No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan - - -
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF - - -
Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 1 /TM (Adukan) - - -
.- Test T500 SF SNI 03 -2496 - 1991 SNI 03 -2496 - 1991 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T96-02 (2015) SNI 2417:2008 - - -
- Ukuran Butir/Gradasi AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Material Lolos #200 SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Air/Absorsi - - -
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
7.6(19).c - PENGUJIAN BOR PILE * DMF / JMF - - -
DIAMETER 1200 mm - PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 1 /TM (Adukan) - - -
.- Test T500 SF SNI 03 -2496 - 1991 1 /TM (Adukan) - - -
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% - - -
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% - - -
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang - - -
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 1 PT.KHI /CILEGON BANTEN
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 1 1 LAB.PT. KHI CILEGON
- Tegangan Tarik(Tensile Srength) 1 1 LAB.PT. KHI CILEGON
- Regangan (Elongation) 1 1 LAB.PT. KHI CILEGON
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 1 LAB.PT. KHI CILEGON
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003
.- Pile Dynamic Loading Test (PDLT) 10% - -
.- Lateral Test 1 /Kelompok Tiang - -
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : JANUARI 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan - - -
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF - 1 1 LAB.TEKNIK SIPIL USU
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - 1 1 LAB.TEKNIK SIPIL USU
- Moisture Content AASHTO T104-99 (2011) SNI 3407:2008 - 2 2 LAB.TEKNIK SIPIL USU
- Ukuran Butir/Gradasi SNI ASTM C136 - 84a Max 1/1000 m3 - 2 2 LAB.TEKNIK SIPIL USU
- Material Lolos #200 SNI ASTM C117:90 Max 1/1000 m3 - 2 2 LAB.TEKNIK SIPIL USU
- Kadar Organik ASTM C. 40 - 48 C 1990 - 1 1 LAB.TEKNIK SIPIL USU
- Specific Grafity/Absortion ASTM C 127 - 88 - 2 2 LAB.TEKNIK SIPIL USU
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF - - -
Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 1 /TM (Adukan) - - -
.- Test T500 SF SNI 03 -2496 - 1991 SNI 03 -2496 - 1991 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T96-02 (2015) SNI 2417:2008 - - -
- Ukuran Butir/Gradasi AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Material Lolos #200 SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Air/Absorsi - - -
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
7.6(19).c - PENGUJIAN BOR PILE * DMF / JMF - - -
DIAMETER 1200 mm - PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 1 /TM (Adukan) - - -
.- Test T500 SF SNI 03 -2496 - 1991 1 /TM (Adukan) - - -
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% - - -
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% - - -
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang - - -
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 1 1 2 LAB.POLTEK NEG.MEDAN
- Tegangan Tarik(Tensile Srength) 1 1 2 LAB.POLTEK NEG.MEDAN
- Regangan (Elongation) 1 1 2 LAB.POLTEK NEG.MEDAN
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1 LAB.POLTEK NEG.MEDAN
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003
.- Pile Dynamic Loading Test (PDLT) 10% - -
.- Lateral Test 1 /Kelompok Tiang - -
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : PEBRUARI 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan - - -
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % 1 - 1
- Moisture Content AASHTO T104-99 (2011) SNI 3407:2008 2 - 2
- Ukuran Butir/Gradasi SNI ASTM C136 - 84a Max 1/1000 m3 2 - 2
- Material Lolos #200 SNI ASTM C117:90 Max 1/1000 m3 2 - 2
- Kadar Organik ASTM C. 40 - 48 C 1990 1 - 1
- Specific Grafity/Absortion ASTM C 127 - 88 2 - 2
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF - - -
Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 1 /TM (Adukan) - - -
.- Test T500 SF SNI 03 -2496 - 1991 SNI 03 -2496 - 1991 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF - - -
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Soundness Test AASHTO T96-02 (2015) SNI 2417:2008 - - -
- Ukuran Butir/Gradasi AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Material Lolos #200 SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Air/Absorsi - - -
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
7.6(19).c - PENGUJIAN BOR PILE * DMF / JMF - - -
DIAMETER 1200 mm - PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 - - -
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Kadar Air/Absorsi SNI 1971 - 2011 - - -
* PENGUJIAN LAB
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 1 /TM (Adukan) - - -
.- Test T500 SF SNI 03 -2496 - 1991 1 /TM (Adukan) - - -
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% - - -
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% - - -
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang - - -
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 2 - 2
- Tegangan Tarik(Tensile Srength) 2 - 2
- Regangan (Elongation) 2 - 2
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003 1 1
.- Pile Dynamic Loading Test (PDLT) 10% 4 4 ABT-1.NO.12,21/P1 NO.21,23
.- Lateral Test 1 /Kelompok Tiang
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : MARET 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan - - -
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % 1 - 1
- Moisture Content 2 - 2
- Ukuran Butir/Gradasi SNI ASTM C136 - 84a Max 1/1000 m3 2 - 2
- Material Lolos #200 SNI ASTM C117:90 Max 1/1000 m3 2 - 2
- Kadar Organik ASTM C. 40 - 48 C 1990 1 - 1
- Specific Grafity/Absortion 2 - 2
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF - 1 1 LAB. BBPJN MEDAN
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF - 3 3 LAB. BBPJN MEDAN/POLTEK
▪ Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
▪ Bahan pengisi tiang Borepile ф =1200 mm - Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - 3 3 LAB.BETON PT.BMA T.PONGGOL
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - 3 3 LAB.BETON PT.BMA T.PONGGOL
- Kadar Organik - 1 1 LAB.BETON PT.BMA T.PONGGOL
- Specific Grafity/Absortion - 3 3 LAB.BETON PT.BMA T.PONGGOL
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - 41 41 LAB.BETON PT.DACA TELE
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 - 35 35 TANO PONGGOL
.- Test T500 SF SNI 03 -2496 - 1991 - 35 35 TANO PONGGOL
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF - 1 1 LAB. BBPJN MEDAN
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF - 1 1 LAB. BBPJN MEDAN
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF - 1 1 LAB. BBPJN MEDAN
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Material Lolos #200 SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
7.6(19).c - PENGUJIAN BOR PILE - - -
DIAMETER 1200 mm * PENGUJIAN LAB
