TYPE
44 ttk 264
jrk
begel Ø 10 = 10 0.62 0.15 1.36 13 11.15 kg
rekap
volume = 11.05 m3
besi = 1,040.62 kg
multiplek = 44.00 bh
jumlah pjg
tiang pancang
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
PONDASI PILE CAP - mutu beton fc'25 mpa
jml besi tul pj besi tot berat besi berat besi Type P1 Besi Total
( bh ) (pt) ( kg ) ∑ ( kg ) ( bh ) ∑ ( kg )
10 31.52 49.74 281.34 20
16 35.25 55.64 5,626.78
10 28.42 84.80
16 30.55 91.16
0 0.00 0.00
m2
m3
m3
m3
m3
jml besi tul pj besi tot berat besi berat besi Type P2 Besi Total
( bh ) (pt) ( kg ) ∑ ( kg ) ( bh ) ∑ ( kg )
9 21.25 25.68 96.58 8
12 23.28 28.13 772.66
8 17.25 20.85
11 18.15 21.93
0 0.00 0.00
m2
m3
m3
m3
m3
jml besi tul pj besi tot berat besi berat besi Type P3 Besi Total
( bh ) (pt) ( kg ) ∑ ( kg ) ( bh ) ∑ ( kg )
4 5.80 9.15 52.63 8
4 5.80 9.15 421.00
5 5.75 17.16
5 5.75 17.16
0 0.00 0.00
m2
m3
m3
m3
m3
PEKERJAAN BANGUNAN UTAMA :
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 12 D 16 1.58 2.140 m' 12 40.53
KOLOM LT. 1 :
panjang lebar tinggi volume Type K1 Volm Tot
(p) (l) (t) (v) ( bh ) ( V tot )
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 12 D 16 1.58 4.500 m' 12 85.23
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 6 D 14 1.21 4.450 m' 6 32.26
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 16 D 19 2.23 4.000 m' 16 142.44
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 8 D 19 2.23 4.000 m' 8 71.22
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 8 D 19 2.23 1.840 m' 8 32.76
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 8 D 19 2.23 1.140 m' 8 20.30
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 8 D 16 1.58 1.720 m' 8 21.72
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 8 D 16 1.58 1.960 m' 8 24.75
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 8 D 16 1.58 2.340 m' 8 29.55
KOLOM LT. 2 :
panjang lebar tinggi volume Type K1 Volm Tot
(p) (l) (t) (v) ( bh ) ( V tot )
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 12 D 16 1.58 4.450 m' 12 84.28
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 12 D 25 3.85 4.000 m' 12 184.96
KOLOM LT. 3 :
panjang lebar tinggi stek volume Type K2 Volm Tot
(p) (l) (t) besi (v) ( bh ) ( V tot )
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 8 D 12 0.89 5.450 m' 8 38.71
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 6 D 25 3.85 5.450 m' 6 126.00
KOLOM LT. 3 :
panjang lebar tinggi volume Type K1 Volm Tot
(p) (l) (t) (v) ( bh ) ( V tot )
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 16 D 25 3.85 4.000 m' 16 246.62
Pembesian Jenis tul. berat / m' besi kolom Tul. pokok besi
( kg ) (t) tul.pokok
tul.utama 16 D 19 2.23 4.000 m' 16 142.44
BALOK LT. 1 :
BALOK LT. 2 :
BALOK LT. 3 :
BALOK LT. 4 :
BALOK LT. 5 :
BALOK LT. 6 :
BALOK LT. 7 :
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.30 2 822.63 103.44 0.00 103.44 3,392.28
400.75
534.33
400.75
0.00
0.00
0.00
0.00
Begesting
( Tot )
182.00 m2
32.500 m3
2.600 m3
2.600 m3
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
1.69 m3 662.68 22.50
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.20 2 143.31 18.45 0.00 18.45 662.68
48.55
64.74
48.55
142.05
0.00
0.00
0.00
Begesting
( Tot )
22.50 m2
3.938 m3
0.338 m3
0.338 m3
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
10.97 m3 2,293.37 88.63
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.45 3 448.17 76.16 0.00 76.16 2,293.37
202.30
289.00
202.30
0.00
1 79.48
1 105.97
1 79.48
1 43.35
1 57.80
1 43.35
Begesting
( Tot )
88.63 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
3.16 m3 692.97 28.44
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.35 2 134.79 35.01 0.00 35.01 692.97
4 265.16 0.00 -68.31 0.00
71.21
94.95
71.21
0.00
1 16.18
1 21.58
1 16.18
Begesting
( Tot )
28.44 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
6.12 m3 1,721.26 63.92
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.25 2 329.90 83.28 0.00 83.28 1,721.26
107.33
134.16
107.33
0.00
1 73.37
1 97.82
1 73.37
1 41.92
1 55.90
1 41.92
Begesting
( Tot )
63.92 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
2.30 m3 401.50 20.70
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.35 2 92.96 12.28 0.00 12.28 401.50
3 136.13 0.00 -23.70 0.00
34.82
64.99
34.82
0.00
1 11.08
1 14.77
1 11.08
Begesting
( Tot )
20.70 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
1.53 m3 338.58 15.98
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.25 2 108.91 14.19 0.00 14.19 338.58
19.17
29.81
19.17
0.00
1 0.00
1 0.00
1 0.00
Begesting
( Tot )
15.98 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
7.24 m3 1,211.83 86.88
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.45 2 231.38 29.66 0.00 29.66 1,211.83
Begesting
( Tot )
86.88 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
11.68 m3 2,214.68 90.65
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.45 3 469.48 79.71 0.00 79.71 2,214.68
151.44
235.57
151.44
0.00
1 83.29
1 111.05
1 83.29
1 45.43
1 60.57
1 45.43
Begesting
( Tot )
90.65 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
5.09 m3 1,023.77 48.34
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.35 2 223.18 57.10 0.00 57.10 1,023.77
Begesting
( Tot )
48.34 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
1.41 m3 386.43 14.70
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.25 2 100.29 26.22 0.00 26.22 386.43
15.42
24.68
15.42
0.00
1 9.64
1 12.85
1 9.64
Begesting
( Tot )
14.70 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
2.30 m3 229.95 134.63 28.75
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.35 2 92.96 12.28 0.00 12.28 455.33
34.82
64.99
34.82
90.75
Begesting
( Tot )
28.75 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
1.53 m3 270.43 68.14 25.50
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.25 2 108.91 14.19 0.00 14.19 445.90
19.17
29.81
19.17
107.33
Begesting
( Tot )
25.50 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
11.08 m3 2,079.84 89.54
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.45 3 441.07 74.98 0.00 74.98 2,079.84
142.19
221.18
142.19
0.00
1 78.20
1 104.27
1 78.20
1 42.66
1 56.88
1 42.66
Begesting
( Tot )
89.54 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
2.48 m3 481.79 23.56
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.35 2 105.75 27.75 0.00 27.75 481.79
34.76
55.61
34.76
0.00
1 12.64
1 16.85
1 12.64
Begesting
( Tot )
23.56 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
1.80 m3 564.94 30.00
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.25 4 255.69 -33.11 0.00 -33.11 564.94
19.73
31.57
19.73
0.00
1 21.58
1 28.77
1 21.58
1 12.33
1 16.44
1 12.33
Begesting
( Tot )
30.00 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
1.40 m3 286.05 17.50
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.35 2 57.45 7.84 0.00 7.84 286.05
21.19
39.56
21.19
0.00
1 12.14
1 16.18
1 12.14
1 6.74
1 8.99
1 6.74
Begesting
( Tot )
17.50 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
3.50 m3 649.79 33.00
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.65 2 127.12 17.84 0.00 17.84 649.79
Begesting
( Tot )
33.00 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
1.00 m3 237.30 10.00
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.45 2 53.12 8.30 0.00 8.30 237.30
17.26
23.02
17.26
47.74
1 0.00
1 0.00
1 0.00
Begesting
( Tot )
10.00 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
129.60 m3 31,905.07 896.40
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.75 4 7227.35 907.63 0.00 907.63 31,905.07
1955.04
2606.72
1955.04
3604.72
1 791.33
1 1055.10
1 791.33
1 325.84
1 434.45
1 325.84
Begesting
( Tot )
896.40 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
149.61 m3 28,893.62 1205.41
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.65 2 5448.26 682.99 0.00 682.99 28,893.62
2529.16
3372.21
2529.16
5440.50
1 421.53
1 562.04
1 421.53
Begesting
( Tot )
1205.41 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
129.60 m3 31,905.07 896.40
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.75 4 7227.35 907.63 0.00 907.63 31,905.07
1955.04
2606.72
1955.04
3604.72
1 791.33
1 1055.10
1 791.33
1 325.84
1 434.45
1 325.84
Begesting
( Tot )
896.40 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
149.61 m3 28,893.62 1205.41
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.65 2 5448.26 682.99 0.00 682.99 28,893.62
2529.16
3372.21
2529.16
5440.50
1 421.53
1 562.04
1 421.53
Begesting
( Tot )
1205.41 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
129.60 m3 31,905.07 896.40
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.75 4 7227.35 907.63 0.00 907.63 31,905.07
1955.04
2606.72
1955.04
3604.72
1 791.33
1 1055.10
1 791.33
1 325.84
1 434.45
1 325.84
Begesting
( Tot )
896.40 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
149.61 m3 28,893.62 1205.41
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.65 2 5448.26 682.99 0.00 682.99 28,893.62
2529.16
3372.21
2529.16
5440.50
1 421.53
1 562.04
1 421.53
Begesting
( Tot )
1205.41 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
129.60 m3 31,905.07 896.40
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.75 4 7227.35 907.63 0.00 907.63 31,905.07
1955.04
2606.72
1955.04
3604.72
1 791.33
1 1055.10
1 791.33
1 325.84
1 434.45
1 325.84
Begesting
( Tot )
896.40 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
149.61 m3 28,893.62 1205.41
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.65 2 5448.26 682.99 0.00 682.99 28,893.62
2529.16
3372.21
2529.16
5440.50
1 421.53
1 562.04
1 421.53
Begesting
( Tot )
1205.41 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.14 m3 24.83 12.50 3.60
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 12.50 0.00 0.00 0.00 37.33
3.75
5.00
3.75
0.00
Begesting
( Tot )
3.60 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
13.68 m3 3,043.55 96.90
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.75 4 698.27 91.49 0.00 91.49 3,043.55
184.50
246.00
184.50
340.18
1 74.68
1 99.57
1 74.68
1 30.75
1 41.00
1 30.75
Begesting
( Tot )
96.90 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
11.64 m3 2,122.80 96.43
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.65 2 404.64 52.53 0.00 52.53 2,122.80
184.50
246.00
184.50
396.88
1 30.75
1 41.00
1 30.75
Begesting
( Tot )
96.43 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
62.08 m3 11,728.95 349.20
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.75 4 2333.52 295.90 0.00 295.90 11,728.95
687.75
917.00
687.75
2315.62
1 254.17
1 338.89
1 254.17
1 134.56
1 179.41
1 134.56
Begesting
( Tot )
349.20 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
56.63 m3 12,719.22 471.88
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.55 2 2259.52 568.49 0.00 568.49 12,719.22
930.97
1241.30
930.97
2252.95
1 174.56
1 232.74
1 174.56
Begesting
( Tot )
471.88 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
1.86 m3 367.63 18.56
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.35 2 75.44 10.09 0.00 10.09 367.63
39.34
52.45
39.34
48.35
1 0.00
1 0.00
1 0.00
Begesting
( Tot )
18.56 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
2.52 m3 580.87 19.95
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.75 6 214.85 0.00 0.00 0.00 580.87
33.99
45.32
33.99
62.66
1 13.76
1 18.34
1 13.76
1 5.66
1 7.55
1 5.66
Begesting
( Tot )
19.95 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.60 m3 123.94 5.61
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.65 2 28.05 5.46 0.00 5.46 123.94
9.43
12.58
9.43
20.29
1 1.57
1 2.10
1 1.57
Begesting
( Tot )
5.61 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
29.31 m3 4,376.05 244.28
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.55 3 1467.70 0.00 0.00 0.00 4,376.05
426.71
568.95
426.71
514.06
1 0.00
1 0.00
1 0.00
Begesting
( Tot )
244.28 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
3.23 m3 541.38 38.70
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.45 3 156.97 0.00 0.00 0.00 541.38
64.62
86.16
64.62
67.21
1 0.00
1 0.00
1 0.00
Begesting
( Tot )
38.70 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.15 m3 26.31 13.24 3.82
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.07 2 13.24 0.00 0.00 0.00 39.56
3.97
5.30
3.97
0.00
Begesting
( Tot )
3.82 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
12.10 m3 2,695.32 85.68
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.75 4 619.49 81.64 0.00 81.64 2,695.32
163.14
217.51
163.14
300.79
1 66.03
1 88.04
1 66.03
1 27.19
1 36.25
1 27.19
Begesting
( Tot )
85.68 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
8.82 m3 1,612.79 73.08
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.65 2 308.55 40.52 0.00 40.52 1,612.79
139.83
186.44
139.83
300.79
1 23.31
1 31.07
1 23.31
Begesting
( Tot )
73.08 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
2.69 m3 530.16 26.88
hookTul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
tul.pokok tump.1 lap. tump.2 total
0.35 2 108.27 14.19 0.00 14.19 530.16
56.97
75.96
56.97
70.02
1 0.00
1 0.00
1 0.00
Begesting
( Tot )
26.88 m2
BANGUNAN :
ELV. + 0.00
jumlah 399.00
pengurang
jumlah 0.00
begesting = 32.10 m2
plat lt. 1 m2
ELV. + 4.50
jumlah 399.00
pengurang
Lift
tangga
Type K1
Type K3
Type BI-1 - 25 x 50 0.25 87.75 =
Type BI-2 - 20 x 40 0.2 39.5 =
Type BI-3 - 15 x 30 0.15 136 =
jumlah
plat lt. 1 Σ = 399.00 - 0.00 x
begesting = 399.00 m2
plat lt. 2 m2
ELV. + 8.00
jumlah 399.00
pengurang
Lift 26.32
tangga 80.10
Type K1 3.52
Type BI-1 - 25 x 50 0.25 69.45 = 17.36
Type BI-2 - 20 x 40 0.2 31.6 = 6.32
jumlah 133.62
begesting = 265.38 m2
ELV. + 8.00
jumlah 57.89
pengurang
Type BI-3 - 15 x 30 0.15 31.27 = 4.69
Type BI-1 - 25 x 50 0.25 24 = 6.00
Type BI-2 - 20 x 40 0.2 32 = 6.40
jumlah 17.09
begesting = 40.80 m2
plat lt. 3 m2
ELV. + 12.00
jumlah 1,961.04
pengurang
Lift 26.32
tangga 99.10
Type K2 3.52
Type BI-1 - 25 x 50 0.25 88.65 = 22.16
Type BI-2 - 20 x 40 0.2 -18.5 = -3.70
jumlah 147.40
begesting = 1,813.64 m2
ELV. + 8.00
jumlah 132.37
pengurang
Type BI-3 - 15 x 30 0.15 40 = 6.00
Type BA-1 - 20 x 40 0.2 17.5 = 3.50
Type B2K - 25 x 70 0.25 20 = 5.00
Type BI-2 - 20 x 40 0.2 49.5 = 9.90
jumlah 24.40
begesting = 107.97 m2
plat lt. 4 m2
ELV. + 16.00
jumlah 112.00
pengurang
Lift
tangga
Type K1
Type B1 - 30 x 80 0.3 540 =
Type B2 - 25 x 70 0.25 854.9 =
jumlah 0.00
begesting = 112.00 m2
ELV. + 20.00
jumlah 1,961.04
pengurang
Lift 26.32
tangga 99.10
#NAME? #NAME?
