PENULANGAN TANGGA
1 Data
Perletakkan Tangga
Tinggi Antar Lantai = 450 cm
Lebar Tangga = 235 cm
Lebar Bordes = 170 cm
Panjang Bordes = 500 cm
Kemiringan Tangga (a ) = 38.66 ◦
tan a = 1.43106110067
Berat Jenis Beton = 2400 kg/m3
Berat Keramik = 24 kg/m2
Berat Spesi = 21 kg/m2
Berat Dinding = 250 kg/m2
Beban Hidup = 300 kg/m2
2 Perancanaan Tangga
Tinggi Antar Lantai = 450 cm
Rumus
2 Optrade + 1 Antrade = (60 - 65) cm
Lebar Anak Tangga =
(Antrede) 26 - 30 cm
Tinggi Anak Tinggi =
(Optrade) 16 - 20 cm
Optrade = 18 cm
Antrade = 29 cm
2 Optrade + 1 Antrade = (60 - 65) cm
65 = (60 - 65) cm
OK!
Jumlah Antrade
(Tinggi Antar = 24 buah
Lantai/Optrade)-1
= 24 buah (termasuk bordes)
Jumlah Optrade = 25 buah
Tinggi Antar Lantai
Jumlah Anak Tangga x = 450 cm
Optrade
Sisa = 0 cm
4 Pembebanan
a. Akibat Beban Mati (DL)
Berat Sendiri Beton = BJ Beton x H Pelat x 1 m
= 930.511632133 kg/m
Berat Keramik = 24 kg/m
Berat Spesi (2 cm) = 42 kg/m
qDL total = 996.511632133 kg/m
7 Reaksi Kombinasi
Beban Ultimate = 1.2 DL + 1.6 LL
= 1675.81395856 kg/m
= 16.7581395856 kN/m
Q1 = 39.1660193017 kN
Q2 = 28.4888372955 kN
VA = 11.2662096879 kN
VB = 9.12329660213 kN
VC = 11.2662096879 kN
= 0.06450892857
ρ max = 75 % ρ bal
= 0.04838169643
ρ min = 0.002
m = 𝑓𝑦/(0,85×𝑓^′ 𝑐)
= 9.41176470588
Rn = 𝑀𝑛/(0,85×𝑏×𝑑²)
= 1.00906917647
ρ perlu = 1/𝑚 x (1 − √((1−2𝑚 𝑥
𝑅𝑛)/𝑓𝑦) )
= 0.00429110714
As = ρ perlu x b x d
= 536.388392441 mm2
ɑ = 𝑥 𝑓𝑦)/(0.85 𝑥 𝑓^′ 𝑐 𝑥 𝑏)
(𝐴𝑠
= 5.04836134062 mm
= 15766705.8824 Nmm
= 15.7667058824 kNm
Mn < Mn ada
13.4017 < 15.7667058824
Pelat Kuat
b. Tulangan Utama
Dipakai Tulangan D = 10 mm
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 6.82950912593
= 8 buah
Jarak Tulangan = b/n
= 125 mm
dipakai = 125 mm
Jadi digunakan Ø10 - 125 mm
= 2.04885273778
= 4 buah
Jarak Tulangan = b/n
= 250 mm
Jadi digunakan Ø10 - 250 mm
= 0.06450892857
ρ max = 75 % ρ bal
= 0.04838169643
ρ min = 0.002
m = 𝑓𝑦/(0,85×𝑓^′ 𝑐)
= 9.41176470588
Rn = 𝑀𝑛/(0,85×𝑏×𝑑²)
= 0.30997821351
As = ρ min x b x d
= 450 mm2
ɑ = 𝑥 𝑓𝑦)/(0.85 𝑥 𝑓^′ 𝑐 𝑥 𝑏)
(𝐴𝑠
= 4.23529411765 mm
= 24071294.1176 Nmm
= 24.0712941176 kNm
Mn < Mn ada
13.33875 < 24.0712941176
Pelat Kuat
e. Tulangan Utama
Dipakai Tulangan D = 10 mm
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 5.72957795131
= 8 buah
Jarak Tulangan = b/n
= 125 mm
dipakai = 125 mm
Jadi digunakan Ø10 - 125 mm
f. Tulangan Pembagi
Dipakai Tulangan D = 10 mm
As = 30% x As Tulangan Utama
= 135 mm2
= 1.71887338539
= 4 buah
Jarak Tulangan = b/n
= 250 mm
Jadi digunakan Ø10 - 250 mm
= 0.0003114411
ρ min = 0.002
As = ρ min x b x d
= 250 mm2
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 4.97359197162
= 6 buah
Jarak Tulangan = b/n
= 166.666666667 mm
dipakai = 150 mm
Jadi digunakan Ø8 - 150 mm
As = ρxbxd
= 720 mm2
1 Data
Perletakkan Tangga
Tinggi Antar Lantai = 400 cm
Lebar Tangga = 235 cm
Lebar Bordes = 170 cm
Panjang Bordes = 500 cm
Kemiringan Tangga (a ) = 38.66 ◦
tan a = 1.43106110067
Berat Jenis Beton = 2400 kg/m3
Berat Keramik = 24 kg/m2
Berat Spesi = 21 kg/m2
Berat Dinding = 250 kg/m2
Beban Hidup = 300 kg/m2
2 Perancanaan Tangga
Tinggi Antar Lantai = 400 cm
Rumus
2 Optrade + 1 Antrade = (60 - 65) cm
Lebar Anak Tangga =
(Antrede) 26 - 30 cm
Tinggi Anak Tinggi =
(Optrade) 16 - 20 cm
Optrade = 20 cm
Antrade = 30 cm
2 Optrade + 1 Antrade = (60 - 65) cm
70 = (60 - 65) cm
OK!