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% - - -
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% - - -
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang - - -
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 2 - 2
- Tegangan Tarik(Tensile Srength) 2 - 2
- Regangan (Elongation) 2 - 2
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003 1 - 1
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 4 3 7 PIER-02 NO.3,5 DAN 12
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : APRIL 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan 50 - 50
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % 1 - 1
- Moisture Content 2 - 2
- Ukuran Butir/Gradasi SNI ASTM C136 - 84a Max 1/1000 m3 2 - 2
- Material Lolos #200 SNI ASTM C117:90 Max 1/1000 m3 2 - 2
- Kadar Organik ASTM C. 40 - 48 C 1990 1 - 1
- Specific Grafity/Absortion 2 - 2
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF 3 1 4 LAB BETON PT,BMA T.PONGGOL
▪ Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
▪ Bahan pengisi tiang Borepile ф =1200 mm - Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 3 - 3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 3 - 3
- Kadar Organik 1 - 1
- Specific Grafity/Absortion 3 - 3
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 41 74 115 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 35 149 184 TANO PONGGOL
.- Test T500 SF SNI 03 -2496 - 1991 35 149 184 TANO PONGGOL
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF 1 1 2 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - 2 2 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - 1 1 TANO PONGGOL
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF 1 1 2 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Material Lolos #200 SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
7.6(19).c - PENGUJIAN BOR PILE - - -
DIAMETER 1200 mm * PENGUJIAN LAB
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% - - -
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% - - -
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang - - -
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 2 - 2
- Tegangan Tarik(Tensile Srength) 2 - 2
- Regangan (Elongation) 2 - 2
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003 1 - 1
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 7 1 8 PIER-01 NO.11
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang 3 3 P1 NO.21/P2 NO.13/P5 NO.11
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : JUNI 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan 50 - 50
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF 1 1 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % 1 - 1
- Moisture Content 2 - 2
- Ukuran Butir/Gradasi SNI ASTM C136 - 84a Max 1/1000 m3 2 - 2
- Material Lolos #200 SNI ASTM C117:90 Max 1/1000 m3 2 - 2
- Kadar Organik ASTM C. 40 - 48 C 1990 1 - 1
- Specific Grafity/Absortion 2 - 2
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF 4 - 4 LAB BETON PT,BMA T.PONGGOL
▪ Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
▪ Bahan pengisi tiang Borepile ф =1200 mm - Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 3 - 3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 3 - 3
- Kadar Organik 1 - 1
- Specific Grafity/Absortion 3 - 3
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 115 166 281 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 184 166 350 LAB BETON PT,BMA T.PONGGOL
.- Test T500 SF SNI 03 -2496 - 1991 184 166 350 LAB BETON PT,BMA T.PONGGOL
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 2 17 19 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 1 17 18 LAB BETON PT,BMA T.PONGGOL
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Material Lolos #200 SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - 4 4 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - 4 4 TANO PONGGOL
7.6(19).c - PENGUJIAN BOR PILE - - -
DIAMETER 1200 mm * PENGUJIAN LAB
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% - - -
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% - - -
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang - - -
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 2 1 3 LAB.T.SIPIL POLTEK MEDAN
- Tegangan Tarik(Tensile Srength) 2 1 3 LAB.T.SIPIL POLTEK MEDAN
- Regangan (Elongation) 2 1 3 LAB.T.SIPIL POLTEK MEDAN
- Tarik sambungan las - 2 2 LAB.T.SIPIL POLTEK MEDAN
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003 1 1
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 8 8
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang 3 3
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : JUNI 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan 50 - 50
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % 1 - 1
- Moisture Content 2 - 2
- Ukuran Butir/Gradasi SNI ASTM C136 - 84a Max 1/1000 m3 2 - 2
- Material Lolos #200 SNI ASTM C117:90 Max 1/1000 m3 2 - 2
- Kadar Organik ASTM C. 40 - 48 C 1990 1 - 1
- Specific Grafity/Absortion 2 - 2
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - 110 110 LAB BETON WITON BINJAI
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - 11 11 LAB BETON WITON BINJAI
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF 4 - 4
▪ Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
▪ Bahan pengisi tiang Borepile ф =1200 mm - Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 3 - 3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 3 - 3
- Kadar Organik 1 - 1
- Specific Grafity/Absortion 3 - 3
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 281 64 345 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 350 64 414 LAB BETON PT,BMA T.PONGGOL
.- Test T500 SF SNI 03 -2496 - 1991 350 64 414 LAB BETON PT,BMA T.PONGGOL
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi fraksi CA 3/4" SNI ASTM C136:2012 Max 1/1000 m3 - 2 2 LAB BETON PT,BMA T.PONGGOL
- Material Lolos #200 Fraksi CA 3/4" SNI ASTM C117:2012 Max 1/1000 m3 - 2 2 LAB BETON PT,BMA T.PONGGOL
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 19 21 40 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 18 19 37 LAB BETON PT,BMA T.PONGGOL
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Material Lolos #200 SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Specific Grafity/Absortion - -
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 4 14 18 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 4 12 16 TANO PONGGOL
7.6(19).c - PENGUJIAN BOR PILE - - -
DIAMETER 1200 mm * PENGUJIAN LAB
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% - 3 3 PIER 04/NO.14,24,27
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% - 3 3 PIER 04/NO.5,10,15
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang - - -
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 3 - 3
- Tegangan Tarik(Tensile Srength) 3 - 3
- Regangan (Elongation) 3 - 3
- Tarik sambungan las 2 - 2
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003 1 1