Type B1 - 30 x 80 0.3 540 = 162.00
Type B2 - 25 x 70 0.25 854.9 = 213.73
jumlah #NAME?
begesting = #NAME? m2
plat lt. 6 m2
ELV. + 24.00
jumlah 1,961.04
pengurang
Lift 26.32
tangga 99.10
#NAME? #NAME?
Type B1 - 30 x 80 0.3 540 = 162.00
Type B2 - 25 x 70 0.25 854.9 = 213.73
jumlah #NAME?
plat lt. 6 m2
ELV. + 28.00
jumlah 1,961.04
pengurang
Lift 26.32
tangga 99.10
#NAME? #NAME?
Type B1 - 30 x 80 0.3 540 = 162.00
Type B2 - 25 x 70 0.25 854.9 = 213.73
jumlah #NAME?
begesting = #NAME? m2
ELV. + 33.00
jumlah 1,020.43
pengurang
#NAME? #NAME?
Type B1 - 30 x 80 0.3 57 = 17.10
Type B2 - 25 x 70 0.25 66.5 = 16.63
Type B4 - 40 x 80 0.4 194 = 77.60
Type B5 - 25 x 60 0.25 377.5 = 94.38
Type B6 - 20 x 40 0.2 23.2 = 4.64
Type B1K - 30 x 80 0.3 10.5 = 3.15
Type B2K - 25 x 70 0.25 3.4 = 0.85
Type BK2 - 30 x 60 0.3 162.85 = 48.86
Type BKG - 20 x 50 0.2 32.25 = 6.45
Type BL 12 x 12 0.12 10.6 = 1.27
jumlah #NAME?
begesting = #NAME? m2
ELV. + 37.00
jumlah 144.16
pengurang
Type B1 - 30 x 80 0.3 50.4 = 15.12
Type B2 - 25 x 70 0.25 50.4 = 12.60
Type B6 - 20 x 40 0.2 33.6 = 6.72
jumlah 34.44
begesting = 109.72 m2
m3 horisontal D jrk kg/m' vertikal D jrk kg/m' pjg lbr tbl
0.15 = 59.85 m3
139.58 = 6,682.96 kg
0.12 = 31.85 m3
139.58 = 6,624.00 kg
139.58 = 891.05 kg
0.12 = 217.64 m3
139.58 = 32,787.03 kg
139.58 = 2,116.61 kg
0.12 = 13.44 m3
139.58 = 1,875.92 kg
m3 horisontal D jrk kg/m' vertikal D jrk kg/m' pjg lbr tbl
0.12 = #NAME? m3
139.58 = #NAME? kg
0.12 = #NAME? m3
139.58 = #NAME? kg
m3 horisontal D jrk kg/m' vertikal D jrk kg/m' pjg lbr tbl
0.12 = #NAME? m3
139.58 = #NAME? kg
139.58 = #NAME? kg
0.12 = 13.17 m3
139.58 = 2,414.57 kg
pjg besi pd pjg besi pd
jmlh besi jmlh besi
(m3) besi kg/m3 bentang pjg besi (kg) bentang lbr besi (kg) B1+B2 (kg)
bentang pjg bentang lbr
(m') (m')
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
pjg besi pd pjg besi pd
jmlh besi jmlh besi Vol. besi
bentang pjg besi (kg) bentang lbr besi (kg) B1+B2 (kg)
bentang pjg bentang lbr ats+bwh (kg)
(m') (m')
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
pjg besi pd pjg besi pd
jmlh besi jmlh besi Vol. besi
bentang pjg besi (kg) bentang lbr besi (kg) B1+B2 (kg)
bentang pjg bentang lbr ats+bwh (kg)
(m') (m')
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
pjg besi pd pjg besi pd
jmlh besi jmlh besi Vol. besi
bentang pjg besi (kg) bentang lbr besi (kg) B1+B2 (kg)
bentang pjg bentang lbr ats+bwh (kg)
(m') (m')
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
pjg besi pd pjg besi pd
jmlh besi jmlh besi Vol. besi
bentang pjg besi (kg) bentang lbr besi (kg) B1+B2 (kg)
bentang pjg bentang lbr ats+bwh (kg)
(m') (m')
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
pjg besi pd pjg besi pd
jmlh besi jmlh besi Vol. besi
bentang pjg besi (kg) bentang lbr besi (kg) B1+B2 (kg)
bentang pjg bentang lbr ats+bwh (kg)
(m') (m')
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
pjg besi pd pjg besi pd
jmlh besi jmlh besi Vol. besi
bentang pjg besi (kg) bentang lbr besi (kg) B1+B2 (kg)
bentang pjg bentang lbr ats+bwh (kg)
(m') (m')
54 8.00 267.99
54 8.00 267.99 535.98 1,071.95
PEKERJAAN TANGGA LT.1 - drop off dan ramp depan
Pekerjaan beton
panjang lebar tebal jumlah pengurang volume
PEK. RAMP DEPAN 14 6 0.12 2 20.16
utk drop off
∑ 45.77
PEMBESIAN TANGGA
D 16 -
D 10 -
tul.atas tump 3 D
lap 3 D
tump 3 D
tul.bwh tump 3 D
lap 3 D
tump 3 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
Pekerjaan beton
beton plat trap tangga 1
PEK. Tangga blkng lebar tinggi panjang jumlah volume
canopy teras belakang 4.2 0.18 5.20 1 3.93
beton plat bordes
luas tinggi jumlah volume
7.02 0.20 1 1.40
beton trap
lebar atas tinggi panjang jumlah volume
0.3 0.17 4.20 16 1.71
beton balok sloof
lebar tinggi panjang jumlah volume
0.25 0.6 4.20 1 0.63
∑ 16.69
PEMBESIAN TANGGA
D 16 -
D 10 -
lebar tinggi
(l) (t)
tul.atas tump 3 D
lap 3 D
tump 3 D
tul.bwh tump 3 D
lap 3 D
tump 3 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
Pekerjaan beton
jumlah total
jumlah total
PEMBESIAN TANGGA
D 16
Ø 12
beton trap Ø 8 - 20 = Ø
lebar tinggi
(l) (t)
tul.atas tump 2 D
lap 2 D
tump 2 D
tul.bwh tump 2 D
lap 2 D
tump 2 D
sengkang tump Ø 10 -
lap Ø 10 -
tump Ø 10 -
tul.susut / peminggang 2 D
lebar tinggi
(l) (t)
tul.atas tump 3 D
lap 3 D
tump 3 D
tul.bwh tump 3 D
lap 3 D
tump 3 D
sengkang tump Ø 10 -
lap Ø 10 -
tump Ø 10 -
tul.susut / peminggang 2 D
Rekap :
besi beton trap tangga
besi beton plat trap tangga / bordes
besi balok bordes
besi balok sloof
TOTAL BESI
jumlah total
jumlah total
PEMBESIAN TANGGA
D 16
Ø 12
beton trap Ø 8 - 20 = Ø
lebar tinggi
(l) (t)
tul.atas tump 2 D
lap 2 D
tump 2 D
tul.bwh tump 2 D
lap 2 D
tump 2 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
lebar tinggi
(l) (t)
tul.atas tump 3 D
lap 3 D
tump 3 D
tul.bwh tump 3 D
lap 3 D
tump 3 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
Rekap :
besi beton trap tangga
besi beton plat trap tangga / bordes
besi balok bordes
besi balok sloof
TOTAL BESI
jumlah total
jumlah total
PEMBESIAN TANGGA
D 16
D 12
beton trap Ø 8 - 20 = Ø
lebar tinggi
(l) (t)
tul.atas tump 2 D
lap 2 D
tump 2 D
tul.bwh tump 2 D
lap 2 D
tump 2 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
lebar tinggi
(l) (t)
tul.atas tump 3 D
lap 3 D
tump 3 D
tul.bwh tump 3 D
lap 3 D
tump 3 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
Rekap :
besi beton trap tangga
besi beton plat trap tangga / bordes
besi balok bordes
besi balok sloof
TOTAL BESI
Pekerjaan beton
jumlah total
jumlah total
PEMBESIAN TANGGA
D 16
D 12
beton trap Ø 8 - 20 = Ø
lebar tinggi
(l) (t)
tul.atas tump 2 D
lap 2 D
tump 2 D
tul.bwh tump 2 D
lap 2 D
tump 2 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
Rekap :
besi beton trap tangga
besi beton plat trap tangga / bordes
besi balok bordes
TOTAL BESI
jumlah total
jumlah total
PEMBESIAN TANGGA
D 16
D 12
beton trap Ø 8 - 20 = Ø
lebar tinggi
(l) (t)
tul.atas tump 2 D
lap 2 D
tump 2 D
tul.bwh tump 2 D
lap 2 D
tump 2 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
Rekap :
besi beton trap tangga
besi beton plat trap tangga / bordes
besi balok bordes
TOTAL BESI
3 Beton tangga lt.1 ke lt. 2 : type 3 ( as K - J : as 2 - 3 )
type 3 beton plat trap tangga
lebar tinggi panjang jumlah
2.33 0.18 7.28 1
beton plat bordes
lebar panjang tinggi jumlah
1.65 5 0.20 1
beton trap
lebar atas tinggi panjang jumlah
0.3 0.17 2.33 22
beton balok bordes BA4
lebar tinggi panjang jumlah
0.2 0.4 5.00 1
jumlah total
jumlah total
PEMBESIAN TANGGA
D 16
D 12
beton trap Ø 8 - 20 = Ø
lebar tinggi
(l) (t)
tul.atas tump 2 D
lap 2 D
tump 2 D
tul.bwh tump 2 D
lap 2 D
tump 2 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
Rekap :
besi beton trap tangga
besi beton plat trap tangga / bordes
besi balok bordes
TOTAL BESI
jumlah total
jumlah total
PEMBESIAN TANGGA
D 16
D 12
beton trap Ø 8 - 20 = Ø
lebar tinggi
(l) (t)
tul.atas tump 2 D
lap 2 D
tump 2 D
tul.bwh tump 2 D
lap 2 D
tump 2 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
lebar tinggi
(l) (t)
tul.atas tump 3 D
lap 3 D
tump 3 D
tul.bwh tump 3 D
lap 3 D
tump 3 D
sengkang tump D 10 -
lap D 10 -
tump D 10 -
tul.susut / peminggang 2 D
Rekap :
besi beton trap tangga
besi beton plat trap tangga / bordes
besi balok bordes
besi balok sloof
TOTAL BESI
1 Beton lift - Lt 01
pondasi batu belah lift
luas tinggi jumlah
24.95 0.8 1
Pembesian
dinding lift
As A'
begesting = 10 m2/m3 ats
Ø
Ø 12
Ø 10
Pembesian
pit lift
As A'
begesting = 1.02 m2/m3 ats
Ø
Ø 12
Ø 12
Balok sabuk
lebar tinggi panjang volume
(l) (t) (p) (v)
2 Beton lift - Lt 01
pondasi batu belah lift
luas tinggi jumlah
16.15 0.8 1
Pembesian
dinding lift
As A'
begesting = 10 m2/m3 ats
Ø
Ø 12
Ø 10
Pembesian
pit lift
As A'
begesting = 1.30 m2/m3 ats
Ø
Ø 12
Ø 12
Balok sabuk
lebar tinggi panjang volume
(l) (t) (p) (v)
3 Beton lift - Lt 01
pondasi batu belah lift
luas tinggi jumlah
17.26 0.8 1
Pembesian
dinding lift
As A'
begesting = 10 m2/m3 ats
Ø
Ø 12
Ø 10
Pembesian
pit lift
As A'
begesting = 1.27 m2/m3 ats
Ø
Ø 12
Ø 12
Balok sabuk
lebar tinggi panjang volume
(l) (t) (p) (v)
LANTAI 1
tul.utama 4 Ø 10
tul.atas tump 2 Ø 10
lap 2 Ø 10
tump 2 Ø 10
tul.bwh tump 2 Ø 10
lap 2 Ø 10
tump 2 Ø 10
sengkang tump Ø 8 - 0.10
lap Ø 8 - 0.150
tump Ø 8 - 0.10
tul.susut / peminggang D
tul.atas tump 2 Ø 10
lap 2 Ø 10
tump 2 Ø 10
tul.bwh tump 2 Ø 10
lap 2 Ø 10
tump 2 Ø 10
sengkang tump Ø 10 - 0.10
lap Ø 10 - 0.150
tump Ø 10 - 0.10
tul.susut / peminggang D
tul.utama 8 D 19
tul.utama 8 D 19
tul.utama 8 D 19
tul.utama 8 D 19
sat
m³ 720.57 kg 33.58 m2
sat
m³ 1,389.51 kg 43.16 m2
sat
m³ 3,380.11 kg 94.50 m2
sat
m³ 351.18 kg 43.33 m2
sat
m³ 174.91 kg 7.92 m2
sat
m³ 1,094.77 kg 34.01 m2
sat
m³ 1,028.34 kg 28.75 m2
sat
m³ 259.39 kg 31.88 m2
m³ 12,004.23 kg 485.13 m2
As A sample
bwh
jrk kg/m' Ø jrk kg/m' pjg lbr
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 6.600 m' 0.55 3 51.41 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 3 44.07 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 1.650 m' 16.28
0.125 0.62 3.300 m' 26.04
0.10 0.62 1.650 m' 16.28
16 1.58 6.600 m' 20.83
sat
m³ 703.06 kg 21.84 m2
sat
m³ 251.09 kg 7.02 m2
sat
m³ 167.61 kg 20.98 m2
sat
m³ 113.98 kg 5.04 m2
sat
m³ 328.55 kg 10.21 m2
sat
m³ 1,028.34 kg 28.75 m2
sat
m³ 139.67 kg 17.48 m2
m³ 2,732.30 kg 111.31 m2
As A sample
bwh
jrk kg/m' Ø jrk kg/m' pjg lbr
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 4.200 m' 0.55 3 35.39 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 3 28.04 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 1.050 m' 10.36
