APRIL
2022
DAFTAR ISI
DAFTAR ISI........................................................................................................................................................... i
BAB I PERHITUNGAN GORDING ...................................................................................................................... 1
BAB II PENGGANTUNG GORDING ................................................................................................................... 5
BAB III PERENCANAAN IKATAN ANGIN ........................................................................................................ 7
BAB IV IKATAN ANTAR KOLOM ................................................................................................................... 10
BAB V ANALISA PERMODELAN SAP............................................................................................................. 13
BAB VI PERHITUNGAN KUDA-KUDA............................................................................................................ 15
BAB VII PERHITUNGAN KOLOM.................................................................................................................... 21
BAB VIII PERHITUNGAN SAMBUNGAN I...................................................................................................... 26
BAB IX PERHITUNGAN SAMBUNGAN II ....................................................................................................... 29
BAB X PERHITUNGAN PELAT LANDAS ........................................................................................................ 32
BAB XI PERHITUNGAN ANGKUR................................................................................................................... 34
BAB XII PERHITUNGAN KOLOM PEDESTAL................................................................................................ 36
BAB XIII PERHITUNGAN PONDASI ................................................................................................................ 38
BAB XIV PERHITUNGAN DAYA DUKUNG TANAH ..................................................................................... 40
BAB XV PENUTUP ............................................................................................................................................ 49
i
BAB I
PERHITUNGAN GORDING
Data Perencanaan :
1. Sudut Kemiringan Atap (a) = 5 ̊ = 0.09 rad
2. Jarak Antar Kuda-Kuda =8m
3. Jarak Antar Gording (b) = 1.338 m
4. Jumlah Penggantung = 2 buah
5. Penutup Atap = Galvalum
6. Berat Penutup Atap = 10 kg/m2
7. Tekanan Tiup Angin = 25 kg/m2 (lokasi jauh dari pantai)
8. BJ = 37
9. Fu = 3700 kg/cm2
10. Fy = 2400 kg/cm2
11. Profil Gording = LLC 125.50.20.3,2
12. E = 200000 MPa
13. Tegangan Ijin = 1600 kg/m2
401.53
= 133.8 cm
3
Sehingga dipakai : Jarak miring gording = 1.34 m
Jarak mendatar gording = 1.33 m
