00
6
450.00 450.00 900.00
100.00 100.00
1 5
500.00
8
4
TM 1
Min 15°
POSISI BELOKAN DENGAN
GUY WIRE
Max 30°
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pc 1 1
WILAYAH SUMBAR BS = Tiang Besi
2. Arm Brace Besi L.40.40.4 pc 1 1 BT = Tiang Beton
3. Bolt & Nut M. 16x300 + Washer set 2 -
4. Bolt & Nut M. 16x50 + Washer pc 1 3
KONSTRUKSI TIANG
5. Line Post Insulator 20 kV pcs 3 3 PENYANGGA
6. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 4,5/3 4,5/3 GAMBAR NO.
7. Band For Arm Brace pc - 1 PARAF TANGGAL KODE KONSTRUKSI
8. U-Bolt / Beugle pc - 1 DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-1
1800.00
6
800.00 800.00
100.00
1
3
4
TM 1BS
Min 15°
POSISI BELOKAN DENGAN
GUY WIRE
Max 30°
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Cross Arm UNP 100.50.6.1800/UNP 80.45.5.1800 pc - 1
WILAYAH SUMBAR BS = Tiang Besi
2. Arm Brace Besi L.40.40.4.2000 pc - 2 BT = Tiang Beton
3. U-Bolt / Beugle set - 1
4. Bolt & Nut M. 16x50 + Washer pc - 4
KONSTRUKSI TIANG
5. Line Post Insulator 20 kV pcs - 3 PENYANGGA
6. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls - 4,5/3 GAMBAR NO.
7. Band For Arm Brace pc - 1 PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-1B(S)
1800.00
6
800.00 800.00
100.00
1
3
4
TM 1BT
Min 15°
POSISI BELOKAN DENGAN
GUY WIRE
Max 30°
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Cross Arm UNP 100.50.6.1800/UNP 80.45.5.1800 pc 1 -
WILAYAH SUMBAR BS = Tiang Besi
2. Arm Brace Besi L.40.40.4.2000 pc 2 - BT = Tiang Beton
3. Bolt & Nut M. 16x300 + Washer set 2 -
4. Bolt & Nut M. 16x50 + Washer pc 2 -
KONSTRUKSI TIANG
5. Line Post Insulator 20 kV pcs 3 - PENYANGGA
6. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 4,5/3 - GAMBAR NO.
7. Centre Breacket / Centre Pin pc 1 - PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-1B(T)
2400.00
6
800.00 800.00
100.00
1
8
3 4
TM 1C
Min 15°
POSISI BELOKAN DENGAN
GUY WIRE
Max 30°
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Cross Arm UNP 100.50.6.2400/UNP 80.45.5.2400 pc 1 1
WILAYAH SUMBAR BS = Tiang Besi
2. Arm Brace Besi L.40.40.4.2000 pc 1 1 BT = Tiang Beton
3. Bolt & Nut M. 16x300 + Washer set 2 -
4. Bolt & Nut M. 16x50 + Washer pc 1 3
KONSTRUKSI TIANG
5. Line Post Insulator 20 kV pcs 3 3 PENYANGGA
6. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 4,5/3 4,5/3 GAMBAR NO.
7. Band For Arm Brace pc - 1 PARAF TANGGAL KODE KONSTRUKSI
8. U-Bolt / Beugle pc - 1 DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-1C
2000.00
6
450.00 450.00 900.00
100.00 100.00
1
5
500.00
4
3
GUY WIRE 7
TM 2
Max 45°
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 2 2
WILAYAH SUMBAR BS = Tiang Besi
2. Arm Brace Besi L.40.40.4 pcs 2 2 BT = Tiang Beton
3. Double Arm Bolt & Nut M. 16x300 + Washer set 4 4
4. Bolt & Nut M. 16x50 + Washer pcs 2 4
KONSTRUKSI TIANG
5. Line Post Insulator 20 kV pcs 6 6 PENYANGGA GANDA
6. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 9/3 9/3 GAMBAR NO.
7. Band For Arm Brace pc - 1 PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-2
2400.00
6
800.00 800.00
100.00
4
3
2
GUY WIRE
TM 2C
Max 45°
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Cross Arm UNP 100.50.6.2400/UNP 80.45.5.2400 pcs 2 2
WILAYAH SUMBAR BS = Tiang Besi
2. Arm Brace Besi L.40.40.4.2000 pcs 2 2 BT = Tiang Beton
3. Double Arm Bolt & Nut M. 16x300 + Washer set 4 4
4. Bolt & Nut M. 16x50 + Washer pcs 2 4
KONSTRUKSI TIANG
5. Line Post Insulator 20 kV pcs 6 6 PENYANGGA GANDA
6. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 9/3 9/3 GAMBAR NO.