0.125 0.62 2.100 m' 16.57
0.10 0.62 1.050 m' 10.36
16 1.58 4.200 m' 13.26
volume sat
1.34 m³ 101.08 179.69
volume sat
1.09 m³ 122.48
volume sat
0.32 m³ 17.98 28.19
volume sat
0.39 m³ 23.20 52.98
volume sat
1.37 m³
volume sat
0.53 m³
volume sat
0.26 m³
volume sat
14.20 m2
volume sat
6.68 m2
volume sat
7.29 m2
volume sat
5.27 m2
volume sat
2.34 m2
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 4.050 m' 0.45 2 22.03 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 2 18.03 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 1.013 m' 9.36
0.125 0.62 2.025 m' 14.98
0.10 0.62 1.013 m' 9.36
16 1.58 4.050 m' 12.78
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 1.950 m' 0.55 3 20.37 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 3 13.02 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 0.488 m' 4.81
0.125 0.62 0.975 m' 7.69
0.10 0.62 0.488 m' 4.81
16 1.58 1.950 m' 6.16
polos ulir
= 122.48 kg 21.48 kg/m3
p tangga / bordes = 817.58 kg 143.39 kg/m3
= 86.56 kg 86.99 kg/m3
= 56.85 kg 145.05 kg/m3
Σ 960.99 kg
volume sat
1.34 m³ 101.08 179.69
volume sat
1.09 m³ 122.48
volume sat
0.32 m³ 17.98 28.19
volume sat
0.39 m³ 23.20 52.98
volume sat
1.37 m³
volume sat
0.53 m³
volume sat
0.26 m³
volume sat
14.20 m2
volume sat
6.68 m2
volume sat
7.29 m2
volume sat
5.27 m2
volume sat
2.34 m2
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 4.050 m' 0.45 2 22.03 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 2 18.03 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 1.013 m' 9.36
0.125 0.62 2.025 m' 14.98
0.10 0.62 1.013 m' 9.36
16 1.58 4.050 m' 12.78
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 1.950 m' 0.55 3 20.37 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 3 13.02 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 0.488 m' 4.81
0.125 0.62 0.975 m' 7.69
0.10 0.62 0.488 m' 4.81
16 1.58 1.950 m' 6.16
Σ 560.22 kg
volume sat
1.65 m³ 124.79 221.84
volume sat
1.31 m³ 146.35
volume sat
0.40 m³ 22.20 34.80
volume sat
0.47 m³ 27.72 63.31
volume sat
1.63 m³
volume sat
0.63 m³
volume sat
0.31 m³
volume sat
16.96 m2
volume sat
8.25 m2
volume sat
8.71 m2
volume sat
6.50 m2
volume sat
2.80 m2
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 5.000 m' 0.45 2 26.26 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 2 22.26 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 1.250 m' 11.56
0.125 0.62 2.500 m' 18.50
0.10 0.62 1.250 m' 11.56
16 1.58 5.000 m' 15.78
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 2.330 m' 0.55 3 22.90 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 3 15.56 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 0.583 m' 5.75
0.125 0.62 1.165 m' 9.19
0.10 0.62 0.583 m' 5.75
16 1.58 2.330 m' 7.36
Σ 589.23 kg
volume sat
1.34 m³ 101.08 179.69
volume sat
1.09 m³ 122.48
volume sat
0.32 m³ 17.98 28.19
volume sat
14.20 m2
volume sat
6.68 m2
volume sat
7.29 m2
volume sat
5.27 m2
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 4.050 m' 0.45 2 22.03 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 2 18.03 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 1.013 m' 9.36
0.125 0.62 2.025 m' 14.98
0.10 0.62 1.013 m' 9.36
16 1.58 4.050 m' 12.78
Σ 503.37 kg
volume sat
2.56 m³
volume sat
1.34 m³
volume sat
1.09 m³
volume sat
0.32 m³
5.31 m³
volume sat
14.20 m2
volume sat
6.68 m2
volume sat
7.29 m2
volume sat
5.27 m2
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 4.050 m' 0.45 2 22.03 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 2 18.03 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 1.013 m' 9.36
0.125 0.62 2.025 m' 14.98
0.10 0.62 1.013 m' 9.36
16 1.58 4.050 m' 12.78
Σ 503.37 kg
volume sat
1.65 m³ 124.79 221.84
volume sat
1.31 m³ 146.35
volume sat
0.40 m³ 22.20 34.80
volume sat
16.96 m2
volume sat
8.25 m2
volume sat
8.71 m2
volume sat
6.50 m2
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
Σ 522.73 kg
volume sat
1.44 m³ 108.91 193.61
volume sat
1.01 m³ 113.06
volume sat
0.32 m³ 17.76 27.84
volume sat
13.10 m2
volume sat
7.20 m2
volume sat
6.73 m2
volume sat
5.20 m2
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4
( kg ) tul.pokok tump.1 lap. tump.2
19 2.23 4.000 m' 0.45 2 21.81 0.00 0.00 0.00
19 2.23
19 2.23
19 2.23 2 17.81 0.00 0.00 0.00
19 2.23
19 2.23
0.10 0.62 1.000 m' 9.25
0.125 0.62 2.000 m' 14.80
0.10 0.62 1.000 m' 9.25
16 1.58 4.000 m' 12.63
Σ #REF! kg
pjg lbr
volume sat 5.20 2.2
19.96 m³ 6.30 3.3
7.10 4.1
5.60 3
volume sat
5.82 m³
volume sat
2.91 m³
volume sat
3.36 m³
volume sat
6.80 m³
volume sat
1.36 m³
volume sat
2.29 m³
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
pjg balok utk hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
1 m3 beton tul.pokok tump.1 lap. tump.2 kg/m3
12.50 m' 0.80 3.00 62.98 0.00 0.00 0.00 169.27
Begesting
m2
12.50
Begesting
m2
12.50
pjg lbr
volume sat 2.40 2.6
12.92 m³ 3.50 3.7
4.30 4.5
2.80 3.4
volume sat
3.87 m³
volume sat
1.94 m³
volume sat
1.90 m³
volume sat
4.00 m³
volume sat
0.80 m³
volume sat
2.29 m³
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
pjg balok utk hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
1 m3 beton tul.pokok tump.1 lap. tump.2 kg/m3
12.50 m' 0.80 3.00 62.98 0.00 0.00 0.00 169.27
Begesting
m2
12.50
Begesting
m2
12.50
pjg lbr
volume sat 2.30 3
13.81 m³ 3.40 4.1
4.20 4.9
2.70 3.8
volume sat
4.12 m³
volume sat
2.06 m³
volume sat
2.05 m³
volume sat
4.24 m³
volume sat
0.85 m³
volume sat
2.29 m³
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
As A' As A sample
ats bwh
jrk kg/m' Ø jrk kg/m' pjg
pjg balok utk hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
1 m3 beton tul.pokok tump.1 lap. tump.2 kg/m3
12.50 m' 0.80 3.00 62.98 0.00 0.00 0.00 169.27
0.40 3.00 61.08 0.00 0.00 0.00
Begesting
m2
12.50
Begesting
m2
12.50
volume sat
0.42 m³
volume sat
9.45 m³
berat / m' besi kolom Tul. pokok besi besi Type KS Besi Total
( kg ) (t) tul.pokok kg ( bh ) ∑ ( kg )
0.62 3.85 m' 4.00 9.49 16.08 5 80.39
berat / m' pjg balok Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
( kg ) tul.pokok tump.1 lap. tump.2 total
0.62 5.00 m' 2 6.17 0.00 0.00 0.00 21.21
0.62
0.62
0.62 2 6.17 0.00 0.00 0.00
0.62
0.62
0.39 1.25 m' 2.66
0.39 2.50 m' 3.55
0.39 1.25 m' 2.66
0.00 5.00 m' 0.00
pengurang Begesting
plat beton ( Tot )
2.00 m2
Volm Tot
( V tot ) besi ulir besi polos begesting
kg kg m2
0.07 m3 22.27 1.20
berat / m' pjg balok hook Tul. pokok besi hit. 1 besi hit. 2 besi hit. 3 besi hit. 4 besi
( kg ) tul.pokok tump.1 lap. tump.2 total
0.62 5.00 m' 0.07 2 6.34 0.00 0.00 0.00 22.27
0.62
0.62
0.62 2 6.17 0.00 0.00 0.00
0.62
0.62
0.62 1.25 m' 2.93
0.62 2.50 m' 3.90
0.62 1.25 m' 2.93
0.00 5.00 m' 0.00
pengurang Begesting
plat beton ( Tot )
1.20 m2
stek volume Type K1 Volm Tot
besi (v) ( bh ) ( V tot ) besi ulir besi polos begesting total
kg kg m2
0.48 3 1.44 m3 213.67 108.51 14.40
berat / m' besi kolom Tul. pokok besi besi Type K1 Besi Total
( kg ) (t) tul.pokok kg ( bh ) ∑ ( kg )
2.23 4.000 m' 8 71.22 107.39 3 322.18
berat / m' besi kolom Tul. pokok besi besi Type K2 Besi Total
( kg ) (t) tul.pokok kg ( bh ) ∑ ( kg )
2.23 4.000 m' 8 71.22 113.97 2 227.94
berat / m' besi kolom Tul. pokok besi besi Type K1 Besi Total
( kg ) (t) tul.pokok kg ( bh ) ∑ ( kg )
2.23 4.000 m' 8 71.22 107.39 4 429.57
berat / m' besi kolom Tul. pokok besi besi Type K1 Besi Total
( kg ) (t) tul.pokok kg ( bh ) ∑ ( kg )
2.23 4.000 m' 8 71.22 107.39 4 429.57
kg
= 284.10
= 67.08
Σ 351.18 97.81 kg/m3
begesting
m2
7.92
besi
total
174.91 176.68 kg/m3
V besi Pembesian
(volume ) kg/m3 atas As A'
tbl (m3) jmlh besi pjg besi pd besi jmlh besi pjg besi pd
btng pjg btng lbr
btng pjg (kg) btng lbr
(m') (m')
kg
= 183.09
= 43.40
begesting
m2
5.04
besi
total
113.98 180.92 kg/m3
sample V besi besi
(volume ) kg/m3 kg/m3 atas As A'
lbr tbl (m3) polos ulir jmlh besi pjg besi pd besi jmlh besi
btng pjg btng pjg (m') (kg) btng lbr
jmlh trap kg
22.00 = 93.32
22.00 = 29.16
begesting
m2
5.27
besi
total
86.56
begesting
m2
2.34
besi
total
56.85
sample V besi
(volume ) kg/m3 atas As A'
lbr tbl (m3) jmlh besi pjg besi pd besi jmlh besi
btng pjg btng pjg (m') (kg) btng lbr
jmlh trap kg
22.00 = 93.32
22.00 = 29.16
Σ 122.48 kg
begesting
m2
5.27
besi
total
86.56
begesting
m2
2.34
besi
total
56.85
sample V besi
(volume ) kg/m3 atas As A'
lbr tbl (m3) jmlh besi pjg besi pd besi jmlh besi
btng pjg btng pjg (m') (kg) btng lbr
jmlh trap kg
22.00 = 109.81
22.00 = 34.32
Σ 144.13 kg
begesting
m2
6.50
besi
total
105.92
begesting
m2
2.80
besi
total
66.50
sample V besi
(volume ) kg/m3 atas As A'
lbr tbl (m3) jmlh besi pjg besi pd besi jmlh besi
btng pjg btng pjg (m') (kg) btng lbr
jmlh trap kg
22.00 = 93.32
22.00 = 29.16
Σ 122.48 kg
begesting
m2
5.27
besi
total
86.56
sample V besi
(volume ) kg/m3 atas As A'
lbr tbl (m3) jmlh besi pjg besi pd besi jmlh besi
btng pjg btng pjg (m') (kg) btng lbr
jmlh trap kg
22.00 = 93.32
22.00 = 29.16
Σ 122.48 kg
begesting
m2
5.27
besi
total
86.56
sample V besi
(volume ) kg/m3 atas As A'
lbr tbl (m3) jmlh besi pjg besi pd besi jmlh besi
btng pjg btng pjg (m') (kg) btng lbr
jmlh trap kg
22.00 = 109.81
22.00 = 34.32
Σ 144.13 kg
begesting
m2
6.50
besi
total
105.92
sample V besi
(volume ) kg/m3 atas As A'
lbr tbl (m3) jmlh besi pjg besi pd besi jmlh besi
btng pjg btng pjg (m') (kg) btng lbr
jmlh trap kg
22.00 = 86.81
22.00 = 27.13
Σ 113.94 kg
begesting
m2
5.20
besi
total
85.54
begesting
m2
#REF!