Jumlah Antrade
(Tinggi Antar = 19 buah
Lantai/Optrade)-1
= 19 buah (termasuk bordes)
Jumlah Optrade = 20 buah
Tinggi Antar Lantai
Jumlah Anak Tangga x = 400 cm
Optrade
Sisa = 0 cm
4 Pembebanan
a. Akibat Beban Mati (DL)
Berat Sendiri Beton = BJ Beton x H Pelat x 1 m
= 950.184447035 kg/m
Berat Keramik = 24 kg/m
Berat Spesi (2 cm) = 42 kg/m
qDL total = 1016.18444703 kg/m
7 Reaksi Kombinasi
Beban Ultimate = 1.2 DL + 1.6 LL
= 1699.42133644 kg/m
= 16.9942133644 kN/m
Q1 = 39.7177553778 kN
Q2 = 28.8901627195 kN
VA = 11.4249180386 kN
VB = 9.25181749749 kN
VC = 11.4249180386 kN
= 0.06450892857
ρ max = 75 % ρ bal
= 0.04838169643
ρ min = 0.002
m = 𝑓𝑦/(0,85×𝑓^′ 𝑐)
= 9.41176470588
Rn = 𝑀𝑛/(0,85×𝑏×𝑑²)
= 1.00906917647
ρ perlu = 1/𝑚 x (1 − √((1−2𝑚 𝑥
𝑅𝑛)/𝑓𝑦) )
= 0.00429110714
As = ρ perlu x b x d
= 536.388392441 mm2
ɑ = 𝑥 𝑓𝑦)/(0.85 𝑥 𝑓^′ 𝑐 𝑥 𝑏)
(𝐴𝑠
= 5.04836134062 mm
= 15766705.8824 Nmm
= 15.7667058824 kNm
Mn < Mn ada
13.4017 < 15.7667058824
Pelat Kuat
b. Tulangan Utama
Dipakai Tulangan D = 10 mm
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 6.82950912593
= 8 buah
Jarak Tulangan = b/n
= 125 mm
dipakai = 125 mm
Jadi digunakan Ø10 - 125 mm
= 2.04885273778
= 4 buah
Jarak Tulangan = b/n
= 250 mm
Jadi digunakan Ø10 - 250 mm
= 0.06450892857
ρ max = 75 % ρ bal
= 0.04838169643
ρ min = 0.002
m = 𝑓𝑦/(0,85×𝑓^′ 𝑐)
= 9.41176470588
Rn = 𝑀𝑛/(0,85×𝑏×𝑑²)
= 0.30997821351
As = ρ min x b x d
= 450 mm2
ɑ = 𝑥 𝑓𝑦)/(0.85 𝑥 𝑓^′ 𝑐 𝑥 𝑏)
(𝐴𝑠
= 4.23529411765 mm
= 24071294.1176 Nmm
= 24.0712941176 kNm
Mn < Mn ada
13.33875 < 24.0712941176
Pelat Kuat
e. Tulangan Utama
Dipakai Tulangan D = 10 mm
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 5.72957795131
= 8 buah
Jarak Tulangan = b/n
= 125 mm
dipakai = 125 mm
Jadi digunakan Ø10 - 125 mm
f. Tulangan Pembagi
Dipakai Tulangan D = 10 mm
As = 30% x As Tulangan Utama
= 135 mm2
= 1.71887338539
= 4 buah
Jarak Tulangan = b/n
= 250 mm
Jadi digunakan Ø10 - 250 mm
= 0.0003114411
ρ min = 0.002
As = ρ min x b x d
= 250 mm2
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 4.97359197162
= 6 buah
Jarak Tulangan = b/n
= 166.666666667 mm
dipakai = 150 mm
Jadi digunakan Ø8 - 150 mm
As = ρxbxd
= 720 mm2
1 Data
Perletakkan Tangga
Tinggi Antar Lantai = 400 cm
Lebar Tangga = 235 cm
Lebar Bordes = 170 cm
Panjang Bordes = 500 cm
Kemiringan Tangga (a ) = 38.66 ◦
tan a = 1.43106110067
Berat Jenis Beton = 2400 kg/m3
Berat Keramik = 24 kg/m2
Berat Spesi = 21 kg/m2
Berat Dinding = 250 kg/m2
Beban Hidup = 300 kg/m2
2 Perancanaan Tangga
Tinggi Antar Lantai = 400 cm
Rumus
2 Optrade + 1 Antrade = (60 - 65) cm
Lebar Anak Tangga =
(Antrede) 26 - 30 cm
Tinggi Anak Tinggi =
(Optrade) 16 - 20 cm
Optrade = 16 cm
Antrade = 25 cm
2 Optrade + 1 Antrade = (60 - 65) cm
57 = (60 - 65) cm
OK!