7. Band For Arm Brace pc - 1 PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-2C
HV Band Strap
20 kV Tension Disc Insulator
Strain Clamp
Conductor
Ball Clevis
2000.00
900.00 550.00
100.00 100.00 6
9
3
1 11 12
510.00
2 8 5
7
4 GUY WIRE
10
13
TM 4
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. String Insulator 20 kV Komplit Accesories set 3 3
2. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 2 2
3. Double Arm Bolt & Nut M. 16x300 + Washer set 3 4 CATATAN
4. Arm Brace Besi L.40.40.4 pcs 4 4 PT PLN (PERSERO)
5. Ball Clevis pcs 3 3 BS = Tiang Besi
WILAYAH SUMBAR
6. Cross Arm Clevis set 3 3 BT = Tiang Beton
7. Bolt & Nut M. 16x50 + Washer set 4 4
8. Socket Eye pcs 3 3 KONSTRUKSI TIANG AKHIR
9. Strain Clamp/Preformed Termination set 3 3
10. Band For Arm Brace pc - 1 GAMBAR NO.
11. Bolt & Nut M 16x 250 For Guy pc 1 - PARAF TANGGAL KODE KONSTRUKSI
12. Band For Guy pc - 1 DIGAMBAR : BUYUNG SOFIARTO M
1
510.00
3 2
13 8
7
4 5 12
10
TM 5
900.00 500.00
5 100.00
11
6 7 8 9 2
3
4
10
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. Line Post Insulator 20 kV pcs 4 4
2. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 3 3
3. Double Arm Bolt & Nut M. 16x300 + Washer pcs 3 4 CATATAN
4. Arm Brace Besi L.40.40.4 pcs 5 5 PT PLN (PERSERO)
5. Bolt & Nut M. 16x50 + Washer set 5 5 BS = Tiang Besi
WILAYAH SUMBAR
6. String Insulator 20 kV set 3 3 BT = Tiang Beton
7. Ball Clevis & Socket Eye pcs 3 3
8. Cross Arm Clevis set 3 3
KONSTRUKSI TIANG
9. Bolt & Nut M. 16x250 + Washer set 2 - PENCABANGAN
10. Band For Arm Brace set - 2 GAMBAR NO.
11. Strain Clamp/Preformed Termination set 3 3 PARAF TANGGAL KODE KONSTRUKSI
12. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 6/4 6/4 DIGAMBAR : BUYUNG SOFIARTO M
13.
14.
Tap Connector / H type Joint 35 – 240 mm pcs 3 3 DIRENCANA
DIPERIKSA
: REN SIS
:
TM-8
11 TM 10
12
2000.00
1
900.00 800.00 9
100.00
2000.00
10 7 6 5 8
5
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. Line Post Insulator 20 kV pcs 2 2
2. Arm Brace Besi L.40.40.4 pcs 8 8
3. Band For Arm Brace set 1 2 CATATAN
4. String Insulator 20 kV set 6 6 PT PLN (PERSERO)
5. Bolt & Nut M. 16x140 + Washer set 6 6 BS = Tiang Besi
WILAYAH SUMBAR
6. Cross Arm Clevis set 6 6 BT = Tiang Beton
7. Ball Clevis & Socket Eye pcs 6 6
8. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 4 4 KONSTRUKSI TIANG BELOKAN
9. Double Arm Bolt & Nut M. 16x300 + Washer pcs 7 8
10. Strain Clamp/Preformed Termination set 6 6 GAMBAR NO.
11. Tap Connector / Non Tension Joint 35 – 240 mm pcs 3 3 PARAF TANGGAL KODE KONSTRUKSI
12. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 3/2 3/2 DIGAMBAR : BUYUNG SOFIARTO M
13.
14.
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-10
2000.00
900.00
100.00 6
12 11 8
3
4 GUY WIRE
5
17
16
10
15
TM
11
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. String Insulator 20 kV set 3 3
2. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 4 4
3. Double Arm Bolt & Nut M. 16x300 + Washer pcs 6 8
4. Arm Brace Besi L.40.40.4 pcs 8 8
5. Band For Arm Brace set 1 2
6. Cross Arm Clevis set 3 3
7. Bolt & Nut M. 16x50 + Washer set 8 8 CATATAN
8. Ball Clevis & Socket Eye pcs 3 3 PT PLN (PERSERO)
9. Lightning Arrester + Mounting Bracket set 3 3
WILAYAH SUMBAR BS = Tiang Besi
10. Cable Band + Nut & Washer set 2 2 BT = Tiang Beton
11. Strain Clamp/Preformed Termination set 3 3
12. Connector Al / Cu pcs 3 3
KONSTRUKSI TIANG AKHIR &
13. Cable Schoen pcs 6 6 CABLE HEAD TERMINATION
14. Copper Conductor 50 mm2 for jumper Mtr 4,5 4,5 GAMBAR NO.
15. Pipa Galvanized 3" / 4" + Clamp Pipa Btg/set 1/3 1/3 PARAF TANGGAL KODE KONSTRUKSI
16. Grounding LA / Body Cable set 1/1 1/1 DIGAMBAR : BUYUNG SOFIARTO M
17.
18.
Cable Termination + Clamp Kabel set 3 3 DIRENCANA
DIPERIKSA
: REN SIS
:
TM-11
2000.00
9
8
450.00 450.00 900.00
100.00 100.00
10
12
6
1
2
13
14
TM 12
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. Arm Brace Besi L.40.40.4 pcs 5 5
2. Band For Arm Brace set 1 2
3. Double Arm Bolt & Nut M. 16x300 + Washer pcs 3 4 CATATAN
4. Bolt & Nut M. 16x50 + Washer set 5 5 PT PLN (PERSERO)
5. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 3 3 BS = Tiang Besi
WILAYAH SUMBAR
6. Lightning Arrester + Mounting Bracket set 3 3 BT = Tiang Beton
7. Line Post Insulator 20 kV pcs 3 3
8. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pcs 4,5/3 4,5/3
KONSTRUKSI PENCABANGAN
9. Connector Al / Cu pcs 3 3 TIANG DENGAN KABEL TANAH
10. Cable Schoen pcs 3 3 GAMBAR NO.
11. Copper Conductor 50 mm2 for jumper Mtr 4,5 4,5 PARAF TANGGAL KODE KONSTRUKSI
12. Cable Termination + Clamp Kabel set 3 3 DIGAMBAR : BUYUNG SOFIARTO M
13.