besi
total
#REF!
sample besi besi
V (volume )
total ( kg ) kg/m3 jmlh besi pjg besi pd atas
jmlh As
besiA'
lbr tbl (m3) bentang bentang pjg besi (kg) bentang
pjg (m') lbr
1.5 x 0.2 = 0.45 11 1.50 14.65
1.5 x 0.2 = 0.45 110.32 11
besi besi
polos ulir
45.21 124.06
kg/m3 kg/m3
sample besi besi
V (volume )
total ( kg ) kg/m3 jmlh besi pjg besi pd atas
jmlh As
besiA'
lbr tbl (m3) bentang bentang pjg besi (kg) bentang
pjg (m') lbr
1.5 x 0.2 = 0.45 11 1.50 14.65
1.5 x 0.2 = 0.45 110.32 11
sample besi besi
V (volume )
total ( kg ) kg/m3 jmlh besi pjg besi pd atas
jmlh As
besiA'
lbr tbl (m3) bentang bentang pjg besi (kg) bentang
pjg (m') lbr
1.5 x 0.2 = 0.45 11 1.50 14.65
1.5 x 0.2 = 0.45 130.21 11
besi besi
polos ulir
45.21 124.06
kg/m3 kg/m3
sample besi besi
V (volume )
total ( kg ) kg/m3 jmlh besi pjg besi pd atas
jmlh As
besiA'
lbr tbl (m3) bentang bentang pjg besi (kg) bentang
pjg (m') lbr
1.5 x 0.2 = 0.45 11 1.50 14.65
1.5 x 0.2 = 0.45 110.32 11
besi besi
polos ulir
45.21 124.06
kg/m3 kg/m3
bawah As A
besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2 Vol. besi
btng lbr ats+bwh
(kg) (kg) btng pjg btng pjg (m') (kg) btng lbr (kg) (kg)
(m') (kg)
11 1.50 26.04
10.17 36.22 11 1.50 10.17 36.22 72.43
bawah As A
besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2 Vol. besi
btng lbr ats+bwh
(kg) (kg) btng pjg btng pjg (m') (kg) btng lbr (kg) (kg)
(m') (kg)
11 1.50 26.04
10.17 36.22 11 1.50 10.17 36.22 72.43
Pembesian
atas As A' bawah As A
pjg besi pd besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2
btng lbr (m') (kg) (kg) btng pjg btng pjg (m') (kg) btng lbr btng lbr (m') (kg) (kg)
37.81
Pembesian
atas As A' bawah As A
pjg besi pd besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2
btng lbr (m') (kg) (kg) btng pjg btng pjg (m') (kg) btng lbr btng lbr (m') (kg) (kg)
11 1.50 26.04
1.50 14.65 40.69 11 1.50 14.65 40.69
Pembesian
atas As A' bawah As A
pjg besi pd besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2
btng lbr (m') (kg) (kg) btng pjg btng pjg (m') (kg) btng lbr btng lbr (m') (kg) (kg)
11 1.50 26.04
1.50 14.65 40.69 11 1.50 14.65 40.69
Pembesian
atas As A' bawah As A
pjg besi pd besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2
btng lbr (m') (kg) (kg) btng pjg btng pjg (m') (kg) btng lbr btng lbr (m') (kg) (kg)
11 1.50 26.04
1.50 14.65 40.69 11 1.50 14.65 40.69
Pembesian
atas As A' bawah As A
pjg besi pd besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2
btng lbr (m') (kg) (kg) btng pjg btng pjg (m') (kg) btng lbr btng lbr (m') (kg) (kg)
11 1.50 26.04
1.50 14.65 40.69 11 1.50 14.65 40.69
Pembesian
atas As A' bawah As A
pjg besi pd besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2
btng lbr (m') (kg) (kg) btng pjg btng pjg (m') (kg) btng lbr btng lbr (m') (kg) (kg)
11 1.50 26.04
1.50 14.65 40.69 11 1.50 14.65 40.69
Pembesian
atas As A' bawah As A
pjg besi pd besi B1+B2 jmlh besi pjg besi pd besi jmlh besi pjg besi pd besi B1+B2
btng lbr (m') (kg) (kg) btng pjg btng pjg (m') (kg) btng lbr btng lbr (m') (kg) (kg)
11 1.50 26.04
1.50 14.65 40.69 11 1.50 14.65 40.69
Pembesian
atas As A' pjg besi pd pjg besi pd bawah As A pjg besi pd
jmlh besi jmlh besi B1+B2
bentang lbr besi (kg) B1+B2 (kg) bentang pjg besi (kg) bentang lbr besi (kg)
bentang pjg bentang lbr (kg)
(m') (m') (m')
11 1.50 14.65
1.50 10.17 24.82 11 1.50 10.17 24.82
Pembesian
atas As A' pjg besi pd pjg besi pd bawah As A pjg besi pd
jmlh besi jmlh besi B1+B2
bentang lbr besi (kg) B1+B2 (kg) bentang pjg besi (kg) bentang lbr besi (kg)
bentang pjg bentang lbr (kg)
(m') (m') (m')
11 1.50 14.65
1.50 14.65 29.30 11 1.50 14.65 29.30
Pembesian
atas As A' pjg besi pd pjg besi pd bawah As A pjg besi pd
jmlh besi jmlh besi B1+B2
bentang lbr besi (kg) B1+B2 (kg) bentang pjg besi (kg) bentang lbr besi (kg)
bentang pjg bentang lbr (kg)
(m') (m') (m')
11 1.50 14.65
1.50 10.17 24.82 11 1.50 10.17 24.82
Pembesian
atas As A' pjg besi pd pjg besi pd bawah As A pjg besi pd
jmlh besi jmlh besi B1+B2
bentang lbr besi (kg) B1+B2 (kg) bentang pjg besi (kg) bentang lbr besi (kg)
bentang pjg bentang lbr (kg)
(m') (m') (m')
11 1.50 14.65
1.50 14.65 29.30 11 1.50 14.65 29.30
Pembesian
atas As A' pjg besi pd pjg besi pd bawah As A pjg besi pd
jmlh besi jmlh besi B1+B2
bentang lbr besi (kg) B1+B2 (kg) bentang pjg besi (kg) bentang lbr besi (kg)
bentang pjg bentang lbr (kg)
(m') (m') (m')
11 1.50 14.65
1.50 10.17 24.82 11 1.50 10.17 24.82
Pembesian
atas As A' pjg besi pd pjg besi pd bawah As A pjg besi pd
jmlh besi jmlh besi B1+B2
bentang lbr besi (kg) B1+B2 (kg) bentang pjg besi (kg) bentang lbr besi (kg)
bentang pjg bentang lbr (kg)
(m') (m') (m')
11 1.50 14.65
1.50 14.65 29.30 11 1.50 14.65 29.30
Vol. besi
ats+bwh (kg)
24.20 ulir
13.61 polos
210.08
Vol. besi
ats+bwh (kg)
81.38
Vol. besi
ats+bwh (kg)
81.38
Vol. besi
ats+bwh (kg)
81.38
Vol. besi
ats+bwh (kg)
81.38
Vol. besi
ats+bwh (kg)
81.38
Vol. besi
ats+bwh (kg)
81.38
Vol. besi
ats+bwh (kg)
49.64
Vol. besi
ats+bwh (kg)
58.60
Vol. besi
ats+bwh (kg)
49.64
Vol. besi
ats+bwh (kg)
58.60
Vol. besi
ats+bwh (kg)
49.64
Vol. besi
ats+bwh (kg)
58.60
PERHITUNGAN STRUKTUR ATAP
TYPE berat
kolom IWF kg/m'
dimensi Type
LAIN - LAIN :
volume
Gording :
TYPE
gording
dimensi Type panjang double / single
TOTAL Gording
volume
TOTAL
TYPE berat
kolom IWF kg/m'
dimensi Type
LAIN - LAIN :
volume
TOTAL Gording
volume
TOTAL
TYPE berat
kolom IWF kg/m'
dimensi Type
LAIN - LAIN :
volume
Gording :
TYPE
gording
dimensi Type panjang double / single
TOTAL Gording
volume
TYPE tebal / dimensi luas , panjang berat / kg jumlah = bh
TOTAL
19.28 x 4 2,283
12.60 x 3 1,119
23.70 x 9 6,314
18.56 x 2 1,099
17.92 x 2 1,061
9.65 x 2 571
6.27 x 4 742
2.96 x 4 350
13.88 x 4 1,643
jumlah total
berat kuda 2
tinggi kolom
(kg)
1.10 x 47 1,530
0.68 x 1 20
0.99 x 4 117
berat berat
kg kg
toleransi
jumlah
5%
440.86
0.00
347.21
32.41
107.15
1,575.65
91.92
91.92
912.88
3,600.00
11.00 = 12,833.37
berat berat
kg kg
toleransi
jumlah
5%
216.03
55.04
271.08
jumlah total
berat kuda 2
panjang kuda 2 (bh)
(kg)
18.54 x 2 1,098
10.54 x 1 312
5.47 x 2 324
3.14 x 2 186
7.15 x 2 423
jumlah total
berat kuda 2
tinggi kolom
(kg)
1.20 x 8 284
berat berat
kg kg
toleransi
jumlah
5%
67.82
0.00
53.42
4.99
16.49
242.41
15.91
10.61
19.10
430.73
berat berat berat
kg/m' kg kg
jumlah jumlah toleransi 10%
11.00 = 1,061.50
berat berat
kg kg
toleransi
jumlah
5%
36.99
9.43
46.42
jumlah total
berat kuda 2
panjang kuda 2 (bh)
(kg)
27.38 x 3 2,431
14.96 x 1 443
9.38 x 2 555
10.79 x 2 639
3.14 x 2 186
12.74 x 2 754
jumlah total
berat kuda 2
tinggi kolom
(kg)
1.20 x 13 462
berat berat
kg kg
toleransi
jumlah
5%
110.21
0.00
86.80
8.10
26.79
393.91
25.85
17.24
94.70
763.61
11.00 = 1,822.70
berat berat
kg kg
toleransi
jumlah
5%
59.19
15.08
74.27
PERHITUNGAN PASANGAN BATA
Lantai 1
BALAI LITBANGKES BATURAJA
PEKERJAAN LANTAI DASAR
Panjang AS
horizontal eksterior 20.80
vertikal eksterior 21.20
horizontal interior 138.00
vertikal interior 148.00
TOTAL 42.00
3 Urugan kembali
galian perhitungan volume satuan
49.14 0.33 49,14 x 0,333333333333333 16.38 m³ <--- sepertiga volume galian
5 Lantai kerja
lebar tinggi panjang perhitungan volume satuan
TANAH 0.8 0.1 305.00 0,8 x 0,1 x 305 24.40 m³
TOTAL 24.40 m³
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. Dasar
33.00 2 33 x 2 66 m2
66.00
TOTAL 66.00 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. Dasar
dinding bata 215.36 2.00 ( 215,364 x 2 ) - 430.73 m2
430.73
TOTAL 430.73 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. Dasar 496.73 496,728 - 496.73 m2
TOTAL 496.73 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. Dasar 4.00 4.00 896.00 ( 4 x 4 ) + ( 896 + ) 912.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Sloof
Lt. Dasar 0.15 0.20 ( ( 0,15 x 0,2 ) x 0.00 m3
Kolom 62.00
Lt. Dasar 0.15 0.15 4.00 38.00 ( ( 0,15 x 0,15 ) x ( 38 x 4 ) 3.42 m3
Balok Latai
Lt. Dasar 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 3.42
III. PEKERJAAN FINISHING LANTAI DAN DINDING
1 Finishing Lantai
Lt. Dasar
Lantai lapis polymer epoxy 20 luas panjang lebar perhitungan volume satuan
1000 micron 24.00 32.00 24 x 32 768.00 m2
8.00 24.00 192.00 m2
16.00 7.50 120.00 m2
4.00 40.00 160.00 m2
7.50 40.00 300.00 m2
15.36 TOTAL 1524.64
4 Plint Cat
panjang pengurangan kusen Volume Satuan
Lt. Dasar
Plint Biasa 0.00 0.00 m'
Plint Partisi 0.00 m'
TOTAL 0.00 m'
6 Pas. ACP
Lt. Dasar
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
belakang 17.40 4.20 ( 17,4 x 4,2 ) - ( + ) m2
depan 14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
TOTAL 57.20 m'
7 Pas. Roster
Lt. Dasar
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
18.85 3.00 ( 18,85 x 3 ) - ( + ) 56.55 m2
18.85 3.00 ( 18,85 x 3 ) - ( + ) 56.55 m2
17.10 3.00 ( 17,1 x 3 ) - ( + ) 51.30 m2
TOTAL 164.40 m'
8 Batu andhesit
Lt. Dasar
