ANALISA PONDASI TELAPAK

1. Data Struktur
Data Pondasi Telapak
1 Dimensi Kolom bx = 300 mm
by = 500 mm
Tinggi pedestal hp = 0 mm
Posisi Kolom αs = 40
(dalam = 40, tepi = 30, sudut = 20)
2 Dimensi Pondasi Bx = 2.00 m
By = 2.00 m
ht = 0.50 m
3 Mutu Beton fc' = 24.9 Mpa
4 Mutu Baja fy' = 390 Mpa
5 Besi tulangan D = 16 mm
(dipakai)
6 BJ Beton γc = 24 kN/m3

Data Tanah :
1 Berat tanah γt = 19.6 kN/m3
2 Tebal tanah diatas z = 0.85 m
footing
3. Nilai Tahanan sondir qc = 48 kg/cm2 4707.168 kN/m2

Data Beban :
1 Gaya aksial Pu = 485.36 KN
2 Gaya lateral arah X Fux = 11.41 KN
3 Gaya lateral arah Y Fuy = 7.85 KN
4 Momen arah X Mux = 61.06 KNm
5 Momen arah Y Muy = 25.64 KNm

2. Perhitungan Berat Pondasi dan Tanah


1 Berat Pedestal Wpedestal = 0.00 KN
2 Berat Footing Wfooting = 48.00 KN
3 Berat Tanah Wtanah = 64.08 KN
Total Beban = 112.08 KN
3. Daya Dukung Tanah dengan Data Sondir
Kapasitas dukung tanah menurut Meyerhof (1956) :
2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd ( dalam kg/cm )
dengan, Kd = 1 + 0.33 * Df / B harus  1.33

qc = tahanan konus rata-rata hasil sondir pada dasar fondasi ( kg/cm 2 )


B = lebar fondasi (m) Bx = By = 2.00 m
Df = Kedalaman fondasi (m) Df = 1.35 m
Kd = 1 + 0.33 * Df / B = 1.22 < 1.33
diambil, Kd = 1.22275
2
Tahanan konus rata-rata hasil sondir pada dasar fondasi, qc = 48 kg/cm
2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd = 2.35 kg/cm
2
Kapasitas dukung ijin tanah, qa = 235.21 kN/m
53.3361987
4. Kontrol Tegangan Tanah
Luas dasar foot plat, A = B x * By = 4 m2
3
Wx = 1/6 * By * Bx = 1.33333333 m
2
Tahanan momen arah x,
3
Tahanan momen arah y, Wy = 1/6 * Bx * By2 = 1.33333333 m
Tinggi tanah di atas foot plat, z= 0.85 m
2
Tekanan akibat berat foot plat dan tanah, q = 28.0188875 kN/m
Eksentrisitas pada fondasi :
ex = {Mux + (Fy.z)} / (Pu + Wp)
ey = {Muy + (Fx.z)} / (Pu + Wp)
ex = 0.113 m < Bx / 6 = 0.333 m (OK)
ey = 0.059 m < By / 6 = 0.333 m (OK)
Tegangan tanah maksimum yang terjadi pada dasar fondasi :
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 233.042868 kN/m2
qmax < qa AMAN (OK)
Tegangan tanah minimum yang terjadi pada dasar fondasi :
2
qmin = Pu / A - Mux / W x - Muy / W y + q = 84.3291625 kN/m
qmin > 0 tak terjadi teg.tarik (OK)

5. Kontrol Terhadap Gaya Geser


a. Geser Arah X

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.058 m


Tebal efektif foot plat, d = h - d' = 0.442 m
Jarak bid. kritis terhadap sisi luar foot plat, ax = ( Bx - bx - d ) / 2 = 0.629 m
Tegangan tanah pada bidang kritis geser arah x,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 186.272 kN/m2
Gaya geser arah x, Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 228.502 kN
Lebar bidang geser untuk tinjauan arah x, b = By = 2000 mm
Tebal efektif footplat, d= 442 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 0.6000
Kuat geser foot plat arah x, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 1470.384 kN
Diambil, kuat geser foot plat, Vc = 1470.384 kN
Faktor reduksi kekuatan geser, f = 0.75
Kuat geser foot plat, f * Vc = 1102.788 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vux
1102.788 > 228.502 AMAN (OK)