14.
Grounding LA / Body Cable
Pipa Galvanized 3" / 4" + Clamp Pipa
set
Btg/Set
1/1
1/3
1/1
1/3
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-12
12
TM 13
11
2000.00
1
9
800.00 400.00 500.00
100.00
2000.00
10 7 6 5 8
5
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. Line Post Insulator 20 kV pcs 3 3
2. Arm Brace Besi L.40.40.4 pcs 8 8
3. Band For Arm Brace set 1 2 CATATAN
4. String Insulator 20 kV set 9 9 PT PLN (PERSERO)
5. Bolt & Nut M. 16x140 + Washer set 8 8 BS = Tiang Besi
WILAYAH SUMBAR
6. Cross Arm Clevis set 9 9 BT = Tiang Beton
7. Ball Clevis & Socket Eye pcs 9 9
8. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 4 4
KONSTRUKSI TIANG PERCABANGAN
9. Double Arm Bolt & Nut M. 16x300 + Washer pcs 7 8
PADA TIANG TARIK
10. Strain Clamp/Preformed Termination set 9 9 GAMBAR NO.
11. Tap Connector / Non Tension Joint 35 – 240 mm pcs 3 3 PARAF TANGGAL KODE KONSTRUKSI
12. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 4,5/3 4,5/3 DIGAMBAR : BUYUNG SOFIARTO M
13.
14.
Tap Connector / H type Joint 35 – 240 mm pcs 6 6 DIRENCANA
DIPERIKSA
: REN SIS
:
TM-13
450.00 450.00 900.00
100.00 100.00 14 13
11
12
9 8
4
1
TM 14
FCO 20 kV
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. Arm Brace Besi L.40.40.4 pcs 5 5
2. Band For Arm Brace set 1 1
3. Double Arm Bolt & Nut M. 16x300 + Washer pcs 4 4
4. Bolt & Nut M. 16x50 + Washer set 5 5
5. Bolt & Nut M. 16x250 + Washer set 1 - CATATAN
6. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 3 3 PT PLN (PERSERO)
7. String Insulator 20 kV set 3 3 BS = Tiang Besi
WILAYAH SUMBAR
8. Cross Arm Clevis set 3 3 BT = Tiang Beton
9. Ball Clevis & Socket Eye pcs 3 3
10. Strain Clamp/Preformed Termination set 3 3
KONSTRUKSI PENCABANGAN
11. Line Post Insulator 20 kV pcs 3 3 TIANG DGN FUSE CUT OUT
12. Fuse Cut Out 20 kV + Fuse Link set 3 3 GAMBAR NO.
13. Connector Al / Cu pcs 3 3 PARAF TANGGAL KODE KONSTRUKSI
14. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/pcs 4,5/3 4,5/3 DIGAMBAR : BUYUNG SOFIARTO M
11
6
5 9 8 7
4
1 GUY WIRE
2
14
TM 15
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. Arm Brace Besi L.40.40.4 pcs 4 4
2. Band For Arm Brace set - 1
3. Double Arm Bolt & Nut M. 16x300 + Washer pcs 3 4
4. Bolt & Nut M. 16x50 + Washer set 4 4 CATATAN
5. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 2 2 PT PLN (PERSERO)
6. String Insulator 20 kV set 3 3 BS = Tiang Besi
WILAYAH SUMBAR
7. Cross Arm Clevis set 3 3 BT = Tiang Beton
8. Ball Clevis & Socket Eye pcs 3 3
9. Strain Clamp/Preformed Termination set 3 3
KONSTRUKSI TIANG TARIK
10. Line Post Insulator 20 kV pcs 3 3 AKHIR DENGAN ARRESTER
11. Lightning Arrester + Mounting Bracket set 3 3 GAMBAR NO.
12. Copper Conductor 50 mm2 for jumper Mtr 4,5 4,5 PARAF TANGGAL KODE KONSTRUKSI
13. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/pcs 4,5/3 4,5/3 DIGAMBAR : BUYUNG SOFIARTO M
14.
15.
Grounding LA / Body Cable
Connector Al / Cu
set
pcs
1
3
1
3
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-15
2000.00
10
400.00 400.00 400.00
200.00 200.00 5 6
3
9
2 8 7
4 11
12
13
TM 16
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 2 2
2. Arm Brace Besi L.40.40.4 pcs 4 4
3. Line Post Insulator 20 kV pcs 2 2 CATATAN
4. Bolt & Nut M. 16x50 + Washer set 4 4 PT PLN (PERSERO)
5. Double Arm Bolt & Nut M. 16x300 + Washer pcs 3 5 BS = Tiang Besi
WILAYAH SUMBAR
6. String Insulator 20 kV set 6 6 BT = Tiang Beton
7. Cross Arm Clevis set 6 6
8. Ball Clevis & Socket Eye pcs 6 6
KONSTRUKSI PEMASANGAN TM
9. Strain Clamp/Preformed Termination set 6 6 PORTAL DUA TIANG
10. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/pcs 3/3 3/3 GAMBAR NO.
