Anda di halaman 1dari 209

Data Properti Besi Hollow

Tinggi Hollow = 0.04 m


Lebar Hollow = 0.02 m
Tebal Hollow = 0.003 m

Data Properti Kanal MC3x3,5


d = 3 in 0.0762 m
tw = 0.132 in 0.0033528 m
t = 0.273 in 0.0069342 m
bf = 1.37 in 0.034798 m
T = 1.625 in 0.041275 m
Panjang (L) = 40 cm 0.4
Area (A) = 1.09 in2 0.0007032 m2
Moment Inertia Arah x (Ix) = 1.57 in4 6.5348E-07 m4
Moment Inertia Arah y (Iy) = 0.169 in4 7.0343E-08 m4
Section Modulus Arah x (Sx) = 1.04 in3 1.7043E-05 m3
Section Modulus Arah y (Sy) = 0.182 in3 2.9824E-06 m3

Data Properti Pelat Baja


Tebal Pelat = 0.002 m
Tinggi Pelat = 0.4 m
Panjang Pelat = 2.4 m
Luas Penampang Pelat (A) = 0.0008 m2
Momen Inersia Pelat (I) = 2.6667E-10 m4
Modulus Penampang (S) = 2.6667E-07 m3
Tegangan Lentur Izin Baja (s izin) = 16000000 kg/m2
Tegangan Geser Izin Baja (t izin) = 9280000 kg/m2
Tegangan Lendut Izin Baja (Δ izin) = 0.00166667 m
Modulus Elastisitas (E) = 2.1E+10 kg/m2

Beban Akibat Campuran Beton


Data Properti Panel Beton
Tinggi Panel = 0.4 m
Panjang Panel = 2.4 m
Tebal Panel = 0.05 m

Pembebanan
Macam" Beban
Beban Beton (Berat Jenis) = 2400 Kg/m3
Beban Pekerja = 100 Kg/m2
Beban Pemadatan = 500 Kg/m2
Beban Horizontal
Akibat Campuran Beton = 24 Kg/m
Akibat Beban Pekerja = 40 Kg/m
Akibat Pemadatan = 200 Kg/m
Beban Horizontal (QTotal) = 24 Kg/m
PERCOBAAN I
Jarak antar pengaku (Bruto) = 2.4 m Jarak Antar
Percobaan pengaku
Jarak antar pengaku (Neto) = 2.4 m (Bruto) (m)

Kontrol Terhadap Momen (Lentur) 1 2.40


Momen Maksimum (Mmax) = 5.76 Kgm 2 1.20
Momen yang terjadi (MT) = 21600000 kg/m2 3 0.80
TIDAK OKE 4 0.59
5 0.48
Kontrol Terhadap Geser 6 0.40
Geser Maksimum (Vm) = 28.8 Kg 7 0.34
Geser yang terjadi (VT) = 54000 kg/m2 8 0.30
OKE 9 0.27
10 0.24
Kontrol Terhadap Lendutan (Defleksi) 11 0.22
Defleksi Maksimum (ΔT) = 0.37028571 m 12 0.20
Defleksi Ijin (Δijin) = 0.01 13 0.18
TIDAK OKE 14 0.17
15 0.16

METODE CROSS
Momen Primer = 1/12 Q L^2
MomenAB = -0.6498 Kgm
MomenBA = 0.6498 Kgm
MomenBC = -0.6498 Kgm
MomenCB = 0.6498 Kgm
MomenCD = -0.6498 Kgm
MomenDC = 0.6498 Kgm
MomenDE = -0.6498 Kgm
MomenED = 0.6498 Kgm

VAB = 6.84 Kg
VBA = 6.84 Kg
VBC = 6.84 Kg
VCB = 6.84 Kg
VCD = 6.84 Kg
VDC = 6.84 Kg
VDE = 6.84 Kg
VED = 6.84 Kg

Menghitung kekakuan masing" balok = 3/4 EI/L (jepit-sendi) Buhul A


= EI/L (jepit-jepit) Ujung Btg AB
KAB = EI/0,58 1.724138 EI Fd 1
KBA = EI/0,58 1.724138 EI Mprimer -0.6498
KBC = EI/0,58 1.724138 EI Mdistribusi
KCB = EI/0,58 1.724138 EI Minduksi 0
KCD = EI/0,58 1.724138 EI Mdistribusi
KDC = EI/0,58 1.724138 EI Minduksi 0
KDE = EI/0,58 1.724138 EI Makhir -0.6498
KED = EI/0,58 1.724138 EI

Menghitung Faktor Distribusi (Fd) = Ki/Ski


FdAB = 1
FdBA = 0.5
FdBC = 0.5
FdCB = 0.5
FdCD = 0.5
FdDC = 0.5
FdDE = 0.5
FdED = 1

Momen Maksimum Tiap Balok = 1/8 q L^2


Balok AB = 0.9747 Kgm
Balok BC = 0.9747 Kgm
Balok CD = 0.9747 Kgm
Balok DE = 0.9747 Kgm
en Maksimum Akibat Momen Akhir Buhul
Balok AB = 0.3249 Kgm
Balok BC = 0.3249 Kgm
Balok CD = 0.3249 Kgm
Balok DE = 0.3249 Kgm

Jarak Antar
Percobaan pengaku
(Bruto) (m)
0.3249
1 2.40
2 1.20
3 0.80
4 0.59

Menghitung Gaya Geser (Vm)


RA = 6.84 Kg
RB = 6.84 Kg
RC = 6.84 Kg
RD = 6.84 Kg
RE = 6.84 Kg

Kontrol Terhadap Geser


Geser yang terjadi (VT) = (3/2)(Vm/A)
VT,A = 12825 Kg/m2 OK
VT,B = 12825 Kg/m2 OK
VT,C = 12825 Kg/m2 OK
VT,D = 12825 Kg/m2 OK
VT,E = 12825 Kg/m2 OK
Kontrol Terhadap Momen (Lentur)
Momen yang terjadi (MT) = Mmax/S
MT,BalokAB = 1218375 Kg/m2 OK
MT,BalokBC = 1218375 Kg/m2 OK
MT,BalokCD = 1218375 Kg/m2 OK
MT,BalokDE = 1218375 Kg/m2 OK
Beban Akibat Pekerja Beban Akibat
kibat Campuran Beton Pemadatan (blm
(SH = 0) ketemu)
Kontrol Terhadap Momen Kontrol Terhadap Geser Kontrol Terhadap Lendutan
Jarak Antar
pengaku (Neto) ΔT
(m) Mmax MT Syarat MT < Vm VT Syarat VT <
(Kgm) (Kg/m2) s izin (Kg) (Kg/m2) t izin
(m)
2.40 5.76 2.16E+07 TDK OK 2.88E+01 5.40E+04 OK 3.70E-01
1.18 1.39 5.22E+06 OK 1.42E+01 2.66E+04 OK 2.16E-02
0.77 0.60 2.24E+06 OK 9.28E+00 1.74E+04 OK 3.99E-03
0.57 0.32 1.22E+06 OK 6.84E+00 1.28E+04 OK 1.18E-03
0.46 0.21 7.94E+05 OK 5.52E+00 1.04E+04 OK 5.00E-04
0.38 0.14 5.42E+05 OK 4.56E+00 8.55E+03 OK 2.33E-04
0.32 0.10 3.91E+05 OK 3.87E+00 7.26E+03 OK 1.21E-04
0.28 0.08 2.94E+05 OK 3.36E+00 6.30E+03 OK 6.86E-05
0.25 0.06 2.28E+05 OK 2.96E+00 5.55E+03 OK 4.13E-05
0.22 0.05 1.82E+05 OK 2.64E+00 4.95E+03 OK 2.61E-05
0.20 0.04 1.47E+05 OK 2.38E+00 4.46E+03 OK 1.72E-05
0.18 0.03 1.22E+05 OK 2.16E+00 4.05E+03 OK 1.17E-05
0.16 0.03 1.02E+05 OK 1.98E+00 3.70E+03 OK 8.20E-06
0.15 0.02 8.60E+04 OK 1.82E+00 3.41E+03 OK 5.87E-06
0.14 0.02 7.35E+04 OK 1.68E+00 3.15E+03 OK 4.29E-06

B C D E
BA BC CB CD DC DE ED
0.5 0.5 0.5 0.5 0.5 0.5 1
0.6498 -0.6498 0.6498 -0.6498 0.6498 -0.6498 0.6498
0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0
0.6498 -0.6498 0.6498 -0.6498 0.6498 -0.6498 0.6498

Kontrol Terhadap Lendutan


Jarak Antar Jumlah
Keterangan
pengaku (Neto) Δijin Pengaku
ΔT
(m) Syarat ΔT < (Harus 3 OK) Vertikal
Δ izin
(m) (m)
2.40 1.00E-02 3.70E-01 TDK OK NO 2
1.18 4.92E-03 2.16E-02 TDK OK NO 3
0.77 3.22E-03 3.99E-03 TDK OK NO 4
0.57 2.38E-03 1.18E-03 OK YES 5
Kontrol Terhadap Lendutan Jumlah
Keterangan Pengaku
Δijin (Harus 3 OK) Vertikal
Syarat
ΔT < Δ izin
(m)
1.00E-02 TDK OK NO 2
4.92E-03 TDK OK NO 3
3.22E-03 TDK OK NO 4
2.38E-03 OK YES 5
1.92E-03 OK YES 6
1.58E-03 OK YES 7
1.35E-03 OK YES 8
1.17E-03 OK YES 9
1.03E-03 OK YES 10
9.17E-04 OK YES 11
8.26E-04 OK YES 12
7.50E-04 OK YES 13
6.86E-04 OK YES 14
6.31E-04 OK YES 15
5.83E-04 OK YES 16
Data Properti Besi Hollow
Tinggi Hollow = 0.04 m
Lebar Hollow = 0.02 m
Tebal Hollow = 0.003 m

Data Properti Kanal MC3x3,5


d = 3 in 0.0762 m
tw = 0.132 in 0.003353 m
t = 0.273 in 0.006934 m
bf = 1.37 in 0.034798 m
T = 1.625 in 0.041275 m
Panjang (L) = 40 cm 0.4
Area (A) = 1.09 in2 0.000703 m2
Moment Inertia Arah x (Ix) = 1.57 in4 6.53E-07 m4
Moment Inertia Arah y (Iy) = 0.169 in4 7.03E-08 m4
Section Modulus Arah x (Sx) = 1.04 in3 1.7E-05 m3
Section Modulus Arah y (Sy) = 0.182 in3 2.98E-06 m3

Data Properti Pelat Baja


Tebal Pelat = 0.002 m
Tinggi Pelat = 0.4 m
Panjang Pelat = 2.4 m
Luas Penampang Pelat (A) = 0.0008 m2
Momen Inersia Pelat (I) = 2.666667E-10 m4
Modulus Penampang (S) = 2.666667E-07 m3
Tegangan Lentur Izin Baja (s izin) = 16000000 kg/m2
Tegangan Geser Izin Baja (t izin) = 9280000 kg/m2
Tegangan Lendut Izin Baja (Δ izin) = 0.001666667 m
Modulus Elastisitas (E) = 21000000000 kg/m2

Beban Akibat Campuran


Data Properti Panel Beton Beton
Tinggi Panel = 0.4 m
Panjang Panel = 2.4 m
Tebal Panel = 0.05 m

Pembebanan
Macam" Beban
Beban Beton (Berat Jenis) = 2400 Kg/m3
Beban Pekerja = 100 Kg/m2
Beban Pemadatan = 500 Kg/m2
Beban Horizontal
Akibat Campuran Beton = 13.2 Kg/m
Akibat Beban Pekerja = 22 Kg/m
Akibat Pemadatan = 110 Kg/m
Beban Horizontal (QTotal) = 24 Kg/m 131.73 Kg/m
PERCOBAAN I Jarak Jarak
Jarak antar pengaku (Bruto) = 0.4 m Antar Antar
Percobaan pengaku pengaku
Jarak antar pengaku (Neto) = 0.32 m (Bruto) (Neto)
(m) (m)

Kontrol Terhadap Momen (Lentur) 1 0.40 0.32


Momen Maksimum (Mmax) = 0.0192 Kgm 2 0.20 0.14
Momen yang terjadi (MT) = 72000 kg/m2 3 0.13 0.07
OKE 4 0.10 0.04
5 0.08 0.02
Kontrol Terhadap Geser 6 0.07 0.01
Geser Maksimum (Vm) = 3.84 Kg
Geser yang terjadi (VT) = 7200 kg/m2
OKE

Kontrol Terhadap Lendutan (Defleksi)


Defleksi Maksimum (ΔT) = 0.000242913 m
OKE

Momen Primer = 1/12 Q L^2


MomenAB = -0.3072 Kgm
MomenBA = - Kgm

VAB = Kg
VBA = Kg

Menghitung kekakuan masing" balok = 3/4 EI/L (jepit-sendi)


= EI/L (jepit-jepit)
KAB = (3/4) EI/0,32 2.34375 EI
KBA = -

Menghitung Faktor Distribusi (Fd) = Ki/Ski


FdAB = 1
FdBA = -

Momen Maksimum Tiap Balok = 1/8 q L^2


Balok AB = 0.3072 Kgm

Maksimum Akibat Momen Akhir Buhul


Balok AB = 0.1536 Kgm
an Akibat Campuran Beban Akibat Beban Akibat
Beton Pekerja Pemadatan
Kontrol Terhadap Momen Kontrol Terhadap Geser Kontrol Terhadap Lendutan
Keteranga
ΔT Δijin n (Harus 3
Mmax MT Syarat Vm VT Syarat Syarat OK)
(Kgm) (Kg/m2) MT < s izin (Kg) (Kg/m2) VT < t izin ΔT < Δ izin
(m) (m)
0.02 7.20E+04 OK 3.84E+00 7.20E+03 OK 2.43E-04 1.33E-03 OK YES
0.00 1.38E+04 OK 1.68E+00 3.15E+03 OK 8.90E-06 5.83E-04 OK YES
0.00 3.78E+03 OK 8.80E-01 1.65E+03 OK 6.70E-07 3.06E-04 OK YES
0.00 1.13E+03 OK 4.80E-01 9.00E+02 OK 5.93E-08 1.67E-04 OK YES
0.00 2.81E+02 OK 2.40E-01 4.50E+02 OK 3.71E-09 8.33E-05 OK YES
0.00 3.13E+01 OK 8.00E-02 1.50E+02 OK 4.58E-11 2.78E-05 OK YES
Jumlah
Pengaku
Horizontal

2
3
4
5
6
7
X 2.4 m Y 0.4 m 2 BEKISTING LUAR X
KEBUTUHAN FRAME perBEKISTING KEBUTUHAN FRAME
FRAME ATAS/BAWAH 2 Btg FRAME VERTIKAL 5 Btg FRAME ATAS/BA
FRAME MIDDLE 4 Btg FRAME VERT
KEBUTUHAN PROFIL UNTUK BEKISTING LUAR KEBUTUHA
KEB. ASLI 18.4 m KEB. ASLI
BATANG 6 m 2.5 BATANG
FRAME A/B 2.4 m 4 FRAME 1 Btg = 2 FRAME A/B FRAME A/B
FRAME MID 0.6 m 8 FRAME FRAME VERT.
FRAME VERT. 0.4 m 10 FRAME
PRIORITAS B
PRIORITAS BELI FRAME 6m/btg FRAME A/B
FRAME A/B 4.8 m Jml Btg 2 Btg SISA BTG
SISA BTG 1.2 m 2 Btg SISA TOTAL
SISA TOTAL 2.4 m
KEBU
KEBUTUHAN SISA FRAME VERT.
FRAME MID 4.8 m TOTAL
FRAME VERT. 4 m KEKURANGAN
TOTAL 8.8 m JML BTG
KEKURANGAN 6.4 m TOTAL BTG
JML BTG 1.066667 » 2 Btg TOTAL BELI
TOTAL BTG 4 Btg KELEBIHAN
TOTAL BELI 24 m
KELEBIHAN 5.6 m

X 1.073 m Y 0.4 m 2 BEKISTING KUNCI


KEBUTUHAN FRAME perBEKISTING KEBUTUHAN FRAME
FRAME VERTIKAL 10 Btg FRAME HORIZO
FRAME HORIZONTAL 2 Btg KEBU
KEBUTUHAN PROFIL UNTUK BEKISTING KUNCI BAGIAN VERTIKAL KEB. ASLI
KEB. ASLI 8 m KEB. FRAME
KEB. FRAME 20 FRAME BATANG
BATANG 6 m 15 FRAME
FRAME VERT. 0.4 m 20 FRAME 1 Btg = 15 FRAME VERT
BELI F
BELI FRAME 6m/btg FRAME
FRAME VERT. 6 m Jml Btg 1 Btg SISA FRAME
SISA FRAME 5 m SISA TOTAL
KEKURANGAN 2 m TOTAL BELI
JML BTG 0.333333 » 1 Btg
TOTAL BTG 2 Btg
TOTAL BELI 12 m
KELEBIHAN 4 m

KEBUTUHAN PROFIL UNTUK BEKISTING KUNCI BAGIAN HORIZONTAL


KEB. ASLI 4.292 m
KEB. FRAME 4 FRAME
BATANG 6 m 5.5918
FRAME HORI 1.073 m 4 FRAME 1 Btg = 5 FRAME HORI

BELI FRAME 6m/btg


FRAME VERT. 4.292 m Jml Btg 0.715333 Btg » 1 Btg
TOTAL BTG 1 Btg
TOTAL BELI 6 m
KELEBIHAN 1.708 m
2.4 m Y 0.4 m 9 BEKISTING DALAM
KEBUTUHAN FRAME perBEKISTING
FRAME ATAS/BAWAH 2 Btg
FRAME VERTIKAL 4 Btg
KEBUTUHAN PROFIL UNTUK BEKISTING DALAM
KEB. ASLI 57.6 m
BATANG 6 m 2.5
FRAME A/B 2.4 m 18 FRAME 1 Btg = 2 FRAME A/B
FRAME VERT. 0.4 m 36 FRAME

PRIORITAS BELI FRAME 6m/btg


FRAME A/B 4.8 m Jml Btg 9 Btg
SISA BTG 1.2 m
SISA TOTAL 10.8 m
27
KEBUTUHAN SISA 15
FRAME VERT. 14.4 m 42
TOTAL 14.4 m 6
KEKURANGAN 3.6 m 2.4
JML BTG 0.6 » 1 Btg
TOTAL BTG 10 Btg
TOTAL BELI 60 m
KELEBIHAN 2.4 m

Y 2.4 m 10 BEKISTING BAWAH


KEBUTUHAN FRAME perBEKISTING KEBUTUHAN FRAME perBE
FRAME HORIZONTAL 1 Btg FRAME HORIZON
KEBUTUHAN PROFIL UNTUK BEKISTING BAWAH
KEB. ASLI 24 m KEB. ASLI
KEB. FRAME 10 FRAME KEB. FRAME
BATANG 6 m 2.5 BATANG
FRAME 2.4 m 10 FRAME 1 Btg = 2 FRAME FRAME

BELI FRAME 6m/btg


FRAME 4.8 m Jml Btg 5 Btg
SISA FRAME 1.2 m 5 Btg
SISA TOTAL 6 m
TOTAL BELI 5 Btg
Z 0.33 m 2 BEKISTING BAWAH
KEBUTUHAN FRAME perBEKISTING
FRAME HORIZONTAL 2 Btg
KEBUTUHAN PROFIL UNTUK BEKISTING BAUT
KEB. ASLI 1.32 m
KEB. FRAME 4 FRAME
BATANG 6 m 18.181818
FRAME 0.33 m 4 FRAME 1 Btg = 18 FRAME
MATERIAL VARIASI HARGA
KANAL UNP Rp 115,346.00 Rp 112,500.00 Rp 105,000.00
HARGA HOLLOW 20/40 Rp 123,000.00 Rp 92,500.00 Rp 115,000.00
HOLLOW 20/20 Rp 60,000.00 - -

Kebutuhan Pembelian
Prioritas Bagian Material (Profil) Material (m) Material (Batang)

Bekisting Luar Kanal U 18.4 4


Utama Bekisting Dalam Hollow 57.6 10
Bekisting Bawah Kanal U 24 5

Kebutuhan Jumlah Detail


Prioritas Bagian Material (Profil) Detail Material Material (Frame)
(m)
Bekisting Kunci Vertikal Kanal U 0.4 20
Kedua Bekisting Kunci Horizontal Hollow 1.073 4
(Alternatif 1)
Bekisting Baut Kanal U 0.33 4

Kebutuhan Jumlah Detail


Prioritas Bagian Material (Profil) Detail Material Material (Frame)
(m)
Bekisting Kunci Vertikal Kanal U 0.4 20
Ketiga Bekisting Kunci Horizontal Kanal U 1.073 4
(Alternatif 2)
Bekisting Baut Kanal U 0.33 4

Kebutuhan Jumlah Detail


Prioritas Bagian Material (Profil) Detail Material Material (Frame)
(m)
Bekisting Kunci Vertikal Kanal U 0.4 20
Keempat Bekisting Baut Kanal U 0.33 4
(Alternatif 3)
Bekisting Kunci Horizontal Kanal U 1.073 4

Kebutuhan Pembelian
Prioritas Bagian Material (Profil) Material (m) Material (Batang)

Bekisting Luar Kanal U 15.2 3


BARU Bekisting Dalam Hollow 68.4 12
Bekisting Bawah Kanal U 24 5

Kebutuhan Jumlah Detail


Prioritas Bagian Material (Profil) Detail Material Material (Frame)
(m)
Kebutuhan Jumlah Detail
Prioritas Bagian Material (Profil) Detail Material Material (Frame)
(m)
Bekisting Kunci Vertikal Kanal U 0.4 20
Bekisting Kunci Horizontal Hollow 1.073 4
BARU LANJUT
Bekisting Baut Kanal U 0.33 4
Bekisting Atas Kanal U 0.96 7
1 btg profil 6 meter

Total Sisa
Sisa Material Keterangan Total Sisa Kanal Total Sisa Hollow Total Sisa Kanal U
U
(m) (Batang) Material (m) (m)
(m)
5.6 1 5.6 Batang 1 Batang 2 Batang 3
2.4 1 2.4 11.6 2.4
5.6 1.2 1.2
1.2 5 6

Kebutuhan Pembelian Total Sisa Keterangan Pemakaian Sisa


Material Material Keterangan Batang Sisa
Material (m) (Bagian)
(m) (Batang)
8 - 0 Bekisting Luar Bekisting Bawah -2.4 -1.2 0
4.292 1 4.108 Bekisting Dalam 0.254 Beli 1 btg baru
1.32 - 2.28 Bekisting Bawah 0.21 0.87 1.2

Kebutuhan Pembelian Total Sisa Keterangan Pemakaian Sisa


Material Material Keterangan Batang Sisa
Material (m) (Bagian)
(m) (Batang)
8 - 0 Bekisting Luar Bekisting Bawah -2.4 -1.2 0
4.292 1 5.308 Bekisting Bawah 0.127 0.127 0.127
1.32 - 3.988 Bekisting Kunci Horizontal 0.127 0.127 0.127

Kebutuhan Pembelian Total Sisa Keterangan Pemakaian Sisa


Material Material Keterangan Batang Sisa
Material (m) (Bagian)
(m) (Batang)
8 - 0 Bekisting Luar Bekisting Bawah -2.4 -1.2 0
1.32 - 2.28 Bekisting Bawah 0.21 0.87 1.2
4.292 1 3.988 Bekisting Baut 0.21 0.87 0.127

Total Sisa
Sisa Material Keterangan Total Sisa Kanal Total Sisa Hollow Total Sisa Kanal U
U
(m) (Batang) Material (m) (m)
(m)
2.8 1 2.8 Batang 1 Batang 2 Batang 3
3.6 1 3.6 8.8 3.6
2.8 1.2 1.2
1.2 5 6

