N = 329 kN
C = 2,45 t/m² MB = 88,356 kNm L = 1,30 m
Cc = 0.65 ML = 88,356 kNm B = 1,15 m
Df = 1,6 m sat.lempung = 1,9 t/m³ LA = 0,4 m
Dw =1m sat . pasir = 1,8 t/m³ LB = 0,3 m
T = 0,15 m b = 1,5 t/m³ t buis beton = 0,1 m
Cv = 15 10 6 w
D pondasi sumuran = 1 m
= 30 = 1 t/m³
beton = 2,4 t/m³
Nc = 30,14
Nq = 18,40 beton.tak .tulang . = 1,8 t/m³
N = 22,40
122
1,15
= 1 0,2
1,30
= 0,823
a.2 Faktor muka air tanah
' = sat .lempung w
= 1,9 – 1
= 0,9
Po = ' Df
= 0,9 x 1,6
= 2,040
qu = ( .C.Nc ) {( Po q 02) Nq} ( .0,5. '.B.N )
=
(1,2.2,45.30,14) {( 2,04 2,5)18,4} (0,823.0,5.0,9.1,15.22,4)
= 1865,69 kN/m²
b. Menghitung qun (daya dukung ultimate netto)
qun = qu ( Df ' )
= 1865,69 – (1,6 x 0,9)
= 1863,73 kN/m²
c. Menghitung qn (tekanan pondasi netto) = v :
Menghitung berat sendiri pondasi
Berat pondasi = 24,24 kN
Berat tanah urug = 9,09 kN
Beban konstruksi (N) = 329,000 kN
+
v 362,33 kN
1) Menghitung beban pondasi
Volume pondasi plat rata
V = B x L x t2
= 1,15 x 1,30 x 0,15
= 0,225 m³
Berat = V x beton.brtulang
= 0,449 x 2,4
= 5,4 kN
Volume pondasi sumuran
= 1 D
2
V
4
= 1 3,14 1
2
4
= 0,785 m³
Berat = V x beton.brtulang
= 0,785 x 2,4
= 18,84 kN
2) Menghitung tanah urug
Volume urugan 1
V1 = B x L x T
= 1,15 x 1,30 x 0,15
= 0,225 m³
123
Berat =Vx '
= 0,225 x 0,9
= 2,025 kN
Volume urugan 2
V1 = 1 D
2
4
= 1 3,14 1
2
4
= 0,785 m³
Berat =Vx '
= 0,785 x 0,9
= 7,065 kN
3) Beban akibat konstruksi (N) = 329 kN
d. Menghitung q max dan q min
qmax dan qmin arah L
v ML
qmax =
B L 16 B L2
362,33 88,356
=
1,15 1,3 16 1,15 1,3 2
= 515,13 kN/m²
v ML
qmin =
B L 16 B L2
362,33 88,356
=
1,15 1,3 16 1,15 1,3 2
= 20,22 kN/m²
qn = qmax – (Df x ' )
= 515,13 - (1,6 x0,9)
= 513,69 kN/m²
qmax dan qmin arah B
v MB
qmax =
BL 1
6 L B
2
362,33 88,356
=
1,15 1,3 16 1,3 1,15 2
= 550,71 kN/m²
v MB
qmin =
B L 16 L B 2
371,87 88,356
=
1,15 1,3 1
6 1,3 1,15
2
= 49,80 kN/m²
qn = qmax – (Df x ' )
= 550,71 - (1,6 x 0,9)
= 549,27 kN/m²
e. Menghitung factor aman (SF)
124
qun 1863,729
SF = qn 549,27
= 3,36
Dipakai factor aman SF = 3 untuk bangunan produksi. Maka, qs
(daya dukung aman) adalah
qun
qs = ( Df ' )
SF
1863,729
= ( Df ' )
3
= 623,283 kN/m² > 550,71 kN/m² (AMAN)
Kontrol selisih antara qmax dan qmin adalah :
qs q max
Presentase = 100%
q max
623,283 550,71
= 100%
550,71
= 13,1% syarat 10% - 20% (AMAN)
5.5.3 Menghitung Qa
Dipakai Sf = 3, bangunan permanen, kontrol normal.
