Excel Hitung Girder Komposit
Excel Hitung Girder Komposit
Asumsi :
- tebal plat beton (t) = 0.3 m = 30 cm = 11.81102362 in
- tinggi gelagar = 1.050 m = 1050 mm = 41.33858268 in
- f'c K-300 = 26.4 mpa = 3.839999988 ksi = 24.000
- fy baja A36 = 248 mpa = 36.07272716 ksi
- Es = 200000 mpa = 29090.91 ksi
Sectional Weight
Designation Dimension(mm)
Area (Kg/m)
Nominal Code H B tw tf r (cm2)
- 1050 350 10 12 11 186.6 -
Konversi AISC
Sectional Weight
Designation Dimension (in)
Area (kip/in)
Nominal Code H B tw tf r (in2)
- 41.339 13.78 0.394 0.472 0.43 28.923
a. Penampang compact : l lp
b. Penampang non-compact : lp < l lr
c. Penampang langsing : l > lr
Elemen p r
141
Flange (sayap)
bf FY 10 65
h 640 970
Web (badan) 2t f FY
tw FY FY
Elemen p r
Sehingga beqivalen
beqv = beff
n
160
8
20
4. Momen Inersia
160 20
y
30
30
31.013
1.01
1
105
105
103.99
1.1
1.2
35
0.35
y= 9796500
18660
y= 525.000
y= 24394.5
786.6
y= 31.012586
Inersia Komposit
I= 1009786.8 cm4
24260.225954 in4
5. Modulus Penampang (S)
Baja Bawah Baja Atas
Ss = 1009786.8 Sc = 1009786.8
103.987 1.013
9710.6640384 cm3 997235.82049 cm3
Beton Bawah
Sc = 1009786.8 yt = y - t
31.013 1.013 cm
32560.549756 cm3
PEMBEBANAN
A. BEBAN MATI
BEBAN HIDUP
Berat
kN/m
Berat
kN/m
Berat
kN/m
kN/m
kN/m 3 titik
KN 12.80
KN 70.40
m
m
m
m
m
m
KN
KN
m2
m
kPa #NAME?
kN/m
Analisa Beban
GELAGAR 1
A. Beban Mati
Terpusat Merata
No Nama Beban
Nilai Jumlah Nilai
1 Plat Jalan 40
2 Perkerasan 14.4
3 Berat sendiri gelagar 1.44
4 Air Hujan 3.92
Total
B. Beban Hidup
Terpusat Merata
No Nama Beban
Nilai Jumlah Nilai
1 Baban Merata 8.00
2 Baban Terpusat 44.00
3 Beban Rem 250 1
Total
Total Pembebanan
1.1(Wdl) + 2 (Wll) 52.86 kN/m
GELAGAR 2
A. Beban Mati
Terpusat Merata
No Nama Beban
Nilai Jumlah Nilai
1 Plat Jalan 40
2 Perkerasan 14.4
3 Berat sendiri gelagar 1.44
4 Air Hujan 3.92
Total
B. Beban Hidup
Terpusat Merata
No Nama Beban
Nilai Jumlah Nilai
1 Baban Merata 8
2 Baban Terpusat 44
3 Beban Rem 250 1
Total
Total Pembebanan
1.1(Wdl) + 2 (Wll) 52.86 kN/m
GELAGAR 3
A. Beban Mati
Terpusat Merata
No Nama Beban
Nilai Jumlah Nilai
1 Plat Jalan 40
2 Perkerasan 14.4
3 Air Hujan 3.92
4 Berat sendiri gelagar 1.44
5 Kereb 6.00
6 Railing Pipa Galvalis 2.5' 1.25 3
Total
B. Beban Hidup
Terpusat Merata
No Nama Beban
Nilai Jumlah Nilai
1 Baban Merata 8
2 Baban Terpusat 44
3 Beban Rem 250 1
4 Beban Pejalan Kaki 3.944
Total
Total Pembebanan
1.1(Wdl) + 2 (Wll) 47.15 kN/m
sa Beban
eban Mati
Merata Digunakan
Terpusat Merata
Dimensi
Nilai Jumlah Nilai Lebar
21 8 21
21 3.84 21
21 0.29 21
21 0.78 21
12.911 21
ban Hidup
Merata Digunakan
Terpusat Merata
Dimensi
Nilai Jumlah Nilai Lebar
(8 x 21) 12.800 21
8 3.352 21
3.175 21
19.327 21
eban Mati
Merata Digunakan
Terpusat Merata
Dimensi
Nilai Jumlah Nilai Lebar
21 8.000 21
21 3.840 21
21 0.29 21
21 0.784 21
12.911 21
ban Hidup
Merata Digunakan
Terpusat Merata
Dimensi
Nilai Jumlah Nilai Lebar
(8 x 21) 12.800 21
8 3.352 21
3.175 21
19.327 21
eban Mati
Merata Digunakan
Terpusat Merata
Dimensi
Nilai Jumlah Nilai Lebar
21 9.000 21
21 1.920 21
21 0.882 21
21 0.144 21
21 6.000 21
0.179 21
18.124 21
ban Hidup