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 8 8
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang 3 3
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : JULI 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan 50 - 50
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % 1 - 1
- Moisture Content 2 - 2
- Ukuran Butir/Gradasi SNI ASTM C136 - 84a Max 1/1000 m3 2 - 2
- Material Lolos #200 SNI ASTM C117:90 Max 1/1000 m3 2 - 2
- Kadar Organik ASTM C. 40 - 48 C 1990 1 - 1
- Specific Grafity/Absortion 2 - 2
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 110 10 120 LAB. BETON WITON BINJAI
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 11 1 12 LAB. BETON WITON BINJAI
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF 4 - 4
▪ Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
▪ Bahan pengisi tiang Borepile ф =1200 mm - Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 3 - 3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 3 - 3
- Kadar Organik 1 - 1
- Specific Grafity/Absortion 3 - 3
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 345 97 442 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 414 97 511 TANO PONGGOL
.- Test T500 SF SNI 03 -2496 - 1991 414 97 511 TANO PONGGOL
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi fraksi CA 3/4" SNI ASTM C136:2012 Max 1/1000 m3 2 - 2
- Material Lolos #200 Fraksi CA 3/4" SNI ASTM C117:2012 Max 1/1000 m3 2 - 2
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 40 51 91 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 37 49 86 TANO PONGGOL
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion - - -
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi AASHTO T104-99 (2011) SNI 3407:2008 - - -
- Material Lolos #200 SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Specific Grafity/Absortion - -
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 18 6 24 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 16 6 22 TANO PONGGOL
7.6(19).c - PENGUJIAN BOR PILE - - -
DIAMETER 1200 mm * PENGUJIAN LAB
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 3 - 3
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% 3 - 3
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang - 1 1 PIER 04/NO.5
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 3 - 3
- Tegangan Tarik(Tensile Srength) 3 - 3
- Regangan (Elongation) 3 - 3
- Tarik sambungan las 2 - 2
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003 1 1
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 8 8
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang 3 3
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : AGUSTUS 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan 50 - 50
Min 100%
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari - - -
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg - - -
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 15 % - - -
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)% - - -
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core driill AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 % - - -
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari - - -
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 % - - -
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 % - - -
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98% - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
- Beton FC 50 MPa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % 1 - 1
- Moisture Content 2 - 2
- Ukuran Butir/Gradasi SNI ASTM C136 - 84a Max 1/1000 m3 2 - 2
- Material Lolos #200 SNI ASTM C117:90 Max 1/1000 m3 2 - 2
- Kadar Organik ASTM C. 40 - 48 C 1990 1 - 1
- Specific Grafity/Absortion 2 - 2
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 120 60 180 LAB. BETON WITON BINJAI
- Kuat Tekan Beton/External - 5 5 LAB.BETON T.SIPIL POLMED
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 12 6 18 LAB. BETON WITON BINJAI
BETON STRUKTUR :
7.1 (3) - Beton FC 40 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik SNI 03 - 2816 - 1992 - - -
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 - - -
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF 4 - 4
▪ Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
▪ Bahan pengisi tiang Borepile ф =1200 mm - Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 2 - 2
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3 1 1
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 3 - 3
- Kadar Organik 1 - 1
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 2 - 2
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016 1 1
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 442 115 557 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 511 115 626 TANO PONGGOL
.- Test T500 SF SNI 03 -2496 - 1991 511 115 626 TANO PONGGOL
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi fraksi CA 3/4" SNI ASTM C136:2012 Max 1/1000 m3 2 - 2
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3 1 1
- Material Lolos #200 Fraksi CA 3/4" SNI ASTM C117:2012 Max 1/1000 m3 2 - 2
- Kadar Organik - - -
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 - - -
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 91 47 138 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 86 25 111 TANO PONGGOL
BETON STRUKTUR :
- K - 300 * JMD / JMF - 1 1 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN MATRIAL
- Abrasi Test
- Moisture Content SNI 1971 - 2011
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
- Material Lolos #200 SNI ASTM C117:2012
- Kadar Organik
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton - 8 8 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump - 3 3 TANO PONGGOL
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 - - -
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - - -
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - - -
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik Max 1/1000 m3 - - -
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 - -
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB. SNI 1971 - 2011
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 24 6 30 LAB BETON PT,BMA T.PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 22 6 28 TANO PONGGOL
7.6(19).c - PENGUJIAN BOR PILE - - -
DIAMETER 1200 mm * PENGUJIAN LAB
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 3 3 6 PIER 03/NO.10,11,28
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% 3 - 3
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang 1 1 2 PIER 03/NO.27
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 3 - 3
- Tegangan Tarik(Tensile Srength) 3 - 3
- Regangan (Elongation) 3 - 3
- Tarik sambungan las 2 - 2
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003 1 1
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 8 3 11 PIER 05/ NO.4,11,15
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang 3 3
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : SEPTEMBER 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan 50 - 50