Kebutuhan Pembelian Total Sisa Keterangan Pemakaian Sisa


Material Material Keterangan Batang Sisa
Material (m) (Bagian)
(m) (Batang)
Kebutuhan Pembelian Total Sisa Keterangan Pemakaian Sisa
Material Material Keterangan Batang Sisa
Material (m) (Bagian)
(m) (Batang)
8 - 0 Bekisting Luar Bekisting Bawah -5.2 -4 -2.8
4.292 1 5.308 Bekisting Dalam 0.381 Beli 1 btg baru
1.32 - 4.52 Bekisting Atas 0.14 4.38
6.72 2 0.24 Beli Baru 0.24 5.04

Hollow Kanal U
13 10
Total Sisa
(m) Hollow
(m)
Batang 4 Batang 5 Batang 6 Batang 1

1.2 1.2 1.2 2.4

sa (m) Total Sisa Kanal U (m) Total Sisa Hollow (m)

1.2 1.2 1.2 Batang 1 Batang 2 Batang 3 Batang 1 Batang 2


3.854
0.21 0.87 1.2 0.254 3.854

sa (m) Total Sisa Kanal U (m)

1.2 1.2 1.2 Batang 1 Batang 2 Batang 3 Batang 4


Beli 1 btg baru 4.927
0.127 0.127 0.127 3.607
3.607

sa (m) Total Sisa Kanal U (m)

1.2 1.2 1.2 Batang 1 Batang 2 Batang 3 Batang 4

0.21 0.87 0.127 2.781


Beli 1 btg baru 2.781

Total Sisa
(m) Hollow
(m)
Batang 4 Batang 5 Batang 6 Batang 1

1.2 1.2 1.2 3.6

sa (m) Total Sisa Kanal U (m) Total Sisa Hollow (m)


sa (m) Total Sisa Kanal U (m) Total Sisa Hollow (m)

-1.6 -0.4 0.8 Batang 1 Batang 2 Batang 3 Batang 1 Batang 2


4.927
0.14 0.24 4.38 0.381 4.927
0.333333

6.666667 7 PELATESER
1 2 2 2 2 2 2 2 2 2 1 20
1 2 3 4 5 6 7 8 9 10
5 5 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 5 5

Lebar Bekisting
0.96 m
X 2.4 m Y 0.4 m 2 BEKISTING LUAR X
KEBUTUHAN FRAME perBEKISTING KEBUTUHAN FRAME perB
FRAME ATAS/BAWAH 2 Btg FRAME VERTIKAL 5 Btg FRAME ATAS/BAWAH
FRAME VERTIKA
KEBUTUHAN PROFIL UNTUK BEKISTING LUAR KEBUTUHAN P
KEB. ASLI 13.6 m KEB. ASLI
BATANG 6 m 2.5 BATANG
FRAME A/B 2.4 m 4 FRAME 1 Btg = 2 FRAME A/B FRAME A/B
FRAME VERT.
FRAME VERT. 0.4 m 10 FRAME
PRIORITAS BELI
PRIORITAS BELI FRAME 6m/btg FRAME A/B
FRAME A/B 4.8 m Jml Btg 2 Btg SISA BTG
SISA BTG 1.2 m 2 Btg SISA TOTAL
SISA TOTAL 2.4 m
KEBUTUH
KEBUTUHAN SISA FRAME VERT.
TOTAL
FRAME VERT. 4 m KEKURANGAN
TOTAL 4 m JML BTG
KEKURANGAN 1.6 m TOTAL BTG
JML BTG 0.266667 » 1 Btg SISA
TOTAL BTG 3 Btg TOTAL BELI
SISA 4.4 m KELEBIHAN
TOTAL BELI 18 m
KELEBIHAN 4.4 m

X 1.073 m Y 0.4 m 2 BEKISTING KUNCI


KEBUTUHAN FRAME perBEKISTING KEBUTUHAN FRAME perB
FRAME VERTIKAL 10 Btg FRAME HORIZONTA
FRAME HORIZONTAL 2 Btg KEBUTU
KEBUTUHAN PROFIL UNTUK BEKISTING KUNCI BAGIAN VERTIKAL KEB. ASLI
KEB. ASLI 8 m KEB. FRAME
KEB. FRAME 20 FRAME BATANG
BATANG 6 m 15 FRAME
FRAME VERT. 0.4 m 20 FRAME 1 Btg = 15 FRAME VERT
BELI FRAM
BELI FRAME 6m/btg FRAME
FRAME VERT. 6 m Jml Btg 1 Btg SISA FRAME
SISA FRAME 5 m SISA TOTAL
KEKURANGAN 2 m TOTAL BELI
JML BTG 0.333333 » 1 Btg
TOTAL BTG 2 Btg
TOTAL BELI 12 m
KELEBIHAN 4 m

KEBUTUHAN PROFIL UNTUK BEKISTING KUNCI BAGIAN HORIZONTAL


KEB. ASLI 4.292 m
KEB. FRAME 4 FRAME
BATANG 6 m 5.5918
FRAME HORI 1.073 m 4 FRAME 1 Btg = 5 FRAME HORI

BELI FRAME 6m/btg


FRAME VERT. 4.292 m Jml Btg 0.715333 Btg » 1 Btg
TOTAL BTG 1 Btg
TOTAL BELI 6 m
KELEBIHAN 1.708 m
2.4 m Y 0.4 m 9 BEKISTING DALAM
KEBUTUHAN FRAME perBEKISTING
FRAME ATAS/BAWAH 2 Btg
FRAME VERTIKAL 5 Btg
KEBUTUHAN PROFIL UNTUK BEKISTING DALAM
KEB. ASLI 61.2 m
BATANG 6 m 2.5
FRAME A/B 2.4 m 18 FRAME 1 Btg = 2 FRAME A/B
FRAME VERT. 0.4 m 45 FRAME

PRIORITAS BELI FRAME 6m/btg


FRAME A/B 4.8 m Jml Btg 9 Btg
SISA BTG 1.2 m
SISA TOTAL 10.8 m
27
KEBUTUHAN SISA 15
FRAME VERT. 18 m 42
TOTAL 18 m -3
KEKURANGAN 7.2 m -1.2
JML BTG 1.2 » 2 Btg
TOTAL BTG 11 Btg
SISA 4.8 m
TOTAL BELI 66 m
KELEBIHAN 4.8 m

Y 2.4 m 10 BEKISTING BAWAH


KEBUTUHAN FRAME perBEKISTING KEBUTUHAN FRAME perBEKIS
FRAME HORIZONTAL 1 Btg FRAME HORIZONT
KEBUTUHAN PROFIL UNTUK BEKISTING BAWAH K
KEB. ASLI 24 m KEB. ASLI
KEB. FRAME 10 FRAME KEB. FRAME
BATANG 6 m 2.5 BATANG
FRAME 2.4 m 10 FRAME 1 Btg = 2 FRAME FRAME

BELI FRAME 6m/btg


FRAME 4.8 m Jml Btg 5 Btg
SISA FRAME 1.2 m 5 Btg
SISA TOTAL 6 m
TOTAL BELI 5 Btg
frame vertikal bekisting dalam
0.4 m
1 btg 9 bekisting dalam
kebutuhan 3.6 m
pembelian 1 btg 6m
sisa 2.4 m

Z 0.33 m 2 BEKISTING BAWAH


KEBUTUHAN FRAME perBEKISTING
FRAME HORIZONTAL 2 Btg
KEBUTUHAN PROFIL UNTUK BEKISTING BAUT
KEB. ASLI 1.32 m
KEB. FRAME 4 FRAME
BATANG 6 m 18.181818
FRAME 0.33 m 4 FRAME 1 Btg = 18 FRAME
VARIASI 1
BL UNP 50/30 2mm BD HOLLOW 20/20 2,3mm (PLAT 1mm) (TANPA PENGAKU ATAS)
Mmax = 64.86 Kgm
Frame No. Frame
Mmin = -64.86 Kgm

Total Ratio = 0.900278 No. Frame 191


Mu = 21.121 Kgm
Syarat Mu ≤ ФMn
ФMn = 23.941 Kgm
AISC-LRFD 93 Vu = 72.728 Kg
Syarat Vu ≤ ФVn
ФVn = 1215.828 Kg
Pu = 11.277 Kg
Syarat Pu ≤ ФPn
ФPn = 3586.693 Kg
Total Ratio = 1.700288 No. Frame 191
AISC-ASD 01 f = 69254.769 Kg/m2
Syarat f ≤ Фfa
fa = 8355063.139 Kg/m2

Mmax = 8.85 Kgm


Area
Mmin = -8.57 Kgm
Tebal Pelat = 0.002 m
Tinggi Pelat = 0.4 m
Panjang Pelat = 0.6 m
Momen Inersia Pelat (I) = 2.666667E-10 m4
Modulus Elastisitas (E) = 21000000000 kg/m2
Tegangan Lendut Izin Baja (Δ izin) = 0.001666667 m
Beban Merata (q) = 196.6666667 Kg/m
Defleksi yang terjadi (Δ) = 0.059263393 m Syarat Δ ≤ L/360

VARIASI MANTAP
BL UNP 50/30 2mm BD HOLLOW 20/40 1,6mm Pelat 1,2mm PENGAKU ATAS
Mmax = 28.12 Kgm
Frame No. Frame
Mmin = -21.43 Kgm

Total Ratio = 0.631222 No. Frame 238


Mu = 15.707 Kgm
Syarat Mu ≤ ФMn
ФMn = 27.842 Kgm
AISC-LRFD 93 Vu = 166.52 Kg
Syarat Vu ≤ ФVn
ФVn = 1585.863 Kg
Pu = 42.367 Kg
Syarat Pu ≤ ФPn
ФPn = 4669.484 Kg
Total Ratio = 1.28521 No. Frame 238
AISC-ASD 01 f = 199842.782 Kg/m2
Syarat f ≤ Фfa
fa = 12165522.84 Kg/m2

Mmax = 0.05 Kgm


Area
Mmin = -0.04 Kgm
Tebal Pelat = 0.002 m
Tinggi Pelat = 0.4 m
Panjang Pelat = 0.4 m
Momen Inersia Pelat (I) = 2.666667E-10 m4
Modulus Elastisitas (E) = 21000000000 kg/m2
Tegangan Lendut Izin Baja (Δ izin) = 0.001111111 m
Beban Merata (q) = 2.5 Kg/m
Defleksi yang terjadi (Δ) = 0.00014881 m Syarat Δ ≤ L/360

VARIASI MAJU
BL UNP 50/30 2mm BD HOLLOW 20/40 1,6mm TENGAH 20/40 2mm Pelat 1,2mm
Mmax = 19.54 Kgm
Frame No. Frame
Mmin = -6.37 Kgm

Total Ratio = 0.593614 No. Frame 238


Mu = 15.614 Kgm
Syarat Mu ≤ ФMn
ФMn = 27.842 Kgm
AISC-LRFD 93 Vu = 165.934 Kg
Syarat Vu ≤ ФVn
ФVn = 1585.863 Kg
Pu = 20.817 Kg
Syarat Pu ≤ ФPn
ФPn = 4669.484 Kg
Total Ratio = 1.219106 No. Frame 238
AISC-ASD 01 f = 98195.738 Kg/m2
Syarat f ≤ Фfa
fa = 12165522.84 Kg/m2

Mmax = 0.07 Kgm


Area
Mmin = 0.005 Kgm
Tebal Pelat = 0.002 m
Tinggi Pelat = 0.4 m
Panjang Pelat = 0.4 m
Momen Inersia Pelat (I) = 2.666667E-10 m4
Modulus Elastisitas (E) = 21000000000 kg/m2
Tegangan Lendut Izin Baja (Δ izin) = 0.001111111 m
Beban Merata (q) = 3.5 Kg/m
Defleksi yang terjadi (Δ) = 0.000208333 m Syarat Δ ≤ L/360
KU ATAS)
81

Shear = -228.69 Kg
Defleksi = 0.000141 m Syarat Δ ≤ L/360 0.000555556 OKE

OKE

OKE

OKE

OKE

GAGAL

ATAS
163

Shear = -123.82 Kg
Defleksi = 0.000037 m Syarat Δ ≤ L/360 0.001111111 OKE

OKE

OKE

OKE

OKE
OKE

t 1,2mm
154

Shear = -49.46 Kg
Defleksi = 0.000203 m Syarat Δ ≤ L/360 0.001111111 OKE

OKE

OKE

OKE

OKE

OKE
4X5 4X4
4.42 0.07 4.65
0.08 0.1
0.1 0.4 0.1
5.33E-11 6.67E-11

0.000278 0.001111 0.000278


3536 3.5 3720
0.004111 0.000208 0.00346
GAP 0.4 m
BEKISTING VARIASI OKE
Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 50/30 2
Bekisting Dalam Hollow 20/40 1.6
Bekisting Dalam (Frame Tengah) Hollow 20/40 2
Bekisting Kunci Kanal UNP 50/30 2
Bekisting Kontak Pelateser 1200/2400 1.2

Tegangan Lentur (f) 98195.738 Kg/m2


Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 12165523 Kg/m2
Momen Ultimate (Mu) 15.614 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 27.842 Kgm
Geser Ultimate (Vu) 165.934 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 1585.863 Kg
Axial Ultimate (Pu) 20.817 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 4669.484 Kg
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000203 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.00111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.00013889 m
Panjang Frame Arah z 0.4 m
Defleksi Arah z (Δz) 0.000233 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.00111111 m
Perhitungan Defleksi Pelat
Mmax 0.07144 Kgm
Tebal Pelat 0.0012 m
Tinggi Pelat 0.4 m
Panjang Pelat 0.4 m
Momen Inersia Pelat (I) 5.76E-11 m4
Modulus Elastisitas (E) 2.1E+10 kg/m2
Tegangan Lendut Izin Baja (Δ izin) 0.00111111 m
Beban Merata (q) 3.572 Kg/m
Syarat Δ ≤ Δ ijin OKE
Defleksi yang terjadi (Δ) 0.00098435 m

BEKISTING OKE
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN
KANAL UNP 50/30 2 9 Rp 105,000.00
HOLLOW 20/40 1.6 11 Rp 72,000.00
HOLLOW 20/40 2 1 Rp 92,500.00
PELATESER 1200/2400 1.2 7 Rp 300,000.00

(m) Lembar
Batang 1 Batang 2 2
SISA MATERIAL Lembar 1
(m) (m) (m)
KANAL UNP 0.14 1.048 - -
HOLLOW 1,6mm 1.2 - - -
HOLLOW 2,0mm 2.4 - - -
PELATESER - - 0.4 -

GAP 0.6 m
BEKISTING REVISI FIX 2
Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 50/30 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 50/30 2
Bekisting Kontak Pelateser 1200/2400 3

Tegangan Lentur (f) 654987.823 Kg/m2


Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 11764157 Kg/m2
Momen Ultimate (Mu) 21.984 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 62.025 Kgm
Geser Ultimate (Vu) 81.257 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Axial Ultimate (Pu) 146.717 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 3823.579 Kg
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000097 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.00111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 5.589E-07 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.00013889 m
Panjang Frame Arah z 0.6 m
Defleksi Arah z (Δz) 0.000036 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.00166667 m
Panjang Shell Arah x 0.6 m
Defleksi Arah x (Δx) 0.001558 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.00166667 m
Panjang Shell Arah y 0.002 m
Defleksi Arah y (Δy) 0.00000442 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 5.5556E-06 m
Panjang Shell Arah z 0.4 m
Defleksi Arah z (Δz) 0.000014 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.00111111 m

BEKISTING OKE
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN
KANAL UNP 50/30 2 9 Rp 105,000.00
HOLLOW 20/40 2 11 Rp 92,500.00
PELATESER 1200/2400 3 7 Rp 700,000.00
Batang 1 Batang 2 Batang 3 Lembar 1
SISA MATERIAL
(m) (m) (m) (m)
KANAL UNP 0.127 0.254 3.607 -
HOLLOW 2,0mm 4.8 - - -
PELATESER - - - 0.4
BEKISTING DEFAULT
Dimensi
Bagian Jenis Baja (mm)
Bekisting Luar Kanal UNP 50/30
Bekisting Dalam Hollow 20/40
Bekisting Kunci Kanal UNP 50/30
Bekisting Kontak Pelateser 1200/2400

Tegangan Lentur (f) 138.483 Kg/m2


Tegangan Ijin (fa) 1154.753 Kg/m2
Momen Ultimate (Mu) 10229.233 Kgm
Momen Rencana (ФMn) 12515.099 Kgm
Geser Ultimate (Vu) 176.517 Kg
Geser Rencana (ФVn) 2378.794 Kg
Axial Ultimate (Pu) 432.067 Kg
Axial Rencana (ФPn) 5212.583 Kg
Panjang Frame Arah x 0.142 m
Defleksi Arah x (Δx) 0.000009924 m
Defleksi Ijin arah x (Δx ijin) 0.0003944444 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0 m
Defleksi Ijin arah y (Δy ijin) 0.0001388889 m
Panjang Frame Arah z 0.6 m
Defleksi Arah z (Δz) 0.00155 m
Defleksi Ijin arah z (Δz ijin) 0.0016666667 m
Perhitungan Defleksi Pelat
Mmax 0.9 Kgm
Tebal Pelat 0.002 m
Tinggi Pelat 0.4 m
Panjang Pelat 0.4 m
Momen Inersia Pelat (I) 2.666666667E-10 m4
Modulus Elastisitas (E) 21000000000 kg/m2
Tegangan Lendut Izin Baja (Δ izin) 0.0011111111 m
Beban Merata (q) 45 Kg/m
Defleksi yang terjadi (Δ) 0.0026785714 m

BEKISTING DEFAULT
TOTAL HARGA PROFIL DIMENSI TEBAL
Rp 945,000.00 KANAL UNP 50/30 3
Rp 792,000.00 HOLLOW 20/40 3
Rp 92,500.00 PELATESER 1200/2400 2
Rp 2,100,000.00
Rp 3,929,500.00
SISA MATERIAL Batang 2
Batang 1 (m) (m)
KANAL UNP 0.127 0.127
HOLLOW 2.4 -
PELATESER - -
DEFLEKSI FRAME
DEFLEKSI SHELL

TOTAL HARGA
Rp 945,000.00
Rp 1,017,500.00
Rp 4,900,000.00
Rp 6,862,500.00
Tebal
(mm)
3
3
3
2

Syarat f ≤ Фfa OKE

Syarat Mu ≤ ФMn OKE

Syarat Vu ≤ ФVn OKE

Syarat Pu ≤ ФPn OKE

Syarat Δx ≤ Δx ijin OKE

Syarat Δy ≤ Δy ijin OKE

Syarat Δz ≤ Δz ijin OKE

Syarat Δ ≤ Δ ijin GAGAL

STING DEFAULT
JUMLAH BELI HARGA SATUAN TOTAL HARGA
10 Rp 115,346.00 Rp 1,153,460.00
10 Rp 123,000.00 Rp 1,230,000.00
7 Rp 457,500.00 Rp 3,202,500.00
Rp 5,585,960.00

Batang 3 Batang 4 Lembar 1


(m) (m) (m)
0.127 3.607 -
- - -
- - 0.4
BEKISTING VARIASI OKE GAP 40 cm
Pembelian
Material (Profil) Kebutuhan(m)
Material
Prioritas Bagian Material
(Batang)
Bekisting Luar Kanal U 15.2 3
Bekisting Dalam Hollow 1,6mm 64.8 11
1
Bekisting Bawah Kanal U 24 5
Bekisting Dalam (Frame Tengah) Hollow 2mm 3.6 1

Jumlah Detail
Kebutuhan Detail
Prioritas Bagian Material (Profil) Material
Material (m) (Frame)
Bekisting Kunci Vertikal Kanal U 0.4 20
2 Bekisting Kunci Horizontal Kanal U 1.073 4
Bekisting Baut Kanal U 0.33 4

beli
sisa

BEKISTING VARIASI REVISI FIX 2 GAP 60 cm


Pembelian
Material (Profil) Kebutuhan(m)
Material
Prioritas Bagian Material
(Batang)
Bekisting Luar Kanal U 13.6 3
1 Bekisting Dalam Hollow 61.2 11
Bekisting Bawah Kanal U 24 5

Jumlah Detail
Kebutuhan Detail
Prioritas Bagian Material (Profil) Material
Material (m) (Frame)
Bekisting Kunci Vertikal Kanal U 0.4 20
2 Bekisting Kunci Horizontal Kanal U 1.073 4
Bekisting Baut Kanal U 0.33 4
Tekuk Pelat Jumlah pelat jumlah tekuk perpelat Total tekuk
Pelat Bekisting luar 2 2 4
Pelat Bekisting Sekat 18 2 36
Pelat Bekisting bawah 10 3 30
Total tekuk 70

Potong Pelat Jumlah pelat jumlah tekuk perpelat Total tekuk


Pelat Bekisting luar 2 2 2
Pelat Bekisting Sekat 18 18 18
Pelat Bekisting bawah 10 10 10
Total tekuk 30
Keterangan Total Sisa Total Sisa Total Sisa
Sisa Material Kanal U Hollow 1,6mm
Material (m) (Batang) (m) (m) (m)
2.8 1 2.8
1.2 1 1.2
8.8 1.2
1.2 5 6
2.4 1 2.4

Kebutuhan Pembelian Total Sisa


Material Material Material Keterangan Pemakaian Sisa (Bagian)
(m) (Batang) (m)
8 - 0.8 Bekisting Luar Bekisting Bawah
4.292 1 1.708 Bekisting Dalam
1.32 - 1.188 Bekisting Kunci Vertikal Bekisting Kunci Horizontal

Hollow 1,6 Hollow 2,0 Kanal U


11 1 9 btg
1.2 2.4 0.14 m
1.048 m

Keterangan Total Sisa Total Sisa


Sisa Total Sisa
Material Kanal U
Material (m) (Batang) Hollow (m)
(m) (m)
4.4 1 4.4
4.8 1 4.8 10.4 4.8
1.2 5 6

Kebutuhan Pembelian Total Sisa


Material Material Material Keterangan Pemakaian Sisa (Bagian)
(m) (Batang) (m)
8 - 3.6 Bekisting Luar
4.292 1 5.308 Bekisting Luar
1.32 - 3.607 Bekisting Kunci Horizontal

Hollow Kanal U
beli 11 9 btg
sisa 4.8 0.127 m
0.254 m
3.607 m
Total Sisa Hollow Detail Sisa Kanal U Detail Sisa Hollow
2,0mm (m) (m) 1,6 mm (m)

Batang 1 Batang 2 Batang 3 Batang 4 Batang 5 Batang 6 Batang 1

2.4
2.8 1.2 1.2 1.2 1.2 1.2 1.2

Detail Sisa Kanal U


Keterangan Batang Sisa (m) (m)

-5.2 -4 -2.8 -1.6 -0.4 0.8 Batang 1 Batang 2


Beli 1 btg baru 1.708
0.14 1.048
0.14 1.048

Detail Sisa Kanal U Detail Sisa Hollow


(m) (m)

Batang 1 Batang 2 Batang 3 Batang 4 Batang 5 Batang 6 Batang 1

4.4 1.2 1.2 1.2 1.2 1.2 4.8

Keterangan Batang Sisa Detail Sisa Kanal U


(m) (m)

-3.6 -2.4 -1.2 0 1.2 2.4 Batang 1 Batang 2


0.127 0.254 Beli 1 btg baru 4.927
0.127 0.254
3.607
Detail Sisa
Hollow 2,0 mm
(m)
Batang 1

2.4

Detail Sisa Detail Sisa Hollow


Hollow 1,6 mm 2,0 mm (m)
(m)
Batang 1 Batang 1

1.2 2.4

U Detail Sisa Hollow


(m) 1,6 mm (m)

