THEORETICAL ELONGATION PEMILIK PROYEK

TENDON SEQUENCE OF TENDON JACKING ULTIMATE AT ACTIVE STRESSING END TOTAL LENGTH KETERANGAN :
STAGE NO. IN (mm) SEMUA SATUAN DINYATAKAN
NO. STRESSING TYPE FORCE (N) FORCE (N) (mm) DALAM MILIMETER, KEMENTERIAN PERHUBUNGAN
BEGIN END KECUALI DISEBUTKAN LAIN PADA GAMBAR.
1 5 16 T 15 3.095.784 4.127.712 78 - 13.747 DIREKTORAT JENDERAL PERKERETAAPIAN
2 3 16 T 15 3.095.784 4.127.712 - 78 13.747 fc' (MPa)
STAGE-1 Element Struktur
3 1 16 T 15 3.095.784 4.127.712 78 - 13.747 Precast Cast in-situ DIREKTORAT PRASARANA PERKERETAAPIAN
CABLES
4 2 16 T 15 3.095.784 4.127.712 - 78 13.747
Kolom Pier 41.5 33.2
5 4 16 T 15 3.095.784 4.127.712 78 - 13.747
Pilecap 29
PHT 29
Bored Pile - 29
Spun Pile 50 -
Slab dan parapet 29 -
Lean Concrete - 10.4
Mutu baja tulangan : fy = 400 MPa
BJTD-40
Balok 50 MPa GEDUNG KARYA LANTAI 11
A 750 Pjack 15.478.920 N JL. MEDAN MERDEKA BARAT N0.8 JAKARTA 10110

300 450 DISETUJUI OLEH

NAMA JABATAN TANDA TANGAN


B C
PEJABAT PEMBUAT KOMITMEN
JUMARDI, ST.MT.
300 PEMBANGUNAN PRASARANA
11x50=550 NIP.19690306 199803 1 002
LRT JABODEBEK

375
PERUSAHAAN PEMOHON
300

300

B C
A

PT ADHI KARYA (Persero) Tbk.


JL. RAYA PASAR MINGGU KM.18 JAKARTA12510, INDONESIA

PROYEK
PERCEPATAN PENYELENGGARAAN
KERETA API RINGAN / LIGHT RAIL TRANSIT
TERINTEGRASI DI WILAYAH
JAKARTA, BOGOR , DEPOK DAN BEKASI

2F 23-10-18 FOR CONSTRUCTION WITH NOTE


REV TANGGAL DESKRIPSI

DISETUJUI OLEH TANGGAL TANDA TANGAN

ERY SATRIADI
MANAGER
DIVISI CIVIL & TRACKWORK LRT

DIPERIKSA OLEH

SYAMSUL HIDAYAT
MANAGER BIRO
DIVISI CIVIL & TRACKWORK LRT

DIBUAT OLEH

KONSULTAN PERENCANA 23-10-18

JUDUL GAMBAR

DETAIL ANGKUR LIVE END & DEAD END

SKALA UKURAN DISIPLIN NO.REV

1 : 25
A3 SIPIL REV.2F
1 : 50
NOMOR GAMBAR TANGGAL LEMBAR

LRT-CV-ST-DW-L3-BT001-03_2F 23-10-2018 5/8