Min 100%
* Material Aggregat
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 2 2 LAB.BETON PT.BMA TANOPONGGL
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 36 36 LAB.BETON PT.BMA TANOPONGGL
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF 4 - 4
▪ Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
▪ Bahan pengisi tiang Borepile ф = 1200 mm - Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 2 - 2
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3 1 1
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 3 - 3
- Kadar Organik 1 - 1
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 2 - 2
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016 1 1
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 557 #REF! #REF! LAB.BETON PT.BMA TANOPONGGL
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 626 #REF! #REF! JEMBATAN TANOPONGGOL
.- Test T500 SF SNI 03 -2496 - 1991 626 #REF! #REF! JEMBATAN TANOPONGGOL
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi fraksi CA 3/4" SNI ASTM C136:2012 Max 1/1000 m3 2 - 2
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3 1 1
- Material Lolos #200 Fraksi CA 3/4" SNI ASTM C117:2012 Max 1/1000 m3 2 - 2
- Kadar Organik - - -
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 - - -
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 138 #REF! #REF! LAB.BETON PT.BMA TANOPONGGL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 111 #REF! #REF! JEMBATAN TANOPONGGOL
BETON STRUKTUR :
- K - 300 * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test
- Moisture Content SNI 1971 - 2011
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
- Material Lolos #200 SNI ASTM C117:2012
- Kadar Organik
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton 8 #REF! #REF! LAB.BETON PT.BMA TANOPONGGL
* PENGUJIAN LAPANGAN
- Slump 3 #REF! #REF! JEMBATAN TANOPONGGOL
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 - - -
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 - #REF! #REF! LAB.BETON PT.BMA TANOPONGGL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) - 1 1 CBP PT.BMA TANO PONGGOL
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 28 #REF! #REF! JEMBATAN TANOPONGGOL
7.6(19).c - PENGUJIAN BOR PILE - - -
DIAMETER 1200 mm * PENGUJIAN LAB
.- Test Piile - - -
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 6 - 6
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
.- Cross Sonic Loading Test (CSL) ASTM D - 6760 10% 3 10 13 JEMBATAN TANOPONGGOL/P4
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang 2 - 2
7.6 (8c) - PENGUJIAN TIANG PANCANG * JMF/Mill Test Serticate 1 - 1
BAJA SPIRAL DIA.800 mm * PENGUJIAN LAB
TEBAL 14 mm A.MECHANICAL PROPERTIES
- Tegangan Leleh/Luluh(Yield Srength) ASTM A252 Gr,2 1 Set/200 Pcs 3 - 3
- Tegangan Tarik(Tensile Srength) 3 - 3
- Regangan (Elongation) 3 - 3
- Tarik sambungan las 2 - 2
B.CHEMICAL COMPOSISI
- Kadar Phospor (P) ASTM A252 Gr,2 1 Set/200 Pcs 1 - 1
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003 1 1
.- Pile Dynamic Loading Test (PDLT) ASTM D - 4945 10% 11 - 11
.- Lateral Test ASTM D - 3966 1 /Kelompok Tiang 3 3
RINGKASAN PENGUJIAN KONTROL KUALITAS
PELAKSANAAN KEGIATAN PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
PEJABAT PEMBUAT KOMITMEN 2.9 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PENGGANTIAN JEMBATAN AEK TANOPONGGOL (MYC)
Kontraktor Pelaksana : PT.WIJAYA KARYA (Persero) Tbk
Konsultan Supervisi : PT.ARTERI CIPTA RENCANA-KSO-PT.INDEC INTERNUSA-PT.MIKO YOVA Bulan : OKTOBER 2021
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan 50 - 50
Min 100%
* Material Aggregat
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3 - - -
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C - - -
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% - - -
500 putaran maks.40% - - -
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % - - -
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm - - -
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C - - -
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman - - -
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 - - -
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 36 - 36
BETON STRUKTUR :
7.1 (5c) - Beton FC 30 M Pa (SCC) * JMD / JMF 4 - 4
▪ Bahan pengisi tiang pancang = 8 m * PENGUJIAN MATRIAL
▪ Bahan pengisi tiang Borepile ф = 1200 mm - Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 2 - 2
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3 1 1
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 3 - 3
- Kadar Organik 1 - 1
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 2 - 2
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016 1 1
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 #REF! #REF! #REF! LAB BETON PT.BMA TANO PONGGOL
* PENGUJIAN LAPANGAN
- Slump Flow Test (SF) ASTM C1611/C1611M-14 #REF! #REF! #REF! CBP PT.WIKA TANO PONGGOL
.- Test T500 SF SNI 03 -2496 - 1991 #REF! #REF! #REF! CBP PT.WIKA TANO PONGGOL
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi fraksi CA 3/4" SNI ASTM C136:2012 Max 1/1000 m3 2 - 2
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3 1 1
- Material Lolos #200 Fraksi CA 3/4" SNI ASTM C117:2012 Max 1/1000 m3 2 - 2
- Kadar Organik - - -
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 - - -
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 #REF! #REF! #REF! LAB BETON PT.BMA TANO PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) #REF! #REF! #REF! JEMBATAN TANO PONGGOL
BETON STRUKTUR :
- K - 300 * JMD / JMF 1 - 1
* PENGUJIAN MATRIAL
- Abrasi Test
- Moisture Content SNI 1971 - 2011
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
- Material Lolos #200 SNI ASTM C117:2012
- Kadar Organik
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton #REF! #REF! #REF! LAB BETON PT.BMA TANO PONGGOL
* PENGUJIAN LAPANGAN
- Slump #REF! #REF! #REF! JEMBATAN TANO PONGGOL
BETON STRUKTUR :
7.1 (7a) - Beton FC 20 M Pa * JMD / JMF 1 1 2 LAB BETON PT.BMA TANO PONGGOL
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % - - -
- Moisture Content SNI 1971 - 2011 - - -
- Ukuran Butir/Gradasi Agg.Kasar SNI ASTM C136:2012 Max 1/1000 m3 - - -
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3
- Material Lolos #200 SNI ASTM C117:2012 Max 1/1000 m3 - - -
- Kadar Organik - - -
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 - - -
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 #REF! #REF! #REF! LAB BETON PT.BMA TANO PONGGOL
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 1 - 1
BETON STRUKTUR :
7.1 (10) - Beton FC 10 M Pa * JMD / JMF 2 - 2
* PENGUJIAN MATRIAL
- Abrasi Test Agregat Kasar Max. 40 % - - -
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI Kumulatif s/d Kumulatif s/d
Bulan ini
Bulan Lalu Bulan ini
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) #REF! - #REF!
PENGUJIAN KUAT TEKAN GALIAN * PENGUJIAN LAB.