Batang 3 Batang 1

3.607 4.8
BEKISTING DEFAULT
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 3 10 Rp 115,346.00 Rp 1,153,460.00
HOLLOW 20/40 3 10 Rp 123,000.00 Rp 1,230,000.00
PELATESER - 2 7 Rp 457,500.00 Rp 3,202,500.00
Rp 5,585,960.00

BEKISTING P1
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 3 10 Rp 115,346.00 Rp 1,153,460.00
HOLLOW 20/40 2 10 Rp 92,500.00 Rp 925,000.00
PELATESER - 2 7 Rp 457,500.00 Rp 3,202,500.00
Rp 5,280,960.00

BEKISTING P2
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 3 10 Rp 115,346.00 Rp 1,153,460.00
HOLLOW 20/40 2 10 Rp 92,500.00 Rp 925,000.00
PELATESER - 1 7 Rp 280,000.00 Rp 1,960,000.00
Rp 4,038,460.00

BEKISTING P3
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 2 10 Rp 105,000.00 Rp 1,050,000.00
HOLLOW 20/40 2 10 Rp 92,500.00 Rp 925,000.00
PELATESER - 2 7 Rp 457,500.00 Rp 3,202,500.00
Rp 5,177,500.00

SELISIH HARGA Rp 1,875,960.00

SELISIH HARGA BARU Rp 1,499,960.00


BEKISTING P4
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 2 10 Rp 105,000.00 Rp 1,050,000.00
HOLLOW 20/40 2 10 Rp 92,500.00 Rp 925,000.00
PELATESER - 1 7 Rp 280,000.00 Rp 1,960,000.00
Rp 3,935,000.00

BEKISTING P5
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 3 10 Rp 115,346.00 Rp 1,153,460.00
HOLLOW 20/20 2.3 10 Rp 70,000.00 Rp 700,000.00
PELATESER - 1 7 Rp 280,000.00 Rp 1,960,000.00
Rp 3,813,460.00

BEKISTING P6
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 3 10 Rp 115,346.00 Rp 1,153,460.00
HOLLOW 20/20 2.3 10 Rp 70,000.00 Rp 700,000.00
PELATESER - 2 7 Rp 457,500.00 Rp 3,202,500.00
Rp 5,055,960.00

BEKISTING P7
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 2 10 Rp 105,000.00 Rp 1,050,000.00
HOLLOW 20/20 2.3 10 Rp 70,000.00 Rp 700,000.00
PELATESER - 1 7 Rp 280,000.00 Rp 1,960,000.00
Rp 3,710,000.00

BEKISTING P8
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 2 10 Rp 105,000.00 Rp 1,050,000.00
HOLLOW 20/20 2.3 10 Rp 70,000.00 Rp 700,000.00
PELATESER - 2 7 Rp 457,500.00 Rp 3,202,500.00
Rp 4,952,500.00

BEKISTING BARU
PROFIL DIMENSI TEBAL JUMLAH BELI HARGA SATUAN TOTAL HARGA
KANAL UNP 50/30 2 10 Rp 105,000.00 Rp 1,050,000.00
HOLLOW 20/40 1.6 13 Rp 72,000.00 Rp 936,000.00
PELATESER - 1.2 7 Rp 300,000.00 Rp 2,100,000.00
Rp 4,086,000.00
No Nama Harga Kasar URUTAN
1 Bekisting Default Rp 5,585,960.00 1 BEKISTING P7
2 Bekisting Pilihan 1 Rp 5,280,960.00 2 BEKISTING P5
3 Bekisting Pilihan 2 Rp 4,038,460.00 3 BEKISTING P4
4 Bekisting Pilihan 3 Rp 5,177,500.00 4 BEKISTING P2
5 Bekisting Pilihan 4 Rp 3,935,000.00 5 BEKISTING P8
6 Bekisting Pilihan 5 Rp 3,813,460.00 6 BEKISTING P6
7 Bekisting Pilihan 6 Rp 5,055,960.00 7 BEKISTING P3
8 Bekisting Pilihan 7 Rp 3,710,000.00 8 BEKISTING P1
9 Bekisting Pilihan 8 Rp 4,952,500.00 9 BEKISTING DEFAULT
URUTAN
Rp 3,710,000.00
Rp 3,813,460.00
Rp 3,935,000.00
Rp 4,038,460.00
Rp 4,952,500.00
Rp 5,055,960.00
Rp 5,177,500.00
Rp 5,280,960.00
Rp 5,585,960.00
BEKISTING DEFAULT
BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
DEFAULT dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 120
Bekisting Sekat - 1 - 0.46 60

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
DEFAULT dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 400
Bekisting Sekat - 1 - 0.46 200

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
DEFAULT dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 119.91
Bekisting Sekat 3 1 0.8 0.46 44.97

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
DEFAULT dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 0.44
Bekisting Sekat 3 1 0.8 0.46 0.17

BEKISTING VARIASI 3
BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 120
Bekisting Sekat - 1 - 0.46 60

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 400
Bekisting Sekat - 1 - 0.46 200

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 119.91
Bekisting Sekat 6 1 0.4 0.46 89.93

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 0.44
Bekisting Sekat 6 1 0.4 0.46 0.33

BEKISTING VARIASI REVISI


BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.46 60
Bekisting Sekat - 1 - 0.46 60

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.46 200
Bekisting Sekat - 1 - 0.46 200

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 8 1 0.3 0.46 119.91
Bekisting Sekat 8 1 0.3 0.46 119.91

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 8 1 0.3 0.46 0.44
Bekisting Sekat 8 1 0.3 0.46 0.44
BEKISTING VARIASI 1
BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 120
Bekisting Sekat - 1 - 0.46 60

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 400
Bekisting Sekat - 1 - 0.46 200

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 119.91
Bekisting Sekat 4 1 0.6 0.46 59.95

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 0.44
Bekisting Sekat 4 1 0.6 0.46 0.22

BEKISTING VARIASI 4
BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 120
Bekisting Sekat - 2 - 0.23 120

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 400
Bekisting Sekat - 2 - 0.23 400

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 119.91
Bekisting Sekat 6 2 0.4 0.23 179.86

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 0.44
Bekisting Sekat 6 2 0.4 0.23 0.67

BEKISTING VARIASI 7
BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.4 60
Bekisting Sekat - 1 - 0.4 60

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.4 200
Bekisting Sekat - 1 - 0.4 200

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 1 0.6 0.4 68.95
Bekisting Sekat 4 1 0.6 0.4 68.95

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 1 0.6 0.4 0.26
Bekisting Sekat 4 1 0.6 0.4 0.26
BEKISTING VARIASI 2
BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 120
Bekisting Sekat - 2 - 0.23 120

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.23 400
Bekisting Sekat - 2 - 0.23 400

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 119.91
Bekisting Sekat 4 2 0.6 0.23 119.91

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 4 2 0.6 0.23 0.44
Bekisting Sekat 4 2 0.6 0.23 0.44

BEKISTING VARIASI 5
BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.46 60
Bekisting Sekat - 1 - 0.46 60

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.46 200
Bekisting Sekat - 1 - 0.46 200

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 6 1 0.4 0.46 89.93
Bekisting Sekat 6 1 0.4 0.46 89.93

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
V1 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 6 1 0.4 0.46 0.33
Bekisting Sekat 6 1 0.4 0.46 0.33

BEKISTING VARIASI 8
BEBAN BETON
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.4 60
Bekisting Sekat - 1 - 0.4 60

BEBAN PEKERJA
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.4 200
Bekisting Sekat - 1 - 0.4 200

BEBAN GEROBAK SORONG


Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 3 1 0.8 0.4 51.71
Bekisting Sekat 3 1 0.8 0.4 51.71

BEBAN PEMADATAN
Panjang Bagian Tinggi Bagian y Z Beban Area
V2 dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 3 1 0.8 0.4 0.19
Bekisting Sekat 3 1 0.8 0.4 0.19
BEKISTING DEFAULT

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN VERTIKAL (m) HORIZONTAL (m)

BEKISTING LUAR SENDI 0.6 0.2


BEKISTING SEKAT JEPIT 0.8 0.4

Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 3
Bekisting Dalam Hollow 20/40 3
Bekisting Kunci Kanal UNP 30/50 3
Bekisting Kontak Pelateser 1200/2400 2

Cek Terhadap Tegangan


Tegangan Lentur (f) 140381.484 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 11547532.53 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 107.625 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 125.51 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 25.885 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 1982.328 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 43.799 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 5212.583 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.2 m
Defleksi Arah x (Δx) 0.000008919 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.000555556 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000004125 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.6 m
Defleksi Arah z (Δz) 0.001689 m
Syarat Δz ≤ Δz ijin GAGAL
Defleksi Ijin arah z (Δz ijin) 0.001666667 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.6 m
Defleksi Arah x (Δx) 0.024545 m
Syarat Δx ≤ Δx ijin GAGAL
Defleksi Ijin arah x (Δx ijin) 0.001666667 m

BEKISTING VARIASI 3

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN VERTIKAL (m) HORIZONTAL (m)
JARAK PENGAKU JARAK PENGAKU
BAGIAN TUMPUAN VERTIKAL (m) HORIZONTAL (m)

BEKISTING LUAR SENDI 0.4 0.4


BEKISTING SEKAT JEPIT 0.4 0.4

Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 30/50 2
Bekisting Kontak Pelateser 1200/2400 3

Cek Terhadap Tegangan


Tegangan Lentur (f) 598726.279 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 11888563.33 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 17.094 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 62.025 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 66.948 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 134.115 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 3870.012 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000064 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 4.622E-07 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.4 m
Defleksi Arah z (Δz) 0.000015 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.001111111 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.4 m
Defleksi Arah x (Δx) 0.000785 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m

BEKISTING VARIASI 6

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN VERTIKAL (m) HORIZONTAL (m)

BEKISTING LUAR SENDI 0.6 0.2


BEKISTING SEKAT JEPIT 0.6 0.2
Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 30/50 2
Bekisting Kontak Pelateser 1200/2400 3

Cek Terhadap Tegangan


Tegangan Lentur (f) 667790.986 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 13196383.15 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 45.48 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 62.025 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 188.327 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 149.585 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 4332.891 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.2 m
Defleksi Arah x (Δx) 0.000085 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.000555556 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000001194 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.6 m
Defleksi Arah z (Δz) 0.000134 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.001666667 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.6 m
Defleksi Arah x (Δx) 0.001982 m
Syarat Δx ≤ Δx ijin GAGAL
Defleksi Ijin arah x (Δx ijin) 0.001666667 m

Status
Variasi Jarak antar Jarak antar pengaku Keamanan
pengaku melintang memanjang Struktur
(m) (m)
Variasi 1 0.8 0.4 Tidak Aman
Variasi 2 0.6 0.4 Aman
Variasi 3 0.4 0.4 Aman
Variasi 4 0.3 0.4 Aman
Variasi 5 0.8 0.2 Tidak Aman
Variasi 6 0.6 0.2 Tidak Aman
Variasi 7 0.4 0.2 Tidak Aman
Variasi 8 0.3 0.2 Tidak Aman
BEKISTING VARIASI 1
JARAK PENGAKU JARAK PENGAKU
BAGIAN TUMPUAN VERTIKAL HORIZONTAL
(m) (m)
BEKISTING LUAR SENDI 0.8 0.4
BEKISTING SEKAT JEPIT 0.8 0.4

Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 30/50 2
Bekisting Kontak Pelateser 1200/2400 3

Cek Terhadap Tegangan


Tegangan Lentur (f) 573119.947 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 11347584.1 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 31.177 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 79.108 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 110.412 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 1321.552 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 121.501 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 3470.719 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000126 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000000682 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.8 m
Defleksi Arah z (Δz) 0.000179 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.002222222 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.8 m
Defleksi Arah x (Δx) 0.002405 m
Syarat Δx ≤ Δx ijin GAGAL
Defleksi Ijin arah x (Δx ijin) 0.002222222 m

BEKISTING VARIASI 4
JARAK PENGAKU JARAK PENGAKU
BAGIAN TUMPUAN VERTIKAL HORIZONTAL
(m) (m)
JARAK PENGAKU JARAK PENGAKU
BAGIAN TUMPUAN VERTIKAL HORIZONTAL
(m) (m)
BEKISTING LUAR SENDI 0.3 0.4
BEKISTING SEKAT JEPIT 0.3 0.4

Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 30/50 2
Bekisting Kontak Pelateser 1200/2400 3

Cek Terhadap Tegangan


Tegangan Lentur (f) 525153.175 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 11951917.65 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 13.841 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 62.025 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 56.658 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 117.634 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 3893.575 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000047 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 4.153E-07 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.3 m
Defleksi Arah z (Δz) 0.000003244 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.000833333 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.3 m
Defleksi Arah x (Δx) 0.00062 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.000833333 m

BEKISTING VARIASI 7
JARAK PENGAKU JARAK PENGAKU
BAGIAN TUMPUAN VERTIKAL HORIZONTAL
(m) (m)
BEKISTING LUAR SENDI 0.4 0.2
BEKISTING SEKAT JEPIT 0.4 0.2
Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 30/50 2
Bekisting Kontak Pelateser 1200/2400 3

Cek Terhadap Tegangan


Tegangan Lentur (f) 694354.845 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 13324089.65 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 34.531 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 62.025 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 144.389 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 155.536 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 4373.574 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.2 m
Defleksi Arah x (Δx) 0.000061 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.000555556 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000001038 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.4 m
Defleksi Arah z (Δz) 0.000023 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.001111111 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.4 m
Defleksi Arah x (Δx) 0.001507 m
Syarat Δx ≤ Δx ijin GAGAL
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
BEKISTING VARIASI 2

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN VERTIKAL HORIZONTAL
(m) (m)
BEKISTING LUAR SENDI 0.6 0.4
BEKISTING SEKAT JEPIT 0.6 0.4

Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 30/50 2
Bekisting Kontak Pelateser 1200/2400 3

Cek Terhadap Tegangan


Tegangan Lentur (f) 654987.823 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 11764157.49 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 21.984 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 62.025 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 81.257 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 146.717 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 3823.579 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000097 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 5.589E-07 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.6 m
Defleksi Arah z (Δz) 0.000036 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.001666667 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.6 m
Defleksi Arah x (Δx) 0.001558 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001666667 m

BEKISTING VARIASI 5

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN VERTIKAL HORIZONTAL
(m) (m)
JARAK PENGAKU JARAK PENGAKU
BAGIAN TUMPUAN VERTIKAL HORIZONTAL
(m) (m)
BEKISTING LUAR SENDI 0.8 0.2
BEKISTING SEKAT JEPIT 0.8 0.2

Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 30/50 2
Bekisting Kontak Pelateser 1200/2400 3

Cek Terhadap Tegangan


Tegangan Lentur (f) 587236.061 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 13092280.57 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 50.945 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 62.025 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 219.706 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 131.541 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 4298.865 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.2 m
Defleksi Arah x (Δx) 0.000101 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.000555556 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000001378 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.8 m
Defleksi Arah z (Δz) 0.000354 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.002222222 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.8 m
Defleksi Arah x (Δx) 0.002492 m
Syarat Δx ≤ Δx ijin GAGAL
Defleksi Ijin arah x (Δx ijin) 0.002222222 m

BEKISTING VARIASI 8

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN VERTIKAL HORIZONTAL
(m) (m)
BEKISTING LUAR SENDI 0.3 0.2
BEKISTING SEKAT JEPIT 0.3 0.2
Dimensi Tebal
Bagian Jenis Baja (mm) (mm)
Bekisting Luar Kanal UNP 30/50 2
Bekisting Dalam Hollow 20/40 2
Bekisting Kunci Kanal UNP 30/50 2
Bekisting Kontak Pelateser 1200/2400 3

Cek Terhadap Tegangan


Tegangan Lentur (f) 529649.904 Kg/m2
Syarat f ≤ Фfa OKE
Tegangan Ijin (fa) 13398716.79 Kg/m2
Cek Terhadap Momen
Momen Ultimate (Mu) 29.084 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 62.025 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 120.259 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 118.642 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 4396.749 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.2 m
Defleksi Arah x (Δx) 0.000049 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.000555556 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 9.882E-07 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.3 m
Defleksi Arah z (Δz) 0.000005832 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.000833333 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.3 m
Defleksi Arah x (Δx) 0.001279 m
Syarat Δx ≤ Δx ijin GAGAL
Defleksi Ijin arah x (Δx ijin) 0.000833333 m
JARAK PENGAKU JARAK PENGAKU
DEFLEKSI DEFLEKSI IZIN
VARIASI TUMPUAN VERTIKAL HORIZONTAL (m) PELAT ARAH X (m)
(m)
(m)
Default SENDI Default Default 0.020702 0.0016666667
JEPIT-JEPIT 0.00062
1 JEPIT-SENDI 0.3 0.009235 0.0008333333
SENDI-SENDI 0.025045
JEPIT-JEPIT 0.001558
2 JEPIT-SENDI 0.6 0.009393 0.0016666667
SENDI-SENDI 0.021722
0.4
JEPIT-JEPIT 0.000785
3 JEPIT-SENDI 0.4 0.00953 0.0011111111
SENDI-SENDI 0.024149
JEPIT-JEPIT 0.002405
4 JEPIT-SENDI 0.8 0.009355 0.0022222222
SENDI-SENDI 0.020653
JEPIT-JEPIT 0.001279
5 JEPIT-SENDI 0.3 0.015001 0.0008333333
SENDI-SENDI 0.042935
JEPIT-JEPIT 0.001508
6 JEPIT-SENDI 0.4 0.014533 0.0011111111
SENDI-SENDI 0.039456
0.2
JEPIT-JEPIT 0.001982
7 JEPIT-SENDI 0.6 0.013936 0.0016666667
SENDI-SENDI 0.035607
JEPIT-JEPIT 0.002492
8 JEPIT-SENDI 0.8 0.013745 0.0022222222
SENDI-SENDI 0.033859
MATERIAL
RATIO
(AISC-LRFD 93) RATIO LIMIT KETERANGAN DIMENSI TEBAL
PROFIL (mm) (mm)
0.722425 TIDAK AMAN KANAL UNP 30/50 2
0.238495 AMAN HOLLOW 20/40 2
0.568247 TIDAK AMAN PELATESER 1200/2400 3
0.998043 TIDAK AMAN
0.373788 AMAN
0.532741 TIDAK AMAN
0.852369 TIDAK AMAN
0.29292 AMAN
0.558884 TIDAK AMAN
0.938121 TIDAK AMAN
0.413078 TIDAK AMAN
0.503909 TIDAK AMAN
0.795367 0.95 TIDAK AMAN
0.482674 TIDAK AMAN
1.227973 TIDAK AMAN
1.682651 TIDAK AMAN
0.574516 TIDAK AMAN
1.157458 TIDAK AMAN
1.521306 TIDAK AMAN
0.751062 TIDAK AMAN
1.076911 TIDAK AMAN
1.391509 TIDAK AMAN
0.837787 TIDAK AMAN
1.029619 TIDAK AMAN
1.275386 TIDAK AMAN
JARAK PENGAKU JARAK PENGAKU VARIASI
VARIASI AMAN VERTIKAL TUMPUAN TEBAL PLAT
HORIZONTAL (m) DEFLEKSI PELAT
(m) (m)
ARAH X (m)
0.003 0.00062
1 0.3 0.4 JEPIT-JEPIT 0.002 0.000923
0.0023 0.000707
0.003 0.000785
0.002 0.001976
3 0.4 0.4 JEPIT-JEPIT 0.0023 0.001409
0.0025 0.001155
0.0028 0.000884
0.003 0.001558
2 0.6 0.4 JEPIT-JEPIT
0.0028 0.001841

VARIASI TERPILIH (1)

JARAK PENGAKU JARAK PENGAKU HORIZONTAL


PROFIL DIMENSI (mm) TEBAL (mm) VERTIKAL (m) (m)

KANAL UNP 30/50 2


HOLLOW 20/40 2 0.3 0.4
PELATESER 1200/2400 2.3
BUAT WORD
DEFLEKSI IZIN KETERANGAN
(m) VARIASI DEFLEKSI
VARIASI TEBAL PLAT PELAT ARAH X BENTANG
AMAN (m)
OKE (m) (m)
0.0008333333 TIDAK OKE 0.003 0.001558
OKE
V.2 0.0028 0.001841
0.6

OKE 0.003 0.000785


TIDAK OKE V.3 0.0028 0.000884 0.4
0.0011111111 TIDAK OKE 0.0025 0.001155
TIDAK OKE 0.003 0.00062
OKE 0.0028 0.000622
0.0016666667
OKE V.4 0.0025 0.000642 0.3
TIDAK OKE 0.0023 0.000707
0.002 0.000923

AK PENGAKU HORIZONTAL
(m)

0.4
AT WORD

DEFLEKSI IZIN KETERANGAN


(m)

OKE
0.0016666667
TIDAK OKE
OKE
0.0011111111 OKE
TIDAK OKE
OKE
OKE
0.0008333333 OKE
OKE
TIDAK OKE
Variasi Aman Tebal Pelat
(m)
Variasi 2 0.003
Variasi 3 0.0028
Variasi 4 0.0023
TAHANAN NOMINAL SAMBUNGAN BAUT METODE LRFD
Diameter Baut tipe ASTM A325
Fy = 660 Mpa 0.66 KN/mm2 67261920 Kg/m2
Fu = 830 Mpa 0.83 KN/mm2 84586960 Kg/m2
Diameter Baut (db) = 0.75 In 19.05 mm 0.01905 m
Luas 1 Baut (Ab) = 284.8785 mm2 0.000284878 m2

Faktor Reduksi = 0.75


Kekuatan (Øf)

Kuat Geser Baut Tanpa Ulir Propertis Profil Kanal UNP 30/50
r1 = 0.4 t = 2
P Geser = 70.93474 KN/baut 7229.100934 Kg/baut tw = 2
Kuat Tumpu Baut Tanpa Ulir T = 50
r2 = 2.4 d = 54
Tebal kanal (tw) = 2 mm 0.002 m bf = 30
Tegangan Runtuh A = 220
= 0.37 KN/mm2
Baut (Fu b) Fy = 240
P tumpu = 25.3746 KN/baut 2585.976235 Kg/baut 0.24
P 1 baut = 25.3746 KN/baut Fu = 370
P tarik = 0.12 KN 12.28 Kg 0.37
Ag = 220 mm2 0.00022 m2 37707440
Lebar badan (d) = 54 mm 0.054 m
Tebal Badan (tw) = 2 mm 0.002 m
Luas badan (Aw) = 108 mm2 0.000108 m2 0.00022
P badan = 0.058909 KN 6.003543273 Kg
Jumlah Baut
N Baut badan = 0.002322 Baut 3.07
N Baut Pakai = 1 Baut
N Lubang = 1 Lubang 0.3175
Cek Block Shear
anjang Baut Geser (Lv) = 27 mm 0.027 m
Panjang Baut Tarik (Lt) = 27 mm 0.027 m
Diameter Lubang = 22.225 mm 0.875 Inchi 0.022225 m
Kanal UNP 30/50
tw = 2 mm 0.002 m
Fy = 240 MPa 0.24 KN/mm2 24458880 Kg/m2
Fu = 370 MPa 0.37 KN/mm2 37707440 Kg/m2
Mencari Luas Bruto Sambungan
Ag v = 54 mm2 0.000054 m2 5.4
Ag t = 54 mm2 0.000054 m2 5.4
Mencari Luas Netto Sambungan
Ln v = 15.8875 mm 0.0158875 m
Ln t = 15.8875 mm 0.0158875 m
An v = 31.775 mm2 0.000031775 m2 3.1775
An t = 31.775 mm2 0.000031775 m2
Mencari Nilai Rn (Block Shear)
Fu.An t = 11.75675 KN 1198.153906 Kg
0,6. Fu. An v = 7.05405 KN 718.8923436 Kg
ØRn = 14.64956 KN 1492.966214 Kg
ØRn = 15.01054 KN
ØRn Pakai = 14.64956 KN

