Perhitungan Bronjong

B b1 b1 b1 b1
q
sho
H

H
BRONJONG

Z
H
Pa
H
BOR PILE/SHEET PILE

Titik tinjau Mguling H


shao O shpo
shz
CHECK Gaya geser Horisontal
LB= 0.5 m
D= 8 m
D pa pp
sha = g.h.Ka - 2.c.√Ka
h=0 shao = 0.000 t/m2
h=D shad = 10.656
shp = g.h.Kp + 2.c.√Kp shad shpd
h=0 shpo = 1.009 L LB
h=D shpd = 19.104

Pa = 14.296
pa= shao x D + D/2 x (shad - shao)
= 0.000 x 8 + 8/ 2 x ( 10.656 - 0.000 ) = 42.625 t/m'
Ha= Pa+pa
= 56.921 t/m'

pp= shpo x D + D/2 x (shpd - shpo)


= 1.009 x 8 + 8/ 2 x ( 19.104 - 1.009 ) = 80.453 t/m'
c x (L+LB) = 0.450 x ( 4.1 + 0.5 ) = 2.070 t/m'
Hp= pp+cx(L+LB)
= 82.523 t/m'
Faktor Keamanan
SH= Ha-Hp Geser Gaya Horisontal
-25.602 t <0-->Hp>Ha aman SF =Hp/Ha = 1.450

CHECK Stabilitas Lereng dgn Metoda Bishop didapat :


Faktor Keamanan : SF=1.613, R= 32.5m
Program Slope Stability, Stabil 2.3 A. Verruijt, 1986
DATA LONGSOR1

Bronjong, Density (BJ) : g= 2.20 t/m3


Est. strength : qu = 50 kg/cm2 H= 1.00 m
Tanah, Density (BJ) : g= 1.8 t/m3 L=B+(n-1)xb1
Sudut Geser : f= 6.53 o
= 4.1 m
Cohesion : c= 0.45 t/m2 B-b1= 1.3 m
Tinggi Timbunan : Z= 4 m a= 0.960 rad = 55 O
q= 1.9 t/m2 t= 1.065 m
CHECK Momen Guling B= 2 m Faktor Keamanan
pada titik O b1= 0.7 m Momen Guling pada titik O
nlayer = 4 SF=Mp/Ma= 2.9068
2
Menurut Rankine, Koefisien Tanah Aktif, Ka= tan (45-f/2) = 0.796
2
Koefisien Tanah Pasif, Kp=tan (45+f/2) = 1.257

Momen Guling Aktif Ma pd titik O p h m=pxh


sh = g.h.Ka + q.Ka - 2.c.√Ka {t} {m} {t m} 1.01
h=0 -> sho = 0.709 t/m2 2.836 2.000 5.673 3.27
h=Z -> shz = 6.439 t/m2 11.459 1.333 15.279
P(t/m')= H(m)= Ma (tm/m')=
14.296 1.466 20.952
Gaya Horisontal Pa(t/m')=
14.296
Momen Guling Pasif Mp pd titik O
tnh dibwh bronjong bronjong
7.56 24.82 17.60 36.08 Mp (tm/m')=
w tnh l tnh wxl wbrj lbrj wxl 60.902
t t.m t t.m Berat konstruksi
0 - - 4.10 - 4.40 3.10 13.64 Wp(t/m')=
1 1.00 1.26 3.75 4.73 4.40 2.40 10.56 25.160
2 2.00 2.52 3.40 8.57 4.40 1.70 7.48
3 3.00 3.78 3.05 11.53 4.40 1.00 4.40 c bronjong (kg/cm2)=
4 - - 4.10 - - 3.10 - c =qu/2=
25
Tahanan geser
horisontal (t/m')
325
Tahanan geser
min (t/m')
266
Perhitungan Turap/Sheet Pile

beban merata, q INPUT DATA TANAH : Density (BJ. Tanah) : g=


Sudut Geser : f=
h= 0 Cohesion : c=
sho
Tinggi Timbunan : Z=
g, f, c
q=
Z P
Menurut Rankine, Koefisien Tanah Aktif, Ka= tan2(45-f/2) =

H A
shz Koefisien Tanah Pasif, Kp=tan2(45+f/2) =
h= Z
g, f, c T t1 = sh = g.h.Ka + q.Ka - 2.c.√Ka
t= t1/3 C B 9.649 h=0 -> sho =
12.376 D h=Z -> shz =
( t-t1 ) =
2.727 p
E {t}
2.836
g.(Kp-Ka).t g.(Kp-Ka).t 11.459
PERIKSA SYARAT KESEIMBANGAN : P(t)=
SH = P-1/2.g.(Kp-Ka).t1 +1/2.g.(Kp-Ka)(t -t1 )
2 2 2
14.296
= 0.000 INPUT MANUAL 14.296
SMT= P.(H+2/3.t1)-1/2.g.(Kp-Ka).t1.(t-t1).(t1/3+(t-t1)/3)-1/2.g.(Kp-Ka).t.(t-t1).(t1/3+2/3.(t-t1))
= 0.000
OUTPUT PERHITUNGAN :
1.8 t/m3
6.53 o

0.45 t/m2
4 m
1.9 t/m2

0.796

1.257
+ q.Ka - 2.c.√Ka
0.709 t/m2
6.439 t/m2

h m=pxh
{m} {t m}
2.000 5.673
1.333 15.279
H(m)= M(tm)=
1.466 20.952 harus < Mijin Sheet pile
1.466 20.952

t1 (m) = 9.649
t (m) = 12.376
Smallest stability factor, F= 1.613
Circle (1,12.5)
R=32.504

(32.847,6)
12 13 26
10 11 25
8 9 24
6 7 22 23
21
5 20
(-29.004, 0) 4
1 2 3 18 19
A 16 17
14 15

27 28
C
Coordinat of Nodal Point :
i X Y
1 -50 0
(32.847,6) 2 -25 0
26 3 0.5 0
4 0.5 1.2
5 1 1.2
6 1 2.4
7 1.5 2.4
8 1.5 3.6
9 2 3.6
10 2 4.8
11 2.5 4.8
12 2.5 6
13 4 6
14 -25 -1.5
15 1.5 -1.5
16 1.5 0
17 2 0
18 2 1.2
19 2.5 1.2
20 2.5 2.4
21 3 2.4
22 3 3.6
23 3.5 3.6
24 3.5 4.8
25 4 4.8
26 50 6
27 -50 -30
28 50 -30