b. Geser Arah Y

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.074 m


Tebal efektif foot plat, d = h - d' = 0.426 m
Jarak bid. kritis terhadap sisi luar foot plat, ay = ( By - by - d ) / 2 = 0.537 m
Tegangan tanah pada bidang kritis geser arah y,
qy = qmin + (By - ay) / By * (qmax - qmin) = 193.113 kN/m2
Gaya geser arah y, Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 198.754 kN
Lebar bidang geser untuk tinjauan arah y, b = Bx = 2000 mm
Tebal efektif footplat, d= 426 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 0.6000
Kuat geser foot plat arah y, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 1417.157 kN
Diambil, kuat geser foot plat, Vc = 1417.157 kN
Faktor reduksi kekuatan geser, f = 0.75
Kuat geser foot plat, f * Vc = 1062.868 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vux
1062.868 > 198.754 AMAN (OK)

c. Geser Dua Arah (Pons)


Jarak pusat tulangan terhadap sisi luar beton, d' = 0.074 m
Tebal efektif foot plat, d = h - d' = 0.43 m
Lebar bidang geser pons arah x, cx = bx + 2 * d = 0.726 m
Lebar bidang geser pons arah y, cy = by + 2 * d = 0.926 m
Gaya geser pons yang terjadi,
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 434.824 kN
2
Luas bidang geser pons, Ap = 2 * ( c x + c y ) * d = 1.408 m
Lebar bidang geser pons, bp = 2 * ( cx + cy ) = 3.304 m
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 0.6000
Tegangan geser pons, diambil nilai terkecil dari fp yang diperoleh dari pers.sbb. :
fp = [ 1 + 2 / bc ] * √ fc' / 6 = 3.604 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 2.976 MPa
fp = 1 / 3 * √ fc' = 1.663 MPa
Tegangan geser pons yang disyaratkan, fp = 1.663 MPa
Faktor reduksi kekuatan geser pons, f = 0.75
Kuat geser pons, f * Vnp = f * Ap * fp * 103 = 1755.86 kN
Syarat : f * Vnp ≥ Vup
1755.858 > 434.824 AMAN (OK)
f * Vnp ≥ Pu
1755.858 > 485.365 AMAN (OK)

6. Penulangan Pondasi
a. Tulangan Arah X
Jarak tepi kolom terhadap sisi luar foot plat, ax = ( Bx - bx ) / 2 = 0.850 m
Tegangan tanah pada tepi kolom,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 169.840 kN/m2
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 132.908 kNm
Lebar plat fondasi yang ditinjau, b = By = 2000 mm
Tebal plat fondasi, h= 500 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 58 mm
Tebal efektif plat, d = h - d' = 442 mm
Kuat tekan beton, fc' = 25 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02795688
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6.598
Mn = Mux / f = 166.135 kNm
6 2
Rn = Mn * 10 / ( b * d ) = 0.42519
Rn < Rmax (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0011
Rasio tulangan minimum, rmin = 1,4/fy = 0.0036
Rasio tulangan yang digunakan, r= 0.0036
Luas tulangan yang diperlukan, As = r * b * d = 3173.33 mm2
Diameter tulangan yang digunakan, D 16 mm
2
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As = 127 mm
Syarat jarak tulangan (1) 2*h = 1000 mm
Syarat jarak tulangan (2) smax = 450 mm
Jarak tulangan yang digunakan, s= 127 mm
Digunakan tulangan, D 16 - 120
Luas tulangan terpakai,
2
As = p / 4 * D * b / s = 3351.03 mm2