AMAN COY
KN x 101.912 = Kg
KN/mm2 x 101912000 = kg/m2

Propertis Profil hollow 20/40


Kanal UNP 30/50 t = 2 mm
mm 0.002 m tw = 2 mm
mm 0.002 m t2 = 20 mm
mm 0.05 m t3 = 40 mm
mm 0.054 m A = 208 mm2
mm 0.03 m Fy = 240 Mpa
mm2 0.00022 m2 0.24 KN/mm2
Mpa Fu = 370 Mpa
KN/mm2 0.37 KN/mm2
Mpa
KN/mm2
Kg/m2

0.75 inchi
25.4 konversi mm
19.05 mm
0.002 m
0.002 m
0.02 m
0.04 m
0.000208 m2
RENCANA ANGGARAN BIAYA (RAB)
BEKISTING BAJA
PT. POWERCON JAYA UTAMA
No Jenis Pekerjaan Volume Satuan Harga satuan
1 2 3 4 5
PEKERJAAN BEKISTING
Bekisting Panel Beton
1 Beli Kanal UNP 50x30x3 mm 10 buah Rp 115,346.00
2 Beli Hollow 20x40x3 mm 10 buah Rp 123,000.00
3 Pelateser (plat hitam)2mm 7 buah Rp 457,500.00
4 Potong Pelat 30 bagian Rp 20,000.00
5 Tekuk Pelat 70 sisi Rp 35,000.00
6 Pengelasan 1 set Rp 3,000,000.00
7 Baut 4 buah Rp 20,000.00
8 Minyak bekisting 5 liter Rp 5,500.00
Total anggaran

Total Rencana Anggaran Biaya (RAB)

Kebutuhan material per 10 panel dinding


Kanal UNP 18.4 m 46
Vertikal 0.4 5 2
Horizontal 2.4 3 7.2
Total 1 bekisting luar 9.2
6 m
15 kg
Pelat baja 1.92 m2 31.13
0.4 2.4 0.96

1.2 2.4 2.88


46.7
112500
7500
457500
9796.573876

Hollow 6.4 m 15.41


6m
14.45 Kg
DAFTAR RENCANA ANGGARAN BIAYA
Harga Satuan
No Uraian Pekerjaan Volume
Satuan Rp
I Pekerjaan Bekisting Luar
Pengerjaan pengelasan dengan las listrik cm Rp -
Pemasangan besi profil (Kanal UNP) Err:509 kg Rp -
Pemasangan besi profil (Plat Hitam) Err:509 kg Rp -
Jumlah
II Pekerjaan Bekisting Sekat
Pengerjaan pengelasan dengan las listrik cm Rp -
Pemasangan besi profil (Hollow) Err:509 kg Rp -
Pemasangan besi profil (Plat Hitam) Err:509 kg Rp -
Jumlah
III Pekerjaan Bekisting Perangkai
Pengerjaan pengelasan dengan las listrik cm Rp -
Pemasangan besi profil (Kanal UNP) 12.98 kg Rp -
Jumlah
IV Pekerjaan Bekisting Bawah
Pengerjaan pengelasan dengan las listrik cm Rp -
Pemasangan besi profil (Kanal UNP) 34.1343 kg Rp -
Pemasangan besi profil (Plat Hitam) 0.00 kg Rp -
Jumlah
IV Pekerjaan Lain-Lain
Pengerjaan baut cm Rp -
Pengelasan pegangan baut kg Rp -
Pengerjaan tulangan pegangan kg Rp -
Pengelasan pegangan pada bekisting sekat kg Rp -
Jumlah

No Jenis Pekerjaan Volume Satuan Harga satuan


1 2 3 4 5
PEKERJAAN BEKISTING
Bekisting Panel Beton
1 Baut 4 buah Rp 20,000.00
2 Tulangan Pegangan 18 buah Rp 20,000.00
Total anggaran

Total Rencana Anggaran Biaya (RAB)


Total harga
6

Rp 1,153,460.00
Rp 1,230,000.00
Rp 3,202,500.00
Rp 600,000.00
Rp 2,450,000.00
Rp 3,000,000.00
Rp 80,000.00
Rp 27,500.00
Rp 11,743,460.00

Rp 11,743,460.00

Kg

kg
m2

m2
kg
Kg
Jumlah Harga

Rp -
Err:509
Err:509
Err:509

Rp -
Err:509
Err:509
Err:509

Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Total harga
6

Rp 80,000.00
Rp 360,000.00
Rp 440,000.00

Rp 440,000.00
Tegangan Ijin Baja BJ-37
fy = 240 Mpa 0.24 KN/mm2 24458880 Kg/m2
Baut
fu = 370 Mpa 0.37 KN/mm2 37707440 Kg/m2
fy = 240 Mpa 0.24 KN/mm2 24458880 Kg/m2
Badan Kanal UNP
fu = 370 Mpa 0.37 KN/mm2 37707440 Kg/m2
Tebal badan kanal tb = 2 mm
= 0.002 m
Beban tarik terfaktor
Ru = P tarik = 12.28 Kg

Persyaratan kekuatan sambungan: Ø = faktor reduksi kekuatan =


Ru ≤ Ø Rn Rn = kuat nominal baut

Mencari diameter minimal baut (rencana baut)


Tinjauan terhadap kuat geser
Rn = m r1 fub Ab
m= 2 (untuk bidang geser)
r1 = 0.4 (untuk bidang geser baut berulir)
fub = 37707440 Kg/m2
Ab = ¼ π d²
Ru ≤ Ø Rn
12.28 ≤ 0,75. 2. 0,4. 37707440. ¼ 3,14 d²
d² ≥ (12,28*4)/(0,75. 2. 0,4. 3,14. 37707440)
d ≥ ((12,28*4)/(0,75. 2. 0,4. 3,14. 37707441))¹ʹ²
d ≥ 0.000831525 m 8.315247982
d ≥ 0.831524798 mm

Tinjauan terhadap kuat tumpu


Rn = n db tw fu
n= 2.4 (berlaku untuk semua jenis lubang baut)
db = diameter baut yang dicari
tw = 0.002 m
fu = 37707440 Kg/m2
Ru ≤ Ø Rn
12.28 ≤ 0,75. 2,4. db. 0,002. 37707440
db ≥ 12,28/(0,75. 2,4. 0,002. 37707440)
db ≥ 9.046255E-05 m
db ≥ 0.090462548 mm

Diambil nilai minimal diameter baut yang paling besar antara d dan db maka diambil;
d ≥ 0.831524798 mm
AHSP Permen PUPR 2016
Kelompok baut yang tersedia;
Diambil baut diameter 10 mm panjang 5cm
db = 0.01 m
dlubang = 0.013175 m
Ab = 0.0000785 m2
Rn Geser -> Pgeser = 1776.020424 Kg/baut
Rn Tumpu -> Ptumpu = 3936.656736 Kg/baut
P baut = 1776.020424 Kg/baut
Badan Kanal
Ag = 394.485 mm2 0.000394485 m2
Lebar badan (d) = 50 mm 0.05 m
Tebal Badan (tw) = 4.35 mm 0.00435 m
Luas badan (Aw) = 217.5 mm2 0.0002175 m2
P badan = 6.770599643 Kg
Jumlah Baut
N Baut badan = 0.003812231 Baut 0
N Baut Pakai = 1 Baut
N Lubang = 1 Lubang 0.3175
Cek Block Shear
Panjang Baut Geser (Lv) = 25 mm 0.025 m
Panjang Baut Tarik (Lt) = 25 mm 0.025 m
Diameter Lubang = 0.013175 m
Kanal UNP 30/50
tw = 4.35 mm 0.00435 m
Fy = 240 MPa 0.24 KN/mm2 24458880 Kg/m2
Fu = 370 MPa 0.37 KN/mm2 37707440 Kg/m2
Mencari Luas Bruto Sambungan
Ag v = 108.75 mm2 0.00010875 m2 1.0875
Ag t = 108.75 mm2 0.00010875 m2
Mencari Luas Netto Sambungan
Ln v = 0.0184125 m
Ln t = 0.0184125 m
An v = 8.009438E-05 m2
An t = 8.009438E-05 m2
Mencari Nilai Rn (Block Shear)
Fu.An t = 3020.15384 Kg
0,6. Fu. An v = 1812.092304 Kg
ØRn = 3462.07182 Kg
ØRn = 3353.996628 Kg
ØRn Pakai = 3462.07182 Kg

AMAN COY
KN x 101.912 = Kg
KN/mm2 x 1.02E+08 = kg/m2

0.75 SNI 03-1729-2002 Hal.18


Propertis Profil Kanal UNP 30/50
t = 3.45 mm 0.00345 m
tw = 4.35 mm 0.00435 m
T = 43.1 mm 0.0431 m
d = 50 mm 0.05 m
bf = 30 mm 0.03 m
A = 394.485 mm2 0.000394 m2
Fy = 240 Mpa
0.24 KN/mm2
Fu = 370 Mpa
0.37 KN/mm2
37707440 Kg/m2
1 Lb 1 kg 1f 1
0.4536 kg 9.81 N 0.3048 m 98100
1 Pa 98.1
input data 1.02E-05 kg/cm2
318 lb/f 1 kPa
473.2441 kg/m 0.010197 kg/cm2
4642.525 N/m 1f 1 kg/m
4.642525 kN/m 12 in 9.81 N/m
0.00981 KN/m
1 kPa 1 in
0.010197 kg/cm2 25.4 mm
1.000326 kN/m2 2.54 cm
0.0254 m

1 kipp-f 1.356 kN.m 1 kipps 4.45 kN


1 kN.m 0.737463 kipp-f 4450 N
1N
0.125 3.175

2231.36 19746.55 1 Mpa 0.14504 ksi


227.5234 MPa 33 ksi

1 ksi
50 ksi

50
kg/cm2 1 Mpa
N/m2 1 N/mm2
kN/m2
1 kN 1000 N
1 kg 9.81 N 1 cm2 0.0001
1 kg/cm2 98100 N/m2
98.1 kN/m2

50 ksi 240 Mpa

1 kN 0.224719 kipp

0.000225 kipp

b 50 BH^2/6 83333.333
h 100 bh^3/6H 83333.333
BH^2/6 - bh^3/6H

6.89465 Mpa
344.7325 MPa
d b t tw
150 75 20 2.3
0.000 0.000 0.000 0.000
60 30 10 1.6
0.00 0.00 0.00 0.00

kg 490.5 N
0.4905 kN

0.0254

1 N/mm2
ksi = kipp/in2
m2

0.101972 kg/mm2
Pembebanan Beton Dimensi Beton Panel
g beton = 2400 Kg/m3 Panjang (L) =
Beban Merata Beton (Lateral) = 24 Kg/m OKE Lebar (B) =
Pembebanan SAP Tinggi (H) =
Bekisting Luar (Lateral)
Daerah yang diampu = 0.2 m
Beban Lateral shell perbidang = 120 Kg/m2 SAP beban bek. Kunci
Bekisting Dalam (Lateral) Atas
Daerah yang diampu = 0.4 m 6.78 Kg/m
Beban Lateral shell perbidang = 60 Kg/m2 SAP Bawah
20.52 Kg/m
Pembebanan Manusia
Berat Maksimal 1 Pekerja = 100 Kg
Bidang Singgung Kaki Pekerja (2 Kaki)
arah y = 0.3 m
Jumlah bekisting yg disinggung = 4 buah
Tegangan Vertikal ke Bekisting = 333.33 Kg/m
Beban Merata Pekerja (Vertikal) = 83.33 Kg/m OKE SAP
Bidang Singgung permeter persegi
arah y = 1 m
arah x dalam 1 beton = 0.05 m
Jumlah beton yg disinggung = 10 buah
Tegangan Vertikal ke Beton = 2000 Kg/m2 100 Kg/m2
Beban Vertikal kepada beton = 200 Kg/m2 40 Kg/m
Beban Merata Pekerja (Lateral) = 80 Kg/m OKE
Pembebanan SAP beban bek. Kunci
Bekisting Luar (Lateral) 80.00 Kg/m
Daerah yang diampu = 0.2 m
Beban Lateral shell perbidang = 400 Kg/m2 SAP
Bekisting Dalam (Lateral)
Daerah yang diampu = 0.4 m
Beban Lateral shell perbidang = 200 Kg/m2 SAP

Pembebanan Gerobak Sorong


Diameter Roda = 13 Inci
= 0.3302 m
Tebal Roda = 3 Inci
= 0.0762 m
Panjang Singgung Roda = 0.24765 m
Lebar Singgung Roda = 0.05 m
Luas Permukaan Singgung = 0.0123825 m2
Volume Gerobak Sorong = 65 Liter
= 0.065 m3
Berat Tampungan = 156 Kg
Berat Gerobak Sorong = 15000 Gram
= 15 Kg
Beban Gerobak Sorong = 171 Kg
Beban Merata GS (Vertikal) = 13809.8122 Kg/m2 2761.96245 Kg/m2
Beban Merata GS (Lateral) = 5523.92489 Kg/m 1104.78498
Tegangan Lateral = 1723.68 Kg/m2
Luas Bidang Teg. Lateral = 0.01 m2
Beban Titik GS (Vertikal) = 171 Kg OKE SAP
Beban Titik GS (Lateral) = 16.55 Kg OKE
Pembebanan SAP beban bek. Kunci
Bekisting Luar (Lateral) 16.55 Kg
Daerah yang diampu arah y = 0.6 m
Daerah yang diampu arah z = 0.2 m
Beban Lateral shell perbidang = 137.89 Kg/m2 SAP
Bekisting Dalam (Lateral)
Daerah yang diampu arah y = 0.8 m
Daerah yang diampu arah z = 0.4 m
Beban Lateral shell perbidang = 51.71 Kg/m2 SAP

Pembebanan Pemadatan
Panjang Tulangan Ø16 = 1 m
Berat Tulangan Ø16 = 1.58 Kg/m
Luas Permukaan Ø16 = 0.0002 m2
Tinggi Jatuh Tulangan = 0.40 m
Beban Pemadatan = 6.213 N
Beban Pemadatan Vertikal = 0.63 Kg
Tegangan Lateral = 6.38 Kg/m2
Luas Bidang Teg. Lateral = 0.01 m2
Beban Titik Pemadatan (Lateral) = 0.06 Kg OKE
Pembebanan SAP
Bekisting Luar (Lateral)
Daerah yang diampu arah y = 0.6 m
Daerah yang diampu arah z = 0.2 m
Beban Lateral shell perbidang = 0.51 Kg/m2 SAP
Bekisting Dalam (Lateral) beban bek. Kunci
Daerah yang diampu arah y = 0.8 m 0.06 Kg
Daerah yang diampu arah z = 0.4 m
Beban Lateral shell perbidang = 0.19 Kg/m2 SAP

Mencari Beban Lateral Akibat Beban Titik Axial


Beban Gerobak Sorong Beba
Rumus Beban Lateral m n sh Rumus Beban Lateral
0.1 609.10
0.2 1496.25
0.3 1723.68
0.4 1461.18
0.5 1085.48
0.1
0.6 766.17
0.7 533.94
0.8 374.06
0.9 265.59
1 191.72
0.1 609.10
0.2 1496.25
0.3 1723.68
0.4 1461.18
0.5 1085.48
0.125
0.6 766.17
0.7 533.94
0.8 374.06
0.9 265.59
1 191.72
0.1 609.10
0.2 1496.25
0.3 1723.68
0.4 1461.18
0.5 1085.48
Rumus Untuk m ≤ 4 0.2 Rumus Untuk m ≤ 4
0.6 766.17
0.7 533.94
0.8 374.06
0.9 265.59
1 191.72
0.1 609.10
0.2 1496.25
0.3 1723.68
0.4 1461.18
0.5 1085.48
0.3
0.6 766.17
0.7 533.94
0.8 374.06
0.9 265.59
1 191.72
0.1 609.10
0.2 1496.25
0.3 1723.68
0.4 1461.18
0.5 1085.48
0.4
0.6 766.17
0.7 533.94
0.8 374.06
0.9 265.59
1 191.72
0.1 269.07
0.2 775.63
0.3 1082.92
0.4 1097.89
0.5 945.84
0.5
0.6 750.07
0.7 571.86
0.8 429.34
0.5

0.9 321.63
1 242.14
0.1 134.45
0.2 425.63
0.3 672.60
0.4 774.93
0.5 750.07
0.6
0.6 656.84
0.7 543.36
0.8 435.84
0.9 344.41
1 270.73
0.1 74.15
0.2 249.05
0.3 427.57
0.4 540.04
0.5 571.86
0.7
0.6 543.36
0.7 482.57
0.8 411.14
0.9 341.74
1 280.21
Rumus Untuk m > 0,4 Rumus Untuk m > 0,4
0.1 44.08
0.2 154.01
0.3 280.09
0.4 378.34
0.5 429.34
0.8
0.6 435.84
0.7 411.14
0.8 369.47
0.9 321.67
1 274.47
0.1 27.79
0.2 99.80
0.3 189.17
0.4 268.62
0.5 321.63
0.9
0.6 344.41
0.7 341.74
0.8 321.67
0.9 291.93
1 258.40
0.1 18.36
0.2 67.27
0.3 131.47
0.4 193.91
0.5 242.14
1
0.6 270.73
1

0.7 280.21
0.8 274.47
0.9 258.40
1 236.46
Beban Lateral Maksimal 0.4 0.3 1723.68 Kg/m2 Beban Lateral Maksimal

Kontrol
m 0.4
n 0.3
H 0.4
P 171.00

47.88
299.25
0.09
0.25
0.015625
5.76
1723.68
Dimensi Beton Panel
2.4 m
0.05 m
0.4 m

0.287

0.058

8.331722
Titik Axial
Beban Pemadatan
Rumus Beban Lateral m n sh
0.1 2.26
0.2 5.54
0.3 6.38
0.4 5.41
0.5 4.02
0.1
0.6 2.84
0.7 1.98
0.8 1.39
0.9 0.98
1 0.71
0.1 2.26
0.2 5.54
0.3 6.38
0.4 5.41
0.5 4.02
0.125
0.6 2.84
0.7 1.98
0.8 1.39
0.9 0.98
1 0.71
0.1 2.26
0.2 5.54
0.3 6.38
0.4 5.41
0.5 4.02
0.2
0.6 2.84
0.7 1.98
0.8 1.39
0.9 0.98
1 0.71
0.1 2.26
0.2 5.54
0.3 6.38
0.4 5.41
0.5 4.02
0.3
0.6 2.84
0.7 1.98
0.8 1.39
0.9 0.98
1 0.71
0.1 2.26
0.2 5.54
0.3 6.38
0.4 5.41
0.5 4.02
0.4
0.6 2.84
0.7 1.98
0.8 1.39
0.9 0.98
1 0.71
0.1 1.00
0.2 2.87
0.3 4.01
0.4 4.07
0.5 3.50
0.5
0.6 2.78
0.7 2.12
0.8 1.59
0.5

0.9 1.19
1 0.90
0.1 0.50
0.2 1.58
0.3 2.49
0.4 2.87
0.5 2.78
0.6
0.6 2.43
0.7 2.01
0.8 1.61
0.9 1.28
1 1.00
0.1 0.27
0.2 0.92
0.3 1.58
0.4 2.00
0.5 2.12
0.7
0.6 2.01
0.7 1.79
0.8 1.52
0.9 1.27
1 1.04
Rumus Untuk m > 0,4
0.1 0.16
0.2 0.57
0.3 1.04
0.4 1.40
0.5 1.59
0.8
0.6 1.61
0.7 1.52
0.8 1.37
0.9 1.19
1 1.02
0.1 0.10
0.2 0.37
0.3 0.70
0.4 0.99
0.5 1.19
0.9
0.6 1.28
0.7 1.27
0.8 1.19
0.9 1.08
1 0.96
0.1 0.07
0.2 0.25
0.3 0.49
0.4 0.72
0.5 0.90
1
0.6 1.00
1

0.7 1.04
0.8 1.02
0.9 0.96
1 0.88
eban Lateral Maksimal 0.4 0.3 6.38 Kg/m2
Pembebanan Pemadatan Revisi
Alat Pemadatan
Bj baja 7850 Kg/m3
Bagian Atas
Pipa baja
Diameter 1.25 Inchi 0.03175 m
Tebal 0.003 m
Diameter Kosong 0.02575
Luas 0.000791
Luas kosong 0.000521
Luas isi 0.000271
Panjang 1.2 m
Berat Bag. Atas 2.551172 kg
Bagian Bawah
Pelat Hitam
Tebal 0.004 m
Panjang 0.6 m
Lebar 0.06 m
Berat Bag. Bawah 1.1304 Kg
Total Berat 3.681572 Kg
Pembebanan Pemadatan
Berat Alat = 3.68 kg
Tinggi Jatuh Alat = 0.40 m
Beban Pemadatan = 14.44649 N
Beban Pemadatan Vertikal = 1.47 Kg
Tegangan Lateral = 14.84 Kg/m2
Luas Bidang Teg. Lateral = 0.01 m2
Beban Titik Pemadatan (Lateral) = 0.14 Kg OKE
Pembebanan SAP
Bekisting Luar (Lateral)
Daerah yang diampu arah y = 0.6 m
Daerah yang diampu arah z = 0.2 m
Beban Lateral shell perbidang = 1.19 Kg/m2 SAP
Bekisting Dalam (Lateral)
Daerah yang diampu arah y = 0.8 m
Daerah yang diampu arah z = 0.4 m
Beban Lateral shell perbidang = 0.45 Kg/m2 SAP

Beban Pemadatan
Rumus Beban Lateral m

0.1

0.125

Rumus Untuk m ≤ 4 0.2

0.3

0.4
0.4

0.5

0.6

0.7

Rumus Untuk m > 0,4

0.8
0.9

Beban Lateral Maksimal 0.4


n sh
0.1 5.25
0.2 12.89
0.3 14.84
0.4 12.58
0.5 9.35
0.6 6.60
0.7 4.60
0.8 3.22
0.9 2.29
1 1.65
0.1 5.25
0.2 12.89
0.3 14.84
0.4 12.58
0.5 9.35
0.6 6.60
0.7 4.60
0.8 3.22
0.9 2.29
1 1.65
0.1 5.25
0.2 12.89
0.3 14.84
0.4 12.58
0.5 9.35
0.6 6.60
0.7 4.60
0.8 3.22
0.9 2.29
1 1.65
0.1 5.25
0.2 12.89
0.3 14.84
0.4 12.58
0.5 9.35
0.6 6.60
0.7 4.60
0.8 3.22
0.9 2.29
1 1.65
0.1 5.25
0.2 12.89
0.3 14.84
0.4 12.58
0.5 9.35
0.6 6.60
0.7 4.60
0.8 3.22
0.9 2.29
1 1.65
0.1 2.32
0.2 6.68
0.3 9.33
0.4 9.45
0.5 8.15
0.6 6.46
0.7 4.92
0.8 3.70
0.9 2.77
1 2.09
0.1 1.16
0.2 3.67
0.3 5.79
0.4 6.67
0.5 6.46
0.6 5.66
0.7 4.68
0.8 3.75
0.9 2.97
1 2.33
0.1 0.64
0.2 2.14
0.3 3.68
0.4 4.65
0.5 4.92
0.6 4.68
0.7 4.16
0.8 3.54
0.9 2.94
1 2.41
0.1 0.38
0.2 1.33
0.3 2.41
0.4 3.26
0.5 3.70
0.6 3.75
0.7 3.54
0.8 3.18
0.9 2.77
1 2.36
0.1 0.24
0.2 0.86
0.3 1.63
0.4 2.31
0.5 2.77
0.6 2.97
0.7 2.94
0.8 2.77
0.9 2.51
1 2.23
0.1 0.16
0.2 0.58
0.3 1.13
0.4 1.67
0.5 2.09
0.6 2.33
0.7 2.41
0.8 2.36
0.9 2.23
1 2.04
0.3 14.84 Kg/m2
BEKISTING VARIASI CEK DEFAULT
BEBAN BETON
Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar - 2 - 0.2 120
Bekisting Sekat - 1 - 0.4 60