Jarak antar kuda-kuda (Lx) = 8.00 m
Dipakai galvalum dengan jenis gelombang besar dengan :
* Tebal = 0.3 mm
* Ukuran = 73 x 120 cm
* Jarak Gording = 1338 mm
Direncanakan profil LLC 125.50.20.3,2
W = 6.13 kg/m C = 20 mm
A = 7.807 cm2 Cy = 16.8 mm
Ix = 181 cm4 ix = 48.2 mm
Iy = 26.6 cm4 iy = 18.5 mm
b = 50 mm Zx = 29.0 cm3
h = 125 mm Zy = 8.02 cm3
tf = 3.2 mm tw = 3.2 mm
1
Berat penggantung gording = 1.33 x 1 = 1.33 kg/m’ +
qD = 20.85 kg/m’
Berat lain-lain 10% x qD = 2.085 +
Jadi, qD = 22.93 kg/m’
Berat lain-lain meliputi berat penggantung gording, berat baut, berat plat sambung, dan berat ikatan angin.
2
Koefisien angin berdasarkan PPIUG 1983 tabel 4.1(lanjutan) hal. 29
KASUS BEBAN A (aliran angin tidak terhalang)
* Koefisien angin tekan
c = 0.02α – 0.4
q = c . w. b = 0.02α – 0.4 x 25 x 1.338 = 0 kg/m
* Koefisien angin hisap
c = – 0.4
q = c . w. b = – 0.4 x 25 x 1.338 = –13.38 kg/m
3
b. Kontrol Plat Badan (dari LFRD tabel 7.5-1 hal 31)
h
<= Ip
tw
h 1680
<=
tw 0.5fy
F total ≤ L⁄
250
2.65 ≤ 3.2 cm OKE
Jadi, profil yang digunakan untuk gording pada bentuk bangunan ini adalah LLC 125.50.20.3,2
4
BAB II
PENGGANTUNG GORDING
Data Perencanaan :
qx = qd sin a
= 22.93 sin 5
= 1.999 kg/m’
A. Beban Mati (D)
DL = qx (Lx/3)
= 1.999 (8/3)
= 5.33 kg
Beban air hujan (H)
qL = qLH sin a
= 26.67 sin 5
= 2.32 kg/m’
B. Beban Hidup (L)
RLL = qL (Lx/3)
= 2.32 (8/3)2
= 6.198 kg
LH = RLL (Lx)
= 6.198 (8)
= 49.58 kg
Beban terpusat (PL) = 100 kg
LL = Px = PL sin a
= 100 sin 5
= 8.716 kg
C. Beban Angin (W)
Koefisien Angin Tekan = 0.9
Beban Angin = 25 kg/m2
qW = 30.11 kg/m
W = qW (Lx/3)
= 30.11 (8/3)
= 80.31 kg
1.338
1.338 m f = arc tg = 9.5 ̊
8
8m
5
Kombinasi pembebanan
* Rtot = 1.2DL + 1.6LL
= 1.2 (5.33) + 1.6 (8.72)
= 20.3 kg
* Rtot = 1.2DL + 0.5LL
= 1.2 (5.33) + 0.5 (8.72)
= 10.8 kg
* Rtot = 1.2DL + 1.6LL + 0.8W
= 1.2 (5.33) + 1.6 (8.72) + 0.8(80.31)
= 84.6 kg
Rtot 10.8
T= = = 65.17 kg .....................(Pu)
Sin f Sin 9.5
Kuat putus
Pu = 0.75 x f x fu x Ag (dari LRFD 10.1.1-2b hal 70)
Pu 65.17
Ag = = = 0.031 cm2
0.75.f.fu 0.75 x 0.75 x 3700
Dipakai Ag = 0.031cm2
4 Ag 4 x 0.031
d=√ =√ = 0.2 cm = 2 mm
phi phi
Dipakai batang bulat berdiameter 10 mm
A pakai > A min
A pakai = ¼ x 𝜋 x d 2
> A min = 0.07 cm2
= 0.79 cm2 > 0.07 cm2 OKE
Kontrol kelangsingan
L 133.84
≤ 500 L= = 811.12 cm
d sin 9.5
6
BAB III
PERENCANAAN IKATAN ANGIN
Data perencanaan :
Jarak antar goding = 1.35 m
Hk = 5.16 m
Jarak antar kuda-kuda =8m
Sudut kemiringan atap = 5 ̊ = 0.26 rad
Tekanan tiup = 25 kg/cm2
Bentang kuda-kuda = 16.7 m
Penutup atap = Galvalum
Mutu baja = BJ 37
Fu = 3700 kg/cm2
Fy = 2400 kg/cm2
Koefisien arah angin = 0.9
b = 2.58 m
P1 P2 8
f = arc tg = 57.2 ̊
5.16
ƩV = 0 R1 = P1 + T1cos f
5.16 m
R1−P1
T1 =
cos Ø
q
482.83−149.77
=
cos 52.7
8m = 614.46 kg .................(tarik)
R1
7
P1 P2
ƩV =0
5.16 m
R – P1 – P2 – T2 cos Ø =0
T2
T1 R−P1−P2