Jumlah Antrade
(Tinggi Antar = 24 buah
Lantai/Optrade)-1
= 24 buah (termasuk bordes)
Jumlah Optrade = 25 buah
Tinggi Antar Lantai
Jumlah Anak Tangga x = 400 cm
Optrade
Sisa = 0 cm
4 Pembebanan
a. Akibat Beban Mati (DL)
Berat Sendiri Beton = BJ Beton x H Pelat x 1 m
= 851.820372529 kg/m
Berat Keramik = 24 kg/m
Berat Spesi (2 cm) = 42 kg/m
qDL total = 917.820372529 kg/m
7 Reaksi Kombinasi
Beban Ultimate = 1.2 DL + 1.6 LL
= 1581.38444703 kg/m
= 15.8138444703 kN/m
Q1 = 36.9590749973 kN
Q2 = 26.8835355996 kN
VA = 10.6313762852 kN
VB = 8.60921302069 kN
VC = 10.6313762852 kN
= 0.06450892857
ρ max = 75 % ρ bal
= 0.04838169643
ρ min = 0.002
m = 𝑓𝑦/(0,85×𝑓^′ 𝑐)
= 9.41176470588
Rn = 𝑀𝑛/(0,85×𝑏×𝑑²)
= 1.00906917647
ρ perlu = 1/𝑚 x (1 − √((1−2𝑚 𝑥
𝑅𝑛)/𝑓𝑦) )
= 0.00429110714
As = ρ perlu x b x d
= 536.388392441 mm2
ɑ = 𝑥 𝑓𝑦)/(0.85 𝑥 𝑓^′ 𝑐 𝑥 𝑏)
(𝐴𝑠
= 5.04836134062 mm
= 15766705.8824 Nmm
= 15.7667058824 kNm
Mn < Mn ada
13.4017 < 15.7667058824
Pelat Kuat
b. Tulangan Utama
Dipakai Tulangan D = 10 mm
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 6.82950912593
= 8 buah
Jarak Tulangan = b/n
= 125 mm
dipakai = 125 mm
Jadi digunakan Ø10 - 125 mm
= 2.04885273778
= 4 buah
Jarak Tulangan = b/n
= 250 mm
Jadi digunakan Ø10 - 250 mm
= 0.06450892857
ρ max = 75 % ρ bal
= 0.04838169643
ρ min = 0.002
m = 𝑓𝑦/(0,85×𝑓^′ 𝑐)
= 9.41176470588
Rn = 𝑀𝑛/(0,85×𝑏×𝑑²)
= 0.30997821351
As = ρ min x b x d
= 450 mm2
ɑ = 𝑥 𝑓𝑦)/(0.85 𝑥 𝑓^′ 𝑐 𝑥 𝑏)
(𝐴𝑠
= 4.23529411765 mm
= 24071294.1176 Nmm
= 24.0712941176 kNm
Mn < Mn ada
13.33875 < 24.0712941176
Pelat Kuat
e. Tulangan Utama
Dipakai Tulangan D = 10 mm
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 5.72957795131
= 8 buah
Jarak Tulangan = b/n
= 125 mm
dipakai = 125 mm
Jadi digunakan Ø10 - 125 mm
f. Tulangan Pembagi
Dipakai Tulangan D = 10 mm
As = 30% x As Tulangan Utama
= 135 mm2
= 1.71887338539
= 4 buah
Jarak Tulangan = b/n
= 250 mm
Jadi digunakan Ø10 - 250 mm
= 0.0003114411
ρ min = 0.002
As = ρ min x b x d
= 250 mm2
Jumlah tulangan (n) = (𝐴𝑠 𝑝𝑒𝑟𝑙𝑢)/(1/4 𝜋"
" 𝐷2)
= 4.97359197162
= 6 buah
Jarak Tulangan = b/n
= 166.666666667 mm
dipakai = 150 mm
Jadi digunakan Ø8 - 150 mm
As = ρxbxd
= 720 mm2
MAX 564.78
MIN -619.33
Kombinasi
Live 0 -202.44
Live 0.4583 -11.14
Live 0.9167 117.13
Live 1.375 182.38
Live 1.8333 184.6
Live 2.2917 123.81
Live 2.75 0
MAX 184.6
MIN -202.44
TABLE: Element Forces - Braces TABLE: Element Forces - Braces
Story Brace Output Case Station M3 Story Brace
m kgf-m
MAX 622.26
MIN -309.67
Kombinasi
Live 0 -101.22
Live 1.5052 203.39
Live 3.0104 0
Live 0 0
Live 1.5052 203.39
Live 3.0104 -101.22
MAX 203.39
MIN -101.22