BEBAN PEKERJA
Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar - 2 - 0.2 200
Bekisting Sekat - 1 - 0.4 100

BEBAN GEROBAK SORONG


Tinggi y Beban
V1 Panjang Bagian Bagian Z Area
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar 4 2 0.6 0.2 137.89
Bekisting Sekat 3 1 0.8 0.4 51.71

BEBAN PEMADATAN
Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar 4 2 0.6 0.2 1.19
Bekisting Sekat 3 1 0.8 0.4 0.45

BEKISTING VARIASI CEK VARIASI 1 BEKISTING VA


BEBAN BETON BEBA
Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area V1
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar - 1 - 0.4 60 Bekisting Luar
Bekisting Sekat - 1 - 0.4 60 Bekisting Sekat

BEBAN PEKERJA BEBA


Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area V1
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar - 1 - 0.4 100 Bekisting Luar
Bekisting Sekat - 1 - 0.4 100 Bekisting Sekat

BEBAN GEROBAK SORONG BEBAN GE


Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area V1
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar 1 1 2.4 0.4 17.24 Bekisting Luar
Bekisting Sekat 1 1 2.4 0.4 17.24 Bekisting Sekat
BEBAN PEMADATAN BEBAN
Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area V1
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar 1 1 2.4 0.4 0.15 Bekisting Luar
Bekisting Sekat 1 1 2.4 0.4 0.15 Bekisting Sekat

BEKISTING VARIASI CEK VARIASI 7 BEKISTING VA


BEBAN BETON BEBA
Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area V1
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar - 2 - 0.2 120 Bekisting Luar
Bekisting Sekat - 2 - 0.2 120 Bekisting Sekat

BEBAN PEKERJA BEBA


Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area V1
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar - 2 - 0.2 200 Bekisting Luar
Bekisting Sekat - 2 - 0.2 200 Bekisting Sekat

BEBAN GEROBAK SORONG BEBAN GE


Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area V1
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar 1 2 2.4 0.2 34.47 Bekisting Luar
Bekisting Sekat 1 2 2.4 0.2 34.47 Bekisting Sekat

BEBAN PEMADATAN BEBAN


Tinggi y Beban
Panjang Bagian Bagian Z
V1 Area V1
dIbagi (m) (m)
dIbagi (Kg/m2)
Bekisting Luar 1 2 2.4 0.2 0.30 Bekisting Luar
Bekisting Sekat 1 2 2.4 0.2 0.30 Bekisting Sekat
BEKISTING VARIASI CEK VARIASI 2 BEKISTING VARIASI CEK VARIAS
BEBAN BETON BEBAN BETON
Tinggi y Beban
Panjang Bagian Bagian Z Panjang Bagian
Area V1
dIbagi (m) (m) dIbagi
dIbagi (Kg/m2)
- 1 - 0.4 60 Bekisting Luar -
- 1 - 0.4 60 Bekisting Sekat -

BEBAN PEKERJA BEBAN PEKERJA


Tinggi y Beban
Panjang Bagian Bagian Z Panjang Bagian
Area V1
dIbagi (m) (m) dIbagi
dIbagi (Kg/m2)
- 1 - 0.4 100 Bekisting Luar -
- 1 - 0.4 100 Bekisting Sekat -

BEBAN GEROBAK SORONG BEBAN GEROBAK SORONG


Tinggi y Beban
Panjang Bagian Bagian Z Panjang Bagian
Area V1
dIbagi (m) (m) dIbagi
dIbagi (Kg/m2)
2 1 1.2 0.4 34.47 Bekisting Luar 3
2 1 1.2 0.4 34.47 Bekisting Sekat 3
BEBAN PEMADATAN BEBAN PEMADATAN
Tinggi y Beban
Panjang Bagian Bagian Z Panjang Bagian
Area V1
dIbagi (m) (m) dIbagi
dIbagi (Kg/m2)
2 1 1.2 0.4 0.30 Bekisting Luar 3
2 1 1.2 0.4 0.30 Bekisting Sekat 3

BEKISTING VARIASI CEK VARIASI 8 BEKISTING VARIASI CEK VARIAS


BEBAN BETON BEBAN BETON
Tinggi y Beban
Panjang Bagian Bagian Z Panjang Bagian
Area V1
dIbagi (m) (m) dIbagi
dIbagi (Kg/m2)
- 2 - 0.2 120 Bekisting Luar -
- 2 - 0.2 120 Bekisting Sekat -

BEBAN PEKERJA BEBAN PEKERJA


Tinggi y Beban
Panjang Bagian Bagian Z Panjang Bagian
Area V1
dIbagi (m) (m) dIbagi
dIbagi (Kg/m2)
- 2 - 0.2 200 Bekisting Luar -
- 2 - 0.2 200 Bekisting Sekat -

BEBAN GEROBAK SORONG BEBAN GEROBAK SORONG


Tinggi y Beban
Panjang Bagian Bagian Z Panjang Bagian
Area V1
dIbagi (m) (m) dIbagi
dIbagi (Kg/m2)
2 2 1.2 0.2 68.95 Bekisting Luar 3
2 2 1.2 0.2 68.95 Bekisting Sekat 3

BEBAN PEMADATAN BEBAN PEMADATAN


Tinggi y Beban
Panjang Bagian Bagian Z Panjang Bagian
Area V1
dIbagi (m) (m) dIbagi
dIbagi (Kg/m2)
2 2 1.2 0.2 0.59 Bekisting Luar 3
2 2 1.2 0.2 0.59 Bekisting Sekat 3
KISTING VARIASI CEK VARIASI 3 BEKISTING VARIASI CEK VARIASI 4
BEBAN BETON BEBAN BETON
Tinggi Beban Tinggi y
Bagian y (m) Z Panjang
Area V1 Bagian
(m) Bagian dIbagi dIbagi (m)
dIbagi (Kg/m2)
1 - 0.4 60 Bekisting Luar - 1 -
1 - 0.4 60 Bekisting Sekat - 1 -

BEBAN PEKERJA BEBAN PEKERJA


Tinggi Beban Tinggi y
Bagian y Z Panjang
Area V1 Bagian
(m) (m) Bagian dIbagi dIbagi (m)
dIbagi (Kg/m2)
1 - 0.4 100 Bekisting Luar - 1 -
1 - 0.4 100 Bekisting Sekat - 1 -

BEBAN GEROBAK SORONG BEBAN GEROBAK SORONG


Tinggi Beban Tinggi y
Bagian y (m) Z Panjang
Area V1 Bagian
(m) Bagian dIbagi dIbagi (m)
dIbagi (Kg/m2)
1 0.8 0.4 51.71 Bekisting Luar 4 1 0.6
1 0.8 0.4 51.71 Bekisting Sekat 4 1 0.6
BEBAN PEMADATAN BEBAN PEMADATAN
Tinggi Beban Tinggi y
Bagian y (m) Z Panjang
Area V1 Bagian
(m) Bagian dIbagi dIbagi (m)
dIbagi (Kg/m2)
1 0.8 0.4 0.45 Bekisting Luar 4 1 0.6
1 0.8 0.4 0.45 Bekisting Sekat 4 1 0.6

KISTING VARIASI CEK VARIASI 9 BEKISTING VARIASI CEK VARIASI 10


BEBAN BETON BEBAN BETON
Tinggi Beban Tinggi y
Bagian y (m) Z Panjang
Area V1 Bagian
(m) Bagian dIbagi dIbagi (m)
dIbagi (Kg/m2)
2 - 0.2 120 Bekisting Luar - 2 -
2 - 0.2 120 Bekisting Sekat - 2 -

BEBAN PEKERJA BEBAN PEKERJA


Tinggi Beban Tinggi y
Bagian y Z Panjang
Area V1 Bagian
(m) (m) Bagian dIbagi dIbagi (m)
dIbagi (Kg/m2)
2 - 0.2 200 Bekisting Luar - 2 -
2 - 0.2 200 Bekisting Sekat - 2 -

BEBAN GEROBAK SORONG BEBAN GEROBAK SORONG


Tinggi Beban Tinggi y
Bagian y (m) Z Panjang
Area V1 Bagian
(m) Bagian dIbagi dIbagi (m)
dIbagi (Kg/m2)
2 0.8 0.2 103.42 Bekisting Luar 4 2 0.6
2 0.8 0.2 103.42 Bekisting Sekat 4 2 0.6

BEBAN PEMADATAN BEBAN PEMADATAN


Tinggi Beban Tinggi y
Bagian y (m) Z Panjang
Area V1 Bagian
(m) Bagian dIbagi dIbagi (m)
dIbagi (Kg/m2)
2 0.8 0.2 0.89 Bekisting Luar 4 2 0.6
2 0.8 0.2 0.89 Bekisting Sekat 4 2 0.6
K VARIASI 4 BEKISTING VARIASI CEK VARIASI 5
N BEBAN BETON
Beban Tinggi y Beban
Z Panjang Z
Area V1 Bagian Area
(m) Bagian dIbagi dIbagi (m) (m)
(Kg/m2) (Kg/m2)
0.4 60 Bekisting Luar - 1 - 0.4 60
0.4 60 Bekisting Sekat - 1 - 0.4 60

JA BEBAN PEKERJA
Beban Tinggi y Beban
Z Panjang Z
Area V1 Bagian Area
(m) Bagian dIbagi dIbagi (m) (m)
(Kg/m2) (Kg/m2)
0.4 100 Bekisting Luar - 1 - 0.4 100
0.4 100 Bekisting Sekat - 1 - 0.4 100

ORONG BEBAN GEROBAK SORONG


Beban Tinggi y Beban
Z Panjang Z
Area V1 Bagian Area
(m) Bagian dIbagi dIbagi (m) (m)
(Kg/m2) (Kg/m2)
0.4 68.95 Bekisting Luar 6 1 0.4 0.4 103.42
0.4 68.95 Bekisting Sekat 6 1 0.4 0.4 103.42
TAN BEBAN PEMADATAN
Beban Tinggi y Beban
Z Panjang Z
Area V1 Bagian Area
(m) Bagian dIbagi dIbagi (m) (m)
(Kg/m2) (Kg/m2)
0.4 0.59 Bekisting Luar 6 1 0.4 0.4 0.89
0.4 0.59 Bekisting Sekat 6 1 0.4 0.4 0.89

VARIASI 10 BEKISTING VARIASI CEK VARIASI 11


N BEBAN BETON
Beban Tinggi y Beban
Z Panjang Z
Area V1 Bagian Area
(m) Bagian dIbagi dIbagi (m) (m)
(Kg/m2) (Kg/m2)
0.2 120 Bekisting Luar - 2 - 0.2 120
0.2 120 Bekisting Sekat - 2 - 0.2 120

JA BEBAN PEKERJA
Beban Tinggi y Beban
Z Panjang Z
Area V1 Bagian Area
(m) Bagian dIbagi dIbagi (m) (m)
(Kg/m2) (Kg/m2)
0.2 200 Bekisting Luar - 2 - 0.2 200
0.2 200 Bekisting Sekat - 2 - 0.2 200

ORONG BEBAN GEROBAK SORONG


Beban Tinggi y Beban
Z Panjang Z
Area V1 Bagian Area
(m) Bagian dIbagi dIbagi (m) (m)
(Kg/m2) (Kg/m2)
0.2 137.89 Bekisting Luar 6 2 0.4 0.2 206.84
0.2 137.89 Bekisting Sekat 6 2 0.4 0.2 206.84

TAN BEBAN PEMADATAN


Beban Tinggi y Beban
Z Panjang Z
Area V1 Bagian Area
(m) Bagian dIbagi dIbagi (m) (m)
(Kg/m2) (Kg/m2)
0.2 1.19 Bekisting Luar 6 2 0.4 0.2 1.78
0.2 1.19 Bekisting Sekat 6 2 0.4 0.2 1.78
BEKISTING VARIASI CEK VARIASI 6
BEBAN BETON
Tinggi y Beban
Panjang Z
V1 Bagian Area
Bagian dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.4 60
Bekisting Sekat - 1 - 0.4 60

BEBAN PEKERJA
Tinggi y Beban
Panjang Z
V1 Bagian Area
Bagian dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 1 - 0.4 100
Bekisting Sekat - 1 - 0.4 100

BEBAN GEROBAK SORONG


Tinggi y Beban
Panjang Z
V1 Bagian Area
Bagian dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 8 1 0.3 0.4 137.89
Bekisting Sekat 8 1 0.3 0.4 137.89
BEBAN PEMADATAN
Tinggi y Beban
Panjang Z
V1 Bagian Area
Bagian dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 8 1 0.3 0.4 1.19
Bekisting Sekat 8 1 0.3 0.4 1.19

BEKISTING VARIASI CEK VARIASI 12


BEBAN BETON
Tinggi y Beban
Panjang Z
V1 Bagian Area
Bagian dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.2 120
Bekisting Sekat - 2 - 0.2 120

BEBAN PEKERJA
Tinggi y Beban
Panjang Z
V1 Bagian Area
Bagian dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar - 2 - 0.2 200
Bekisting Sekat - 2 - 0.2 200

BEBAN GEROBAK SORONG


Tinggi y Beban
Panjang Z
V1 Bagian Area
Bagian dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 8 2 0.3 0.2 275.79
Bekisting Sekat 8 2 0.3 0.2 275.79

BEBAN PEMADATAN
Tinggi y Beban
Panjang Z
V1 Bagian Area
Bagian dIbagi dIbagi (m) (m) (Kg/m2)
Bekisting Luar 8 2 0.3 0.2 2.38
Bekisting Sekat 8 2 0.3 0.2 2.38
BEKISTING DEFAULT

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN MEMANJANG
MELINTANG (m) (m)
BEKISTING LUAR SENDI 0.6 0.2
BEKISTING SEKAT JEPIT 0.8 0.4

Dimensi
Bagian Jenis Baja (mm)
Bekisting Luar Kanal UNP 30/50
Bekisting Sekat Hollow 20/40
Bekisting Kunci Kanal UNP 30/50
Bekisting Kontak Plat Hitam 1200/2400
Bekisting Bawah Kanal UNP 30/50

Cek Terhadap Momen


Momen Ultimate (Mu) 72.885 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 150.615 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 22.586 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2874.376 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 10.724 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 6618.108 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.2 m
Defleksi Arah x (Δx) 0.00001 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.000555556 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000000475 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.6 m
Defleksi Arah z (Δz) 0.000971 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.001666667 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.6 m
Defleksi Arah x (Δx) 0.14672 m
Syarat Δx ≤ Δx ijin GAGAL
Defleksi Ijin arah x (Δx ijin) 0.001666667 m

BEKISTING VARIASI 1

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN MEMANJANG
MELINTANG (m) (m)
BEKISTING LUAR JEPIT 2.4 0.4
BEKISTING SEKAT JEPIT 2.4 0.4

Dimensi
Bagian Jenis Baja (mm)
Dimensi
Bagian Jenis Baja (mm)
Bekisting Luar Kanal UNP 30/50
Bekisting Sekat Hollow 20/40
Bekisting Kunci Kanal UNP 30/50
Bekisting Kontak Pelateser 1200/2400
Bekisting Bawah Kanal UNP 30/50

Cek Terhadap Momen


Momen Ultimate (Mu) 20.476 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 51.565 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 136.8 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2114.483 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 384.4 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 511.599 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000128 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000001276 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 2.4 m
Defleksi Arah z (Δz) 0.007248 m
Syarat Δz ≤ Δz ijin GAGAL
Defleksi Ijin arah z (Δz ijin) 0.006666667 m
Cek Defleksi Pelat
Panjang Pelat Arah x 2.4 m
Defleksi Arah x (Δx) 0.007839 m
Syarat Δx ≤ Δx ijin GAGAL
Defleksi Ijin arah x (Δx ijin) 0.006666667 m

GAGAL
BEKISTING VARIASI 2

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN MEMANJANG
MELINTANG (m) (m)
BEKISTING LUAR JEPIT 1.2 0.4
BEKISTING SEKAT JEPIT 1.2 0.4

Dimensi
Bagian Jenis Baja (mm)
Dimensi
Bagian Jenis Baja (mm)
Bekisting Luar Kanal UNP 30/50
Bekisting Sekat Hollow 20/40
Bekisting Kunci Kanal UNP 30/50
Bekisting Kontak Pelateser 1200/2400
Bekisting Bawah Kanal UNP 30/50

Cek Terhadap Momen


Momen Ultimate (Mu) 26.146 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 95.011 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 86.399 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2960.277 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 184.924 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 5383.984 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000087 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000001274 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 1.2 m
Defleksi Arah z (Δz) 0.000477 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.003333333 m
Cek Defleksi Pelat
Panjang Pelat Arah x 1.2 m
Defleksi Arah x (Δx) 0.001611 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.003333333 m

OKE
BEKISTING VARIASI 3

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN MELINTANG MEMANJANG
(m) (m)
BEKISTING LUAR JEPIT 0.8 0.4
BEKISTING SEKAT JEPIT 0.8 0.4

Dimensi
Bagian Jenis Baja (mm)
Dimensi
Bagian Jenis Baja (mm)
Bekisting Luar Kanal UNP 30/50
Bekisting Sekat Hollow 20/40
Bekisting Kunci Kanal UNP 30/50
Bekisting Kontak Pelateser 1200/2400
Bekisting Bawah Kanal UNP 30/50

Cek Terhadap Momen


Momen Ultimate (Mu) 18.143 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 95.011 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 63.683 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2960.277 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 183.267 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 5528.269 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000051 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.00000127 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.8 m
Defleksi Arah z (Δz) 0.000121 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.002222222 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.8 m
Defleksi Arah x (Δx) 0.0011 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.002222222 m

OKE
BEKISTING VARIASI 4
JARAK PENGAKU
JARAK PENGAKU
BAGIAN TUMPUAN MEMANJANG
MELINTANG (m) (m)
BEKISTING LUAR JEPIT 0.6 0.4
BEKISTING SEKAT JEPIT 0.6 0.4

Dimensi
Bagian Jenis Baja (mm)
Dimensi
Bagian Jenis Baja (mm)
Bekisting Luar Kanal UNP 30/50
Bekisting Sekat Hollow 20/40
Bekisting Kunci Kanal UNP 30/50
Bekisting Kontak Pelateser 1200/2400
Bekisting Bawah Kanal UNP 30/50

Cek Terhadap Momen


Momen Ultimate (Mu) 15.285 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 95.011 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 55.55 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2960.277 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 181.659 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 5605.104 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000042 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000001271 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.6 m
Defleksi Arah z (Δz) 0.000049 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.001666667 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.6 m
Defleksi Arah x (Δx) 0.000757 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001666667 m

OKE
BEKISTING VARIASI 5
JARAK PENGAKU
JARAK PENGAKU
BAGIAN TUMPUAN MELINTANG MEMANJANG
(m) (m)
BEKISTING LUAR JEPIT 0.4 0.4
BEKISTING SEKAT JEPIT 0.4 0.4

Dimensi
Bagian Jenis Baja (mm)
Dimensi
Bagian Jenis Baja (mm)
Bekisting Luar Kanal UNP 30/50
Bekisting Sekat Hollow 20/40
Bekisting Kunci Kanal UNP 30/50
Bekisting Kontak Pelateser 1200/2400
Bekisting Bawah Kanal UNP 30/50

Cek Terhadap Momen


Momen Ultimate (Mu) 12.281 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 95.011 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 46.469 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2960.277 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 147.047 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 5684.419 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.00003 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000001263 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.4 m
Defleksi Arah z (Δz) 0.000013 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.001111111 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.4 m
Defleksi Arah x (Δx) 0.000409 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m

OKE
BEKISTING VARIASI 6

JARAK PENGAKU JARAK PENGAKU


BAGIAN TUMPUAN MEMANJANG
MELINTANG (m) (m)
BEKISTING LUAR JEPIT 0.3 0.4
BEKISTING SEKAT JEPIT 0.3 0.4

Dimensi
Bagian Jenis Baja (mm)
Dimensi
Bagian Jenis Baja (mm)
Bekisting Luar Kanal UNP 30/50
Bekisting Sekat Hollow 20/40
Bekisting Kunci Kanal UNP 30/50
Bekisting Kontak Pelateser 1200/2400
Bekisting Bawah Kanal UNP 30/50

Cek Terhadap Momen


Momen Ultimate (Mu) 10.686 Kgm
Syarat Mu ≤ ФMn OKE
Momen Rencana (ФMn) 95.011 Kgm
Cek Terhadap Gaya Geser
Geser Ultimate (Vu) 43.643 Kg
Syarat Vu ≤ ФVn OKE
Geser Rencana (ФVn) 2960.277 Kg
Cek Terhadap Gaya Axial
Axial Ultimate (Pu) 162.457 Kg
Syarat Pu ≤ ФPn OKE
Axial Rencana (ФPn) 5724.736 Kg
Cek Defleksi Frame
Panjang Frame Arah x 0.4 m
Defleksi Arah x (Δx) 0.000004218 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.001111111 m
Panjang Frame Arah y 0.05 m
Defleksi Arah y (Δy) 0.000001469 m
Syarat Δy ≤ Δy ijin OKE
Defleksi Ijin arah y (Δy ijin) 0.000138889 m
Panjang Frame Arah z 0.3 m
Defleksi Arah z (Δz) 0.000000925 m
Syarat Δz ≤ Δz ijin OKE
Defleksi Ijin arah z (Δz ijin) 0.000833333 m
Cek Defleksi Pelat
Panjang Pelat Arah x 0.3 m
Defleksi Arah x (Δx) 0.000319 m
Syarat Δx ≤ Δx ijin OKE
Defleksi Ijin arah x (Δx ijin) 0.000833333 m

OKE
Bekisting Default Satuan Syarat Keterangan
Mu 72.885 Kgm
Momen Mu ≤ ФMn AMAN
ФMn 150.615 Kgm
Vu 22.586 Kg
Geser Vu ≤ ФVn AMAN
ФVn 2874.376 Kg
Pu 10.724 Kg
Axial Pu ≤ ФPn AMAN
ФPn 6618.108 Kg
Δx 0.00001 m
Δx ≤ Δxizin AMAN
Δxizin 0.000555556 m
Defleksi Δy 0.000000475 m
Δy ≤ Δyizin AMAN
Batang Δyizin 0.000138889 m
Δz 0.000971 m
Δz ≤ Δzizin AMAN
Δzizin 0.001666667 m
Defleksi Δx 0.14672 m
Pelat Δx ≤ Δxizin TIDAK AMAN
Δxizin 0.001666667 m