T2 =
cos Ø
482.83−149.77−157.13
T2 =
8m cos 52.7
6m
T2 = 324.57 kg
Diambil nilai T terbesar
Pu = 614.46 kg
Perencanaan Dimensi Ikatan Angin
Pu = 614.46 kg
Kuat leleh
Pu = f x fy x Ag (dari LRFD 10.1.1-2a hal 70)
Pu 614.46
Ag = = = 0.284 cm2
f.fy 0.9 x 2400
Kuat putus
Pu = 0.75 x f x fu x Ag (dari LRFD 10.1.1-2b hal 70)
Pu 614.46
Ag = = = 0.295 cm2
0.75.f.fu 0.75 x 0.75 x 3700
Dipakai Ag = 0.295cm2
4 Ag 4 x 0.295
d=√ =√ = 0.61 cm = 6.1 mm
phi phi
Dipakai diameter 12 mm
Penampang pakai ikatan angin
Ag pakai = ¼ x 𝜋 x d2
= 1.131 cm2
Kontrol ketahanan profil
Pu
Tu = = 731.2 kg
sin Ø
Tn = Ø x Ag x fy = 2442.9 kg
Tu ≤ Ø.Tn
731.2 kg ≤ 2442.9 kg OKE
Kontrol tegangan
Pu
σ= ≤ 1600
A
543.58 kg/cm 2
≤ 1600 OKE
Stress Ratio :
Tu
≤ 1
Tn
731.2
≤ 1
2442.9
8
0.3 ≤ 1 OKE
Dari kedua nilai diameter (d) tersebut, diambil yang terbesar dan yang dipasang haruslah sesuai dengan diameter
yang tersedia dipasaran. Digunakan penggantung berdiameter 12 mm
9
BAB IV
IKATAN ANTAR KOLOM
Data Perencanaan :
1 Sudut Kemiringan Atap = 5 ᵒ = 0.09 rad
2 Jarak Antar Kuda-kuda = 8 m
3 Bentang Kuda-kuda = 16.7 m
4 Jarak Antar Gording (b) = 1.35 m
5 Tinggi Kolom = 5.16 m
6 Penutup Atap = Seng Galvallum = 10 kg/m2
7 Penutup Dinding = Tertutup
8 Tekanan Tiup Angin = 25 kg/m2
9 BJ = 37
10 Fu = 3700 kg/cm2
11 Fy = 2400 kg/cm2
12 Rencana Penampang = 150 50 20 4.5
double LLC A = 11.72 cm2
W = 9.2 kg/m
Ix = 368.00 cm4
Iy = 35.70 cm4
ix = 5.60 cm
iy = 1.75 cm
Zx = 49.00 cm3
Zy = 10.50 cm3
13 E = 200000 kg/cm2
B S1
C Diketahui :
R = 482.83 kg
S1 = ikatan angin pada kolom WF
SH =0
7m
K1 K2 =R+P
= 482.83 + P
P = -482.83 kg
= 482.83 kg (TEKAN)
A D
Q S1 =WxL
= 9.2 x 8
6m
= 74 kg
SMB = MB + (QS1 x 4 m) + (P x 8 m)
MB = 4157.01 kg.m
= 4.157 Ton.m
10
Cek Kelangsingan Penampang
b 25 h 150
Flens = = = 1.3 Web = = = 3.3
2tf 4.5 tw 4.5
250 250 665 665
= = = 16.14 = = = 42.93
√fy √240 √fy √240
b/2 250 h 665
< OKE < OKE
tf √fy tw √240
Kondisi tumpuan jepit-jepit, k = 0.65
Arah Sumbu Bahan (sumbu x) :
k x Lx 0.65 x 8000
λx = = = 92.86
ix 56000
λx fy 92.86 240
λcx = √ = √ = 1.024
π E π 200000
Nilai λcx = 1.024, untuk 0.25 < λx < 1.2, makan nilai 𝜔 :
1.43
𝜔x = Nn = Ag x Fcr
1.6−(0.67−1.024)
fy
𝜔x = 1.56 = Ag x
ωx
= 187271.94 N
= 18.73 Ton
Nu 0.483
= = 0.03 < 1
Ø x Nn 0.85 x 18.73
Maka dapat disimpulkan bahwa penampang yang digunakan dapat menahan gaya yang terjadi dengan kekuatan
penampang Nn = 18727.19 kg > 482.83 kg
λy fy 104 240
λcy = √ = √ = 1.147
π E π 200000
Nilai λcy = 1.147, untuk λc > 1.2, makan nilai 𝜔 :
𝜔x = 1.25 x λcy2 Nn = Ag x Fcr
fy
𝜔x = 1.64 = Ag x
ωx
= 178241.75 N
= 17.82Ton
Nu 0.483
= = 0.03 < 1
Ø x Nn 0.85 x 17.82
Maka dapat disimpulkan bahwa penampang yang digunakan dapat menahan gaya yang terjadi dengan kekuatan
penampang Nn = 17824.18 kg > 482.83 kg
11
Gaya tekan maksimum = 561.64 kg …………………………………..(Dari hasil SAP)
Momen maksimum yang terjadi = 952.88 kg.m
