Anda di halaman 1dari 7

TUGAS 2 Pondasi Dangkal Beban Eksentris 2 arah data CPT

DIKETAHUI
ϒb = 1.45 ton/m3
ϒw = 1.0 ton/m3
ϒsat lempung = 1.8 ton/m3
ϒbeton bertulang = 2.4 ton/m3
ϒbeton tak bertulang = 1.8 ton/m3
dw = 1.2 m
df = 2.0 m
H = 5.2 m
qc = 30 kg/cm2
qo1 = 2.600 ton/m3
qo2 = 0.25 ton/m2
ex = 0.4 m
ey = 0.55 m
N = 12 ton

Karena MAT merupakan kasus B dimana MAT terletak diatas df. Maka nilai
berat volume yang dipakai adalah ϒ'
ϒ' = 0.80 ton/m3

Menghitung qn :
Berat Pondasi = 11.448 ton
Berat Tanah Urug = 10.149 ton
Beban qo1 = 0.657 ton
Beban Berguna qo2 = 2.297 ton
Beban Akibat Konstruksi (N) = 12.00 ton
Beban Lantai Kerja (lk) = 1.654 ton
∑V = 38.204 ton

Menghitung qmax dan q min


ex/B = 0.163
Re = 0.5
B' = 1.650 m
L' = 2.65 m

i. Qmax dan qmin arah L


qmax = 10.809 ton/m2
qmin = 6.666 ton/m2
ii. Qmax dan qmin arah B
qmax = 6.448 ton/m2
qmin = 2.290 ton/m2
Menghitung Tegangan Efektif Tanah (Po')
1.Po'1 = 10.041 ton/m2
2. Po'2 = 11.425 ton/m2
2. Po'3 = 12.809 ton/m2
Menghitung Yegangan Tanah (σv) Memakai Metode Perbandingan 2v:1H
σv1 = 2.497 ton/m2
σv2 = 1.193 ton/m2
σv3 = 0.698 ton/m2
qc1 = 32.778 kg/cm2
= 327.78 ton/m2
qc2 = 46.667 kg/cm2
= 466.67 ton/m2
qc3 = 167.778 kg/cm2
= 1677.78 ton/m2
C1 = 4896.375
C2 = 6126.678
C3 = 19646.966
Trial&Error
L = 3.75
B = 2.45
LA = 1.1
LB = 0.70
t1 = 0.6
t2 = 0.25
lk = 0.1

ML = 4
MB = 2.5
ML = 0.00
A (Luas Conus) = 10
T = 1.3
z = 0.0

Uraian Perhitungan
Menghitung Berat Pondasi
i. Volume plat pondasi rata = 2.296875
Berat pondasi = 5.513
ii. Volume pondasi limas terpancung = 1.472
Berat pondasi = 3.533
iii. Volume kolom pendek = 1.001
Berat kolom = 2.402
Jadi berat pondasi = 11.448

Menghitung Conus
A = 10
SF = 2.5
qs = 1.2
= 12
qs>qmax
Selisih antara qs dan qmax = 11.023
Menghitung Penurunan
z1 = 0.865
z2 = 2.595
z3 = 4.325
∆h1 = 1.73
∆h2 = 1.73
∆h3 = 1.73

Menghitung Besar Penurunan


P1 = 0.00008
= 0.00785
P2 = 2.8E-05
= 0.00281
P3 = 4.7E-06
= 0.00047

Jadi pondasi akan mengalami penurunan sedalam penurunan total


Penurunan total = 0.01112
m
m
m
m
m
m
m

ton.m
ton.m
m
cm2
m
m

Menghitung Tanah Urug


Volume urugan = 12.686 m3
m3 Berat Urugan = 10.149 ton
ton Menghitung qo1
m3 Tebal lantai = 0.03 m
ton qo1 = 0.078 ton/m2
m3 Akibat qo1 = 0.656565 ton
ton Menghitung qo2
ton qo2 = 0.25 ton/m2
Akibat qo2 = 2.297 ton
Beban Akibat Konstruksi (N) = 12 ton
Menghitung Beban Lantai Kerja = 1.65375 ton

cm2

kg/cm2
ton/m2
AMAN
% AMAN

m
m
m
m
m
m

m
cm
m
cm
m
cm

cm

Anda mungkin juga menyukai