B b1 b1 b1 b1
q
sho
H
H
BRONJONG
Z
H
Pa
H
BOR PILE/SHEET PILE
Pa = 14.296
pa= shao x D + D/2 x (shad - shao)
= 0.000 x 8 + 8/ 2 x ( 10.656 - 0.000 ) = 42.625 t/m'
Ha= Pa+pa
= 56.921 t/m'
H A
shz Koefisien Tanah Pasif, Kp=tan2(45+f/2) =
h= Z
g, f, c T t1 = sh = g.h.Ka + q.Ka - 2.c.√Ka
t= t1/3 C B 9.649 h=0 -> sho =
12.376 D h=Z -> shz =
( t-t1 ) =
2.727 p
E {t}
2.836
g.(Kp-Ka).t g.(Kp-Ka).t 11.459
PERIKSA SYARAT KESEIMBANGAN : P(t)=
SH = P-1/2.g.(Kp-Ka).t1 +1/2.g.(Kp-Ka)(t -t1 )
2 2 2
14.296
= 0.000 INPUT MANUAL 14.296
SMT= P.(H+2/3.t1)-1/2.g.(Kp-Ka).t1.(t-t1).(t1/3+(t-t1)/3)-1/2.g.(Kp-Ka).t.(t-t1).(t1/3+2/3.(t-t1))
= 0.000
OUTPUT PERHITUNGAN :
1.8 t/m3
6.53 o
0.45 t/m2
4 m
1.9 t/m2
0.796
1.257
+ q.Ka - 2.c.√Ka
0.709 t/m2
6.439 t/m2
h m=pxh
{m} {t m}
2.000 5.673
1.333 15.279
H(m)= M(tm)=
1.466 20.952 harus < Mijin Sheet pile
1.466 20.952
t1 (m) = 9.649
t (m) = 12.376
Smallest stability factor, F= 1.613
Circle (1,12.5)
R=32.504
(32.847,6)
12 13 26
10 11 25
8 9 24
6 7 22 23
21
5 20
(-29.004, 0) 4
1 2 3 18 19
A 16 17
14 15
27 28
C
Coordinat of Nodal Point :
i X Y
1 -50 0
(32.847,6) 2 -25 0
26 3 0.5 0
4 0.5 1.2
5 1 1.2
6 1 2.4
7 1.5 2.4
8 1.5 3.6
9 2 3.6
10 2 4.8
11 2.5 4.8
12 2.5 6
13 4 6
14 -25 -1.5
15 1.5 -1.5
16 1.5 0
17 2 0
18 2 1.2
19 2.5 1.2
20 2.5 2.4
21 3 2.4
22 3 3.6
23 3.5 3.6
24 3.5 4.8
25 4 4.8
26 50 6
27 -50 -30
28 50 -30