Kontrol Ik = Ly
Ik 800
λ= = = 457.14
imin 1.75
E
λg = 𝜋 √ = 108.3
0.7 x Fy
λ
λs = = 4.22
λg
12
BAB V
ANALISA PERMODELAN SAP
A. Permodelan 3D SAP2000
C. Pemotongan Melintang
13
D. Pemotongan Memanjang
14
BAB VI
PERHITUNGAN KUDA-KUDA
Data perencanaan :
1. Sudut Kemiringan Atap = 5 ̊ = 0.09 rad
2. Jarak Antar Kuda-kuda ( d ) =8m
3. Jarak Antar Gording ( b ) = 1.35 m
4. Jumlah Penggantung = 2 buah
5. Penutup Atap = Seng Galvalum
6. Berat Pentutup Atap = 10 kg/m
7. Tekanan Tiup Angin = 25 kg/m2
8. BJ = 37
9. Fu = 3700 kg/cm2 = 370 MPa
10. Fy = 2400 kg/cm2 = 240 MPa
11. Fr (teg. sisa penampang gilas panas) = 70 MPa
12. Profil Gording = LLC 125.50.20.3,2
W = 4.96 kg/m
13. Profil kuda-kuda = WF 300.150.6,5.9
ø leleh = 0.9
ø fraktur = 0.75
U fraktur = 0.85
14. Tinggi bangunan (hk) = 5.16 m
15. E = 200000 Mpa
16. Tegangan Ijin = 1600 kg/cm2
15
KASUS BEBAN II
Angin tekan
c = koefisien angin tekan bangunan tertutup = 0.9
W tekan = c x w x b x d =241 kg
Beban padaangin atap hanya ada angin tekan, dimana nilainya terproyeksikan dalam 2 arah yaitu :
Arah x = 241 sin 5 = 21 kg
Arah z = 241 cos 5 = 240 kg
Beban Angin Tekan Titik Simpul Tengah (kg) Titik Simpul Tepi (kg)
Arah x 21.00 10.50
Arah z 240.00 120.00
KASUS BEBAN I
Angin hisap kanan
c = koefisien angin tekan bangunan tertutup = - 0.4
W tekan = c x w x b x d = 107.07 kg
Beban padaangin atap hanya ada angin tekan, dimana nilainya terproyeksikan dalam 2 arah yaitu :
Arah x = 107.07 sin 5 = 9.33 kg
Arah z = 107.07 cos 5 = 106.67 kg
Angin hisap kiri
c = koefisien angin tekan bangunan tertutup = 0.9
W tekan = c x w x b x d = 240.92 kg
Beban padaangin atap hanya ada angin tekan, dimana nilainya terproyeksikan dalam 2 arah yaitu :
Arah x = 240.92 sin 5 = 21 kg
Arah z = 240.92 cos 5 = 240 kg
Titik Simpul Tengah (kg) Titik Simpul Tepi (kg)
Beban Angin Hisap
Kanan Kiri Kanan Kiri
Arah x 9.33 21.00 4.67 10.50
Arah z 106.67 240.00 53.33 120.00
Beban dinding
Koefisien tiup angin pada bangunan yang jauh dari laut q = 25 kg/m2 (PPIUG 1983 pasal 4.2.1)
5. Beban Sendiri Balok Rafter Sudah Secara Otomatis Masuk Ketika Kita Menggunakan Program SAP 14.2.2
dalam menghitung struktur gaya pada bangunan gudang ini dengan menginput data jenis materialdimensi
profil yang digunakan :
16
Kombinasi Pembebanan
a. 1,4D
b. 1,2D + 0,5L
c. 1,2D + 1,6L + 0,8W Metode LRFD halaman 14
d. 1,2D + 1,3W + 0,5L
e. 0,9D + 1,3W
Kombinasi pembebanan untuk batang utama kuda-kuda (lihat SAP 2000)
No. Kombinasi Pembebanan Gaya Tekan (kg) Gaya Tarik (kg) Momen (kg.m)
1 1,4 D 153.15 821.32 485.45
Kombinasi
2 1,2 D + 0,5L 179.31 976.84 578.73
yang
3 1,2 D + 1,3W + 0,5L 365.47 856.46 533.15
Digunakan
4 0,9 D + 1 W 284.6 407.62 266.5
5 1,2D + 1,6L 285.04 1577.11 936.51
Didapatkan nilai kombinasi yang paling menentukan terjadi pada kombinasi 1,2D + 1,6L dengan hasil
gaya aksial maksimum yaitu :