Merata Digunakan
Terpusat Merata
Dimensi
Nilai Jumlah Nilai Lebar
(6*7.6) 6.400 21
6 1.676 21
1.587 21
7.6 3.944 21
13.607 21
1. Pembebanan
a. Beban Hidup
Beban lalu lintas menurut bms'92 untuk l < 30 m
beban tersebar merata (UDL) q adalah : q = 12.800
beban garis (KEL), P = 3.352
beban rem = 3.175
19.32698
19.327
b. Beban Mati
berat plat beton = 8.000
berat perkerasan = 3.840
berat sendiri gelagar = 0.287
berat air hujan = 0.784
12.91136
12.912
2. Gaya Dalam Maksimum
a. Momen Maksimum
Mmax = 1.1 DL + 2 LL
= 782.91 + 2130.80
= 2913.71 kNm = 2145.59119 kip-ft
Efisiensi = 91.572639 %
b. Geser Maksimum
Fmax = 1.10 DL + 2 LL
= 209.34 + 285.76
= 495.09 kN = 111.32 kip
3. Tegangan-tegangan Maksimum
28116.5800868 X 0.40
_=(._)/ = = 0.462 ksi
24260.23
28116.5800868 X 41.33858268
_=(._)/ = = 47.91 ksi
24260.23
Component A y Ay
y y
Concrete 20.0 y y/2 10
Plat Girder 186.60 82.5 15394.5
10 + 15394.5
=() / () = y
20.0 y + 186.60
y y + 15394.5
y( 20.0 y + 186.60 )= 10
y y + 15394.5
20.00 y + 186.60 y = 10
y y
10.00 y + 186.60 y 15394.5 = 0
(1,2)=((^2+4))/2 = 31.00 cm = 12.20 in
The moment of inertia of this revised composite area is:
1
= X 20.00 X 29790.64 + 316277.118 + 494912.2
3
1009793.63465427 cm4 = 24260.3890127577 in4
28116.5800868 X -0.393652
= = -0.46
24260.3890127577
28116.5800868 X 40.9449307
= = 47.45
24260.3890127577
28116.5800868 X 12.20
= = 14.14
24260.3890127577
The maximum stress in the steel 47.45 ksi tension
and the maximum stress in the concrete is 14.14 ksi
6. Deflection
Total beban merata = 32 KN/m
= 0.1841172229 kip/inci
Inersia komposit = 24260.3890127577 in4
Elastisitas baja = 29090.91 ksi
Panjang bentang = 21 m
= 826.771654 in
Defleksi maksimum = 5 WL4 5x 0.18 x 826.77 4
=
384 EI 384 x 29090.9 x 24260.389
7. Shear Connector
Diameter maksimal = tf x 25 = 0.47244
Digunakan stud ukuran 1
x 2 in
3
d = 0.33333 < 0.4724409 in ...OK
Luas satu area shear connector = Asc = 3.14 x 0.3333 2
= 0.0872
4
Ec = 24149.037 Mpa = 3512.58723 ksi
Kekuatan geser satu shear connector
Qn = 0.5 x Asc x (f'c x Ec)0.5
= 0.5 x 0.0872222 x ( 3.84 x 3512.587 )0.5
= 5.0649635219 kips
RgRpAscFu = 1 x 1 x 0.08722 x 65
= 5.6694444444 kips
Dipakai = 5.0649635219 kips
Jarak minimum membujur = 6d = 2 in
Jarak minimum melintang = 4d = 1.33333 in
Jarak maximum membujur = 8t = 3.77953 in
Jumlah Stud yang digunakan : N = Vu 111.32 Dipakai :
= = 21.9784929
Qn 5.06496352 Total :
syarat jarak antar stud = s = 39.3701 x 12
= 10.737 in
44
8. Sambungan
3
2 x in
8
Digunakan baut ukuran: 7
in A325 Fnv : = 48
8
Luas baut: Ab = 3.14 x ukuran baut2 3.14 x 0.875 2
=
4 4
SAMBUNGAN DI 12 M
baut bagian 1
diameter lubang: h = 7 1
+ = 0.9375 in
8 16
jarak tengah lubang ke bagian garis tumpuan : h
Lc = Le - = 2 -
2
kekuatan baut : Rn = 1.2 x Fu x Lc x t
= 1.2 x 24.54007 x 2 x 0.75
= 33.8192878 kips
Upper Limit : Rn = 2.4 x d x t x Fu
= 2.4 x 0.875 x 1 x 24.54
= 38.6506147 kips
Digunakan : Rn = 33.81928784 kips untuk baut bagian 1
baut bagian 2
diameter lubang: h = 7 1
+ = 0.9375 in
8 16
jarak tengah lubang ke bagian garis tumpuan : Lc = s - h = 3 -
2
kekuatan baut : Rn = 1.2 x Fu x Lc x t
