Anda di halaman 1dari 85

A. PEKERJAAN PERSIAPAN (P.

Ps)
1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.000 60,000.00
2 Tukang Kayu OH 120,000.00 2.000 240,000.00
3 Kepala Tukang OH 175,000.00 0.200 35,000.00
4 Mandor OH 230,000.00 0.050 11,500.00
Jumlah 346,500.00
B BAHAN
1 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg 31,600.00 1.250 39,500.00
2 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m M3 3,610,300.00 0.186 671,515.80
3 Paku Seng Kg 40,000.00 0.300 12,000.00
4 Seng Gelombang Bjls 20 Lbr 71,900.00 1.500 107,850.00
5 Triplek t uk 3 mm Lbr 76,400.00 1.3500 103,140.00
Jumlah 934,005.80
C JUMLAH A + B 1,280,505.80
D HARGA SATUAN 1,280,505.80
Acuan : SNI : 2001 - 2002 (6.9)
Menggali 1m3 Tanah Biasa sedalam 1 meter (P.T. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.750 45,000.00
2 Mandor OH 230,000.00 0.025 5,750.00
Jumlah 50,750.00
B JUMLAH A 50,750.00
C HARGA SATUAN 50,750.00
Acuan : SNI 2835:2008 (6.1)
Menggali 1m3 Tanah Biasa sedalam 2 meter (P.T. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.900 54,000.00
2 Mandor OH 230,000.00 0.045 10,350.00
Jumlah 64,350.00
B JUMLAH A 64,350.00
C HARGA SATUAN 64,350.00
Acuan : SNI 2835:2008 (6.2)
Mengurug Kembali 1m3 Galian (P.T. 09)
Mengurug kembali 1m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.250 15,000.00
2 Mandor OH 230,000.00 0.0083 1,916.67
Jumlah 16,916.67
B JUMLAH A 16,916.67
C HARGA SATUAN 16,916.67
Acuan : SNI 2835:2008 (6.9)
Mengurug 1m3 Pasir Urug (P.T. 11)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.300 18,000.00
2 Mandor OH 230,000.00 0.010 2,300.00
Jumlah 20,300.00
B BAHAN
1 Pasir Urug M3 144,000.00 1.200 172,800.00
Jumlah 172,800.00
B JUMLAH A 193,100.00
C HARGA SATUAN 193,100.00
Acuan : SNI 2835:2008 (6.11)
1 m3 Urugan Tanah Datang (P.T. 12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.250 15,000.00
2 Mandor OH 230,000.00 0.010 2,300.00
Jumlah 17,300.00
B BAHAN
1 Tanah Datang M3 42,000.00 1.200 50,400.00
Jumlah 50,400.00
C JUMLAH A + B 67,700.00
D HARGA SATUAN 67,700.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya pekerjaan BOW - A.16 (1)
C. PEKERJAAN PONDASI BATU (P.PB.)

Memasang 1m3 Pondasi Batu Belah, Campuran 1 PC : 3 PP (P.PB. 01)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 55,000.00 1.500 82,500.00
2 Tukang Batu OH 65,000.00 0.750 48,750.00
3 Kepala Tukang OH 70,000.00 0.075 5,250.00
4 Mandor OH 70,000.00 0.075 5,250.00
Jumlah 141,750.00
B BAHAN
1 Batu pecah 10-15 cm M3 184,000.00 1.200 220,800.00
2 Portland Cement (PC) Kg 1,500.00 202.000 303,000.00
3 Pasir M3 115,000.00 0.485 55,775.00
Jumlah 579,575.00
C JUMLAH A + B 721,325.00
D HARGA SATUAN 721,325.00
Acuan : SNI 2836:2008 (6.1)
Membuat 1m3 Beton Mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0,87 (P.BB. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.650 99,000.00
2 Tukang Batu OH 120,000.00 0.275 33,000.00
3 Kepala Tukang OH 175,000.00 0.028 4,900.00
4 Mandor OH 230,000.00 0.083 19,090.00
Jumlah 155,990.00
B BAHAN
1 Portland Cement (PC) Kg 2,536.00 247.000 626,392.00
2 Pasir Kg 102.86 869.000 89,382.86
3 Kerikil Kg 796.30 999.000 795,500.00
4 Air Liter 0.00 - 0.00
Jumlah 1,511,274.86
C JUMLAH A + B 1,667,264.86
D HARGA SATUAN 1,667,264.86
Acuan : SNI 7394:2008 (6.1)
Membuat 1m3 Lantai Kerja Beton Mutu fc= 7,4 Mpa (K100), Slump (3-6) cm, w/c = 0,87 (P.BB. 03)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.200 72,000.00
2 Tukang Batu OH 120,000.00 0.200 24,000.00
4 Mandor OH 230,000.00 0.060 13,800.00
Jumlah 113,300.00
B BAHAN
1 Portland Cement (PC) Kg 2,536.00 230.000 583,280.00
3 Kerikil Kg 796.30 1,027.000 817,796.30
4 Air Liter 0.00 - 0.00
Jumlah 1,494,841.30
C JUMLAH A + B 1,608,141.30
D HARGA SATUAN 1,608,141.30
Acuan : SNI 7394:2008 (6.4)
Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 (P.BB. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.650 99,000.00
2 Tukang Batu OH 120,000.00 0.275 33,000.00
3 Kepala Tukang OH 175,000.00 0.028 4,900.00
4 Mandor OH 230,000.00 0.083 19,090.00
Jumlah 155,990.00
B BAHAN
1 Portland Cement (PC) Kg 2,536.00 326.000 826,736.00
2 Pasir Kg 105.00 760.000 79,800.00
3 Batu pecah 1-2 cm Kg 1,189.63 1,029.000 1,224,128.89
4 Air Liter 0.00 - 0.00
Jumlah 2,130,664.89
C JUMLAH A + B 2,286,654.89
D HARGA SATUAN 2,286,654.89
Acuan : SNI 7394:2008 (6.5)
Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 (P.BB. 05)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.650 99,000.00
2 Tukang Batu OH 120,000.00 0.275 33,000.00
3 Kepala Tukang OH 175,000.00 0.028 4,900.00
4 Mandor OH 230,000.00 0.083 19,090.00
Jumlah 155,990.00
B BAHAN
1 Portland Cement (PC) Kg 2,536.00 371.000 940,856.00
2 Pasir Kg 105.00 698.000 73,290.00
3 Batu pecah 1-2 cm Kg 1,189.63 1,047.000 1,245,542.22
4 Air Liter 0.00 - 0.00
Jumlah 2,259,688.22
C JUMLAH A + B 2,415,678.22
D HARGA SATUAN 2,415,678.22
Acuan : SNI 7394:2008 (6.7)

Pembesian 10 Kg dengan Besi Polos atau Ulir (P.BB. 08)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.070 4,200.00
2 Tukang Besi OH 120,000.00 0.070 8,400.00
3 Kepala Tukang OH 175,000.00 0.007 1,225.00
4 Mandor OH 230,000.00 0.004 920.00
Jumlah 14,745.00
B BAHAN
1 Besi Beton (polos/ulir) Kg 15,000.00 10.500 157,500.00
2 Kawat Ikat Beton (bendrat) Kg 46,000.00 0.150 6,900.00
Jumlah 164,400.00
C JUMLAH A + B 179,145.00
D HARGA SATUAN 179,145.00
E HARGA SATUAN PER 1 KG 17,914.50
Acuan : SNI 7394:2008 (6.17)

Memasang 10 Kg Jaring Kawat Baja/Wire Mesh (P.BB. 09)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.025 1,500.00
2 Tukang Besi OH 120,000.00 0.025 3,000.00
3 Kepala Tukang OH 175,000.00 0.025 4,375.00
4 Mandor OH 230,000.00 0.001 230.00
Jumlah 9,105.00
B BAHAN
1 Besi Wire Mesh Kg 15,500.00 10.200 158,100.00
2 Kawat Ikat Beton (bendrat) Kg 46,000.00 0.050 2,300.00
Jumlah 160,400.00
C JUMLAH A + B 169,505.00
D HARGA SATUAN 169,505.00
E HARGA SATUAN PER 1 KG 16,950.50
Acuan : SNI 7394:2008 (6.19)
Memasang 1m2 Bekisting untuk Pondasi (P.BB. 10)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.520 31,200.00
2 Tukang Kayu OH 120,000.00 0.260 31,200.00
3 Kepala Tukang OH 175,000.00 0.026 4,550.00
4 Mandor OH 230,000.00 0.026 5,980.00
Jumlah 72,930.00
B BAHAN
1 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m M3 2,266,100.00 0.040 90,644.00
2 Paku 2" - 5" Kg 21,900.00 0.300 6,570.00
3 Minyak Bekisting Lt 4,500.00 0.100 450.00
Jumlah 97,664.00
C JUMLAH A + B 170,594.00
D HARGA SATUAN 170,594.00
Acuan : SNI 7394:2008 (6.20)

Memasang 1m2 Bekisting untuk Pondasi (P.BB. 10.a)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.520 31,200.00
2 Tukang Kayu OH 120,000.00 0.260 31,200.00
3 Kepala Tukang OH 175,000.00 0.026 4,550.00
4 Mandor OH 230,000.00 0.026 5,980.00
Jumlah 72,930.00
B BAHAN
1 Papan Mal Kelas III M3 2,779,100.00 0.031 86,152.10
2 Paku 2" - 5" Kg 27,000.00 0.300 8,100.00
3 Minyak Bekisting Lt 0.00 - 0.00
Jumlah 94,252.10
C JUMLAH A + B 167,182.10
D HARGA SATUAN 167,182.10
Acuan : SNI 7394:2008 (6.20)

Memasang 1m2 Bekisting untuk Sloof (P.BB. 11)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.520 31,200.00
2 Tukang Kayu OH 120,000.00 0.260 31,200.00
3 Kepala Tukang OH 175,000.00 0.026 4,550.00
4 Mandor OH 230,000.00 0.026 5,980.00
Jumlah 72,930.00
B BAHAN
1 Kayu kls III M3 2,250,000.00 0.045 101,250.00
2 Paku 2" - 5" Kg 27,000.00 0.300 8,100.00
3 Minyak Bekisting Lt 7,550.00 0.100 755.00
Jumlah 110,105.00
C JUMLAH A + B 183,035.00
D HARGA SATUAN 183,035.00
Acuan : SNI 7394:2008 (6.21)
Memasang 1m2 Bekisting untuk Kolom (P.BB. 12.c)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.660 39,600.00
2 Tukang Kayu OH 120,000.00 0.330 39,600.00
3 Kepala Tukang OH 175,000.00 0.033 5,775.00
4 Mandor OH 230,000.00 0.033 7,590.00
Jumlah 92,565.00
B BAHAN
1 Kayu kls III Tidak Ketam M3 2,250,000.00 0.025 56,250.00
2 Paku 2" - 5" Kg 27,000.00 0.400 10,800.00
3 Minyak Bekisting Lt 7,550.00 - 0.00
4 Papan kls III M3 2,779,100.00 0.022 61,140.20
6 Cerucuk Ǿ 6 - 8cm / 4m Btg 31,600.00 2.000 63,200.00
Jumlah 191,390.20
C JUMLAH A + B 283,955.20
D HARGA SATUAN 283,955.20
Acuan : SNI 7394:2008 (6.22)

Memasang 1m2 Bekisting untuk Balok (P.BB. 13.a)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.660 39,600.00
2 Tukang Kayu OH 120,000.00 0.330 39,600.00
3 Kepala Tukang OH 175,000.00 0.033 5,775.00
4 Mandor OH 230,000.00 0.033 7,590.00
Jumlah 92,565.00
B BAHAN
1 Kayu kls III Tidak Ketam M3 2,250,000.00 0.058 130,500.00
2 Paku 2" - 5" Kg 27,000.00 0.400 10,800.00
3 Minyak Bekisting Lt 7,550.00 - 0.00
4 Papan kls III M3 2,779,100.00 0.022 61,140.20
5 Cerucuk Ǿ 6 - 8cm / 4m Btg 31,600.00 2.000 63,200.00
Jumlah 265,640.20
C JUMLAH A + B 358,205.20
D HARGA SATUAN 358,205.20
Acuan : SNI 7394:2008 (6.23)

Memasang 1m2 Bekisting untuk Lantai (P.BB. 14.a)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.660 39,600.00
2 Tukang Kayu OH 120,000.00 0.330 39,600.00
3 Kepala Tukang OH 175,000.00 0.033 5,775.00
4 Mandor OH 230,000.00 0.033 7,590.00
Jumlah 92,565.00
B BAHAN
1 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m M3 2,250,000.00 0.055 123,750.00
2 Paku 2" - 5" Kg 27,000.00 0.400 10,800.00
3 Minyak Bekisting Lt 7,550.00 - 0.00
4 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M3 2,779,100.00 0.022 61,140.20
6 Cerucuk Ǿ 6 - 8cm / 4m Btg 31,600.00 4.000 126,400.00
Jumlah 322,090.20
C JUMLAH A + B 414,655.20
D HARGA SATUAN 414,655.20
Acuan : SNI 7394:2008 (6.24)
Memasang 1m2 Dinding Batako 7 cm x 15 cm x 30 cm (P.Dnd. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.320 19,200.00
2 Tukang Batu OH 120,000.00 0.100 12,000.00
3 Kepala Tukang OH 175,000.00 0.010 1,750.00
4 Mandor OH 230,000.00 0.015 3,450.00
Jumlah 36,400.00
B BAHAN
1 Batako 7 cm x 15 cm x 30 cm Bh 2,000.00 22.000 44,000.00
2 Portland Cement (PC) Kg 2,536.00 7.500 19,020.00
3 Pasir Ayak untuk Beton M3 147,000.00 0.027 3,969.00
Jumlah 66,989.00
C JUMLAH A + B 103,389.00
D HARGA SATUAN 103,389.00
Acuan : ABK Bangunan Gedung dan Perumahan 6.20
Memasang 1m2 Plesteran 1 PC : 3 PP, Tebal 15 mm (P.Pls.02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.300 18,000.00
2 Tukang Batu OH 120,000.00 0.150 18,000.00
3 Kepala Tukang OH 175,000.00 0.015 2,625.00
4 Mandor OH 230,000.00 0.015 3,450.00
Jumlah 42,075.00
B BAHAN
1 Portland Cement (PC) Kg 2,536.00 7.776 19,719.94
2 Pasir Ayak untuk Beton M3 147,000.00 0.023 3,381.00
Jumlah 23,100.94
C JUMLAH A + B 65,175.94
D HARGA SATUAN 65,175.94
Acuan : SNI 2837:2008 (6.3)
Memasang 1m2 Plesteran tekstur (P.Pls. 05.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.400 24,000.00
2 Tukang Batu OH 120,000.00 0.200 24,000.00
3 Kepala Tukang OH 175,000.00 0.020 3,500.00
4 Mandor OH 230,000.00 0.022 5,060.00
Jumlah 56,560.00
B BAHAN
1 Portland Cement (PC) Kg 2,536.00 13.632 34,570.75
2 Pasir Ayak untuk Beton M3 147,000.00 0.027 3,969.00
Jumlah 38,539.75
C JUMLAH A + B 95,099.75
D HARGA SATUAN 95,099.75
Acuan : SNI 2837:2008 (6.13)
1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 (P.K. 06)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 12.000 720,000.00
2 Tukang Kayu OH 120,000.00 36.000 4,320,000.00
3 Kepala Tukang OH 175,000.00 3.600 630,000.00
4 Mandor OH 230,000.00 0.600 138,000.00
Jumlah 5,808,000.00
B BAHAN
1 Kayu Belian (uk. 8/8) M3 11,272,100.00 1.100 12,399,310.00
2 Paku belian Kg 27,000.00 6.000 162,000.00
Jumlah 12,561,310.00
C Jumlah A + B 18,369,310.00
D Harga Satuan 18,369,310.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.27

1 m1 Memancang Cerucuk ke Dalam Tanah (P.K. 11.i)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.046 2,773.44
2 Mandor OH 230,000.00 0.001 197.80
Jumlah 2,971.24
B Jumlah A 2,971.24
C Harga Satuan 2,971.24
E Harga Upah 1/2 x Harga Satuan 1,485.62
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - E.13

Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I (P.K. 12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 7.000 420,000.00
2 Tukang Kayu OH 120,000.00 21.000 2,520,000.00
3 Kepala Tukang OH 175,000.00 2.100 367,500.00
4 Mandor OH 230,000.00 0.350 80,500.00
Jumlah 3,388,000.00
B BAHAN
1 Kayu Kelas 1 uk. 5/10 (Ketam) M3 5,551,000.00 1.100 6,106,100.00
2 Paku kg 27,000.00 1.250 33,750.00
3 Lem Kayu kg 84,000.00 1.000 84,000.00
Jumlah 6,223,850.00
C Jumlah A + B 9,611,850.00
D Harga Satuan 9,611,850.00
Acuan : SNI 3434:2008 (6.1)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu Belian (P.K. 12.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 7.000 420,000.00
2 Tukang Kayu OH 120,000.00 21.000 2,520,000.00
3 Kepala Tukang OH 175,000.00 2.100 367,500.00
4 Mandor OH 230,000.00 0.350 80,500.00
Jumlah 3,388,000.00
B BAHAN
1 Kayu Belian M3 12,292,800.00 1.100 13,522,080.00
2 Paku 10 cm kg 27,000.00 1.250 33,750.00
3 Lem Kayu kg 84,000.00 1.000 84,000.00
Jumlah 13,639,830.00
C Jumlah A + B 17,027,830.00
D Harga Satuan 17,027,830.00
Acuan : SNI 3434:2008 (6.1)

Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas I (P.K. 14)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.000 60,000.00
2 Tukang Kayu OH 120,000.00 3.000 360,000.00
3 Kepala Tukang OH 175,000.00 0.300 52,500.00
4 Mandor OH 230,000.00 0.050 11,500.00
Jumlah 484,000.00
B BAHAN
1 Papan kayu klas I ketam M3 6,149,100.00 0.040 245,964.00
2 Lem Kayu kg 84,000.00 0.500 42,000.00
Jumlah 287,964.00
C Jumlah A + B 771,964.00
D Harga Satuan 771,964.00
Acuan : SNI 3434:2008 (6.5)
Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu belian (P.K. 14.i)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 1.000 60,000.00
2 Tukang Kayu OH 120,000.00 3.000 360,000.00
3 Kepala Tukang OH 175,000.00 0.300 52,500.00
4 Mandor OH 230,000.00 0.050 11,500.00
Jumlah 484,000.00
B BAHAN
1 Papan kayu belian ketam M3 30,850,800.00 0.040 1,234,032.00
2 Lem Kayu kg 84,000.00 0.500 42,000.00
Jumlah 1,276,032.00
C Jumlah A + B 1,760,032.00
D Harga Satuan 1,760,032.00
Acuan : SNI 3434:2008 (6.5)

1m2 Pemasangan Ventilasi Kaca. Setiap luas 1 m2 bidang daun ventilasi, luas kacanya adalah 0.60 m2 (P.K.
19)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.280 16,800.00
2 Tukang Kayu OH 120,000.00 0.800 96,000.00
3 Kepala Tukang OH 175,000.00 0.080 14,000.00
4 Mandor OH 230,000.00 0.014 3,220.00
Jumlah 130,020.00
B BAHAN
1 List Kayu M' 8,000.00 8.000 64,000.00
2 Kaca Polos tebal 5 mm M2 239,500.00 0.600 143,700.00
3 Paku triplek Kg 53,000.00 0.050 2,650.00
Jumlah 210,350.00
C Jumlah A + B 340,370.00
D Harga Satuan 340,370.00
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.37.c

Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas II Bentang 6 m (P.K. 20.a)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 4.000 240,000.00
2 Tukang Kayu OH 120,000.00 12.000 1,440,000.00
3 Kepala Tukang OH 175,000.00 1.200 210,000.00
4 Mandor OH 230,000.00 0.200 46,000.00
Jumlah 1,936,000.00
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 3,610,300.00 1.100 3,971,330.00
2 Besi Strip Kg 124,000.00 15.000 1,860,000.00
3 Paku 12 cm Kg 27,000.00 5.600 151,200.00
Jumlah 5,982,530.00
C Jumlah A + B 7,918,530.00
D Harga Satuan 7,918,530.00
Acuan : SNI 3434:2008 (6.13)
Memasang 1m3 Konstruksi Gordeng, Kayu Kelas II (P.K. 22)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 2.400 144,000.00
2 Tukang Kayu OH 120,000.00 7.200 864,000.00
3 Kepala Tukang OH 175,000.00 0.720 126,000.00
4 Mandor OH 230,000.00 0.120 27,600.00
Jumlah 1,161,600.00
B BAHAN
1 Balok Kayu Kelas II (Tidak Ketam) M3 3,610,300.00 1.100 3,971,330.00
2 Besi Strip Btg 124,000.00 15.000 1,860,000.00
3 Paku 12 cm Kg 27,000.00 3.000 81,000.00
Jumlah 5,912,330.00
C Jumlah A + B 7,073,930.00
D Harga Satuan 7,073,930.00
Acuan : SNI 3434:2008 (6.15)
Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III (P.K. 29)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.200 12,000.00
2 Tukang Kayu OH 120,000.00 0.300 36,000.00
3 Kepala Tukang OH 175,000.00 0.030 5,250.00
4 Mandor OH 230,000.00 0.010 2,300.00
Jumlah 55,550.00
B BAHAN
1 Kaso-kaso (5x7) cm M3 3,610,300.00 0.0163 58,847.89
2 Paku 7 cm - 10 cm Kg 27,000.00 0.250 6,750.00
Jumlah 65,597.89
C Jumlah A + B 121,147.89
D Harga Satuan 121,147.89
Acuan : SNI 3434:2008 (6.20)

1m1 Pasang Lisplank Ukuran 2 x (3 x 20cm) Kayu Kelas I (P.K. 33)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.150 9,000.00
2 Tukang Kayu OH 120,000.00 0.250 30,000.00
3 Kepala Tukang OH 175,000.00 0.025 4,375.00
4 Mandor OH 230,000.00 0.075 17,250.00
Jumlah 60,625.00
B BAHAN
1 Papan Kayu Kelas I (Ketam) M3 6,149,100.00 0.0145 89,161.95
2 Paku Kg 27,000.00 0.060 1,620.00
Jumlah 90,781.95
C Jumlah A + B 151,406.95
D Harga Satuan 151,406.95
Acuan : ABK Bangunan Gedung dan Perumahan - 6.51
1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Belian (P.K. 34)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.100 6,000.00
2 Tukang Kayu OH 120,000.00 0.100 12,000.00
3 Kepala Tukang OH 175,000.00 0.010 1,750.00
4 Mandor OH 230,000.00 0.050 11,500.00
Jumlah 31,250.00
B BAHAN
1 Papan Kayu Belian (Ketam) M3 30,850,800.00 0.0088 271,487.04
2 Paku Kg 27,000.00 0.060 1,620.00
Jumlah 273,107.04
C Jumlah A + B 304,357.04
D Harga Satuan 304,357.04
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53
1m2 Pasang Atap Genteng Metal (P.PA. 03)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.200 12,000.00
2 Tukang Kayu OH 120,000.00 0.100 12,000.00
3 Kepala Tukang OH 175,000.00 0.010 1,750.00
4 Mandor OH 230,000.00 0.001 230.00
Jumlah 25,980.00
B BAHAN
1 Genteng Metal Lbr 52,900.00 1.620 85,698.00
2 Paku Kg 46,000.00 0.200 9,200.00
Jumlah 94,898.00
C Jumlah A + B 120,878.00
D Harga Satuan 120,878.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32
1m1 Pasang Nok / Bumbungan Genteng Metal Stone Kotak 0.35 (P.PA. 10)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.250 15,000.00
2 Tukang Kayu OH 120,000.00 0.150 18,000.00
3 Kepala Tukang OH 175,000.00 0.015 2,625.00
4 Mandor OH 230,000.00 0.013 2,990.00
Jumlah 38,615.00
B BAHAN
1 Nok / Bubungan Genteng Metal Stone Kotak Meter 66,000.00 1.000 66,000.00
2 Paku 1/2" - 1" Kg 27,000.00 0.050 1,350.00
Jumlah 67,350.00
C Jumlah A + B 105,965.00
D Harga Satuan 105,965.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.36
Memasang 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm (P.Pf. 03)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.100 6,000.00
2 Tukang Kayu OH 120,000.00 0.050 6,000.00
3 Kepala Tukang OH 175,000.00 0.005 875.00
4 Mandor OH 230,000.00 0.005 1,150.00
Jumlah 14,025.00
B BAHAN
1 Gypsum Board (120 x 240 x 9) Lbr 89,800.00 0.364 32,687.20
2 Paku Sekrup Gypsum Kg 28,000.00 0.110 3,080.00
Jumlah 35,767.20
C Jumlah A + B 49,792.20
D Harga Satuan 49,792.20
Acuan : SNI 2839:2008 (6.5)

Memasang 1 m1 List Plafond Gypsum Profil (P.Pf.06)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.060 3,600.00
2 Tukang Kayu OH 120,000.00 0.060 7,200.00
3 Kepala Tukang OH 175,000.00 0.006 1,050.00
4 Mandor OH 230,000.00 0.003 690.00
Jumlah 12,540.00
B BAHAN
1 List Profil gypsum uk. Besar L = 20 - 25 CM m 1
22,000.00 1.050 23,100.00
2 Tepung gypsum Kg 5,800.00 0.150 870.00
Jumlah 23,970.00
C JUMLAH A + B 36,510.00
D HARGA SATUAN 36,510.00
Acuan : SNI 2839:2008 (6.8)

Memasang 1 m' list langit-langit kayu profil (P.Pf. 07)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.050 3,000.00
2 Tukang Kayu OH 120,000.00 0.050 6,000.00
3 Kepala Tukang OH 175,000.00 0.005 875.00
4 Mandor OH 230,000.00 0.003 690.00
Jumlah 10,565.00
B BAHAN
1 List kayu profil m' 16,000.00 1.050 16,800.00
2 Paku kg 27,000.00 0.010 270.00
Jumlah 17,070.00
C Jumlah A + B 27,635.00
D Harga Satuan 27,635.00
Acuan : SNI 2839:2008 (6.10)
1m2 Langit-langit GRC (P.Pf. 08)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.100 6,000.00
2 Tukang Kayu OH 120,000.00 0.050 6,000.00
3 Kepala Tukang OH 175,000.00 0.005 875.00
4 Mandor OH 230,000.00 0.005 1,150.00
Jumlah 14,025.00
B BAHAN
1 GRC Board (120 x 240 x 4) Lbr 89,800.00 0.364 32,687.20
2 Paku GRC Kg 28,000.00 0.110 3,080.00
Jumlah 35,767.20
C Jumlah A + B 49,792.20
D Harga Satuan 49,792.20
Acuan : ABK Bangunan Gedung dan Perumahan - 6.24
Pemasangan Kloset Jongkok Keramik (P.Snt. 02)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
2 Tukang Batu OH 120,000.00 1.500 180,000.00
3 Kepala Tukang OH 175,000.00 1.500 262,500.00
4 Mandor OH 230,000.00 0.160 36,800.00
Jumlah 539,300.00
B BAHAN
1 Kloset jongkok Bh 532,694.00 1.000 532,694.00
2 Semen Portland Kg 2,536.00 6.000 15,216.00
3 Pasir M3 147,000.00 0.010 1,470.00
Jumlah 549,380.00
C JUMLAH A + B 1,088,680.00
D HARGA SATUAN 1,088,680.00
Acuan : SNI : 2001 - 2002 (6.2)
K. PEKERJAAN BESI DAN ALLUMINIUM (P. BA.)

