Berdasarkan PMI 1970 jenis konstruksi pasangan batu kali 1:4, maka:
Tegangan desak = 1500.00 kN/m2
Tegangan tarik = 300.00 kN/m2
Tegangan geser = 150.00 kN/m2
Berat = 22.00 KN/m3
g Tekanan Aktif
Ea = Luas area
Ea1 = 3.2333333 KN/m
Ea2 = 2.6658833 KN/m
Ea3 = 17.9249 KN/m
Ea4 = 5.4945333 KN/m
Ea total = 29.32 KN/m
h Tekanan Pasif
Ep = Luas area
Ep1 = 86.63 KN/m
Ep2 3.27
Ep total = 89.89 KN/m
R = 306.36 kN
c' = 19.50 kN/m2
Pp = 89.89 kN
tan φ' = 0.07
Fr = 189.47 kN
Ph = 29.32 kN
SF = 6.46
LEBIH DARI
σmax 51.42 101.75
q ult = 282.44
s ijin tanah 94.15
1 kpa = 1kn/m2
Titik P tanah W tanah W beton Gaya vertikal Jarak thd. O
(kN) (kN) (kN) (kN) (m)
Ea1 3.23 0.00
Ea2 2.67 0.00
Ea3 17.92 0.00
Ea4 5.49 0.00
Ea5 0.00 0.00
q 20.00 20.00 -1.00
Wt1 32.98 32.98 -1.00
Wt2 73.08 73.08 -1.00
Wt3 15.30 15.30 -1.00
Wb1 88.00 88.00 0.00
Wb2 77.00 77.00 0.50
Ep1 86.63 0.00
Ep2 3.27 0.00
R 306.36
+
Tanah Timbunan
γsoil
γsat
φ
c
Tanah Dasar
γ'
φB
cB
tan φB
c'B =
Angka Keamanan
Tegangan geser = 1.5
Tegangan izin tanah = 3