40 40 40 40 40 40 40 40 40 40
supir 150,000
mobil 350,000
minyak 400,000
900,000 4,500,000
RAB Pembuatan Tower 60 meter
B Bahan Pondasi
Pasir 1 Lot 250,000 250,000
Batu Split 1 Lot 250,000 250,000
Semen 6 sak 70,000 420,000
33,500,000