Memasang 1 Kg Besi Profil (P.BA. 01)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 55,000.00 0.060 3,300.00
2 Tukang las OH 65,000.00 0.060 3,900.00
3 Kepala Tukang OH 70,000.00 0.006 420.00
4 Mandor OH 70,000.00 0.003 210.00
Jumlah 7,830.00
B BAHAN
1 Besi Profil Kg 18,800.00 1.150 21,620.00
Jumlah 21,620.00
C JUMLAH A + B 29,450.00
D HARGA SATUAN 29,450.00
Acuan : SNI 7393:2008 (6.1)

Memasang 1 Kg Rangka Kuda - Kuda Baja IWF (P.BA. 02)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 55,000.00 0.060 3,300.00
2 Tukang las OH 65,000.00 0.060 3,900.00
3 Kepala Tukang OH 70,000.00 0.006 420.00
4 Mandor OH 70,000.00 0.003 210.00
Jumlah 7,830.00
B BAHAN
1 Besi baja IWF kg 18,800.00 1.150 21,620.00
Jumlah 21,620.00
C JUMLAH A + B 29,450.00
D HARGA SATUAN 29,450.00
Acuan : SNI 7393:2008 (6.2)

Mengerjakan 100 kg pekerjaan perakitan (P. BA 03)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 55,000.00 0.100 5,500.00
2 Tukang Besi OH 65,000.00 0.100 6,500.00
3 Kepala Tukang OH 70,000.00 0.001 70.00
4 Mandor OH 70,000.00 0.0050 350.00
Jumlah 12,420.00
B BAHAN
1 Solar Liter 4,500.00 1.000 4,500.00
2 Minyak Pelumas Liter 26,250.00 0.100 2,625.00
Jumlah 7,125.00
C ALAT
1 Sewa Alat Jam 65,620.00 0.800 52,496.00
Jumlah 52,496.00
D Jumlah A + B + C 72,041.00
E Harga Satuan 72,041.00
Acuan : SNI 7393:2008 (6.3)

Membuat 1 M2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku (P.BA 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 55,000.00 0.060 3,300.00
2 Tukang las OH 65,000.00 0.060 3,900.00
3 Kepala Tukang OH 70,000.00 0.006 420.00
4 Mandor OH 70,000.00 0.003 210.00
Jumlah 7,830.00
B BAHAN
1 Besi siku L 30.30.3 kg 19,500.00 15.000 292,500.00
2 Besi plat baja kg 18,800.00 32.800 616,640.00
3 Kawat las kg 115,000.00 0.050 5,750.00
Jumlah 914,890.00
C JUMLAH A + B 922,720.00
D HARGA SATUAN 922,720.00
Acuan : SNI 7393:2008 (6.4)

Mengerjakan 10 cm pengelasan dengan las listrik (P. BA 05)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 55,000.00 0.040 2,200.00
2 Tukang Besi OH 65,000.00 0.020 1,300.00
3 Kepala Tukang OH 70,000.00 0.002 140.00
4 Mandor OH 70,000.00 0.002 140.00
Jumlah 3,780.00
B BAHAN
1 Kawat las listrik kg 115,000.00 0.400 46,000.00
2 Solar Liter 4,500.00 0.300 1,350.00
2 Minyak pelumas Liter 26,250.00 0.040 1,050.00
Jumlah 48,400.00
C ALAT
1 Sewa Alat Jam 65,620.00 0.170 11,155.40
Jumlah 11,155.40
D Jumlah A + B + C 63,335.40
E Harga Satuan 63,335.40
Acuan : SNI 7393:2008 (6.5)

Mengerjakan pengelasan dengan las listrik / Titik (P. BA 05.a)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 55,000.00 0.040 2,200.00
2 Tukang Besi OH 65,000.00 0.020 1,300.00
3 Kepala Tukang OH 70,000.00 0.002 140.00
4 Mandor OH 70,000.00 0.002 140.00
Jumlah 3,780.00
B BAHAN
1 Kawat las listrik kg 115,000.00 0.400 46,000.00
2 Solar Liter 4,500.00 0.300 1,350.00
2 Minyak pelumas Liter 26,250.00 0.040 1,050.00
Jumlah 48,400.00
C ALAT
1 Sewa Alat Jam 65,620.00 0.170 11,155.40
Jumlah 11,155.40
D Jumlah A + B + C 63,335.40
E Harga Satuan/10 cm 63,335.40
E Harga Satuan / Titik 1,266.71
Acuan : SNI 7393:2008 (6.5)
Memasang 1m2 Lantai Keramik Ukuran (30 x 30) cm (P.LD. 01)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.700 42,000.00
2 Tukang Batu OH 120,000.00 0.350 42,000.00
3 Kepala Tukang OH 175,000.00 0.035 6,125.00
4 Mandor OH 230,000.00 0.035 8,050.00
Jumlah 98,175.00
B BAHAN
1 Keramik uk. 30 cm x 30 cm Bh 12,277.78 11.870 145,737.22
2 Portland Cement (PC) Kg 2,536.00 10.000 25,360.00
3 Pasir M3 147,000.00 0.045 6,615.00
4 Oker Warna ( Biasa ) Kg 27,000.00 1.500 40,500.00
218,212.22
C JUMLAH A + B 316,387.22
D HARGA SATUAN 316,387.22
Acuan : SNI 7395:2008 (6.35)

Memasang 1m2 Lantai Keramik Ukuran (20 x 20) cm (P.LD. 02)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.700 42,000.00
2 Tukang Batu OH 120,000.00 0.350 42,000.00
3 Kepala Tukang OH 175,000.00 0.035 6,125.00
4 Mandor OH 230,000.00 0.035 8,050.00
Jumlah 98,175.00
B BAHAN
1 Keramik uk. 20 cm x 20 cm Bh 4,420.00 26.500 117,130.00
2 Portland Cement (PC) Kg 2,536.00 10.400 26,374.40
3 Pasir M3 147,000.00 0.045 6,615.00
4 Oker Warna ( Biasa ) Kg 27,000.00 1.620 43,740.00
193,859.40
C JUMLAH A + B 292,034.40
D HARGA SATUAN 292,034.40
Acuan : SNI 7395:2008 (6.36)

1m2 Pasang Lantai Keramik 40 x 40cm Polos (P.LD. 03)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 100,000.00 0.620 62,000.00
2 Tukang Batu OH 120,000.00 0.350 42,000.00
3 Kepala Tukang OH 175,000.00 0.035 6,125.00
4 Mandor OH 230,000.00 0.030 6,900.00
Jumlah 117,025.00
B BAHAN
1 Keramik 40 x 40cm Polos Bh 19,600.00 6.250 122,500.00
2 Semen Portland Kg 2,536.00 11.380 28,859.68
3 Pasir M3 147,000.00 0.042 6,174.00
4 Semen Warna Kg 27,000.00 0.1500 4,050.00
161,583.68
C Jumlah A + B 278,608.68
D Harga Satuan 278,608.68
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47
1m2 Pasang Lantai Keramik 60 x 60 cm (P.LD. 05.b)
SATUAN SATUAN
No. URAIAN PEKERJAAN SATUAN KUANTITAS
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 60,000.00 0.620 37,200.00
2 Tukang Batu OH 120,000.00 0.350 42,000.00
3 Kepala Tukang OH 175,000.00 0.035 6,125.00
4 Mandor OH 230,000.00 0.030 6,900.00
Jumlah 92,225.00
B BAHAN
1 Keramik 60 x 60 cm Bh 43,333.33 3.000 130,000.00
2 Semen Portland Kg 2,536.00 11.380 28,859.68
3 Pasir M3 147,000.00 0.042 6,174.00
4 Semen Warna Kg 27,000.00 0.1500 4,050.00
169,083.68
C Jumlah A + B 261,308.68
D Harga Satuan 261,308.68
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47

1m2 Pasang Lantai Keramik 30 x 60 cm (P.LD. 05.c)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja OH 60,000.00 0.620 37,200.00
2 Tukang Batu OH 120,000.00 0.350 42,000.00
3 Kepala Tukang OH 175,000.00 0.035 6,125.00
4 Mandor OH 230,000.00 0.030 6,900.00
Jumlah 92,225.00
B BAHAN
1 Keramik 30 x 60 cm Bh 20,833.33 6.000 125,000.00
2 Semen Portland Kg 2,536.00 11.380 28,859.68
3 Pasir M3 147,000.00 0.042 6,174.00
4 Semen Warna Kg 27,000.00 0.1500 4,050.00
164,083.68
C Jumlah A + B 256,308.68
D Harga Satuan 256,308.68
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47

1m2 Pasang Dinding Keramik 20 x 25cm (P.LD. 10)


HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.600 36,000.00
2 Tukang Batu OH 120,000.00 0.450 54,000.00
3 Kepala Tukang OH 175,000.00 0.045 7,875.00
4 Mandor OH 230,000.00 0.030 6,900.00
Jumlah 104,775.00
B BAHAN
1 Keramik 20 x 25 cm Bh 3,250.00 20.000 65,000.00
2 Semen Kg 2,536.00 9.300 23,584.80
3 Pasir M3 147,000.00 0.018 2,646.00
4 Oker Pengisi Nat Keramik Kg 27,000.00 0.200 5,400.00
96,630.80
C Jumlah A + B 201,405.80
D Harga Satuan 201,405.80
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63
1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.070 4,200.00
2 Tukang Cat OH 120,000.00 0.009 1,080.00
3 Kepala Tukang OH 175,000.00 0.006 1,050.00
4 Mandor OH 230,000.00 0.0025 575.00
Jumlah 6,905.00
B BAHAN
1 Cat Meni Kg 99,000.00 0.200 19,800.00
2 Dempul Kg 67,000.00 0.150 10,050.00
3 Cat Dasar Kg 66,000.00 0.170 11,220.00
4 Cat Kilat Penutup 2 Kali Kg 80,000.00 0.260 20,800.00
61,870.00
C Jumlah A + B 68,775.00
D Harga Satuan 68,775.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.8

1m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Dengan Cat Mutu Baik. (P.Ct.
12)
HARGA BIAYA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
1 2 3 4 5 6
A TENAGA
1 Pekerja Tidak Terlatih OH 60,000.00 0.028 1,680.00
2 Tukang Cat OH 120,000.00 0.042 5,040.00
3 Kepala Tukang OH 175,000.00 0.0042 735.00
4 Mandor OH 230,000.00 0.0025 575.00
Jumlah 8,030.00
B BAHAN
1 Cat Dasar tembok Kg 51,000.00 0.120 6,120.00
2 Cat Tembok Penutup 2 x Kg 62,000.00 0.180 11,160.00
17,280.00
C Jumlah A + B 25,310.00
D Harga Satuan 25,310.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.15
A. UPAH DAN BAHAN BANGUNAN

1 2 3 4 5 6
III JASA PELAYANAN
A Bahan Pasir, Batu dan Tanah ( Sand, Stone dan Soil )
1 Batu Belah Ukuran 10 - 15 cm M3 Rp 1,010,000
Ukuran 7 - 10 cm M3
Ukuran 5 - 7 cm M3
Ukuran 3 - 5 cm M3
Ukuran 2 - 3 cm M3
2 Batu Pecah Ukuran 2 - 3 cm stone crusher M3 Rp 1,488,000
Ukuran 1 - 2 cm stone crusher M3 Rp 1,606,000
Ukuran 0,5 - 1 cm stone crusher M3 Rp 1,638,000
3 Batako Cetak Ukr. 7 x 15 x 30 Buah Rp 2,000
4 Bata Merah Ukr. 5 x 11 x 22 cm Buah Rp 2,000
5 Batu Gunung atau Batu Quari - M3
6 Batu Quari Royalti - M3
7 Gorong-gorong Beton Diameter 40 cm M1 Rp 626,000
Diameter 60 cm M1 Rp 860,000
Diameter 80 cm M1 Rp 1,201,000
Diameter 100 cm M1 Rp 1,462,000
8 Ijuk - Kg Rp 27,000
9 Kapur Bakar - M3
10 Kerikil Galian Royalti - M3 Rp 367,000
11 Kerikil Sungai Royalti - M3 Rp 1,075,000
12 Pasir Beton / Pasang - M3 Rp 147,000
13 Pasir Urug / Timbun - M3 Rp 144,000
14 Pasir Batu / Sirtu (Tidak Ayak) - M3 Rp 265,000
15 Paving Block - Buah Rp 4,200
16 Sirtu Royalti - M3 Rp 768,000
17 Stone Dust - M3 Rp 1,638,000
18 Tanah Humus / Tanah Bakar - Karung
19 Tanah Urug / Timbunan Pilihan - M3 Rp 42,000
20 Terawang / Rooster Batako - Buah Rp 6,350
21 Lempengan / Gebalan Rumput
Manila - M²
22 Timbunan Pilihan Setempat - M3 Rp 33,000

B Bahan Semen, Aspal dan Minyak ( Cement, Asphalt and Oil )


1 Aspal Bitumen - Kg Rp 17,200
2 Rapidrant / Addition - Liter
3 Semen PC 50 kg - Zak Rp 126,800
4 Semen Warna / Oker - Kg Rp 27,000
5 Minyak Aspal - Liter Rp 15,000
6 Minyak Pelumas / Oli - Liter Rp 72,000

C Bahan Kayu ( Timber, Woods )


1 Kayu Belian Ukrn. 15/15 M3 Rp 16,741,800
Ukrn. 12/12 M3 Rp 18,516,800
Ukrn. 8/8, 9/9 M3 Rp 11,272,100
2 Kayu Belian ( Ketam ) Ukrn. 7/7, 8/8, 9/9, 10/10 M3 Rp 12,292,800
3 Kayu Klas I - M3 Rp 4,576,000
4 Kayu Klas I ( Ketam ) - M3 Rp 5,551,000
5 Kayu Kelas II - M3 Rp 3,610,300
6 Papan Kayu Belian - M3 Rp 26,694,800
7 Papan Kayu Belian ( Ketam ) - M3 Rp 30,850,800
8 Papan Kayu Klas I - M3 Rp 5,658,600
9 Papan Kayu Klas I ( Ketam ) - M3 Rp 6,149,100
10 Papan Kayu Klas II - M3 Rp 3,907,400
11 Papan Bekisting / Mal Kayu Kls. III - M3 Rp 2,779,100
12 Kayu Cerucuk ( dolken ) Ɵ 6 - 8 cm; p = 4 m Batang Rp 31,600
13 Kayu Cerucuk ( dolken ) Ɵ 10 - 15 cm ; p = 4 m Batang Rp 44,300
14 Kayu Cerucuk ( dolken ) Ɵ 15 - 25 cm; p = 12 m Batang
15 Kayu Perancah / Stabilisasi
Cerucuk - M3 Rp 706,000
16 Papan Jelusie / Renglat Kayu
Klas I - M3 Rp 3,902,800
17 List Kayu Profil - M1 Rp 16,000
18 List Pintu / Jendela - M1 Rp 8,000
19 Plint Kayu Ukrn. 2 x 10 cm M1 Rp 12,900
20 Kayu Bakar - M3 Rp 328,000

D Bahan Keramik, Granite ( Tile, Ceramic, Granite, Marble )


1 Granit : ukuran 30 x 30 1 kotak = 11 keping = 0,99 m2 Kotak Rp 248,400
2 Granit : ukuran 40 x 40 1 kotak = 6 keping = 0,96 m2 Kotak Rp 347,500
3 Granit : ukuran 60 x 60 1 kotak = 3 keping = 1,08 m2 Kotak Rp 356,300
4 Keramik Porselin Ukr. 20 x 20 polos utk lantai Kotak Rp 110,500
5 Keramik Porselin Ukr. 30 x 30 polos utk lantai Kotak Rp 110,500
6 Keramik Porselin Ukr. 40 x 40 polos utk lantai Kotak Rp 117,600
7 Keramik Porselin Ukr. 20 x 20 wana utk lantai Kotak Rp 110,500
8 Keramik Porselin Ukr. 30 x 30 warna utk lantai Kotak Rp 110,500
9 Keramik Porselin Ukr. 40 x 40 warna utk lantai Kotak Rp 117,600
10 Keramik Porselin Ukr. 30 x 30 polos anti slip utk lantai Kotak Rp 110,600
11 Vynil Karet Ukrn. 30 x 30 cm Lembar Rp 12,000
12 Batu Alam Marmo ukrn.10 x 20 abu-abu M2 Rp 344,000

E Bahan Langit - Langit ( Plafond, Acoustic )


E Bahan Langit - Langit ( Plafond, Acoustic )
1 Plywood Ukuran 4 x 8 tebal 3 mm Lembar Rp 111,400
2 Triplek Tebal 3 mm Lembar Rp 76,400
3 Triplek Tebal 6 mm Lembar Rp 150,700
4 Triplek Tebal 9 mm Lembar Rp 306,000
5 Multiplek Tebal 12 mm Lembar Rp 423,300
6 Gypsum Board Tebal 9 mm Lembar Rp 89,800

F Bahan Atap ( Roof )


1 Seng Gelombang BJLS 0,30 Lembar Rp 75,800
2 Seng Gelombang BJLS 0,20 Lembar Rp 71,900
3 Genteng Metal Warna Berpasir Uk. 0,88 x 0,88 m², tebal 0,35 mm Buah Rp 72,900
4 Genteng Metal Warna Polos Uk. 0,88 x 0,88 m², tebal 0,35 mm Buah Rp 52,900
5 Genteng Multi Sirap Tyoe Borneo Uk. 7,00 x 0,50 m², tebal 0,40 mm Buah
6 Nok Genteng Metal Warna
Berpasir Uk. 1,00 x 0,91 m², tebal 0,35 mm Buah Rp 59,000
7 Nok Genteng Metal Warna Polos Uk. 1,00 x 0,91 m², tebal 0,35 mm Buah Rp 66,000
8 Nok Genteng Metal Multi Sirap Uk. 0,46 x 0,23 m², tebal 0,40 mm Buah
9 Seng Datar BJKLS 0,20 Lembar Rp 73,200
10 Seng Datar BJLS O,30 Lembar Rp 83,000
11 Plat Alumunium Uk. 2,00 x 1,00 m², tebal 0,25 mm Lembar Rp 80,000
12 Plat Alumunium Uk. 2,00 x 1,00 m², tebal 0,30 mm Lembar Rp 92,000
13 Atap Fiberglass Gelobang 3 mm Lembar Rp 83,000
14 Zincalume Gelombang Tebal 0,3 polos M2 Rp 90,000
15 Terpal - Lembar Rp 53,000

G Bahan Kaca ( Glass )


1 Kaca Polos / Bening 5 mm M2 Rp 239,500
2 Kaca Rayban 5 mm M2 Rp 265,500
3 Kaca Cermin 3 mm M2

H Bahan Cat ( Paint )


1 Amplas Kayu / Besi / Tembok - Lembar Rp 21,000
2 Dempul - Kg Rp 67,000
3 Cat Dasar - Kg Rp 66,000
4 Cat Tembok - Kg Rp 62,000
5 Cat Kayu - Kg Rp 80,000
6 Meni Besi - Kg Rp 99,000
7 Cat Kilat - Kg Rp 80,000
8 Plamur - Kg Rp 51,000
9 Vernis - Liter Rp 92,000
10 Cat Khusus Tembok Luar - Liter Rp 344,000
11 Minyak Cat / Thinner - Liter Rp 33,000
12 Pelitur - Liter Rp 92,000
13 Melamic - Liter Rp 99,000
14 Teak Oil A. 101. - 110 - Liter
15 Ter / Residu - Liter Rp 28,000
16 Cat Pelapis Batu Alam AN 52 - Liter Rp 124,000
17 Cat Jembatan - Kg Rp 62,000

I Bahan Besi, Alumunium dan Kawat ( Iron, Aluminium & Wire )


1 Besi Simpai Kawat - Kg Rp 24,000
2 Besi Penahan Talang - Buah Rp 7,000
3 Baja Tulangan Beton Polos - Kg Rp 15,000
4 Baja Tulangan Beton Ulir Kg Rp 15,000
5 Baja Konstruksi Galvanisir - Kg Rp 35,000
6 Kawat Ikat Beton - Kg Rp 46,000
7 Kawat Baja (Bendrat) Rp 28,000
8 Kawat Harmonika 1 Roll = 1 x 25 m2 Roll Rp 557,000
9 Kawat Nyamuk / Besi - M2 Rp 258,000
10 Kawat Nyamuk / Plastik Kassa M2 Rp 33,000
11 Kawat Ikat Beronjong Galvanis Kg Rp 165,000
12 Kawat Las Listrik - Kg Rp 172,000
13 Wiremesh Besi Ulir Dia. 4 mm 1 glng = 2,10 x 54,00 m2 Gulung Rp 3,160,000
14 Wiremesh Besi Ulir Dia. 5 mm 1 glng = 2,10 x 54,00 m2 Gulung Rp 3,434,000
15 Wiremesh Besi Ulir Dia. 6 mm 1 glng = 2,10 x 54,00 m2 Gulung Rp 4,579,000
16 Multi Truss ( Rangka Atap
Baja Ringan Benta) < 12,00 m M2 Rp 103,000
17 Baja Konstruksi / Profil - Kg Rp 19,000
18 Besi Pelat T = 1,00 mm L = 2 cm (besi strip) Batang Rp 124,000
19 Teralis Jendela Besi dia. 8 mm M2
20 Roling Door Besi - M2
21 Pintu Folding Gate - M2
22 Pintu Lipat - M2
23 Alumunium Foil Ukrn. 60,00 x 1,25 m2 M2
24 Alumunium Tape - Roll
25 Sunscreen Alumunium - M1
26 Venetions Blinds - M2
27 Horizontal Blinds - M2
28 Vertikal Blinds - M2
29 Besi Spoor Plank - Buah
30 Kabel Dia. 2 inc M1 Rp 18,000
31 Pintu Alumunium - Unit Rp 1,083,000

J Bahan Penggantung, Kunci & Perekat ( Nails, Keys, & Glue )


1 Baut Baja ( Jembatan ) - Kg
2 Baut - Buah Rp 11,000
3 Door Closer Beloci Buah Rp 328,000
4 Door Stop - Buah Rp 42,000
5 Engsel Pintu Biasa - Buah Rp 17,000
6 Engsel Jendela Biasa - Buah Rp 14,000
7 Engsel Pintu Kuningan - Buah Rp 46,000
8 Engsel Jendela Kuningan - Buah Rp 33,000
9 Handle Pintu & Jendela - Buah Rp 210,000
10 Kait Angin - Buah Rp 20,000
11 Kunci Pintu Tanam Antik - Buah Rp 416,000
12 Kunci Pintu Tanam (Union) - Buah Rp 197,000
13 Kunci Tanam KM / WC - Buah Rp 131,000
14 Kunci Silinder - Buah Rp 99,000
15 Kunci Lemari - Buah Rp 20,000
16 Lem Kayu / Tripleks - Kg Rp 84,000
17 Lem PVC - Kg Rp 46,000
18 Paku Campuran 1" - 5" - Kg Rp 27,000
19 Paku Atap Seng / Paku Payung - Kg Rp 40,000
20 Paku Genteng Metal Multi Sirap - Kg Rp 46,000
21 Paku Gypsum - Kg Rp 28,000
22 Paku Sekrup 3,5" - Buah Rp 7,000
23 Paku Beton 4" Kotak / 100 bh Kotak Rp 46,000
24 Paku Jembatan - Kg Rp 53,000
25 Paku Tripleks - Kg Rp 53,000
26 Rel Pintu Geser / Sliding Door - Set
27 Seal Tape - Buah Rp 14,000
28 Sekrup / Baut / Mur - Kg Rp 14,000
29 Selot Pintu 4" Buah Rp 20,000
30 Selot Jendela 2" Buah Rp 14,000
31 Beugel - Buah Rp 11,000
32 Lem Genteng Metal Multi Sirap - Cup

K Bahan Sanitair ( Sanitary )