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
32.60 4.00 ( 32,6 x 4 ) - ( + ) 130.40 m2
12.30 4.00 ( 12,3 x 4 ) - ( + ) 49.20 m2
17.80 2.00 ( 17,8 x 2 ) - ( + ) 35.60 m2
21.80 4.00 ( 21,8 x 4 ) - ( + ) 87.20 m2
23.60 2.50 ( 23,6 x 2,5 ) - ( + ) 59.00 m2
18.40 2.50 ( 18,4 x 2,5 ) - ( + ) 46.00 m2
TOTAL 407.40 m'
10 Dinding HT 30x60
Lt. Dasar
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
70.50 3.00 8.40 ( 70,5 x 3 ) - ( 8,4 + ) 203.10 m2
TOTAL 203.10 m'
11 HT 80x80 (lift)
Lt. Dasar
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
16.10 3.00 9.00 ( 16,1 x 3 ) - ( 9 + ) 39.30 m2
TOTAL 39.30 m'
PEKERJAAN LANTAI 01
Panjang AS
horizontal eksterior 20.80
vertikal eksterior 21.20
horizontal interior 161.00
vertikal interior 171.80
TOTAL 42.00
2 Pas bata 1 : 5
Lt. 01
lav 22.00 2.38 ( 22 x 2,38 ) - 52.36
non lav 25.00 3.88 ( 25 x 3,88 ) - 97.00
40.96 108.40
TOTAL 108.40 m²
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. 01
33.00 2 33 x 2 66 m2
66.00
TOTAL 66.00 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. 01
dinding bata 108.40 2.00 ( 108,4 x 2 ) - 216.80 m2
216.80
TOTAL 216.80 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. 01 282.80 282,8 - 282.80 m2
TOTAL 282.80 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. 01 4.00 7.00 896.00 ( 4 x 7 ) + ( 896 + ) 924.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Kolom 72.00
Lt. 01 0.15 0.15 4.00 38.00 ( ( 0,15 x 0,15 ) x ( 38 x 4 ) 3.42 m3
Balok Latai
Lt. 01 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 3.42
1 Finishing Lantai
Lt. 01
4 Plint Cat
panjang pengurangan kusen Volume Satuan
Lt. 01
Plint Biasa 0.00 0.00 m'
Plint Partisi 0.00 m'
TOTAL 0.00 m'
5 Dinding lapis slimstone
Lt. 01
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
62.30 4.00 ( 62,3 x 4 ) - ( + ) m2
130.30 1.35 ( 130,3 x 1,35 ) - ( + ) m2
11.20 4.00 ( 11,2 x 4 ) - ( + ) m2
14.00 4.00 ( 14 x 4 ) - ( + ) m2
15.90 4.00 ( 15,9 x 4 ) - ( + ) 63.60 m2
4.75 1.30 ( 4,75 x 1,3 ) - ( + ) 6.18 m2
14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
TOTAL 126.98 m'
6 Pas. ACP
Lt. 01
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
belakang 17.40 4.20 ( 17,4 x 4,2 ) - ( + ) m2
depan 14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
TOTAL 57.20 m'
PEKERJAAN LANTAI 02
Panjang AS
horizontal eksterior 20.80
vertikal eksterior 21.20
horizontal interior 161.00
vertikal interior 171.80
TOTAL 42.00
2 Pas bata 1 : 5
Lt. 02
lav 25.00 2.38 ( 25 x 2,38 ) - 59.50
non lav 17.00 3.88 ( 17 x 3,88 ) - 65.96
40.96 84.50
TOTAL 84.50 m²
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. 02
37.50 2 37,5 x 2 75 m2
75.00
TOTAL 75.00 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. 02
dinding bata 84.50 2.00 ( 84,5 x 2 ) - 169.00 m2
169.00
TOTAL 169.00 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. 02 244.00 244 - 244.00 m2
TOTAL 244.00 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. 02 4.00 8.00 896.00 ( 4 x 8 ) + ( 896 + ) 928.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Kolom 50.00
Lt. 02 0.15 0.15 4.00 38.00 ( ( 0,15 x 0,15 ) x ( 38 x 4 ) 3.42 m3
Balok Latai
Lt. 02 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 3.42
1 Finishing Lantai
Lt. 02
4 Plint Cat
panjang pengurangan kusen Volume Satuan
Lt. 02
Plint Biasa 0.00 0.00 m'
Plint Partisi 0.00 m'
TOTAL 0.00 m'
6 Pas. ACP
Lt. 02
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
belakang 17.40 4.20 ( 17,4 x 4,2 ) - ( + ) m2
depan 14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
TOTAL 57.20 m'
PEKERJAAN LANTAI 03
Panjang AS
horizontal eksterior 19.20
vertikal eksterior 19.80
horizontal interior 161.00
vertikal interior 171.80
TOTAL 39.00
2 Pas bata 1 : 5
Lt. 03
lav 25.00 2.38 ( 25 x 2,38 ) - 59.50
non lav 14.00 3.88 ( 14 x 3,88 ) - 54.32
40.96 72.86
TOTAL 72.86 m²
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. 03
37.50 2 37,5 x 2 75 m2
75.00
TOTAL 75.00 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. 03
dinding bata 72.86 2.00 ( 72,86 x 2 ) - 145.72 m2
145.72
TOTAL 145.72 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. 03 220.72 220,72 - 220.72 m2
TOTAL 220.72 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. 03 4.00 8.00 896.00 ( 4 x 8 ) + ( 896 + ) 928.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Kolom 50.00
Lt. 03 0.15 0.15 4.00 38.00 ( ( 0,15 x 0,15 ) x ( 38 x 4 ) 3.42 m3
Balok Latai
Lt. 03 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 3.42
1 Finishing Lantai
Lt. 03
4 Plint Cat
panjang pengurangan kusen Volume Satuan
Lt. 03
Plint Biasa 0.00 0.00 m'
Plint Partisi 0.00 m'
TOTAL 0.00 m'
5 Pas. ACP
Lt. 03
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
belakang 17.40 4.00 ( 17,4 x 4 ) - ( + ) m2
depan 14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
ZONA E 7.90 4.00 ( 7,9 x 4 ) - ( + ) m2
ZONA E 5.60 4.00 ( 5,6 x 4 ) - ( + ) m2
ZONA E 8.80 4.00 ( 8,8 x 4 ) - ( + ) m2
ZONA E 5.20 4.00 ( 5,2 x 4 ) - ( + ) m2
ZONA D 19.60 4.00 ( 19,6 x 4 ) - ( + ) m2
ZONA D 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA C 3.00 4.00 (3x4) - ( + ) m2
ZONA C 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA B 4.50 4.00 ( 4,5 x 4 ) - ( + ) 18.00 m2
ZONA B 4.00 4.00 (4x4) - ( + ) 16.00 m2
ZONA A 7.80 4.00 ( 7,8 x 4 ) - ( + ) 31.20 m2
ZONA A 4.80 4.00 ( 4,8 x 4 ) - ( + ) 19.20 m2
ZONA A 2.40 4.00 ( 2,4 x 4 ) - ( + ) 9.60 m2
ZONA A 3.40 4.00 ( 3,4 x 4 ) - ( + ) 13.60 m2
ZONA A 10.40 4.00 ( 10,4 x 4 ) - ( + ) 41.60 m2
ZONA A 5.20 4.00 ( 5,2 x 4 ) - ( + ) 20.80 m2
ZONA A 3.00 4.00 (3x4) - ( + ) 12.00 m2
ZONA A 7.60 4.00 ( 7,6 x 4 ) - ( + ) 30.40 m2
TOTAL 269.60 m'
PEKERJAAN LANTAI 04
Panjang AS
horizontal eksterior 19.20
vertikal eksterior 19.80
horizontal interior 158.00
vertikal interior 168.80
TOTAL 39.00
2 Pas bata 1 : 5
Lt. 04
lav 25.00 2.38 ( 25 x 2,38 ) - 59.50
non lav 14.00 3.88 ( 14 x 3,88 ) - 54.32
40.96 72.86
TOTAL 72.86 m²
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. 04
37.50 2 37,5 x 2 75 m2
75.00
TOTAL 75.00 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. 04
dinding bata 72.86 2.00 ( 72,86 x 2 ) - 145.72 m2
145.72
TOTAL 145.72 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. 04 220.72 220,72 - 220.72 m2
TOTAL 220.72 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. 04 4.00 8.00 896.00 ( 4 x 8 ) + ( 896 + ) 928.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Kolom 50.00
Lt. 04 0.15 0.15 4.00 38.00 ( ( 0,15 x 0,15 ) x ( 38 x 4 ) 3.42 m3
Balok Latai
Lt. 04 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 3.42
1 Finishing Lantai
Lt. 04
4 Plint Cat
panjang pengurangan kusen Volume Satuan
Lt. 04
Plint Biasa 0.00 0.00 m'
Plint Partisi 0.00 m'
TOTAL 0.00 m'
5 Pas. ACP
Lt. 04
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
belakang 17.40 4.00 ( 17,4 x 4 ) - ( + ) m2
depan 14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
ZONA E 7.90 4.00 ( 7,9 x 4 ) - ( + ) m2
ZONA E 5.60 4.00 ( 5,6 x 4 ) - ( + ) m2
ZONA E 8.80 4.00 ( 8,8 x 4 ) - ( + ) m2
ZONA E 5.20 4.00 ( 5,2 x 4 ) - ( + ) m2
ZONA D 19.60 4.00 ( 19,6 x 4 ) - ( + ) m2
ZONA D 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA C 3.00 4.00 (3x4) - ( + ) m2
ZONA C 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA B 4.50 4.00 ( 4,5 x 4 ) - ( + ) 18.00 m2
ZONA B 4.00 4.00 (4x4) - ( + ) 16.00 m2
ZONA A 7.80 4.00 ( 7,8 x 4 ) - ( + ) 31.20 m2
ZONA A 4.80 4.00 ( 4,8 x 4 ) - ( + ) 19.20 m2
ZONA A 2.40 4.00 ( 2,4 x 4 ) - ( + ) 9.60 m2
ZONA A 3.40 4.00 ( 3,4 x 4 ) - ( + ) 13.60 m2
ZONA A 10.40 4.00 ( 10,4 x 4 ) - ( + ) 41.60 m2
ZONA A 5.20 4.00 ( 5,2 x 4 ) - ( + ) 20.80 m2
ZONA A 3.00 4.00 (3x4) - ( + ) 12.00 m2
ZONA A 7.60 4.00 ( 7,6 x 4 ) - ( + ) 30.40 m2
TOTAL 269.60 m'
PEKERJAAN LANTAI 05
Panjang AS
horizontal eksterior 19.20
vertikal eksterior 19.80
horizontal interior 158.00
vertikal interior 168.80
TOTAL 39.00
2 Pas bata 1 : 5
Lt. 05
lav 25.00 2.38 ( 25 x 2,38 ) - 59.50
non lav 14.00 3.88 ( 14 x 3,88 ) - 54.32
40.96 72.86
TOTAL 72.86 m²
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. 05
37.50 2 37,5 x 2 75 m2
75.00
TOTAL 75.00 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. 05
dinding bata 72.86 2.00 ( 72,86 x 2 ) - 145.72 m2
145.72
TOTAL 145.72 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. 05 220.72 220,72 - 220.72 m2
TOTAL 220.72 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. 05 4.00 8.00 896.00 ( 4 x 8 ) + ( 896 + ) 928.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Kolom 50.00
Lt. 05 0.15 0.15 4.00 38.00 ( ( 0,15 x 0,15 ) x ( 38 x 4 ) 3.42 m3
Balok Latai
Lt. 05 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 3.42
1 Finishing Lantai
Lt. 05
5 Pas. ACP
Lt. 05
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
belakang 17.40 4.00 ( 17,4 x 4 ) - ( + ) m2
depan 14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
ZONA E 7.90 4.00 ( 7,9 x 4 ) - ( + ) m2
