Data Teknis
Tebal multiplek = 1.5 cm
Lebar Balok = 100 cm
Tinggi Balok = 200 cm
BJ Beton = 2600 kg/m3
BJ Kayu = 750 kg/m3
Beban Hidup = 100 kg/m2
Jarak antar hollow bodeman = 20 cm
Jarak perancah x = 100 cm
Jarak perancah y = 100 cm
Berat pekerja = 150 kg/m2
Pehitungan Beban
Berat Balok (W1) = 5200 kg/m
Berat menumpuknya beton (W2) = 1560 kg/m
Selfweigth plywood = 56.25 kg/m
Berat Pekerja = 150 kg/m
Berat Total = 6966.25 kg/m
Perhitungan lendutan
q = 69.6625 kg/cm2
E = 125000 kg/cm2
I = 28.125 cm4
= 0.0171 cm
Syarat (δ terjadi ) < (δ izin) = AMAN
Safety Factor = 1.345774269
Analisis Kekuatan Hollow Bodeman
Pehitungan Beban
Berat Beton (W1) = 1040 kg/m
Berat menumpuknya beton = 312 kg/m
Berat plywood = 56.25 kg/m
Selfweight hollow 4 kg/m
Berat pekerja = 150 kg/m
Berat Total = 1562.25 kg/m
Perhitungan lendutan
q = 15.6225 kg/cm
E = 2100000 kg/cm2
I = 20.85 cm4
= 0.007 cm
Syarat (δ terjadi ) < (δ izin) = AMAN
Safety Factor = 5.548041972
Analisis Kekuatan Suri-suri
Pehitungan Beban
Berat Beton (W1) = 2600 kg/m
Berat menumpuknya beton = 780 kg/m
Berat plywood = 28.125 kg/m
Berat hollow = 20.04 kg/m
Berat suri2 = 7.00 kg/m
Selfweight hollow gelagar = 10 kg/m
Berat pekerja = 150.00 kg/m
Berat Total = 3595.17 kg/m
Perhitungan lendutan
q = 35.95165 kg/cm
E = 2100000 kg/cm2
I = 182.71 cm4
= 0.122 cm
Syarat (δ terjadi ) < (δ izin) = AMAN
Safety Factor = 2.51324209