1 Kloset Duduk / Monoblok Ukrn. 70 x 41 x 70 cm Set Rp 3,801,864
2 Kloset Jongkok Standar Ina Set Rp 532,694
3 Urinoir Type U 57 M Ex. toto / setara Set Rp 283,694
4 Bidet Ukrn. 63 x 44 x 37 cm Buah
5 Washtafel KIA Gantung Set Rp 657,694
6 Bak Mandi Fiberglass - Buah
7 Badkip / Bathub Porselin Panjang Ukrn. 145 x 75 x 40 cm Buah Rp 6,006,833
8 Badkip / Bathub Porselin Sudut Ukrn. 125 x 125 x 50 cm Buah Rp 6,748,228
9 Bak Air Fiberglass Vol. 1 (satu) m3 - Buah Rp 458,000
10 Bak Cuci Piring Stainless steel double Buah Rp 754,384
11 Water Drain + Accessories Plastik Set Rp 112,283
12 Shower Tray Ukrn. 90 x 85 x x 10 cm Buah Rp 212,543
13 Tempat Sabun, Diisi 1 Lubang - Buah Rp 59,283
14 Kran Air Lokal 3/4" - Buah Rp 33,283
15 Floor Drain Plastik Buah Rp 27,283
16 Pemanas Air + Lapisan Anti Karat Kap. 15 liter Buah Rp 5,836,249
17 Talang Gantung PVC Lebar 6" cm M2 Rp 214,136
L Bahan Pipa ( Pipe )
L Bahan Pipa ( Pipe ) …
1 Pipa SP Diam. 400 mm, spiral welded, M Rp 3,219,000
one sleeve end
2 Pipa SP Diam. 300 mm M Rp 2,811,000
3 Pipa SP Diam. 250 mm M
4 Pipa SP Diam. 200 mm M
5 Pipa GIP Class Medium 200 mm (8") 6 m/Btng Rp 8,917,000
6 Pipa GIP Class Medium 150 mm (6") 6 m/Btng Rp 8,040,000
7 Pipa GIP Class Medium 125 mm (5") 6 m/Btng Rp 3,240,000
8 Pipa GIP Class Medium 100 mm (4") 6 m/Btng Rp 2,600,000
9 Pipa GIP Class Medium 75 mm (3") 6 m/Btng Rp 2,121,000
10 Pipa GIP Class Medium 50 mm (2") 6 m/Btng Rp 157,000
11 Pipa GIP Class Medium 40 mm (1,5") 4 m/Btng Rp 737,000
12 Pipa GIP Class Medium 25 mm (1") 4 m/Btng Rp 509,000
13 Pipa GIP Class Medium 19 mm (3/4") 4 m/Btng Rp 412,000
14 Pipa GIP Class Medium 13 mm (1/2") 4 m/Btng Rp 329,000
15 Pipa GIP Diam. 150 mm M Rp 1,317,000
16 Pipa GIP Diam. 100 mm M Rp 1,038,000
17 Pipa GIP Diam. 75 mm M Rp 562,000
18 Pipa GIP Diam. 50 mm M Rp 333,000
19 Pipa GIP Diam. 1" M Rp 97,000
20 Pipa GIP Diam. 3/4 " M Rp 63,000
21 Pipa HDPE Diam. 400 mm, PN 100, SDR 13,6 M Rp 2,651,000
(Setara dengan S10)
22 Pipa HDPE Diam. 400 mm, PN 100, SDR 17 M Rp 2,151,000
(Setara dengan S12,5)
23 Pipa HDPE Diam. 300 mm, PN 100 M Rp 1,964,000
24 Pipa HDPE Diam. 200 mm, PN 100 M Rp 882,000
25 Pipa HDPE Diam. 150 mm, PN 100 M Rp 566,000
26 Pipa HDPE Diam. 100 mm, PN 100 M Rp 268,000
27 Pipa HDPE Diam. 75 mm, PN 100 M Rp 181,000
28 Pipa HDPE Diam. 50 mm, PN 100 M Rp 90,000
29 Pipa PVC Type AW Diam. 250 mm (10") 6 m/Btng Rp 1,692,000
30 Pipa PVC Type AW Diam. 200 mm (8") 6 m/Btng Rp 1,100,000
31 Pipa PVC Type AW Diam. 150 mm (6") 6 m/Btng Rp 636,000
32 Pipa PVC Type AW Diam. 125 mm (5") 6 m/Btng Rp 459,000
33 Pipa PVC Type AW Diam. 100 mm (4") 6 m/Btng Rp 284,000
34 Pipa PVC Type AW Diam. 75 mm (3") 6 m/Btng Rp 172,000
35 Pipa PVC Type AW Diam. 50 mm (2") 6 m/Btng Rp 87,000
36 Pipa PVC Type AW Diam. 40 mm (1,5") 4 m/Btng Rp 67,000
37 Pipa PVC Type AW Diam. 25 mm (1") 4 m/Btng Rp 40,000
38 Pipa PVC Type AW Diam. 19 mm (3/4") 4 m/Btng Rp 28,000
39 Pipa PVC Type AW Diam. 13 mm (1/2") 4 m/Btng Rp 20,000
40 Pipa PVC S- 12,5 Diam. 600 mm (24") 6 m/Btng Rp 18,736,000
41 Pipa PVC S- 12,5 Diam. 500 mm (20") 6 m/Btng Rp 11,772,000
42 Pipa PVC S- 12,5 Diam. 450 mm (18") 6 m/Btng Rp 9,511,000
43 Pipa PVC S- 12,5 Diam. 400 mm (16") 6 m/Btng Rp 7,478,000
44 Pipa PVC S- 12,5 Diam. 350 mm (14") 6 m/Btng Rp 5,850,000
45 Pipa PVC S- 12,5 Diam. 300 mm (12") 6 m/Btng Rp 4,562,000
46 Pipa PVC S- 12,5 Diam. 250 mm (10") 6 m/Btng Rp 2,869,000
47 Pipa PVC S- 12,5 Diam. 200 mm (8") 6 m/Btng Rp 1,831,000
48 Pipa PVC S- 12,5 Diam. 150 mm (6") 6 m/Btng Rp 1,175,000
49 Pipa PVC S- 12,5 Diam. 100 mm (4") 6 m/Btng Rp 550,000
50 Pipa PVC S- 12,5 Diam. 75 mm (3") 6 m/Btng Rp 377,000
51 Pipa PVC S- 12,5 Diam. 50 mm (2") 6 m/Btng Rp 245,000
52 Pipa PVC Diam. 400 mm, S10 M
U Tenaga Kerja ( Upah )
1 Mandor - Org/hr Rp 230,000
2 Kepala Tukang - Org/hr Rp 175,000
3 Tukang - Org/hr Rp 120,000
4 Mekanik Org/hr Rp 230,000
6 Operator Terlatih - Org/hr Rp 175,000
7 Operator Kurang Terlatih - Org/hr Rp 175,000
8 Pembantu Operator - Org/hr Rp 120,000
9 Supir Material / Truk - Org/hr Rp 100,000
10 Supir Personil - Org/hr Rp 120,000
11 Pembantu Supir / Kernet Org/hr Rp 100,000
12 Buruh Lapangan Tak Terlatih - Org/hr Rp 60,000
13 Buruh Lapangan Agak Terlatih - Org/hr Rp 80,000
14 Buruh Lapangan Terlatih / Pekerja - Org/hr Rp 100,000
15 Alat - Alat Bantu *) - Set
STANDAR HARGA SATUAN UPAH DAN BAHAN
WILAYAH I
(Periode Oktober 2011)

PROVINSI KALIMANTAN BARAT


KABUPATEN PONTIANAK
HARGA
NO JENIS PEKERJA KODE SATUAN KETERANGAN
(Rp)
1 2 3 4 5 6

A. UPAH
1 Mandor Lapangan L 061 Hari 70,000.00 1. Harga Tahun 2011
2 Mekanik L 071 Hari 70,000.00 Harga Belum
3 Mekanik Pembantu L 072 Hari 65,000.00 Termasuk PPn
4 Kepala Tukang L 073 Hari 70,000.00
5 Tukang L 079 Hari 65,000.00
6 Operator Terlatih *) L 081 Hari 65,000.00
7 Operator Kurang Terlatih **) L 082 Hari 60,000.00
8 Pembantu Operator L 083 Hari 55,000.00
9 Supir Material / Truck L 091 Hari 60,000.00
10 Supir Personil L 092 Hari 60,000.00
11 Pembantu Supir / Kernet L 099 Hari 55,000.00
12 Buruh Lapangan Terlatih L 106 Hari 65,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 60,000.00
14 Buruh Lapangan Tak Terlatih L 101 Hari 55,000.00
15 Penjaga Api - Hari 45,000.00
16 Penjaga Malam - Hari 55,000.00

Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan


jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll
**) Operator yang mengoperasikan peralatan untuk melayani pekerjaan
yang agak ringan
Misal : Steel Wheeled Roller, Stamper, Concrete Mixer/Mesin pengaduk beton dll

HARGA
NO JENIS BAHAN KODE SATUAN KETERANGAN
(Rp)
1 2 3 4 5 6

B. BAHAN PENGISI
1 Batu Kong M.101 M³ 165,000.00 1. Harga Tahun 2011
2 Batu Sap Pinang - M³ 184,000.00 Harga Belum
3 Batu pecah 15-20 cm - M³ 268,000.00 Termasuk PPn
4 Batu pecah 10-15 cm M.020 M³ 184,000.00
5 Batu pecah 5-7 cm M.022 M³ 203,200.00
6 Batu pecah 3-5 cm M.023 M³ 230,000.00 2. Harga ini berlaku untuk
7 Batu pecah 2-3 cm M.024 M³ 287,500.00 Wilayah I :
8 Batu pecah 1-2 cm M.025 M³ 394,300.00 Kec. Sungai Kunyit
9 Batu pecah 1-1 cm - M³ 428,100.00 Kec. Mempawah Hilir
10 Batu pecah 0,5 cm M.026 M³ 427,400.00 Kec. Mempawah Timur
11 Stone Dust - M³ 394,400.00 Kec. Sungai Pinyuh
12 Aspal Bitumen 60/70 - Kg 11,500.00 Kec.Segedong
13 Pasir M.040 M³ 115,000.00 Kec.Siantan
14 Semen PC M.080 Zak 73,600.00 dan daerah lain yang
15 Semen PC - Kg 1,500.00 memiliki kesamaan
16 Timbunan Pilihan (Tanah Datang) M.050.a M³ 63,300.00 karakteristik wilayah yang
17 Paving Block - Buah 2,600.00 mempengaruhi harga
18 Paving Stone - Buah 4,200.00 satuan.
19 Batu Bata 5 cm x 11 cm x 22 cm Buah 2,700.00
20 Batako 7 cm x 15 cm x 30 cm - Buah 1,300.00 3. Harga satuan merupakan
21 Batako 6 cm x 15 cm x 30 cm - Buah 1,300.00 harga on side (di lapangan)
22 Batako 7 cm x 20 cm x 40 cm (press) - Buah 2,500.00
23 Batako 9 cm x 20 cm x 40 cm (press) - Buah 2,700.00
24 Bata terawang ( roster ) uk.18 cm x 18 cm - Buah 3,500.00
25 Bata terawang uk.20 cm x 20 cm - Buah 2,000.00 4. Untuk penentuan harga
26 Bata terawang press ( roster ) uk.30 x 30 cm - Buah 27,600.00 satuan yang dipergunakan
27 Bata terawang keramik uk.30 x 30 cm - Buah 54,700.00 dipengaruhi oleh asumsi
28 Keramik uk. 10 cm x 20 cm - Kotak 54,100.00 perencanaan yang dipakai.
29 Keramik uk. 20 cm x 20 cm - Kotak 48,300.00
30 Keramik uk. 20 cm x 20 cm ( Corak ) - Kotak 55,200.00
31 Keramik uk. 20 cm x 25 cm - Kotak 57,400.00
32 Keramik uk. 30 cm x 30 cm (biasa) - Kotak 41,400.00
33 Keramik uk. 30 cm x 30 cm Unpolished - Kotak 57,000.00
34 Keramik uk. 30 cm x 30 cm Artistik - Kotak 67,100.00
35 Keramik uk. 40 cm x 40 cm (biasa) - Kotak 48,300.00
36 Keramik uk. 40 cm x 40 cm Polished (setaraf Indogress) - Kotak 131,700.00
37 Keramik uk. 40 cm x 40 cm Polished (setaraf Decogress) - Kotak 124,900.00
38 Keramik uk. 40 cm x 40 cm Unpolished (setaraf Indogress) - Kotak 147,800.00
39 Keramik uk. 40 cm x 40 cm Unpolished (setaraf Decogress) - Kotak 126,700.00
40 Keramik uk. 60 cm x 60 cm Polished (setaraf Indogress) - Kotak 289,800.00
41 Keramik uk. 60 cm x 60 cm Polished (setaraf Decogress) - Kotak 219,200.00
42 Granito uk. 40 cm x 40 cm - Kotak 198,100.00
43 Marmer - M² 474,400.00
44 Wood Flooring - M² 287,500.00
45 List Keramik uk 2 cm x 5 cm - Bh 900.00
46 List Keramik WC. Uk. 8 cm x 20 cm - Bh 5,500.00
47 Plint Kayu uk. 2 x 10 cm - Bh 48,900.00
48 Batu Tempel Hitam uk.5 x 10 cm - M² 149,500.00
49 Batu Paras uk. 5 x 10 cm - M² 149,500.00
50 Floor Hardener - Kg 8,700.00
51 Beton Ready Mix B 0 - M³ 793,500.00
52 Beton Ready Mix 125 - M³ 833,800.00
53 Beton Ready Mix 175 - M³ 897,000.00
54 Beton Ready Mix 225 - M³ 994,800.00
55 Beton Ready Mix 300 - M³ 1,086,800.00
56 Additive Ready Mix - Liter 46,000.00
57 Karung Goni Curing Beton ( 0.7m² ) - Lembar 12,100.00
58 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m - Btg 1,207,500.00
59 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m - Btg 1,587,000.00
60 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m - Btg 1,035,000.00
61 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m - Btg 1,155,800.00
62 Papan Turap Uk. 15/50 - 5m - K 300 - Kpg 920,000.00
1 2 3 4 5 6
63 Papan Turap Uk. 15/50 - 6m - K 300 - Kpg 1,173,000.00
64 Pemancangan Mini Pile - 6m - Btg 138,000.00
65 Sewa Pompa Ready Mix (Min. 100 M³) - M³ 57,500.00
66 Bahan Plastik Cor Beton - M² 4,100.00

C. BAHAN KAYU
1 Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m - M³ 9,767,300.00
2 Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m - M³ 12,945,200.00
3 Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m - M³ 10,888,100.00
4 Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m - M³ 9,587,900.00
5 Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m - M³ 6,289,100.00
6 Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m - M³ 8,970,000.00
7 Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m - M³ 9,200,000.00
8 Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m - M³ 9,970,500.00
9 Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m - M³ 10,810,000.00
10 Kayu Belian Tidak Ketam uk.18 cm x 18 cm x 4 m - M³ 7,705,900.00
11 Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m - M³ 8,625,000.00
12 Kayu Belian Ketam uk. 6 cm x 6 cm x 4 m - M³ 15,175,700.00
13 Kayu Belian Ketam uk. 7 cm x 7 cm x 4 m - M³ 12,866,400.00
14 Kayu Belian Ketam uk. 8 cm x 8 cm x 4 m - M³ 11,885,300.00
15 Kayu Belian Ketam uk. 3 cm x 7 cm x 4 m - M³ 15,395,700.00
16 Kayu Belian Ketam uk. 4 cm x 8 cm x 4 m - M³ 12,653,000.00
17 Kayu Belian Ketam uk. 5 cm x 10 cm x 4 m - M³ 11,260,800.00
18 Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m M.181.d M³ 14,839,400.00
19 Papan Belian Ketam uk. 2 cm x 16 cm x 4 m M.181.e M³ 17,659,700.00
20 Kayu kls I Bengkirai Tidak Ketam uk. 7 cm x 7 cm x 4 m - M³ 4,840,600.00
21 Kayu kls I Bengkirai Tidak Ketam uk. 8 cm x 8 cm x 4 m M.181.g M³ 11,810,800.00
22 Papan kls I Tidak Ketam - M³ 9,463,600.00
23 Kayu kls I Bengkirai Ketam uk. 7 cm x 7 cm x 4 m - M³ 6,307,500.00
24 Kayu kls I Bengkirai Ketam uk. 8 cm x 8 cm x 4 m M.181.f M³ 6,963,000.00
25 Papan kls I Ketam - M³ 7,906,300.00
26 Kayu kls I Bengkirai Ketam uk. 5 cm x 10 cm x 4 m ( untuk kusen ) - M³ 12,075,000.00
27 Kusen Kayu Kelas I Bangkirai uk. 5/10 - M³ 86,300.00
28 Kayu kls II Tidak Ketam uk.3 cm x 5 cm x 4 m - M³ 3,818,000.00
29 Kayu kls II Tidak Ketam uk.4 cm x 6 cm x 4 m - M³ 3,348,800.00
30 Kayu kls II Tidak Ketam uk.4 cm x 8 cm x 4 m - M³ 3,834,700.00
31 Kayu kls II Tidak Ketam uk.5 cm x 7 cm x 4 m - M³ 3,674,300.00
32 Kayu kls II Tidak Ketam uk.5 cm x 10 cm x 4 m - M³ 3,737,500.00
33 Kayu kls II Tidak Ketam uk.6 cm x 10 cm x 4 m - M³ 3,391,500.00
34 Kayu kls II Tidak Ketam uk.6 cm x 12 cm x 4 m - M³ 3,284,400.00
35 Kayu kls II Tidak Ketam uk.7 cm x 7 cm x 4 m - M³ 3,812,300.00
36 Kayu kls II Tidak Ketam uk.8 cm x 8 cm x 4 m - M³ 3,363,800.00
37 Kayu kls II Tidak Ketam uk.8 cm x 12 cm x 4 m - M³ 3,532,000.00
38 Kayu kls II Tidak Ketam uk.8 cm x 15 cm x 4 m - M³ 2,635,500.00
39 Kayu kls II Tidak Ketam uk.10 cm x 10 cm x 4 m - M³ 3,593,800.00
40 Papan kls II Tidak Ketam uk.2,5 cm x 20 cm x 4 m M.181.j M³ 3,881,300.00
41 Kayu kls II Ketam uk.5 cm x 10 cm x 4 m - M³ 4,528,200.00
42 Kayu kls II Ketam uk.8 cm x 8 cm x 4 m - M³ 4,288,800.00
43 Kayu kls II Ketam uk.7 cm x 7 cm x 4 m - M³ 4,692,000.00
44 Kayu kls II Ketam uk.6 cm x 6 cm x 4 m - M³ 5,554,500.00
45 Kayu kls II Ketam uk.3 cm x 7 cm x 4 m - M³ 5,884,600.00
46 Kayu kls II Ketam uk.3 cm x 5 cm x 4 m - M³ 5,917,900.00
47 Papan kls II Ketam uk.1,8 cm x 18 cm x 4 m M.181.k M³ 5,479,100.00
48 Papan kls II Ketam uk.1 cm x 7 cm x 4 m M.181.k M³ 7,851,800.00
49 Kayu kls III Tidak Ketam uk.3 cm x 5 cm x 4 m - M³ 2,290,800.00
50 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m - M³ 2,266,100.00
51 Kayu kls III Tidak Ketam uk.5 cm x 7 cm x 4 m - M³ 1,796,300.00
52 Kayu kls III Tidak Ketam uk.5 cm x 10 cm x 4 m - M³ 2,070,000.00
53 Kayu kls III Tidak Ketam uk.6 cm x 12 cm x 4 m - M³ 1,979,500.00
54 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m - M³ 2,018,300.00
55 Kayu kls III Tidak Ketam uk.8 cm x 12 cm x 4 m - M³ 2,093,000.00
56 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M.181.l M³ 2,380,500.00
57 Papan Simpiran - M³ 1,102,100.00
58 Renglat kayu klas I uk 1/8 cm - Btg 44,700.00
59 Kayu profil 10 cm - Btg 21,700.00
60 Profil Kayu Klas II L = 7 cm Pjg 4 m - Keping 28,800.00
61 Kayu cerucuk /dolken ø 4 - 6 - Pj. 4 M - Batang 5,900.00
62 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M - Batang 8,700.00
63 Kayu cerucuk /dolken ø 8 - 10 - Pj. 4 M - Batang 11,000.00
64 Kayu cerucuk /dolken ø12 - Pj. 12 M - Batang 80,500.00
65 Kayu cerucuk /dolken ø 15 - Pj. 12 M - Batang 97,800.00
66 Kayu untuk Perancah - M³ 983,300.00
67 Kayu Simpiran - M³ 952,200.00
68 Kayu Bakar - M³ 69,000.00
69 Alat-alat Bantu - Set 102,300.00
70 Alas laci - Btg 17,300.00
71 Wood Plank - M' 57,500.00

D. BAHAN CAT
1 Amplas Besi - Lembar 2,500.00
2 Amplas Kayu - Lembar 1,400.00
3 Minyak Cat - Liter 29,300.00
4 Plamur - Kg 30,900.00
5 Cat Dasar - Kg 29,400.00
6 Cat Kilat - Kg 46,000.00
7 Cat Tembok - Kg 15,000.00
8 Cat tembok type weather shield - Kg 103,500.00
9 Cat tembok type weather coat (acrylic) - Kg 165,400.00
10 Cat seng - Kg 112,100.00
11 Dempul - Kg 29,300.00
12 Plitur - Kg 52,500.00
13 Thiner M.090.f Ltr 24,100.00
14 Thiner ND - Ltr 34,000.00
15 Cat Melamic - Kg 61,000.00
16 Cat Pilox - Klg 23,000.00
17 Meni - Kg 46,300.00
18 Teer - Liter 12,700.00
19 Vernis - Liter 38,600.00
20 Oker Warna ( Induk ) - Kg 58,700.00
21 Oker Warna ( Biasa ) - Kg 15,000.00
22 Lem Fox ( Putih ) - Kg 36,300.00
23 Lem Fox ( Kuning ) - Kg 42,600.00
24 Sealent - Tube 143,800.00
1 2 3 4 5 6
25 Soda Api - Kg 12,700.00
26 Sabun / cream pembersih kotoran - Kg 21,300.00
27 Teak Oil - Liter 46,000.00
28 Kuas 4" - Buah 18,600.00
29 Road Line Paint ( Cat Marka ) M.090.e Liter 103,500.00
30 Glass Bit M.090.g Kg 42,000.00
31 Weatherbond Emulsion ( cat kerb ) M.090.h Kg 103,500.00
32 Termoplast - Kg 39,300.00
33 Water Proofing - M² 55,500.00

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton M.167 Kg 16,300.00
2 Besi wire mesh ø 5 - Kg 18,600.00
3 Kawat baja/bendrat M.168 Kg 19,600.00
4 Simpai roll - Kg 21,900.00
5 Kawat simpai - Kg 27,900.00
6 Kawat Nyamuk Besi - M² 17,300.00
7 Kawat Nyamuk Plastik - M² 6,900.00
8 Kawat Saringan Pasir - M² 11,500.00
9 Kawat harmonika - M² 28,800.00
10 Kawat kasa - M² 14,400.00
11 Baut Baja 4" Panjang 20 cm - Buah 8,700.00
12 Baut Baja 4" Panjang 30 cm - Buah 11,000.00
13 Baut Baja 4" Panjang 40 cm - Buah 13,300.00
14 Beugel plat L. 3 cm - bh 40,300.00
15 Besi Penahan Buah 12,100.00
16 Besi Plat Tebal 2,5 mm - Lembar 747,500.00
17 Besi Plat Tebal 1,25 mm - Lembar 437,000.00
18 Besi Baja IWF - Kg 18,800.00
19 Besi strip 3/4 panjang - Kg 9,800.00
20 Besi Konstruksi (I, H) - Kg 18,800.00
21 Besi Konstruksi ( C ) - Kg 19,500.00
22 Besi Konstruksi (siku ) - Kg 19,500.00
23 Kawat Las - Batang 5,800.00
24 Kawat Las - Kg 115,000.00
25 Folding gate - M² 575,000.00
26 Rangka Aluminium 1 1/2" x 3" - Meter 86,300.00
27 Rangka Aluminium 1 3/4" x 4" - Meter 110,400.00
28 Pintu Aluminium std IKP, lengkap 4" - Unit 2,501,300.00
29 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M² 195,500.00
30 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M² 276,000.00
31 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) - M² 207,000.00
32 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M² 310,500.00
33 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M² 184,000.00
34 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M² 230,000.00
35 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) - M² 195,500.00
36 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M² 264,500.00
37 Alumunium Komposit + Rangka Besi - M² 993,300.00
38 Rangka Plafond Metal Furing + Pemasangan - M² 83,700.00
39 Alumatek 220 x 120 cm (partisi) - Lembar 1,625,000.00
40 Alucofon 220 x 120 cm (partisi) - Lembar 1,625,000.00

F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC - Buah 316,300.00
2 Engsel Kupu-kupu 4" ( biasa ) - Kotak 9,200.00
3 Engsel Kupu-kupu 4" ( Stainles ) - Kotak 31,100.00
4 Engsel Kupu-kupu 3" ( biasa ) - Kotak 8,700.00
5 Engsel Kupu-kupu 3" ( Stainles ) - Kotak 23,000.00
6 Slot Jendela ( Biasa ) - Buah 2,300.00
7 Slot Jendela ( Stainles ) - Buah 5,800.00
8 Slot Pintu ( Biasa ) - Buah 4,600.00
9 Slot Pintu ( Stainles ) - Buah 23,000.00
10 Kunci tanam 2 slag (setaraf Belluci) - Buah 192,700.00
11 Kunci tanam 1 slag - Buah 123,700.00
12 Kunci tanam antik - Buah 187,200.00
13 Kunci tanam biasa - Buah 90,900.00
14 Kunci silinder - Buah 112,200.00
15 Kunci Tanam Kecil - Buah 89,700.00
16 Door Closer - Buah 171,100.00
17 Door Stoper - Buah 80,500.00
18 Pegangan Pintu ( Biasa ) - Buah 80,500.00
19 Pegangan Pintu ( Stainles ) - Buah 149,500.00
20 Pegangan Jendela ( Biasa ) - Buah 2,900.00
21 Pegangan Jendela ( Stainles ) - Buah 6,900.00
22 Kait angin ( Biasa ) - Buah 3,500.00
23 Kait angin ( Stainles ) - Buah 9,200.00
24 Paku Campuran M.166.b Kg 21,900.00
25 Paku Seng M.166.a Kg 25,700.00
26 Paku Atap Seng M.166.c Kg 23,000.00
27 Paku Atap Metal - Kg 40,300.00
28 Paku GRC - kg 30,200.00
29 Paku / sekrup Gypsum - Buah 200.00
30 Paku triplek - Kg 30,200.00
31 Paku Asbes - Kg 30,200.00
32 Paku Beton - Kg 28,800.00
33 Sekrup fixer - Buah 1,800.00
34 Sekrup Steel Sheet - Buah 500.00
35 Sekrup Zincalume Buah 600.00
36 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm - Unit 4,600,000.00
37 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm - Unit 2,300,000.00
38 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm - Unit 1,725,000.00
39 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) - Unit 690,000.00
40 Kusen Alumunium - M' 80,500.00
G. BAHAN ATAP
1 Sirap belian - Lembar 5,800.00
2 Asbes - Lembar 59,300.00
3 Eternit - M² 74,800.00
4 Atap Metal 0,30 mm 2 Gelombang uk.70 x 80 cm - Lembar 44,900.00
5 Atap Metal 0,30 mm 4 Gelombang uk.120 x 80 cm - Lembar 82,300.00
6 Atap Metal 0,25 mm 2 Gelombang uk.70 x 80 cm - Lembar 39,100.00
7 Atap Metal 0,25 mm 4 Gelombang uk.120 x 80 cm - Lembar 75,900.00
8 Genteng Metal Type Prima 0.35 - Lembar 72,800.00
9 Genteng Metal Type Royal 0.35 - Lembar 72,800.00
1 2 3 4 5 6
10 Genteng Metal Type Classic 0.35 - Lembar 70,400.00
11 Genteng Metal Stone ( Type Classic 0.35 ) - Lembar 93,000.00
12 Genteng Metal Stone ( Type Prima 0.35 ) - Lembar 93,000.00
13 Atap Metal Supersheet 0.35 (polos) - M' 97,800.00
14 Atap Metal Supersheet 0.35 (polos) - M² 122,300.00
15 Atap Trim Deck 0.3 (polos) - M² 109,300.00
16 Atap Trim Deck 0.33 (color) - M² 122,800.00
17 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) - Buah 74,800.00
18 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm) - Buah 92,000.00
19 Nok bubungan genteng metal kotak 0.35 - M' 89,300.00
20 Nok bubungan genteng metal stone kotak 0.35 - M' 105,800.00
21 Nok bubungan Trim Deck (polos) - M' 119,600.00
22 Nok bubungan Trim Deck (color) - M' 134,600.00
23 Nok bubungan Steel Sheet 0.33 (color) (pj 50 cm) - M' 48,300.00
24 Nok bubungan Steel Sheet 0.43 (color) (pj 50 cm) - M' 55,200.00
25 Nok bubungan Steel Sheet 0.35 (polos) (pj 50 cm) - M' 44,900.00
26 Nok bubungan Steel Sheet 0.40 (polos) (pj 50 cm) - M' 48,300.00
27 Seng Gelombang Bjls 30 - Lembar 74,700.00
28 Seng Gelombang Bjls 20 - Lembar 53,800.00
29 Seng Plat Bjls 20 - Lembar 55,200.00
30 Seng Plat Bjls 30 - Lembar 74,800.00
31 Seng Plat Bjls 30 (lebar 45 cm) - M' 21,900.00
32 Plat Datar Color 0.35 - Lembar 63,300.00
33 Zincalume Gelombang Persegi 0.35 (polos) - M² 131,300.00
34 Zincalume Gelombang Persegi 0.30 (polos) - M² 115,500.00
35 Zincalume Gelombang Persegi 0.35 (color) - M² 147,100.00
36 Zincalume Gelombang Persegi 0.30 (color) - M² 131,300.00
37 Zincalume Plat 0.2 - Lembar 136,900.00
38 Aluminium Foil - M² 57,500.00
39 Atap Steel Sheet 0.33 (color) - M² 121,800.00
40 Atap Steel Sheet 0.40 (polos) - M² 121,800.00
41 Alumunium Plat BJLS 0,25 - Lembar 55,200.00
42 Alumunium Plat BJLS 0,30 - Lembar 61,000.00
43 Atap Fiberglass Gelombang - Lembar 57,500.00
44 Atap Plastik Gelombang - Lembar 57,500.00

