10m1 Pemasangan Pipa Pembuangan dari Talang Atap Ø 8cm BJLS 30 Acuan : Harga Satuan Bahan, Upah dan
24 P.BA. 22 Rp 46,470.00
(P.BA. 22) Analisa Biaya Pekerjaan BOW - H.18
2 P.LD. 02 Memasang 1m2 Lantai Keramik Ukuran (20 x 20) cm (P.LD. 02) Acuan : SNI 7395:2008 (6.36) Rp 292,034.40
1m2 Pasang Lantai Keramik 40 x 40cm Polished (setaraf Indogress) Acuan : ABK Bangunan Gedung dan
4 P.LD. 04 Rp 222,737.50
(P.LD. 04) Perumahan - 6.47
1m2 Pasang Lantai Keramik 40 x 40cm Polished (setaraf Decogress) Acuan : ABK Bangunan Gedung dan
5 P.LD. 04.a Rp 215,654.17
(P.LD. 04.a) Perumahan - 6.47
1m2 Pasang Lantai Keramik 40 x 40cm Unpolished (setaraf Indogress) Acuan : ABK Bangunan Gedung dan
6 P.LD. 05 Rp 239,508.33
(P.LD. 5) Perumahan - 6.47
1m2 Pasang Lantai Keramik 40 x 40cm Unpolished (setaraf Decogress) Acuan : ABK Bangunan Gedung dan
7 P.LD. 05.a Rp 217,529.17
(P.LD. 05.a) Perumahan - 6.47
8 P.LD. 06 Memasang 1m1 Plint Keramik Ukuran (10 x 20) cm (P.LD. 06) Acuan : SNI 7395:2008 (6.39)
9 P.LD. 07 Memasang 1m1 Plint Keramik Ukuran (10 x 10) cm (P.LD. 07) Acuan : SNI 7395:2008 (6.40)
10 P.LD. 08 Memasang 1m1 Plint Keramik Ukuran (5 x 20) cm (P.LD. 08) Acuan : SNI 7395:2008 (6.41)
11 P.LD. 09 Memasang 1 m2 lantai marmer ukuran (100 x 100) cm (P.LD. 09) Acuan : SNI DT 91-0012-2007 Rp 587,449.00
17 P.LD. 13 Memasang 1 m2 Floor Hardener (P.LD. 13) Acuan : SNI DT 91-0012-2007 Rp 59,160.00
20 P.LD. 16 Memasang 1m2 Dinding Porselen Ukuran (11 x 11) cm (P.LD. 16) Acuan : SNI 7395:2008 (6.48)
21 P.LD. 17 Memasang 1m2 Dinding Porselen Ukuran (10 x 20) cm (P.LD. 17) Acuan : SNI 7395:2008 (6.49) Rp 196,420.00
22 P.LD. 18 Memasang 1m2 Dinding Porselen Ukuran (20 x 20) cm (P.LD. 18) Acuan : SNI 7395:2008 (6.50) Rp 181,368.00
23 P.LD. 19 Memasang 1m2 Dinding Batu Paras (P.LD. 19) Acuan : SNI 7395:2008 (6.57) Rp 252,250.00
24 P.LD. 19.a Memasang 1m2 Dinding Batu Alam (P.LD. 19.a) Acuan : SNI 7395:2008 (6.57) Rp 340,800.00
25 P.LD. 20 Memasang 1m2 Dinding Batu Tempel Hitam (P.LD. 20) Acuan : SNI 7395:2008 (6.58) Rp 252,250.00
26 P.LD. 21 Memasang 1m2 Wall Paper, Lebar 50 cm (P.LD. 21) Acuan : SNI 7395:2008 (6.60)
1m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual Acuan : ABK Bangunan Gedung dan
2 P.Ct. 02 Rp 9,477.50
(P.Ct. 02) Perumahan - 6.3
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, Acuan : ABK Bangunan Gedung dan
4 P.Ct. 04 Rp 68,775.00
2Lapis Cat Penutup) (P.Ct. 04) Perumahan - 6.8
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, Acuan : ABK Bangunan Gedung dan
5 P.Ct. 05 Rp 45,883.00
3Lapis Cat Penutup) (P.Ct. 05) Perumahan - 6.9
1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Acuan : ABK Bangunan Gedung dan
11 P.Ct. 11 Rp 39,577.50
Lapis Cat Penutup) Dengan Cat Mutu Baik. (P.Ct. 11) Perumahan - 6.14
1m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Acuan : ABK Bangunan Gedung dan