11. Tap Connector / Non Tension Joint 35 – 240 mm pcs 3 3 PARAF TANGGAL KODE KONSTRUKSI
12. Band For Arm Brace set 2 2 DIGAMBAR : BUYUNG SOFIARTO M
13.
14.
Bolt & Nut M. 16x250 + Washer pc 1 - DIRENCANA
DIPERIKSA
: REN SIS
:
TM-16
2000.00
10
400.00 800.00
200.00 200.00 5 6
3
1
1000.00
9
2 8 7
4
12
13
9
2 8 7
4 11
13
TM 16A
JUMLAH
No. NAMA MATERIAL STN
BT BS
1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 pcs 4 4
2. Arm Brace Besi L.40.40.4 pcs 8 8
3. Line Post Insulator 20 kV pcs 2 2 CATATAN
4. Bolt & Nut M. 16x50 + Washer set 8 8 PT PLN (PERSERO)
5. Double Arm Bolt & Nut M. 16x300 + Washer pcs 4 10 BS = Tiang Besi
WILAYAH SUMBAR
6. String Insulator 20 kV set 6 6 BT = Tiang Beton
7. Cross Arm Clevis set 6 6
8. Ball Clevis & Socket Eye pcs 6 6
KONSTRUKSI PEMASANGAN TM
9. Strain Clamp/Preformed Termination set 6 6 PORTAL DUA TIANG
10. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/pcs 3/3 3/3 GAMBAR NO.
11. Tap Connector / Non Tension Joint 35 – 240 mm pcs 3 3 PARAF TANGGAL KODE KONSTRUKSI
12. Band For Arm Brace set - 4 DIGAMBAR : BUYUNG SOFIARTO M
13.
14.
Bolt & Nut M. 16x250 + Washer pc 4 - DIRENCANA
DIPERIKSA
: REN SIS
:
TM-16A
JUMLAH
No. NAMA MATERIAL STN
6000.00 BT BS
1. Cross Arm UNP 100.50.6.6000/UNP 80.45.5.6000 bh 2 2
3000.00 11 8 2. Band For Arm Brace bh - 2
TM-17
325.00
750.00
100.00
PASIR
1100.00
TANAH DIPADATKAN
750.00
1500.00
650.00
CATATAN
PT PLN (PERSERO)
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
2800.00 2800.00 TRAFO 3 PHASA TIANG PORTAL
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TM-17
JUMLAH
2.00 No. NAMA MATERIAL STN
BT BS
19 SUTM
18
FCO
17
LA
TRAFO
15
14 PAPAN PEMBAGI TR
16 DUA JURUSAN
GD 1
PIPA GALVANIZED 3"
CATATAN
PT PLN (PERSERO)
2.00
23
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA TIANG PORTAL
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-1
JUMLAH
2.00 No. NAMA MATERIAL STN
BT BS
SUTM
19
FCO
18
17
LA
TRAFO
15
PIPA GALVANIZED 3"
PAPAN PEMBAGI TR
14 DUA JURUSAN
16 GD 1B
PIPA GALVANIZED 3"
CATATAN
PT PLN (PERSERO)
2.00
23
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA TIANG PORTAL
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-1B
JUMLAH
2.00 0.80 No. NAMA MATERIAL STN
31 BT BS
32
21 29 5 1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 bh 4 4
2. Arm Brace Besi L.40.40.4 bh 4 4
3. Bolt & Nut M. 16x300 + Washer bh 8 8
4. Bolt & Nut M. 16x50 + Washer bh 8 8
5. Line Post Insulator 20 kV bh 6 6
3
28 11 6. Beugle / U - Bolt bh 2 2
26 4 1
1.50
SUTM 32. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 9/6 9/6
18
17
FCO
LA
TRAFO
15
GD 1C
PIPA GALVANIZED 3"
14
16 PAPAN PEMBAGI TR
DUA JURUSAN KODE PADA GAMBAR DISTRIBUSI
22
1.00
CATATAN
PT PLN (PERSERO)
2.00
23
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA TIANG PORTAL
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-1C
JUMLAH
2.00 No. NAMA MATERIAL STN
BT BS
18
17 LA
TRAFO
22
1.00
CATATAN
PT PLN (PERSERO)
2.00
23
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA TIANG PORTAL
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-1D
JUMLAH
2.00 0.80 No. NAMA MATERIAL STN
30 BT BS
31
21 5 1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 bh 4 4
2. Arm Brace Besi L.40.40.4 bh 4 4
3. Bolt & Nut M. 16x300 + Washer bh 8 8
4. Bolt & Nut M. 16x50 + Washer bh 8 8
5. Line Post Insulator 20 kV bh 6 6
3
28 11 6. Beugle / U - Bolt bh 2 2
26 4 1
1.50
19 31. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 9/6 9/6
SUTM
18
17
FCO
LA
TRAFO
15
GD 1E
PIPA GALVANIZED 3"
14
16 PAPAN PEMBAGI TR
DUA JURUSAN KODE PADA GAMBAR DISTRIBUSI
22
1.00
CATATAN
PT PLN (PERSERO)
2.00
23
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA TIANG PORTAL