BATU LUNAK - Kuat Tekan Batu lunak SNI 1974 - 2011 - #REF! #REF! LAB BETON PT.BMA TANO PONGGOL
3.2.(2a)
- DMF/JMF 1 1
* PENGUJIAN LAB
- Analisa Saringan 2/Sumber Bukan Kelas A-7-6 1 1
- Standar Proctor AASHTO T99-15 SNI 1742:2008 1 1 LAB. / PT. JAYA
Timbunan Pilihan - CBR pada kepadatan maximum AASTHO T 193-13 SNI 1744:2012 2/sumber Min. 6% 1 1 KONTRUKSI MANGGALA
- Nilai Aktif PRATAMA, Tbk
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan 2 2
Min 100%
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm 1 1
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C 1 1
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman 1 1
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 1 1
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm 128 128
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C 128 128
3√ jumlah drum
* PENGUJIAN LAPANGAN
'- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman 44216 819 45035 15.0115396666667
'- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 667 20 687 45,034.62
-
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA BATASAN
URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN KETERANGAN
PEMBAYARAN Kumulatif s/d Kumulatif s/d
AASHTO SNI Bulan ini
Bulan Lalu Bulan ini
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8% 1 1
500 putaran maks.40% 1 1
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 % 1 1
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm 8 1 9
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C 8 1 9
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman 2696 278 2973 2,973.44
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 127 71 198
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 M Pa * JMD / JMF 1 1
- -
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 % 1 1
- Moisture Content SNI 1971 - 2011 1 1
- Ukuran Butir/Gradasi fraksi CA 3/4" SNI ASTM C136:2012 Max 1/1000 m3 1 1
- Ukuran Butir/Gradasi Agg.Halus SNI 03 -2834 - 2000 Max 1/1000 m3 1 1
- Material Lolos #200 Fraksi CA 3/4"/1"/Pasir] SNI ASTM C117:2012 Max 1/1000 m3 1 1
- Kadar Organik 1 1 Lab/PT. JAKON
- Specific Grafity/Absortion Agg.Halus SNI 03 - 1970 -2016 1 1
- Specific Grafity/Absortion Agg.Kasar SNI 03 - 1969 -2016 1 1
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 12 Silinder / 60 m3 76 76
AASHTO M31M/M31-17 SNI 2052:2017
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008 1 /TM (Adukan) 38 38
Dibuat oleh,
Konsultan Supevisi
PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Ramses Panjaitan, ST
Quality Engineer
REKAPITULASI
PT. JAYA KONTRUKSI MANGGALA PRATAMA, Tbk
PERIODE : 01 Agustus s/d 31 Agustus 23
BAHAN KELUAR
STONE CRUSHER
NO. HARI TANGGAL
KELAS B KELAS A KELAS S URPIL Lokasi Penghamparan
M3 M3 M3 M3 Link.
Dibuat oleh,
Konsultan Supevisi
PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Ramses Panjaitan, ST
Quality Engineer
REKAPITULASI
PT. JAYA KONTRUKSI MANGGALA PRATAMA, Tbk
PERIODE : 01 Agustus s/d 31 Agustus 23
Kumulatif s/d Bulan Lalu 3,482.18 44,216.01 2,695.81 20,714.04 294,182.50 6,444.49 379 25 ### 173
Dibuat oleh,
Konsultan Supevisi
PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Ramses Panjaitan, ST
Quality Engineer
RINGKASAN PENGUJIAN KONTROL KUALITAS
PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
PEJABAT PEMBUAT KOMITMEN 2.3 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
Kontraktor Pelaksana : PT. JAYA KONTRUKSI MANGGALA PRATAMA, Tbk
Konsultan Supervisi : PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Bulan : 31-Aug-23
2.4.2 PENGUJIAN MATERIAL
NILAI HASIL PENGUJIAN
No. MATA NILAI HASIL
NAMA MATERIAL NAMA PENGUJIAN POTO PELAKSANAAN KETERANGAN
PEMBAYARAN PENGUJIAN LAB. SESUAI SPESIFIKASI TEKNIS
3.2.(2a)
- DMF/JMF
PT. JAYA KONTRUKSI
MANGGALA
* PENGUJIAN LAB
PRATAMA, Tbk
- Analisa Saringan Bukan Kelas A-7-6
- Standar Proctor
Timbunan Pilihan
- CBR pada kepadatan maximum Min. 6%
- Nilai Aktif
* PENGUJIAN LAPANGAN PT. JAYA KONTRUKSI
MANGGALA
- Kepadatan Lapangan Derajat Kepadatan
PRATAMA, Tbk
Min 100%
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan 100.52% Derajat Kepadatan
Link.040 & 041
RINGKASAN PENGUJIAN KONTROL KUALITAS
PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
