PT. WASKITA KARTA (Persero) Tbk Form.

PW-QTY-07-05
Rev. 02, Juni 2021

Unit Bisnis : BUILDING DIVISION


Proyek : Rumah Sakit Umum Daerah Tigaraksa (Multiyears)

MONITORING PERSETUJUAN BAHAN/MATERIAL


Nomor Formulir Persetujuan Bahan/Material Rencana Waktu Realisasi Pengajuan
No Status Persetujuan
Pengajuan Approval Jenis Bahan/Material Keterangan Bahan/Material Pengajuan Kirim Kembali
(1) (2) (3) (4) (5) (6) (7) (8)
STRUKTUR
1 015/STR/2023 Floor Hardener Ultrachem 12-Mar-23 12-Mar-23
2 016/STR/2023 Waterproofing Integral Ultrachem 12-Mar-23 12-Mar-23
3 017/STR/2023 Waterproofing Ultrachem 12-Mar-23 12-Mar-23
Super
4 018/STR/2023 Waterproofing Ultrachem 12-Mar-23 12-Mar-23
Torch S
5 019/STR/2023 Beton Ready-Mix Farika Beton 15-Mar-23 15-Mar-23 27-Mar-23 REVISI DOKUMEN
ARSITEKTUR
1 002/ARS/2023 Alumunium Composite 3-Feb-23 3-Feb-23 20-Feb-23 DITERIMA
Panel Seven
6-Mar-23
2 004/ARS/2023 Homogenous Tile Indogress 3-Feb-23 2-Feb-23 3-Mar-23 REVISI DOKUMEN
60x60 6-Mar-23
30 x 60
10 x 60
Step Nosing
Type : TP2
3 005/ARS/2023 Keramik Platinum 3-Feb-23 3-Feb-23 3-Mar-23 REVISI DOKUMEN
30 x 60 6-Mar-23
60 x 60
4 009/ARS/2023 Powder Coating Jotun 3-Feb-23 3-Feb-23 3-Mar-23 REVISI DOKUMEN
6-Mar-23
5 010/ARS/2023 Cat Exterior Jotun 3-Feb-23 3-Feb-23 3-Mar-23 REVISI DOKUMEN
PT. WASKITA KARTA (Persero) Tbk Form. PW-QTY-07-05
Rev. 02, Juni 2021

Unit Bisnis : BUILDING DIVISION


Proyek : Rumah Sakit Umum Daerah Tigaraksa (Multiyears)

MONITORING PERSETUJUAN BAHAN/MATERIAL


Nomor Formulir Persetujuan Bahan/Material Rencana Waktu Realisasi Pengajuan
No Status Persetujuan
Pengajuan Approval Jenis Bahan/Material Keterangan Bahan/Material Pengajuan Kirim Kembali
(1) (2) (3) (4) (5) (6) (7) (8)
Jotashield 6-Mar-23
6 011/ARS/2023 Cat Interior Jotun 3-Feb-23 3-Feb-23 3-Mar-23 REVISI DOKUMEN
Jotaplast 6-Mar-23
7 012/ARS/2023 Cat Exterior Jotun 3-Feb-23 3-Feb-23 3-Mar-23 REVISI DOKUMEN
Toughshield
8 013/ARS/2023 Homogenous Tile Niro Granite 3-Feb-23 2-Mar-23 3-Mar-23 REVISI DOKUMEN
60x60 6-Mar-23
30 x 60
10 x 60
Step Nosing
Type : GC042 GC
9 014/ARS/2023 Spandek Metal Prima Roof 28-Mar-23 28-Mar-23
10 015/ARS/2023 Alumunium Foil Safe Foil 28-Mar-23 28-Mar-23
11 016/ARS/2023 Listplank Lokal 28-Mar-23 28-Mar-23
MEP
TRANSPORTASI DALAM GEDUNG
1 001/MEP/2023 Lift/ELevator Pillar 3-Feb-23 3-Feb-23 9-Feb-23 REVISI DOKUMEN
- Bed Lift 28-Feb-23 03-Mar-23 DITERIMA
- Passanger Lift
- Service Lift / Fire Lift
ELEKTRIKAL
1 001/MEP.EL/2023 Panel TM (Set) ABB 16-Feb-23 16-Feb-23 03-Mar-23 REVISI DOKUMEN
Incoming 14-Mar-23 24-Mar-23 DITERIMA
PT. WASKITA KARTA (Persero) Tbk Form. PW-QTY-07-05
Rev. 02, Juni 2021

Unit Bisnis : BUILDING DIVISION


Proyek : Rumah Sakit Umum Daerah Tigaraksa (Multiyears)

