Anda di halaman 1dari 7

ANALISA PONDASI TELAPAK

Reff : M. Noer Ilham

1. Data Struktur
Data Pondasi Telapak
1 Dimensi Kolom bx = 400 mm
by = 400 mm
Tinggi pedestal hp = 2100 mm
Posisi Kolom αs = 40
(dalam = 40, tepi = 30, sudut = 20)
2 Dimensi Pondasi Bx = 2.20 m
By = 2.20 m
ht = 0.40 m
3 Mutu Beton fc' = 20 Mpa
4 Mutu Baja fy' = 390 Mpa
5 Besi tulangan D = 16 mm
(dipakai)
6 BJ Beton γc = 24 kN/m3

Data Tanah :
1 Berat tanah γt = 17.6 kN/m3
2 Tebal tanah diatas z = 2.10 m
footing
3. Nilai Tahanan sondir qc = 95 kg/cm2

Data Beban :
1 Gaya aksial Pu = 500.00 KN
2 Gaya lateral arah X Fux = 40.00 KN
3 Gaya lateral arah Y Fuy = 40.00 KN
4 Momen arah X Mux = 100.00 KNm
5 Momen arah Y Muy = 100.00 KNm

2. Perhitungan Berat Pondasi dan Tanah


1 Berat Pedestal Wpedestal = 8.06 KN
2 Berat Footing Wfooting = 46.46 KN
3 Berat Tanah Wtanah = 172.97 KN
Total Beban = 227.50 KN
3. Daya Dukung Tanah dengan Data Sondir
Kapasitas dukung tanah menurut Meyerhof (1956) :
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd ( dalam kg/cm2)
dengan, Kd = 1 + 0.33 * Df / B harus £ 1.33

qc = tahanan konus rata-rata hasil sondir pada dasar fondasi ( kg/cm 2 )


B = lebar fondasi (m) Bx = By = 2.20 m
Df = Kedalaman fondasi (m) Df = 2.50 m
Kd = 1 + 0.33 * Df / B = 1.38 > 1.33
diambil, Kd = 1.33
Tahanan konus rata-rata hasil sondir pada dasar fondasi, qc = 95 kg/cm2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd = 4.94 kg/cm2
Kapasitas dukung ijin tanah, qa = 494.42 kN/m2

4. Kontrol Tegangan Tanah


Luas dasar foot plat, A = B x * By = 4.84 m2
Tahanan momen arah x, Wx = 1/6 * By * Bx2 = 1.77466667 m3
Tahanan momen arah y, Wy = 1/6 * Bx * By2 = 1.77466667 m3
Tinggi tanah di atas foot plat, z= 2.10 m
Tekanan akibat berat foot plat dan tanah, q = 47.0042975 kN/m2
Eksentrisitas pada fondasi :
ex = {Mux + (Fy.z)} / (Pu + Wp)
ey = {Muy + (Fx.z)} / (Pu + Wp)
ex = 0.253 m < Bx / 6 = 0.367 m (OK)
ey =
0.253 m < By / 6 = 0.367 m (OK)
Tegangan tanah maksimum yang terjadi pada dasar fondasi :
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 263.007303 kN/m2
qmax < qa AMAN (OK)
Tegangan tanah minimum yang terjadi pada dasar fondasi :
qmin = Pu / A - Mux / Wx - Muy / Wy + q = 37.6128625 kN/m2
qmin > 0 tak terjadi teg.tarik (OK)

5. Kontrol Terhadap Gaya Geser


a. Geser Arah X

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.058 m


Tebal efektif foot plat, d = h - d' = 0.342 m
Jarak bid. kritis terhadap sisi luar foot plat, ax = ( B x - b x - d ) / 2 = 0.729 m
Tegangan tanah pada bidang kritis geser arah x,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 188.320 kN/m2
Gaya geser arah x, Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 286.534 kN
Lebar bidang geser untuk tinjauan arah x, b = By = 2200 mm
Tebal efektif footplat, d= 342 mm
Rasio sisi panjang thd. sisi pendek kolom, b c = bx / b y =
1.0000
Kuat geser foot plat arah x, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 1121.612 kN
Diambil, kuat geser foot plat, Vc = 1121.612 kN
Faktor reduksi kekuatan geser, f = 0.75
Kuat geser foot plat, f * Vc = 841.209 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vux
841.209 > 286.534 AMAN (OK)

b. Geser Arah Y

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.074 m


Tebal efektif foot plat, d = h - d' = 0.326 m
Jarak bid. kritis terhadap sisi luar foot plat, ay = ( B y - b y - d ) / 2 = 0.737 m
Tegangan tanah pada bidang kritis geser arah y,
qy = qmin + (By - ay) / By * (qmax - qmin) = 187.500 kN/m2
Gaya geser arah y, Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 289.014 kN
Lebar bidang geser untuk tinjauan arah y, b = Bx = 2200 mm
Tebal efektif footplat, d= 326 mm
Rasio sisi panjang thd. sisi pendek kolom, b c = bx / b y =
1.0000
Kuat geser foot plat arah y, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 1069.139 kN
Diambil, kuat geser foot plat, Vc = 1069.139 kN
Faktor reduksi kekuatan geser, f = 0.75
Kuat geser foot plat, f * Vc = 801.854 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vux
801.854 > 289.014 AMAN (OK)

c. Geser Dua Arah (Pons)