Gaya tekan (Nu) = 285.04 kg Ma (Momen 1/4 Bentang) = 408.72 kgm
Gaya tarik (Tu) = 1577.11 kg Mb (Momen 1/2 Bentang) = 119.07 kgm
Momen (Mu) = 936.51 Kgm Mc (Momen 3/4 Bentang) = 637.25 kgm
Ix = 72100000 mm4
Iy = 5080000 mm4
r
h1 rx = 124 mm
ry = 32.9 mm
bf Sx = 481000 cm3
Sy = 67700 cm3
w= 36.7 kg/m
Lx = 8000 mm 17
Faktor panjang tekuk
1 kxL fy
λc = √ = 2.15
π ry E
1.43
𝜔= Nn = Ag x Fcr
1.6−(0.67−λc)
fy
𝜔 = 8.78 = Ag x
ωx
= 17257.96 N
= 17.26 Ton
Nu
= 0.022 < 1
Ø x Nn
D. Aksi Balok
Periksa apakah WF 300.150.6,5.9 kompak atau tidak
Cek kelangsingan :
bf 170
= 8.33 < = 10.973 OKE
2tf √fy
h 1680
= 46.2 < = 108.444 OKE
tw √fy
Cek Terhadap Lentur
𝐄
Lp = 1.76 x = 1671.55 mm
𝐟𝐲
L > Lp periksa Lr
𝐈𝐲 𝐱 𝐡²
Iw = = 114300000000 mm4
𝟒
𝐄
G= = 76923.077 Mpa
𝟐(𝟏+𝐯)
18
𝛑 𝐄 𝐱 𝐆 𝐱 𝐉 𝐱 𝐀𝐠
X1 = √ = 12026.16 Mpa
𝐒𝐱 𝟐
𝐒𝐱 2 𝐈𝐰
X2 = 4( ) = 0.00000072 mm4/N
𝐆𝐱𝐉 𝐈𝐲
fy
𝜔 = 1.17 = Ag x
ωx
= 322860.12 N
= 32.29 Ton
Nu
= 0.12 < 1 OKE
Ø x Nn
E. Momen Pembesaran
𝐌𝟏
Cm = 0.6 – 0.4( ) = 0.6
𝐌𝟐
𝛑² 𝐄.𝐀𝐠
Ncrb = = 76864562.06
𝛌𝐱
𝐂𝐦
δb = 𝐍𝐮 = 0.6 ≤ 1
𝟏−𝐍𝐜𝐫𝐛
19
Momen arah x diabaikan
(𝑁𝑢/(2𝜙𝑡.𝑁𝑛))+(𝑀𝑢𝑦/(𝜙𝑏. 𝑀𝑛𝑦)) ≤1
0.25 ≤1 OKE
Perhitungan Lendutan
𝟓 𝐌𝐮𝐲 𝐋²
Δ= = 4.32
𝟒𝟖𝐄 𝐈𝐱
𝐋
Kontrol lendutan ≤
𝟐𝟓𝟎
4.32 ≤ 32 mm
Maka profil WF 300.150.6,5.9 dapat digunakan karena mampu menahan beban aksial dan momen
ultimate dari beban eksternal
20
BAB VII
PERHITUNGAN KOLOM
Data perencanaan :
1. Sudut Kemiringan Atap = 5 = 0.09 rad
2. Jarak Antar Kuda-kuda ( c ) =8m
3. Jarak Antar Gording ( b ) = 1.35 m
4. Jumlah Penggantung = 2 buah
5. Penutup Atap = Galvalum
6. Berat Pentutup Atap = 10 kg/m
7. Tekanan Tiup Angin = 25 kg/m2
8. BJ = 37
9. Fu = 3700 kg/cm2 = 370 MPa
10. Fy = 2400 kg/cm2 = 240 MPa
11. Fr = 70 MPa
12. Profil Gording = LLC 125.50.20.3,2
W = 6.31 kg/m
13. Profil Kolom = H Beam 300.300.10.15
A = 300 mm tw = 10 mm
B = 300 mm tf = 15 mm
Ag = 119.8 cm2 Jy = 6750 cm4
R = 18 mm ix = 13.1cm
D = 300 mm iy = 7.51cm
W = 1128 kg/m Zx = 1360 cm3
Jx = 20400 cm4 Zy = 450 cm3
14. E = 200000 Mpa
15. Tegangan Ijin = 1600 kg/cm2
21
Cek Kelangsingan Lateral
Iy
ry = √ = 75.06 mm
Ag
𝐄
Lp = 1.76 x ry x = 3815.59 mm
𝐟𝐲
Lp < L
3815.59 mm < 8000 m
𝐈𝐟 𝐱 𝐡²
Cw = = 1674421875000 mm4
𝟐
J = 1/3 (2 x𝑏 𝑥𝑡𝑓)^3 + (h-2tw)^3) = 77500 mm4
Diketahui G =80000 Mpa
𝛑 𝐄 𝐱𝐆 𝐱 𝐉 𝐱 𝐀𝐠
X1 = √ = 19908.35 Mpa
𝐙𝐱 𝟐
𝐙𝐱 2 𝐂𝐰
X2 = 4( ) = 0.00004774 mm4/N
𝐆𝐱𝐉 𝐈𝐲
𝜔 = 1.15
fy
Nn = Ag x
ωx
22
= 249130.84 N
Nu
< 0.2 maka digunakan persamaan interaksi 2
Øt x Nn
Momen Pembesaran
Muy = δb x Mnty2 = 133 Kgm = 1331794.046 Nmm
Kontrol Kombinasi Tekan dan Tarik
Nu
< 0.2
Øt x Nn
Menggunakan Persamaan B
Nu Mux Muy
+( + ) ≤ 1
2ØcNn ØbMnx ØbMny
0.10 ≤ 1 OKE
Perhitungan lendutan
𝟓 𝐌𝐮𝐲 𝐋²
Δ= = 0.0544 mm
𝟒𝟖𝐄 𝐈𝐱
𝐋
Kontrol lendutan ≤
𝟐𝟒𝟎
0.0544 mm ≤ 33.3 mm OKE
Nu
≤ 1600 mm
Ag
1518.33 mm ≤1600 mm OKE
Jadi, profil yang digunakan adalah H-Beam 300.300.10.15
23
HASIL OUTPUT SAP2000 UNTUK KOLOM H-BEAM 300.300.10.15
M1 M2
Mmax Ma
24
Mb Mc