12 P.Ct. 12 Rp 25,310.00
Penutup) Dengan Cat Mutu Baik. (P.Ct. 12) Perumahan - 6.15
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Acuan : ABK Bangunan Gedung dan
13 P.Ct. 13 1m2 Pengecatan Permukaan Baja dengan Meni Besi (P.Ct. 13) Perumahan - 6.20 Rp 20,816.00
1m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah Acuan : ABK Bangunan Gedung dan
14 P.Ct. 14 Rp 44,965.60
(P.Ct. 14) Perumahan - 6.21
11 P. Bkr. 08 1m3 Pekerjaan Bongkaran Pasangan Batu (P.Bkr. 08) Acuan : SNI 2835:2008 (6.5) Rp 86,700.00
PEMERINTAH KABUPATEN SEKADAU
DINAS PENDIDIKAN
Jalan Merdeka Timur Km.9 Telp (0564) - 2042020 Fax : (0564) - 2042028 Sekadau 79582
SEKADAU
KEGIATAN :
Rehabilitasi Jamban Siswa / Guru Beserta
Sanitasinya
PEKERJAAN :
REKAPITULASI
RENCANA ANGGARAN BIAYA
Harga Perkiraan Sendiri (HPS)
Kegiatan :
Rehabilitasi Jamban Siswa / Guru Beserta Sanitasinya
Pekerjaan :
Rehab Jamban SDN 18 Sungai Asam
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)
1 2 3
JUMLAH A Rp 100,000,457.79
:Diperiksa Disetujui
,Konsultan Perencana
Sekadau, Juni 2020
HARGA JUMLAH
NO URAIAN JENIS PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7
A PEKERJAAN PENDAHULUAN
1 Pekerjaan persiapan,pengukuran,pembersihan lokasi ---- 1.00 Lsm 1,500,000.00 1,500,000.00
TOTAL A 1,500,000.00
B PEKERJAAN BANGUNAN WC
I PEKERJAAN PONDASI
1 Pondasi Menerus Cor Beton Bertulang uk. 15/40 cm
a Galian Tanah P.T. 02 1.86 m3 64,350.00 119,691.00
b Lantai Kerja t = 5 cm P.BB. 03 0.23 m3 1,608,141.30 373,892.85
c Pasir Urug t = 10 cm P.T. 11 0.46 m3 193,100.00 89,791.50
d Cor Beton P.BB. 01 1.86 m3 1,667,264.86 3,101,112.63
e Tulangan Pokok Pondasi 6 D 12 P.BB. 08 165.54 kg 17,914.50 2,965,566.33
f Beugel D 8 - 150 mm P.BB. 08 81.63 kg 17,914.50 1,462,420.35
g Bekisting Pondasi (pemasangan lebih dari 1 kali) P.BB. 11 6.20 m2 183,035.00 1,134,817.00
IV PEKERJAAN DINDING
1 Dinding pasangan batako 7/15/30 cm P.D.nd. 01 36.61 m2 103,389.00 3,785,071.29
2 Plesteran dinding T.1,5 cm spesi 1:3 P.Pls. 02 52.01 m2 65,175.94 3,389,800.43
3 Keramik dinding uk.20 x 25 cm T = 150 cm P.LD. 10 21.21 m2 201,405.80 4,271,817.02
4 Pasangan Batako Untuk Bak Air P.D.nd. 01 2.94 m2 103,389.00 303,963.66
5 Keramik Bak Air Uk.20/25 cm Tinggi 70 cm P.LD. 10 2.94 m2 201,405.80 592,133.05
1 2 3 4 5 6 7
V PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II P.K. 29 29.11 m2 121,147.89 3,526,615.08
2 Plafond GRC P.Pf. 08 29.11 m2 49,792.20 1,449,450.94
3 List Plafond Profil Kayu P.Pf. 07 30.00 m' 27,635.00 829,050.00
VI PEKERJAAN ATAP
1 Rangka Kuda Kuda Kayu Klas II Uk. 8/8 P.K. 20.a 0.14 m3 7,918,530.00 1,093,137.23
2 Gording Kayu Klas II Uk. 8/8 P.K. 22 0.09 m3 7,073,930.00 642,878.76
3 Kasau Dan Reng Kayu Klas II P.K. 27 34.79 m2 69,707.20 2,425,113.49