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-1E
JUMLAH
2.00 No. NAMA MATERIAL STN
BT BS
7
15. Kebutuhan Klem / Band Pole set 1 1
25
16. LS Board Komplit unit 1 1
19 FCO
18
17 LA
TRAFO
22
1.00
CATATAN
PT PLN (PERSERO)
2.00
23
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA TIANG PORTAL
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-1F
JUMLAH
No. NAMA MATERIAL STN
26 21 BT BS
5 1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 bh 2 2
2. Arm Brace Besi L.40.40.4 bh 2 2
3. Bolt & Nut M. 16x300 + Washer bh 2 -
4. Bolt & Nut M. 16x50 + Washer bh 2 2
5. Line Post Insulator 20 kV bh 3 3
3
6. Beugle / U - Bolt bh 1 2
1.50
11 4 7. Lightning Arrester + Mounting Bracket set 3 3
1
8. Fuse Cut Out 20 kV + Fuse Link set 3 3
2 9
9. Band for Arm Brace bh 1 2
8
10. Bouchten 3" bh 3 3
6
11. BC 25 mm2 untuk jumper kg 3 3
12. Cable NYY 1 x 150 mm2 Mtr 40 40
13. Cable NYFGBY 4 x 70 mm2 Mtr 20 20
14. UNP untuk dudukan Trafo LS Board set 2 2
7
15. Kebutuhan Klem / Band Pole set 1 1
16. LS Board Komplit unit 1 1
2.50
17. Pipa Galvanized btg 3 3
18. Plat Tanda Bahaya bh 1 1
12
19. Konstruksi dudukan Trafo unit 1 1
20. Compression Connector / Tap Connector 50/50 & 70/70 bh 8 8
24
21. Compression Connector / Tap Connector Al / Cu bh 3 3
22. Pondasi Tiang Trafo bh 1 1
FCO
20
13
LA
TRAFO
17
22
1.00
23
CATATAN
PT PLN (PERSERO)
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA 1 TIANG
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-3
JUMLAH
No. NAMA MATERIAL STN
21 26 BT BS
5 1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 bh 2 2
2. Arm Brace Besi L.40.40.4 bh 2 2
3. Bolt & Nut M. 16x300 + Washer bh 2 -
4. Bolt & Nut M. 16x50 + Washer bh 2 2
5. Line Post Insulator 20 kV bh 3 3
3
6. Beugle / U - Bolt bh 1 2
4
1.50
1 11 7. Lightning Arrester + Mounting Bracket set 3 3
9 1 8. Fuse Cut Out 20 kV + Fuse Link set 3 3
2
9. Band for Arm Brace bh 1 2
8
10. Bouchten 3" bh 3 3
6
11. BC 25 mm2 untuk jumper kg 3 3
12. Cable NYY 1 x 150 mm2 Mtr 40 40
13. Cable NYFGBY 4 x 70 mm2 Mtr 20 20
14. UNP untuk dudukan Trafo LS Board set 2 2
7
15. Kebutuhan Klem / Band Pole set 1 1
16. LS Board Komplit unit 1 1
2.50
17. Pipa Galvanized btg 3 3
18. Plat Tanda Bahaya bh 1 1
12
19. Konstruksi dudukan Trafo unit 1 1
20. Compression Connector / Tap Connector 50/50 & 70/70 bh 8 8
24 18
21. Compression Connector / Tap Connector Al / Cu bh 3 3
25
22. Pondasi Tiang Trafo bh 1 1
23. Grounding Set untuk LA & Accessories (GTM – 1 / GTM – 2) set 2 2
BERBAHAYA
TEGANGAN
TINGGI
24. Trafo 3 Phasa 25 – 50 kVA 20 kV / 400 V unit 1 1
25. Konstruksi Pemasangan (SKUTR) Tiang awal/akhir set 2 2
26. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 4,5/3 4,5/3
19
20 SUTM
13
10 FCO
LA
TRAFO
17
22
1.00
23
CATATAN
PT PLN (PERSERO)
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA 1 TIANG
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-3B
JUMLAH
No. NAMA MATERIAL STN
21 BT BS
31
28 5 1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 bh 3 3
29 27
2. Arm Brace Besi L.40.40.4 bh 5 5
3. Bolt & Nut M. 16x300 + Washer bh 4 4
26
4. Bolt & Nut M. 16x50 + Washer bh 5 5
5. Line Post Insulator 20 kV bh 1 1
3
6. Beugle / U - Bolt bh 1 1
1.50
30 4 7. Lightning Arrester + Mounting Bracket set 3 3
1
8. Fuse Cut Out 20 kV + Fuse Link set 3 3
11 9
8 2 9. Band for Arm Brace bh 1 2
10. Bouchten 3" bh 9 9
6
11. BC 25 mm2 untuk jumper kg 3 3
12. Cable NYY 1 x 150 mm2 Mtr 40 40
13. Cable NYFGBY 4 x 70 mm2 Mtr 20 20
14. UNP untuk dudukan Trafo LS Board set 2 2
7
15. Kebutuhan Klem / Band Pole set 1 1
16. LS Board Komplit unit 1 1
2.50
17. Pipa Galvanized btg 3 3
18. Plat Tanda Bahaya bh 1 1
12
19. Konstruksi dudukan Trafo unit 1 1