H. BAHAN KACA
1 Kaca Bening uk 12 mm - M² 575,000.00
2 Kaca Bening uk. 5 mm - M² 126,500.00
3 Kaca Bening uk. 3 mm - M² 107,600.00
4 Kaca Bening uk. 2 mm - M² 74,800.00
5 Kaca Rayban uk. 5 mm - M² 153,000.00
6 Kaca Rayban uk. 3 mm - M² 120,800.00
7 Kaca Cermin uk. 2 mm - M² 241,500.00
8 Kaca Patri - M² 2,875,000.00
9 Nako + Bingkai (80 x 15) x 10 daun polos - Buah 266,800.00
10 Nako + Bingkai (80 x 15) x 10 daun rayben - Buah 294,400.00
11 Kaca Es - M² 174,800.00

I. BAHAN TRIPLEK
1 Triplek t uk 3 mm - Lembar 63,300.00
2 Triplek t uk 6 mm - Lembar 139,200.00
3 Triplek t uk 9 mm - Lembar 172,500.00
4 Multiplek t uk 10 mm - Lembar 195,500.00
5 Multiplek t uk 12 mm - Lembar 232,300.00
6 Poliwood uk 3 mm x 122 cm x 244 cm - Lembar 74,800.00
7 Poliwood 4' x 8' x 4mm - Lembar 114,400.00
8 Teak Wood - Lembar 103,500.00
9 Papan GRC uk 3 mm x 122 cm x 244 cm - Lembar 54,100.00
10 Papan GRC uk 4 mm x 122 cm x 244 cm - Lembar 59,800.00
11 Panel GRC 120 x 240 x 40 - Lembar 67,900.00
12 Gypsum Board uk. 9 x 120 x 240 cm - Lembar 62,100.00
13 Tepung Gypsum - Kg 5,800.00
14 Asbes Polos uk. 1 m x 1 m - Lembar 20,200.00

J. BAHAN SANITASI
1 Kloset duduk monoblok - Buah 1,782,500.00
2 Kloset duduk putih (setaraf TOTO) - Buah 2,242,500.00
3 Kloset duduk warna (setaraf TOTO) - Buah 2,449,500.00
4 Kloset jongkok (setaraf TOTO) - Buah 213,900.00
5 Kloset jongkok (setaraf INA) - Buah 143,800.00
6 Wastafel Alumunium - Buah 195,500.00
7 Wastafel Keramik - Buah 287,500.00
8 Bak Cuci Stainles 1 Lubang - Buah 184,000.00
9 Bak Cuci Stainles 2 lubang - Buah 379,500.00
10 Keran air 1/2" (RRC) - Buah 28,800.00
11 Keran air 1/2" (Lokal) - Buah 15,000.00
12 Seal Tape - Buah 2,300.00
13 Lem PVC - Tube 6,900.00
14 Floor Drain - Buah 9,200.00
15 Pipa GIV Dia 1/2" Panjang 6 m - Batang 92,000.00
16 Pipa GIV Dia 3/4" Panjang 6 m - Batang 115,000.00
17 Pipa GIV Dia 1 " Panjang 6 m - Batang 143,800.00
18 Pipa GIV Dia 1 1/2" Panjang 6 m - Batang 230,000.00
19 Pipa GIV 2"/Btg - 6 M Tebal 1,8 - Batang 299,000.00
20 Pipa GIV 2"/Btg - 6 M Tebal 2 - Batang 494,500.00
21 Pipa GIV 3"/Btg - 6 M Tebal 2,3 - Batang 575,000.00
22 Pipa GIV 4"/Btg - 6 M Tebal 2,3 - Batang 920,000.00
23 Pipa Paralon PVC uk. 1/2" (AW) Panjang : 4 M - Batang 17,300.00
24 Pipa paralon PVC uk. 3/4" (AW)Panjang : 4 M - Batang 21,900.00
25 Pipa Paralon PVC uk.1" (AW) Panjang : 4 M - Batang 32,800.00
26 Pipa Paralon PVC uk.1.5" (AW) Panjang : 4 M - Batang 57,500.00
27 Pipa Paralon PVC uk.2" (AW) Panjang : 4 M - Batang 65,600.00
28 Pipa Paralon PVC uk.2.5" (AW) Panjang :4 M - Batang 103,500.00
29 Pipa Paralon PVC uk.3" (AW) Panjang : 4 M - Batang 132,300.00
30 Pipa Paralon PVC uk.4" (AW) Panjang : 4 M - Batang 218,500.00
31 Pipa Paralon PVC uk.5" (AW) Panjang : - Batang 310,500.00
32 Pipa Paralon PVC uk.6" (AW) Panjang : - Batang 425,500.00
33 Pipa Paralon PVC uk.1/2" ( C ) Panjang : 4 M - Batang 13,800.00
34 Pipa Paralon PVC uk.3/4" ( C ) Panjang : 4 M - Batang 19,000.00
35 Pipa Paralon PVC uk.1" ( C ) Panjang : 4 M - Batang 26,500.00
36 Pipa Paralon PVC uk.1.5" ( D ) Panjang : 4 M - Batang 28,800.00
37 Pipa Paralon PVC uk.2" ( D ) Panjang : 4 M - Batang 38,000.00
1 2 3 4 5 6
38 Pipa Paralon PVC uk.2.5" ( D ) Panjang : 4 M - Batang 51,800.00
39 Pipa Paralon PVC uk.3" ( D ) Panjang : 4 M - Batang 66,700.00
40 Pipa Paralon PVC uk.4" ( D ) Panjang : 4 M - Batang 102,400.00
41 Pipa Paralon PVC uk.5" ( D ) Panjang : 4 M - Batang 166,800.00
42 Pipa Paralon PVC uk.6" ( D ) Panjang : 4 M - Batang 402,500.00
43 Pipa S.12,5 PVC/RRJ Ø 150 MM/6 " Panjang : 6 M - Batang 970,000.00
44 Pipa S.12,5 PVC/RRJ Ø 100 MM/4 " Panjang : 6 M - Batang 453,100.00
45 Pipa S.12,5 PVC/RRJ Ø 75 MM/3 " Panjang : 6 M - Batang 310,800.00
46 Pipa S.12,5 PVC/RRJ Ø 50 MM/2 " Panjang : 6 M - Batang 149,900.00
47 ALL SOCKET TEE PVC/RRJ Ø 200 X 100 MM - Buah 1,885,500.00
48 ALL SOCKET TEE PVC/RRJ Ø 200 X 75 MM - Buah 1,915,700.00
49 ALL SOCKET TEE PVC/RRJ Ø 200 X 50 MM - Buah 2,106,700.00
50 ALL SOCKET TEE PVC/RRJ Ø 150 X 100 MM - Buah 942,600.00
51 ALL SOCKET TEE PVC/RRJ Ø 150 X 75 MM - Buah 904,200.00
52 ALL SOCKET TEE PVC/RRJ Ø 150 X 50 MM - Buah 853,400.00
53 ALL SOCKET TEE PVC/RRJ Ø 100 X 100 MM - Buah 463,000.00
54 ALL SOCKET TEE PVC/RRJ Ø 100 X 75 MM - Buah 432,800.00
55 ALL SOCKET TEE PVC/RRJ Ø 100 X 50 MM - Buah 409,300.00
56 ALL SOCKET TEE PVC/RRJ Ø 75 X 75 MM - Buah 293,700.00
57 ALL SOCKET TEE PVC/RRJ Ø 75 X 50 MM - Buah 265,700.00
58 ALL SOCKET TEE PVC/RRJ Ø 50 X 50 MM - Buah 169,600.00
59 ALL SOCKET REDUCER PVC/RRJ Ø 100 X 75 MM - Buah 143,800.00
60 ALL SOCKET REDUCER PVC/RRJ Ø 100 X 50 MM - Buah 107,400.00
61 ALL SOCKET REDUCER PVC/RRJ Ø 75 X 50 MM - Buah 81,100.00
62 ALL BELL BEND 90º PVC/RRJ Ø 150 MM - Buah 397,700.00
63 ALL BELL BEND 90º PVC/RRJ Ø 100 MM - Buah 156,900.00
64 ALL BELL BEND 90º PVC/RRJ Ø 75 MM - Buah 100,500.00
65 ALL BELL BEND 90º PVC/RRJ Ø 50 MM - Buah 49,200.00
66 ALL BELL BEND 45º PVC/RRJ Ø 150 MM - Buah 380,500.00
67 ALL BELL BEND 45º PVC/RRJ Ø 100 MM - Buah 156,700.00
68 ALL BELL BEND 45º PVC/RRJ Ø 75 MM - Buah 100,500.00
69 ALL BELL BEND 45º PVC/RRJ Ø 50 MM - Buah 49,200.00
70 ALL BELL BEND 22,5º PVC/RRJ Ø 150 MM - Buah 296,900.00
71 ALL BELL BEND 22,5º PVC/RRJ Ø 100 MM - Buah 146,800.00
72 ALL BELL BEND 22,5º PVC/RRJ Ø 75 MM - Buah 93,000.00
73 ALL BELL BEND 22,5º PVC/RRJ Ø 50 MM - Buah 39,300.00
74 DOP PVC/RRJ Ø 150 MM - Buah 251,900.00
75 DOP PVC/RRJ Ø 100 MM - Buah 154,800.00
76 DOP PVC/RRJ Ø 75 MM - Buah 78,000.00
77 DOP PVC/RRJ Ø 50 MM - Buah 43,300.00
78 FLANGE SOCKET PVC/RRJ Ø 150 MM - Buah 571,500.00
79 FLANGE SOCKET PVC/RRJ Ø 100 MM - Buah 314,900.00
80 FLANGE SOCKET PVC/RRJ Ø 75 MM - Buah 237,300.00
81 FLANGE SOCKET PVC/RRJ Ø 50 MM - Buah 169,300.00
82 FLANGE SPIGOT PVC/RRJ Ø 150 MM - Buah 480,500.00
83 FLANGE SPIGOT PVC/RRJ Ø 100 MM - Buah 238,600.00
84 FLANGE SPIGOT PVC/RRJ Ø 75 MM - Buah 179,600.00
85 FLANGE SPIGOT PVC/RRJ Ø 50 MM - Buah 126,700.00
86 FLANGE LAS (STELL) 150 MM - Buah 146,000.00
87 FLANGE LAS (STELL) Ø 100 MM - Buah 74,800.00
88 FLANGE LAS (STELL) Ø 75 MM - Buah 63,900.00
89 FLANGE LAS (STELL) Ø 50 MM - Buah 47,600.00
90 SPIGOT BEND 45º (SP) Ø 150 MM - Buah 250,800.00
91 SPIGOT BEND 45º (SP) Ø 100 MM - Buah 109,300.00
92 SPIGOT BEND 45º (SP) Ø 75 MM - Buah 63,000.00
93 SPIGOT BEND 45º (SP) Ø 50 MM - Buah 40,000.00
94 GIBOULT JOINT (CI) Ø 150 MM - Buah 528,800.00
95 GIBOULT JOINT (CI) Ø 100 MM - Buah 340,900.00
96 GIBOULT JOINT (CI) Ø 75 MM - Buah 269,500.00
97 GIBOULT JOINT (CI) Ø 50 MM - Buah 174,000.00
98 ALL FLANGE GATE VALVE (CI) Ø 150 MM - Buah 2,201,100.00
99 ALL FLANGE GATE VALVE (CI) Ø 100 MM - Buah 1,062,600.00
100 ALL FLANGE GATE VALVE (CI) Ø 75 MM - Buah 829,200.00
101 ALL FLANGE GATE VALVE (CI) Ø 50 MM - Buah 591,400.00
102 AIR RELIEF VALVE (CI) Ø 100 MM - Buah 1,518,000.00
103 AIR RELIEF VALVE (CI) Ø 75 MM - Buah 1,889,800.00
104 AIR RELIEF VALVE (CI) Ø 50 MM - Buah 1,410,500.00
105 Piber Glas 0,5 M3 - Buah 822,300.00
106 Piber Glas 1 M3 - Buah 1,201,800.00
107 Piber Glas 1,5 M3 - Buah 2,087,300.00
108 Piber Glas 2 M3 - Buah 2,340,300.00
109 Piber Glas 3 M3 - Buah 3,415,500.00
110 Meteran Air Ø 16 mm - Unit 316,300.00
111 Ball Valve Ø 16 mm - Buah 20,700.00
112 Double Niple GI Ø 16 mm - Buah 6,300.00
113 F. Elbouw PVC Ø 16 mm - Buah 11,300.00
114 Elbouw PVC Ø 16 mm - Buah 4,100.00
115 Reducer PVC Ø 20 x 16 mm - Buah 5,800.00
116 DOV PVC Ø 16 mm - Buah 2,100.00

K. BAHAN MINYAK
1 Minyak Tanah Non Subsidi M 065 Liter 9,200.00
2 Minyak Diesel/Solar M 183 Liter 4,500.00
3 Minyak Diesel/Solar Industri M 183 Liter 8,100.00
4 Bensin Premium M 184 Liter 4,500.00
5 Minyak Pelumas M 185 Liter 26,250.00
6 Grease - Kg 47,250.00
7 Oli BEO 154W40/Cat - Liter 48,980.00
8 Gas Elpiji - Kg 8,710.00
9 Alat-alat bantu M.170 Set 59,850.00
10 Sewa Alat Untuk Pengelasan - Jam 65,620.00
11 Sewa Molen - Set 157,500.00
12 Sewa kuali termasuk angkutan - Set 66,460.00
1 2 3 4 5 6

L. BAHAN ALAT-ALAT LISTRIK


1 Lampu Hias Automatic RB. 006 15x8x8 - Set 60,299,800.00
2 Lampu Hias Automatic D-201 2x1,5 m - Set 60,299,800.00
3 Lampu Hias Automatic D-202 2x1,5 m - Set 60,299,800.00
4 Lampu Hias Automatic D-203 2x1,5 m - Set 60,299,800.00
5 Lampu Hias Automatic D-204 2x1,5 m - Set 60,299,800.00
6 Lampu Hias Automatic D-205 2x1,5 m - Set 60,299,800.00
7 Lampu Hias Automatic D-206 2x1,5 m - Set 60,299,800.00
8 Lampu Hias Automatic D-207 2x1,5 m - Set 60,299,800.00
9 Lampu Hias Automatic D-208 2x1,5 m - Set 60,299,800.00
10 Lampu Hias Automatic D-209 2x1,5 m - Set 60,299,800.00
11 Lampu Hias Automatic D-210 2x1,5 m - Set 60,299,800.00
12 Lampu Hias Automatic D-211 2x1,5 m - Set 60,299,800.00
13 Lampu Hias Automatic D-212 2x1,5 m - Set 60,299,800.00
14 Lampu Hias Automatic DC-005 1,5 m - Set 25,842,800.00
15 Lampu Hias Automatic DC-008 1,5 m - Set 25,842,800.00
16 Lampu Hias Automatic DC-007 3 m - Set 25,842,800.00
17 Lampu Hias Automatic DC-008 1 m - Set 51,685,500.00
18 Lampu Hias Automatic DC-009 2 m - Set 51,685,500.00
19 Lampu Hias Automatic DC-010 3 m - Set 51,685,500.00
20 Lampu Hias Automatic DC-011 3 m - Set 51,685,500.00
21 Lampu Hias Automatic DC-012 1,5 m - Set 51,685,500.00
22 Lampu Hias Automatic DC-001 6 m - Set 51,685,500.00
23 Lampu Hias Automatic DC-002 3 m - Set 51,685,500.00
24 Lampu Hias Automatic DC-003 4 m - Set 51,685,500.00
25 Lampu Hias Automatic DC-004 3 m - Set 51,685,500.00
26 Lampu Hias Automatic DC-005 1,5 m - Set 51,685,500.00
27 Armatur lampu High Mass Holovent 400 watt (lengkap) - Unit 15,142,100.00
28 Armatur lampu SGP 338 / SONT 400 Watt - Unit 6,277,400.00
29 Armatur lampu SGP 328 / SONT 250 Watt - Unit 4,283,800.00
30 Armatur lampu SGP 338 / SONT 400 Watt (lengkap) - Unit 5,870,900.00
31 Armatur lampu SGP 368 / SONT 250 Watt (lengkap) - Unit 4,916,300.00
32 Armatur lampu LVD 100 Watt (lengkap) - Unit 5,679,900.00
33 Armatur lampu Ekorola TRX 800 - 20 Watt (set) - Set 626,200.00
34 Armatur lampu Sorot HPIT 250 Watt (lengkap) - Set 7,677,300.00
35 Sorot HPIT 250 watt (lengkap) - Set 6,397,800.00
36 XKS SON T 250 watt (lengkap) - Set 4,139,800.00
37 Tiang Artagonal Cabang 2 T = 11 M - Tiang 8,918,200.00
38 Tiang Artagonal Cabang 1 T = 11 M - Tiang 7,826,800.00
39 Tiang Oktagonal Cabang 2 T = 11 M - Btg 8,322,600.00
40 Tiang Oktagonal Cabang 1 T = 11 M - Btg 8,741,200.00
41 Tiang high mass 22 m cab. 5 ring - Tiang 77,299,800.00
42 Tiang high mass 22 m cab. 4 ring - Tiang 92,758,700.00
43 Tiang lampu oktagonal 11 m - Btg 12,464,300.00
44 Tiang lampu oktagonal 12 m - Btg 14,216,500.00
45 Tiang lampu oktagonal cab. 4 Ring 12 Mtr - Btg 12,464,100.00
46 Tiang lampu oktagonal cab. 2 (11m) - Btg 13,096,600.00
47 Stang Ornamen Galvanis dia 2" Pj. 7 M + Klem Tiang - Btg 1,130,500.00
48 Stang Ornamen Galvanis dia 2" Pj. 6 M + Klem Tiang - Btg 1,130,500.00
49 Stang Ornamen Galvanis dia 2" Pj. 5 M + Klem Tiang - Btg 1,052,500.00
50 Stang Ornamen Galvanis dia 2" Pj. 3 M + Klem Tiang - 12 784,300.00
51 Stang Ornamen Galvanis dia 2" Pj. 2 M + Klem Tiang - Btg 594,600.00
52 Box Panel PJU Uk. 60x90x30 Cm lengkap Time Swich - Set 5,363,600.00
53 Box Panel PJU Uk. 50x45x25 Cm lengkap Time Swich - Set 3,882,600.00
54 Box KWH Meter Uk. 35 x 50 x 25 cm - Buah 917,200.00
55 Traffo HPL 400 Watt - Buah 287,200.00
56 Traffo HPL 250 Watt - Buah 232,400.00
57 Traffo HPL 125 Watt - Buah 143,600.00
58 Traffo SOX 135 Watt - Buah 969,400.00
59 Traffo SOX 180 Watt - Buah 969,400.00
60 Traffo SON T 400 Watt - Buah 528,400.00
61 Traffo SON T 250 Watt - Buah 430,600.00
62 Traffo SON T 125 Watt - Buah 285,600.00
63 Traffo SON H 70 Watt - Buah 166,300.00
64 Traffo H 400 Watt - Buah 470,700.00
65 Traffo H 250 Watt - Buah 323,100.00
66 Traffo H 125 Watt - Buah 285,600.00
67 Traffo H 70 Watt - Buah 170,500.00
68 Traffo HPiT 400 - Buah 311,100.00
69 Traffo Neon 40 Watt - Buah 22,600.00
70 Traffo Neon 20 Watt - Buah 18,900.00
71 Traffo Neon 10 Watt - Buah 16,600.00
72 HPL 400 Watt - Buah 233,400.00
73 HPL 250 Watt - Buah 170,600.00
74 HPL 125 Watt - Buah 80,800.00
75 SOX 135 Watt - Buah 558,400.00
76 SOX 180 Watt - Buah 558,400.00
77 MLL 160 Watt - Buah 80,800.00
78 Bola SON T 1000 Watt - Buah 853,900.00
79 Bola SON T 400 Watt - Buah 387,100.00
80 Bola SON T 250 Watt - Buah 373,200.00
81 Bola SON T 125 Watt - Buah 285,600.00
82 Bola Lampu SON 70 Watt - Buah 193,800.00
83 SON H 400 Watt - Buah 323,100.00
84 SON H 250 Watt - Buah 323,100.00
85 SON H 125 Watt - Buah 285,600.00
86 SON H 70 Watt - Buah 161,500.00
87 Bola Lampu HPIT 400 Watt - Buah 387,100.00
88 HPIT 400 Watt - Buah 373,400.00
89 Seri 200 Biji - Kotak 63,800.00
90 Seri Kuning - Kotak 63,800.00
91 Neon Sen - Meter 47,900.00
92 Pijar 5 Watt - Buah 2,500.00
93 Pijar 20 Watt - Buah 4,100.00
94 Pijar 25 Watt - Buah 4,100.00
95 Pijar 40 Watt - Buah 4,100.00
96 Pijar 60 Watt - Buah 5,700.00
97 Pijar 75 Watt - Buah 5,700.00
98 Pijar 80 Watt - Buah 4,600.00
99 Pijar 100 Watt - Buah 7,200.00
100 Pijar 200 Watt - Buah 16,000.00
101 Neon 40 Watt - Buah 15,100.00
102 Neon 20 Watt - Buah 10,500.00
103 Neon 10 Watt - Buah 6,100.00
104 Lampu Ekorola TRX 800 - 20 watt (set) - Set 618,800.00
1 2 3 4 5 6
105 Lampu Light Grick - Buah 151,600.00
106 Lampu Genite 16 Watt - Buah 47,900.00
107 Lampu XL 14 Watt - Buah 39,900.00
108 Lampu Sorot 300 Watt - Buah 158,200.00
109 Lampu Nepalos 25 Watt - Buah 39,900.00
110 Lampu Superlox 25 Watt - Buah 6,400.00
111 Lampu Superlox 40 Watt - Buah 7,200.00
1 2 3 4 5 6
112 Lampu Fisikom 25 Watt - Buah 39,900.00
113 Lampu Fisikom 23 Watt - Buah 39,900.00
114 Lampu Fisikom 18 Watt - Buah 32,000.00
115 Lampu Mercury 125 Watt - Buah 80,800.00
116 Lampu Mercury 250 Watt - Buah 170,500.00
117 Lampu Matsuka 8 Watt - Buah 24,000.00
118 Lampu Matsuka 14 Watt - Buah 25,600.00
119 Lampu Matsuka 18 Watt - Buah 36,700.00
120 Lampu Matsuka 20 Watt - Buah 43,200.00
121 Lampu Matsuka 25 Watt - Buah 44,700.00
122 Lampu Merk EKONOMAT Ukuran 10 Watt - Buah 8,900.00
123 Lampu EKONOMAT Ukuran 16 Watt - Buah 8,900.00
124 Lampu EKONOMAT Ukuran 12 Watt - Buah 8,900.00
125 Lampu EKONOMAT Ukuran 13 Watt - Buah 8,900.00
126 Lampu EKONOMAT Ukuran 14 Watt - Buah 8,900.00
127 Lampuk ECOLITE Ukuran 30 Watt - Buah 16,500.00
128 Lampu ECOLITE Ukuran 35 Watt - Buah 16,500.00
129 Lampu ITAMI Ukuran 25 Watt - Buah 16,500.00
130 Lampu PHILIPS Ukuran 11 Watt - Buah 34,900.00
131 Lampu PHILIPS Ukuran 18 Watt - Buah 34,900.00
132 Lampu PHILIPS Ukuran 8 Watt - Buah 28,500.00
133 Lampu Hakiko Ukuran 18 Watt - Buah 34,100.00
134 Lampu Sunnyco Ukuran 45 Watt - Buah 95,800.00
135 Lampu Sunnyco Ukuran 18 Watt - Buah 42,400.00
136 Lampu PHILIPS Ukuran 23 Watt - Buah 47,000.00
137 Lampu LEUCH TECH (Spiral)Uk. 9 Watt - Buah 41,100.00
138 Lampu LEUCH TECH (Spiral)Uk. 13 Watt - Buah 47,500.00
139 Lampu LEUCH TECH (Spiral)Uk. 18 Watt - Buah 51,200.00
140 Lampu LEUCH TECH (Spiral)Uk. 23 Watt - Buah 55,000.00
141 Lampu LEUCH TECH (Spiral)Uk. 32 Watt - Buah 107,600.00
142 Lampu LEUCH TECH (Spiral)Uk. 42 Watt - Buah 145,500.00
143 Lampu ETERNA Ukuran 8 Watt - Buah 33,600.00
144 Lampu ETERNA Ukuran 18 Watt - Buah 41,800.00
145 Lampu ETERNA Ukuran 20 Watt - Buah 44,300.00
146 Lampu ETERNA Ukuran 23 Watt - Buah 48,100.00
147 Lampu SHINYOKU (Spiral) Uk. 85 Watt - Buah 354,200.00
148 Lampu SHINYOKU Ukuran 85 Watt - Buah 316,300.00
149 Lampu Cup Hemat Energi 7 m - Tiang 4,479,500.00
150 Lampu Cup Hemat Energi 3 m - Tiang 1,722,900.00
151 Lampu Cobra 9 m - Tiang 7,752,900.00
152 Lampu Cobra 7 m - Tiang 6,737,700.00
153 Lampu Sorot (Kecil) Merk : Hanok 500 watt - Buah 74,100.00
154 Lampu Sorot (Sedang) Merk : Hanok 1000 watt - Buah 107,600.00
155 Lampu Par 38 Watt - Buah 59,100.00
156 Lampu Taman - Buah 39,900.00
157 Kap Lampu Kobra - Buah 442,800.00
158 Kap Lampu Pijar 1 Set - Set 44,300.00
159 SL 15 Watt - Buah 132,900.00
160 SL 18 Watt - Buah 51,800.00
161 SL 25 Watt - Buah 67,000.00
162 TL Rina 32 Watt - Buah 31,900.00
163 Bola Essetial - Buah 38,400.00
164 Bola Spot Light - Buah 59,800.00
165 Bola Lampu Sorot 300 Watt - Buah 158,200.00
166 Hologen 500 Watt - Buah 46,300.00
167 Hologen 1.000 Watt - Buah 91,000.00
168 Hologen 1.500 Watt - Buah 103,700.00
169 NYY 1 x 1.5 mm - Meter 3,500.00
170 NYY 1 x 2.5 mm - Meter 5,400.00
171 NYY 1 x 4 mm - Meter 8,400.00
172 NYY 1 x 6 mm - Meter 13,000.00
173 NYY 2 mm - Meter 7,100.00
174 NYY 2 x 2.5 mm - Meter 14,100.00
175 NYY 2 x 4 mm - Meter 20,200.00
176 NYY 2 x 6 mm - Meter 19,200.00
177 NYY 2 x 10 mm - Meter 25,200.00
178 NYY 3 x 4 mm - Meter 27,400.00
179 NYY 4 x 2.5 mm - Meter 27,000.00
180 NYY 4 x 4 mm - Meter 39,900.00
181 NYY 4 x 6 mm - Meter 64,700.00
182 NYY 4 x 10 mm - Meter 88,100.00
183 NYY 4 x 16 mm - Meter 75,800.00
184 NYY 4 x 25 mm - Meter 314,400.00
185 NYY 4 x 35 mm - Meter 351,100.00
186 NYY 4 x 50 mm - Meter 430,800.00
187 NYY 4 x 70 mm - Meter 154,800.00
188 NYN 2 x 2,5 mm - Meter 17,900.00
189 NYN 3 x 1,5 mm - Meter 14,700.00
190 NYN 3 x 2,5 mm - Meter 21,300.00
191 NYA 1 x 1,5 mm - Meter 3,500.00
192 NYA 1 x 2,5 mm - Meter 5,400.00
193 NYA 1 x 4 mm - Meter 8,400.00
194 NYA 1 x 6 mm - Meter 13,000.00
195 NYA 2 x 2,5 mm - Meter 20,000.00
196 NYA 2 x 4 mm - Meter 30,500.00
197 NYA 2 x 30 mm - Meter 34,800.00
198 NYA 4 x 6 mm - Meter 51,900.00
199 NYA 1,5 mm - Meter 2,500.00
200 NYA 4 mm - Meter 7,900.00
201 NYA 10 mm - Meter 10,100.00
202 NYA 16 mm - Meter 2,800.00
203 NYF6BY 4 x 10 mm - Meter 146,400.00
204 NYF6BY 4 x 16 mm - Meter 161,400.00
205 NYF6BY 4 x 25 mm - Meter 191,500.00
206 NYF6BY 4 x 35 mm - Meter 235,800.00
207 NYF6BY 4 x 50 mm - Meter 314,200.00
208 NYF6BY 4 x 70 mm - Meter 407,300.00
209 NYM 4 mm - Meter 4,200.00
210 NYM 3 x 4 mm - Meter 22,700.00
211 NYM 2 x 2 mm - Meter 6,900.00
212 NYM 2 x 4 mm - Meter 16,900.00
213 NYM 2 x 2,5 mm - Meter 11,700.00
214 NYM 2 x 1,5 mm - Meter 5,100.00
1 2 3 4 5 6
215 NYM 3 x 1,5 mm - Meter 6,400.00
216 NYM 3 x 2,5 mm - Meter 9,100.00
217 NYM 3 x 10 mm - Meter 31,900.00
218 NYM 4 x 2,5 mm - Meter 11,600.00
219 NYM 4 x 4 mm - Meter 29,400.00
220 NYMHYM 2 x 0,75 mm - Meter 3,600.00
221 NYMHYM 2 x 1,5 mm - Meter 6,200.00
222 Traffo SON T 1000 Watt - Buah 1,069,000.00
223 Traffo SON T 400 Watt - Buah 634,100.00
224 Traffo SON T 250 Watt - Buah 516,700.00
225 Traffo SON T 70 Watt - Buah 199,500.00
226 Kabel Snur - Roll 63,800.00
227 Kabel Tester - Meter 31,900.00
228 Kabel Box - Meter 63,800.00
229 Kabel Mic Transparan - Roll 207,400.00
230 Kabel 3 x 2,5 mm - Meter 9,100.00
231 Kabel Antena - Roll 39,900.00
232 Kabel H / M - Meter 2,400.00
233 Kabel Transparan - Meter 3,200.00
234 Kabel Telepon - Meter 1,900.00
235 Kabel TC 2 x 10 mm - Meter 8,200.00
236 Kabel TC 2 x 16 mm - Meter 11,400.00
237 Box TL 20 Watt - Buah 9,500.00
238 Box MCB 1 Group - Buah 4,800.00
239 Cal Gulung - Buah 63,800.00
240 Contactor 100 A - Buah 1,272,000.00
241 Conector - Buah 9,200.00
242 Contractor KI.300 25 A - Buah 316,300.00
243 Contractor Merk Mitsubhisi 25 A - Buah 379,500.00
244 Dop 3" - Buah 8,100.00
245 Esensial - Buah 39,900.00
246 Fitting Gantung - Buah 1,700.00
247 Fitting Duduk - Buah 4,100.00
248 Fitting Atom - Buah 32,000.00
249 Fitting Gantung E 27 - Buah 20,100.00
250 Fitting Duduk E 27 - Buah 20,100.00
251 Fitting Duduk E 40 - Buah 25,500.00
252 Fitting Hologen - Buah 32,000.00
253 Full Breket - Buah 14,400.00
254 Gulung Spul - Buah 79,800.00
255 Gulung Coil Contactor - Buah 79,800.00
256 Isolasi Unibel - Buah 5,700.00
257 Icnitor SN 58 - Buah 114,900.00
258 Inector - Buah 95,800.00
259 Ignator - Buah 111,300.00
260 Indiktor - Buah 149,700.00
261 Insuluk - Buah 400.00
262 Kapasitor - Buah 179,700.00
263 Kap Hijau E 27 - Buah 31,700.00
264 Kap Hijau E 40 - Buah 50,600.00
265 Kap Lampu - Buah 111,700.00
266 Kap To2 - Buah 111,700.00
267 Kop Skring - Buah 4,900.00
268 Klem Tiang - Buah 12,800.00
269 k. Skum 10-8 - Buah 1,000.00
270 MCB 1.A - Buah 34,500.00
271 MCB 2.A - Buah 40,300.00
272 MCB 25 A - Buah 175,700.00
273 MCB 63 A - Buah 287,900.00
274 MCB 40 A - Buah 149,500.00
275 MCB 45 A - Buah 194,300.00
276 MCB 50 A - Buah 271,000.00
277 MCB 10 A - Buah 128,800.00
278 MCB 16 A - Buah 138,000.00
279 MCB 6 A - Buah 154,900.00
280 MCB 2 A - Buah 104,500.00
281 MCB 4 A - Buah 138,400.00
282 MCB 32 A - Buah 324,300.00
283 MCB Box - Buah 4,100.00
284 Multi Tester - Buah 71,800.00
285 MC Se-3 N - Buah 1,048,400.00
286 Macon Mec gmg-50 aC - Buah 574,500.00
287 Magnetic Contactor 100 A - Buah 1,526,400.00
288 NH Fuse 80 A - Buah 28,800.00
289 Ornamen Pijar - Buah 374,600.00
290 Ornamen Gantung - Buah 55,900.00
291 Obeng Plus - Buah 40,300.00
292 Obeng Minus - Buah 40,300.00
293 Open Steker - Buah 23,000.00
294 On - Off - Buah 7,300.00
295 Pat 38 - Buah 59,900.00
296 Solar Seal / Photo Seal - Buah 143,600.00
297 Opstic 1/2" lengkap klem - Batang 263,500.00
298 Pipa Paralon 1/2" - Batang 8,800.00
299 Pipa L 1/2" - Batang 2,500.00
300 Pipa Paralon 1' - Batang 10,400.00
301 Pipa Paralon 3/4" - Batang 9,600.00
302 Pipa Paralon 3' - Batang 19,200.00
303 Pipa PVC 1,5" - Batang 50,100.00
304 Pipa PVC Galvanis 1,5" - Batang 172,500.00
305 Pipa Besi - Batang 95,800.00
306 Pipa Galvanis - Batang 111,700.00
307 Pipa ornamen dia 2" x 2m - Batang 504,400.00
308 Pipa ornamen dia 2" x 3m lengkap klem - Batang 654,900.00
309 Pipa ornamen dia 2" x 6m lengkap klem - Batang 1,317,200.00
310 Pipa ornamen dia 2" x 7m lengkap klem - Batang 1,467,800.00
311 Pondasi tiang lampu oktagonal (11 meter) - Unit 1,655,900.00
312 Pres Conector - Buah 3,300.00
313 Rangka Ring 32 Watt - Buah 16,000.00
314 Rel MCB - Buah 24,000.00
315 Roset Telpon - Buah 5,700.00
316 Saklar Double - Buah 7,300.00
317 Saklar Engkel - Buah 5,000.00
1 2 3 4 5 6
318 Saklar Tripel - Buah 19,200.00
319 Spul Contactor - Buah 63,800.00
320 Sekring 63 A - Buah 10,400.00
321 Solder Pistol - Buah 351,100.00
322 Solder - Buah 24,000.00
323 Solar Seal / Photo Seal - Buah 143,600.00
324 Stop Kontak - Buah 4,900.00
325 Steker Arde - Buah 9,600.00
326 Steker T - Buah 11,200.00
327 Steker PH - Buah 3,300.00
328 Sadel No. 6 - Bungkus 1,200.00
329 Sadel No. 8 - Bungkus 1,500.00
330 Sadel No. 9 - Bungkus 1,700.00
331 Sadel No. 10 - Bungkus 4,500.00
332 Sadel No. 12 - Bungkus 5,700.00
333 Sadel No. 14 - Bungkus 3,300.00
334 Sadel No. 19 - Bungkus 4,900.00
335 Sadel No. 22 - Bungkus 9,700.00
336 Skun RS-16 - Buah 1,200.00
337 Stater - Buah 3,300.00
338 Ston 63 A - Buah 143,700.00
339 Stost 40 A + Ip - Buah 60,700.00
340 Stost 32 A + Ip - Buah 39,900.00
341 Tedus Hitam - Buah 900.00
342 Tali Tester - Buah 24,000.00
343 Tang Amper - Buah 1,037,200.00
344 Tang Buaya - Buah 32,000.00
345 Tang Potong - Buah 32,000.00
346 Tang Kombinasi - Buah 32,000.00
347 Tang Jepit - Buah 32,000.00
348 Tang Skun - Buah 319,200.00
349 Time Swicht Theben - Buah 681,100.00
350 Taping - Buah 526,600.00
351 Taping Conector 1 baut - Buah 12,300.00
352 Taping Conector 2 baut - Buah 20,100.00
353 Tespen - Buah 8,000.00
354 Timah Solder - Buah 24,000.00
355 Terminal 25 ml - Buah 39,900.00
356 Tolkit - Buah 71,800.00
357 Wedge Klem - Buah 4,900.00
358 Wide Klem - Buah 7,400.00
359 WD 40 - Buah 39,900.00
360 Klem Tiang uk. 5" s/d 8" x 2" - Set 221,400.00
361 Time Switc - Buah 347,900.00
362 Fhoto Shell 10 A merk Selcon - Buah 139,200.00
363 Taping 1 Baut - Buah 15,900.00
364 Dead And - Buah 6,400.00
365 Isolasi - Buah 7,600.00