Nu
25
BAB VIII
PERHITUNGAN SAMBUNGAN I
Data perencanaan :
Sudut kemiringan = 5⁰ = 0.09 rad
Profil kuda kuda = WF 300.150.6,5.9
A = 300 mm
B = 150 mm
tf = 9 mm
tw = 6.5 mm
Tebal pelat alas = 12 mm
Diameter baut pasaran = 16 mm
Mutu baja = 37
fu = 370 Mpa fy = 240 Mpa
fuw = 480 Mpa fub = 825 Mpa
Sketsa Gambar :
I
II
III
26
Vu cosα
Vu
Vu sinα
5̊ Pu cosα
Pu
Pu sinα
Vu = 380.27 Kg = 3802.7 N
Pu = 285.51 Kg = 2855.1 N
Mu = 1177.57 Kgm = 11775700 Nmm
Penguraian Gaya
Pu sin α = 248.8383611 N
Pu cos α = 2844.235483 N
Vu sin α = 331.4271429 N
Vu cos α = 3788.229578 N
Pu H= Pu cos α - Vu sin α = 2512.80834 N
Pu V= Vu cos α + Pu sin α = 4037.06794 N Maka gaya yang menentukan adalah Pu V
43.75
87.5
43.75
27
Tinjauan Terhadap Sambungan Baut
Asumsi Jumlah baut (n) = 4 buah
Pu H
Rv = = 1009.7
n
∑x² + ∑y² = 38281 mm
Mu.Y
Rm.x =
∑x² + ∑y²
= 13458 N
Mu.X
Rm.x =
∑x² + ∑y²
= 13458 N
Ru = ((Rm.x²+(Rv+Rmy)²)^0,5 = 19759 N
Cek terhadap Tekanan Tarik
øRn = ø 0,75 x Fub x Ab
= 93305 N
Cek Terhadap Tahanan Lentur
øRn = ø 0,24 x tp x db x fu
= 12787 N
Cek Terhadap Tahanan Geser
øRn = ø m x r x Fub x Ab
= 49736 N (menentukan)
Kontrol
Ru ≤ øRn
2513 ≤ 49736 OKE
Tinjau terhadap Pelat
Ag = 12 mm x 150 mm
= 1800 mm²
Kondisi Fraktur
øTn = ø Ag x fu
= 499500 N
Kondisi Leleh
øTn = ø Ag x fy
= 324000 N
Kontrol
Tu ≤ øTn
2512.81 ≤ 324000 OKE
0.008 ≤ 1 OKE
Perencanaan jarak baut
Jarak tepi rencana = 100 mm
max = 12tp
= 144 > 100 OKE
min = 1,2 db
= 19.2 < 100 OKE
28
BAB IX
PERHITUNGAN SAMBUNGAN II
Data perencanaan :
Sudut kemiringan = 5⁰ = 0.09 rad
Profil kuda kuda = WF 300.150.6,5.9
A = 300 mm
B = 150 mm
tf = 9 mm
tw = 6.5 mm
Tebal pelat alas = 12 mm
Diameter baut pasaran = 16 mm
Mutu baja = 37
fu = 370 Mpa fy = 240 Mpa
fuw = 480 Mpa fub = 825 Mpa
Sketsa Gambar :
I
II
III
29
α=5°
= 0.09 rad
Vu = 1573.4 Kg = 15734 N
Pu = 82.39 Kg = 823.9 N
Mu 2665.67 Kgm = 26656700 Nmm
Penguraian Gaya
Pu sin α = 71.80761645 N
Pu cos α = 820.7648118 N
Vu sin α = 1371.308456 N
Vu cos α = 15674.12738 N
Pu H= Pu cos α - Vu sin α = -550.5436446 N
Maka gaya yang menentukan adalah Pu V
Pu V= Vu cos α + Pu sin α = 15745.935 N
43.75
83.5
43.75
30
Tinjauan Terhadap Sambungan Baut
Asumsi Jumlah baut (n) = 4 buah
Pu H
Rv = = 3936.48
n
∑x² + ∑y² = 35545 mm
Mu.Y
Rm.x =
∑x² + ∑y²
= 31310 N
Mu.X
Rm.x =
∑x² + ∑y²
= 31310 N
Ru = ((Rm.x²+(Rv+Rmy)²)^0,5 = 47145 N
Cek terhadap Tekanan Tarik
øRn = ø 0,75 x Fub x Ab
= 93305 N
Cek Terhadap Tahanan Lentur
øRn = ø 0,24 x tp x db x fu
= 12787 N
Cek Terhadap Tahanan Geser
øRn = ø m x r x Fub x Ab
= 49736 N (menentukan)
Kontrol
Ru ≤ øRn
-550.54 ≤ 12787 OKE
Tinjau terhadap Pelat
Ag = 12 mm x 150 mm
= 1800 mm²
Kondisi Fraktur
øTn = ø Ag x fu
= 499500 N
Kondisi Leleh
øTn = ø Ag x fy
= 324000 N
Kontrol
Tu ≤ øTn
-550.54 ≤ 324000 OKE
-0.017 ≤ 1 OKE
Perencanaan jarak baut
Jarak tepi rencana = 100 mm
max = 12tp
= 144 > 100 OKE
min = 1,2 db
