L2 = M/F= 4,828 m
Jlh momen thd titik S = ΣMs = 0 maka F * (2*L2) = H * (L2 + Ld + La)
Gaya lateral H= F * (2 * L2) / (L2 + Ld + La) = 15350,22 kN
Jlh baris tiang ny = 5 bh
Jlh tiang per baris nx = 4 bh
Gaya lateral satu tiang bor h= H / (nx * ny) = 767,51106 kN
Angka aman SF = 1,2
Daya dukung ijin lateral tiang bor hijin = h / SF = 639,59 kN
diambil daya dukung lateral ijin tiang bor hijin = 630,00 kN
mit
r= X /2 = 0,9 m r= Y /2 = 0,9 m
ambil r = 0,9 m
hp = 1,2 m ht = 1,8 m L1 = 3,1 m
Tebal bid kritis geser pons h= hp + (r+a) / L1 * (ht - hp) = 1,57 m
h= 1567,74 mm
Tebal eff bidang kritis geser pons d= h - d' = 1467,74 mm
Pjg total bid kritis Lv = (2 * (r + a) + π / 2 * r) * 10^3 = 5213,7167 mm
Luas bid kritis geserpons Av = Lv * h = 8173762,3 mm2
Gaya geser pons nominal Pn = Av * fv = 12236098 N
Kapasitas geser pons ϕ * Pn = 7341,6586 kN
Reaksi ultimit satu tiang bor Pumax = 1176,2221 kN
Pumax = 1176,222 kN < ϕ * Pn = 7341,6586 kN OK