b. Tulangan arah Y
Jarak tepi kolom terhadap sisi luar foot plat, ay = ( By - by ) / 2 = 0.750 m
Tegangan tanah pada tepi kolom,
2
qy = qmin + (By - ay) / By * (qmax - qmin) = 177.275 kN/m
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 104.870 kNm
Lebar plat fondasi yang ditinjau, b = Bx = 2000 mm
Tebal plat fondasi, h= 500 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 74 mm
Tebal efektif plat, d = h - d' = 426 mm
Kuat tekan beton, fc' = 25 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02795688
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6.598
Mn = Muy / f = 131.087 kNm
Rn = Mn * 106 / ( b * d2 ) = 0.36117
Rn < Rmax (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0009
Rasio tulangan minimum, rmin = 1,4/fy = 0.0036
Rasio tulangan yang digunakan, r= 0.0036
Luas tulangan yang diperlukan, As = r * b * d = 3058.46 mm2
Diameter tulangan yang digunakan, D 16 mm
2
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As = 131 mm
Syarat jarak tulangan (1) 2*h = 1000 mm
Syarat jarak tulangan (2) smax = 450 mm
Jarak tulangan yang digunakan, s= 131 mm
Digunakan tulangan, D 16 - 130
Luas tulangan terpakai,
2
As = p / 4 * D * b / s = 3093.26 mm2
1 Penurunan Pondasi Dangkal (Ste
q
B
E
µ
Ip
Si
Penurunan Pondasi Dangkal (Steinbrenner 1934)
233.0429 kN/m2
2.00 m
9414.336 kN/m2
0.4
0.82
0.034101 m
3.41 cm < 5 cm (OK)
ANALISA PONDASI TELAPAK

1. Data Struktur
Data Pondasi Telapak
1 Dimensi Kolom bx = 300 mm
by = 500 mm
Tinggi pedestal hp = 350 mm
Posisi Kolom αs = 40
(dalam = 40, tepi = 30, sudut = 20)
2 Dimensi Pondasi Bx = 2.00 m
By = 4.00 m
ht = 0.50 m
3 Mutu Beton fc' = 24.9 Mpa
4 Mutu Baja fy' = 390 Mpa
5 Besi tulangan D = 16 mm
(dipakai)
6 BJ Beton γc = 24 kN/m3

Data Tanah :
1 Berat tanah γt = 17.6 kN/m3
2 Tebal tanah diatas z = 0.85 m
footing
3. Nilai Tahanan sondir qc = 48 kg/cm2

Data Beban :
1 Gaya aksial Pu = 609.61 KN
2 Gaya lateral arah X Fux = 11.92 KN
3 Gaya lateral arah Y Fuy = 26.92 KN
4 Momen arah X Mux = 55.79 KNm
5 Momen arah Y Muy = 26.37 KNm

2. Perhitungan Berat Pondasi dan Tanah


1 Berat Pedestal Wpedestal = 1.26 KN
2 Berat Footing Wfooting = 96.00 KN
3 Berat Tanah Wtanah = 117.44 KN
Total Beban = 214.70 KN
3. Daya Dukung Tanah dengan Data Sondir
Kapasitas dukung tanah menurut Meyerhof (1956) :
2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd ( dalam kg/cm )
dengan, Kd = 1 + 0.33 * Df / B harus  1.33

qc = tahanan konus rata-rata hasil sondir pada dasar fondasi ( kg/cm 2 )


B = lebar fondasi (m) Bx = By = 4.00 m
Df = Kedalaman fondasi (m) Df = 1.35 m
Kd = 1 + 0.33 * Df / B = 1.11 < 1.33
diambil, Kd = 1.111375
2
Tahanan konus rata-rata hasil sondir pada dasar fondasi, qc = 48 kg/cm
2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd = 1.87 kg/cm
2
Kapasitas dukung ijin tanah, qa = 186.81 kN/m
11.6757521 KN
4. Kontrol Tegangan Tanah
Luas dasar foot plat, A = B x * By = 8 m2
3
Wx = 1/6 * By * Bx = 2.66666667 m
2
Tahanan momen arah x,
3
Tahanan momen arah y, Wy = 1/6 * Bx * By2 = 5.33333333 m
Tinggi tanah di atas foot plat, z= 0.85 m
2
Tekanan akibat berat foot plat dan tanah, q = 26.837 kN/m
Eksentrisitas pada fondasi :
ex = {Mux + (Fy.z)} / (Pu + Wp)
ey = {Muy + (Fx.z)} / (Pu + Wp)
ex = 0.095 m < Bx / 6 = 0.333 m (OK)
ey = 0.044 m < By / 6 = 0.667 m (OK)
Tegangan tanah maksimum yang terjadi pada dasar fondasi :
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 128.902925 kN/m2
qmax < qa AMAN (OK)
Tegangan tanah minimum yang terjadi pada dasar fondasi :
2
qmin = Pu / A - Mux / W x - Muy / W y + q = 77.17355 kN/m
qmin > 0 tak terjadi teg.tarik (OK)