= 1.2 x 24.54007 x 3 x 0.75
= 55.9053534 kips
Upper Limit : Rn = 2.4 x d x t x Fu
= 2.4 x 0.875 x 1 x 24.54
= 38.6506147 kips
Digunakan : Rn = 38.6506147 kips untuk baut bagian 2
baut bagian 3
diameter lubang: h = 7 1
+ = 0.9375 in
8 16
jarak tengah lubang ke bagian garis tumpuan : Lc = s - h = 6 -
2
kekuatan baut : Rn = 1.2 x Fu x Lc x t
= 1.2 x 24.54007 x 6 x 0.75
= 122.16355 kips
Upper Limit : Rn = 2.4 x d x t x Fu
= 2.4 x 0.875 x 1 x 24.54
= 38.6506147 kips
Digunakan : Rn = 38.6506147 kips untuk baut bagian 3
baut bagian 4
diameter lubang: h = 7 1
+ = 0.9375 in
8 16
jarak tengah lubang ke bagian garis tumpuan : Lc = s - h = 9 -
2
kekuatan baut : Rn = 1.2 x Fu x Lc x t
= 1.2 x 24.54007 x 8.53125 x 0.75
= 188.421747 kips
Upper Limit : Rn = 2.4 x d x t x Fu
= 2.4 x 0.875 x 0.75 x 24.54
= 38.6506147 kips
Digunakan : Rn = 38.6506147 kips untuk baut bagian 4
LFRD Solution
Beban terfaktor
Pu = 1.1 D + 2 L
= 1.1 60.964826 + 2 91.25807
= 249.5774583002 kips
Jumlah total bagian yang dibutuhkan = banyak bagian x jumlah baut per bagia
= 8 x 6
= 48 baut
= momen akiba
= momen tahan
SAMBUNGAN DI 12 M
Jarak antara baut = 6.34271654 in
Bagian 1 Bagian 3
Baris Baut Rn l Momen Baris Baut Rn
1 33.8192878439 25.4807579 861.7410850229 1 38.650615
2 33.8192878439 18.2005413 615.529346445 2 38.650615
3 33.8192878439 10.9203248 369.317607867 3 38.650615
4 33.8192878439 3.64010827 123.105869289 4 38.650615
Total 1969.693908624 Total
Bagian 2 Bagian 4
Baris Baut Rn l Momen Baris Baut Rn
1 38.6506146788 25.4807579 984.8469543119 1 38.650615
2 38.6506146788 18.2005413 703.4621102228 2 38.650615
3 38.6506146788 10.9203248 422.0772661337 3 38.650615
4 38.6506146788 3.64010827 140.6924220446 4 38.650615
Total 2251.078752713 Total
KN/m
KN/m
KN/m
KN/m
KN/m2
KN/m2
6.4516
39.370
2603.387045 kip - ft
494912.2328 =
= 1.587159 in
24260.389
0.0872 in2
3
mbung ukuran: 2 x in
8
0.601016 in2
Fu = 24.54
0.9375
= 1.53125 in
2
0.9375 = 2.53125 in
2
0.9375 = 5.53125 in
2
0.9375 = 8.53125 in
2
Mu = 1493.57592
l Momen
25.48076 984.84695431
18.20054 703.46211022
10.92032 422.07726613
3.640108 140.69242204
Total 2251.0787527
l Momen
25.48076 984.84695431
18.20054 703.46211022
10.92032 422.07726613
3.640108 140.69242204
Total 2251.0787527
KONVERSI
1 m 39.37007874 in
1 m 3.280839895 ft
1 m2 10.76391042 ft
1 kg 0.0022046225 pound (lb)
1 kg/cm2 2.04815625 kip/ft2
1 kip/ft2 6.94445 lb/in2
1 kip/ft2 0.001 lb/ft2
1 kip 1000 pound (lb)
1 ksi 1 kip/in2 0
1 KN 0.224847425 kip
1 KNm 0.736377025 kip-ft
1 mpa 0.145454545 ksi
1 ft 12 inci
1 mm 0.03937008 inci
1 cm2 0.15500031 inci2
1 kg/m 1 kip/in
1 cm 0.39370079 inci
1 cm3 0.06102374 inci3
1 cm4 0.02402510 inci4
1 kg/m 0.00980665 KN/m
111.54856
15.829259
0.8772287
70.4
12.8
c c c co c
o
c o
c o
c co o
c
o o o o
AISC MEMBER DIMENSIONS AND PROPERTIES VI
W, S, M, HP Shapes C, MC Shapes WT, ST, MT Shapes
Y Y
k1=0,75 Y
k=0,832 tf=0,43 tf=0,343
bf=5,75
y=1,07
x(bar)=0,514 tf=0,36 d=8
d=15,9 T X d=6 X
d=5,09 X
tw=0,295 tw=0,437 tw=0,24
bf=6,99 bf=2,16
Y
Y Y
b=5 t=0,349
t=0,375
x=2,4
t=1,125 X
X d=3,5 H=8 X
y=2,4
b=8
(0, 3/8, or 3/4