ANALISA KEKUATAN PIER HEAD KK4 DENGAN PENGECORAN 2 TAHAP

Data Perencanaan :
- Kuat tekan beton (f'c) = 29.25 MPa
- Tegangan leleh baja (fy) = 420 MPa
- modulus elastisitas baja (Es) = 200000 MPa
- β1 = 0.84 → f'c > 28 Mpa

Dimensi Struktur :
- Tebal pier head (h) = 1100 mm
- Panjang pier head (L) = 8500 mm
- Lebar pier head (B) = 7500 mm
- Diameter kolom Luar (OD) = 6000 mm
- Diameter kolom dalam (ID) = 4000 mm
- Selimut beton (p) = 40 mm
- Lebar pelat (b) = 1000 mm → Diambil per m
- Diameter Tulangan (D) = 32 mm
- dx = h-p-(Ø.tul/2) = 1044 mm

Data beban-beban dari PPIUG 1983 dan SNI 1727-2013 :


- Berat isi beton bertulang = 24 kN/m³
- Beban hidup = 2.40 kN/m² → ACI-347

A. Beban yang Bekerja


1.1. Beban Mati (WDL)
- Berat sendiri pelat = BI.h = 26.4 kN/m²
- Berat beton basah I = BI.t.120% = 107.42 kN/m²
- Berat beton basah II = BI.t.120% = 31.68 kN/m² +
Wdl total = 165.50 kN/m²
1.2. Beban Hidup (WLL)
- Beban Hidup = 2.40 kN/m²

Beban rencana terfaktor (Wu) = 1,2WDL+1,6WLL


= 202.44 kN/m²

B. Cek Kekuatan Pier Head


2.1. Cek Terhadap Geser Lentur/One Way Action
a. Penampang kritis aksi geser 1 arah sejauh "d" dari muka kolom
-X = 1.62 m
- A kritis = 6.78 m²
b. Gaya geser rencana
- Vu = qu . A kritis = 1373.41 kN
c. Kuat geser 1 arah
- Vc = = 7057.87 kN

d. Periksa apakah pondasi kuat memikul gaya geser


- Ф (faktor reduksi geser) = 0.75
Syarat :
Vu < Ф.Vc
1373.41 < 5293.40 kN
OK
2.2. Cek Terhadap Geser Pons/ Two Way Action
a. Penampang kritis aksi geser 2 arah sejauh "d/2" dari muka kolom
- A kritis = 24.78 m²

b. Gaya geser rencana


- Vu = qu . A kritis = 5016.62 kN
c. Kuat geser aksi 2 arah
- bo = 22.13 m
β1 = b kolom/h kolom = 1.0
Vc1 = = 62474481.18 N
= 62474.48 kN
- αs untuk kolom sudut = 20
Vc 2 = = 30649377.40 N
= 30649.38 kN
- Vc 3 = = 41649654.12 N
= 41649.65 kN
Jadi, Vc ambil yang terkecil = 30649.38 kN
d. Periksa apakah pondasi kuat memikul gaya geser
- Ф (faktor reduksi geser) = 0.75
Syarat :
Vu < Ф.Vc
5016.62 < 22987.03 kN
Ok
2.3. Kontrol Terhadap Area Tumpuan
a. Penampang kritis lentur tepat di muka kolom
- Lc = 2.67 m

b. Momen ultimate area tumpuan


- Qu = 202.44 kN/m²
- Tributary Area = 1.00 m
- Qu = 202.44 kN/m
- Mu = -(1/2).qu.Lc² = -721.60 kN.m
- Ф (faktor reduksi lentur) = 0.9

b. Momen nominal tumpuan


- (As') = 8042.48 mm²
- Diameter tulangan pokok tarik (D) = 25 mm
- Jarak sengkang (S) = 200 mm
- Tinggi selimut beton area tertarik (p) = 40 mm
- (As) = 2454.37 mm²
- d = tinggi slab - p - D/2 = 1048 mm
- d' = 56 mm
- C = (600/(600+fy)).d = 616.18 mm
- a = β1.C = 518.25 mm
- εs' = εc.(C-d')/C = 0.00273
- Fs' = Es.εs' = 545.5 MPa → Sudah leleh, gunakan Fy
- Mn = (As.Fy.(d-a/2))+(As'.Fs'.(a/2-d')) = 1498806600.19 N.mm
= 1498.81 kN.m
Kontrol :
Mn.Φ ≥ Mu
1348.93 ≥ 721.60 kN.m
Ok

2.4. Kontrol Terhadap Lendutan Area Tumpuan


- Lebar slab (b) = 1000 mm
- Tebal slab (h) = 1100 mm
- Modulus elastisitas beton (Ec) = 25419.14 MPa
- Modulus elastisitas baja (Es) = 200000 MPa
- Panjang slab (Lx) = 2670 mm
- Lendutan izin = Lx/240 = 11.1 mm
- Momen inersia bruto slab (Ig) = 1.10917E+11 mm³
- Modulus keruntuhan lentur beton (fr) = 3.79 MPa
- Nilai perbandingan modulus elastisitas (n) = Es/Ec = 7.87
- As ada = 8042.48 mm²
- Tinggi garis netral (c) = (n.As)/b = 63.28 mm
- Momen inersia penampang retak (Icr) = 337843726.01 mm⁴
Icr = ((1/3).b.c³) + (n.As.(dx-c)²)
- yt = h/2 = 550 mm
- Momen crack (Mcr) = (fr.Ig)/yt = 763475482.6 N.mm
- Momen maksimum akibat beban tanpa faktor (Ma) = 598485412.8 N.mm
Ma = (1/2).Q.Lx²
- Inersia efektif = 2.29898E+11 mm⁴
Ie = (Mcr/Ma)³.Ig + [1-(Mcr/Ma)³].Icr
- Lendutan elastis seketika = 0.02 mm
δe = (5.Q.Lx⁴)/(384.Ec.Ie)
- Rasio tulangan slab (ρ) = As'/(b.d'x) = 0.14362
- Faktor ketergantungan waktu (jangka waktu > 1 bulan)
z = 1.0
λ = ξ/(1+50.ρ) = 0.12
- Lendutan jangka panjang akibat rangkak dan susut = 0.00 mm
δg = (λ.5.Q.Lx⁴)/(384.Ec.Ie)
- Lendutan total (δ) = δe + δg = 0.02 mm
Kontrol :
δ izin ≥ δ
11.1 ≥ 0.02 mm
Ok
2.5. Kontrol Terhadap Area Lapangan
a. Momen ultimate area lapangan
-L = 4.00 m
- Mu = (1/8).qu.L² = 404.89 kN.m
- Ф (faktor reduksi lentur) = 0.9

b. Momen nominal lapangan


- (As') = 0.00 mm²
- (As) = 8042.48 mm²
-d = 1044 mm
- a= = 135.86 mm

- Mn = As.Fy.(d-a/2) = 3297007261.70 N.mm


= 3297.01 kN.m
Kontrol :
Mn.Φ ≥ Mu
2967.31 ≥ 404.89 kN.m
Ok