N. ALAT-ALAT PEMADAM KEBAKARAN


1 Helm pemadam kebakaran - Buah 659,600.00
2 Baju tahan panas - Buah 7,475,000.00
3 Baret lengkap - Buah 57,500.00
4 Celana tahan api - Buah 6,325,000.00
5 Sepatu pemadam - Pasang 575,000.00
6 Sarung tangan - Pasang 383,600.00
7 Chainsaw - Buah 9,200,000.00
8 Dahrem - Buah 69,000.00
9 Handy Talky - Buah 2,875,000.00
10 Tali pengaman - Buah 172,500.00
11 Kapak Pemadam - Buah 345,000.00
12 Kopel rem - Buah 51,800.00
13 Y Connection 1.5" - Buah 5,175,000.00
14 Y Connection 2.5" - Buah 5,750,000.00
15 Pilar Hydrant - Unit 5,635,000.00
16 Nozzle multi spray jet 1.5' - Buah 8,625,000.00
17 Nozzle multi spray jet 2.5' - Buah 9,200,000.00
18 Selang pemadan uk. 1.5 " x 20m + Machino Coupling - Roll 3,162,500.00
19 Selang pemadan uk. 2.5 " x 20m + Machino Coupling - Roll 3,392,500.00
20 Tac stick (alat pendeteksi kebocoran listrik) - Buah 11,040,000.00
21 Hydrant tester (alat ukur hydrant) - Unit 10,120,000.00
22 Tabung pernapasan (continued breathing aparatus) - Unit 18,687,500.00
23 Floating Pump (pompa apung) - Unit 95,354,300.00
24 Hydrant Pillar Two Way 2,5" Machino - Unit 5,462,500.00
25 Tabung Apar 3 Kg - Unit 766,700.00
26 Tabung Apar 6 Kg - Unit 1,150,000.00
27 Sepeda Motor 110 cc - Unit 11,500,000.00
28 Sepeda Motor (Modifikasi) - Unit 18,208,400.00
29 Repiter - Unit 40,459,600.00
30 Mesin DF (Daug Feng) - Unit 5,750,000.00
31 Pump Niagara - Unit 9,966,700.00

M. TANAMAN HIAS
1 Palm Ponik - Batang 45,400.00
2 Palm Raja 2,5 m - Batang 130,600.00
3 Palm Raja 2 m - Batang 171,900.00
4 Palm Raja 1 m - Batang 268,000.00
5 Palm Raja 1,5 m - Batang 364,300.00
6 Palm Raja 0,5 m - Batang 391,700.00
7 Palm Ekor Tupai 2,5 m - Batang 254,300.00
8 Palm Ekor Tupai 2 m - Batang 426,200.00
9 Palm Ekor Tupai 1 m - Batang 446,700.00
10 Palm Ekor Tupai 0,5 m - Batang 556,600.00
11 Palm Kamdoria 1 m - Batang 158,000.00
12 Palm Kamdoria - Batang 89,300.00
13 Palm Putri 1,5 m - Batang 364,300.00
14 Serut 2 m - Batang 4,129,900.00
15 Serut 1,5 m - Batang 2,755,500.00
16 Serut 1 m - Batang 1,367,500.00
17 Cemara Udang 2 m - Batang 4,129,900.00
18 Cemara Udang 1,5 m - Batang 2,755,500.00
19 Cemara Udang 1 m - Batang 1,367,500.00
20 Cemara Tiang 2 m - Batang 226,800.00
1 2 3 4 5 6
21 Cemara Tiang 1,5 m - Batang 171,900.00
22 Cemara Tiang 1 m - Batang 130,600.00
23 Cemara Mas 80 cm - Batang 364,300.00
24 Cemara Mas 50 cm - Batang 116,900.00
25 Cemara Norflok 70 cm - Batang 116,900.00
26 Cemara Norflok 1 m - Batang 199,300.00
27 Cemara Pinus 1,5 m - Batang 226,800.00
28 Cemara Pinus 1 m - Batang 144,300.00
29 Bougenvil - Batang 158,000.00
30 Nolima 2 m - Batang 900,300.00
31 Nolima 1 m - Batang 446,700.00
32 Sirlon 120 cm - Batang 309,200.00
33 Sirlon 60 cm - Batang 97,600.00
34 Tri Color - Batang 41,200.00
35 Asoka - Batang 20,600.00
36 Sambangdara - Batang 61,800.00
37 Pedang - Pedangan - Batang 17,200.00
38 Ki Hujan Bongkol - Batang 158,000.00
39 Ki Hujan Bulat - Batang 28,200.00
40 Nusa Indah - Batang 15,100.00
41 Sikas 1 m - Batang 1,931,000.00
42 Sikas 50 cm - Batang 1,243,800.00
43 Sikas 30 cm - Batang 625,300.00
44 Agave - Batang 96,200.00
45 Wali Songo - Batang 762,800.00
46 Lantana - Batang 12,400.00
47 Rambusa - Batang 48,100.00
48 Miramta - Batang 20,600.00
49 Asam Keranji - Batang 27,500.00
50 Heli Konia - Batang 13,800.00
51 Song Of India - Batang 61,800.00
52 Beringin Korea - Batang 3,030,400.00
53 Tombak Raja - Batang 254,300.00
54 Pandan Bali Persit - Batang 391,700.00
55 Pandan Bali Cabang - Batang 762,800.00
56 Pandan Kuning - Batang 19,200.00
57 Tanjung 1 m - Batang 17,900.00
58 Tanjung 2 m - Batang 96,200.00
59 Tanjung 3 m - Batang 226,800.00
60 Sapu Tangan 2 m - Batang 130,600.00
61 Kasia Golden 1,5 m - Batang 110,000.00
62 Rumput Golf - M2 24,100.00
63 Rumput Manila - M2 27,500.00
64 Puring - Batang 23,400.00
65 Melati Kosta - Batang 110,000.00
66 Anggrek Tanah - Batang 19,200.00
67 Lili Bombai - Batang 20,600.00
68 Lili Bakung - Batang 19,200.00
69 Lili Paris Putih - Batang 15,100.00
70 Nanas Merah - Batang 27,500.00
71 Amander - Batang 20,600.00
72 Puring Z - Batang 27,500.00
73 Anjuang - Batang 13,800.00
74 Pakis Kelabang - Batang 13,800.00
75 Lidah Mertua - Batang 13,800.00
76 Lapender - Batang 20,600.00
77 Batavia - Batang 27,500.00
78 Sambang Dara - Batang 34,300.00
79 Pillo Denrum - Batang 20,600.00
80 Evorria - Batang 27,500.00
81 Bayam - bayaman - Batang 11,000.00
82 Aglonema Lokal - Batang 34,300.00
83 Katus Kodok - Batang 12,400.00
84 Kipranrus - Batang 34,300.00
85 Siklok Besar - Batang 116,800.00
86 Siklok Kecil - Batang 61,800.00
87 Helokomin - Batang 13,800.00
88 Pisang Betet - Batang 20,600.00
89 Kana - Batang 13,800.00
90 Adenium - Batang 75,600.00
91 Bromedia - Batang 13,800.00
92 Echinacea/pucuk merah 50 cm - Batang 57,500.00

O. LAIN-LAIN
1 Pintu Air Sorong Uk. 0,40 s/d 0,60 m - Unit 2,300,000.00
2 Pintu Air Ulir Uk. 0,60 s/d 0,80 m - Unit 4,830,000.00
3 Pintu Air Ulir Uk. 0,90 s/d 1,20 m - Unit 5,175,000.00
4 Gorong2 Beton 60 cm Tanpa Tulang M 031 M1 287,500.00
5 Gorong2 Beton 80 cm Tanpa Tulang M 033 M1 402,500.00
6 Gorong2 Beton 100 cm Tanpa Tulang M 035 M1 517,500.00
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5

A P.Ps PEKERJAAN PERSIAPAN


1m1 Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 meter Acuan : SNI : 2001 - 2002 (6.2)
1 P.Ps. 01 Rp 358,537.60
(P.Ps. 01)

2 P.Ps. 02 1m1 Pengukuran dan Pemasangan Bouwplank (P.Ps. 02) Acuan : SNI : 2001 - 2002 (6.4) Rp 84,217.30

3 P.Ps. 03 1m2 Membersihkan Lapangan dan Perataan (P.Ps. 03) Acuan : SNI : 2001 - 2002 (6.8) Rp 17,500.00

4 P.Ps. 03.a 1m2 Membersihkan Lapangan (P.Ps. 03.a) Acuan : SNI : 2001 - 2002 (6.8) Rp 2,181.82

1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat /


5 P.Ps. 04 Acuan : SNI : 2001 - 2002 (6.9) Rp 1,280,505.80
Bedeng Pekerja (P.Ps. 04)

B P.T. PEKERJAAN TANAH


1 P.T. 01 Menggali 1m3 Tanah Biasa sedalam 1 meter (P.T. 01) Acuan : SNI 2835:2008 (6.1) Rp 50,750.00

2 P.T. 02 Menggali 1m3 Tanah Biasa sedalam 2 meter (P.T. 02) Acuan : SNI 2835:2008 (6.2) Rp 64,350.00

3 P.T. 03 Menggali 1m3 Tanah Biasa sedalam 3 meter (P.T. 03) Acuan : SNI 2835:2008 (6.3) Rp 78,410.00

4 P.T. 04 Menggali 1m3 Tanah Keras sedalam 1 meter (P.T. 04) Acuan : SNI 2835:2008 (6.4) Rp 67,360.00

5 P.T. 05 Menggali 1m3 Tanah Cadas sedalam 1 meter (P.T. 05) Acuan : SNI 2835:2008 (6.5) Rp 103,800.00

6 P.T. 06 Menggali 1m3 Tanah Lumpur sedalam 1 meter (P.T. 06) Acuan : SNI 2835:2008 (6.6) Rp 82,350.00

7 P.T. 07 Mengerjakan 1m2 Stripping Tebing setinggi 1 meter (P.T. 07) Acuan : SNI 2835:2008 (6.7) Rp 4,150.00

8 P.T. 08 Membuang 1m3 Tanah Sejauh 30 meter (P.T. 08) Acuan : SNI 2835:2008 (6.8) Rp 22,100.00

9 P.T. 09 Mengurug Kembali 1m3 Galian (P.T. 09) Acuan : SNI 2835:2008 (6.9) Rp 16,916.67

10 P.T. 10 Memadatkan 1m3 Tanah (per 20 cm) (P.T. 10) Acuan : SNI 2835:2008 (6.10) Rp 41,500.00

11 P.T. 11 Mengurug 1m3 Pasir Urug (P.T. 11) Acuan : SNI 2835:2008 (6.11) Rp 193,100.00

Acuan : Harga Satuan Bahan, Upah dan


12 P.T. 12 1 m3 Urugan Tanah Datang (P.T. 12) Analisa Biaya pekerjaan BOW - A.16 (1) Rp 67,700.00

C P.PB. PEKERJAAN PONDASI BATU


1 P.PB. 01 Memasang 1m3 Pondasi Batu Belah, Campuran 1 PC : 3 PP (P.PB. 01) Acuan : SNI 2836:2008 (6.1) Rp 721,325.00

2 P.PB. 02 Memasang 1m3 Pondasi Batu Belah, Campuran 1 PC : 4 PP (P.PB. 02) Acuan : SNI 2836:2008 (6.2) Rp 666,850.00

Memasang 1m3 Pondasi Siklop, 60% Beton Campuran 1 PC : 2 PB : 3


3 P.PB. 03 Acuan : SNI DT 91-0007-2007 Rp 3,175,103.20
KR dan 40% Batu Belah (P.PB. 03)
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
D P.BB. PEKERJAAN BETON BERTULANG
Membuat 1m3 Beton Mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.1)
1 P.BB. 01 Rp 1,667,264.86
= 0,87 (P.BB. 01)
Membuat 1m3 Beton Mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.2)
2 P.BB. 02 Rp 893,988.25
= 0,78 (P.BB. 02)
Membuat 1m3 Lantai Kerja Beton Mutu fc= 7,4 Mpa (K100), Slump (3-6) Acuan : SNI 7394:2008 (6.4)
3 P.BB. 03 Rp 1,608,141.30
cm, w/c = 0,87 (P.BB. 03)
Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.5)
4 P.BB. 04 Rp 2,286,654.89
= 0,66 (P.BB. 04)

5 P.BB. 04.a Err:509 Err:509 Err:509

Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.7)
6 P.BB. 05 Rp 2,415,678.22
= 0,58 (P.BB. 05)

7 P.BB. 05.a Membeli dan Mengerjakan 1m3 Beton Ready Mix K 225 (P.BB. 05.a) Acuan : SNI DT 91-0008-2007 Rp 1,111,195.00

Membuat 1m3 Beton Mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.8)
8 P.BB. 06 Rp 1,052,702.82
= 0,56 (P.BB. 06)
Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c Acuan : SNI 7394:2008 (6.10)
9 P.BB. 07 Rp 1,090,041.92
= 0,52 (P.BB. 07)

10 P.BB. 07.a Membeli dan Mengerjakan 1m3 Beton Ready Mix K 300 (P.BB. 07.a) Acuan : SNI DT 91-0008-2007 Rp 1,203,195.00

11 P.BB. 08 Pembesian 10 Kg dengan Besi Polos atau Ulir (P.BB. 08) Acuan : SNI 7394:2008 (6.17) Rp 17,914.50

12 P.BB. 09 Memasang 10 Kg Jaring Kawat Baja/Wire Mesh (P.BB. 09) Acuan : SNI 7394:2008 (6.19) Rp 16,950.50

13 P.BB. 10 Memasang 1m2 Bekisting untuk Pondasi (P.BB. 10) Acuan : SNI 7394:2008 (6.20) Rp 170,594.00

14 P.BB. 10.A Memasang 1m2 Bekisting untuk Pondasi (P.BB. 10.a) Acuan : SNI 7394:2008 (6.20) Rp 167,182.10

15 P.BB. 11 Memasang 1m2 Bekisting untuk Sloof (P.BB. 11) Acuan : SNI 7394:2008 (6.21) Rp 183,035.00

16 P.BB. 12 Memasang 1m2 Bekisting untuk Kolom (P.BB. 12) Acuan : SNI 7394:2008 (6.22) Rp 262,517.00

17 P.BB. 12.b Memasang 1m2 Bekisting untuk Kolom (P.BB. 12.b) Acuan : SNI 7394:2008 (6.22) Rp 250,862.00

18 P.BB. 12.a Memasang 1m2 Bekisting untuk Kolom (P.BB. 12.a) Acuan : SNI 7394:2008 (6.22) Rp 270,136.50

19 P.BB. 12.c Memasang 1m2 Bekisting untuk Kolom (P.BB. 12.c) Acuan : SNI 7394:2008 (6.22) Rp 283,955.20

19 P.BB. 13 Memasang 1m2 Bekisting untuk Balok (P.BB. 13) Acuan : SNI 7394:2008 (6.23) Rp 305,327.40

20 P.BB. 13.a Memasang 1m2 Bekisting untuk Balok (P.BB. 13.a) Acuan : SNI 7394:2008 (6.23) Rp 358,205.20

21 P.BB. 13.b Memasang 1m2 Bekisting untuk Balok (P.BB. 13.b) Acuan : SNI 7394:2008 (6.23) Rp 293,672.40

22 P.BB. 14 Memasang 1m2 Bekisting untuk Lantai (P.BB. 14) Acuan : SNI 7394:2008 (6.24) Rp 339,281.00

23 P.BB. 14.a Memasang 1m2 Bekisting untuk Lantai (P.BB. 14.a) Acuan : SNI 7394:2008 (6.24) Rp 414,655.20

24 P.BB. 15 Memasang 1m2 Bekisting untuk Tangga (P.BB. 15) Acuan : SNI 7394:2008 (6.26) Rp 272,395.00

25 P.BB. 16 Memasang 1m2 Jembatan untuk Pengecoran Beton (P.BB. 16) Acuan : SNI 7394:2008 (6.27) Rp 90,875.04

Membuat 1m3 Pondasi Beton Bertulang (150 kg besi + bekisting) (P.BB. Acuan : SNI 7394:2008 (6.28)
26 P.BB. 17 Rp 4,483,718.00
17)

27 P.BB. 18 Membuat 1m3 Sloof Beton Bertulang (200 kg besi + bekisting) (P.BB. 18) Acuan : SNI 7394:2008 (6.29) Rp 5,589,075.00

Membuat 1m3 Kolom Beton Bertulang (300 kg besi + bekisting) (P.BB.