Qu
Qa = Sf
1863,729
=
3
= 621,243 kN
125
5.5.4 Menghitung n dan η
Menghitung n
NB
n = Qa
329
= 621,243
126
h = (MT s.d TK) – ( 2 H )
3 Z = 1 h
2
= 165 cm – 110 cm
= 55 cm = 0,55 m = 1 0,55.m
1. Menghitung Tegangan Efektif Tanah (Po’)
2
= 0,275 m
Po’ = (b Dw).[(sat w).( 2 3 H Dw)] [(sat w).z ]
= (1,5 1).[(1,8 1).(1,1 1)] [(1,8 1).0,275]
= 3,4 kN/m²
2. Menghitung Penyebaran Tegangan Tanah ( z )
V
z =
( L z ).( B z )
362,33
=
(1,3 0,275).(1,15 0,275)
= 161 kN/m²
qc.rata.kedalaman. 2 3 pile.s.d .TK
qc =
titik .qc
qc.rata.kedalaman.1,1m.s.d .1.65m
=
4
20 20 25 30
( ) 25 25 ( )
= 2 2
4
= 243,75 kN/m²
300
C = ( 2 Po' ) qc
300
= (2 3,4) 243,75
= 10753,68
h Po'z
= ln( )
c Po'
0,55 3,4 161
= 10753,68 ln( 3,4 )
= 0,0001984 m
127
= 0,01984 cm
Jadi pondasi mengalami penurunan sedalam 0,01984 cm.
128
= 6191150 N
= 6191,2 kN
c. Vc = (4√fc’) x bo x d
= (4√35) x 433 x 133
= 525608,192 N
= 525,609 kN
Diambil nilai yang terkecil, sehingga Vc = 525,609 kN
Mu=88,356 kNm
d=49cm
b=115cm
Gambar 5.5.7 Tegangan Beton
b = 115 cm
ND= 0,85fc’ x a x b
= 0,85 x 35 x a x 115
ND= 3421,25a
Syarat setimbang: ∑ M = 0 dan ∑ H = 0
Untuk ∑ M =0 --------- ND x Z = Mu
(3421,25a) x (d – 1/2a) = 88,356
3421,25a x (49 – 0,5a) = 88,356
167641,25a – 1710,625a2 = 88,356
a2 – 98a + 0,051 =0
a1 = 63,5 cm (tidak memenuhi)
a2 = 0,83 cm (memenuhi)
ND = 3421,25 x a
129
ND = 3421,25 x 0,83
ND = 2839,63 kN
Untuk ∑ H = 0
ND = NT
2839,63 = Ast x fy
2839,63 = Ast x 360
Ast = 2839,63/360
Ast = 20,65 mm2
Syarat tulang minimum ρmin = 14/fy
= 14/360
= 0,0058
Amin = ρ x b x d
=(0,0058 x 115 x 49) cm2
= 57,52 mm2
Dipakai tulang minimum 12 Ø 20 mm = 2,834 cm2
Tulangan 12 Ø20 mm dipasang untuk lebar plat = 115 cm
Jarak tulangan = 115 cm / 12 = 10 cm
Jadi dipasang tulangan Ø20 mm – 10 cm
a Penulangan Pada Tiang Pondasi Cakar Ayam / Sumuran
Dipakai tulangan D20
Tebal buis beton = 10 cm = 100 mm
Selimut = 70 mm
d = 100 – 70 – ½ 20 = 20 mm
Mu = 88,356 kNm
88,356 kN
Mu/bd2 = 2,5 x 0,20² = 883,56
883,56 200
ρ =0,0005 + (0,001- 0,0005) = 0.00392
300 - 200
ρmin = 1,4/fy
= 1,4/360 = 0,0038
ρmin < ρhit, maka yang dipakai adalah ρhit = 0,00392
As = 0,00392 x b x d = 0,00392 x 1150 x 20 = 195,79 mm2
Maka dipasang tulangan 16D20 – dengan jarak 15 cm
b Tulangan Geser
D = 100 mm, selimut = 40 mm
Diameter Sengkang = 8
Diameter tulangan utama = 20
d = 150- 40 - 8- ½ 20 = 92 mm
Vu = ½ x Wu x L = ½ x 329 x 1,3 = 213,85 kN
130
Vc = Øvc.b.d tabel 15 buku 1 gideon untuk fc’ =35 Mpa, maka
Øvc = 0,5
Vc = Øvc.b.d
= 0,5 . 115. 92
= 162300 N = 162,3 kN < Vu = 213,85kN
Jarak min = d/2 = 92/2 = 46 cm
Maka dipasang tulangan D8-150