5. Kontrol Terhadap Gaya Geser


a. Geser Arah X

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.058 m


Tebal efektif foot plat, d = h - d' = 0.442 m
Jarak bid. kritis terhadap sisi luar foot plat, ax = ( Bx - bx - d ) / 2 = 0.629 m
Tegangan tanah pada bidang kritis geser arah x,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 112.634 kN/m2
Gaya geser arah x, Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 236.332 kN
Lebar bidang geser untuk tinjauan arah x, b = By = 4000 mm
Tebal efektif footplat, d= 442 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 0.6000
Kuat geser foot plat arah x, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 2940.767 kN
Diambil, kuat geser foot plat, Vc = 2940.767 kN
Faktor reduksi kekuatan geser, f = 0.75
Kuat geser foot plat, f * Vc = 2205.576 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vux
2205.576 > 236.332 AMAN (OK)

b. Geser Arah Y

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.074 m


Tebal efektif foot plat, d = h - d' = 0.426 m
Jarak bid. kritis terhadap sisi luar foot plat, ay = ( By - by - d ) / 2 = 1.537 m
Tegangan tanah pada bidang kritis geser arah y,
qy = qmin + (By - ay) / By * (qmax - qmin) = 109.026 kN/m2
Gaya geser arah y, Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 283.200 kN
Lebar bidang geser untuk tinjauan arah y, b = Bx = 2000 mm
Tebal efektif footplat, d= 426 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 0.6000
Kuat geser foot plat arah y, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 1417.157 kN
Diambil, kuat geser foot plat, Vc = 1417.157 kN
Faktor reduksi kekuatan geser, f = 0.75
Kuat geser foot plat, f * Vc = 1062.868 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vux
1062.868 > 283.200 AMAN (OK)

c. Geser Dua Arah (Pons)


Jarak pusat tulangan terhadap sisi luar beton, d' = 0.074 m
Tebal efektif foot plat, d = h - d' = 0.43 m
Lebar bidang geser pons arah x, cx = bx + 2 * d = 0.726 m
Lebar bidang geser pons arah y, cy = by + 2 * d = 0.926 m
Gaya geser pons yang terjadi,
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 558.382 kN
2
Luas bidang geser pons, Ap = 2 * ( c x + c y ) * d = 1.408 m
Lebar bidang geser pons, bp = 2 * ( cx + cy ) = 3.304 m
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 0.6000
Tegangan geser pons, diambil nilai terkecil dari fp yang diperoleh dari pers.sbb. :
fp = [ 1 + 2 / bc ] * √ fc' / 6 = 3.604 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 2.976 MPa
fp = 1 / 3 * √ fc' = 1.663 MPa
Tegangan geser pons yang disyaratkan, fp = 1.663 MPa
Faktor reduksi kekuatan geser pons, f = 0.75
Kuat geser pons, f * Vnp = f * Ap * fp * 103 = 1755.86 kN
Syarat : f * Vnp ≥ Vup
1755.858 > 558.382 AMAN (OK)
f * Vnp ≥ Pu
1755.858 > 609.610 AMAN (OK)

6. Penulangan Pondasi
a. Tulangan Arah X
Jarak tepi kolom terhadap sisi luar foot plat, ax = ( Bx - bx ) / 2 = 0.850 m
Tegangan tanah pada tepi kolom,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 106.918 kN/m2
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 136.896 kNm
Lebar plat fondasi yang ditinjau, b = By = 4000 mm
Tebal plat fondasi, h= 500 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 58 mm
Tebal efektif plat, d = h - d' = 442 mm
Kuat tekan beton, fc' = 25 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02795688
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6.598
Mn = Mux / f = 171.120 kNm
6 2
Rn = Mn * 10 / ( b * d ) = 0.21898
Rn < Rmax (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0006
Rasio tulangan minimum, rmin = 1,4/fy = 0.0036
Rasio tulangan yang digunakan, r= 0.0036
Luas tulangan yang diperlukan, As = r * b * d = 6346.67 mm2
Diameter tulangan yang digunakan, D 16 mm
2
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As = 127 mm
Syarat jarak tulangan (1) 2*h = 1000 mm
Syarat jarak tulangan (2) smax = 450 mm
Jarak tulangan yang digunakan, s= 127 mm
Digunakan tulangan, D 16 - 120
Luas tulangan terpakai,
2
As = p / 4 * D * b / s = 6702.06 mm2