28 P.BB. 19 Acuan : SNI 7394:2008 (6.30) Rp 9,139,588.00
19)

29 P.BB. 20 Membuat 1m3 Balok Beton Bertulang (200 kg besi + bekisting) (P.BB. 20) Acuan : SNI 7394:2008 (6.31) Rp 6,908,492.00

30 P.BB. 21 Membuat 1m3 Plat Beton Bertulang (150 kg besi + bekisting) (P.BB. 21) Acuan : SNI 7394:2008 (6.32) Rp 6,035,346.00

Membuat 1m3 Dinding Beton Bertulang (150 kg besi + bekisting) (P.BB.


31 P.BB. 22 Acuan : SNI 7394:2008 (6.33) Rp 5,899,800.00
22)
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Membuat 1m3 Dinding Beton Bertulang (200 kg besi + bekisting) (P.BB.
32 P.BB. 23 Acuan : SNI 7394:2008 (6.34) Rp 6,505,227.00
23)

32 P.BB. 24 Membuat 1m' Kolom Praktis Beton Bertulang (11 x 11) cm (P.BB. 24) Acuan : SNI 7394:2008 (6.35) Rp 87,559.90

34 P.BB. 25 Membuat 1m' Ring Balok Beton Bertulang (10 x 15) cm (P.BB. 25) Acuan : SNI 7394:2008 (6.36) Rp 106,615.80
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
E P.Dnd. PEKERJAAN DINDING
Acuan : ABK Bangunan Gedung dan
1 P.D.nd. 01 Memasang 1m2 Dinding Batako 7 cm x 15 cm x 30 cm (P.Dnd. 01) Perumahan 6.20 Rp 103,389.00

Acuan : ABK Bangunan Gedung dan


2 P.D.nd. 02 Memasang 1m2 Dinding Batako 9 cm x 20 cm x 40 cm (P.Dnd. 02) Perumahan 6.20 Rp 73,955.00

Acuan : ABK Bangunan Gedung dan


3 P.D.nd. 03 Memasang 1m2 Dinding Batako 7 cm x 20 cm x 40 cm (P.Dnd. 03) Perumahan 6.20 Rp 82,005.00

Memasang 1m2 Dinding Bata Merah ukuran (5x11x22) cm tebal 1 Bata


4 P.D.nd. 04 Acuan : SNI 6897:2008 (6.3) Rp 478,020.00
campuran 1Pc : 4Ps (P.Dnd. 04)
Memasang 1m2 Dinding Bata Merah ukuran (5x11x22) cm tebal 1/2 Bata Acuan : SNI 6897:2008 (6.9)
5 P.D.nd. 05 Rp 235,945.00
campuran 1Pc : 4Ps (P.Dnd. 05)

Memasang 1m2 Dinding Terawang (roster) ukuran (18x18) cm,


6 P.D.nd. 06 Acuan : SNI 6897:2008 (6.23) Rp 150,275.00
campuran 1Pc : 4Ps (P.Dnd. 06)

F P.Pls. PEKERJAAN PLESTERAN


1 P.Pls. 01 Memasang 1m2 Plesteran 1 PC : 2 PP, Tebal 15 mm (P.Pls. 01) Acuan : SNI 2837:2008 (6.2) Rp 45,986.00

2 P.Pls. 02 Memasang 1m2 Plesteran 1 PC : 3 PP, Tebal 15 mm (P.Pls.02) Acuan : SNI 2837:2008 (6.3) Rp 65,175.94

3 P.Pls. 03 Memasang 1m2 Plesteran 1 PC : 4 PP, Tebal 15 mm (P.Pls. 03) Acuan : SNI 2837:2008 (6.4) Rp 61,427.64

4 P.Pls. 04 Memasang 1m2 Plesteran 1 PC : 5 PP, Tebal 15 mm (P.Pls. 04) Acuan : SNI 2837:2008 (6.5) Rp 59,043.62

5 P.Pls. 05 Memasang 1m2 Plesteran 1 PC : 2 PP, Tebal 20 mm (P.Pls. 05) Acuan : SNI 2837:2008 (6.13) Rp 61,493.00

P.Pls. 05.a Memasang 1m2 Plesteran tekstur (P.Pls. 05.a) Acuan : SNI 2837:2008 (6.13) Rp 95,099.75

6 P.Pls. 06 Memasang 1m2 Plesteran 1 PC : 3 PP, Tebal 20 mm (P.Pls.06) Acuan : SNI 2837:2008 (6.14) Rp 48,727.00

7 P.Pls. 07 Memasang 1m2 Plesteran 1 PC : 4 PP, Tebal 20 mm (P.Pls. 07) Acuan : SNI 2837:2008 (6.15) Rp 54,100.00

8 P.Pls. 08 Memasang 1m2 Berapen 1 PC : 5 PP, Tebal 15 mm (P.Pls. 08) Acuan : SNI 2837:2008 (6.19) Rp 25,011.00

9 P.Pls. 09 Memasang 1m2 Skoning 1 PC : 2 PP, Tebal 10 mm (P.Pls. 09) Acuan : SNI 2837:2008 (6.20) Rp 35,725.00

Membuat 1 m2 Finishing Siar pasangan Batu Kali Adukan 1 PC : 2 PP


10 P.Pls. 10 Acuan : SNI 2837:2008 (6.26) Rp 39,240.00
(P.Pls.10)

11 P.Pls. 11 Memasang 1m2 Acian (P.Pls. 11) Acuan : SNI 2837:2008 (6.27) Rp 36,292.00

Acuan : Harga Satuan Bahan, Upah dan


Memasang 1m2 Plesteran 1 PC : 3 PP, Menggunakan Kawat Simpai
12 P.Pls. 12 Analisa Biaya Pekerjaan BOW - Suplement Rp 194,726.00
Tebal 30 mm (P.Pls. 12) G.50

G P.K. PEKERJAAN KAYU


1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air
Acuan : Harga Satuan Bahan, Upah dan
1 P.K. 01 Pada Barau, Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Analisa Biaya Pekerjaan BOW - F.3 Rp 12,149,400.00
Menggunakan Kayu Belian Uk. 9/9 (P.K. 01)

1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air
Acuan : Harga Satuan Bahan, Upah dan
2 P.K. 02 Pada Barau, Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Analisa Biaya Pekerjaan BOW - F.3 Rp 12,402,400.00
Menggunakan Kayu Belian Uk. 10/10 (P.K. 02)

1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air
Acuan : Harga Satuan Bahan, Upah dan
3 P.K. 03 Pada Barau, Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Analisa Biaya Pekerjaan BOW - F.3 Rp 14,173,400.00
Menggunakan Kayu Belian Uk. 12/12 - 15/15 (P.K. 03)

1m3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air
Acuan : Harga Satuan Bahan, Upah dan
4 P.K. 04 Pada Barau, Topangan Angin dan Balok Tarahan Kayu-kayu Penahan Analisa Biaya Pekerjaan BOW - F.3 Rp 10,758,890.00
Menggunakan Kayu Belian Uk. 18/18 - 20/20 (P.K. 04)

Acuan : Harga Satuan Bahan, Upah dan


5 P.K. 05 1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 7/7 (P.K. 05) Analisa Biaya Pekerjaan BOW - F.27 Rp 17,619,840.00

Acuan : Harga Satuan Bahan, Upah dan


6 P.K. 06 1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 (P.K. 06) Analisa Biaya Pekerjaan BOW - F.27 Rp 18,369,310.00

Acuan : Harga Satuan Bahan, Upah dan


7 P.K. 07 1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 7/7 (P.K. 07) Analisa Biaya Pekerjaan BOW - F.27.a Rp 9,265,650.00

Acuan : Harga Satuan Bahan, Upah dan


8 P.K. 08 1m3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8 (P.K. 08) Analisa Biaya Pekerjaan BOW - F.27.a Rp 9,986,700.00

Acuan : Harga Satuan Bahan, Upah dan


9 P.K. 09 1m1 Melancip Tiang / Batang (P.K. 09) Analisa Biaya Pekerjaan BOW - E.1 Rp 23,850.00

Acuan : Harga Satuan Bahan, Upah dan


10 P.K. 10 Membuat Puting dan Lubang / Pasang (P.K. 10) Analisa Biaya Pekerjaan BOW - E.4 Rp 43,200.00

Acuan : Harga Satuan Bahan, Upah dan


11 P.K. 11 1 m1 Memancang Tiang ke Dalam Tanah (P.K. 11) Analisa Biaya Pekerjaan BOW - E.13 Rp 52,445.00
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Acuan : Harga Satuan Bahan, Upah dan
12 P.K. 11.i 1 m1 Memancang Cerucuk ke Dalam Tanah (P.K. 11.i) Analisa Biaya Pekerjaan BOW - E.13 Rp 1,485.62

Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu
13 P.K. 12 Acuan : SNI 3434:2008 (6.1) Rp 9,611,850.00
Kelas I (P.K. 12)
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela Kayu
14 P.K. 12.a Acuan : SNI 3434:2008 (6.1) Rp 17,027,830.00
Belian (P.K. 12.a)
Membuat dan Memasang 1m3 Kusen Pintu dan Kusen Jendela, Kayu
15 P.K. 13 Acuan : SNI 3434:2008 (6.2) Rp 6,195,675.00
Kelas II (P.K. 13)

16 P.K. 14 Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas I (P.K. 14) Acuan : SNI 3434:2008 (6.5) Rp 771,964.00

P.K. 14.i Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu belian (P.K. 14.i) Acuan : SNI 3434:2008 (6.5) Rp 1,760,032.00

Membuat dan Memasang 1m2 Daun Pintu Panel, Kayu Kelas II (P.K.
17 P.K. 14.a Acuan : SNI 3434:2008 (6.5) Rp 511,814.00
14.a)

Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas I
18 P.K. 15 Acuan : SNI 3434:2008 (6.7) Rp 798,653.20
(P.K. 15)

Membuat dan Memasang 1m2 Pintu dan Jendela Jalusi Kayu Kelas II
19 P.K. 15.a Acuan : SNI 3434:2008 (6.7) Rp 795,165.20
(P.K. 15.a)

Membuat 1m2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka


20 P.K. 16 Acuan : SNI 3434:2008 (6.8) Rp 462,334.50
Tertutup Kayu Kelas II (Lebar sampai 90 cm) (P.K. 16)

Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I


21 P.K. 17 Acuan : SNI 3434:2008 (6.9) Rp 555,208.28
(P.K. 17)

Membuat 1m2 Pintu Plywood Rangkap, Rangka Expose Kayu Kelas II


22 P.K. 17.a Acuan : SNI 3434:2008 (6.9) Rp 553,813.08
(P.K. 17.a)

23 P.K. 18 Membuat 1m2 Jalusi Kusen, Kayu Kelas I (P.K. 18) Acuan : SNI 3434:2008 (6.10) Rp 681,963.00

24 P.K. 18.a Membuat 1m2 Jalusi Kusen, Kayu Kelas II (P.K. 18.a) Acuan : SNI 3434:2008 (6.10) Rp 678,693.00

1m2 Pemasangan Ventilasi Kaca. Setiap luas 1 m2 bidang daun ventilasi, Acuan : Harga Satuan Bahan, Upah dan
25 P.K. 19 Rp 340,370.00
luas kacanya adalah 0.60 m2 (P.K. 19) Analisa Biaya Pekerjaan BOW - F.37.c

Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas I


26 P.K. 20 Acuan : SNI 3434:2008 (6.13) Rp 7,149,800.00
Bentang 6 m (P.K. 20)
Memasang 1m3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas II
27 P.K. 20.a Acuan : SNI 3434:2008 (6.13) Rp 7,918,530.00
Bentang 6 m (P.K. 20.a)

28 P.K. 21 Memasang 1m3 Konstruksi Kuda-kuda Expose, Kayu Kelas I (P.K. 21) Acuan : SNI 3434:2008 (6.14) Rp 8,375,010.00

29 P.K. 22 Memasang 1m3 Konstruksi Gordeng, Kayu Kelas II (P.K. 22) Acuan : SNI 3434:2008 (6.15) Rp 7,073,930.00

30 P.K. 22.a Memasang 1m3 Konstruksi Gordeng, Kayu Kelas I (P.K. 22.a) Acuan : SNI 3434:2008 (6.15) Rp 6,653,660.00

31 P.K. 22.b Memasang 1m3 Konstruksi Gordeng, Kayu Belian (P.K. 22.b) Acuan : SNI 3434:2008 (6.15) Rp 13,305,910.00

32 P.K. 23 Memasang 1m2 Rangka Atap Genteng Keramik, Kayu Kelas II (P.K. 23) Acuan : SNI 3434:2008 (6.16) Rp 78,212.08

33 P.K. 24 Memasang 1m2 Rangka Atap Genteng Beton, Kayu Kelas II (P.K. 24) Acuan : SNI 3434:2008 (6.17) Rp 86,458.96

34 P.K. 25 Memasang 1m2 Rangka Atap Sirap, Kayu Kelas II (P.K. 25) Acuan : SNI 3434:2008 (6.18) Rp 649,069.50

Acuan : Harga Satuan Bahan, Upah dan


35 P.K. 26 1m2 Pemasangan Rangka Atap Seng (P.K. 26) Analisa Biaya Pekerjaan BOW - F.19 Rp 60,011.39

Acuan : ABK Bangunan Gedung dan


36 P.K. 27 1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II (P.K. 27) Perumahan - 6.35 Rp 69,707.20

Memasang 1m2 Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau
37 P.K. 28 Acuan : SNI 3434:2008 (6.19) Rp 96,064.22
III (P.K. 28)
Memasang 1m2 Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III Acuan : SNI 3434:2008 (6.20)
38 P.K. 29 Rp 121,147.89
(P.K. 29)
Acuan : ABK Bangunan Gedung dan
39 P.K. 30 1m2 Pasang Rangka Langit-langit (30 x 60)cm Kayu Kelas II (P.K. 30) Perumahan - 6.41 Rp 124,267.90

Acuan : ABK Bangunan Gedung dan


40 P.K. 31 1m2 Pasang Rangka Langit-langit (30 x 30)cm Kayu Kelas II (P.K. 31) Perumahan - 6.44 Rp 147,137.10

41 P.K. 32 Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas I (P.K. 32) Acuan : SNI 3434:2008 (6.21) Rp 107,828.04

42 P.K. 32.a Memasang 1m1 Lisplank Ukuran (3 x 20) cm, Kayu Kelas II (P.K. 32.a) Acuan : SNI 3434:2008 (6.21) Rp 107,239.44

Acuan : ABK Bangunan Gedung dan


43 P.K. 33 1m1 Pasang Lisplank Ukuran 2 x (3 x 20cm) Kayu Kelas I (P.K. 33) Perumahan - 6.51 Rp 151,406.95

Acuan : ABK Bangunan Gedung dan


44 P.K. 34 1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Belian (P.K. 34) Perumahan - 6.53 Rp 304,357.04

Acuan : ABK Bangunan Gedung dan


45 P.K. 34.a 1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas I (P.K. 34.a) Perumahan - 6.53 Rp 87,089.44

Acuan : ABK Bangunan Gedung dan


46 P.K. 34.b 1m1 Pasang Lisplank Ukuran 2 x (2 x 20cm) Kayu Kelas II (P.K. 34.b) Perumahan - 6.53 Rp 86,609.84

Acuan : ABK Bangunan Gedung dan


47 P.K. 35 1m2 Pasang Rangka Dinding Pemisah Kayu Kelas I (P.K. 35) Perumahan - 6.54 Rp 208,726.90
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Memasang 1m2 Rangka Dinding Pemisah (60x120) cm Kayu Kelas II
48 P.K. 36 Acuan : SNI 3434:2008 (6.23) Rp 151,239.40
(P.K. 36)
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Memasang 1m2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas Acuan : SNI 3434:2008 (6.25)
49 P.K. 37 Rp 268,860.20
II (P.K. 37)

50 P.K. 38 Memasang 1m2 Dinding Lambriziring dari Papan Kayu Kelas I (P.K. 38) Acuan : SNI 3434:2008 (6.26) Rp 232,584.10

51 P.K. 38.a Memasang 1m2 Dinding Lambriziring dari Papan Kayu Belian (P.K. 38.a) Acuan : SNI 3434:2008 (6.26) Rp 301,547.90

Memasang 1m2 Dinding Lambriziring dari Plywood ukuran (120 x 240)


52 P.K. 39 Acuan : SNI 3434:2008 (6.27) Rp 53,735.00
cm (P.K. 39)
Acuan : ABK Bangunan Gedung dan
53 P.K. 40 1m1 Pasang List Plafond, Kayu Profil (P.K. 40) Perumahan - 6.60 Rp 8,426.25

Acuan : Harga Satuan Bahan, Upah dan


54 P.K. 41 1m2 Pemasangan Lantai Papan Kayu Belian (P.K. 41) Analisa Biaya Pekerjaan BOW - F.38 Rp 594,292.80

Acuan : Harga Satuan Bahan, Upah dan


55 P.K. 41.a 1m2 Pemasangan Lantai Papan Kayu Kelas I (P.K. 41.a) Analisa Biaya Pekerjaan BOW - F.38 Rp 358,831.20

H P.PA PEKERJAAN PENUTUP ATAP


Acuan : ABK Bangunan Gedung dan
1 P.PA. 01 1m2 Pasang Atap Genteng Metal Type PRIMA 0.35 (P.PA. 01) Perumahan - 6.32 Rp 156,602.00

Acuan : ABK Bangunan Gedung dan


2 P.PA. 02 1m2 Pasang Atap Genteng Metal T. 0.35 (P.PA. 02) Perumahan - 6.32 Rp 154,848.00

Acuan : ABK Bangunan Gedung dan


3 P.PA. 03 1m2 Pasang Atap Genteng Metal (P.PA. 03) Perumahan - 6.32 Rp 120,878.00

Acuan : ABK Bangunan Gedung dan


4 P.PA. 04 1m2 Pasang Atap Genteng Metal Stone Type CLASSIC 0.35 (P.PA. 04) Perumahan - 6.32 Rp 173,310.00

Acuan : ABK Bangunan Gedung dan


5 P.PA. 05 1m2 Pasang Atap Genteng Metal Stone Type PRIMA 0.35 (P.PA. 05) Perumahan - 6.32 Rp 193,770.00

Acuan : ABK Bangunan Gedung dan


6 P.PA. 06 1m2 Pasang Atap Sirap Belian (P.PA. 06) Perumahan - 6.33 Rp 380,070.00

1m1 Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m1 (P.PA. Acuan : Harga Satuan Bahan, Upah dan
7 P.PA. 07 Rp 69,319.36
07) Analisa Biaya Pekerjaan BOW - H.10

1m1 Pasang Nok / Bumbungan Genteng Metal 1/2 Lingkaran 0.35 (P.PA. Acuan : ABK Bangunan Gedung dan
8 P.PA. 08 Rp 213,555.00
08) Perumahan - 6.36

Acuan : ABK Bangunan Gedung dan


9 P.PA. 09 1m1 Pasang Nok / Bumbungan Genteng Metal Kotak 0.35 (P.PA. 09) Perumahan - 6.36 Rp 115,855.00

1m1 Pasang Nok / Bumbungan Genteng Metal Stone Kotak 0.35 (P.PA. Acuan : ABK Bangunan Gedung dan
10 P.PA. 10 Rp 105,965.00
10) Perumahan - 6.36

Acuan : ABK Bangunan Gedung dan


11 P.PA. 11 1m1 Pasang Bumbungan Atap Sirap (P.PA. 11) Perumahan - 6.37 Rp 95,478.40

Acuan : ABK Bangunan Gedung dan


12 P.PA. 12 1m2 Pasang Atap Seng Gelombang BJLS 30 (P.PA. 12) Perumahan - 6.38 Rp 64,090.00

Acuan : ABK Bangunan Gedung dan


13 P.PA. 13 1m2 Pasang Atap Metal Supersheet 0.35 (polos) (P.PA. 13) Perumahan - 6.38 Rp 189,395.00

Acuan : ABK Bangunan Gedung dan


14 P.PA. 14 1m2 Pasang Zincalume Gelombang Persegi 0.30 (Polos) (P.PA. 14) Perumahan - 6.38 Rp 182,255.00

Acuan : ABK Bangunan Gedung dan


15 P.PA. 15 1m2 Pasang Zincalume Gelombang Persegi 0.30 (Colour) (P.PA. 15) Perumahan - 6.38 Rp 198,845.00

Acuan : ABK Bangunan Gedung dan


16 P.PA. 16 1m2 Pasang Zincalume Gelombang Persegi 0.30 (Polos) (P.PA. 16) Perumahan - 6.38 Rp 198,780.00

Acuan : ABK Bangunan Gedung dan


17 P.PA. 17 1m2 Pasang Zincalume Gelombang Persegi 0.35 (Colour) (P.PA. 17) Perumahan - 6.38 Rp 259,235.00

Acuan : Harga Satuan Bahan, Upah dan


18 P.PA. 18 1m1 Pekerjaan Bubungan Atap Seng BJLS 30 / 10m1 (P.PA. 18) Analisa Biaya Pekerjaan BOW - H.10 Rp 76,331.86

Acuan : ABK Bangunan Gedung dan


19 P.PA. 19 1m2 Pasang Aluminium Foil / Sealation (P.PA. 19) Perumahan - 6.42 Rp 72,785.00

Acuan : ABK Bangunan Gedung dan


20 P.PA. 20 1m2 Pasang Atap Steel Sheet 0.33 (color) (P.PA. 20) Perumahan - 6.38 Rp 188,870.00

Acuan : ABK Bangunan Gedung dan


21 P.PA. 21 1m2 Pasang Atap Steel Sheet 0.40 (polos) (P.PA. 21) Perumahan - 6.38 Rp 188,870.00
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
I P.Pf PEKERJAAN PLAFOND
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm Acuan : SNI 2839:2008 (6.5)
1 P.Pf. 01 Rp 37,693.50
(P.Pf. 01)
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm Acuan : SNI 2839:2008 (6.5)
2 P.Pf. 02 Rp 66,156.00
(P.Pf. 02)
Memasang 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, Acuan : SNI 2839:2008 (6.5)
3 P.Pf. 03 Rp 49,792.20
tebal 9 mm (P.Pf. 03)

4 P.Pf. 04 Memasang 1 m2 Langit - Langit Lambrizing Kayu, Tebal 9 mm (P.Pf. 04) Acuan : SNI 2839:2008 (6.6) Rp 107,289.50

Memasang 1 m2 Langit - Langit Gypsum Board Ukuran (120 x 240 x 9)


5 P.Pf. 05 Acuan : SNI 2839:2008 (6.7) Rp 39,644.40
mm, Tebal 9 mm (P.Pf. 05)

6 P.Pf. 06 Memasang 1 m1 List Plafond Gypsum Profil (P.Pf.06) Acuan : SNI 2839:2008 (6.8) Rp 36,510.00

7 P.Pf. 07 Memasang 1 m' list langit-langit kayu profil (P.Pf. 07) Acuan : SNI 2839:2008 (6.10) Rp 27,635.00

Acuan : ABK Bangunan Gedung dan


8 P.Pf. 08 1m2 Langit-langit GRC (P.Pf. 08) Perumahan - 6.24 Rp 49,792.20

Acuan : Harga Satuan Bahan, Upah dan


9 P.Pf. 09 1m2 Pekerjaan Plafond Renglat Kayu Kelas I (P.Pf. 09) Analisa Biaya Pekerjaan BOW - SUPL. VIII.a Rp 302,353.80

J P.Snt PEKERJAAN SANITASI


1 P.Snt. 01 Pemasangan 1 Buah Kloset Duduk / Monoblok (P.Snt. 01) Acuan : SNI : 2001 - 2002 (6.1) Rp 4,182,525.71

2 P.Snt. 02 Pemasangan Kloset Jongkok Keramik (P.Snt. 02) Acuan : SNI : 2001 - 2002 (6.2) Rp 1,088,680.00

3 P.Snt. 03 Pemasangan Wastafel (P.Snt. 03) Acuan : SNI : 2001 - 2002 (6.5) Rp 1,195,337.28

4 P.Snt. 04 Memasang 1m1 Pipa Galvanis Ø 1/2" (P.Snt. 04) Acuan : SNI : 2001 - 2002 (6.19) Rp 35,106.67

5 P.Snt. 05 Memasang 1m1 Pipa Galvanis Ø 3/4" (P. Snt. 05) Acuan : SNI : 2001 - 2002 (6.20) Rp 41,048.33

6 P.Snt. 06 Memasang 1m1 Pipa Galvanis Ø 1" (P.Snt. 06) Acuan : SNI : 2001 - 2002 (6.21) Rp 48,488.33

7 P.Snt. 07 Memasang 1m1 Pipa Galvanis Ø 11/2" (P.Snt. 07) Acuan : SNI : 2001 - 2002 (6.22) Rp 78,694.67

8 P.Snt. 08 Memasang 1m1 Pipa Galvanis Ø 3" (P.Snt. 08) Acuan : SNI : 2001 - 2002 (6.23) Rp 167,819.67

9 P.Snt. 09 Memasang 1m1 Pipa Galvanis Ø 4" (P.Snt. 09) Acuan : SNI : 2001 - 2002 (6.24) Rp 261,767.67

10 P.Snt. 10 Memasang 1m1 Pipa PVC Tipe AW Ø 1/2" (P.Snt. 10) Acuan : SNI : 2001 - 2002 (6.25) Rp 13,129.75

11 P.Snt. 11 Memasang 1m1 Pipa PVC Tipe AW Ø 3/4" (P.Snt. 11) Acuan : SNI : 2001 - 2002 (6.26) Rp 14,912.25

12 P.Snt. 12 Memasang 1m1 Pipa PVC Tipe AW Ø 1" (P.Snt. 12) Acuan : SNI : 2001 - 2002 (6.27) Rp 26,324.00

13 P.Snt. 13 Memasang 1m1 Pipa PVC Tipe AW Ø 2" (P.Snt. 13) Acuan : SNI : 2001 - 2002 (6.29) Rp 35,059.00

14 P.Snt. 14 Memasang 1m1 Pipa PVC Tipe AW Ø 3" (P.Snt. 14) Acuan : SNI : 2001 - 2002 (6.31) Rp 65,728.25

15 P.Snt. 15 Memasang 1m1 Pipa PVC Tipe AW Ø 4" (P.Snt. 15) Acuan : SNI : 2001 - 2002 (6.32) Rp 97,732.17

16 P.Snt. 16 Memasang 1 Buah Bak Cuci Piring Stainles Steel (P.Snt. 16) Acuan : SNI : 2001 - 2002 (6.33) Rp 502,855.00

17 P.Snt. 17 Memasang 1 Buah Kran Air Ø 3/4" atau Ø 1/2" (P.Snt. 17) Acuan : SNI : 2001 - 2002 (6.35) Rp 49,133.00

18 P.Snt. 18 Memasang 1 Buah Floor Drain (P.Snt. 18) Acuan : SNI : 2001 - 2002 (6.36) Rp 42,783.00
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
K P.BA PEKERJAAN BESI DAN ALUMUNIUM
1 P.BA. 01 Memasang 1 Kg Besi Profil (P.BA. 01) Acuan : SNI 7393:2008 (6.1) Rp 29,450.00