Bekisting Variasi 1 Satuan Syarat Keterangan Bekisting Variasi 2


Mu 20.476 Kgm
Momen Mu ≤ ФMn AMAN Momen
ФMn 51.565 Kgm
Vu 136.8 Kg
Geser Vu ≤ ФVn AMAN Geser
ФVn 2114.483 Kg
Pu 384.4 Kg
Axial Pu ≤ ФPn AMAN Axial
ФPn 511.599 Kg
Δx 0.000128 m
Δx ≤ Δxizin AMAN
Δxizin 0.001111111 m
Defleksi Δy 0.000001276 m Defleksi
Δy ≤ Δyizin AMAN
Batang Δyizin 0.000138889 m Batang
Δz 0.007248 m
Δz ≤ Δzizin TIDAK AMAN
Δzizin 0.006666667 m
Defleksi Δx 0.007839 m Defleksi Pelat
Pelat Δx ≤ Δxizin TIDAK AMAN
Δxizin 0.006666667 m
Bekisting Variasi 2 Satuan Syarat Keterangan Bekisting Variasi 3
Mu 26.146 Kgm Mu
Mu ≤ ФMn AMAN Momen
ФMn 95.011 Kgm ФMn
Vu 86.399 Kg Vu
Vu ≤ ФVn AMAN Geser
ФVn 2960.277 Kg ФVn
Pu 184.924 Kg Pu
Pu ≤ ФPn AMAN Axial
ФPn 5383.984 Kg ФPn
Δx 0.000087 m Δx
Δx ≤ Δxizin AMAN
Δxizin 0.0011111111 m Δxizin
Δy 0.000001274 m Defleksi Δy
Δy ≤ Δyizin AMAN
Δyizin 0.0001388889 m Batang Δyizin
Δz 0.000477 m Δz
Δz ≤ Δzizin AMAN
Δzizin 0.0033333333 m Δzizin
Δx 0.001611 m Defleksi Δx
Δx ≤ Δxizin AMAN Pelat
Δxizin 0.0033333333 m Δxizin
Bekisting Variasi 3 Satuan Syarat Keterangan Bekisting Variasi 4
18.143 Kgm Mu 15.285
Mu ≤ ФMn AMAN Momen
95.011 Kgm ФMn 95.011
63.683 Kg Vu 55.55
Vu ≤ ФVn AMAN Geser
2960.277 Kg ФVn 2960.277
183.267 Kg Pu 181.659
Pu ≤ ФPn AMAN Axial
5528.269 Kg ФPn 5605.104
0.000051 m Δx 0.000042
Δx ≤ Δxizin AMAN
0.0011111111 m Δxizin 0.0011111111
0.00000127 m Defleksi Δy 0.000001271
Δy ≤ Δyizin AMAN
0.0001388889 m Batang Δyizin 0.0001388889
0.000121 m Δz 0.000049
Δz ≤ Δzizin AMAN
0.0022222222 m Δzizin 0.0016666667
0.0011 m Defleksi Δx 0.000757
Δx ≤ Δxizin AMAN Pelat
0.0022222222 m Δxizin 0.0016666667
Satuan Syarat Keterangan Bekisting Variasi 5 Satuan Syarat
Kgm Mu 12.281 Kgm
Mu ≤ ФMn AMAN Momen Mu ≤ ФMn
Kgm ФMn 95.011 Kgm
Kg Vu 46.469 Kg
Vu ≤ ФVn AMAN Geser Vu ≤ ФVn
Kg ФVn 2960.277 Kg
Kg Pu 147.047 Kg
Pu ≤ ФPn AMAN Axial Pu ≤ ФPn
Kg ФPn 5684.419 Kg
m Δx 0.00003 m
Δx ≤ Δxizin AMAN Δx ≤ Δxizin
m Δxizin 0.0011111111 m
m Defleksi Δy 0.000001263 m
Δy ≤ Δyizin AMAN Δy ≤ Δyizin
m Batang Δyizin 0.0001388889 m
m Δz 0.000013 m
Δz ≤ Δzizin AMAN Δz ≤ Δzizin
m Δzizin 0.0011111111 m
m Defleksi Δx 0.000409 m
Δx ≤ Δxizin AMAN Pelat Δx ≤ Δxizin
m Δxizin 0.0011111111 m
Keterangan Bekisting Variasi 6 Satuan Syarat Keterangan
Mu 10.686 Kgm
AMAN Momen Mu ≤ ФMn AMAN
ФMn 95.011 Kgm
Vu 43.643 Kg
AMAN Geser Vu ≤ ФVn AMAN
ФVn 2960.277 Kg
Pu 162.457 Kg
AMAN Axial Pu ≤ ФPn AMAN
ФPn 5724.736 Kg
Δx 0.000004218 m
AMAN Δx ≤ Δxizin AMAN
Δxizin 0.0011111111 m
Defleksi Δy 0.000001469 m
AMAN Δy ≤ Δyizin AMAN
Batang Δyizin 0.0001388889 m
Δz 0.000000925 m
AMAN Δz ≤ Δzizin AMAN
Δzizin 0.0008333333 m
Defleksi Δx 0.000319 m
AMAN Pelat Δx ≤ Δxizin AMAN
Δxizin 0.0008333333 m
JARAK PENGAKU JARAK PENGAKU VARIASI DEFLEKSI
VARIASI AMAN MELINTANG MEMANJANG TUMPUAN TEBAL PLAT PELAT ARAH X
(m) (m) (m) (m)
0.003 0.001611

0.0028 0.001837

2 1.2 0.4 JEPIT-JEPIT 0.0025 0.002278

0.0023 0.002663

0.002 0.00344

0.003 0.0011

0.0028 0.001256

3 0.8 0.4 JEPIT-JEPIT 0.0025 0.001562

0.0023 0.001834

0.002 0.002407

0.003 0.000757

0.0028 0.000869

4 0.6 0.4 JEPIT-JEPIT 0.0025 0.001097

0.0023 0.001307

0.002 0.001769

0.003 0.000409

0.0028 0.000454

0.0025 0.000553
5 0.4 0.4 JEPIT-JEPIT
0.0023 0.000649

0.002 0.000876

0.0017 0.001291

0.003 0.000319

0.0028 0.000335

0.0025 0.000385
6 0.3 0.4 JEPIT-JEPIT
0.0023 0.000461

0.002 0.000643

0.0017 0.000975
VARIASI TERPILIH (1)
DEFLEKSI KETERANGAN
IZIN (m)
DIMENSI JARAK PENGAKU
PROFIL (mm) MELINTANG (m)
OKE
OKE KANAL UNP 30/50
0.003333 OKE HOLLOW 20/40 0.3
OKE PELATESER 1200/2400
GAGAL
OKE
OKE
0.002222 OKE
OKE
GAGAL
OKE
OKE
0.001667 OKE
OKE
GAGAL
OKE
OKE
OKE
0.001111
OKE
OKE
GAGAL
OKE
OKE
OKE
0.000833
OKE
OKE
GAGAL
) BUAT WORD

JARAK ANTAR
JARAK PENGAKU VARIASI VARIASI TEBAL DEFLEKSI DEFLEKSI
PENGAKU
MEMANJANG (m) PLAT (m) PELAT ARAH IZIN (m)
MELINTANG (m)
X (m)
0.003 0.001611
0.4 0.0028 0.001837

2 0.0025 0.002278 1.2 0.003333333

0.0023 0.002663

0.002 0.00344

0.003 0.0011

0.0028 0.001256

3 0.0025 0.001562 0.8 0.002222222

0.0023 0.001834

0.002 0.002407

0.003 0.000757

0.0028 0.000869

4 0.0025 0.001097 0.6 0.001666667

0.0023 0.001307

0.002 0.001769

0.003 0.000409

0.0028 0.000454

0.0025 0.000553
5 0.4 0.001111111
0.0023 0.000649

0.002 0.000876

0.0017 0.001291

0.003 0.000319

0.0028 0.000335

0.0025 0.000385
6 0.3 0.000833333
0.0023 0.000461

0.002 0.000643

0.0017 0.000975
KETERANGAN

AMAN
AMAN
AMAN
AMAN
GAGAL
AMAN
AMAN
AMAN
AMAN
GAGAL
AMAN
AMAN
AMAN
AMAN
GAGAL
AMAN
AMAN
AMAN
AMAN
AMAN
GAGAL
AMAN
AMAN
AMAN
AMAN
AMAN
GAGAL
Tegangan Ijin Baja BJ-37
fy = 240 Mpa 0.24 KN/mm2 24458880 Kg/m2
Baut
fu = 370 Mpa 0.37 KN/mm2 37707440 Kg/m2
fy = 240 Mpa 0.24 KN/mm2 24458880 Kg/m2
Badan Kanal UNP
fu = 370 Mpa 0.37 KN/mm2 37707440 Kg/m2
Tebal badan kanal tb = 2 mm
= 0.002 m
Beban tarik terfaktor
Ru = P tarik = 68.19 Kg

Persyaratan kekuatan sambungan: Ø = faktor reduksi kekuatan =


Ru ≤ Ø Rn Rn = kuat nominal baut

Mencari diameter minimal baut (rencana baut)


Tinjauan terhadap kuat geser
Rn = m r1 fub Ab
m= 1 (untuk bidang geser)
r1 = 0.4 (untuk bidang geser baut berulir)
fub = 37707440 Kg/m2
Ab = ¼ π d²
Ru ≤ Ø Rn
68.19 ≤ 0,75. 2. 0,4. 37707440. ¼ 3,14 d²
d² ≥ (16,96*4)/(0,75. 2. 0,4. 3,14. 37707440)
d ≥ ((16,96*4)/(0,75. 2. 0,4. 3,14. 37707441))¹ʹ²
d ≥ 0.002771095 m 272.76
d ≥ 2.771094684 mm 35520408.48
0.000007679
Tinjauan terhadap kuat tumpu 0.0027710947
Rn = n db tw fu
n= 2.4 (berlaku untuk semua jenis lubang baut)
db = diameter baut yang dicari
tw = 0.002 m
fu = 37707440 Kg/m2
Ru ≤ Ø Rn
68.19 ≤ 0,75. 2,4. db. 0,002. 37707440
db ≥ 16,96/(0,75. 2,4. 0,002. 37707440)
db ≥ 0.000502332 m
db ≥ 0.502332343 mm

Diambil nilai minimal diameter baut yang paling besar antara d dan db maka diambil;
d ≥ 2.771094684 mm
AHSP Permen PUPR 2016
Kelompok baut yang tersedia;
Diambil baut diameter 10 mm panjang 5cm
db = 0.01 m
dlubang = 0.013175 m
Ab = 0.0000785 m2
Rn Geser -> Pgeser = 888.010212 Kg/baut 888.010212
Rn Tumpu -> Ptumpu = 3936.656736 Kg/baut
P baut = 888.010212 Kg/baut
Badan Kanal
Ag = 394.485 mm2 0.000394485 m2
Lebar badan (d) = 50 mm 0.05 m
Tebal Badan (tw) = 4.35 mm 0.00435 m
Luas kanal (Apenampang) = 394.485 mm2 0.000394485 m2
P badan = 68.19 Kg
Jumlah Baut
N Baut badan = 0.076789657 Baut 0
N Baut Pakai = 1 Baut 1 Baut
N Lubang = 1 Lubang 1 Lubang 0.3175
Cek Block Shear
Panjang Baut Geser (Lv) = 121 mm 0.121 m
Panjang Baut Tarik (Lt) = 55 mm 0.055 m
Diameter Lubang = 0.013175 m
Kanal UNP 30/50
Panjang lebihan kanal UNP(lk) = 96 mm 0.096 m
tw = 4.35 mm 0.00435 m
t= 3.45 mm 0.00345 m
Fy = 240 MPa 0.24 KN/mm2 24458880 Kg/m2
Fu = 370 MPa 0.37 KN/mm2 37707440 Kg/m2
Mencari Luas Bruto Sambungan
Ag v = 526.35 mm2 0.00052635 m2 5.2635
Ag t = 212.25 mm2 0.00021225 m2
Mencari Luas Netto Sambungan
Ln v = 0.1144125 m
Ln t = 0.0484125 m
An v = 0.000497694 m2
An t = 0.000183594 m2
Mencari Nilai Rn (Block Shear)
Fu.An t = 6922.87388 Kg
0,6. Fu. An v = 11260.06847 Kg
ØRn = 10985.42458 Kg
ØRn = 12338.59931 Kg
ØRn Pakai = 12338.59931 Kg

AMAN COY
KN x 101.912 = Kg
KN/mm2 x 101912000 = kg/m2

Variasi 2 68.19 kg
Variasi 5 16.96 kg
Variasi 6 16.17 kg

0.75 SNI 03-1729-2002 Hal.18

Penambahan Ø per 1 mm
db Pgeser Ptumpu
(m) (Kg/baut) (Kg/baut)
0.0027711
0.003
0.004
0.005
0.006
0.007
0.008
0.009
0.01

Propertis Profil Kanal UNP 30/50


t = 3.45 mm 0.00345 m
tw = 4.35 mm 0.00435 m
T = 43.1 mm 0.0431 m
d = 50 mm 0.05 m
bf = 30 mm 0.03 m
A = 394.485 mm2 0.0003945 m2
Fy = 240 Mpa
0.24 KN/mm2
Fu = 370 Mpa
0.37 KN/mm2
37707440 Kg/m2

0.0023669
18.580244

2.4087 2.406
2.4
2.3487
DAFTAR VOLUME
KEBUTUHAN MATERIAL PER 10 PANEL DINDING
BEKISTING BAJA PT. POWERCON JAYA UTAMA
I PEKERJAAN BEKISTING LUAR
19.16 m'
1 Pekerjaan Kanal UNP
44.70 kg
1.82 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
29.52 kg
3 Pekerjaan Pengelasan 396.00 cm
II PEKERJAAN BEKISTING SEKAT
54.83 m'
1 Pekerjaan Hollow
145.99 kg
16.38 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
265.68 kg
4.50 m²
3 Pekerjaan Handle Bekisting Sekat
2.78 kg
4 Pekerjaan Pengelasan 738.00 cm
III PEKERJAAN BEKISTING PERANGKAI
12.31 m'
1 Pekerjaan Kanal UNP
28.72 kg
2 Pekerjaan Baut 8.00 buah
3 Pekerjaan Pengelasan 240.00 cm
IV PEKERJAAN BEKISTING BAWAH
23.96 m'
1 Pekerjaan Kanal UNP
55.91 kg
2.10 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
34.07 kg
3 Pekerjaan Pengelasan 180.00 cm
V PEKERJAAN LANDASAN
8.54 m'
1 Pekerjaan Kanal UNP
19.93 kg
2 Pekerjaan Pengelasan 48.00 cm

Pekerjaan Material volume sat


Kanal UNP 9.58 m
Bek. Luar Plat 0.91 m2
las 198.00 cm
Hollow 6.09 m
Plat (2mm) 1.82 m2
Bek. Skt
Handle 0.50 m
las 82.00 cm
Kanal UNP 6.15 m
Bek. Prgk Baut 4.00 buah
las 120.00 cm
Kanal UNP 2.40 m
Bek. Bwh Plat 0.21 m2
las 18.00 cm

DAFTAR VOLUME
KEBUTUHAN MATERIAL PER 10 PANEL DINDING
BEKISTING BAJA REDESAIN VARIASI 6
I PEKERJAAN BEKISTING LUAR
17.06 m'
1 Pekerjaan Kanal UNP
39.82 kg
1.82 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
29.52 kg
3 Pekerjaan Pengelasan 624.00 cm
II PEKERJAAN BEKISTING SEKAT
78.95 m'
1 Pekerjaan Hollow
210.22 kg
16.38 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
265.68 kg
4.50 m²
3 Pekerjaan Pegangan Bekisting Sekat
2.78 kg
4 Pekerjaan Pengelasan 2142.00 cm
III PEKERJAAN BEKISTING PERANGKAI
13.01 m'
1 Pekerjaan Kanal UNP
30.35 kg
2 Pekerjaan Baut 8.00 buah
3 Pekerjaan Pengelasan 240.00 cm
IV PEKERJAAN BEKISTING BAWAH
23.96 m'
1 Pekerjaan Kanal UNP
55.91 kg
2.10 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
34.07 kg
3 Pekerjaan Pengelasan 180.00 cm
V PEKERJAAN LANTAI KERJA
1 Pekerjaan Beton K100 Lantai Kerja 0.92337 mᶟ

Pekerjaan Material volume


Kanal UNP 8.53
Bek. Luar Plat 0.91
las 312.00
Hollow 8.77
Plat (2,3mm) 1.82
Bek. Skt
Handle 0.50
las 238.00
Kanal UNP 6.50
Bek. Prgk Baut 4.00
las 120.00
Kanal UNP 2.40
Bek. Bwh Plat 0.21
las 18.00

DAFTAR VOLUME
KEBUTUHAN MATERIAL PER 10 PANEL DINDING
BEKISTING BAJA REDESAIN VARIASI 2
I PEKERJAAN BEKISTING LUAR
12.98 m'
1 Pekerjaan Kanal UNP
30.30 kg
1.82 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
34.13 kg
3 Pekerjaan Pengelasan 240.00 cm
II PEKERJAAN BEKISTING SEKAT
59.51 m'
1 Pekerjaan Hollow
158.45 kg
16.38 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
307.21 kg
4.50 m²
3 Pekerjaan Pegangan Bekisting Sekat
2.78 kg
4 Pekerjaan Pengelasan 1008.00 cm
III PEKERJAAN BEKISTING PERANGKAI
13.01 m'
1 Pekerjaan Kanal UNP
30.35 kg
2 Pekerjaan Baut 8.00 buah
3 Pekerjaan Pengelasan 240.00 cm
IV PEKERJAAN BEKISTING BAWAH
23.96 m'
1 Pekerjaan Kanal UNP
55.91 kg
2.10 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
39.40 kg
3 Pekerjaan Pengelasan 180.00 cm
V PEKERJAAN LANTAI KERJA
1 Pekerjaan Beton K100 Lantai Kerja 0.92337 mᶟ
Pekerjaan Material volume
Kanal UNP 6.49
Bek. Luar Plat 0.91
las 120.00
Hollow 6.61
Plat (2,3mm) 1.82
Bek. Skt
Handle 0.50
las 112.00
Kanal UNP 6.50
Bek. Prgk Baut 4.00
las 120.00
Kanal UNP 2.40
Bek. Bwh Plat 0.21
las 18.00

DAFTAR VOLUME
KEBUTUHAN MATERIAL PER 10 PANEL DINDING
BEKISTING BAJA REDESAIN VARIASI 5
I PEKERJAAN BEKISTING LUAR
15.58 m'
1 Pekerjaan Kanal UNP
36.36 kg
1.82 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
29.52 kg
3 Pekerjaan Pengelasan 480.00 cm
II PEKERJAAN BEKISTING SEKAT
72.47 m'
1 Pekerjaan Hollow
192.96 kg
16.38 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
265.68 kg
4.50 m²
3 Pekerjaan Pegangan Bekisting Sekat
2.78 kg
4 Pekerjaan Pengelasan 1764.00 cm
III PEKERJAAN BEKISTING PERANGKAI 29.2
13.01 m' 125.2
1 Pekerjaan Kanal UNP
30.35 kg
2 Pekerjaan Baut 8.00 buah 9.6
3 Pekerjaan Pengelasan 240.00 cm
IV PEKERJAAN BEKISTING BAWAH
23.96 m'
1 Pekerjaan Kanal UNP
55.91 kg 0.192
2.10 m²
2 Pekerjaan Plateser (Plat Hitam 2mm)
34.07 kg
3 Pekerjaan Pengelasan 180.00 cm
V PEKERJAAN LANTAI KERJA
1 Pekerjaan Beton K100 Lantai Kerja 0.92337 mᶟ

Pekerjaan Material volume


Kanal UNP 7.79
Bek. Luar Plat 0.91
las 240.00
Hollow 8.05
Plat (2,3mm) 1.82
Bek. Skt
Handle 0.50
las 196.00
Kanal UNP 6.50
Bek. Prgk Baut 4.00
las 120.00
Kanal UNP 2.40
Bek. Bwh Plat 0.21
las 18.00

DAFTAR VOLUME
KEBUTUHAN MATERIAL PER 10 PANEL DINDING
BEKISTING BAJA REDESAIN VARIASI 3
I PEKERJAAN BEKISTING LUAR
13.72 m'
1 Pekerjaan Kanal UNP
32.02 kg
1.82 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
34.13 kg
3 Pekerjaan Pengelasan 240.00 cm
II PEKERJAAN BEKISTING SEKAT
62.75 m'
1 Pekerjaan Hollow
167.08 kg
16.38 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
307.21 kg
4.50 m²
3 Pekerjaan Pegangan Bekisting Sekat
2.78 kg
4 Pekerjaan Pengelasan 1062.00 cm
III PEKERJAAN BEKISTING PERANGKAI
13.01 m'
1 Pekerjaan Kanal UNP
30.35 kg
2 Pekerjaan Baut 8.00 buah
3 Pekerjaan Pengelasan 240.00 cm
IV PEKERJAAN BEKISTING BAWAH
23.96 m'
1 Pekerjaan Kanal UNP
55.91 kg
2.10 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
39.40 kg
3 Pekerjaan Pengelasan 180.00 cm
V PEKERJAAN LANTAI KERJA
1 Pekerjaan Beton K100 Lantai Kerja 0.92337 mᶟ

Pekerjaan Material volume


Kanal UNP 6.86
Bek. Luar Plat 0.91
las 120.00
Hollow 6.97
Plat (2,3mm) 1.82
Bek. Skt
Handle 0.50
las 118.00
Kanal UNP 6.50
Bek. Prgk Baut 4.00
las 120.00
Kanal UNP 2.40
Bek. Bwh Plat 0.21
las 18.00

DAFTAR VOLUME
KEBUTUHAN MATERIAL PER 10 PANEL DINDING
BEKISTING BAJA REDESAIN VARIASI 4
I PEKERJAAN BEKISTING LUAR
14.94 m'
1 Pekerjaan Kanal UNP
34.87 kg
1.82 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
34.13 kg
3 Pekerjaan Pengelasan 336.00 cm
II PEKERJAAN BEKISTING SEKAT
65.99 m'
1 Pekerjaan Hollow
1 Pekerjaan Hollow
175.71 kg
16.38 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
307.21 kg
4.50 m²
3 Pekerjaan Pegangan Bekisting Sekat
2.78 kg
4 Pekerjaan Pengelasan 1278.00 cm
III PEKERJAAN BEKISTING PERANGKAI
13.01 m'
1 Pekerjaan Kanal UNP
30.35 kg
2 Pekerjaan Baut 8.00 buah
3 Pekerjaan Pengelasan 240.00 cm
IV PEKERJAAN BEKISTING BAWAH
23.96 m'
1 Pekerjaan Kanal UNP
55.91 kg
2.10 m²
2 Pekerjaan Plateser (Plat Hitam 2,3mm)
39.40 kg
3 Pekerjaan Pengelasan 180.00 cm
V PEKERJAAN LANTAI KERJA
1 Pekerjaan Beton K100 Lantai Kerja 0.92337 mᶟ

Pekerjaan Material volume


Kanal UNP 7.47
Bek. Luar Plat 0.91
las 168.00
Hollow 7.33
Plat (2,3mm) 1.82
Bek. Skt
Handle 0.50
las 142.00
Kanal UNP 6.50
Bek. Prgk Baut 4.00
las 120.00
Kanal UNP 2.40
Bek. Bwh Plat 0.21
las 18.00
Bekisting Luar
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
0.4 5 2
Vertikal
0.33 2 0.66 2
2.406 1 2.406
Horizontal 0.543 4 2.172
0.585 4 2.34
Total Panjang 9.578

Bekisting Sekat
Hollow Panjang Jumlah Total Panjang
(m) (m)
9
Vertikal 0.32 4 1.28
Horizontal 2.406 2 4.812
Total Panjang 6.092

Bekisting Perangkai
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
2
Vertikal 0.4 10 4
Horizontal 1.0772 2 2.1544
Total Panjang 6.1544

Bekisting Bawah
Panjang Total Panjang
Jumlah
Kanal UNP (m) (m) 10
2.396 1 2.396
Total Panjang 2.396

Landasan
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
Vertikal 2.46 2 4.92 1
Horizontal 0.905 4 3.62
Total Panjang 8.54

jumlah bekisting Total Volume sat


19.16 m
2 1.82 m2
396.00 cm
54.83 m
16.38 m2
9
4.50 m
738.00 cm
12.31 m
2 4.00 buah
240.00 cm
23.96 m
10 2.10 m2
180.00 cm

Bekisting Luar
Kanal UNP Panjang Jumlah Total Panjang
(m) (m)
0.4 9 3.6 2
Vertikal
0.33 2 0.66
Horizontal 0.267 16 4.272
Total Panjang 8.532