ZONA E 5.60 4.00 ( 5,6 x 4 ) - ( + ) m2
ZONA E 8.80 4.00 ( 8,8 x 4 ) - ( + ) m2
ZONA E 5.20 4.00 ( 5,2 x 4 ) - ( + ) m2
ZONA D 19.60 4.00 ( 19,6 x 4 ) - ( + ) m2
ZONA D 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA C 3.00 4.00 (3x4) - ( + ) m2
ZONA C 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA B 4.50 4.00 ( 4,5 x 4 ) - ( + ) 18.00 m2
ZONA B 4.00 4.00 (4x4) - ( + ) 16.00 m2
ZONA A 7.80 4.00 ( 7,8 x 4 ) - ( + ) 31.20 m2
ZONA A 4.80 4.00 ( 4,8 x 4 ) - ( + ) 19.20 m2
ZONA A 2.40 4.00 ( 2,4 x 4 ) - ( + ) 9.60 m2
ZONA A 3.40 4.00 ( 3,4 x 4 ) - ( + ) 13.60 m2
ZONA A 10.40 4.00 ( 10,4 x 4 ) - ( + ) 41.60 m2
ZONA A 5.20 4.00 ( 5,2 x 4 ) - ( + ) 20.80 m2
ZONA A 3.00 4.00 (3x4) - ( + ) 12.00 m2
ZONA A 7.60 4.00 ( 7,6 x 4 ) - ( + ) 30.40 m2
TOTAL 269.60 m'
PEKERJAAN LANTAI 06
Panjang AS
horizontal eksterior 19.20
vertikal eksterior 19.80
horizontal interior 158.00
vertikal interior 168.80
TOTAL 39.00
2 Pas bata 1 : 5
Lt. 06
lav 25.00 2.38 ( 25 x 2,38 ) - 59.50
non lav 14.00 3.88 ( 14 x 3,88 ) - 54.32
40.96 72.86
TOTAL 72.86 m²
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. 06
37.50 2 37,5 x 2 75 m2
75.00
TOTAL 75.00 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. 06
dinding bata 72.86 2.00 ( 72,86 x 2 ) - 145.72 m2
145.72
TOTAL 145.72 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. 06 220.72 220,72 - 220.72 m2
TOTAL 220.72 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. 06 4.00 8.00 896.00 ( 4 x 8 ) + ( 896 + ) 928.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Kolom 50.00
Lt. 06 0.15 0.15 4.00 38.00 ( ( 0,15 x 0,15 ) x ( 38 x 4 ) 3.42 m3
Balok Latai
Lt. 06 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 3.42
1 Finishing Lantai
Lt. 06
4 Plint Cat
panjang pengurangan kusen Volume Satuan
Lt. 06
Plint Biasa 0.00 0.00 m'
Plint Partisi 0.00 m'
TOTAL 0.00 m'
5 Pas. ACP
Lt. 06
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
belakang 17.40 4.00 ( 17,4 x 4 ) - ( + ) m2
depan 14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
ZONA E 7.90 4.00 ( 7,9 x 4 ) - ( + ) m2
ZONA E 5.60 4.00 ( 5,6 x 4 ) - ( + ) m2
ZONA E 8.80 4.00 ( 8,8 x 4 ) - ( + ) m2
ZONA E 5.20 4.00 ( 5,2 x 4 ) - ( + ) m2
ZONA D 19.60 4.00 ( 19,6 x 4 ) - ( + ) m2
ZONA D 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA C 3.00 4.00 (3x4) - ( + ) m2
ZONA C 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA B 4.50 4.00 ( 4,5 x 4 ) - ( + ) 18.00 m2
ZONA B 4.00 4.00 (4x4) - ( + ) 16.00 m2
ZONA A 7.80 4.00 ( 7,8 x 4 ) - ( + ) 31.20 m2
ZONA A 4.80 4.00 ( 4,8 x 4 ) - ( + ) 19.20 m2
ZONA A 2.40 4.00 ( 2,4 x 4 ) - ( + ) 9.60 m2
ZONA A 3.40 4.00 ( 3,4 x 4 ) - ( + ) 13.60 m2
ZONA A 10.40 4.00 ( 10,4 x 4 ) - ( + ) 41.60 m2
ZONA A 5.20 4.00 ( 5,2 x 4 ) - ( + ) 20.80 m2
ZONA A 3.00 4.00 (3x4) - ( + ) 12.00 m2
ZONA A 7.60 4.00 ( 7,6 x 4 ) - ( + ) 30.40 m2
TOTAL 269.60 m'
PEKERJAAN LANTAI 07
Panjang AS
horizontal eksterior 19.20
vertikal eksterior 19.80
horizontal interior 105.50
vertikal interior 112.80
TOTAL 39.00
2 Pas bata 1 : 5
Lt. 07
lav 21.50 2.38 ( 21,5 x 2,38 ) - 51.17
non lav 17.50 3.88 ( 17,5 x 3,88 ) - 67.90
40.96 78.11
TOTAL 78.11 m²
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. 07
32.25 2 32,25 x 2 64.5 m2
64.50
TOTAL 64.50 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. 07
dinding bata 78.11 2.00 ( 78,11 x 2 ) - 156.22 m2
156.22
TOTAL 156.22 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. 07 220.72 220,72 - 220.72 m2
TOTAL 220.72 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. 07 4.00 8.00 896.00 ( 4 x 8 ) + ( 896 + ) 928.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Kolom 50.00
Lt. 07 0.15 0.15 4.00 38.00 ( ( 0,15 x 0,15 ) x ( 38 x 4 ) 3.42 m3
Balok Latai
Lt. 07 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 3.42
1 Finishing Lantai
Lt. 07
4 Plint Cat
panjang pengurangan kusen Volume Satuan
Lt. 07
Plint Biasa 0.00 0.00 m'
Plint Partisi 0.00 m'
TOTAL 0.00 m'
5 Pas. ACP
Lt. 07
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
belakang 17.40 4.00 ( 17,4 x 4 ) - ( + ) m2
depan 14.30 4.00 ( 14,3 x 4 ) - ( + ) 57.20 m2
ZONA E 7.90 4.00 ( 7,9 x 4 ) - ( + ) m2
ZONA E 5.60 4.00 ( 5,6 x 4 ) - ( + ) m2
ZONA E 8.80 4.00 ( 8,8 x 4 ) - ( + ) m2
ZONA E 5.20 4.00 ( 5,2 x 4 ) - ( + ) m2
ZONA D 19.60 4.00 ( 19,6 x 4 ) - ( + ) m2
ZONA D 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA C 3.00 4.00 (3x4) - ( + ) m2
ZONA C 11.60 4.00 ( 11,6 x 4 ) - ( + ) m2
ZONA B 4.50 4.00 ( 4,5 x 4 ) - ( + ) 18.00 m2
ZONA B 4.00 4.00 (4x4) - ( + ) 16.00 m2
ZONA A 7.80 4.00 ( 7,8 x 4 ) - ( + ) 31.20 m2
ZONA A 4.80 4.00 ( 4,8 x 4 ) - ( + ) 19.20 m2
ZONA A 2.40 4.00 ( 2,4 x 4 ) - ( + ) 9.60 m2
ZONA A 3.40 4.00 ( 3,4 x 4 ) - ( + ) 13.60 m2
ZONA A 10.40 4.00 ( 10,4 x 4 ) - ( + ) 41.60 m2
ZONA A 5.20 4.00 ( 5,2 x 4 ) - ( + ) 20.80 m2
ZONA A 3.00 4.00 (3x4) - ( + ) 12.00 m2
ZONA A 7.60 4.00 ( 7,6 x 4 ) - ( + ) 30.40 m2
ZONA E , Tampak B 7.45 27.40 ( 7,45 x 27,4 ) - ( + ) m2
ZONA E , Tampak A 11.20 1.70 ( 11,2 x 1,7 ) - ( + ) m2
ZONA E , Tampak A 5.20 0.60 ( 5,2 x 0,6 ) - ( + ) m2
ZONA D 7.45 91.00 ( 7,45 x 91 ) - ( + ) m2
ZONA C 7.45 17.40 ( 7,45 x 17,4 ) - ( + ) m2
ZONA B 7.45 51.00 ( 7,45 x 51 ) - ( + ) 379.95 m2
ZONA A 7.45 43.40 ( 7,45 x 43,4 ) - ( + ) 323.33 m2
ZONA A , Tampak A 15.80 1.70 ( 15,8 x 1,7 ) - ( + ) 26.86 m2
ZONA A , Tampak A 0.80 5.20 ( 0,8 x 5,2 ) - ( + ) 4.16 m2
TOTAL 1003.90 m'
2 Pas bata 1 : 5
Lt. DAAK
lav 0.00 2.38 ( 0 x 2,38 ) - 0.00
non lav 68.50 3.88 ( 68,5 x 3,88 ) - 265.78
265.78
TOTAL 265.78 m²
3 Plesteran bata 1 : 3
luas dinding sisi
Lt. DAAK
0.00 2 0x2 0 m2
0.00
TOTAL 0.00 m²
4 Plesteran bata 1 : 5
luas dinding sisi
Lt. DAAK
dinding bata 265.78 2.00 ( 265,78 x 2 ) - 531.56 m2
531.56
TOTAL 531.56 m²
5 Plesteran beton
keliling kolom tinggi jumlah perhitungan volume satuan
6 Acian
luas plesterapengurang lain perhitungan volume satuan
Lt. DAAK 531.56 531,56 - 531.56 m2
TOTAL 531.56 m²
7 Sponengan sudut
panjang jumlah sponengan kolom
Lt. DAAK 4.00 8.00 96.00 ( 4 x 8 ) + ( 96 + ) 128.00 m'
8 Beton Praktis
lebar tinggi panjang jumlah perhitungan volume satuan
Kolom
Lt. DAAK 0.15 0.15 4.00 14.00 ( ( 0,15 x 0,15 ) x ( 14 x 4 ) 1.26 m3
Balok Latai
Lt. DAAK 0.15 0.15 ( ( 0,15 x 0,15 ) x 0.00 m3
TOTAL 1.26
1 Finishing Lantai
Lt. DAAK
4 Plint Cat
panjang pengurangan kusen Volume Satuan
Lt. DAAK
Plint Biasa 0.00 0.00 m'
Plint Partisi 0.00 m'
TOTAL 0.00 m'
5 Pas. ACP
Lt. DAAK
panjang tinggi pengurangan kusen
pengurangan lain perhitungan volume satuan
ZONA E, Tampak A 26.50 16.60 ( 26,5 x 16,6 ) - ( + ) m2
ZONA E, Tampak A 4.40 2.30 ( 4,4 x 2,3 ) - ( + ) m2
ZONA E, Tampak B 26.40 9.95 ( 26,4 x 9,95 ) - ( + ) m2
ZONA E 14.80 24.80 ( 14,8 x 24,8 ) - ( + ) m2
ZONA D 14.80 45.00 ( 14,8 x 45 ) - ( + ) m2
ZONA C 14.80 8.60 ( 14,8 x 8,6 ) - ( + ) m2
ZONA B 16.02 10.55 ( 16,02 x 10,55 ) - ( + ) 169.01 m2
ZONA A, Tampak A 40.96 8.87 ( 40,96 x 8,87 ) - ( + ) 363.32 m2
ZONA A, Tampak A 4.10 2.40 ( 4,1 x 2,4 ) - ( + ) 9.84 m2
ZONA A, Tampak B 10.70 4.00 ( 10,7 x 4 ) - ( + ) 42.80 m2
ZONA A, Tampak B 9.40 1.00 ( 9,4 x 1 ) - ( + ) 9.40 m2
ZONA A, Tampak B 5.40 1.00 ( 5,4 x 1 ) - ( + ) 5.40 m2
ZONA A, Tampak B 2.25 22.00 ( 2,25 x 22 ) - ( + ) 49.50 m2
ZONA A, Tampak B 3.00 0.60 ( 3 x 0,6 ) - ( + ) 1.80 m2
ZONA A, Tampak B 2.60 8.80 ( 2,6 x 8,8 ) - ( + ) 22.88 m2
ZONA A, Tampak B 1.00 0.80 ( 1 x 0,8 ) - ( + ) 0.80 m2
TOTAL 674.75 m'
1 Galian tanah
lebar panjang tinggi perhitungan volume satuan
7.95 4.3 2.50 7,95 x 4,3 x 2,5 85.46 m³
TOTAL 85.46 m³
4 Anstamping
lebar panjang tinggi perhitungan volume satuan
7.95 4.3 0.20 7,95 x 4,3 x 0,2 6.84 m³
5 pekerjaan beton :
- beton plat lantai dasar
lebar panjang tinggi pengurang perhitungan volume satuan
7.95 4.3 0.20 6.84 m³
- beton plat daak
lebar panjang tinggi pengurang perhitungan volume satuan
7.95 4.3 0.15 5.13 m³
- beton dinding
lebar panjang tinggi perhitungan volume satuan
0.15 38 2.80 15.96 m³
- beton balok (bwh)
lebar tinggi panjang perhitungan volume satuan
0.15 0.4 40.35 0,15 x 0,4 x 40,35 2.42 m³
- beton balok (atas)
lebar tinggi panjang perhitungan volume satuan
0.15 0.4 40.35 0,15 x 0,4 x 40,35 2.42 m³
- beton balok kolom
lebar panjang tinggi jumlah perhitungan volume satuan
0.15 0.15 2.60 10.00 0.59 m³
- keramik dinding
panjang tinggi perhitungan volume satuan
40 2.5 100.00 m2
- keramik lantai
panjang lebar perhitungan volume satuan
7.95 5 39.75 m2
- water proofing
volume satuan
ground 179.50 m2
179.50 m2
Ø jrk
D 10 - 0.15
D 10 - 0.15
D 10 - 0.2
D 10 - 0.2
Ø jrk
D 10 - 0.2
D 10 - 0.2
Σ 0.625
Σ 0.625
JUMLAH Rp. -
PPN 10 % Rp. -
------------------------------------------------------------
JUMLAH TOTAL Rp. -
DIBULATKAN Rp. -
Terbilang :
________________________
BILL OF QUANTITY (BOQ)
PEKERJAAN PEMBANGUNAN GEDUNG LABORATORIUM TERPADU BALAI LITBANGKES BATURAJA
TAHUN 2021
Harga Jumlah
No. Uraian Pekerjaan Volume SAT Jumlah Rp.