= 19.2 < 100 OKE
31
BAB X
PERHITUNGAN PELAT LANDAS
Data perencanaan :
Mutu baja = BJ 37 Fu = 4100 Kg/cm² = 410 MPa
Mutu beton = 30 Mpa Fy = 2500 Kg/cm² = 250 MPa
σ ijin = 1600 Kg/cm²
Dimensi kolom = H-Beam 300.300.10.15
Dimensi pelat = 150 X 150 mm2
Sketsa :
B = 150 mm = 15 cm
H = 150 mm = 15 cm
n = 69 mm = 6.9 cm
m = 67.88 mm = 6.8 cm
bf = 15 mm
0.8*bf = 12 mm
d = 15 mm
0.95*d = 14.25 mm
fc' = 30 Mpa
32
4 𝑥 𝑀𝑥
tp minimum =√ = 3.29 cm
𝑁 𝑥 0.9 𝑥 𝑓𝑦
Anggap tp = 5 cm
Kontrol tegangan = 𝑀x/(1/6×𝐵×𝑡^2 ) < tegangan ijin
= 140.56 < 1600 OKE
Kesimpulan dari hasil perhitungan yang telah dilakukan maka dipakai pelat dengan tebal 5 cm
33
BAB XI
PERHITUNGAN ANGKUR
Data perencanaan :
Mutu baja = 37 B = 150 mm = 15 cm
Mutu beton = 30 Mpa H = 150 mm = 15 cm
σ ijin = 1600 Kg/cm² b = 100 mm = 10 cm
Dimensi kolom = H-Beam 300.300.10.15 a = 100 mm = 10 cm
Dimensi pelat = 150 x 150 mm2
Jumlah Angkur
σ max = 𝑁/𝐴+𝑀/𝑊 = 𝑁𝑢/(𝐵×𝐻)+(6×𝑀𝑢)/(𝐵×𝐻^2 ) = 6.909 kg/cm2
σ min = 𝑁/𝐴+𝑀/𝑊 = 𝑁𝑢/(𝐵×𝐻)-(6×𝑀𝑢)/(𝐵×𝐻^2 ) = 1.884 kg/cm2
Gambar diagram tegangan
1.884 -
6.909
+
X Y
Mencari nilai X dan Y
X 1.884 1
= =
Y 6.909 3.667
Y = 3.667 x X X+Y = 15
= 3.667 x 3.21 X + 3.667 X = 15
= 11.79 cm 4.667 X = 15
X = 3.21 cm
34
Direncanakan baut angkur diletakkan ⅓ ujung kiri
1.884
-
+ 6.909
3.21 11.79
35
BAB XII
PERHITUNGAN KOLOM PEDESTAL
Pn = 0.85 x fc' x B x H
= 5100000 N
= 510000 kg (SNI 03-2847-2002 pasal 24.5.5)
φ Pn > Pu
433500 > 691.22 OKE
S = 1/6 x B x H2 = 10666666.67 mm3
Mn = 0.85 x fc' x S = 375000000 Nmm
Mn = 3750 kgm > Mu = 262.96 kgm OKE (SNI 03-2847-2002 pasal 24.5.1)
Untuk kolom pedestal diambil prosentase tulangan (ρ) sebesar 1% dari luas penampang kolom
As = 0.01 x B x H
= 2000 mm2
Dipakai d 16 mm, maka diperlukan tulangan sebanyak 8 buah
φ*Vc = 0.6 x 1/6 x √fc' x B x H
= 109545 N
Kontrol geser kolom
Pu < φ*Vc
691.22 < 10954.45 Maka, Tidak perlu tulangan geser
Cukup dipasang tulangan geser minimum d 8 mm S 150 mm
36
Panjang penyaluran dibawah pertemuan kolom dengan pelat pondasi
Lb = 0.02 x (Ab/√fc') x fy
= 68.8 mm
= 7.0 cm
Kesimpulan :
Dari hasil perhitungan didapatkan panjang penyaluran adalah 7 cm, maka tinggi kolom pedestal sudah memenuhi.
37
BAB XIII
PERHITUNGAN DAYA DUKUNG TANAH
Metode langsung ini dikemukakan oleh beberapa ahli diantaranya Meyerhoff, Tomlinson dan Bagemann.
Pada metode langsung ini, kapasitas daya dukung ultimit (Qult) yaitu beban maksimum yang dapat dipikul
pondasi tanpa mengalami keruntuhan, dirumuskan sebagai berikut :
Q ijin yaitu beban maksimum yang dapat dibebankan terhadap pondasi sehingga persyaratan keamanan
terhadap daya dukung dan penurunan dapat terpenuhi. Q ijin dirumuskan sebagai berikut :
Q ijin = +
Dimana :
Cn = Tahanan konus pada ujung tiang (kg/cm2), mayerhoff menyarankan nilai rata-rata yang
Dihitung dari 8D keatas dan 4D dibawah dasar tiang.
A = Luas penampang tiang
JHP = Jumlah hambatan perekat.