PEJABAT PEMBUAT KOMITMEN 2.3 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
Kontraktor Pelaksana : PT. JAYA KONTRUKSI MANGGALA PRATAMA, Tbk Link.040 & 041
Konsultan Supervisi : PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Bulan : 31-Aug-23
2.4.2 PENGUJIAN MATERIAL
NILAI HASIL PENGUJIAN
No. MATA NILAI HASIL
NAMA MATERIAL NAMA PENGUJIAN POTO PELAKSANAAN KETERANGAN
PEMBAYARAN PENGUJIAN LAB. SESUAI SPESIFIKASI TEKNIS
* PENGUJIAN LAB
- Analisa Saringan Gradasi Gabungan CV. Kramat Sakti
- Proctor Metoda D 2.03% CV. Kramat Sakti
Lapis Pondasi - Batas Cair (Liquid Limit) 27.80% ( 0 - 35 ) % CV. Kramat Sakti
Agregat Kelas S - Batas Plastis (Plastic Limit) 17.15% CV. Kramat Sakti
- Indek Plastisitas (PI) 10.65% ( 4 - 15 ) % CV. Kramat Sakti
- CBR 60.30% Min. 50% CV. Kramat Sakti
- Abrasi Test 24.82% Max.40% CV. Kramat Sakti
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan Derajat Kepadatan
Min 100%
RINGKASAN PENGUJIAN KONTROL KUALITAS
PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
PEJABAT PEMBUAT KOMITMEN 2.3 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
Kontraktor Pelaksana : PT. JAYA KONTRUKSI MANGGALA PRATAMA, Tbk
Konsultan Supervisi : PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Bulan : 31-Aug-23
2.4.2 PENGUJIAN MATERIAL
NILAI HASIL PENGUJIAN
No. MATA NILAI HASIL
NAMA MATERIAL NAMA PENGUJIAN POTO PELAKSANAAN KETERANGAN
PEMBAYARAN PENGUJIAN LAB. SESUAI SPESIFIKASI TEKNIS
6.1 (1) Lapis Resap Pengikat -
* JMD / JMF
Aspal Cair/Emulsi * PENGUJIAN LAB PT. JAYA KONTRUKSI
- Paper test 1.0 ( 0,4 - 1,3 ) MANGGALA
PRATAMA, Tbk
* PENGUJIAN LAB
- Campuran Aspal Gradasi Gabungan
- Kadar Aspal 5.70% toleransi +/- 0,3 %
- Gradasi Hasil Ekstraksi Gradasi Gabungan
- Gradasi Hot Bin Gradasi Gabungan
- Stabilitas Marshall 1102.92 Min 800 kg
- VMA (Rongga Dalam Agregat) 15.19% Min 15 %
- VIM (Rongga Dalam Campuran) 4.40% (3-5)%
- VFB (Rongga Terisi Aapal) 71.03% Min 65 %
- Kadar Aspal Efektif 5.70%
- Stab. Marshall sisa 92.19% Min 90 %
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) 2.23% Min 2 % Lab/PT. JAKON
- Kepadatan hasil "core driill 99.26% Min 98%
RINGKASAN PENGUJIAN KONTROL KUALITAS
PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
PEJABAT PEMBUAT KOMITMEN 2.3 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
Kontraktor Pelaksana : PT. JAYA KONTRUKSI MANGGALA PRATAMA, Tbk
Konsultan Supervisi : PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Bulan : 31-Aug-23
2.4.2 PENGUJIAN MATERIAL
NILAI HASIL PENGUJIAN
No. MATA NILAI HASIL
NAMA MATERIAL NAMA PENGUJIAN POTO PELAKSANAAN KETERANGAN
PEMBAYARAN PENGUJIAN LAB. SESUAI SPESIFIKASI TEKNIS
Laston Lapis Aus
(AC-WC)
* Material Aggregat
- Abrasi mat.cold bin 5.80% 100 putaran maks.8% Lab/PT. JAKON
24.82% 500 putaran maks.40% Lab/PT. JAKON
- Gradasi mat.cold bin Gradasi Gabungan
- Nilai Setara Pasir 72% Min. 60 % Lab/PT. JAKON
* Material Aspal
- Penetrasi 64.5 Pen.60/70(60-70)x0,1mm Lab/PT. JAKON
* PENGUJIAN LAPANGAN
- Temperatur campuran 155 °C Suhu 135 °C - 150 °C
di AMP dan Lapangan
- Tebal Hamparan ( Core Drill ) 4.1
* Material Aspal
- Penetrasi 64 Pen.60/70(60-70)x0,1mm
* PENGUJIAN LAPANGAN
'- Temperatur campuran 150 °C Suhu 135 °C - 150 °C
di AMP dan Lapangan
'- Tebal Hamparan ( Core Drill ) 6,2 Cm
* PENGUJIAN LAB.
- Campuran Aspal Gradasi Gabungan
- Kadar Aspal 5.00% toleransi +/- 0,3 %
- Gradasi Hasil Ekstraksi Gradasi Gabungan
- Gradasi Hot Bin Gradasi Gabungan
- Stabilitas Marshall 2121 Min 1800 kg
- VMA (Rongga Dalam Agregat) 14.61% Min 14 %
- VIM (Rongga Dalam Campuran) 4.51% (3-5)%
- VFB (Rongga Terisi Aapal) 69.88% Min 65 %
- Kadar Aspal Efektif 5.00%
- Stab. Marshall sisa 90.45% Min 90 %
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) 3.10% Min 2 %
- Kepadatan hasil "core Drill* 98.99% Min 98%
Laston Lapis
Fondasi (AC-Base)
* Material Aggregat
- Abrasi mat.cold bin 5.80% 100 putaran maks.8%
24.82% 500 putaran maks.40%
- Gradasi mat.cold bin
RINGKASAN PENGUJIAN KONTROL KUALITAS
PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
PEJABAT PEMBUAT KOMITMEN 2.3 PROVINSI SUMATERA UTARA
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA UTARA