b. Tulangan arah Y
Jarak tepi kolom terhadap sisi luar foot plat, ay = ( By - by ) / 2 = 1.750 m
Tegangan tanah pada tepi kolom,
2
qy = qmin + (By - ay) / By * (qmax - qmin) = 106.271 kN/m
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 289.474 kNm
Lebar plat fondasi yang ditinjau, b = Bx = 2000 mm
Tebal plat fondasi, h= 500 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 74 mm
Tebal efektif plat, d = h - d' = 426 mm
Kuat tekan beton, fc' = 25 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02795688
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6.598
Mn = Muy / f = 361.842 kNm
Rn = Mn * 106 / ( b * d2 ) = 0.99694
Rn < Rmax (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0026
Rasio tulangan minimum, rmin = 1,4/fy = 0.0036
Rasio tulangan yang digunakan, r= 0.0036
Luas tulangan yang diperlukan, As = r * b * d = 3058.46 mm2
Diameter tulangan yang digunakan, D 16 mm
2
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As = 131 mm
Syarat jarak tulangan (1) 2*h = 1000 mm
Syarat jarak tulangan (2) smax = 450 mm
Jarak tulangan yang digunakan, s= 131 mm
Digunakan tulangan, D 16 - 130
Luas tulangan terpakai,
2
As = p / 4 * D * b / s = 3093.26 mm2
1 Penurunan Pondasi Dangkal (Ste
q
B
E
µ
Ip
Si
Penurunan Pondasi Dangkal (Steinbrenner 1934)
128.9029 kN/m2
4.00 m
9414.336 kN/m2
0.4
0.82
0.037725 m
3.77 cm < 5 cm (OK)
ANALISA PONDASI TELAPAK

1. Data Struktur
Data Pondasi Telapak
1 Dimensi Kolom bx = 300 mm
by = 300 mm
Tinggi pedestal hp = 0 mm
Posisi Kolom αs = 40
(dalam = 40, tepi = 30, sudut = 20)
2 Dimensi Pondasi Bx = 1.10 m
By = 1.10 m
ht = 0.50 m
3 Mutu Beton fc' = 24.9 Mpa
4 Mutu Baja fy' = 390 Mpa
5 Besi tulangan D = 16 mm
(dipakai)
6 BJ Beton γc = 24 kN/m3

Data Tanah :
1 Berat tanah γt = 19.6 kN/m3
2 Tebal tanah diatas z = 0.85 m
footing
3. Nilai Tahanan sondir qc = 48 kg/cm2 4707.168 kN/m2

Data Beban :
1 Gaya aksial Pu = 152.58 KN
2 Gaya lateral arah X Fux = 6.51 KN
3 Gaya lateral arah Y Fuy = 5.58 KN
4 Momen arah X Mux = 11.73 KNm
5 Momen arah Y Muy = 16.81 KNm

2. Perhitungan Berat Pondasi dan Tanah


1 Berat Pedestal Wpedestal = 0.00 KN
2 Berat Footing Wfooting = 14.52 KN
3 Berat Tanah Wtanah = 18.64 KN
Total Beban = 33.16 KN
3. Daya Dukung Tanah dengan Data Sondir
Kapasitas dukung tanah menurut Meyerhof (1956) :
2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd ( dalam kg/cm )
dengan, Kd = 1 + 0.33 * Df / B harus  1.33

qc = tahanan konus rata-rata hasil sondir pada dasar fondasi ( kg/cm 2 )


