Diketahui konstruksi tembok penahan Type Gravity Wall/cantilever dengan data sebagai berikut :
Beban Merata Permukaan
Sudut Kemiringan Permukaan Tanah
Tinggi tembok penahan
Lapisan Tanah 1 Lapisan Tanah 2
Tinggi H1 = 3.9 m Tinggi
ϒ1 = 24 kN/m3 ϒ2
φ1 = 26 ° φ2
C1 = 0 kN/m3 C2
Ybeton
D
A. PERHITUNGAN DIMENSI
Bagian Telapak :
Untuk lebar tapak a digunakan : 0,5t-t
a = 0.5t
= 0.36
a = t
= 0.73
Diambil a = 0.5
Untuk H0 :
Ho = (a+b)tg β
= 0.36
Untuk Kemiringan α :
Tangen α = (H-t)/b
Tangen α = 6.074074074
α = 80.65102241
B. PERHITUNGAN TEKANAN TANAH
Koefisien Tekanan Tanah
((cos(radian(β))) - (sqrt((cos(radians(β))^(2)) -(cos(radiaan(φ))^(2)))))
Ka = cos β
((cos(radian(β)))+ (sqrt((cos(radians(β))^(2)) -(cos(radiaan(φ))^(2)))))
β = 16
Untuk Kφ₁ = 26 °
Ka₁ = 0.45799
Untuk φ₂ = 35 °
Ka₂ = 0.30084
Pa₁ = Tekanan tanah aktif akibat q terhadap tanah pada tanah setinggi h₁
Pa₁ = q*h₁*Ka₁
Pa₁ = 4.875744675 kN/m
Pa₃ = Tekanan tanah aktif akibat q dan tanah setinggi h₁ terhadap tanah setinggi h
Pa₃ = (q*ϒ₁*h₁)*h₂*Ka₂
Pa₃ = 34.6481061 kN/m
β = 16 °
PaH = Pa*cos β
= 139.3931035
PaV = Pa*Sin β
= 39.97032923
X₀ = 2.2917
X₁ = 2.5000
X₂ = 2.0947
X₃ = 2.6127
X₄ = 2.3494
X₅ = 3.4167
X₆ = 1.0156
X₇ = 1.4583
X₈ = 1.9010
X₉ = 0.5672
X₁₀ = 0.2734
X₁₁ = 1.4583
XTOTAL 21.9392
315.072677 615.90851
Jadi
Momen akibat gaya Vertikal (Mw) = 615.9085
Resultan gaya-gaya Vertikal (X) = Mw total / W total = 1.954814
Σ gaya-gaya vertikal = V total = 315.0727
Σ Gaya berat konstruksi = 275.1023
D PERHITUNGAN STABILITAS
Stabilitas Geser
F = 2.009287602 > 2 OK
Stabilitas Guling
F = 2.651085802 > 2 OK
Stabilitas Eksetritas
e = 0.007409123 < 0.48611111 OK
q' = 35.2
B' = 2.901848421
Nc = 27.86
Nq = 16.44
Ny = 19.34
ƛcs = 1.590093324
ƛqs = 1.700207538
ƛys = 0.6
ƛqd = 1.09652885
ƛcd = 1.104914341
ƛyd = 1
Faktor Kemiringan
α = 23.86535146 °
ƛci=ƛqi = 0.539974289
ƛyi = 0.318132816
qu = 1121.327304
qmax = 109.6713931
qmin = 106.3784428
F = 10.22442838 > 3 OK
E MENGHITUNG M, D, N, POTONGAN.
a. Potongan 1-1
Hb = 0.37
Pa1 = 4.875744675
Pa2 = 99.66252404
Pa3 = 11.68061153
Pa4 = 0.661923577
Pp' = 6.758190794
b. Potongan 2-2
x = 3.292950322
σ2 = 0.617428185
w1 = 6.489583333
w2 = 9.5703125
R1 = 58.17571092
R2 = 0.168828019
Pp 26.12922523
Beban Bekerja H (kN) V (kN) x (m) M (kN.m)
Tek Tanah (H)
Pp 26.1292252
Tek Tanah (V)
W1 -6.48958333 0.2734375 -1.7744954
W2 -9.5703125 0.2734375 -2.6168823
R1 58.17571092 0.2734375 15.907421
R2 0.168828019 0.18229167 0.03077594
26.1292 42.2846431 11.5468191
D 42.2846431
M 11.54681913
N 26.12922523
c. potongan 3-3
x 0.201617849
y 3.292950322
σ2 2.675522137
W0 1.422284385
W1 1.029091106
W2 2.646234273
W3 51.1875
W4 6.489583333
W5 9.5703125
R1 59.63888708
R2 0.168828019
Pa1 25.57056482
Pa2 2.559198277
beban bekerja H V x M
tek.tanah H
PH1 25.5706
PH2 2.5592
Tek.tanah V
W0 -1.42228438 0.2734375 -0.3889059
W1 -1.02909111 0.36458333 -0.3751895
W2 -2.64623427 0.2734375 -0.7235797
W3 -51.1875 0.2734375 -13.996582
W4 -6.48958333 0.2734375 -1.7744954
W5 -9.5703125 0.2734375 -2.6168823
R1 59.63888708 0.2734375 16.3075082
R2 0.168828019 0.36458333 0.06155188
ΣPaV -7.75361352 0.5 -4.2402574
28.1298 -20.290904 -7.7468322
= 24 kN/m3
= 1.1 m
ns(β))^(2)) -(cos(radiaan(φ))^(2)))))
ns(β))^(2)) -(cos(radiaan(φ))^(2)))))
Ca = 0
734.022904866258
φ2 = 35
Fcd = 1.15085714285714
Fqd = 1.09603843071293
Fyd = 1
Ψ° = 23.8653514554237
Fcs=Fqs = 0.73482942827307
Fys = 0.318132815559324
qu = 679.124082936615
qmax = 109.671393138913
qmin = 106.378442816449
F = 6.1923539356924 > 3 OK
a 0.5
ΣPH28.1297631010788