Satuan Rp. Harga Rp.
A. PEKERJAAN PERSIAPAN :
A. PEKERJAAN PERSIAPAN : -
I. PEK. TANAH :
1 Galian tanah pondasi struktur + sloof 67.22 m³ - -
2 Pekerjaan urugan tanah peninggian peil bangunan + pemadatan Lt. 01 248.85 m³ - -
-
II. PEK. BETON BERTULANG :
a. PEKERJAAN STRUKTUR LANTAI 1 : elv. + 0.00
1 Pasir urug bawah pondasi pile cap + sloof 8.08 m³ - -
2 Lantai kerja K100 bwh pondasi pile cap + sloof 4.04 m³ - -
3 Beton bertulang pondasi pile cap type P1
- Beton fc'25 mpa 36.96 m³ - -
- Pembesian ulir 5,626.78 Kg - -
- Bekisting 86.40 m² - -
4 Beton bertulang pondasi pile cap type P2
- Beton fc'25 mpa 8.64 m³ - -
- Pembesian ulir 772.66 Kg - -
- Bekisting 24.00 m² - -
5 Beton bertulang pondasi pile cap type P3
- Beton fc'25 mpa 1.73 m³ - -
- Pembesian ulir 421.00 Kg - -
- Bekisting 11.52 m² - -
5 Beton bertulang sloof struktur Type S1
- Beton fc'25 mpa 18.20 m³ - -
- Pembesian ulir 3,392.28 Kg - -
- Bekisting 182.00 m² - -
6 Beton bertulang sloof struktur Type S2
- Beton fc'25 mpa 1.69 m³ - -
- Pembesian ulir 662.68 Kg - -
- Bekisting 22.50 m² - -
7 Beton bertulang kolom pedestal struktur type K1
- Beton fc'25 mpa 8.25 m³ - -
- Pembesian ulir 1,808.16 Kg - -
- Bekisting 66.00 m² - -
8 Beton bertulang kolom struktur type K1
- Beton fc'25 mpa 15.84 m³ - -
- Pembesian ulir 3,282.99 Kg - -
- Bekisting 158.40 m² - -
9 Beton bertulang kolom struktur type K3
- Beton fc'25 mpa 5.07 m³ - -
- Pembesian ulir 1,291.39 Kg - -
- Bekisting 84.55 m² - -
10 Beton bertulang tangga dari Lt. 1 ke Lt.2 type 1
- Beton fc'25 mpa 5.70 m³ - -
- Pembesian ulir 604.42 Kg - -
- Pembesian polos 457.99 Kg - -
- Bekisting 35.78 m² - -
- Pondasi batu belah 1.37 m³ - -
- Aanstamping 0.53 m³ - -
- Pasir urug 0.26 m³ - -
11 Beton bertulang tangga dari Lt. 1 ke Lt.2 type 2 (Tangga darurat)
- Beton fc'25 mpa 6.84 m³ - -
- Pembesian ulir 725.31 Kg - -
- Pembesian polos 549.59 Kg - -
- Bekisting 42.93 m² - -
- Pondasi batu belah 1.64 m³ - -
- Aanstamping 0.63 m³ - -
- Pasir urug 0.32 m³ - -
12 Beton bertulang janggutan tangga
- Beton fc'25 mpa 0.42 m³ - -
- Pembesian ulir 63.00 Kg - -
- Bekisting 4.20 m² - -
-
Harga Jumlah
No. Uraian Pekerjaan Volume SAT Jumlah Rp.
Satuan Rp. Harga Rp.
1 Pek. Pondasi Bored Pile (t = 5 m), D30 cm (16 titik) dan D40 cm (40 titik)
Mobilisasi dan demobilisasi alat bor 1.00 ls -
Pengeboran diameter 30cm 80.00 m' -
Pengeboran diameter 40cm 200.00 m' -
Beton Ready Mix K-350 30.79 m³ -
Besi Tulangan D16 2,654.40 kg -
Besi Tulangan Ø8 691.25 kg -
Cor Beton dengan pipa tremie 280.00 m' -
Pemasukan Besi Tulangan ke dalam lubang bor 280.00 m' -
Harga Jumlah
No. Uraian Pekerjaan Volume SAT Jumlah Rp.
Satuan Rp. Harga Rp.
LANTAI 2
1 Lampu downligt Recessed LED 7 watt 24.00 bh -
2 Lampu downligt Recessed LED 9 watt 3.00 bh -
3 Lampu downligt Recessed LED 15 watt 13.00 bh -
4 V Shape TL LED 2x14,5 watt 19.00 bh -
5 Saklar Tunggal 22.00 bh -
6 Saklar Ganda 5.00 bh -
8 Stop kontak 99.00 bh -
10 Instalasi penerangan 158.00 ttk -
11 Kotak panel (MCB 63 A + KELENGKAPAN) 4.00 bh -
12 Kabel Tray 20x5 cm 23.54 m' -
13 Kabel Feeder NYFGbY 39.00 m' -
VII. GROUND RESERVOIR Kap. 120 m3 , BAK PENAMPUNGAN AIR HUJAN Kap. 30 m3
1 Galian tanah 85.46 m3 -
2 Lantai kerja t= 10 cm 1.71 m3 -
3 Pasir urug t= 5 cm 3.42 m3 -
4 Aantamping 6.84 m3 -
5 Beton plat dasar
- Beton fc'21,7 mpa 6.84 m³ -
- Pembesian 332.93 Kg -
- Bekisting 34.19 m² -
6 Beton plat daak
- Beton fc'21,7 mpa 5.13 m³ -
- Pembesian 332.93 Kg -
- Bekisting 25.64 m² -
7 Beton dinding
- Beton fc'21,7 mpa 15.96 m³ -
- Pembesian 270.91 Kg -
- Bekisting 79.80 m² -
8 Beton balok
Harga Jumlah
No. Uraian Pekerjaan Volume SAT Jumlah Rp.
Satuan Rp. Harga Rp.
Pekerjaan SMK3
E. Personel K3 Konstruksi :
1 Petugas P3K ls 1 Rp -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
1 A.2.2.1.2 Pembuatan 1 m' pagar sementara dari seng gelombang tinggi 2 m'
A TENAGA KERJA
0.2000 OH Pekerja @Rp. - Rp. -
0.4000 OH Tukang Kayu @Rp. - Rp. -
0.0200 OH Kepala Tukang @Rp. - Rp. -
0.0200 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
1.2500 batang Dolken kayu galam Ø 8-10 cm, pjg 3 m @Rp. - Rp. -
1.2000 Lbr Seng gelombang 3" - 5 " @Rp. - Rp. -
0.0720 m3 Kayu Sengon (balok) @Rp. - Rp. -
0.0600 kg Paku @Rp. - Rp. -
2.5000 kg Portland cement @Rp. - Rp. -
0.4500 kg menie mesi @Rp. - Rp. -
0.0090 m³ Koral beton @Rp. - Rp. -
0.0090 m³ Pasir beton (quarry - lokasi pekerjaan) @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
Pengurugan hasil galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
13 A.2.3.1.11 Pengurugan 1 m3 dengan Pasir urug
A TENAGA KERJA
0.3000 OH Pekerja @Rp. - Rp. -
0.0100 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
1.2000 m³ Pasir urug (quarry - lokasi pekerjaan) @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
18 A.4.1.1.4 a Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa (K 100) slump (3-6) cm w/c = 0,87
A TENAGA KERJA
1.2000 OH Pekerja @Rp. - Rp. -
0.2000 OH Tukang Batu @Rp. - Rp. -
0.0200 OH Kepala Tukang @Rp. - Rp. -
0.0600 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
230.0000 kg Portland cement @Rp. - Rp. -
893.0000 kg Pasir beton @Rp. - Rp. -
1,027.0000 kg Batu pecah @Rp. - Rp. -
200.0000 liter Air @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
HPS b 1 m2 lantai kerja beton mutu f'c = 7,4 MPa (K 100) slump (3-6) cm w/c = 0,87 , t= 8 cm = 1.00 =
0.08
= - = Rp.
- = = = = = = = = = =
HPS c 1 m2 lantai kerja beton mutu f'c = 7,4 MPa (K 100) slump (3-6) cm w/c = 0,87 , t= 5 cm = 1.00 =
0.05
= - = Rp.