B = lebar fondasi (m) Bx = By = 1.10 m
Df = Kedalaman fondasi (m) Df = 1.35 m
Kd = 1 + 0.33 * Df / B = 1.41 > 1.33
diambil, Kd = 1.33
2
Tahanan konus rata-rata hasil sondir pada dasar fondasi, qc = 48 kg/cm
2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd = 3.13 kg/cm
2
Kapasitas dukung ijin tanah, qa = 313.36 kN/m
71.0576843
4. Kontrol Tegangan Tanah
Luas dasar foot plat, A = B x * By = 1.21 m2
3
Wx = 1/6 * By * Bx = 0.22183333 m
2
Tahanan momen arah x,
3
Tahanan momen arah y, Wy = 1/6 * Bx * By2 = 0.22183333 m
Tinggi tanah di atas foot plat, z= 0.85 m
2
Tekanan akibat berat foot plat dan tanah, q = 27.4050909 kN/m
Eksentrisitas pada fondasi :
ex = {Mux + (Fy.z)} / (Pu + Wp)
ey = {Muy + (Fx.z)} / (Pu + Wp)
ex = 0.089 m < Bx / 6 = 0.183 m (OK)
ey = 0.120 m < By / 6 = 0.183 m (OK)
Tegangan tanah maksimum yang terjadi pada dasar fondasi :
qmax = Pu / A + Mux / Wx + Muy / Wy + q = 306.709762 kN/m2
qmax < qa AMAN (OK)
Tegangan tanah minimum yang terjadi pada dasar fondasi :
2
qmin = Pu / A - Mux / W x - Muy / W y + q = 24.8541067 kN/m
qmin > 0 tak terjadi teg.tarik (OK)

5. Kontrol Terhadap Gaya Geser


a. Geser Arah X

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.058 m


Tebal efektif foot plat, d = h - d' = 0.442 m
Jarak bid. kritis terhadap sisi luar foot plat, ax = ( Bx - bx - d ) / 2 = 0.179 m
Tegangan tanah pada bidang kritis geser arah x,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 260.844 kN/m2
Gaya geser arah x, Vux = [ qx + ( qmax - qx ) / 2 - q ] * ax * By = 50.480 kN
Lebar bidang geser untuk tinjauan arah x, b = By = 1100 mm
Tebal efektif footplat, d= 442 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 1.0000
Kuat geser foot plat arah x, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 808.711 kN
Diambil, kuat geser foot plat, Vc = 808.711 kN
Faktor reduksi kekuatan geser, f = 0.75
Kuat geser foot plat, f * Vc = 606.533 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vux
606.533 > 50.480 AMAN (OK)

b. Geser Arah Y

Jarak pusat tulangan terhadap sisi luar beton, d' = 0.074 m


Tebal efektif foot plat, d = h - d' = 0.426 m
Jarak bid. kritis terhadap sisi luar foot plat, ay = ( By - by - d ) / 2 = 0.187 m
Tegangan tanah pada bidang kritis geser arah y,
qy = qmin + (By - ay) / By * (qmax - qmin) = 258.794 kN/m2
Gaya geser arah y, Vuy = [ qy + ( qmax - qy ) / 2 - q ] * ay * Bx = 52.525 kN
Lebar bidang geser untuk tinjauan arah y, b = Bx = 1100 mm
Tebal efektif footplat, d= 426 mm
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 1.0000
Kuat geser foot plat arah y, diambil nilai terkecil dari V c yang diperoleh dari pers.sbb. :
Vc = 1 / 3 * √ fc' * b * d * 10-3 = 779.436 kN
Diambil, kuat geser foot plat, Vc = 779.436 kN
Faktor reduksi kekuatan geser, f = 0.75
Kuat geser foot plat, f * Vc = 584.577 kN
Syarat yang harus dipenuhi,
f * Vc ≥ Vux
584.577 > 52.525 AMAN (OK)

c. Geser Dua Arah (Pons)


Jarak pusat tulangan terhadap sisi luar beton, d' = 0.074 m
Tebal efektif foot plat, d = h - d' = 0.43 m
Lebar bidang geser pons arah x, cx = bx + 2 * d = 0.726 m
Lebar bidang geser pons arah y, cy = by + 2 * d = 0.726 m
Gaya geser pons yang terjadi,
Vup = ( Bx * By - cx * cy ) * [ ( qmax + qmin ) / 2 - q ] = 94.501 kN
2
Luas bidang geser pons, Ap = 2 * ( c x + c y ) * d = 1.237 m
Lebar bidang geser pons, bp = 2 * ( cx + cy ) = 2.904 m
Rasio sisi panjang thd. sisi pendek kolom, bc = bx / by = 1.0000
Tegangan geser pons, diambil nilai terkecil dari fp yang diperoleh dari pers.sbb. :
fp = [ 1 + 2 / bc ] * √ fc' / 6 = 2.495 MPa
fp = [ as * d / bp + 2 ] * √ fc' / 12 = 3.272 MPa
fp = 1 / 3 * √ fc' = 1.663 MPa
Tegangan geser pons yang disyaratkan, fp = 1.663 MPa
Faktor reduksi kekuatan geser pons, f = 0.75
Kuat geser pons, f * Vnp = f * Ap * fp * 103 = 1543.28 kN
Syarat : f * Vnp ≥ Vup
1543.284 > 94.501 AMAN (OK)
f * Vnp ≥ Pu
1543.284 > 152.584 AMAN (OK)