Bekisting Sekat
Panjang Total Panjang
Hollow Jumlah
(m) (m)
9
Vertikal 0.36 11 3.96
Horizontal 2.406 2 4.812
Total Panjang 8.772

Bekisting Perangkai
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
2
Vertikal 0.4 10 4
Horizontal 1.252 2 2.504
Total Panjang 6.504

Bekisting Bawah
Panjang Total Panjang
Jumlah
Kanal UNP (m) (m) 10
2.396 1 2.396
Total Panjang 2.396

Lantai kerja dan Beton Penjepit


Panjang Lebar Tinggi
Beton (m) (m) (m)
Lantai 3.4 2.4 0.1
Beton Penjepit (ktr) 2.406 0.15 0.15 2
Beton Penjepit (ksg) 0.03 0.05 0.15 2

sat jumlah bekistingTotal Volume sat


m 17.06 m
m2 2 1.82 m2
cm 624.00 cm
m 78.95 m
m2 16.38 m2
9
m 4.50 m
cm 2142.00 cm
m 13.01 m
buah 2 4.00 buah
cm 240.00 cm
m 23.96 m
m2 10 2.10 m2
cm 180.00 cm

Bekisting Luar
Panjang Total Panjang
Kanal UNP (m) Jumlah (m)
0.4 3 1.2 2
Vertikal
0.33 2 0.66
Horizontal 1.158 4 4.632
Total Panjang 6.492

Bekisting Sekat
Panjang Total Panjang
Hollow Jumlah
(m) (m)
9
Vertikal 0.36 5 1.8
Horizontal 2.406 2 4.812
Total Panjang 6.612

Bekisting Perangkai
Panjang Total Panjang
Kanal UNP (m) Jumlah (m)
2
Vertikal 0.4 10 4
Horizontal 1.252 2 2.504
Total Panjang 6.504

Bekisting Bawah
Panjang Total Panjang
Jumlah
Kanal UNP (m) (m) 10
2.396 1 2.396
Total Panjang 2.396

Lantai kerja dan Beton Penjepit


Panjang Lebar Tinggi
Beton (m) (m) (m)
Lantai 3.4 2.4 0.1
Beton Penjepit (ktr) 2.406 0.15 0.15 2
Beton Penjepit (ksg) 0.03 0.05 0.15 2

sat jumlah bekistingTotal Volume sat


m 12.98 m
m2 2 1.82 m2
cm 240.00 cm
m 59.51 m
m2 16.38 m2
9
m 4.50 m
cm 1008.00 cm
m 13.01 m
buah 2 4.00 buah
cm 240.00 cm
m 23.96 m
m2 10 2.10 m2
cm 180.00 cm

Bekisting Luar
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
0.4 7 2.8 2
Vertikal
0.33 2 0.66
Horizontal 0.361 12 4.332
Total Panjang 7.792

Bekisting Sekat
Panjang Total Panjang
Hollow (m) Jumlah (m)
9
Vertikal 0.36 9 3.24
Horizontal 2.406 2 4.812
Total Panjang 8.052

Bekisting Perangkai
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
2
Vertikal 0.4 10 4
Horizontal 1.252 2 2.504
Total Panjang 6.504

Bekisting Bawah
Panjang Total Panjang
Jumlah
Kanal UNP (m) (m) 10
Kanal UNP 10
2.396 1 2.396
Total Panjang 2.396

Lantai kerja dan Beton Penjepit


Panjang Lebar Tinggi
Beton (m) (m) (m)
Lantai 3.4 2.4 0.1
Beton Penjepit (ktr) 2.406 0.15 0.15 2
Beton Penjepit (ksg) 0.03 0.05 0.15 2

sat jumlah bekistingTotal Volume sat


m 15.58 m
m2 2 1.82 m2
cm 480.00 cm
m 72.47 m
m2 16.38 m2
9
m 4.50 m
cm 1764.00 cm
m 13.01 m
buah 2 4.00 buah
cm 240.00 cm
m 23.96 m
m2 10 2.10 m2
cm 180.00 cm

Bekisting Luar
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
0.4 4 1.6 2
Vertikal
0.33 2 0.66
Horizontal 0.767 6 4.602
Total Panjang 6.862

Bekisting Sekat
Panjang Total Panjang
Hollow Jumlah
(m) (m)
9
Vertikal 0.36 6 2.16
Horizontal 2.406 2 4.812
Total Panjang 6.972

Bekisting Perangkai
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
2
2
Vertikal 0.4 10 4
Horizontal 1.252 2 2.504
Total Panjang 6.504

Bekisting Bawah
Panjang Total Panjang
Jumlah
Kanal UNP (m) (m) 10
2.396 1 2.396
Total Panjang 2.396

Lantai kerja dan Beton Penjepit


Beton Panjang Lebar Tinggi
(m) (m) (m)
Lantai 3.4 2.4 0.1
Beton Penjepit (ktr) 2.406 0.15 0.15 2
Beton Penjepit (ksg) 0.03 0.05 0.15 2

sat jumlah bekistingTotal Volume sat


m 13.72 m
m2 2 1.82 m2
cm 240.00 cm
m 62.75 m
m2 16.38 m2
9
m 4.50 m
cm 1062.00 cm
m 13.01 m
buah 2 4.00 buah
cm 240.00 cm
m 23.96 m
m2 10 2.10 m2
cm 180.00 cm

Bekisting Luar
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
0.4 5 2 2
Vertikal
0.33 2 0.66
Horizontal 0.6015 8 4.812
Total Panjang 7.472

Bekisting Sekat
Panjang Total Panjang
Hollow Jumlah
(m) (m)
9
9
Vertikal 0.36 7 2.52
Horizontal 2.406 2 4.812
Total Panjang 7.332

Bekisting Perangkai
Panjang Total Panjang
Kanal UNP Jumlah
(m) (m)
2
Vertikal 0.4 10 4
Horizontal 1.252 2 2.504
Total Panjang 6.504

Bekisting Bawah
Panjang Total Panjang
Jumlah
Kanal UNP (m) (m) 10
2.396 1 2.396
Total Panjang 2.396

Lantai kerja dan Beton Penjepit


Panjang Lebar Tinggi
Beton (m) (m) (m)
Lantai 3.4 2.4 0.1
Beton Penjepit (ktr) 2.406 0.15 0.15 2
Beton Penjepit (ksg) 0.03 0.05 0.15 2

sat jumlah bekistingTotal Volume sat


m 14.94 m
m2 2 1.82 m2
cm 336.00 cm
m 65.99 m
m2 16.38 m2
9
m 4.50 m
cm 1278.00 cm
m 13.01 m
buah 2 4.00 buah
cm 240.00 cm
m 23.96 m
m2 10 2.10 m2
cm 180.00 cm
Material Panjang/btg/lmbr Lebar/lmbr Berat/btg
(m) (m) (kg)
Kanal UNP 6 - 14.00
Hollow 6 - 15.98
Pelateser (Plat Hitam 2mm) 2.4 1.2 46.70
Besi Beton Ø 10 mm 12 - 7.40

Pelateser Tinggi/Panjang Panjang (m) Luas Jumlah


(m) (m2) Sisi
Bekisting Luar 0.388 2.346 0.910248 1
Bekisting Sekat 0.388 2.346 0.910248 2
Bekisting Bawah 0.0877 2.396 0.2101292 1

Properties Hollow 20x40x2 mm


Bj Baja 7850 Kg/m3
t2 0.02 m
t3 0.04 m
t 0.004 m
tw 0.0028 m
A 0.0003392 m2

Panjang Jumlah Total (m)


handle bkstg (m)
0.25 18 4.5

Pengelasan 3 cm/titik
Bekisting Luar Titik Jumlah Total Titik
Kanal Kunci 2 2 4
vertikal 4 5 20 2
horizontal 1 4 8 32
horizontal 2 2 5 10
Total panjang las 66 396 cm

Bekisting Sekat Titik Jumlah Total Titik


Pegangan 4 1 4
kerangka 12 1 12 9
vertikal ke plat 2 4 8
horizontal ke plat 1 6 6
Total panjang las 26 738 cm

Bekisting Perangkai Titik Jumlah Total Titik


Kunci Atas 2 10 20 2
Kunci Bawah 2 10 20
Total panjang las 40 240 cm

Bekisting Bawah Titik Jumlah Total Titik


10
Bekisting Bawah 6 1 6
Total panjang las 6 180 cm

Landasan Titik Jumlah Total Titik 1


Landasan 4 4 16 48 cm

Material Panjang/btg/lmbr Lebar/lmbr Berat/btg


(m) (m) (kg)
Kanal UNP 6 - 14
Hollow 6 - 15.98
Pelateser (Plat Hitam 2mm) 2.4 1.2 46.70
Besi Beton Ø 10 mm 12 - 7.4

Pelateser Tinggi/Panjang Panjang (m) Luas


(m2)
Jumlah
(m) Sisi
Bekisting Luar 0.388 2.346 0.910248 1
Bekisting Sekat 0.388 2.346 0.910248 2
Bekisting Bawah 0.0877 2.396 0.2101292 1

Properties Hollow 20x40x2 mm


Bj Baja 7850 Kg/m3
t2 0.02 m
t3 0.04 m
t 0.004 m
tw 0.0028 m
A 0.0003392 m2

Panjang Jumlah Total (m)


handle bkstg (m)
0.25 18 4.5

Pengelasan 3 cm/titik
Bekisting Luar Titik Jumlah Total Titik
Kanal Kunci 2 2 4
2
vertikal 4 9 36
horizontal 4 16 64
Total panjang las 104 624 cm

Bekisting Sekat Titik Jumlah Total Titik


Pegangan 4 1 4
kerangka 44 1 44 9
vertikal ke plat 2 9 18
horizontal ke plat 1 16 16
Total panjang las 78 2142 cm

Bekisting Perangkai Titik Jumlah Total Titik


Kunci Atas 2 10 20 2
Kunci Bawah 2 10 20
Total panjang las 40 240 cm

Bekisting Bawah Titik Jumlah Total Titik


10
Bekisting Bawah 6 1 6
Total panjang las 6 180 cm

Material Panjang/btg/lmbr Lebar/lmbr Berat/btg


(m) (m) (kg)
Kanal UNP 6 - 14
Hollow 6 - 15.98
Pelateser (Plat Hitam 2,3mm) 2.4 1.2 54.00
Besi Beton Ø 10 mm 12 - 7.4

Pelateser Tinggi/Panjang Panjang (m) Luas Jumlah


(m) (m2) Sisi
Bekisting Luar 0.388 2.346 0.910248 1
Bekisting Sekat 0.388 2.346 0.910248 2
Bekisting Bawah 0.0877 2.396 0.2101292 1

Properties Hollow 20x40x2 mm


Bj Baja 7850 Kg/m3
t2 0.02 m
t3 0.04 m
t 0.004 m
tw 0.0028 m
A 0.0003392 m2

Panjang Jumlah Total (m)


handle bkstg (m)
0.25 18 4.5

Pengelasan 3 cm/titik
Bekisting Luar Titik Jumlah Total Titik
Kanal Kunci 2 2 4
2
vertikal 4 3 12
horizontal 6 4 24
Total panjang las 40 240 cm
Bekisting Sekat Titik Jumlah Total Titik
Pegangan 4 1 4
kerangka 20 1 20 9
vertikal ke plat 2 3 6
horizontal ke plat 1 10 10
Total panjang las 36 1008 cm

Bekisting Perangkai Titik Jumlah Total Titik


Kunci Atas 2 10 20 2
Kunci Bawah 2 10 20
Total panjang las 40 240 cm

Bekisting Bawah Titik Jumlah Total Titik


10
Bekisting Bawah 6 1 6
Total panjang las 6 180 cm

Material Panjang/btg/lmbr Lebar/lmbr Berat/btg


(m) (m) (kg)
Kanal UNP 6 - 14
Hollow 6 - 15.98
Pelateser (Plat Hitam 2mm) 2.4 1.2 46.70
Besi Beton Ø 10 mm 12 - 7.4

Pelateser Tinggi/Panjang Panjang (m) Luas Jumlah


(m) (m2) Sisi
Bekisting Luar 0.388 2.346 0.910248 1
Bekisting Sekat 0.388 2.346 0.910248 2
Bekisting Bawah 0.0877 2.396 0.2101292 1

Properties Hollow 20x40x2 mm


Bj Baja 7850 Kg/m3
t2 0.02 m
t3 0.04 m
t 0.004 m
tw 0.0028 m
A 0.0003392 m2

Panjang Jumlah Total (m)


handle bkstg (m)
0.25 18 4.5
Pengelasan 3 cm/titik
Bekisting Luar Titik Jumlah Total Titik
Kanal Kunci 2 2 4
2
vertikal 4 7 28
horizontal 4 12 48
Total panjang las 80 480 cm

Bekisting Sekat Titik Jumlah Total Titik


Pegangan 4 1 4
kerangka 36 1 36 9
vertikal ke plat 2 7 14
horizontal ke plat 1 14 14
Total panjang las 64 1764 cm

Bekisting Perangkai Titik Jumlah Total Titik


Kunci Atas 2 10 20 2
Kunci Bawah 2 10 20
Total panjang las 40 240 cm

Bekisting Bawah Titik Jumlah Total Titik


10
Bekisting Bawah 6 1 6
Total panjang las 6 180 cm

Material Panjang/btg/lmbr Lebar/lmbr Berat/btg


(m) (m) (kg)
Kanal UNP 6 - 14
Hollow 6 - 15.98
Pelateser (Plat Hitam 2,3mm) 2.4 1.2 54.00
Besi Beton Ø 10 mm 12 - 7.4

Pelateser Tinggi/Panjang Panjang (m) Luas Jumlah


(m) (m2) Sisi
Bekisting Luar 0.388 2.346 0.910248 1
Bekisting Sekat 0.388 2.346 0.910248 2
Bekisting Bawah 0.0877 2.396 0.2101292 1

Properties Hollow 20x40x2 mm


Bj Baja 7850 Kg/m3
t2 0.02 m
t3 0.04 m
t 0.004 m
tw 0.0028 m
A 0.0003392 m2

Panjang Jumlah Total (m)


handle bkstg (m)
0.25 18 4.5

Pengelasan 3 cm/titik
Bekisting Luar Titik Jumlah Total Titik
Kanal Kunci 2 2 4
2
vertikal 4 3 12
horizontal 4 6 24
Total panjang las 40 240 cm

Bekisting Sekat Titik Jumlah Total Titik


Pegangan 4 1 4
kerangka 24 1 24 9
vertikal ke plat 2 4 8
horizontal ke plat 1 6 6
Total panjang las 38 1062 cm

Bekisting Perangkai Titik Jumlah Total Titik


Kunci Atas 2 10 20 2
Kunci Bawah 2 10 20
Total panjang las 40 240 cm

Bekisting Bawah Titik Jumlah Total Titik


10
Bekisting Bawah 6 1 6
Total panjang las 6 180 cm

Material Panjang/btg/lmbr Lebar/lmbr Berat/btg


(m) (m) (kg)
Kanal UNP 6 - 14
Hollow 6 - 15.98
Pelateser (Plat Hitam 2,3mm) 2.4 1.2 54.00
Besi Beton Ø 10 mm 12 - 7.4

Pelateser Tinggi/Panjang Panjang (m) Luas Jumlah


(m) (m2) Sisi
Bekisting Luar 0.388 2.346 0.910248 1
Bekisting Sekat 0.388 2.346 0.910248 2
Bekisting Bawah 0.0877 2.396 0.2101292 1

Properties Hollow 20x40x2 mm


Bj Baja 7850 Kg/m3
t2 0.02 m
t3 0.04 m
t 0.004 m
tw 0.0028 m
A 0.0003392 m2

Panjang Jumlah Total (m)


handle bkstg (m)
0.25 18 4.5

Pengelasan 3 cm/titik
Bekisting Luar Titik Jumlah Total Titik
Kanal Kunci 2 2 4
2
vertikal 4 5 20
horizontal 4 8 32
Total panjang las 56 336 cm

Bekisting Sekat Titik Jumlah Total Titik


Pegangan 4 1 4
kerangka 28 1 28 9
vertikal ke plat 2 5 10
horizontal ke plat 1 8 8
Total panjang las 46 1278 cm

Bekisting Perangkai Titik Jumlah Total Titik


Kunci Atas 2 10 20 2
Kunci Bawah 2 10 20
Total panjang las 40 240 cm

Bekisting Bawah Titik Jumlah Total Titik


10
Bekisting Bawah 6 1 6
Total panjang las 6 180 cm
BEKISTING BAJA REDESAIN VARIASI 2
Pekerjaan Material Volume Satuan Jumlah Bek.
Kanal UNP 6.492 m'
Bekisting Luar Plat Hitam 0.910248 m² 2
Las 120 cm
Hollow 6.612 m'
Plat Hitam 1.820496 m²
Bekisting Sekat 9
Handle 0.5 m²
Las 112 cm
Kanal UNP 6.504 m'
Bekisting Perangkai Baut 4 buah 2
Las 120 cm
Kanal UNP 2.396 m'
Bekisting Bawah Plat Hitam 0.210129 m² 10
Las 18 cm
Lantai Kerja Beton 0.92337 mᶟ 1
BEKISTING BAJA REDESAIN VARIASI 5
Pekerjaan Material Volume Satuan Jumlah Bek.
Kanal UNP 7.792 m'
Bekisting Luar Plat Hitam 0.910248 m² 2
Las 240 cm
Hollow 8.052 m'
Plat Hitam 1.820496 m²
Bekisting Sekat 9
Handle 0.5 m²
Las 196 cm
Kanal UNP 6.504 m'
Bekisting Perangkai Baut 4 buah 2
Las 120 cm
Kanal UNP 2.396 m'
Bekisting Bawah Plat Hitam 0.210129 m² 10
Las 18 cm
Lantai Kerja Beton 0.92337 mᶟ 1
BEKISTING BAJA REDESAIN VARIASI 5
Pekerjaan Material Volume Satuan Jumlah Bek.
Kanal UNP 6.862 m'
Bekisting Luar Plat Hitam 0.910248 m² 2
Las 120 cm
Hollow 6.972 m'
Plat Hitam 1.820496 m²
Bekisting Sekat 9
Handle 0.5 m²
Las 118 cm
Kanal UNP 6.504 m'
Bekisting Perangkai Baut 4 buah 2
Las 120 cm
Kanal UNP 2.396 m'
Bekisting Bawah Plat Hitam 0.210129 m² 10
Las 18 cm
Lantai Kerja Beton 0.92337 mᶟ 1
BEKISTING BAJA REDESAIN VARIASI 5
Pekerjaan Material Volume Satuan Jumlah Bek.
Kanal UNP 7.472 m'
Bekisting Luar Plat Hitam 0.910248 m² 2
Las 168 cm
Hollow 7.332 m'
Plat Hitam 1.820496 m²
Bekisting Sekat 9
Handle 0.5 m²
Las 142 cm
Kanal UNP 6.504 m'
Bekisting Perangkai Baut 4 buah 2
Las 120 cm
Kanal UNP 2.396 m'
Bekisting Bawah Plat Hitam 0.210129 m² 10
Las 18 cm
Lantai Kerja Beton 0.92337 mᶟ 1
VARIASI 2
Total Volume Satuan
12.98 m'
1.82 m²
240.00 cm
59.51 m'
16.38 m²
4.50 m²
1008.00 cm
13.01 m'
8.00 buah
240.00 cm
23.96 m'
2.10 m²
180.00 cm
0.92337 mᶟ
VARIASI 5
Total Volume Satuan
15.58 m'
1.82 m²
480.00 cm
72.47 m'
16.38 m²
4.50 m²
1764.00 cm
13.01 m'
8.00 buah
240.00 cm
23.96 m'
2.10 m²
180.00 cm
0.92337 mᶟ
VARIASI 5
Total Volume Satuan
13.72 m'
1.82 m²
240.00 cm
62.75 m'
16.38 m²
4.50 m²
1062.00 cm
13.01 m'
8.00 buah
240.00 cm
23.96 m'
2.10 m²
180.00 cm
0.92337 mᶟ
VARIASI 5
Total Volume Satuan
14.94 m'
1.82 m²
336.00 cm
65.99 m'
16.38 m²
4.50 m²
1278.00 cm
13.01 m'
8.00 buah
240.00 cm
23.96 m'
2.10 m²
180.00 cm
0.92337 mᶟ
Mengerjakan 10cm pengelasan dengan las listrik
Kebutuhan Satuan Indeks Harga Satuan Jumlah
Kawat las listrik Kg 0.4 Rp 16,000 Rp 6,400
Bahan Solar Liter 0.3 Rp 5,150 Rp 1,545
Minyak Pelumas Liter 0.04 Rp 10,000 Rp 400
Pekerja OH 0.04 Rp 52,100 Rp 2,084
Tukang Besi Konstruksi OH 0.02 Rp 61,000 Rp 1,220
Tenaga Kerja
Kepala Tukang OH 0.002 Rp 63,000 Rp 126
Mandor OH 0.002 Rp 65,000 Rp 130
Alat Sewa Alat Jam 0.17 Rp 75,000 Rp 12,750
Jumlah Rp 24,655
Rp 2,466 /cm

Memasang 1 Kg besi profil (Plat Hitam 2mm)


Kebutuhan Satuan Indeks Harga Satuan Jumlah
Bahan Besi profil Kg 1.15 Rp 9,797 Rp 11,266
Pekerja OH 0.06 Rp 52,100 Rp 3,126
Tukang las konstruksi OH 0.06 Rp 63,000 Rp 3,780
Tenaga Kerja
Kepala Tukang OH 0.006 Rp 64,000 Rp 384
Mandor OH 0.003 Rp 65,000 Rp 195
Jumlah Rp 18,751

Memasang 1 Kg besi profil (Plat Hitam 2,3mm)


Kebutuhan Satuan Indeks Harga Satuan Jumlah
Bahan Besi profil Kg 1.15 Rp 9,583 Rp 11,021
Pekerja OH 0.06 Rp 52,100 Rp 3,126
Tukang las konstruksi OH 0.06 Rp 63,000 Rp 3,780
Tenaga Kerja
Kepala Tukang OH 0.006 Rp 64,000 Rp 384
Mandor OH 0.003 Rp 65,000 Rp 195
Jumlah Rp 18,506

Memasang 1 Kg besi profil (Kanal UNP)


Kebutuhan Satuan Indeks Harga Satuan Jumlah
Bahan Besi profil Kg 1.15 Rp 7,143 Rp 8,214
Pekerja OH 0.06 Rp 52,100 Rp 3,126
Tukang las konstruksi OH 0.06 Rp 63,000 Rp 3,780
Tenaga Kerja
Kepala Tukang OH 0.006 Rp 64,000 Rp 384
Mandor OH 0.003 Rp 65,000 Rp 195
Jumlah Rp 15,699

Memasang 1 Kg besi profil (Hollow)


Kebutuhan Satuan Indeks Harga Satuan Jumlah
Bahan Besi profil Kg 1.15 Rp 5,945 Rp 6,837
Pekerja OH 0.06 Rp 52,100 Rp 3,126
Tukang las konstruksi OH 0.06 Rp 63,000 Rp 3,780
Tenaga Kerja
Kepala Tukang OH 0.006 Rp 64,000 Rp 384
Mandor OH 0.003 Rp 65,000 Rp 195
Jumlah Rp 14,322

Membuat 1 mᶟ beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87
Kebutuhan Satuan Indeks Harga Satuan Jumlah
PC kg 247 Rp 1,240 Rp 306,280
PB kg 869 Rp 125 Rp 108,625
Bahan
KR (maksimum 30mm) kg 999 Rp 78 Rp 77,700
Air Liter 215 Rp 5 Rp 1,075
Pekerja OH 1.65 Rp 52,100 Rp 85,965
Tukang batu OH 0.275 Rp 58,000 Rp 15,950
Tenaga kerja
Kepala tukang OH 0.028 Rp 63,000 Rp 1,764
Mandor OH 0.083 Rp 65,000 Rp 5,395
Jumlah Rp 602,754
DAFTAR HARGA MATERIAL DAN UPA
WILAYAH D.I. YOGYAKARTA
TAHUN 2016
NO
A
1
2
3
4
5
6
7
8
9
10
11
12
13
B
1
2
3
4
5
6
7
8
C
1