Paket : PESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
Kontraktor Pelaksana : PT. JAYA KONTRUKSI MANGGALA PRATAMA, Tbk
Konsultan Supervisi : PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Laston Lapis Bulan : 31-Aug-23
Fondasi (AC-Base)
2.4.2 PENGUJIAN MATERIAL
NILAI HASIL PENGUJIAN
No. MATA NILAI HASIL
NAMA MATERIAL NAMA PENGUJIAN POTO PELAKSANAAN KETERANGAN
PEMBAYARAN PENGUJIAN LAB. SESUAI SPESIFIKASI TEKNIS
- Nilai Setara Pasir 72% Min. 60 %
* Material Aspal
- Penetrasi 64 Pen.60/70(60-70)x0,1mm
* PENGUJIAN LAPANGAN
- Temperatur campuran 151 °C Suhu 135 °C - 150 °C
di AMP dan Lapangan
- Tebal Hamparan ( Core Drill ) 7,6 Cm
Dibuat oleh,
Konsultan Supevisi
PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Ramses Panjaitan, ST
Quality Engineer
KEGIATAN PERSONIL KONSULTAN SUPERVISI
Nama Ramses Panjaitan Bulan JULI
Posisi Quality Engginerr Tahun 2023
Lokasi / Paket PRESERVASI JALAN BTS. PADANG SIDIMPUAN - JEMB. MERAH - IMAM BONJOL ( MYC )
Konsultan PT. SEECONS. KSO - PT. ESCONSOIL ENSAN - PT. PLATO ISOIKI
Keterangan
Tanggal Uraian Kegiatan
Kantor Lapangan
8/1/2023 Test Penetrasi, Titik Lebek Aspal Monitoring prod. (AC-WC), Ekstrasi, Mashall √
8/5/2023 Test Penetrasi, Titik Lebek Aspal Monitoring prod. (AC-WC), Ekstrasi, Mashall, Kelas A. √
8/6/2023 Test Penetrasi, Titik Lebek Aspal Monitoring prod. (AC-WC), Ekstrasi, Mashall √
8/7/2023 Test Penetrasi, Titik Lebek Aspal Monitoring prod. (AC-WC/CAP), Ekstrasi, Mashall, Kelas A & B. √
8/10/2023 Test Penetrasi, Titik Lebek Aspal,Monitoring prod. (AC-WC ) Ekstrasi, Mashall. √
8/11/2023 Test Penetrasi, Titik Lebek Aspal,Monitoring prod. (Ac-Bc & Ac-Base ) Ekstrasi, Mashall, kelas B. √
8/18/2023 Monitoring prod. ( AC-WC ) Ekstrasi, Mashall, kelas A, B & Tim. Pilihan. √
8/19/2023 Monitoring prod. ( AC-Base ) Ekstrasi, Mashall, kelas A. √
8/20/2023 Test Penetrasi, Titik Lebek Aspal,Monitoring prod. (Ac-Bc) Ekstrasi, Mashall, kelas A. √
Test Penetrasi, Titik Lebek Aspal, Monitoring prod. (Ac-Bc, Ac-Wc & Ac-Base ) Ekstrasi,
8/21/2023 √
Mashall, Kelas A & B.
Test Penetrasi, Titik Lebek Aspal Monitoring prod. (Ac-Bc, Ac-Wc ) Ekstrasi, Mashall, Tim.
8/22/2023 √
Pilihan.
8/25/2023 Monitoring prod. (Ac-Bc & Ac-Base ) Ekstrasi, Mashall, Kelas A, B & Tim. Pilihan. √
8/26/2023 Monitoring prod. (Ac-Bc & Ac-Base ) Ekstrasi, Mashall, Kelas A & Tim. Pilihan. √
8/27/2023 Monitoring prod. ( AC-WC ) Ekstrasi, Mashall, kelas S & Tim. Pilihan.. √
8/28/2023 Monitoring prod. ( AC-WC ) Ekstrasi, Mashall, kelas B, S & Tim. Pilihan. √
8/30/2023 Monitoring prod. AC - WC/CAP. Ekstrasi, Mashall, Kelas S & Tim. Pilihan. √
PELAKSANAAN KEGIATAN JALAN NASIONAL WILAYAH ………. (DIISI SESUAI WILAYAH PPK DAN SATKER)
TRIWULAN - 01
Paket :
Kontraktor Pelaksana :
Konsultan Supervisi : Bulan :
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI MEI JUNI JULI
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan
Min 100%
* PENGUJIAN LAB
- Analisa Saringan 2/Sumber Bukan Kelas A-7-6
- Standar Proctor AASHTO T99-15 SNI 1742:2008
- CBR pada kepadatan maximum AASTHO T 193-13 SNI 1744:2012 3/sumber Min. 10%
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan
Min 100%
* PENGUJIAN LAPANGAN
- Kepadatan Lap ≥100% AASHTO T99-15 SNI 1742:2008 1/200 m Derajat Kepadatan
Min 100%
* PENGUJIAN LAPANGAN
- Kepadatan Lap ≥100% AASHTO T99-15 SNI 1742:2008 1/100 m Derajat Kepadatan
Min 100%
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 Acak Derajat Kepadatan
Min 100%
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI MEI JUNI JULI
* PENGUJIAN LAPANGAN
- Kepadatan Lapangan AASHTO T99-15 SNI 1742:2008 1/200 m , 1 / 50 m Derajat Kepadatan
Min 100%
6.1 (1) Lapis Resap Pengikat -
Aspal Cair * JMD / JMF
* PENGUJIAN LAB
- Paper test 3/200 m
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8%
500 putaran maks.40%
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 %
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥ 48 °C
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI MEI JUNI JULI
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8%
500 putaran maks.40%
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 %
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50
* PENGUJIAN LAB.