4 Atap Genteng Metal P.PA. 03 34.79 m2 120,878.00 4,205,345.62
5 Lisplank Kayu Klas I P.K. 33 22.20 m1 151,406.95 3,361,234.29
IX PEKERJAAN ELEKTRIKAL
1 Lampu SL 9 Watt ---- 7.00 Buah 45,000.00 315,000.00
2 Saklar Ganda ---- 3.00 Buah 25,000.00 75,000.00
3 Saklar Tunggal ---- 1.00 Buah 25,000.00 25,000.00
4 Stop Kontak ---- 1.00 Buah 15,000.00 15,000.00
5 Fitting Lampu ---- 7.00 Buah 30,000.00 210,000.00
6 Kabel Listrik ---- 1.00 Roll 350,000.00 350,000.00
7 MCB ---- 1.00 Unit 50,000.00 50,000.00
8 Instalasi Listrik ---- 12.00 Titik 45,000.00 540,000.00
9 Genset ---- 1.00 Unit 2,000,000.00 2,000,000.00
X PEKERJAAN SANITASI
1 Closet Jongkok P.Snt. 02 3.00 Unit 1,088,680.00 3,266,040.00
2 Floor Drain - 3.00 Buah 27,283.00 81,849.00
3 Kran Air 3/4" - 3.00 Buah 33,283.00 99,849.00
4 Pipa Air Bersih 3/4" - 16.00 M1 7,000.00 112,000.00
5 Pipa Air Kotor 2" - 16.00 M1 14,500.00 232,000.00
6 Pipa Kotoran PVC 4" - 16.00 M1 47,333.33 757,333.33
C PEKERJAAN SEPTICTANK
1 Galian Tanah P.T. 01 11.25 m3 50,750.00 570,937.50
2 Rangka Kayu Belian Uk. 8/8 P.K. 06 0.28 m3 18,369,310.00 5,172,797.70
3 Pasangan batako 7/15/30 cm P.D.nd. 01 14.40 m2 103,389.00 1,488,801.60
4 Plesteran T.1,5 cm spesi 1:3 P.Pls. 02 2.40 m2 65,175.94 156,422.25
5 Cor Beton Lantai Atas
a Cor Beton K-100 P.BB. 01 0.50 m3 1,667,264.86 833,632.43
b Besi Polos D 6 - 150 mm P.BB. 08 16.50 kg 17,914.50 295,589.25
c Bekisting Lantai P.BB. 14.a 1.88 m2 414,655.20 777,478.50
6 Pipa Hawa 2" - 1.00 m1 14,500.00 14,500.00
TOTAL C 9,310,159.22
HARGA JUMLAH
NO URAIAN JENIS PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7
IV PEKERJAAN SANITASI
1 Tong Fiberglass 1,5 M3 ---- 2.00 buah 2,000,000.00 4,000,000.00
2 Sumur Bor + Pompa Air ---- 1.00 unit 2,000,000.00 2,000,000.00
3 Pipa Air Bersih 3/4" ---- 16.0 m1 7,000.00 112,000.00
4 Pipa Air 4" (Talang Untuk Air Hujan) ---- 9.03 m1 47,333.33 427,420.00
1 4 11 1.00 0.090
2 6 12 2.66 0.220
3 8 12 4.74 0.395
4 9 12 6.00 0.500
5 10 12 7.40 0.620 7.40 0.62
6 11 12 9.00 0.750
7 12 12 10.70 0.890
8 13 12 12.50 1.040 12.50 1.04
9 15 12 14.50 1.210
10 16 12 19.00 1.580
11 19 12 26.70 2.230 26.70 2.23
12 22 12 35.80 2.980 35.80 2.98
13 23 12 39.10 3.260
14 24 12 42.62 3.550
15 25 12 46.20 3.850 46.20 3.85
16 29 12 60.50 5.04
17 28 12 58.00 4.830
18 31 12 71.10 5.930
19 32 12 75.77 6.310 75.77 6.31
20 35 12 90.10 7.51
21 38 12 107.00 8.92
22 41 12 126.00 10.50
Spesifikasi
Spesification
Type
Penampang Jarak Panjang
Diameter Spacing Length
10 mm 150 mm 5,40 mm
M 10
10 mm 150 mm 2,10 mm
9 mm 150 mm 5,40 mm
M 9 / DM 9
9 mm 150 mm 2,10 mm
8 mm 150 mm 5,40 mm
M 8 / DM 8
8 mm 150 mm 2,10 mm
7 mm 150 mm 5,40 mm
M 7 / DM 7
7 mm 150 mm 2,10 mm
6 mm 150 mm 5,40 mm
M 6 / DM 6
6 mm 150 mm 2,10 mm
5 mm 150 mm 5,40 mm
M 5 / DM 5
5 mm 150 mm 2,10 mm
4 mm 150 mm 5,40 mm
M4
4 mm 150 mm 2,10 mm
Berat
Weight
Kg / lbr.