2 P.BA. 02 Memasang 1 Kg Rangka Kuda - Kuda Baja IWF (P.BA. 02) Acuan : SNI 7393:2008 (6.2) Rp 29,450.00

3 P.BA. 03 Mengerjakan 100 kg pekerjaan perakitan (P. BA 03) Acuan : SNI 7393:2008 (6.3) Rp 72,041.00

Membuat 1 M2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Acuan : SNI 7393:2008 (6.4)
4 P.BA. 04 Rp 922,720.00
(P.BA 04)

5 P.BA. 05 Mengerjakan 10 cm pengelasan dengan las listrik (P. BA 05) Acuan : SNI 7393:2008 (6.5) Rp 63,335.40

6 P.BA. 05.a Mengerjakan pengelasan dengan las listrik / Titik (P. BA 05.a) Acuan : SNI 7393:2008 (6.5) Rp 1,266.71

7 P.BA. 06 Memasang 1 m2 Pintu Rolling Door Besi (P.BA. 06) Acuan : SNI 7393:2008 (6.7)

8 P.BA. 07 Memasang 1 m2 Pintu Lipat (Folding Door) (P.BA. 07) Acuan : SNI 7393:2008 (6.8) Rp 632,420.00

9 P.BA. 08 Memasang 1 m2 Sunscreen Alluminium (P.BA. 08) Acuan : SNI 7393:2008 (6.9)

10 P.BA. 09 Memasang 1m Kusen Pintu Alluminium (P. BA. 09) Acuan : SNI 7393:2008 (6.11) Rp 112,766.00

11 P.BA. 10 Memasang 1 m2 Pintu Alluminum Strip Lebar 8 cm (P.BA. 10) Acuan : SNI 7393:2008 (6.12)

12 P.BA. 11 Memasang 1 m2 Pintu Kaca Rangka Alluminium (P.BA. 11) Acuan : SNI 7393:2008 (6.13)

13 P.BA. 12 Memasang 1 m2 Terali Besi Strip (2 x 3) mm (P.BA. 12) Acuan : SNI 7393:2008 (6.15)

14 P.BA. 13 Memasang 1 m2 Kawat Nyamuk Plastik (P.BA. 13) Acuan : SNI 7393:2008 (6.16) Rp 27,749.34

15 P.BA. 13.a Memasang 1 m2 Kawat Nyamuk Besi (P.BA. 13.a.) Acuan : SNI 7393:2008 (6.16)

Acuan : ABK Bangunan Gedung dan


16 P.BA. 14 1m2 Pasang Kawat Harmonika (P.BA. 14) Perumahan - 6.13 Rp 54,715.38

Acuan : ABK Bangunan Gedung dan


17 P.BA. 15 1m2 Pasang Kawat Kassa (P.BA. 15) Perumahan - 6.15 Rp 38,875.38

18 P.BA. 16 Memasang 1 m2 Jendela Nako dan Tralis (P.BA. 16) Acuan : SNI 7393:2008 (6.17) Rp 318,950.00

19 P.BA. 17 Memasang 1 m1 Talang Datar / Jurai Alumunium BJLS 30 (P.BA. 17) Acuan : SNI 7393:2008 (6.18) Rp 152,014.50

Memasang 1m1 Talang 1/2 Lingkaran D-15 cm, Seng Plat BJLS 30 Lebar Acuan : SNI 7393:2008 (6.19)
20 P.BA. 18 Rp 99,579.00
45 cm (P.BA. 18)
Acuan : ABK Bangunan Gedung dan
21 P.BA. 19 1m2 Pasang Talang Datar Seng BJLS 30 / Talang Sembunyi (P.BA.19) Perumahan - 6.18 Rp 122,651.48

Acuan : ABK Bangunan Gedung dan


22 P.BA. 20 1m2 Pasang Talang Miring Seng BJLS 30 / Jurai Dalam (P.BA. 20) Perumahan - 6.19 Rp 155,400.70

Acuan : Harga Satuan Bahan, Upah dan


23 P.BA. 21 10m1 Talang Cucuran Atap 1/2 Lingkaran Ø 15cm BJLS 30 (P.BA. 21) Analisa Biaya Pekerjaan BOW - H.17 Rp 70,380.00

10m1 Pemasangan Pipa Pembuangan dari Talang Atap Ø 8cm BJLS 30 Acuan : Harga Satuan Bahan, Upah dan
24 P.BA. 22 Rp 46,470.00
(P.BA. 22) Analisa Biaya Pekerjaan BOW - H.18

L P.KK PEKERJAAN KUNCI DAN KACA


Acuan : ABK Bangunan Gedung dan
1 P.KK. 01 1 Buah Pemasangan Kunci Tanam Antik (P.KK. 01) Perumahan - 6.1 Rp 502,790.00
Acuan : ABK Bangunan Gedung dan
2 P.KK. 02 1 Buah Pemasangan Kunci Tanam Biasa (P.KK. 02) Perumahan - 6.2 Rp 125,000.00
Acuan : ABK Bangunan Gedung dan
3 P.KK. 03 1 Buah Pemasangan Kunci Silinder (P.KK. 03) Perumahan - 6.4 Rp 145,342.50
Acuan : ABK Bangunan Gedung dan
4 P.KK. 04 1 Buah Pemasangan Engsel Pintu (P.KK. 04) Perumahan - 6.5 Rp 67,697.50
Acuan : ABK Bangunan Gedung dan
5 P.KK. 04.a 1 Buah Pemasangan Engsel Jendela (P.KK. 04.a) Perumahan - 6.5 Rp 54,697.50
Acuan : ABK Bangunan Gedung dan
6 P.KK. 05 1 Buah Pemasangan Kait Angin (P.KK. 05) Perumahan - 6.9 Rp 41,697.50
Acuan : ABK Bangunan Gedung dan
7 P.KK. 06 1 Buah Pemasangan Door Closer (P.KK. 06) Perumahan - 6.10 Rp 210,025.00
Acuan : ABK Bangunan Gedung dan
8 P.KK. 07 1 Buah Pemasangan Slot Pintu (P.KK. 07) Perumahan - 6.11 Rp 48,930.00
Acuan : ABK Bangunan Gedung dan
9 P.KK. 07.a 1 Buah Pemasangan Slot Jendela (P.KK. 07.a) Perumahan - 6.11 Rp 42,930.00
Acuan : ABK Bangunan Gedung dan
10 P.KK. 08 1 Buah Pemasangan Door Stoper (P.KK. 08) Perumahan - 6.13 Rp 88,285.00
Acuan : ABK Bangunan Gedung dan
11 P.KK. 09 1 m2 Pemasangan Kaca Tebal 5mm (P.KK. 09) Perumahan - 6.17 Rp 150,827.50
Acuan : ABK Bangunan Gedung dan
12 P.KK. 10 1 m2 Pemasangan Kaca Tebal 12mm (P.KK. 10) Perumahan - 6.19 Rp 659,152.50
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Acuan : ABK Bangunan Gedung dan
13 P.KK. 11 1 m2 Pemasangan Kaca Cermin, Tebal 2mm (P.KK. 11) Perumahan - 6.20 Rp 277,327.50
Acuan : ABK Bangunan Gedung dan
14 P.KK. 12 1 m2 Pemasangan Kaca Patri (P.KK. 12) Perumahan - 6.24 Rp 3,174,177.50
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
M P.LD PEKERJAAN LANTAI DAN DINDING
1 P.LD. 01 Memasang 1m2 Lantai Keramik Ukuran (30 x 30) cm (P.LD. 01) Acuan : SNI 7395:2008 (6.35) Rp 316,387.22

2 P.LD. 02 Memasang 1m2 Lantai Keramik Ukuran (20 x 20) cm (P.LD. 02) Acuan : SNI 7395:2008 (6.36) Rp 292,034.40

Acuan : ABK Bangunan Gedung dan


3 P.LD. 03 1m2 Pasang Lantai Keramik 40 x 40cm Polos (P.LD. 03) Perumahan - 6.47 Rp 278,608.68

1m2 Pasang Lantai Keramik 40 x 40cm Polished (setaraf Indogress) Acuan : ABK Bangunan Gedung dan
4 P.LD. 04 Rp 222,737.50
(P.LD. 04) Perumahan - 6.47

1m2 Pasang Lantai Keramik 40 x 40cm Polished (setaraf Decogress) Acuan : ABK Bangunan Gedung dan
5 P.LD. 04.a Rp 215,654.17
(P.LD. 04.a) Perumahan - 6.47

1m2 Pasang Lantai Keramik 40 x 40cm Unpolished (setaraf Indogress) Acuan : ABK Bangunan Gedung dan
6 P.LD. 05 Rp 239,508.33
(P.LD. 5) Perumahan - 6.47

1m2 Pasang Lantai Keramik 40 x 40cm Unpolished (setaraf Decogress) Acuan : ABK Bangunan Gedung dan
7 P.LD. 05.a Rp 217,529.17
(P.LD. 05.a) Perumahan - 6.47

Acuan : ABK Bangunan Gedung dan


P.LD. 05.b 1m2 Pasang Lantai Keramik 60 x 60 cm (P.LD. 05.b) Perumahan - 6.47 Rp 261,308.68

Acuan : ABK Bangunan Gedung dan


P.LD. 05.c 1m2 Pasang Lantai Keramik 30 x 60 cm (P.LD. 05.c) Perumahan - 6.47 Rp 256,308.68

8 P.LD. 06 Memasang 1m1 Plint Keramik Ukuran (10 x 20) cm (P.LD. 06) Acuan : SNI 7395:2008 (6.39)

9 P.LD. 07 Memasang 1m1 Plint Keramik Ukuran (10 x 10) cm (P.LD. 07) Acuan : SNI 7395:2008 (6.40)

10 P.LD. 08 Memasang 1m1 Plint Keramik Ukuran (5 x 20) cm (P.LD. 08) Acuan : SNI 7395:2008 (6.41)

11 P.LD. 09 Memasang 1 m2 lantai marmer ukuran (100 x 100) cm (P.LD. 09) Acuan : SNI DT 91-0012-2007 Rp 587,449.00

Acuan : ABK Bangunan Gedung dan


13 P.LD. 10 1m2 Pasang Dinding Keramik 20 x 25cm (P.LD. 10) Perumahan - 6.63 Rp 201,405.80

Acuan : ABK Bangunan Gedung dan


14 P.LD. 11 1m2 Pasang Dinding Keramik 30 x 30cm (P.LD. 11) Perumahan - 6.63 Rp 127,920.00

Acuan : ABK Bangunan Gedung dan


15 P.LD. 12 1m2 Pasang Dinding Keramik 40 x 40cm (P.LD. 12) Perumahan - 6.63 Rp 134,820.00

Acuan : ABK Bangunan Gedung dan


16 P.LD. 12.a 1m2 Pasang Dinding Granito 40 x 40cm (P.LD. 12.a) Perumahan - 6.63 Rp 284,620.00

17 P.LD. 13 Memasang 1 m2 Floor Hardener (P.LD. 13) Acuan : SNI DT 91-0012-2007 Rp 59,160.00

Acuan : Harga Satuan Bahan, Upah dan


18 P.LD. 14 1m2 Pemasangan Paving Block (P.LD. 14) Analisa Biaya Pekerjaan BOW - G.60 Rp 158,500.00

Acuan : Harga Satuan Bahan, Upah dan


19 P.LD. 15 1m2 Pemasangan Paving Stone (P.LD. 15) Analisa Biaya Pekerjaan BOW - G.60.a Rp 238,500.00

20 P.LD. 16 Memasang 1m2 Dinding Porselen Ukuran (11 x 11) cm (P.LD. 16) Acuan : SNI 7395:2008 (6.48)

21 P.LD. 17 Memasang 1m2 Dinding Porselen Ukuran (10 x 20) cm (P.LD. 17) Acuan : SNI 7395:2008 (6.49) Rp 196,420.00

22 P.LD. 18 Memasang 1m2 Dinding Porselen Ukuran (20 x 20) cm (P.LD. 18) Acuan : SNI 7395:2008 (6.50) Rp 181,368.00

23 P.LD. 19 Memasang 1m2 Dinding Batu Paras (P.LD. 19) Acuan : SNI 7395:2008 (6.57) Rp 252,250.00

24 P.LD. 19.a Memasang 1m2 Dinding Batu Alam (P.LD. 19.a) Acuan : SNI 7395:2008 (6.57) Rp 340,800.00

25 P.LD. 20 Memasang 1m2 Dinding Batu Tempel Hitam (P.LD. 20) Acuan : SNI 7395:2008 (6.58) Rp 252,250.00

26 P.LD. 21 Memasang 1m2 Wall Paper, Lebar 50 cm (P.LD. 21) Acuan : SNI 7395:2008 (6.60)

N P.Ct PEKERJAAN PENGECATAN


Acuan : ABK Bangunan Gedung dan
1 P.Ct. 01 1m2 Mengikis / Mengerok Permukaan Cat Tembok Lama (P.Ct. 01) Perumahan - 6.1 Rp 21,112.50

1m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual Acuan : ABK Bangunan Gedung dan
2 P.Ct. 02 Rp 9,477.50
(P.Ct. 02) Perumahan - 6.3

Acuan : ABK Bangunan Gedung dan


3 P.Ct. 03 1m2 Pengecatan Bidang Kayu Lama (P.Ct. 03) Perumahan - 6.7 Rp 26,638.00

1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, Acuan : ABK Bangunan Gedung dan
4 P.Ct. 04 Rp 68,775.00
2Lapis Cat Penutup) (P.Ct. 04) Perumahan - 6.8

1m2 Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, Acuan : ABK Bangunan Gedung dan
5 P.Ct. 05 Rp 45,883.00
3Lapis Cat Penutup) (P.Ct. 05) Perumahan - 6.9

Acuan : ABK Bangunan Gedung dan


6 P.Ct. 06 1m2 Pelaburan Bidang Kayu dengan Teak Oil (P.Ct. 06) Perumahan - 6.10 Rp 27,440.00

Acuan : ABK Bangunan Gedung dan


7 P.Ct. 07 1m2 Pelaburan Bidang Kayu dengan Politur (P.Ct. 07) Perumahan - 6.11 Rp 35,400.00

Acuan : Harga Satuan Bahan, Upah dan


8 P.Ct. 08 1m2 Pekerjaan Melamic (P.Ct. 08) Analisa Biaya Pekerjaan BOW - K.15.a Rp 60,339.00
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Acuan : ABK Bangunan Gedung dan
9 P.Ct. 09 1m2 Pelaburan Bidang Kayu Dengan Cat Residu dan Ter (P.Ct. 09) Perumahan - 6.12 Rp 11,365.00

Acuan : ABK Bangunan Gedung dan


10 P.Ct. 10 1m2 Pelaburan Bidang Kayu Dengan Vernis (P.Ct. 10) Perumahan - 6.13 Rp 28,076.00

1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Acuan : ABK Bangunan Gedung dan
11 P.Ct. 11 Rp 39,577.50
Lapis Cat Penutup) Dengan Cat Mutu Baik. (P.Ct. 11) Perumahan - 6.14

1m2 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Acuan : ABK Bangunan Gedung dan
12 P.Ct. 12 Rp 25,310.00
Penutup) Dengan Cat Mutu Baik. (P.Ct. 12) Perumahan - 6.15
HARGA
NO KODE URAIAN ACUAN
WILAYAH I
1 2 3 4 5
Acuan : ABK Bangunan Gedung dan
13 P.Ct. 13 1m2 Pengecatan Permukaan Baja dengan Meni Besi (P.Ct. 13) Perumahan - 6.20 Rp 20,816.00

1m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah Acuan : ABK Bangunan Gedung dan
14 P.Ct. 14 Rp 44,965.60
(P.Ct. 14) Perumahan - 6.21

Acuan : Harga Satuan Bahan, Upah dan


15 P.Ct. 15 1m2 Pengecatan Atap Seng (P.Ct. 15) Analisa Biaya Pekerjaan BOW - K.23.e Rp 29,882.50

O P. ME PEKERJAAN MEKANIKAL ELEKTRIKAL (P.ME)

P P. Bkr PEKERJAAN BONGKARAN


Acuan : ABK Bangunan Gedung dan
1 P. Bkr. 01 1m3 Pekerjaan Bongkaran Beton Bertulang (P.Bkr. 01) Perumahan - 6.13 Rp 389,995.00

Acuan : ABK Bangunan Gedung dan


2 P. Bkr. 01.a 1m3 Pekerjaan Bongkaran Beton (P.Bkr. 01.a) Perumahan - 6.13 Rp 58,499.25

Acuan : Harga Satuan Bahan, Upah dan


3 P. Bkr. 02 1m2 Pekerjaan Bongkaran Dinding Tembok Plesteran Simpai (P. Bkr. 02) Analisa Biaya Pekerjaan BOW - L.4 Rp 58,500.00

Acuan : Harga Satuan Bahan, Upah dan


4 P. Bkr. 02.a 1m2 Pekerjaan Bongkaran Dinding Pasangan batako (P. Bkr. 02a) Analisa Biaya Pekerjaan BOW - L.5 Rp 22,750.00

Acuan : Harga Satuan Bahan, Upah dan


5 P. Bkr. 03 1m2 Pekerjaan Bongkaran Lantai Ubin / Keramik (P.Bkr. 03) Analisa Biaya Pekerjaan BOW - L.5 Rp 2,925.00

Acuan : Harga Satuan Bahan, Upah dan


6 P. Bkr. 04 1m2 Pekerjaan Bongkaran Atap Genteng / Sirap (P.Bkr. 04) Analisa Biaya Pekerjaan BOW - L.7 Rp 900.00

Acuan : Harga Satuan Bahan, Upah dan


7 P. Bkr. 05 1m2 Pekerjaan Bongkaran Atap Seng (P.Bkr. 05) Analisa Biaya Pekerjaan BOW - L.8 Rp 9,000.00

Acuan : Harga Satuan Bahan, Upah dan


8 P. Bkr. 06 1m2 Pekerjaan Bongkaran Rangka Atap Kayu (P.Bkr. 06) Analisa Biaya Pekerjaan BOW - L.9 Rp 58,500.00

Acuan : Harga Satuan Bahan, Upah dan


9 P. Bkr. 07 1m3 Pekerjaan Bongkaran Rangka Badan Kayu (P.Bkr. 07) Analisa Biaya Pekerjaan BOW - L.13 Rp 444,000.00

Acuan : Harga Satuan Bahan, Upah dan


10 P. Bkr. 07.a 1m3 Pekerjaan Bongkaran Reling (P.Bkr. 07.a) Analisa Biaya Pekerjaan BOW - L.13 Rp 210,800.00

11 P. Bkr. 08 1m3 Pekerjaan Bongkaran Pasangan Batu (P.Bkr. 08) Acuan : SNI 2835:2008 (6.5) Rp 86,700.00
PEMERINTAH KABUPATEN SEKADAU

DINAS PENDIDIKAN
Jalan Merdeka Timur Km.9 Telp (0564) - 2042020 Fax : (0564) - 2042028 Sekadau 79582

SEKADAU

HARGA PERKIRAAN SENDIRI (HPS)

KEGIATAN :
Rehabilitasi Jamban Siswa / Guru Beserta
Sanitasinya
PEKERJAAN :

Rehab Jamban SDN 18 Sungai Asam


LOKASI :
KECAMATAN BELITANG HILIR
TAHUN ANGGARAN :
2020
PEMERINTAH KABUPATEN SEKADAU
DINAS PENDIDIKAN
Jalan Merdeka Timur Km.9 Telp (0564) - 2042020 Fax : (0564) - 2042028 Sekadau 79582
SEKADAU

REKAPITULASI
RENCANA ANGGARAN BIAYA
Harga Perkiraan Sendiri (HPS)
Kegiatan :
Rehabilitasi Jamban Siswa / Guru Beserta Sanitasinya

Pekerjaan :
Rehab Jamban SDN 18 Sungai Asam

Lokasi : KECAMATAN BELITANG HILIR


Tahun Anggaran : 2020

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp.)
1 2 3

A PEKERJAAN PENDAHULUAN 1,500,000.00


B PEKERJAAN BANGUNAN WC 66,835,903.62
C PEKERJAAN SEPTICTANK 9,310,159.22
D PEKERJAAN MENARA TONG AIR 22,354,394.95

JUMLAH A Rp 100,000,457.79

JUMLAH (A+B) Rp 100,000,457.79


DIBULATKAN ………………… Rp 100,000,000.00
Terbilang : Seratus Juta Rupiah

:Diperiksa Disetujui
,Konsultan Perencana
Sekadau, Juni 2020

Diperiksa : Dibuat oleh


KEPALA PEJABAT PELAKSANA TEKNIS KEGIATAN
DINAS PENDIDIKAN DINAS PENDIDIKAN
KABUPATEN SEKADAU KABUPATEN SEKADAU

LOSIANUS, S.Pd, M.Si SUPRIYOSO , S.Pd


NIP. 19640723 198803 1 017 NIP. 19700204 1989 05 1 001
Pembina Utama Muda
RENCANA ANGGARAN BIAYA
Harga Perkiraan Sendiri (HPS)

Kegiatan : Rehabilitasi Jamban Siswa / Guru Beserta Sanitasinya


Pekerjaan : Rehab Jamban SDN 18 Sungai Asam
Lokasi : KECAMATAN BELITANG HILIR
Tahun Anggaran : 2020

HARGA JUMLAH
NO URAIAN JENIS PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)

1 2 3 4 5 6 7

A PEKERJAAN PENDAHULUAN
1 Pekerjaan persiapan,pengukuran,pembersihan lokasi ---- 1.00 Lsm 1,500,000.00 1,500,000.00

TOTAL A 1,500,000.00

B PEKERJAAN BANGUNAN WC
I PEKERJAAN PONDASI
1 Pondasi Menerus Cor Beton Bertulang uk. 15/40 cm
a Galian Tanah P.T. 02 1.86 m3 64,350.00 119,691.00
b Lantai Kerja t = 5 cm P.BB. 03 0.23 m3 1,608,141.30 373,892.85
c Pasir Urug t = 10 cm P.T. 11 0.46 m3 193,100.00 89,791.50
d Cor Beton P.BB. 01 1.86 m3 1,667,264.86 3,101,112.63
e Tulangan Pokok Pondasi 6 D 12 P.BB. 08 165.54 kg 17,914.50 2,965,566.33
f Beugel D 8 - 150 mm P.BB. 08 81.63 kg 17,914.50 1,462,420.35
g Bekisting Pondasi (pemasangan lebih dari 1 kali) P.BB. 11 6.20 m2 183,035.00 1,134,817.00

Sub Jumlah 9,247,291.67

II PEKERJAAN STRUKTUR BETON BERTULANG


1 Kolom Beton uk.15/15 cm
a. Cor beton K-100 P.BB. 01 0.38 m3 1,667,264.86 641,480.15
b. Tulangan pokok 4 D 12 P.BB. 08 60.88 kg 17,914.50 1,090,563.10
c. Beugel D 8 - 150 mm P.BB. 08 22.52 kg 17,914.50 403,344.97
d. Bekisting (pemasangan lebih dari 1 kali) P.BB. 12.c 3.80 m2 283,955.20 1,080,281.43
2 Kolom Beton uk.10/10 cm
a. Cor beton K-100 P.BB. 01 0.23 m3 1,667,264.86 386,805.45
b. Tulangan pokok 4 D 10 P.BB. 08 57.54 kg 17,914.50 1,030,728.67
c. Beugel D 6 - 150 mm P.BB. 08 10.21 kg 17,914.50 182,871.22
d. Bekisting (pemasangan lebih dari 1 kali) P.BB. 12.c 0.70 m2 283,955.20 197,632.82
3 Ring Balok uk.15/15 cm
a. Cor beton K-100 P.BB. 01 0.36 m3 1,667,264.86 600,215.35
b. Tulangan pokok 4 D.12 mm P.BB. 08 56.96 kg 17,914.50 1,020,409.92
c. Beugel D.8 - 150 mm P.BB. 08 21.07 kg 17,914.50 377,398.80
d. Bekisting (pemasangan lebih dari 1 kali) P.BB. 13.a 2.16 m2 358,205.20 773,723.23
4 Ring Balok uk.10/10 cm
a. Cor beton K-100 P.BB. 01 0.15 m3 1,667,264.86 250,089.73
b. Tulangan pokok 4 D.10 mm P.BB. 08 37.20 kg 17,914.50 666,419.40
c. Beugel D.6 - 150 mm P.BB. 08 6.60 kg 17,914.50 118,235.70
d. Bekisting (pemasangan lebih dari 1 kali) P.BB. 13.a 1.35 m2 358,205.20 483,577.02

Sub Jumlah 9,303,776.96

III PEKERJAAN LANTAI


1 Urugan Pasir Bawah Lantai P.T. 11 3.08 m3 193,100.00 594,748.00
2 Cor Beton Tumbuk P.BB. 01 1.10 m3 1,667,264.86 1,833,991.34
3 Keramik Lantai Uk. 40 x 40 cm (selasar) P.LD. 03 7.00 m2 278,608.68 1,950,260.76
4 Keramik Lantai Uk. 20 x 20 cm (WC) P.LD. 02 5.25 m2 292,034.40 1,533,180.60

