TUGAS 2 Pondasi Dangkal Beban Eksentris 2 arah data CPT

DIKETAHUI
ϒb = 1,45 ton/m3
ϒw = 1,0 ton/m3
ϒsat lempung = 1,8 ton/m3
ϒbeton bertulang = 2,4 ton/m3
ϒbeton tak bertulang = 1,8 ton/m3
dw = 1,2 m
df = 2,0 m
H = 5,2 m
qc = 30 kg/cm2
qo1 = 2,600 ton/m3
qo2 = 0,25 ton/m2
ex = 0,4 m
ey = 0,55 m
N = 12 ton

Trial&Error
L = 3,75 m
B = 2,45 m
LA = 1,1 m
LB = 0,70 m
t1 = 0,6 m
t2 = 0,25 m
lk = 0,1 m
ML = 4 ton.m
MB = 2,5 ton.m
ML = 0,00 m
A (Luas Conus) = 10 cm2
T = 1,3 m
z = 0,0 m

Karena MAT merupakan kasus B dimana MAT terletak diatas df.


Maka nilai berat volume yang dipakai adalah ϒ'
ϒ' = 0,80 ton/m3

Uraian Perhitungan
Menghitung Berat Pondasi
i. Volume plat pondasi rata = 2,296875 m3
Berat pondasi = 5,513 ton
ii. Volume pondasi limas terpancung = 1,472 m3
Berat pondasi = 3,533 ton
iii. Volume kolom pendek = 1,001 m3
Berat kolom = 2,402 ton
Jadi berat pondasi = 11,448 ton
Menghitung Tanah Urug
Volume urugan = 12,686 m3
Berat Urugan = 10,149 ton
Menghitung qo1
Tebal lantai = 0,03 m
qo1 = 0,078 ton/m2
Akibat qo1 = 0,65657 ton
Menghitung qo2
qo2 = 0,25 ton/m2
Akibat qo2 = 2,297 ton
Beban Akibat Konstruksi (N) = 12 ton
Menghitung Beban Lantai Kerja = 1,65375 ton

Menghitung qn :
Berat Pondasi = 11,448 ton
Berat Tanah Urug = 10,149 ton
Beban qo1 = 0,657 ton
Beban Berguna qo2 = 2,297 ton
Beban Akibat Konstruksi (N) = 12,00 ton
Beban Lantai Kerja (lk) = 1,654 ton
∑V = 38,204 ton
Menghitung qmax dan q min
ex/B = 0,163  
Re = 0,5  
B' = 1,650 m
L' = 2,65 m
       
i. Qmax dan qmin arah L      
qmax = 10,809 ton/m2
qmin = 6,666 ton/m2
ii. Qmax dan qmin arah B      
qmax = 6,448 ton/m2
qmin = 2,290 ton/m2
Menghitung Conus
SF = 2,5    
A conus = 10 cm2
qs = 1,2 kg/cm2  
  = 12 ton/m2  
qs>qmax       AMAN
Selisih antara qs
dan qmax = 11,023 % AMAN
Menghitung Tegangan Efektif Tanah (Po')
1.Po'1 = 10,041 ton/m2
2. Po'2 = 11,425 ton/m2
2. Po'3 = 12,809 ton/m2
Menghitung Yegangan Tanah (σv) Memakai Metode Perbandingan
2v:1H
σv1 = 2,497 ton/m2
σv2 = 1,193 ton/m2
σv3 = 0,698 ton/m2
qc1 = 32,778 kg/cm2
  = 327,78 ton/m2
qc2 = 46,667 kg/cm2
  = 466,67 ton/m2
qc3 = 167,778 kg/cm2
  = 1677,78 ton/m2
C1 = 4896,375  
C2 = 6126,678  
C3 = 19646,966  
Menghitung Penurunan
z1 = 0,865 m
z2 = 2,595 m
z3 = 4,325 m
∆h1 = 1,73 m
∆h2 = 1,73 m
∆h3 = 1,73 m
Menghitung Besar Penurunan
P1 = 0,00008 m
  = 0,00785 cm
P2 = 2,8E-05 m
  = 0,00281 cm
P3 = 4,7E-06 m
  = 0,00047 cm

Jadi pondasi akan mengalami penurunan


sedalam penurunan total sebesar:      
Penurunan total = 0,01112 cm
LAMPIRAN TABEL DAN DATA CPT
Lampiran 1. Data CPT SD Al-Anwar Pasuruan
Lampiran 2. Berat Sendiri Bangunan dan Konstruksi
Lampiran 3. Muatan Hidup Lantai Bangunan

Lampiran 4. Faktor Aman yang Disarankan (Reese & O’neill, 1989)


Lampiran 5. Pembebanan Eksentris pada Pondasi Memanjang

Anda mungkin juga menyukai