Kg / m2
Kg / Sheet
96.55
8.51
78.21
6.9
61.79
5.45
47.31
4.17
34.76
3.07
24.14
2.13
15.45
1.36
NO. URAIAN CACAH SATUAN PANJANG LEBAR
A PEKERJAAN PENDAHULUAN
1 Pekerjaan persiapan,pengukuran,pembersihan lokasi Lsm
B PEKERJAAN BANGUNAN WC
I PEKERJAAN PONDASI
1 Pondasi Menerus Cor Beton Bertulang uk. 15/40 cm
a Galian Tanah m3 5.50 0.15
2.50 0.15
1.50 0.15
b Lantai Kerja t = 5 cm m3 5.50 0.15
2.50 0.15
1.50 0.15
c Pasir Urug t = 10 cm m3 5.50 0.15
2.50 0.15
1.50 0.15
d Cor Beton m3 5.50 0.15
2.50 0.15
1.50 0.15
e Tulangan Pokok Pondasi 6 D 12 kg 5.50 1.00
2.50 1.00
1.50 1.00
f Beugel D 8 - 150 mm kg 1.00 1.00
1.00 1.00
1.00 1.00
g Bekisting Pondasi (pemasangan lebih dari 1 kali) m2 5.50 1.00
2.50 1.00
1.50 1.00
IV PEKERJAAN DINDING
1 Dinding pasangan batako 7/15/30 cm m2 1.40 1
1
LUAS PINTU 1.90 0.7
2 Plesteran dinding T.1,5 cm spesi 1:3 m2 1 1
3 Keramik dinding uk.20 x 25 cm T = 150 cm m2 1.40 1
LUAS PINTU 0.70 1
LUAS BAK 1
4 Pasangan Batako Untuk Bak Air m2 0.70 1
5 Keramik Bak Air Uk.20/25 cm Tinggi 70 cm m2 0.70 1
V PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II m2 5.5 2.5
kaki atap m2 7.1 0.8
m2 2.5 0.8
2 Plafond GRC m2 5.5 2.5
7.1 0.8
2.5 0.8
3 List Plafond Profil Kayu m' 1.50 1
4.50 1
1.50 1
VI PEKERJAAN ATAP
1 Rangka Kuda Kuda Kayu Klas II Uk. 8/8 m3 2.65 0.08
0.74 0.08
1.30 0.08
0.60 0.08
2 Gording Kayu Klas II Uk. 8/8 m3 7.10 0.08
3 Kasau Dan Reng Kayu Klas II m2 7.10 2.45
4 Atap Genteng Metal m2 7.10 2.45
5 Lisplank Kayu Klas I m1 7.10 1
2.00 1
IX PEKERJAAN ELEKTRIKAL
1 Lampu SL 9 Watt Buah 1.00 1
2 Saklar Ganda Buah 1.00 1
3 Saklar Tunggal Buah 1.00 1
4 Stop Kontak Buah 1.00 1
5 Fitting Lampu Buah 1.00 1
6 Kabel Listrik Roll 1.00 1
7 MCB Unit 1.00 1
8 Instalasi Listrik Titik 1.00 1
9 Genset Unit 1.00 1
c PEKERJAAN SEPTICTANK
1 Galian Tanah m3 2.50 2.5
2 Rangka Kayu Belian Uk. 8/8 m3 3.00 0.08
8.00 0.08
12.00 0.08
