Asumsi Pembebanan
1. γ Beton : 2,800 kg/m³
2. Shock Load (vibrator, dll) : 100 kg/m²
3. Mountain Load : 7.5%
4. Beban Hidup : 250 kg/m²
5. Ukuran Balok : 3 m x 1.25 m
B. Kalkulasi Pembebanan
1. Beban mati (Dead Load)
4. Beban Kombinasi
Beban Kombinasi : 1 DL + 1 LL + 1 SW
KONTROL MATERIAL
A. Plywood Kontrol (Phenolich 15 mm)
jarak plywood = 26 cm
ketentuan ijin :
f = L 26 cm 26 cm 26 cm 26 cm
400 A B C D E
= 260
400
= 0.65 mm
3
Ix = 1/12 x b x h
3
= 0.083333333 x 100 x 1.5
= 28.125 cm4
Wx = Ix
0,5h
= 37.5 cm3
Pembebanan
- Beban Mati (DL) : 3,863 kg/m² x 1 m = 3,862.5 Kg/m'
- Beban Hidup (LL) : 250 kg/m² x 1 m = 250 Kg/m'
- Beban Sendiri (SW) : 9 kg/m² x 1 m = 9 Kg/m'
4,121.5 Kg/m'
Sehingga :
2
# M max = 1/10 x ql
2
= 0.1 x 4122 x 0.26
= 27.86134 Kgm
= 2786.134 Kgcm
Teg. Ijin = M
Wx
= 2786.1
37.5
= 74.29690667 Kg/cm2 < 100 Kg/cm2 …………………………… Ok!!
# D max = 5/8 x ql
= 0.625 x 3862.5 x 0.26
= 627.66 kg