20. Compression Connector / Tap Connector 50/50 & 70/70 bh 8 8
24
21. Compression Connector / Tap Connector Al / Cu bh 3 3
22. Pondasi Tiang Trafo bh 1 1
LA
TRAFO
17
22
1.00
23
CATATAN
PT PLN (PERSERO)
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA 1 TIANG
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-3C
JUMLAH
No. NAMA MATERIAL STN
26 BT BS
5 21 29
4 28 31 1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 bh 3 3
2. Arm Brace Besi L.40.40.4 bh 5 5
3. Bolt & Nut M. 16x300 + Washer bh 4 4
27
4. Bolt & Nut M. 16x50 + Washer bh 5 5
5. Line Post Insulator 20 kV bh 1 1
6. Beugle / U - Bolt bh 1 1
1.50
7. Lightning Arrester + Mounting Bracket set 3 3
1 11 30 3 1 8. Fuse Cut Out 20 kV + Fuse Link set 3 3
2
9. Band for Arm Brace bh 1 2
8
10. Bouchten 3" bh 3 3
6
11. BC 25 mm2 untuk jumper kg 3 3
12. Cable NYY 1 x 150 mm2 Mtr 40 40
13. Cable NYFGBY 4 x 70 mm2 Mtr 20 20
14. UNP untuk dudukan Trafo LS Board set 2 2
7
15. Kebutuhan Klem / Band Pole set 1 1
16. LS Board Komplit unit 1 1
9
2.50
17. Pipa Galvanized btg 3 3
18. Plat Tanda Bahaya bh 1 1
12
19. Konstruksi dudukan Trafo unit 1 1
20. Compression Connector / Tap Connector 50/50 & 70/70 bh 8 8
24 18
21. Compression Connector / Tap Connector Al / Cu bh 3 3
25
22. Pondasi Tiang Trafo bh 1 1
23. Grounding Set untuk LA & Accessories (GTM – 1 / GTM – 2) set 2 2
BERBAHAYA
TEGANGAN
TINGGI
24. Trafo 3 Phasa 25 – 50 kVA 20 kV / 400 V unit 1 1
25. Konstruksi Pemasangan (SKUTR) Tiang awal/akhir set 2 2
26. All Bending Wire 3,2 mm / Preformed Top Tie Mtr/Pls 1,5/1 1,5/1
19 27. String Insulator 20 kV bh 6 6
28. Cross Arm Clevis bh 6 6
20
SUTM 29. Tap Connector / Non Tension Joint 35 – 240 mm bh 3 3
LA
17 TRAFO
GD 3D
16 16 PIPA GALVANIZED 3"
22
1.00
23
CATATAN
PT PLN (PERSERO)
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA 1 TIANG
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-3D
JUMLAH
No. NAMA MATERIAL STN
21 BT BS
26
5 1. Cross Arm UNP 100.50.6.2000/UNP 80.45.5.2000 bh 3 3
27
2. Arm Brace Besi L.40.40.4 bh 5 5
3. Bolt & Nut M. 16x300 + Washer bh 4 4
4. Bolt & Nut M. 16x50 + Washer bh 5 5
5. String Insulator 20 kV bh 3 3
3
6. Beugle / U - Bolt bh 1 1
28
1.50
4 7. Lightning Arrester + Mounting Bracket set 3 3
1
8. Fuse Cut Out 20 kV + Fuse Link set 3 3
11 9
8 2 9. Band for Arm Brace bh 1 2
10. Bouchten 3" bh 9 9
11. BC 25 mm2 untuk jumper kg 3 3
2.50
17. Pipa Galvanized btg 3 3
18. Plat Tanda Bahaya bh 1 1
12
19. Konstruksi dudukan Trafo unit 1 1
20. Compression Connector / Tap Connector 50/50 & 70/70 bh 8 8
24
21. Compression Connector / Tap Connector Al / Cu bh 3 3
22. Pondasi Tiang Trafo bh 1 1
FCO
20
13
LA
TRAFO
17
22
1.00
23
CATATAN
PT PLN (PERSERO)
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
KONSTRUKSI PEMASANGAN
TRAFO 3 PHASA 1 TIANG
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
GD-3E
4
2
1
L = tinggi tiang
± 3,5 Mtr
≥ 45.0°
1/6 L
7
E-1
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Band Pole For Guy Wire set - 1
WILAYAH SUMBAR BS = Tiang Besi
2. Turn Buckle / Span Scroef pc 1 1 BT = Tiang Beton
3. Preformed Dead End / Wire Clip / Stall Clamp pcs 4/8 4/8
4. Bolt & Nut M. 16x250 + Washer with Guy Attachment pc 1 - DOWN GUY / TREEK SCHOOR
5. Guy Insulator pc 1 51
6. Guy Wire / Galvanized Steel Wire Mtr 11 11 GAMBAR NO.
7. Achor Rod / 2,4 / 1,7 Mtr pc 1 1 PARAF TANGGAL KODE KONSTRUKSI
8. Beton Plat Komplit pc 1 1 DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
Guy Wire Thimble pc 1 1 DIRENCANA
DIPERIKSA
: REN SIS
:
E-1
1 4
1 4
6
L = tinggi tiang
9
± 3,5 Mtr
≥ 45°
7
1/6 L
E-2
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Band Pole For Guy Wire set - 2