Sub Jumlah 5,912,180.70

IV PEKERJAAN DINDING
1 Dinding pasangan batako 7/15/30 cm P.D.nd. 01 36.61 m2 103,389.00 3,785,071.29
2 Plesteran dinding T.1,5 cm spesi 1:3 P.Pls. 02 52.01 m2 65,175.94 3,389,800.43
3 Keramik dinding uk.20 x 25 cm T = 150 cm P.LD. 10 21.21 m2 201,405.80 4,271,817.02
4 Pasangan Batako Untuk Bak Air P.D.nd. 01 2.94 m2 103,389.00 303,963.66
5 Keramik Bak Air Uk.20/25 cm Tinggi 70 cm P.LD. 10 2.94 m2 201,405.80 592,133.05

Sub Jumlah 12,342,785.45


HARGA JUMLAH
NO URAIAN JENIS PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)

1 2 3 4 5 6 7

V PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II P.K. 29 29.11 m2 121,147.89 3,526,615.08
2 Plafond GRC P.Pf. 08 29.11 m2 49,792.20 1,449,450.94
3 List Plafond Profil Kayu P.Pf. 07 30.00 m' 27,635.00 829,050.00

Sub Jumlah 5,805,116.02

VI PEKERJAAN ATAP
1 Rangka Kuda Kuda Kayu Klas II Uk. 8/8 P.K. 20.a 0.14 m3 7,918,530.00 1,093,137.23
2 Gording Kayu Klas II Uk. 8/8 P.K. 22 0.09 m3 7,073,930.00 642,878.76
3 Kasau Dan Reng Kayu Klas II P.K. 27 34.79 m2 69,707.20 2,425,113.49
4 Atap Genteng Metal P.PA. 03 34.79 m2 120,878.00 4,205,345.62
5 Lisplank Kayu Klas I P.K. 33 22.20 m1 151,406.95 3,361,234.29

Sub Jumlah 11,727,709.39

VII PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Pintu WC Aluminium ---- 3.00 unit 680,000.00 2,040,000.00

Sub Jumlah 2,040,000.00

VIII PEKERJAAN PENGECATAN


1 Cat Tembok P.Ct. 12 81.12 m2 25,310.00 2,053,147.20
2 Cat Kilat P.Ct. 04 4.00 m2 68,775.00 274,824.90

Sub Jumlah 2,327,972.10

IX PEKERJAAN ELEKTRIKAL
1 Lampu SL 9 Watt ---- 7.00 Buah 45,000.00 315,000.00
2 Saklar Ganda ---- 3.00 Buah 25,000.00 75,000.00
3 Saklar Tunggal ---- 1.00 Buah 25,000.00 25,000.00
4 Stop Kontak ---- 1.00 Buah 15,000.00 15,000.00
5 Fitting Lampu ---- 7.00 Buah 30,000.00 210,000.00
6 Kabel Listrik ---- 1.00 Roll 350,000.00 350,000.00
7 MCB ---- 1.00 Unit 50,000.00 50,000.00
8 Instalasi Listrik ---- 12.00 Titik 45,000.00 540,000.00
9 Genset ---- 1.00 Unit 2,000,000.00 2,000,000.00

Sub Jumlah 3,580,000.00

X PEKERJAAN SANITASI
1 Closet Jongkok P.Snt. 02 3.00 Unit 1,088,680.00 3,266,040.00
2 Floor Drain - 3.00 Buah 27,283.00 81,849.00
3 Kran Air 3/4" - 3.00 Buah 33,283.00 99,849.00
4 Pipa Air Bersih 3/4" - 16.00 M1 7,000.00 112,000.00
5 Pipa Air Kotor 2" - 16.00 M1 14,500.00 232,000.00
6 Pipa Kotoran PVC 4" - 16.00 M1 47,333.33 757,333.33

Sub Jumlah 4,549,071.33


TOTAL B 66,835,903.62

C PEKERJAAN SEPTICTANK
1 Galian Tanah P.T. 01 11.25 m3 50,750.00 570,937.50
2 Rangka Kayu Belian Uk. 8/8 P.K. 06 0.28 m3 18,369,310.00 5,172,797.70
3 Pasangan batako 7/15/30 cm P.D.nd. 01 14.40 m2 103,389.00 1,488,801.60
4 Plesteran T.1,5 cm spesi 1:3 P.Pls. 02 2.40 m2 65,175.94 156,422.25
5 Cor Beton Lantai Atas
a Cor Beton K-100 P.BB. 01 0.50 m3 1,667,264.86 833,632.43
b Besi Polos D 6 - 150 mm P.BB. 08 16.50 kg 17,914.50 295,589.25
c Bekisting Lantai P.BB. 14.a 1.88 m2 414,655.20 777,478.50
6 Pipa Hawa 2" - 1.00 m1 14,500.00 14,500.00

TOTAL C 9,310,159.22
HARGA JUMLAH
NO URAIAN JENIS PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)

1 2 3 4 5 6 7

D PEKERJAAN MENARA TONG AIR


I PEKERJAAN PONDASI
1 Pondasi Poer Beton Bertulang Uk. 80 x 80 cm
a Galian Tanah P.T. 01 3.46 m3 50,750.00 175,392.00
b Lantai Kerja t = 5 cm P.BB. 03 0.19 m3 1,608,141.30 308,763.13
c Pasir Urug Bawah Pondasi t = 10 cm P.T. 11 0.38 m3 193,100.00 74,150.40
d Pengadaan cerucuk D.10 - 12 cm panjang 4 meter - 6.00 Btg 44,300.00 265,800.00
e Cor Beton K-100 P.BB. 01 0.58 m3 1,667,264.86 960,344.56
f Tulangan pokok pondasi D 12 - 150 mm P.BB. 08 91.14 kg 17,914.50 1,632,655.87
g Bekisting Pondasi (pemasangan lebih dari 1 kali) P.BB. 10.A 0.86 m2 167,182.10 144,445.33
2 Kolom Pondasi uk. 20 x 20 cm
a Cor Beton K-100 P.BB. 01 0.16 m3 1,667,264.86 260,093.32
b Tulangan pokok 4 D 12 P.BB. 08 13.88 kg 17,914.50 248,724.92
c Beugel D 8 - 150 mm P.BB. 08 7.19 kg 17,914.50 128,787.34
d Bekisting (pemasangan lebih dari 1 kali) P.BB. 12.c 1.09 m2 283,955.20 310,079.08

Sub Jumlah 4,509,235.95

II PEKERJAAN STRUKTUR BETON BERTULANG


1 Sloof Uk. 20 x 25 cm
a Cor Beton K-100 P.BB. 01 0.53 m3 1,667,264.86 875,314.05
b Tulangan pokok 8 D 12 P.BB. 08 74.76 kg 17,914.50 1,339,288.02
c Beugel D 8 - 150 mm P.BB. 08 22.12 kg 17,914.50 396,268.74
d Bekisting (pemasangan lebih dari 1 kali) P.BB. 11 1.57 m2 183,035.00 288,280.12
2 Kolom Uk. 20 x 20 cm
a Cor Beton K-100 P.BB. 01 0.36 m3 1,667,264.86 600,215.35
b Tulangan pokok 8 D 12 P.BB. 08 64.08 kg 17,914.50 1,147,961.16
c Beugel D 8 - 150 mm P.BB. 08 16.59 kg 17,914.50 297,201.55
d Bekisting (pemasangan lebih dari 1 kali) P.BB. 12.c 2.16 m2 283,955.20 613,343.23
3 Ring Balok Uk. 20 x 25 cm
a Cor Beton K-100 P.BB. 01 0.53 m3 1,667,264.86 875,314.05
b Tulangan pokok 8 D 12 P.BB. 08 74.76 kg 17,914.50 1,339,288.02
c Beugel D 8 - 150 mm P.BB. 08 22.12 kg 17,914.50 396,268.74
d Bekisting (pemasangan lebih dari 1 kali) P.BB. 13.a 1.57 m2 358,205.20 564,173.19

Sub Jumlah 8,732,916.23

III PEKERJAAN LANTAI


1 Cor Beton P.BB. 01 0.45 M3 1,667,264.86 750,269.19
2 Tulangan pokok D 8 - 100 mm P.BB. 08 74.66 Kg 17,914.50 1,337,407.00
3 Bekisting (pemasangan 1 kali) P.BB. 14.a 1.17 M2 414,655.20 485,146.58

Sub Jumlah 2,572,822.77

IV PEKERJAAN SANITASI
1 Tong Fiberglass 1,5 M3 ---- 2.00 buah 2,000,000.00 4,000,000.00
2 Sumur Bor + Pompa Air ---- 1.00 unit 2,000,000.00 2,000,000.00
3 Pipa Air Bersih 3/4" ---- 16.0 m1 7,000.00 112,000.00
4 Pipa Air 4" (Talang Untuk Air Hujan) ---- 9.03 m1 47,333.33 427,420.00

Sub Jumlah 6,539,420.00


TOTAL D 22,354,394.95
DAFTAR BERAT BESI BETON POLOS DAN ULIR
BERAT /M' BERAT /M'
DIAMETER PANJANG BERAT/BTG BERAT/BTG
NO POLOS ULIR
(mm) (m') (kg) (Kg) (Kg) (Kg)

1 4 11 1.00 0.090
2 6 12 2.66 0.220
3 8 12 4.74 0.395
4 9 12 6.00 0.500
5 10 12 7.40 0.620 7.40 0.62
6 11 12 9.00 0.750
7 12 12 10.70 0.890
8 13 12 12.50 1.040 12.50 1.04
9 15 12 14.50 1.210
10 16 12 19.00 1.580
11 19 12 26.70 2.230 26.70 2.23
12 22 12 35.80 2.980 35.80 2.98
13 23 12 39.10 3.260
14 24 12 42.62 3.550
15 25 12 46.20 3.850 46.20 3.85
16 29 12 60.50 5.04
17 28 12 58.00 4.830
18 31 12 71.10 5.930
19 32 12 75.77 6.310 75.77 6.31
20 35 12 90.10 7.51
21 38 12 107.00 8.92
22 41 12 126.00 10.50

Spesifikasi
Spesification
Type
Penampang Jarak Panjang
Diameter Spacing Length
10 mm 150 mm 5,40 mm
M 10
10 mm 150 mm 2,10 mm
9 mm 150 mm 5,40 mm
M 9 / DM 9
9 mm 150 mm 2,10 mm
8 mm 150 mm 5,40 mm
M 8 / DM 8
8 mm 150 mm 2,10 mm
7 mm 150 mm 5,40 mm
M 7 / DM 7
7 mm 150 mm 2,10 mm
6 mm 150 mm 5,40 mm
M 6 / DM 6
6 mm 150 mm 2,10 mm
5 mm 150 mm 5,40 mm
M 5 / DM 5
5 mm 150 mm 2,10 mm
4 mm 150 mm 5,40 mm
M4
4 mm 150 mm 2,10 mm
Berat
Weight
Kg / lbr.
Kg / m2
Kg / Sheet
96.55
8.51
78.21
6.9
61.79
5.45
47.31
4.17
34.76
3.07
24.14
2.13
15.45
1.36
NO. URAIAN CACAH SATUAN PANJANG LEBAR

A PEKERJAAN PENDAHULUAN
1 Pekerjaan persiapan,pengukuran,pembersihan lokasi Lsm

B PEKERJAAN BANGUNAN WC
I PEKERJAAN PONDASI
1 Pondasi Menerus Cor Beton Bertulang uk. 15/40 cm
a Galian Tanah m3 5.50 0.15
2.50 0.15
1.50 0.15
b Lantai Kerja t = 5 cm m3 5.50 0.15
2.50 0.15
1.50 0.15
c Pasir Urug t = 10 cm m3 5.50 0.15
2.50 0.15
1.50 0.15
d Cor Beton m3 5.50 0.15
2.50 0.15
1.50 0.15
e Tulangan Pokok Pondasi 6 D 12 kg 5.50 1.00
2.50 1.00
1.50 1.00
f Beugel D 8 - 150 mm kg 1.00 1.00
1.00 1.00
1.00 1.00
g Bekisting Pondasi (pemasangan lebih dari 1 kali) m2 5.50 1.00
2.50 1.00
1.50 1.00

II PEKERJAAN STRUKTUR BETON BERTULANG


1 Kolom Beton uk.15/15 cm
a. Cor beton K-100 m3 2.85 0.15
b. Tulangan pokok 4 D 12 kg 2.85 1
c. Beugel D 8 - 150 mm kg 0.50 1
d. Bekisting (pemasangan lebih dari 1 kali) m2 2.85 0.15

2 Kolom Beton uk.10/10 cm


a. Cor beton K-100 m3 2.90 0.10
b. Tulangan pokok 4 D 10 kg 2.90 1
c. Beugel D 6 - 150 mm kg 0.30 1
d. Bekisting (pemasangan lebih dari 1 kali) m2 2.90 0.1

3 Ring Balok uk.15/15 cm


a. Cor beton K-100 m3 5.50 0.15
2.50 0.15
b. Tulangan pokok 4 D.12 mm kg 5.50 1
2.50 1
c. Beugel D.8 - 150 mm kg 0.50 1
0.50 1
d. Bekisting (pemasangan lebih dari 1 kali) m2 5.50 1
2.50 1.00
4 Ring Balok uk.10/10 cm
a. Cor beton K-100 m3 4.50 0.10
1.50 0.10
b. Tulangan pokok 4 D.10 mm kg 4.50 1
1.50 1
c. Beugel D.6 - 150 mm kg 0.30 1
0.30 1
d. Bekisting (pemasangan lebih dari 1 kali) m2 4.50 0.1
1.50 0.1

III PEKERJAAN LANTAI


1 Urugan Pasir Bawah Lantai m3 5.50 2.50
2 Cor Beton Tumbuk m3 5.5 2.5
3 Keramik Lantai Uk. 40 x 40 cm (selasar) m2 5.5 2.5
4 Keramik Lantai Uk. 20 x 20 cm (WC) m2 1.5 1.5

IV PEKERJAAN DINDING
1 Dinding pasangan batako 7/15/30 cm m2 1.40 1
1
LUAS PINTU 1.90 0.7
2 Plesteran dinding T.1,5 cm spesi 1:3 m2 1 1
3 Keramik dinding uk.20 x 25 cm T = 150 cm m2 1.40 1
LUAS PINTU 0.70 1
LUAS BAK 1
4 Pasangan Batako Untuk Bak Air m2 0.70 1
5 Keramik Bak Air Uk.20/25 cm Tinggi 70 cm m2 0.70 1

V PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II m2 5.5 2.5
kaki atap m2 7.1 0.8
m2 2.5 0.8
2 Plafond GRC m2 5.5 2.5
7.1 0.8
2.5 0.8
3 List Plafond Profil Kayu m' 1.50 1
4.50 1
1.50 1

VI PEKERJAAN ATAP
1 Rangka Kuda Kuda Kayu Klas II Uk. 8/8 m3 2.65 0.08
0.74 0.08
1.30 0.08
0.60 0.08
2 Gording Kayu Klas II Uk. 8/8 m3 7.10 0.08
3 Kasau Dan Reng Kayu Klas II m2 7.10 2.45
4 Atap Genteng Metal m2 7.10 2.45
5 Lisplank Kayu Klas I m1 7.10 1
2.00 1

VII PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Pintu WC Aluminium unit 1.00 1

VIII PEKERJAAN PENGECATAN


1 Cat Tembok m2 1.00 1
2 Cat Kilat m2 22.20 0.18

IX PEKERJAAN ELEKTRIKAL
1 Lampu SL 9 Watt Buah 1.00 1
2 Saklar Ganda Buah 1.00 1
3 Saklar Tunggal Buah 1.00 1
4 Stop Kontak Buah 1.00 1
5 Fitting Lampu Buah 1.00 1
6 Kabel Listrik Roll 1.00 1
7 MCB Unit 1.00 1
8 Instalasi Listrik Titik 1.00 1
9 Genset Unit 1.00 1

c PEKERJAAN SEPTICTANK
1 Galian Tanah m3 2.50 2.5
2 Rangka Kayu Belian Uk. 8/8 m3 3.00 0.08
8.00 0.08
12.00 0.08
3 Pasangan batako 7/15/30 cm m2 1 1
4 Plesteran T.1,5 cm spesi 1:3 m2 1 1
5 Cor Beton Lantai Atas
a Cor Beton K-100 m3 2.50 2.5
b Besi Polos D 6 - 150 mm kg 2.50 1
2.00 1
c Bekisting Lantai m2 2.50 2.5
6 Pipa Hawa 2" m1 1.00 0.5

D PEKERJAAN MENARA TONG AIR


I PEKERJAAN PONDASI
1 Pondasi Poer Beton Bertulang Uk. 80 x 80 cm
a Galian Tanah m3 0.8 0.80
b Lantai Kerja t = 5 cm m3 0.8 0.80
c Pasir Urug Bawah Pondasi t = 10 cm m3 0.8 0.80
d Pengadaan cerucuk D.10 - 12 cm panjang 4 meter Btg 1 1
e Cor Beton K-100 m3 0.8 0.80
f Tulangan pokok pondasi D 12 - 150 mm kg 1.6 1.00
g Bekisting Pondasi (pemasangan lebih dari 1 kali) m2 0.8 0.15
2 Kolom Pondasi uk. 20 x 20 cm
a Cor Beton K-100 m3 0.65 0.2
b Tulangan pokok 4 D 12 kg 0.65 1
c Beugel D 8 - 150 mm kg 0.7 1.00
d Bekisting (pemasangan lebih dari 1 kali) m2 0.65 0.20

II PEKERJAAN STRUKTUR BETON BERTULANG


1 Sloof Uk. 20 x 25 cm
a Cor Beton K-100 m3 1.5 0.20
b Tulangan pokok 8 D 12 kg 1.5 1.00
c Beugel D 8 - 150 mm kg 0.8 1.00
d Bekisting (pemasangan lebih dari 1 kali) m2 1.5 1.00
2 Kolom Uk. 20 x 20 cm
a Cor Beton K-100 m3 1.5 0.20
b Tulangan pokok 8 D 12 kg 1.5 1.00
c Beugel D 8 - 150 mm kg 0.7 1.00
d Bekisting (pemasangan lebih dari 1 kali) m2 1.5 0.20
3 Ring Balok Uk. 20 x 25 cm
a Cor Beton K-100 m3 1.5 0.20
b Tulangan pokok 8 D 12 kg 1.5 1.00
c Beugel D 8 - 150 mm kg 0.8 1.00
d Bekisting (pemasangan lebih dari 1 kali) m2 1.5 1.00

III PEKERJAAN LANTAI


1 Cor Beton K-100 m3 1.5 3.00
2 Tulangan pokok D 8 - 100 mm kg 6.2 1.00
3.2 1.00
3 Bekisting (pemasangan 1 kali) m2 1.5 3.00

IV PEKERJAAN SANITASI
1 Tong Fiberglass 1,5 M3 buah 1 1.00
2 Sumur Bor + Pompa Air unit 1 1.00
3 Pipa Air Bersih 3/4" m1 16.0 1.00
4 Pipa Air 4" (Talang Untuk Air Hujan) m1 9.03 1.00

5000000
TINGGI TEBAL
LS.PENAMPANG
BERAT JENIS KUANTITAS KOEFISIEN UNIT VOLUME

1.00

0.40 1 1 1 1 1 2.00 0.66


0.40 1 1 1 1 1 2.00 0.30
0.40 1 1 1 1 1 10.00 0.90
0.05 1.00 1 1 1 1 2.00 0.08
0.05 1.00 1 1 1 1 2.00 0.04
0.05 1.00 1 1 1 1 10.00 0.11
0.1 1.00 1 1 1 1 2.00 0.17
0.1 1.00 1 1 1 1 2.00 0.08
0.1 1.00 1 1 1 1 10.00 0.22
0.4 1.00 1 1 1 1 2.00 0.66
0.4 1.00 1 1 1 1 2.00 0.30
0.4 1.00 1 1 1 1 10.00 0.90
1 1.00 1 0.89 6 1 2.00 58.74
1 1.00 1 0.89 6 1 2.00 26.70
1 1.00 1 0.89 6 1 10.00 80.10
1 1.00 1 0.395 36.67 1 2.00 28.97
1 1.00 1 0.395 16.67 1 2.00 13.17
1 1.00 1 0.395 10.00 1 10.00 39.50
0.4 1.00 1 1 1 0.5 2.00 2.20
0.4 1.00 1 1 1 0.5 2.00 1.00
0.4 1.00 1 1 1 0.5 10.00 3.00

0.15 1 1 1.000 1 1 6 0.38


1 1 1 0.89 4.00 1 6 60.88
1 1 1 0.395 19.00 1 6 22.52
1.00 1 1 1 4.00 0.37 6 3.80

0.10 1 1 1.000 1 1 8 0.23


1 1 1 0.62 4.00 1 8 57.54
1 1 1 0.220 19.33 1 8 10.21
1.00 1 1 1 1 0.30 8 0.70

0.15 1 1 1 1 1 2.00 0.25


0.15 1 1 1 1 1 2.00 0.11
1.00 1 1 0.89 4 1 2.00 39.16
1.00 1 1 0.89 4 1 2.00 17.80
1 1 1 0.395 36.67 1 2.00 14.48
1 1 1 0.395 16.67 1 2.00 6.58
0.15 1 1 1 3.00 0.30 2.00 1.48
0.15 1.00 1.00 1.00 3.00 0.30 2.00 0.67

0.10 1 1 1 1 1 2.00 0.09


0.10 1 1 1 1 1 4.00 0.06
1.00 1 1 0.620 4 1 2.00 22.32
1.00 1 1 0.620 4 1 4.00 14.88
1 1 1 0.220 30.00 1 2.00 3.96
1 1 1 0.220 10.00 1 4.00 2.64
1.00 1 1 1 3.00 0.30 2.00 0.81
1.00 1 1 1 3.00 0.30 4.00 0.54

0.15 1 1.00 1 1 1 1 2.06


0.08 1 1.00 1 1 1 1 1.10
1 1.00 1.00 1 1 1 1 7.00
1 1 1.00 1.00 1 1 3 5.25

2.90 1 1 1 1 1 10.00 40.60


1 1 1 1 1 -
1.00 1 1 1 1 1 3.00 3.99
1 1 36.61 1 2.00 1 1 73.22
1.50 1 1 1 1 1 12.00 25.20
1.90 1 1 1 1 1 3.00 3.99
1 1 1 2 1 3 -
0.70 1 1 1 1 1 6.00 2.94
0.70 1 1 1 1 1 6.00 2.94

1 1 1.00 1 1 1 1 13.75
1.00 2 11.36
2 4.00
1 1 1 1 1 1 1 13.75
1 1 1.00 1 1 1 2 11.36
1 1 1.00 1 1 1 2 4.00
1 1 1 1 4 1 3.00 18.00
1 1 1 1 1 1 2 9.00
1 1 1 1 1 1 2 3.00

0.08 1 1 1 1 1 3 0.05
0.08 1 1 1 1 1 3 0.01
0.08 1 1 1 1 1 6 0.05
0.08 1 1 1 1 1 6 0.02
0.08 1 1 1 1 1 2 0.09
1 1 1 1 1 1 2 34.79
1 1 1.00 1 1 1 2 34.79
1 1 1 1 1 1 2 14.20
1 1 1 1 1 1 4 8.00

1 1 1 1 1 1 3.00 3.00

1 1 81.12 1 1 1 1 81.12
1 1 1 1 1 1 1 4.00

1 1 1 1 1 1 7 7.00
1 1 1 1 1 1 3 3.00
1 1 1 1 1 1 1 1.00
1 1 1 1 1 1 1 1.00
1 1 1 1 1 1 7 7.00
1 1 1 1 1 1 1 1.00
1 1 1 1 1 1 1 1.00
1 1 1 1 1 1 12 12.00
1 1 1 1 1 1 1 1.00

1.8 1 1 1 1 1 1 11.25
0.08 1 1 1 1 1 8 0.15
0.08 1 1 1 1 1 1 0.05
0.08 1 1 1 1 1 1 0.08
1 1 14.4 1 1 1 1 14.40
1 1 2.4 1 1 1 1 2.40
0.08 1 1 1 1 1 1 0.50
1 1 1 0.22 16.67 1 1 9.17
1 1 1 0.22 16.67 1 1 7.33
1 1 1 1 1 0.3 1 1.88
1 1 1 1 1 1 2 1.00

0.90 1 1 1 1 1 6.00 3.46


0.05 1 1 1 1.00 1 6.00 0.19
0.1 1 1 1 1.00 1 6.00 0.38
1 1 1 1 4 1 6.00 24.00
0.15 1 1 1 1.00 1 6.00 0.58
1.00 1 1 0.89 5.3333333333 2.00 6.00 91.14
1 1 1 1 4.00 0.30 6.00 0.86

0.2 1 1 1 1.00 1.00 6.00 0.16


1 1 1 0.89 4.00 1.00 6.00 13.88
1.00 1 1 0.395 4.3333333333 1.00 6.00 7.19
1.00 1.00 1.00 1.00 4 0.35 6.00 1.09

0.25 1 1 1 1 1.00 7.00 0.53


1.00 1 1 0.89 8 1.00 7.00 74.76
1.00 1 1 0.395 10 1.00 7.00 22.12
0.25 1 1 1 2 0.30 7.00 1.57

0.20 1 1 1 1 1.00 6.00 0.36


1.00 1 1 0.89 8 1.00 6.00 64.08
1.00 1 1 0.395 10 1.00 6.00 16.59
1.00 1 1 1 4 0.30 6.00 2.16

0.25 1 1 1 1 1.00 7.00 0.53


1.00 1 1 0.89 8 1.00 7.00 74.76
1.00 1 1 0.395 10 1.00 7.00 22.12
0.25 1 1 1 2 0.30 7.00 1.57
0.10 1 1 1 1 1.00 1.00 0.45
1.00 1 1 0.395 15 1.00 1.00 36.74
1.00 1 1 0.395 30.00 1.00 1.00 37.92
1.00 1 1 1 1 0.26 1.00 1.17

1.00 1 1 1 1 1.00 2.00 2.00


1.00 1 1 1 1 1.00 1.00 1.00
1.00 1 1 1 1 1.00 1.00 16.00
1.00 1 1 1 1 1.00 1.00 9.03
VOL.KOMULATIF

1.00

1.86

0.23

0.46

1.86

165.54

81.63

6.20

0.38
60.88
22.52 0
3.80

0.23
57.54
10.21
0.70

0.36

56.96

21.07

2.16

0.15

37.20

6.60

1.35

2.06
1.10
7.00
5.25

36.61

52.01
21.21

2.94
2.94

29.11

29.11 7.1
30.00 8.1

0.14

0.09 0
34.79
34.79
22.20

3.00

81.12
4.00

7.00
3.00
1.00
1.00
7.00
1.00
1.00
12.00
1.00

11.25
0.28

14.40
2.40
0.50
16.50

1.88
1.00

96.11

-
3.46 3.46
0.19
0.38
24.00
0.58
91.14 91.14
0.86

0.16
13.88
7.19 0.56
1.09 0.96

0.53
74.76
22.12
1.57
-
0.36
64.08
16.59
2.16

0.53
74.76
22.12
1.57
0.45
74.66

1.17 0

2.00
1.00
16.00
9.03