3 Pasangan batako 7/15/30 cm m2 1 1
4 Plesteran T.1,5 cm spesi 1:3 m2 1 1
5 Cor Beton Lantai Atas
a Cor Beton K-100 m3 2.50 2.5
b Besi Polos D 6 - 150 mm kg 2.50 1
2.00 1
c Bekisting Lantai m2 2.50 2.5
6 Pipa Hawa 2" m1 1.00 0.5
IV PEKERJAAN SANITASI
1 Tong Fiberglass 1,5 M3 buah 1 1.00
2 Sumur Bor + Pompa Air unit 1 1.00
3 Pipa Air Bersih 3/4" m1 16.0 1.00
4 Pipa Air 4" (Talang Untuk Air Hujan) m1 9.03 1.00
5000000
TINGGI TEBAL
LS.PENAMPANG
BERAT JENIS KUANTITAS KOEFISIEN UNIT VOLUME
1.00
1 1 1.00 1 1 1 1 13.75
1.00 2 11.36
2 4.00
1 1 1 1 1 1 1 13.75
1 1 1.00 1 1 1 2 11.36
1 1 1.00 1 1 1 2 4.00
1 1 1 1 4 1 3.00 18.00
1 1 1 1 1 1 2 9.00
1 1 1 1 1 1 2 3.00
0.08 1 1 1 1 1 3 0.05
0.08 1 1 1 1 1 3 0.01
0.08 1 1 1 1 1 6 0.05
0.08 1 1 1 1 1 6 0.02
0.08 1 1 1 1 1 2 0.09
1 1 1 1 1 1 2 34.79
1 1 1.00 1 1 1 2 34.79
1 1 1 1 1 1 2 14.20
1 1 1 1 1 1 4 8.00
1 1 1 1 1 1 3.00 3.00
1 1 81.12 1 1 1 1 81.12
1 1 1 1 1 1 1 4.00
1 1 1 1 1 1 7 7.00
1 1 1 1 1 1 3 3.00
1 1 1 1 1 1 1 1.00
1 1 1 1 1 1 1 1.00
1 1 1 1 1 1 7 7.00
1 1 1 1 1 1 1 1.00
1 1 1 1 1 1 1 1.00
1 1 1 1 1 1 12 12.00
1 1 1 1 1 1 1 1.00
1.8 1 1 1 1 1 1 11.25
0.08 1 1 1 1 1 8 0.15
0.08 1 1 1 1 1 1 0.05
0.08 1 1 1 1 1 1 0.08
1 1 14.4 1 1 1 1 14.40
1 1 2.4 1 1 1 1 2.40
0.08 1 1 1 1 1 1 0.50
1 1 1 0.22 16.67 1 1 9.17
1 1 1 0.22 16.67 1 1 7.33
1 1 1 1 1 0.3 1 1.88
1 1 1 1 1 1 2 1.00
1.00
1.86
0.23
0.46
1.86
165.54
81.63
6.20
0.38
60.88
22.52 0
3.80
0.23
57.54
10.21
0.70
0.36
56.96
21.07
2.16
0.15
37.20
6.60
1.35
2.06
1.10
7.00
5.25
36.61
52.01
21.21
2.94
2.94
29.11
29.11 7.1
30.00 8.1
0.14
0.09 0
34.79
34.79
22.20
3.00
81.12
4.00
7.00
3.00
1.00
1.00
7.00
1.00
1.00
12.00
1.00
11.25
0.28
14.40
2.40
0.50
16.50
1.88
1.00
96.11
-
3.46 3.46
0.19
0.38
24.00
0.58
91.14 91.14
0.86
0.16
13.88
7.19 0.56
1.09 0.96
0.53
74.76
22.12
1.57
-
0.36
64.08
16.59
2.16
0.53
74.76
22.12
1.57
0.45
74.66
1.17 0
2.00
1.00
16.00
9.03