WILAYAH SUMBAR BS = Tiang Besi
2. Turn Buckle / Span Scroef pc 1 1 BT = Tiang Beton
3. Preformed Dead End / Wire Clip / Stall Clamp pcs 6/12 6/12
4. Bolt & Nut M. 16x250 + Washer with Guy Attachment pc 2 - KONTRA MAST
5. Guy Insulator pc 1 1
6. Guy Wire / Galvanized Steel Wire Mtr 27 27 GAMBAR NO.
7. Achor Rod / 2,4 / 1,7 Mtr pc 1 1 PARAF TANGGAL KODE KONSTRUKSI
8. Beton Plat Komplit pc 1 1 DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
Guy Wire Thimble pc 4 4 DIRENCANA
DIPERIKSA
: REN SIS
:
E-2
50 150 150
100
1 90 90
2
4
300
UNP 100.50.6.300
TIPE TIANG
No.
UTAMA STRUT POLE
1. 12 11
2. 11 11
3. 9 9
4. 7 7
4
4
E-3
Mi
n
10
00
1/6 L
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Strut Arm Band + Bolt & Nut M 16x50 bh 1 1
WILAYAH SUMBAR BS = Tiang Besi
2. Strut Arm UNP 100.50.6.300 mm bh 1 1 BT = Tiang Beton
3. Pipa Galvanized 2" – 2 Mtr btg 1 1
4. Single Band + Bolt & Nut M 16x50 set 4 4 DRUCK SCHOOR
5. Beton Plat 500 x 500 mm set 1 1
6. GAMBAR NO.
7. PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
E-3
2
1
L = tinggi tiang
X1
1/6 L
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Besi L.40.40.4.2400 bh 2 2
WILAYAH SUMBAR BS = Tiang Besi
2. Band Pole bh 4 4 BT = Tiang Beton
3. Bolt & Nut M. 16x50 + Washer bh 1 1
4. PEMBESIAN TIANG PORTAL
5.
6. GAMBAR NO.
7. PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
X-1
1
2
L = tinggi tiang
X2
1/6 L
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Cross Arm UNP 100.50.6.2400/UNP 80.45.5.2400 bh 2 2
WILAYAH SUMBAR BS = Tiang Besi
2. U-Bolt / Beugle bh 4 4 BT = Tiang Beton
3. Besi L.40.40.4.2400 bh 2 2
4. Bolt & Nut M. 16x50 + Washer bh 8 8 PEMBESIAN TIANG PORTAL
5.
6. GAMBAR NO.
7. PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
X-2
1
2
L = tinggi tiang
X2Z
1/6 L
JUMLAH CATATAN
No. NAMA MATERIAL STN
BT BS PT PLN (PERSERO)
1. Cross Arm UNP 100.50.6.2400/UNP 80.45.5.2400 bh 2 2
WILAYAH SUMBAR BS = Tiang Besi
2. U-Bolt / Beugle bh 4 4 BT = Tiang Beton
3. Besi L.40.40.4.2400 bh 1 1
4. Bolt & Nut M. 16x50 + Washer bh 8 8 PEMBESIAN TIANG PORTAL
5.
6. GAMBAR NO.
7. PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
X-2Z
1
TR 1
Max 25°
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Suspension Clamp Bracket set 1
WILAYAH SUMBAR
2. Suspension Clamp set 1
3. Stainless Steel Strap Mtr 3
4. Stoping Buckle bh 2
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 3 PENYANGGA
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TR-1
1
TR 2
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Tension Bracket set 1
WILAYAH SUMBAR
2. Large Angle Assembly set 1
3. Stainless Steel Strap Mtr 3
4. Stoping Buckle bh 2
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 3 SUDUT & BELOKAN
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TR-2
1
3 2
A DETAIL - A
8
8
TR 3
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Tension Bracket set 1
WILAYAH SUMBAR
2. Fixed Dead End Clamp set 1
3. Stainless Steel Strap Mtr 6,5
4. Stoping Buckle bh 4
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 2 AKHIR
6. PVC 2" 50 cm bh 1 GAMBAR NO.
7. Link bh 2 PARAF TANGGAL KODE KONSTRUKSI
8. Dead End Tubes bh 4 DIGAMBAR : BUYUNG SOFIARTO M
3 2
Compression Connector /
Tap Connector 50/50 & 70/70
Pada konstruksi trafo
TR 3A
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Tension Bracket set 1
WILAYAH SUMBAR
2. Fixed Dead End Clamp set 1
3. Stainless Steel Strap Mtr 3
4. Stoping Buckle bh 2
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 1 AWAL
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TR-3A
1
TR 4
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Suspension Clamp Bracket set 2
WILAYAH SUMBAR
2. Suspension Clamp set 2
3. Stainless Steel Strap Mtr 6
4. Stoping Buckle bh 4
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 6
PENYANGGA PADA PERSIMPANGAN
6. Tap Connector / Compression Connector bh 8 GAMBAR NO.
7. Twisted Cable Mtr 1 PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TR-4
8
3
9
2
5
TR 4A
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Suspension Clamp Bracket set 1
