Data : Penyelesaian :
N = 40 ton Dicoba :
D = 0.35 m Ukuran Pile
ML = 7 ton.m Panjang pile (L) =
MB = 4 ton.m Dia. Pile (D) =
γb = 1.4 ton/m³ S (4 x D) =
γw = 1 ton/m³ LA =
γsat 1 = 1.75 ton/m³ LB =
γsat 2 = 1.8 ton/m³ Ukuran pile cap
γsat 3 = 1.8 ton/m³ L =
γpasir = 1.9 ton/m³ B =
Øpasir = 28 ˚ T =
Cc = 0.75 Perhitungan End Bearing (E)
e0 = 0.7 Akibat sudut geser dalam
ep = 1.65 Nq* =
q01 (penutup lantai keramik) = 2600 kg/m3 Qp1 =
= 2.6 ton/m3 =
q02 (beban berguna untuk stadion) = 400 kg/m² Akibat tegangan efektif
= 0.4 ton/m² Qp2 =
h1 = 2.75 m Dipakai yang terkecil
h2 = 3.75 m
h3 = 3.5 m Perhitungan Friction
h4 = 4m Dengan metode alpa
hpasir = 4m Cu 1 =
γbeton bertulang = 2.4 ton/m³ Cu 2 =
γbeton tidak bertulang = 1.8 ton/m³ Cu 3 =
Diketahui:
2/3 pile = 8m
Δh1 = 2m
Δh2 = 2m
Δh3 = 2m
Δh pasir = 4m
z1 = 1m
z2 = 7m
z3 = 9m
menghitung tegangan efektif tanah
σv1 = 8.663 ton/m2
σv2 = 13.863 ton/m2
σv3 = 15.463 ton/m2
menghitung penyebaran tegangan tanah
Lg = 1.75 m
Bg = 1.75 m
menghitung ΔP dengan metode 2V:1H
ΔP1 = 13.132 ton/m2
ΔP2 = 0.590 ton/m2
ΔP3 = 0.373 ton/m2
Cu 1 = 220 kN/m² dipilih yg minimum
Cu 2 = 230 kN/m² SF
Cu 3 = 240 kN/m² Qu
12 m α1 = 0.26 Qs
0.35 m α2 = 0.25 Menghitung jumlah gaya vertikal
1.40 m α3 = 0.23 1. Berat pile cap =
0.63 Qf1 = 62.217 ton 2. Berat 4 pile =
0.50 Metode gamma 3. Berat LK =
Cu rata2 = 23.08 ton/m² 4. Berat qo1 =
2.5 m 5. Beban (N) =
2.5 5 Besar Tegangan efektif (σv) dan area (A) 6. Berat qo2 =
0.525 m σv 1 = 3.85 ton/m²
σv 2 = 6.66 ton/m² Berat Pile cap
σv 3 = 9.46 ton/m² volume
40 (dari grafik) A1 = 5.29 m² Berat
102.26102 kN A2 = 19.71 m² Berat 4 pile
10.226 ton A3 = 28.22 m² volume
Berat
36.398 kN Menghitung σv rata rata Berat lantai kerja
3.640 ton σv rata2 = 5.32 ton/m² t
Berat
Panjang pile efektif Beban lantai granit, qo1
= 10 m tebal granit
22 ton/m² λ = 0.25 akibat qo1
23 ton/m² FAV = 12.87 ton/m² Beban N
24 ton/m² Qf2 = 141.42 ton Beban berguna stadion, qo2
Akibat qo2
m
cm
tahun
tahun
tahun
cm
cm
unan sebesar 73,253 cm setelah