Anda di halaman 1dari 2

Analisa Struktur, Konstruksi Turap (Sheet Pile)

Perhitungan Turap/Sheet Pile.


ISI HANYA PADA HURUF WARNA MERAH SAJA

INPUT DATA TANAH : Density (BJ. Tanah) : g= 1.9 t/m3


beban merata, q
Sudut Geser : f= 10 o

h= 0 Cohesion : c= 0.4 t/m2


sho Tinggi Timbunan : Z= 2.5 m
g, f, c q= 1.5 t/m2
Z
P Ka= tan2(45-f/2) =
0.704
H A
h= Z Kp= tan2(45+f/2) =
shz 1.420
g, f, c
T t1 = sh = g.h.Ka + q.Ka - 2.c. √Ka
t= t1/3 C B 4.60 h=0 -> sho = 0.385 t/m2
5.90 D h=Z -> shz = 3.729 t/m2
( t-t1 ) =
1.30 p h m=pxh
{t} {m} {t m}
E
0.962 1.250 1.203
g.(Kp-Ka).t g.(Kp-Ka).t 4.181 0.833 3.484
PERIKSA SYARAT KESEIMBANGAN : P(t)= H(m)= M(tm)=
SH = P-1/2.g.(Kp-Ka).t12+1/2.g.(Kp-Ka)(t2-t12) 5.14 0.91 4.69
= 0.000 INPUT MANUAL 5.14 0.91 4.69
SMT= P.(H+2/3.t1)-1/2.g.(Kp-Ka).t1.(t-t1).(t1/3+(t-t1)/3)-1/2.g.(Kp-Ka).t.(t-t1).(t1/3+2/3.(t-t1))
= 0.000 t1 (m) = 4.60
OUTPUT PERHITUNGAN :
t (m) = 5.90
File Name : 607805336.xls
Date : 08/26/2022n Time : 23:19:25
12354 12354

Anda mungkin juga menyukai