Jarak pusat tulangan terhadap sisi luar beton, d' = 0.074 m
Tebal efektif foot plat, d = h - d' = 0.33 m
Lebar bidang geser pons arah x, cx = bx + 2 * d = 0.726 m
Lebar bidang geser pons arah y, cy = by + 2 * d = 0.726 m
Gaya geser pons yang terjadi,
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 445.550 kN
Luas bidang geser pons, Ap = 2 * ( cx + cy ) * d = 0.947 m2
Lebar bidang geser pons, bp = 2 * ( cx + cy ) = 2.904 m
Rasio sisi panjang thd. sisi pendek kolom, b c = bx / b y = 1.0000
Tegangan geser pons, diambil nilai terkecil dari f p yang diperoleh dari pers.sbb. :
fp = [ 1 + 2 / bc ] * √ fc' / 6 = 2.236 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 2.419 MPa
fp = 1 / 3 * √ fc' = 1.491 MPa
Tegangan geser pons yang disyaratkan, fp = 1.491 MPa
Faktor reduksi kekuatan geser pons, f = 0.75
Kuat geser pons, f * Vnp = f * Ap * fp * 103 = 1058.45 kN
Syarat : f * Vnp ≥ Vup
1058.447 > 445.550 AMAN (OK)
f * Vnp ≥ Pu
1058.447 > 500.000 AMAN (OK)

6. Penulangan Pondasi
a. Tulangan Arah X
Jarak tepi kolom terhadap sisi luar foot plat, ax = ( B x - b x ) / 2 = 0.900 m
Tegangan tanah pada tepi kolom,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 170.800 kN/m2
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 165.073 kNm
Lebar plat fondasi yang ditinjau, b = By = 2200 mm
Tebal plat fondasi, h= 400 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 58 mm
Tebal efektif plat, d = h - d' = 342 mm
Kuat tekan beton, fc' = 20 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02245532
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 5.299
Mn = Mux / f = 206.342 kNm
Rn = Mn * 10 / ( b * d ) =
6 2
0.80188
Rn < Rmax (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0021
Rasio tulangan minimum, rmin = 1,4/fy = 0.0036
Rasio tulangan yang digunakan, r= 0.0036
Luas tulangan yang diperlukan, As = r * b * d = 2700.92 mm2
Diameter tulangan yang digunakan, D 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As =
2
164 mm
Syarat jarak tulangan (1) 2*h = 800 mm
Syarat jarak tulangan (2) smax = 450 mm
Jarak tulangan yang digunakan, s= 164 mm
Digunakan tulangan, D 16 - 160
Luas tulangan terpakai, As = p / 4 * D2 * b / s = 2764.60 mm2

b. Tulangan arah Y
Jarak tepi kolom terhadap sisi luar foot plat, ay = ( B y - b y ) / 2 = 0.900 m
Tegangan tanah pada tepi kolom,
qy = qmin + (By - ay) / By * (qmax - qmin) = 170.800 kN/m2
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 165.073 kNm
Lebar plat fondasi yang ditinjau, b = Bx = 2200 mm
Tebal plat fondasi, h= 400 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 74 mm
Tebal efektif plat, d = h - d' = 326 mm
Kuat tekan beton, fc' = 20 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02245532
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 5.299
Mn = Muy / f = 206.342 kNm
Rn = Mn * 106 / ( b * d2 ) = 0.88253
Rn < Rmax (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0023
Rasio tulangan minimum, rmin = 1,4/fy = 0.0036
Rasio tulangan yang digunakan, r= 0.0036
Luas tulangan yang diperlukan, As = r * b * d = 2574.56 mm2
Diameter tulangan yang digunakan, D 16 mm
Jarak tulangan yang diperlukan, s = p / 4 * D2 * b / As = 172 mm
Syarat jarak tulangan (1) 2*h = 800 mm
Syarat jarak tulangan (2) smax = 450 mm
Jarak tulangan yang digunakan, s= 172 mm
Digunakan tulangan, D 16 - 170
Luas tulangan terpakai, As = p / 4 * D * b / s = 2601.98
2
mm2

Anda mungkin juga menyukai