Tugas 3
PERENCANAAN PONDASI DANGKAL PERSEGI PANJANG BEBAN
EKSENTRIS DUA ARAH DATA TANAH CONE PENETRATION TEST (CPT)
OLEH
NISVI ASARI
NIM 160523610892
OFF D
1. Diketahui : Data CPT Sample 2 (S2) Masjid SMA Sholahudin Malang (Terlampir)
γb = 1,5 ton/m3
γw = 1,0 ton/m3
γsat lempung = 1,70 ton/m3
γbeton bertulang = 2,4 ton/m3
γbeton tak bertulang = 1,8 ton/m3
Df = 1,00 m
Dw = 1,50 m
H = 4,20 m
qc = 25 kg/m2
q01 = Beban penutup lantai granit tebal 4 cm
Granit / batu alam = 2600 kg/m3 , (PMI 1970)
q02 = Beban berguna masjid = 400 kg/m2 , (PMI 1970)
ex = 0,3 m
ey = 0,6 m
N = 15 ton
ML = 4,0 ton.m
MB = 2,5 ton.m
A (Luas Connus) = 10 cm2
T = 0,7 m
3. Penyelesaian :
3.1 Dicoba : L = 4,40 m
B = 3,00 m
LA = 0,90 m
LB = 0,60 m
t1 = 0,60 m
t2 = 0,30 m
LK = 0,10 m
1
3.2 Gambar Data Tanah CPT
Vi = B . L . t2
= 3,00 . 4,40 . 0,30
= 3,960 m3
3
ii. Volume Pondasi Limas Terpancung
= 1,745 m3
Viii = LA . LB . T
= 0,90 . 0,60 . 0,47
= 0,378 m3
4
Jadi, berat pondasi = berat i + berat ii + berat iii
= 9,504 + 4,187 + 0,907
= 14,598 ton
Berat = V urugan . γ’
= 11,077 . 0,9
= 9,970 ton
4. Menghitung q02 = Beban berguna untuk masjid = 400 kg/m2, (PMI 1970)
400 kg/m2 = 0,40 ton/m2
Akibat Akibat q02 = q02 . B . L
= 0,40 . 3,0 . 4,4
= 5,28 ton
Memanjang)
B’ = B – (2 . ex) L’ = L – (2 . ey)
= 3,0 – (2 . 0,3) = 4,4 – (2 . 0,6)
= 2,4 m = 3,2 m
qmax = + qmin = -
= + = -
6
2) qmax dan qmin Arah B
qmax = + qmin = -
= + = -
c. Menghitung qs
A = 10 cm2
7
SF = 3,0 , untuk masjid/bangunan monumental dan kontrol normal, (Tabel
2.6
Faktor Aman yang disarankan ( Reese & O’neil, 1989))
qs =
= 0,833 kg/cm2
= 8,333 ton/m2 > qmax = 7,297 ton/m2 (AMAN)
Presentase =( ) . 100%
=( ) . 100%
8
3.3 Perhitungan Penurunan
= 2,199 ton/m2
σv2 =
= 1,045 ton/m2
9
qc1 =
= 28,182 kg/cm2
= 281,82 ton/m2
qc2 =
= 71,818 kg/cm2
= 718,18 ton/m2
C1 = . qc1
= . 281,82
= 4690,746
C2 = . qc2
= . 718,18
= 8985,487
ρ1 = . In
= . In
= 0,00048 . In 1,244
= 0,0000978 m
= 0,00978 cm
10
ρ2 = . In
= . In
= 0,000234 . In 1,087
= 0,0000195 m
= 0,00195 cm
11
Lampiran 1. Perhitungan Excel
12
13
14
Lampiran 2. Berat Sendiri Bahan Bangunan dan Konstruksi
15
Lampiran 3. Muatan Hidup Lantai Bangunan
16
Lampiran 4. Faktor Aman yang disarankan (Reese dan O’neill, 1989)
Tabel 2.6 Faktor Aman yang disarankan (Reese dan O’neill, 1989)
Klasifikasi Faktor Aman
Struktur
Kontrol Baik Kontrol Normal Kontrol Jelek Kontrol
Sangat Jelek
17
Lampiran 5. Pembebanan Eksentris pada Pondasi Memanjang
18
Lampiran 6. Data CPT Masjid SMA Sholahudin – Malang
19