- Campuran Aspal AASHTO T164-14 (Method A) SNI-03-6894-2002
- Kadar Aspal AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari toleransi +/- 0,3 %
- Gradasi Hasil Ekstraksi AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari
- Gradasi Hot Bin AASHTO T27-14 SNI ASTM C136:2012 2/200 ton, min 2 hari
- Stabilitas Marshall AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 800 kg
- VMA (Rongga Dalam Agregat) AASHTO T19M/T19-14 SNI 03-4804-1998 2/200 ton, min 2 hari Min 14 %
- VIM (Rongga Dalam Campuran) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari (3-5)%
- VFB (Rongga Terisi Aapal) AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 65 %
- Kadar Aspal Efektif AASHTO T164-14 (Method A) SNI-03-6894-2002 2/200 ton, min 2 hari
- Stab. Marshall sisa AASHTO T245-15 SNI 06-2489-1991 2/200 ton, min 2 hari Min 90 %
- Vim PRD (Rongga dalam campuran (%) pada
Kepadatan membal (refusal) AASHTO T245-15 SNI 06-2489-1991 1/3000 ton Min 2 %
- Kepadatan hasil "core Drill* AASHTO T166-13 SNI 03-6757-2002 2/100 m Min 98%
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8%
500 putaran maks.40%
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 %
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C
3√ jumlah drum
* PENGUJIAN LAP
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI MEI JUNI JULI
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8%
500 putaran maks.40%
- Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 %
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50
* Material Aggregat
Abrasi mat.cold bin AASHTO T96-02(2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8%
500 putaran maks.40%
Gradasi mat.cold bin AASHTO T335-09(2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08(2013) SNI 03-4428-1997 1/250 m3 Min. 60 %
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm
3√ jumlah drum
- Titik Lembek AASHTO T53-09(2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C
3√ jumlah drum
* PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50 m
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI MEI JUNI JULI
* Material Aggregat
- Abrasi mat.cold bin AASHTO T96-02 (2015) SNI 2417:2008 1/5000 m3 100 putaran maks.8%
500 putaran maks.40%
- Gradasi mat.cold bin AASHTO T335-09 (2013) SNI 7619:2012 1/1000 m3
- Nilai Setara Pasir AASHTO T176-08 (2013) SNI 03-4428-1997 1/250 m3 Min. 60 %
* Material Aspal
- Penetrasi AASHTO T49-15 SNI 2456:2011 1/tangki atau Pen.60/70(60-70)x0,1mm
3√ jumlah drum
- Titik Lembek AASHTO T53-09 (2013) SNI 2434:2011 1/tangki atau Pen.60/70 ≥48 °C
3√ jumlah drum
- PENGUJIAN LAPANGAN
- Temperatur campuran Setiap batch dan Suhu 135 °C - 150 °C
di AMP dan Lapangan pengiriman
- Tebal Hamparan ( Core Drill ) 2/100 , 1/50
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 MPa (K-350) * DMF / JMF
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 %
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008
- Flexsur Strenght Test AASHTO T97-14 SNI 4431:2011
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 9 Silinder / 60 m3
- Baja Tulangan Beton AASHTO M31M/M31-17 SNI 2052:2017
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008
- Test Pile
BETON STRUKTUR :
7.1 (5a) - Beton FC 30 MPa (K-350) * DMF / JMF
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 %
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008
- Flexsur Strenght Test AASHTO T97-14 SNI 4431:2011
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 9 Silinder / 60 m3
- Baja Tulangan Beton AASHTO M31M/M31-17 SNI 2052:2017
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008
- Test Pile
7.1 (7a) - Beton FC 20 MPa (K-250) * DMF / JMF
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 %
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008
- Flexsur Strenght Test AASHTO T97-14 SNI 4431:2011
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 9 Silinder / 60 m3
- Baja Tulangan Beton AASHTO M31M/M31-17 SNI 2052:2017
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008
- Test Pile
STANDARD PENGUJIAN JUMLAH PENGUJIAN
No. MATA PEMBAYARAN URAIAN JENIS PENGUJIAN FREKWENSI PENGUJIAN BATASAN KETERANGAN
AASHTO SNI MEI JUNI JULI
* PENGUJIAN MATRIAL
- Abrasi Test AASHTO T96-02 (2015) SNI 2417:2008 Agregat Kasar Max. 40 %
- Soundness Test AASHTO T104-99 (2011) SNI 3407:2008
- Flexsur Strenght Test AASHTO T97-14 SNI 4431:2011
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 9 Silinder / 60 m3
- Baja Tulangan Beton AASHTO M31M/M31-17 SNI 2052:2017
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008
- Test Pile
7.1 (10) - Beton FC 10 MPa (K-125)
* DMF / JMF
* PENGUJIAN LAB.
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011 9 Silinder / 60 m3
- Baja Tulangan Beton AASHTO M31M/M31-17 SNI 2052:2017
* PENGUJIAN LAPANGAN
- Slump AASHTO T119-13 SNI 1972 - 2008
.- Test Pile
* PENGUJIAN LAB
- Kuat Tekan Beton AASHTO T22-14 SNI 1974 - 2011
- Baja Tulangan Beton AASHTO M31M/M31-17 SNI 2052:2017
* PENGUJIAN LAPANGAN
- Slump
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003
* PENGUJIAN LAPANGAN
.- Test Pile ASTM C174/C174M-17 SNI 03-6969-2003
5.90%
110 12.12 = 1333.2
89 12.12 = 1078.68
6%
99 12.12 = 1199.88
113 12.12 = 1369.56
6%
99 12.12 = 1199.88
113 12.12 = 1369.56
BALAI BESAR PELAKSANAAN JALAN NASIONAL (BBPJN)
PROVINSI SUMATERA UTARA
CORETEAM P2JN PROVINSI SUMATERA UTARA
TAHUN ANGGARAN 2022
Marshall Marshall
Sand cone Kelas S Pelebaran Link 40 Sand cone Kelas S Pelebaran Link 40
Sand cone Kelas S Pelebaran Link 40 Sand cone Kelas A Pelebaran Link 40
Sand cone Kelas A Pelebaran Link 40 Sand cone Kelas S Pelebaran Link 40
TEST SAND CONE & PROOFROLLING
Sand cone base A sta 41+800L link 40 Sand cone base A sta 41+845R
Sand cone Base A Sta 41+100 link 41 Sand cone Base A Sta 41+100 link 41
TEST SAND CONE
Sand cone base B sta 43+450 L link 40 Sand cone base B sta 43+450 L link 40
TEST SAND CONE & PROOFROLLING
STA 39+325 - STA 37+642 R segmen 2 link 40 STA 39+325 - STA 37+642 R segmen 2 link 40
Sand cone Sta 8+884 link 41 Sand cone Sta 8+884 link 41
CONE DRILL
Inti Coredrill Overlay AC WC link 040 Inti Coredrill Overlay AC WC link 040
Inti Coredrill Overlay AC WC link 040 Inti Coredrill Overlay AC WC link 040
Inti Coredrill Overlay AC WC link 040 Inti Coredrill Overlay AC WC link 040
CONE DRILL
Link 040. AC - Base ( Pelebaran )
Core AC - BC Core AC - WC