6. Penulangan Pondasi
a. Tulangan Arah X
Jarak tepi kolom terhadap sisi luar foot plat, ax = ( Bx - bx ) / 2 = 0.400 m
Tegangan tanah pada tepi kolom,
qx = qmin + (Bx - ax) / Bx * (qmax - qmin) = 204.217 kN/m2
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Mux = 1/2 * ax2 * [ qx + 2/3 * ( qmax - qx ) - q ] * By = 21.572 kNm
Lebar plat fondasi yang ditinjau, b = By = 1100 mm
Tebal plat fondasi, h= 500 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 58 mm
Tebal efektif plat, d = h - d' = 442 mm
Kuat tekan beton, fc' = 25 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02795688
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6.598
Mn = Mux / f = 26.965 kNm
6 2
Rn = Mn * 10 / ( b * d ) = 0.12548
Rn < Rmax (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0003
Rasio tulangan minimum, rmin = 1,4/fy = 0.0036
Rasio tulangan yang digunakan, r= 0.0036
Luas tulangan yang diperlukan, As = r * b * d = 1745.33 mm2
Diameter tulangan yang digunakan, D 16 mm
2
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As = 127 mm
Syarat jarak tulangan (1) 2*h = 1000 mm
Syarat jarak tulangan (2) smax = 450 mm
Jarak tulangan yang digunakan, s= 127 mm
Digunakan tulangan, D 16 - 120
Luas tulangan terpakai,
2
As = p / 4 * D * b / s = 1843.07 mm2

b. Tulangan arah Y
Jarak tepi kolom terhadap sisi luar foot plat, ay = ( By - by ) / 2 = 0.400 m
Tegangan tanah pada tepi kolom,
2
qy = qmin + (By - ay) / By * (qmax - qmin) = 204.217 kN/m
Momen yang terjadi pada plat fondasi akibat tegangan tanah,
Muy = 1/2 * ay2 * [ qy + 2/3 * ( qmax - qy ) - q ] * Bx = 21.572 kNm
Lebar plat fondasi yang ditinjau, b = Bx = 1100 mm
Tebal plat fondasi, h= 500 mm
Jarak pusat tulangan thd. sisi luar beton, d' = 74 mm
Tebal efektif plat, d = h - d' = 426 mm
Kuat tekan beton, fc' = 25 MPa
Kuat leleh baja tulangan, fy = 390 MPa
Modulus elastis baja, Es = 2.00E+05 MPa
Faktor distribusi teg. beton, b1 = 0.85
rb = b1* 0.85 * fc’/ fy * 600 / ( 600 + fy ) = 0.02795688
Faktor reduksi kekuatan lentur, f = 0.80
Rmax = 0.75 * rb * fy * [1-½*0.75* rb * fy / ( 0.85 * fc’ ) ] = 6.598
Mn = Muy / f = 26.965 kNm
Rn = Mn * 106 / ( b * d2 ) = 0.13508
Rn < Rmax (OK)
Rasio tulangan yang diperlukan,
r = 0.85 * fc’ / fy * [ 1 - Ö {1 – 2 * Rn / ( 0.85 * fc’ ) } ] = 0.0003
Rasio tulangan minimum, rmin = 1,4/fy = 0.0036
Rasio tulangan yang digunakan, r= 0.0036
Luas tulangan yang diperlukan, As = r * b * d = 1682.15 mm2
Diameter tulangan yang digunakan, D 16 mm
2
Jarak tulangan yang diperlukan, s = p / 4 * D * b / As = 131 mm
Syarat jarak tulangan (1) 2*h = 1000 mm
Syarat jarak tulangan (2) smax = 450 mm
Jarak tulangan yang digunakan, s= 131 mm
Digunakan tulangan, D 16 - 130
Luas tulangan terpakai,
2
As = p / 4 * D * b / s = 1701.29 mm2