K = Keliling tiang
SF1 = Angka keamanan 1 = 3
SF2 = Angka Keamanan 2 = 5
D = 40 cm
= 0.4 m
8D = 8 x 0.4 m
= 3.2 m
4D = 4 x 0.4 m
= 1.6 m
L = 4 m
= 400 cm
38
L - 8D = 4 m - 3.2 m
= 0.8 m
L + 4D = 4 m + 1.6 m
= 5.6 m
Cn = (3+3+2+2+6+5+18+21+19+19+18+18+80+21+40+40+50+50)/18
= 23.06 kg/cm²
39
BAB XIV
PERHITUNGAN PONDASI
Syarat Jarak antar tiang pancang (S) Syarat Jarak tiang pancang ke tepi poer (S')
2,5 D ≤ S ≤ 3D 1,5 D ≤ S' ≤ 2D
100 cm ≤ S ≤ 120 cm 60 cm ≤ S' ≤ 80 cm
Menggunakan nilai S 110 cm Menggunakan nilai S' 70 cm
40
Pengecekan Ulang Kebutuhan Tiang Pancang
41
Tiang P Satuan Kontrol :
P1 1.438041591 m Ton P tiang < Pijin tanah . η Cek
P2 1.356273409 m Ton 1.44 < 56.39 OK
P3 1.356273409 m Ton
P4 1.3971575 m Ton
P pakai 1.44 Ton
Perhitungan Daya Dukung Tiang Dalam Kelompok
Berdasarkan Output dari SAP2000 didapatkan gaya-gaya dalam dari joint yang ditinjau :
Kombinasi P max Momen X Momen Y
1.2D + 1L + 1EY + 0.3EX 5.359 Ton 0.206 Ton-m 0.569 Ton-m
42
No. X X²
1 -0.55 m 0.3025 m
2 0.55 m 0.3025 m
3 -0.55 m 0.3025 m
4 0.55 m 0.3025 m
𝑥2 1.21 m
No. Y Y²
1 0.55 m 0.3025 m
2 0.55 m 0.3025 m
3 -0.55 m 0.3025 m
4 -0.55 m 0.3025 m
𝑦2 1.21 m
Persamaan 3 (c)
Vc = 0,33 λ √f ′ c . bo . d = 193.85 Ton
Dipakai nilai Vc yang terkecil yaitu 193.85 Ton
Kontrol kuat geser dua arah
Cek
Vu < φVc
-0.42 < 145.39 OK
44
Cek Kuat Geser Beton
Data perencanaan Nilai Satuan
an = sisi panjang kolom 500 mm
bn = sisi pendek kolom 400 mm
β = an/bn 1.25
d = tebal pondasi - selimut beton 325 mm
bo = kel. Penampang kritis 2276.5 mm
Persamaan 1 (a)
2
𝑉𝑐 = 0,17 (1 + ) 𝜆 √𝑓 ′ 𝑐 . 𝑏𝑜 . 𝑑 = 179.12 Ton
𝛽
Persamaan 2 (b)
as
Kolom interior Kolom tepi Kolom Sudut
40 30 20
as. d
Vc = 0,083 ( + 2) λ √f ′ c . bo . d = 259.34 Ton
bo
Persamaan 3 (c)
Vc = 0,33 λ √f ′ c . bo . d = 133.73 Ton
Dipakai nilai Vc yang terkecil yaitu 133.73 Ton
Kontrol kuat geser dua arah
Cek
Vu < φVc
5.49 < 100.30 OK
Hasil rekapitulasi perhitungan perencanaan dimensi poer
Rekapitulasi perhitungan dimensi poer Nilai
Dimensi poer 150 cm x 150 cm
Tebal poer 40 cm
Arah X 2 buah
Jumlah tiang pancang
Arah Y 2 buah
Jarak antar tiang pancang (S) 110 cm
Jarak tiang pancang ke tepi poer (S') 70 cm
45
Data perencanaan Nilai Satuan
Dimensi poer 150 x 150 cm
Jumlah tiang pancang 4 buah
Dimensi kolom 40 / 50 cm
Mutu beton (Fc') 30 MPa
Mutu baja (Fy) 400 MPa
Diameter tul.utama 14 mm
Selimut beton 0.075 mm
Tebal poer 400 mm
φ 0.9
β 0.85
dx 392.925 mm
dy 378.925 mm
Mn Rn Cek As perlu
Daerah
Mu/ᵩ Mn/b.d² p (pmin<p p use p xb xd
penulangan
Nmm N/mm² <pmaks) mm²
Poer arah X 242 0.0000016 0.0000000039 NO OKE 0.0000000051 0.003
46
Penulangan poer arah Y
Beban yang terjadi :
Berat poer = 720 Kg
Pmax beban tiang dipakai yang memiliki nilai terbesar
P = 1438.04 Kg
Mn Rn Cek As perlu
Daerah
Mu/ᵩ Mn/b.d² p (pmin<p p use p xb xd
penulangan
Nmm N/mm² <pmaks) mm²
Poer arah Y 19915 0.0001 0.0000003 NO OKE 0.0000005 0.26
47
48
BAB XV
PENUTUP
Laporan perencanan Struktur SPBU yang terletak di jalan Raya Kabuh – Sukorame, Sukorame, Lamongan dibuat
berdasarkan standar perhitungan SNI yang berlaku di Indonesia. Dari proses perhitungan baik secara matematis dan dengan
menggunakan alat bantu software SAP2000 didapatkan hasil berupa, strutur mampu memikul beban-beban yang
bekerja dan juga beban gempa dan aman untuk digunakan.
Demikian laporan perencanaan struktur ini dibuat sebagai dokumen pendukung untuk pelaksanaan konstruksi
maupun sebagai dokumen perijinan, besar harapan kami dengan adanya laporan perencanaan ini langkah selanjutnya yaitu
dari sisi konstruksi dapat dilanjutkan dengan lebih baik demi tercapainya kesuksesan pembangunan, sehingga segera dapat
dimanfaatkan sesuai dengan fungsinya.
49