Berat profil
15.98 kg
14.00 kg
46.7 kg
54 kg
DAFTAR HARGA MATERIAL DAN UPAH
WILAYAH D.I. YOGYAKARTA
TAHUN 2016
URAIAN BAHAN SATUAN HARGA SATUAN
DAFTAR HARGA MATERIAL
Air (PDAM) Liter Rp 5
Baut Ø 10 mm panjang 5 cm buah Rp 4,500
Besi profil hollow Kg Rp 5,945
Besi profil kanal UNP Kg Rp 7,143
Besi profil plat hitam 2mm Kg Rp 9,797
Besi profil plat hitam 2,3mm Kg Rp 9,583
Besi beton 10 mm Kg Rp 8,784
Kawat las listrik Kg Rp 16,000
Krikil / Split 2/3 cm (batu pecah) kg Rp 78
Minyak Pelumas Liter Rp 10,000
Pasir Beton kg Rp 125
Portland Cement 50 kg kg Rp 1,240
Solar Liter Rp 5,150
DAFTAR HARGA UPAH TUKANG DAN PEKERJA
Pekerja OH Rp 52,100
Tukang Batu Konstruksi OH Rp 58,000
Tukang Besi Konstruksi OH Rp 61,000
Tukang Las Konstruksi OH Rp 63,000
Kepala Tukang Batu OH Rp 63,000
Kepala Tukang Besi OH Rp 63,000
Kepala Tukang Las OH Rp 64,000
Mandor OH Rp 65,000
LAIN-LAIN
Sewa Alat Las Jam Rp 75,000

Material Profil Harga/btg/lmbr


Besi profil hollow Rp 95,000.00
Besi profil kanal UNP Rp 100,000.00
Besi profil plat hitam 2mm Rp 457,500.00
Besi profil plat hitam 2,3mm Rp 517,500.00

10 m3
Rp 50,000.00
Air PDAM
1 m3
Rp 5,000.00
No Uraian Satuan Harga Keterangan
1 Mengerjakan 10cm pengelasan dengan las listrik cm Rp 2,466
2 Memasang 1 Kg besi profil (Kanal UNP) kg Rp 15,699
3 Memasang 1 Kg besi profil (Plat Hitam 2mm) kg Rp 18,751
4 Memasang 1 Kg besi profil (Plat Hitam 2,3mm) kg Rp 18,506
5 Memasang 1 Kg besi profil (Hollow) kg Rp 14,322
6 Membuat 1 mᶟ lantai kerja (K100) mᶟ Rp 602,754
DAFTAR RENCANA ANGGARAN BIAYA
BEKISTING BAJA PT. POWERCON JAYA UTAMA
Harga Satuan
No Uraian Pekerjaan Volume
Satuan Rp
I Pekerjaan Bekisting Luar
Pengerjaan pengelasan dengan las listrik 396.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 44.70 kg Rp 15,699
Pemasangan besi profil (Plat Hitam 2mm) 29.52 kg Rp 18,751
Jumlah
II Pekerjaan Bekisting Sekat
Pengerjaan pengelasan dengan las listrik 738 cm Rp 2,466
Pemasangan besi profil (Hollow) 145.99 kg Rp 14,322
Pemasangan besi profil (Plat Hitam 2mm) 265.68 kg Rp 18,751
Pemasangan pegangan bekisting 2.78 kg Rp 8,784
Jumlah
III Pekerjaan Bekisting Perangkai
Pengerjaan pengelasan dengan las listrik 240 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 28.72 kg Rp 15,699
Pemasangan baut 8 buah Rp 4,500
Jumlah
IV Pekerjaan Bekisting Bawah
Pengerjaan pengelasan dengan las listrik 180.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 55.91 kg Rp 15,699
Pemasangan besi profil (Plat Hitam 2mm) 34.07 kg Rp 18,751
Jumlah
V Pekerjaan Landasan
Pengerjaan pengelasan dengan las listrik 48.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 19.93 kg Rp 15,699
Jumlah

DAFTAR RENCANA ANGGARAN BIAYA


BEKISTING BAJA REDESAIN VARIASI 2
Harga Satuan
No Uraian Pekerjaan Volume
Satuan Rp
I Pekerjaan Bekisting Luar
Pengerjaan pengelasan dengan las listrik 240.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 30.30 kg Rp 15,699
Pemasangan besi profil (Plat Hitam 2,3mm) 34.13 kg Rp 18,506
Jumlah
II Pekerjaan Bekisting Sekat
Pengerjaan pengelasan dengan las listrik 1008.00 cm Rp 2,466
Pemasangan besi profil (Hollow) 158.45 kg Rp 14,322
Pemasangan besi profil (Plat Hitam 2,3mm) 307.21 kg Rp 18,506
Pemasangan pegangan bekisting 2.78 kg Rp 8,784
Jumlah
II Pekerjaan Bekisting Perangkai
Pengerjaan pengelasan dengan las listrik 240.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 30.35 kg Rp 15,699
Pemasangan baut 8 buah Rp 4,500
Jumlah
IV Pekerjaan Bekisting Bawah
Pengerjaan pengelasan dengan las listrik 180.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 55.91 kg Rp 15,699
Pemasangan besi profil (Plat Hitam 2,3mm) 39.40 kg Rp 18,506
Jumlah
V Pekerjaan Lantai Kerja
Pengerjaan beton K100 lantai kerja 0.92 m3 Rp 602,754
Jumlah

DAFTAR RENCANA ANGGARAN BIAYA


BEKISTING BAJA REDESAIN VARIASI 3
Harga Satuan
No Uraian Pekerjaan Volume
Satuan Rp
I Pekerjaan Bekisting Luar
Pengerjaan pengelasan dengan las listrik 240.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 32.02 kg Rp 15,699
Pemasangan besi profil (Plat Hitam 2,3mm) 34.13 kg Rp 18,506
Jumlah
II Pekerjaan Bekisting Sekat
Pengerjaan pengelasan dengan las listrik 1062.00 cm Rp 2,466
Pemasangan besi profil (Hollow) 167.08 kg Rp 14,322
Pemasangan besi profil (Plat Hitam 2,3mm) 307.21 kg Rp 18,506
Pemasangan pegangan bekisting 2.78 kg Rp 8,784
Jumlah
II Pekerjaan Bekisting Perangkai
Pengerjaan pengelasan dengan las listrik 240.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 30.35 kg Rp 15,699
Pemasangan baut 8 buah Rp 4,500
Jumlah
IV Pekerjaan Bekisting Bawah
Pengerjaan pengelasan dengan las listrik 180.00 cm Rp 2,466
Pemasangan besi profil (Kanal UNP) 55.91 kg Rp 15,699
Pemasangan besi profil (Plat Hitam 2,3mm) 39.40 kg Rp 18,506
Jumlah
V Pekerjaan Lantai Kerja
Pengerjaan beton K100 lantai kerja 0.92 m3 Rp 602,754
Jumlah
DAFTAR RENCANA ANGGARAN BIAYA
BEKISTING BAJA REDESAIN VARIASI 6
Jumlah Harga No Uraian Pekerjaan Volume

I Pekerjaan Bekisting Luar


Rp 976,338 Pengerjaan pengelasan dengan las listrik 624.00
Rp 701,716 Pemasangan besi profil (Kanal UNP) 39.82
Rp 553,528 Pemasangan besi profil (Plat Hitam 2mm) 29.52
Rp 2,231,583 Jum
II Pekerjaan Bekisting Sekat
Rp 1,819,539 Pengerjaan pengelasan dengan las listrik 2142
Rp 2,090,844 Pemasangan besi profil (Hollow) 210.22
Rp 4,981,756 Pemasangan besi profil (Plat Hitam 2mm) 265.68
Rp 24,375 Pemasangan pegangan bekisting 2.78
Rp 8,892,139 Jum
II Pekerjaan Bekisting Perangkai
Rp 591,720 Pengerjaan pengelasan dengan las listrik 240
Rp 450,892 Pemasangan besi profil (Kanal UNP) 30.35
Rp 36,000 Pemasangan baut 8
Rp 1,042,612 Jum
IV Pekerjaan Bekisting Bawah
Rp 443,790 Pengerjaan pengelasan dengan las listrik 180.00
Rp 877,695 Pemasangan besi profil (Kanal UNP) 55.91
Rp 638,905 Pemasangan besi profil (Plat Hitam 2mm) 34.07
Rp 1,960,390 Jum
V Pekerjaan Lantai Kerja
Rp 118,344 Pengerjaan beton K100 lantai kerja 0.92
Rp 312,834 Jum
Rp 431,178

DAFTAR RENCANA ANGGARAN BIAYA


BEKISTING BAJA REDESAIN VARIASI 5
Jumlah Harga No Uraian Pekerjaan Volume

I Pekerjaan Bekisting Luar


Rp 591,720 Pengerjaan pengelasan dengan las listrik 480.00
Rp 475,626 Pemasangan besi profil (Kanal UNP) 36.36
Rp 631,684 Pemasangan besi profil (Plat Hitam 2mm) 29.52
Rp 1,699,029 Jum
II Pekerjaan Bekisting Sekat
Rp 2,485,224 Pengerjaan pengelasan dengan las listrik 1764.00
Rp 2,269,314 Pemasangan besi profil (Hollow) 192.96
Rp 5,685,153 Pemasangan besi profil (Plat Hitam 2mm) 265.68
Rp 24,375 Pemasangan pegangan bekisting 2.78
Rp 10,439,691 Jum
II Pekerjaan Bekisting Perangkai
Rp 591,720 Pengerjaan pengelasan dengan las listrik 240.00
Rp 476,505 Pemasangan besi profil (Kanal UNP) 30.35
Rp 36,000 Pemasangan baut 8
Rp 1,068,225 Jum
IV Pekerjaan Bekisting Bawah
Rp 443,790 Pengerjaan pengelasan dengan las listrik 180.00
Rp 877,695 Pemasangan besi profil (Kanal UNP) 55.91
Rp 729,115 Pemasangan besi profil (Plat Hitam 2mm) 34.07
Rp 2,050,600 Jum
V Pekerjaan Lantai Kerja
Rp 556,565 Pengerjaan beton K100 lantai kerja 0.92
Rp 556,565 Jum

DAFTAR RENCANA ANGGARAN BIAYA


BEKISTING BAJA REDESAIN VARIASI 4
Jumlah Harga No Uraian Pekerjaan Volume

I Pekerjaan Bekisting Luar


Rp 591,720 Pengerjaan pengelasan dengan las listrik 336.00
Rp 502,733 Pemasangan besi profil (Kanal UNP) 34.87
Rp 631,684 Pemasangan besi profil (Plat Hitam 2,3mm) 34.13
Rp 1,726,137 Jum
II Pekerjaan Bekisting Sekat
Rp 2,618,361 Pengerjaan pengelasan dengan las listrik 1278.00
Rp 2,392,870 Pemasangan besi profil (Hollow) 175.71
Rp 5,685,153 Pemasangan besi profil (Plat Hitam 2,3mm) 307.21
Rp 24,375 Pemasangan pegangan bekisting 2.78
Rp 10,696,384 Jum
II Pekerjaan Bekisting Perangkai
Rp 591,720 Pengerjaan pengelasan dengan las listrik 240.00
Rp 476,505 Pemasangan besi profil (Kanal UNP) 30.35
Rp 36,000 Pemasangan baut 8
Rp 1,068,225 Jum
IV Pekerjaan Bekisting Bawah
Rp 443,790 Pengerjaan pengelasan dengan las listrik 180.00
Rp 877,695 Pemasangan besi profil (Kanal UNP) 55.91
Rp 729,115 Pemasangan besi profil (Plat Hitam 2,3mm) 39.40
Rp 2,050,600 Jum
V Pekerjaan Lantai Kerja
Rp 556,565 Pengerjaan beton K100 lantai kerja 0.92
Rp 556,565 Jum
ANGGARAN BIAYA
DESAIN VARIASI 6
Harga Satuan
Jumlah Harga
Satuan Rp

cm Rp 2,466 Rp 1,538,472
kg Rp 15,699 Rp 625,083
kg Rp 18,751 Rp 553,528
Jumlah Rp 2,717,083

cm Rp 2,466 Rp 5,281,101
kg Rp 14,322 Rp 3,010,650
kg Rp 18,751 Rp 4,981,756
kg Rp 8,784 Rp 24,375
Jumlah Rp 13,273,507

cm Rp 2,466 Rp 591,720
kg Rp 15,699 Rp 476,505
buah Rp 4,500 Rp 36,000
Jumlah Rp 1,068,225

cm Rp 2,466 Rp 443,790
kg Rp 15,699 Rp 877,695
kg Rp 18,751 Rp 638,905
Jumlah Rp 1,960,390

m3 Rp 602,754 Rp 556,565
Jumlah Rp 556,565

ANGGARAN BIAYA
DESAIN VARIASI 5
Harga Satuan
Jumlah Harga
Satuan Rp

cm Rp 2,466 Rp 1,183,440
kg Rp 15,699 Rp 570,868
kg Rp 18,751 Rp 553,528
Jumlah Rp 2,307,836

cm Rp 2,466 Rp 4,349,142
kg Rp 14,322 Rp 2,763,538
kg Rp 18,751 Rp 4,981,756
kg Rp 8,784 Rp 24,375
Jumlah Rp 12,094,436

cm Rp 2,466 Rp 591,720
kg Rp 15,699 Rp 476,505
buah Rp 4,500 Rp 36,000
Jumlah Rp 1,068,225

cm Rp 2,466 Rp 443,790
kg Rp 15,699 Rp 877,695
kg Rp 18,751 Rp 638,905
Jumlah Rp 1,960,390

m3 Rp 602,754 Rp 556,565
Jumlah Rp 556,565

ANGGARAN BIAYA
DESAIN VARIASI 4
Harga Satuan
Jumlah Harga
Satuan Rp

cm Rp 2,466 Rp 828,408
kg Rp 15,699 Rp 547,424
kg Rp 18,506 Rp 631,684
Jumlah Rp 2,007,515

cm Rp 2,466 Rp 3,150,909
kg Rp 14,322 Rp 2,516,426
kg Rp 18,506 Rp 5,685,153
kg Rp 8,784 Rp 24,375
Jumlah Rp 11,352,488

cm Rp 2,466 Rp 591,720
kg Rp 15,699 Rp 476,505
buah Rp 4,500 Rp 36,000
Jumlah Rp 1,068,225

cm Rp 2,466 Rp 443,790
kg Rp 15,699 Rp 877,695
kg Rp 18,506 Rp 729,115
Jumlah Rp 2,050,600

m3 Rp 602,754 Rp 556,565
Jumlah Rp 556,565
REKAPITULASI BIAYA KESELURUHAN
BEKISTING BAJA
PT. POWERCON JAYA UTAMA
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp)
I PEKERJAAN BEKISTING LUAR Rp 2,231,582.65
II PEKERJAAN BEKISTING SEKAT Rp 8,892,138.83
III PEKERJAAN BEKISTING PERANGKAI Rp 1,042,611.86
IV PEKERJAAN BEKISTING BAWAH Rp 1,960,390.23
V PEKERJAAN LANDASAN Rp 431,178.43
JUMLAH Rp 14,557,902.00

REKAPITULASI BIAYA KESELURUHAN REKAPIT


BEKISTING BAJA
REDESAIN VARIASI 6
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp) NO
I PEKERJAAN BEKISTING LUAR Rp 2,717,083.21 I
II PEKERJAAN BEKISTING SEKAT Rp 13,273,507.37 II
III PEKERJAAN BEKISTING PERANGKAI Rp 1,068,224.72 III
IV PEKERJAAN BEKISTING BAWAH Rp 1,960,390.23 IV
V PEKERJAAN LANTAI KERJA Rp 556,564.96 V
JUMLAH Rp 19,575,770.48 JUMLAH

REKAPIT

NO
I
II
III
IV
V
JUMLAH
REKAPITULASI BIAYA KESELURUHAN REKAPITULA
BEKISTING BAJA BE
REDESAIN VARIASI 2 RED
URAIAN PEKERJAAN JUMLAH HARGA (Rp) NO
PEKERJAAN BEKISTING LUAR Rp 1,699,029.23 I
PEKERJAAN BEKISTING SEKAT Rp 10,439,690.74 II
PEKERJAAN BEKISTING PERANGKAI Rp 1,068,224.72 III
PEKERJAAN BEKISTING BAWAH Rp 2,050,600.22 IV
PEKERJAAN LANTAI KERJA Rp 556,564.96 V
JUMLAH Rp 15,814,109.87 JUMLAH

REKAPITULASI BIAYA KESELURUHAN REKAPITULA


BEKISTING BAJA BE
REDESAIN VARIASI 3 RED
URAIAN PEKERJAAN JUMLAH HARGA (Rp) NO
PEKERJAAN BEKISTING LUAR Rp 1,726,136.66 I
PEKERJAAN BEKISTING SEKAT Rp 10,696,383.84 II
PEKERJAAN BEKISTING PERANGKAI Rp 1,068,224.72 III
PEKERJAAN BEKISTING BAWAH Rp 2,050,600.22 IV
PEKERJAAN LANTAI KERJA Rp 556,564.96 V
JUMLAH Rp 16,097,910.41 JUMLAH
REKAPITULASI BIAYA KESELURUHAN
BEKISTING BAJA
REDESAIN VARIASI 5
URAIAN PEKERJAAN JUMLAH HARGA (Rp)
PEKERJAAN BEKISTING LUAR Rp 2,307,836.34
PEKERJAAN BEKISTING SEKAT Rp 12,094,436.16
PEKERJAAN BEKISTING PERANGKAI Rp 1,068,224.72
PEKERJAAN BEKISTING BAWAH Rp 1,960,390.23
PEKERJAAN LANTAI KERJA Rp 556,564.96
JUMLAH Rp 17,987,452.41

REKAPITULASI BIAYA KESELURUHAN


BEKISTING BAJA
REDESAIN VARIASI 4
URAIAN PEKERJAAN JUMLAH HARGA (Rp)
PEKERJAAN BEKISTING LUAR Rp 2,007,515.29
PEKERJAAN BEKISTING SEKAT Rp 11,352,487.94
PEKERJAAN BEKISTING PERANGKAI Rp 1,068,224.72
PEKERJAAN BEKISTING BAWAH Rp 2,050,600.22
PEKERJAAN LANTAI KERJA Rp 556,564.96
JUMLAH Rp 17,035,393.14
Bekisting Baja
PT. PJU Variasi 6 Variasi 2
Pekerjaan Bekisting Luar
Pengerjaan pengelasan dengan las listrik Rp 976,338 Rp 1,538,472 Rp 591,720
Pemasangan besi profil (Kanal UNP) Rp 701,716 Rp 625,083 Rp 475,626
Pemasangan besi profil (Plat Hitam) Rp 553,528 Rp 553,528 Rp 631,684
Jumlah biaya bekisting luar Rp 2,231,583 Rp 2,717,083 Rp 1,699,029
Selisih biaya bekisting luar Rp - Rp 485,501 Rp (532,553)
Pekerjaan Bekisting Sekat
Pengerjaan pengelasan dengan las listrik Rp 1,819,539 Rp 5,281,101 Rp 2,485,224
Pemasangan besi profil (Hollow) Rp 2,090,844 Rp 3,010,650 Rp 2,269,314
Pemasangan besi profil (Plat Hitam) Rp 4,981,756 Rp 4,981,756 Rp 5,685,153
Pemasangan pegangan bekisting Rp 24,375 Rp 24,375 Rp 24,375
Jumlah biaya bekisting sekat Rp 8,892,139 Rp 13,273,507 Rp 10,439,691
Selisih biaya bekisting sekat Rp - Rp 4,381,369 Rp 1,547,552
Pekerjaan Bekisting Perangkai
Pengerjaan pengelasan dengan las listrik Rp 591,720 Rp 591,720 Rp 591,720
Pemasangan besi profil (Kanal UNP) Rp 450,892 Rp 476,505 Rp 476,505
Pemasangan baut Rp 36,000 Rp 36,000 Rp 36,000
Jumlah biaya bekisting perangkai Rp 1,042,612 Rp 1,068,225 Rp 1,068,225
Selisih biaya bekisting perangkai Rp - Rp 25,613 Rp 25,613
Pekerjaan Bekisting Bawah
Pengerjaan pengelasan dengan las listrik Rp 443,790 Rp 443,790 Rp 443,790
Pemasangan besi profil (Kanal UNP) Rp 877,695 Rp 877,695 Rp 877,695
Pemasangan besi profil (Plat Hitam) Rp 638,905 Rp 638,905 Rp 729,115
Jumlah biaya bekisting bawah Rp 1,960,390 Rp 1,960,390 Rp 2,050,600
Selisih biaya bekisting bawah Rp - Rp - Rp 90,210
Pekerjaan Landasan
Pengerjaan pengelasan dengan las listrik Rp 118,344 Rp - Rp -
Pemasangan besi profil (Kanal UNP) Rp 312,834 Rp - Rp -
Jumlah biaya landasan Rp 431,178 Rp - Rp -
Selisih biaya landasan Rp 431,178 Rp - Rp -
Pekerjaan Lantai Kerja
Pengerjaan beton K100 lantai kerja Rp - Rp 556,565 Rp 556,565
Jumlah biaya lantai kerja Rp - Rp 556,565 Rp 556,565
Selisih biaya lantai kerja Rp - Rp 556,565 Rp 556,565
Total Biaya Rp 14,557,902.00 Rp 19,575,770.48 Rp 15,814,109.87
Selisih Biaya Total Rp - Rp 5,017,868.48 Rp 1,256,207.87
Perbandingan 1 134.5% 108.6%
Variasi 5 Variasi 3 Variasi 4

Rp 1,183,440 Rp 591,720 Rp 828,408


Rp 570,868 Rp 502,733 Rp 547,424
Rp 553,528 Rp 631,684 Rp 631,684
Rp 2,307,836 Rp 1,726,137 Rp 2,007,515
Rp 76,254 Rp (505,446) Rp (224,067)

Rp 4,349,142 Rp 2,618,361 Rp 3,150,909


Rp 2,763,538 Rp 2,392,870 Rp 2,516,426
Rp 4,981,756 Rp 5,685,153 Rp 5,685,153
Rp 24,375 Rp 24,375 Rp 24,375
Rp 12,094,436 Rp 10,696,384 Rp 11,352,488
Rp 3,202,297 Rp 1,804,245 Rp 2,460,349

Rp 591,720 Rp 591,720 Rp 591,720


Rp 476,505 Rp 476,505 Rp 476,505
Rp 36,000 Rp 36,000 Rp 36,000
Rp 1,068,225 Rp 1,068,225 Rp 1,068,225
Rp 25,613 Rp 25,613 Rp 25,613

Rp 443,790 Rp 443,790 Rp 443,790


Rp 877,695 Rp 877,695 Rp 877,695
Rp 638,905 Rp 729,115 Rp 729,115
Rp 1,960,390 Rp 2,050,600 Rp 2,050,600
Rp - Rp 90,210 Rp 90,210

Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -
Rp - Rp - Rp -

Rp 556,565 Rp 556,565 Rp 556,565


Rp 556,565 Rp 556,565 Rp 556,565
Rp 556,565 Rp 556,565 Rp 556,565
Rp 17,987,452.41 Rp 16,097,910.41 Rp 17,035,393.14
Rp 3,429,550.41 Rp 1,540,008.41 Rp 2,477,491.14
123.6% 110.6% 117.0%

Anda mungkin juga menyukai