Nama Owner :
Nama Proyek :
a: 250 mm d: 500 mm
b: 400 mm h1 : 1000 mm
c: 2750 mm h2 : 4000 mm
b2: 1433.3 mm
DATA TANAH
S1
𝐾𝑎=𝑡𝑎𝑛^2(45−∅⁄2) Ø : Angle Friction Tanah
Ch : Kohesi Tanah
𝐾𝑝=𝑡𝑎𝑛^2(45+∅⁄2) BJ : Berat Jenis Tanah
X S1
S2 Ø: 25 deg Ka : 0.4059
Ch : 0 tn/m2 Kp : 2.4639
Bj : 1.6 tn/m3
S2
Ø: 10 deg Ka : 0.7041
Bj DPT : 2.4 tn/m3 ...... Berat Jenis (tn/m3) Ch : 2 tn/m2 Kp : 1.4203
Bj : 1.6 tn/m3
F.guling = 2.841
AMAN TERHADAP GULING
∑M w = 26.1904 tn.m
𝑀_𝑢=1.2×(1/2×𝐵_𝑗×𝑦^2×𝐾_𝑎1×(𝑦⁄3))
Sg.1 +1.6×(1/2×𝑞×𝑦^2×𝐾_𝑎1)
Sg.2
𝑉_𝑢=(1.2×1/2×𝐵_𝑗×𝑦^2×𝐾_𝑎1)
+(1.6×1/2×𝑞×𝑦^2×𝐾_𝑎1)
Sg.3
y Mu Vu
Segment
1= 1.33 0.3079 tn.m 0.69 tn
Segment
2= 2.67 2.4628 tn.m 2.77 tn
Segment
3= 4.00 8.3120 tn.m 6.23 tn
Segment 4 = faktor q b1 y Mu Vu
tn/m m m tn.m tn
Beban Tanah Urug Sisi Kiri 1 -1.600 0.917 0.458 -0.672 -1.467
Beban Beton sisi Kiri 1 -1.0298182 0.917 0.458 -0.433 -0.944
Tekanan Tanah dari Bawah 1 1 4.141 0.917 0.458 1.740 3.796
Tekanan Tanah dari Bawah 2 1 4.488 0.917 0.611 1.257 2.057 Tekanan Dari Bawah
1.892 3.442 Lebih Besar
Segment 5 = faktor q b2 y Mu Vu
tn/m m m tn.m tn
Beban Tanah Urug Sisi Kanan 1 -6.400 1.433 0.717 -6.574 -9.173
Beban Beton sisi Kanan 1 -1.005 1.433 0.717 -1.032 -1.440
Tekanan Tanah dari Bawah 1 1 2.418 1.433 0.717 2.484 3.466
Tekanan Tanah dari Bawah 2 1 3.237 1.433 0.956 2.217 2.320 Tekanan Dari Atas
-2.906 -4.828 Lebih Besar
Data Balok
Mutu Beton = 350 kg/cm2
f'c = 29.05 MPa
Modulus Elastisitas = 25332.084 MPa
β = 0.85 Pilih Diameter Tulangan
Mutu Baja Tulangan = 400 Mpa
16
m = (Fy/(0.85.f'c)) = 16.20
ρ b = (( 0,85 x β x fc) / fy ) x (600/(600+fy)) = 0.0370
ρ max = 0.75 x ρ b = 0.0278
Vu Tebal CONTROL
CEK GESER 1 ARAH Effektif Vc CEK
tn mm tn SELIMUT BETON
Segment 1 = 0.69 250.00 22.89 AMAN DINDING PADA PERHITUNGAN INI
DIPAKAI 50 mm
Segment 2 = 2.77 300.00 27.47 AMAN
Segment 3 = 6.23 350.00 32.05 AMAN
Segment 4 = 3.442 350.00 32.05 AMAN
Segment 5 = 4.828 350.00 32.05 AMAN
SKETSA DINDING BETON PENAHAN TANAH
SKETSA RENCANA
DINDING PENAHAN TANAH
PEMBEBANAN
SKETSA PENULANGAN
HARAP LAKUKAN PENGECEKAN KEMBALI DARI FORMULA YANG DIPAKAI DIATAS SEBELUM DI GUNAKAN DI LAPANGAN
325
1316.6667
916.66667
1.6
6.4
0.0000 TN/M