MONITORING PERSETUJUAN BAHAN/MATERIAL


Nomor Formulir Persetujuan Bahan/Material Rencana Waktu Realisasi Pengajuan
No Status Persetujuan
Pengajuan Approval Jenis Bahan/Material Keterangan Bahan/Material Pengajuan Kirim Kembali
(1) (2) (3) (4) (5) (6) (7) (8)
Outgoing
Metering
2 002/MEP.EL/2023 Travo KVA CU/CU Weltrav 16-Feb-23 16-Feb-23 03-Mar-23 DITERIMA
Tipe Natural Oil Ester
Vector Group : Dyn 5
3 003/MEP.EL/2023 Generator Set Perkins 27-Feb-23 27-Feb-23 03-Mar-23 REVISI DOKUMEN
650KVA (S-P650/s) 14-Mar-23 24-Mar-23 DITERIMA
800KVA (S-P800/s)
4 004/MEP.EL/2023 Panel Tegangan Rendah Duta Listrik Graha Prima Panel 27-Feb-23 27-Feb-23 03-Mar-23 REVISI DOKUMEN
14-Mar-23 24-Mar-23 DITERIMA
PLUMBING
1 001/MEP.PL/2023 Pipa dan Fitting HDPE PIF PT 27-Feb-23 27-Feb-23 03-Mar-23 DITERIMA
Pipa Transfer
Pipa Gravitasi
2 002/MEP.PL/2023 Pipa PVC PT. Vinilon Jaya Sakti 27-Feb-23 27-Feb-23 03-Mar-23 DITERIMA
Vinilon
3 003/MEP.PL/2023 Pipa PPR PT. Wahana Jaya Rucika 27-Feb-23 27-Feb-23 03-Mar-23 DITERIMA
PN 10
4 004/MEP.PL/2023 Pipa BS SCH 40 PT. Steel Pipa Industry 27-Feb-23 27-Feb-23 03-Mar-23 DITERIMA
SCH 40
5 005/MEP.PL/2023 Fitting PVC Rucika PT. Wahana Jaya Rucika 27-Feb-23 27-Feb-23 03-Mar-23 DITERIMA
6 006/MEP.PL/2023 Sambungan Pipa PPR PT. Wahana Jaya Rucika 27-Feb-23 27-Feb-23 03-Mar-23 DITERIMA
PN 10
PT. WASKITA KARTA (Persero) Tbk Form. PW-QTY-07-05
Rev. 02, Juni 2021

Unit Bisnis : BUILDING DIVISION


Proyek : Rumah Sakit Umum Daerah Tigaraksa (Multiyears)

MONITORING PERSETUJUAN BAHAN/MATERIAL


Nomor Formulir Persetujuan Bahan/Material Rencana Waktu Realisasi Pengajuan
No Status Persetujuan
Pengajuan Approval Jenis Bahan/Material Keterangan Bahan/Material Pengajuan Kirim Kembali
(1) (2) (3) (4) (5) (6) (7) (8)
7 007/MEP.PL/2023 Jokie Pump PT. Juvantee Indonesia 02-Mar-23 02-Mar-23 03-Mar-23 DITERIMA
Dun 10.20
8 008/MEP.PL/2023 Booster Pump PT. Juvantee Indonesia 02-Mar-23 02-Mar-23 03-Mar-23 DITERIMA
Dun 15.3
9 009/MEP.PL/2023 Diesel Pump PT. Juvantee Indonesia 02-Mar-23 02-Mar-23 03-Mar-23 DITERIMA
68TA 138 kW3000 rPM
10 010/MEP.PL/2023 Elektrik Pump PT. Juvantee Indonesia 02-Mar-23 02-Mar-23 03-Mar-23 DITERIMA
SNT 100-315
11 011/MEP.PL/2023 Transfer Pump PT. Juvantee Indonesia 02-Mar-23 02-Mar-23 03-Mar-23 DITERIMA
DUN 32.4
TATA UDARA
1 001/MEP.VAC/2023 Unit AC Samsung 27-Feb-23 25-Feb-23 25-Feb-23 DITOLAK
VRF 27-Feb-23 03-Mar-23 DITERIMA

Keterangan : Kabupaten Tangerang,28 Maret 2023


(4) Diisi dengan ex produk bahan/nama suplier bahan
(5) Disesuaikan dengan jadwal pelaksanaan
(8) diisi Ditolak/Diterima
Disetujui oleh Dibuat oleh

(Enny Vebriyanti Novian) (Jiwo Waskito)


PT. WASKITA KARTA (Persero) Tbk Form. PW-QTY-07-05
Rev. 02, Juni 2021

Unit Bisnis : BUILDING DIVISION


Proyek : Rumah Sakit Umum Daerah Tigaraksa (Multiyears)

MONITORING PERSETUJUAN BAHAN/MATERIAL


Nomor Formulir Persetujuan Bahan/Material Rencana Waktu Realisasi Pengajuan
No Status Persetujuan
Pengajuan Approval Jenis Bahan/Material Keterangan Bahan/Material Pengajuan Kirim Kembali
(1) (2) (3) (4) (5) (6) (7) (8)