Data Perencanaan
Parameter Data Tanah Geometrik Tembok
Jenis Tanah = Tanah Pasir Tinggi Tembok
Berat Isi Tanah Timbun Ys = 19 kN/m3 H = 7.00 m
Sudut geser tanah f = 35 o H1 = 6.20
koef gesekan m = 0.5 H2 = 0.80
Daya dukung izin qa = 150 kPa L1 = 0.40
Mutu Bahan Beton L2 = 1.00
Berat Jenis Beton Yc = 25 kN/m3 L3 = 0.80
Mutu Beton fc = 30 N/mm2 L4 = 2.20
Mutu Baja fy = 460 N/mm2 B = 4.00
Diameter tulangan utama D = 20 mm
Diameter tulangan susut D = 16 mm
Tebal penutup beton d = 40 mm
0.80
data tanah asli
0.80 Ys = 18 kN/m3
0.4 f = 35 o
1.00 2.20 CU = 20 Kpa
1 1
0.80 Wc3
4.00
0.4
WQ
WC2
7.00 6.20 WS
WC1
a b pot a-b
Tekanan tanah setinggi dinding
0.80
a b untuk analisa penulangan tembok
0.80
0.4
1.00 2.20
4.00
Wc 20 Wc 20
148 Wq+Ws+Wc
qmax-Wc 108.45 b 49.17 Wq+Ws+Wc-qmin
qmax-Wc 108.45
a q2+Ws+Wc-qmin= 32.77
q1-Wc= 100.99
Bidang Momen
Ma-a = 1.4 50.50 + 4.97 = 77.65 kNm tapak depan/toe
Mb-b = 1.4 79.30 + 26.46 = 148.06 kNm tapak belakang/heel
Ma-b = 1.4 52.08 + 204.52 = 359.24 kNm tekanan setinggi steam
Mu 359.24 kNm
lebar per m' b= 1000 mm
tinggi slab h= 500 mm
selimut beton d= 40 mm
tulangan diameter f= 20 mm
beugel f= 10 mm
tinggi slab efektif d= 450 mm
Mutu Beton f'c = 30 Mpa
Mutu Baja fy = 460 Mpa
b1 = 0.85
Mu 359.24 kNm
Tebal dinding 450.00
Selimut 40.00
Tinggi efektif 400.00
rb =b*0.85*fc/fy*600/(600+fy) = 0.0267
f = 1.0
Rmax = 0.75*rb*fy*[1-*0.75*rb*fy/(0.85*fc)] = 7.541
Ru = Mn*106/(b*d2 ) = 2.245
Ru < Rmax (OK)
r =fc/fy*[1- {12*Rn/(0.85*fc)}] = 0.0060
rmin = 0.0030
r= 0.0060
As = r*b*d = 2,408.09 mm2
D 22 mm
s = p/4*D2*b/As = 158 mm
smax = 200 mm
s= 158 mm
Tualngan Utama
rencana digunakan tulangan, D 22 - 150
Luas tulangan terpakai, As = p/4*D2*b/s = 2,534.22 mm2
OK As terpakai > As tersedia
Tualngan Susut
Luas Tulangan Susu0.2%*b*h 800.00 mm2
digunakan tulangan D16 - 200
( 1,005 mm2 )
OK As terpakai > As tersedia
Kontrol Geser Gaya V = 162.07 kN/m
v=V/bd = 0.36 N/mm2
Vc =0.79*(100As/bd)^1/3(400/d)^1/4/Ym
100*As/bd = 0.563
Vc = 0.63 N/mm2
Kontrol = OK Vc>V
Tualngan Susut
Luas Tulangan Susu0.2%*b*h 1,400.00 mm2
digunakan tulangan D16 - 200
( 1,005 mm2 )
OK As terpakai > As tersedia
Vc =0.79*(100As/bd)^1/3(400/d)^1/4/Ym
100*As/bd = 0.298
Vc = 0.45 N/mm2
Kontrol = OK Vc>V
Tualngan Susut
Luas Tulangan Susu0.2%*b*h 1,400.00 mm2
digunakan tulangan D16 - 200
( 1,005 mm2 )
OK As terpakai > As tersedia
Kontrol Geser
Gaya V = 126.18 kN/m
v=V/bd = 0.168 N/mm2
Vc =0.79*(100As/bd)^1/3(400/d)^1/4/Ym
100*As/bd = 0.298
Vc = 0.45 N/mm2
Kontrol = OK Vc>V
D 22 - 150
tul utama STEAM
D D16 - 200
tul susut
tul susut
D 14 - 150 D 22 - 170
D 22 - 170 tul utama HEEL
tul utama TOE D 14 - 100
tul susut
DATA PERENCANAAN TEKNINS RETAINING WALL
DIMENSI KONSTRUKSI
H1 = 6.2 m
T1 beban hidup, q H2 = 0.8 m
10 kN/m2 H tot = 7.0 m
T1 = 0.4 m
T2 = 0.4 m
T3 = 1.0 m
T4 = 2.2 m
B = 4.0 m
PARAMETER TANAH
H1 TANAH TIMBUN
H tot Y1 = 19 t/m3
f1 = 35 derajat
C1 = t/m2
H2
PARAMETER TANAH
TANAH ASLI
T3 T2 T1 T4 Y2 = 18 t/m3
f2 = 30 derajat
B C2 = 20 t/m2
TEKANAN TANAH
TEGANGAN TANAH koef tekanan tanah aktif
p1 = 2.71
p2 = 36.04 Spah = 0,5*H^2*Yb*Ka + q*H*Ka
342.209
FK trhdp geser SRh/SPh = = 2.35819
145.115 >1,5, OK
A= B'*1 m 3.3 m
kator inclinasi
^0,5
0,5*H
ic = 1 - =
V + A'*ca*cot f
ic =iq (1-(0.5*E36)/(G44+G65*U25*TANH(U24)))^5
^0,5
0,7*H
icY = 1 - =
V + A'*ca*cot f
0.3
dari tabel diperoleh, Nc = 33.30
Nq = 46.12
NY = 48.03
t/m3 Pa1
derajat
t/m2
Pa2
Y2
t/m3
derajat
t/m2
= 0.27099
= 0.472
G65*U25*TANH(U24)))^5
= 0.338
- 100