- = = = = = = = = = =
19 A.4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 MPa (K 175) slump (12± 2) cm w/c = 0,66
A TENAGA KERJA
1.6500 OH Pekerja @Rp. - Rp. -
0.2750 OH Tukang Batu @Rp. - Rp. -
0.0280 OH Kepala Tukang @Rp. - Rp. -
0.0830 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
326.0000 kg Portland cement @Rp. - Rp. -
760.0000 kg Pasir beton @Rp. - Rp. -
1,029.0000 kg Batu pecah @Rp. - Rp. -
215.0000 liter Air @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
20 A.4.1.1.7 Membuat 1 m3 beton mutu f'c = 19,3 MPa (K 225) slump (12±2) cm w/c = 0,58
A TENAGA KERJA
1.6500 OH Pekerja @Rp. - Rp. -
0.2750 OH Tukang Batu @Rp. - Rp. -
0.0280 OH Kepala Tukang @Rp. - Rp. -
0.0830 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
371.0000 kg Portland cement @Rp. - Rp. -
698.0000 kg Pasir beton @Rp. - Rp. -
1,047.0000 kg Batu pecah @Rp. - Rp. -
215.0000 liter Air @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
21 A.4.1.1.8 Membuat 1 m3 beton mutu f'c = 21,7 MPa (K 250) slump (12±2) cm w/c = 0,56
A TENAGA KERJA
1.6500 OH Pekerja @Rp. - Rp. -
0.2750 OH Tukang Batu @Rp. - Rp. -
0.0280 OH Kepala Tukang @Rp. - Rp. -
0.0830 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
384.0000 kg Portland cement @Rp. - Rp. -
692.0000 kg Pasir beton @Rp. - Rp. -
1,039.0000 kg Batu pecah @Rp. - Rp. -
215.0000 liter Air @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
22 A.4.1.1.9 Membuat 1 m3 beton mutu f'c = 24,0 MPa (K 275)slump (12±2) cm w/c = 0,53
A TENAGA KERJA
1.6500 OH Pekerja @Rp. - Rp. -
0.2750 OH Tukang Batu @Rp. - Rp. -
0.0280 OH Kepala Tukang @Rp. - Rp. -
0.0830 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
406.0000 kg Portland cement @Rp. - Rp. -
684.0000 kg Pasir beton @Rp. - Rp. -
1,026.0000 kg Batu pecah @Rp. - Rp. -
215.0000 liter Air @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
23 A.4.1.1.10 Membuat 1 m3 beton mutu f'c = 26,4 MPa (K 300) slump (12±2) cm w/c = 0,52
A TENAGA KERJA
1.6500 OH Pekerja @Rp. - Rp. -
0.2750 OH Tukang Batu @Rp. - Rp. -
0.0280 OH Kepala Tukang @Rp. - Rp. -
0.0830 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
413.0000 kg Portland cement @Rp. - Rp. -
681.0000 kg Pasir beton @Rp. - Rp. -
1,021.0000 kg Batu pecah @Rp. - Rp. -
215.0000 liter Air @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
24 A.4.1.1.11 Membuat 1 m3 beton mutu f'c = 28,8 MPa (K 325) slump (12±2) cm w/c = 0,49
A TENAGA KERJA
2.1000 OH Pekerja @Rp. - Rp. -
0.3500 OH Tukang Batu @Rp. - Rp. -
0.0350 OH Kepala Tukang @Rp. - Rp. -
0.1050 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
439.0000 kg Portland cement @Rp. - Rp. -
670.0000 kg Pasir beton @Rp. - Rp. -
1,006.0000 kg Batu pecah @Rp. - Rp. -
215.0000 liter Air @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
25 A.4.1.1.12 Membuat 1 m3 beton mutu f'c = 31,2 MPa (K 350) slump (12±2) cm w/c = 0,48
A TENAGA KERJA
2.1000 OH Pekerja @Rp. - Rp. -
0.3500 OH Tukang Batu @Rp. - Rp. -
0.0350 OH Kepala Tukang @Rp. - Rp. -
0.1050 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
448.0000 kg Portland cement @Rp. - Rp. -
667.0000 kg Pasir beton @Rp. - Rp. -
1,000.0000 kg Batu pecah @Rp. - Rp. -
215.0000 liter Air @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
28 A.4.2.1.2a Pekerjaan 1 kg perakitan & pemasangan konstruksi baja siku / profil / IWF
A TENAGA KERJA
1.0000 OH Pemasangan konstruksi baja siku / profil / IWF @Rp. - Rp. -
1.0000 OH Perakitan konstruksi baja siku / profil / IWF @Rp. Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Total Harga Satuan Pekerjaan Rp. -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
29 A.4.2.1.2 Pekerjaan 1 kg pemasangan konstruksi baja siku / profil / IWF
A TENAGA KERJA
0.0600 OH Pekerja @Rp. - Rp. -
0.0600 OH Tukang besi @Rp. - Rp. -
0.0060 OH Kepala Tukang @Rp. - Rp. -
0.0030 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
1.1500 kg Profil baja / IWF @Rp. - Rp. -
0.0600 kg Menie besi @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
38 A.4.1.1.32 Membuat 1 m3 beton bertulang mutu f'c = 14,5 MPa (K 175) slump (12± 2) cm w/c = 0,66 (beton praktis)
A BAHAN
1.0000 m3 Beton K 175 @Rp. - Rp. -
150.0000 Kg Besi @Rp. - Rp. -
5.0000 m2 Begesting @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Total Harga Satuan Pekerjaan Rp. -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
38A Membuat 1 m3 beton bertulang mutu f'c = 26,5 Mpa (K-300)
A TENAGA KERJA
1.0000 OH Pekerja @Rp. - Rp. -
0.2500 OH Tukang Kayu @Rp. - Rp. -
0.0250 OH Kepala Tukang @Rp. - Rp. -
0.1000 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
1.0200 m3 Beton ready mix K-300 @Rp. 860,000.00 Rp. 877,200.00
Rp. 877,200.00
C ALAT
0.1200 Sewa/hari Pompa dan Conveyor beton @Rp. 780,000.00 Rp. 93,600.00
Rp. 93,600.00
= = ===============
Jumlah Total Rp. 970,800.00
Overhead & Profit ( 10% ) Rp. 97,080.00
Total Harga Satuan Pekerjaan Rp. 1,067,880.00
39 A.4.2.1.11 Pemasangan 1 m' kusen aluminium 4" t= 1,15 mm fin powder coating
A TENAGA KERJA
0.0430 OH Pekerja @Rp. - Rp. -
0.0430 OH Tukang Khusus Alumunium @Rp. - Rp. -
0.0043 OH Kepala Tukang @Rp. - Rp. -
0.0021 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
1.1000 m¹ Profil aluminium 4" t= 1,15 mm fin powder coating @Rp. - Rp. -
2.0000 buah Skrup fixer @Rp. - Rp. -
0.0600 tube Sealant @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
40 A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
A TENAGA KERJA
0.2500 OH Pekerja @Rp. - Rp. -
0.2500 OH Tukang Besi @Rp. - Rp. -
0.0250 OH Kepala Tukang @Rp. - Rp. -
0.0130 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
3.5000 m' Rangka metal hollow 40.40.2 mm @Rp. - Rp. -
100%xrangka Ls Assesoris (perkuatan las dll) @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
41 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, plafon
A TENAGA KERJA
0.3500 OH Pekerja @Rp. - Rp. -
0.3500 OH Tukang Besi @Rp. - Rp. -
0.0350 OH Kepala Tukang @Rp. - Rp. -
0.0180 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
4.0000 M1 Rangka metal hollow 40.40.2 mm @Rp. - Rp. -
100%xrangka Ls Assesoris (perkuatan las dll) @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
42 A.4.4.1.8 a Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
A TENAGA KERJA
0.3000 OH Pekerja @Rp. - Rp. -
0.1000 OH Tukang Batu @Rp. - Rp. -
0.0100 OH Kepala Tukang @Rp. - Rp. -
0.0150 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
70.0000 bh Bata merah 5 x 11 x 22 cm @Rp. - Rp. -
14.3700 kg Portland cement @Rp. - Rp. -
0.0400 m³ Pasir pasang @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
57 HPS Pemasangan 1 m2 langit-langit kalsium silika board ukuran (120x240x4,5) mm tebal 4,5 mm
A TENAGA KERJA
0.1000 OH Pekerja @Rp. - Rp. -
0.0500 OH Tukang Kayu @Rp. - Rp. -
0.0050 OH Kepala Tukang @Rp. - Rp. -
0.0050 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
0.3640 lembar Kalsium silika board (120 cm x 240 cm x 4,5 mm) @Rp. - Rp. -
0.1100 kg Paku sekrup @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
58 HPS Pemasangan 1 m' list plafond almunium shadow line stopping angle
A TENAGA KERJA
0.0600 OH Pekerja @Rp. - Rp. -
0.0600 OH Tukang Kayu @Rp. - Rp. -
0.0060 OH Kepala Tukang @Rp. - Rp. -
0.0030 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
1.0500 m' list plafond almunium shadow line stopping angle @Rp. - Rp. -
0.1500 kg tepung gypsum @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
J A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
61 A.4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu klas II atau III
A TENAGA KERJA
6.0000 OH Pekerja @Rp. - Rp. -
18.0000 OH Tukang Kayu @Rp. - Rp. -
1.8000 OH Kepala Tukang @Rp. - Rp. -
0.3000 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
1.2000 m³ Balok kayu klas II atau III @Rp. - Rp. -
1.2500 kg Paku @Rp. - Rp. -
1.0000 kg Lem kayu @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
62 A.4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca kayu kelas I atau II
A TENAGA KERJA
0.8000 OH Pekerja @Rp. - Rp. -
2.4000 OH Tukang Kayu @Rp. - Rp. -
0.2400 OH Kepala Tukang @Rp. - Rp. -
0.0400 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
0.0240 m³ Kayu kamper (papan) @Rp. - Rp. -
0.3000 kg Lem kayu @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
70 HPS Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) interior
A TENAGA KERJA
0.0200 OH Pekerja @Rp. - Rp. -
0.0630 OH Tukang Cat @Rp. - Rp. -
0.0063 OH Kepala Tukang @Rp. - Rp. -
0.0030 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
0.1000 kg Plamir tembok @Rp. - Rp. -
0.1000 kg Cat dasar (cat tembok) @Rp. - Rp. -
0.2600 kg Cat penutup (cat tembok interior) @Rp. - Rp. -
Rp. -
Jumlah Jumlah
Harga Satuan
No Nomor Analisa Koefisien Satuan Uraian Harga Total
(Rp) (Rp) (Rp)
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
71 HPS Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) eksterior
A TENAGA KERJA
0.0200 OH Pekerja @Rp. - Rp. -
0.0630 OH Tukang Cat @Rp. - Rp. -
0.0063 OH Kepala Tukang @Rp. - Rp. -
0.0030 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
0.1000 kg Plamir tembok @Rp. - Rp. -
0.1000 kg Cat dasar (cat tembok) @Rp. - Rp. -
0.2600 kg Cat penutup (cat tembok eksterior) @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
72 HPS Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup).
A TENAGA KERJA
0.0280 OH Pekerja @Rp. - Rp. -
0.0420 OH Tukang Cat @Rp. - Rp. -
0.0042 OH Kepala Tukang @Rp. - Rp. -
0.0030 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
0.1200 kg Cat dasar (cat tembok) @Rp. - Rp. -
0.1800 kg Cat penutup (cat tembok) @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
78 HPS Pemasangan Bak Kontrol Pas.Batu Bata 60 x 60 tinggi 100 cm + entry pit
0.7680 m3 Galian tanah @Rp. - Rp. -
3.2000 m2 Pasangan bata 1 : 3 ( terpasang ) @Rp. - Rp. -
0.1920 m3 Pasangan bata 1 : 3 rolag ( terpasang ) @Rp. - Rp. -
5.1200 m2 Plesteran 1 : 3 ( terpasang ) @Rp. - Rp. -
5.1200 m2 Acian ( terpasang ) @Rp. - Rp. -
0.0640 m3 beton K175 tutup bak kontrol ( terpasang ) @Rp. - Rp. -
9.6000 kg Besi tulangan U32 tutup bak kontrol ( terpasang ) @Rp. - Rp. -
0.0723 m3 beton K175 plat dasar bak kontrol ( terpasang ) @Rp. - Rp. -
0.0361 m3 Lantai kerja bwh plat dasar bak kontrol ( terpasang ) @Rp. - Rp. -
0.1053 m3 Beton K300 @Rp. - Rp. -
0.0270 m3 Tutup beton @Rp. - Rp. -
1.0300 m' Pipa PVC Ø4" @Rp. - Rp. -
1.0000 Ls Alat bantu kerja @Rp. Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Total Harga Satuan Pekerjaan Rp. -
85 HPS Pekerjaan membuat daun pintu plywood rangka alumunium + HPL per 1 m2
B BAHAN
3.6000 m' Rangka alumunium @Rp. Rp. -
0.0300 Kg Paku sekrup @Rp. - Rp. -
0.5000 Ltr Lem kayu @Rp. - Rp. -
1.0000 Lbr Plywood 4 mm @Rp. - Rp. -
2.0000 m2 HPL @Rp. - Rp. -
Rp. -
C SUB PEKERJAAN
0.7000 OH Pekerja @Rp. - Rp. -
2.1000 OH Tukang Batu @Rp. - Rp. -
0.2100 OH Kepala Tukang @Rp. - Rp. -
0.0350 OH Mandor @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
5 HPS 1 Titik nstalasi power gondola NYY 4 x 6 mm2 menuju ke panel exsting di lantai 01. yg belum dibongkar
A TENAGA KERJA
0.2000 OH Pekerja @Rp. - Rp. -
0.1000 OH Tukang Listrik @Rp. - Rp. -
0.0100 OH Kepala Tukang @Rp. - Rp. -
0.0100 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
10.0000 m' Kabel NYM 4 X 6 mm2 @Rp. - Rp. -
10.0000 m' Pipa Conduit @Rp. - Rp. -
2.0000 bh Socket Pipa @Rp. - Rp. -
1.0000 bh Tee Doos @Rp. - Rp. -
6.0000 bh Klem Pipa @Rp. - Rp. -
12.0000 bh Fhiser @Rp. - Rp. -
4.0000 bh Las Doop @Rp. - Rp. -
0.2500 bh Isolasi Ban @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
7 HPS 1 Titik Inst. Penerangan (NYM 3 X 2,5 mm²) dalam conduit high impact 20 mm
A TENAGA KERJA
0.2000 OH Pekerja @Rp. - Rp. -
0.1000 OH Tukang Listrik @Rp. - Rp. -
0.0100 OH Kepala Tukang @Rp. - Rp. -
0.0100 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
10.0000 m' Kabel NYM 3 X 2,5 mm2 @Rp. - Rp. -
10.0000 m' Pipa Conduit @Rp. - Rp. -
2.0000 bh Socket Pipa @Rp. - Rp. -
1.0000 bh Tee Doos @Rp. - Rp. -
6.0000 bh Klem Pipa @Rp. - Rp. -
12.0000 bh Fhiser @Rp. - Rp. -
4.0000 bh Las Doop @Rp. - Rp. -
0.2500 bh Isolasi Ban @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
1 HPS 1 Titik Inst. Penerangan (NYM 3 X 2,5 mm²) dalam conduit high impact 20 mm
A TENAGA KERJA
0.2000 OH Pekerja @Rp. - Rp. -
0.1000 OH Tukang Listrik @Rp. - Rp. -
0.0100 OH Kepala Tukang @Rp. - Rp. -
0.0100 OH Mandor @Rp. - Rp. -
Rp. -
B BAHAN
10.0000 m' Kabel NYM 3 X 2,5 mm2 @Rp. - Rp. -
10.0000 m' Pipa Conduit @Rp. - Rp. -
2.0000 bh Socket Pipa @Rp. - Rp. -
1.0000 bh Tee Doos @Rp. - Rp. -
6.0000 bh Klem Pipa @Rp. - Rp. -
12.0000 bh Fhiser @Rp. - Rp. -
4.0000 bh Las Doop @Rp. - Rp. -
0.2500 bh Isolasi Ban @Rp. - Rp. -
Rp. -
= = ===============
Jumlah Total Rp. -
Overhead & Profit ( 10% ) Rp. -
Total Harga Satuan Pekerjaan Rp. -
HARGA BAHAN
TAHUN 2021
Harga Bahan
No Bahan / Upah Tenaga Satuan
(Rp)
I. UPAH PEKERJA
1 Pekerja OH
2 Tukang Kayu OH
3 Tukang Batu OH
4 Tukang besi OH
5 Tukang las konstruksi OH
6 Tukang besi konstruksi OH
7 Tukang las biasa OH
8 Tukang khusus alumunium OH
9 Tukang cat OH
10 Tukang listrik OH
11 Kepala Tukang OH
12 Mandor OH
Harga Bahan
No Bahan / Upah Tenaga Satuan
(Rp)