WILAYAH SUMBAR
2. Suspension Clamp set 1
3. Stainless Steel Strap Mtr 6
4. Stoping Buckle bh 4
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 7
PENYANGGA &SUDUT SILANG
6. Tap Connector / Compression Connector bh 8 GAMBAR NO.
7. Twisted Cable Mtr 1 PARAF TANGGAL KODE KONSTRUKSI
8. Tension Bracket set 1 DIGAMBAR : BUYUNG SOFIARTO M
1
5
TR 5
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Tension Bracket set 2
WILAYAH SUMBAR
2. Fixed Dead End Clamp set 2
3. Stainless Steel Strap Mtr 3
4. Stoping Buckle bh 2
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 3 PENEGANG
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TR-5
1
6
5
TR 6
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Suspension Clamp Bracket set 1
WILAYAH SUMBAR
2. Suspension Clamp set 1
3. Stainless Steel Strap Mtr 6
4. Stoping Buckle bh 4
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 4 PENCABANGAN
6. Tension Bracket set 1 GAMBAR NO.
7. Fixed Dead End Clamp set 1 PARAF TANGGAL KODE KONSTRUKSI
8. Tap Connector / Compression Connector bh 4 DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TR-6
6
3 1
TR 6A
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Tension Bracket set 2
WILAYAH SUMBAR
2. Large Angle Assembly set 1
3. Stainless Steel Strap Mtr 3
4. Stoping Buckle bh 2
KONSTRUKSI SKUTR TIANG
5. Plastic Strap bh 5 PENCABANGAN
6. Fixed Dead End Clamp set 1 GAMBAR NO.
7. Tap Connector / Compression Connector bh 4 PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TR-6A
AAAC
TR 7
AAAC TIC
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Tension Bracket set 1
WILAYAH SUMBAR
2. Fixed Dead End Clamp set 1
3. Stainless Steel Strap Mtr 3
4. Stoping Buckle bh 2
KONSTRUKSI PENYAMBUNGAN
5. Plastic Strap bh 1 SKUTR DENGAN SUTR
6. Tap Connector / Compression Connector bh 4 GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
TR-7
KODE PADA GAMBAR DISTRIBUSI
UC 1
KONSTRUKSI
PERMUKAAN (SESUAI
250
KONDISI JALAN)
500
5
500
1000
1250
200
1
100
2 4
200
100
3
1
100
100
2
100
3
400
Pipa Galvanised /
100
Pipa PVC
400
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Batu Bata bh 10
WILAYAH SUMBAR
2. Pasir Urug m3 0,12
3. Kabel Tanah 20 kV m 1
4. Tanah Urug Bersih (tanpa batu / kerikil) m3 0,08
GALIAN KABEL TANAH 20 KV
5. Tanah Urug dipadatkan m3
0,2 1(SATU) SALURAN
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
UC-1
KODE PADA GAMBAR DISTRIBUSI
UC 2
KONSTRUKSI
PERMUKAAN
250
(SESUAI KONDISI
JALAN)
500
5
500
1000
1250
200
1
100
2 4
200
100
3
1
100
100
2
100
3
MIN 2 D
Pipa Galvanised /
100
MIN 2 D
500
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
D = Diameter Luar
1. Batu Bata bh 25
3
WILAYAH SUMBAR Kabel
2. Pasir Urug m 0,15
3. Kabel Tanah 20 kV m 2x1
4. Tanah Urug Bersih (tanpa batu / kerikil) m3 0,1
GALIAN KABEL TANAH 20 KV
5. Tanah Urug dipadatkan m3
0,25 2(DUA) SALURAN
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
UC-2
KODE PADA GAMBAR DISTRIBUSI
UC 3
KONSTRUKSI
PERMUKAAN
250
(SESUAI KONDISI
JALAN)
500
5
500
1000
1250
200
1
100
2 4
200
100
3
1
100
100
2
100
3
100 200 200 100
Pipa Galvanised /
100
600
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
D = Diameter Luar
1. Batu Bata bh 40
3
WILAYAH SUMBAR Kabel
2. Pasir Urug m 0,15
3. Kabel Tanah 20 kV m 3x1
4. Tanah Urug Bersih (tanpa batu / kerikil) m3 0,12
GALIAN KABEL TANAH 20 KV
5. Tanah Urug dipadatkan m3
0,3 3(TIGA) SALURAN
GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
UC-3
TYPE A
KAWAT DURI
X Y X X Y X
TYPE B 4
KAWAT DURI
1250
1250 Y X X Y
15.0°
1000 1000
250 250
DI LAS
5
3
POSISI KLAMP
PLAT BESI 250 x 40 x 10 MM
X Y 2
25 25
40
14
50 150 50
10
250
1
KANAL NP 15
M 12 x 200
APLIKASI APLIKASI
TYPE A TYPE B
PONDASI
UC 4
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. TYPE A/B
1. Besi Kanal NP 15 : 150 x 75 x 6,5 mm bh 2
WILAYAH SUMBAR DISESUAIKAN KONDISI
2. Plat Besi 250 x 40 x 10 mm bh 12 LAPANGAN
2. UKURAN DALAM MM
3. Baut Mur M12 x 200 + Ring set 12 3. DICAT PLINKOTE
KONSTRUKSI KANAL NP 15 PELINDUNG
4. Kawat Duri Mtr 15
KABEL MENYEBRANG SUNGAI/GOT
5. Plinkote Kg 2
6. Pondasi bh 2 GAMBAR NO.
PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
DIRENCANA
DIPERIKSA
: REN SIS
:
UC-4
Arrester
6
3
5
2
4 BC Conductor dihubungkan
Earth Terminal
6
1
Earth Terminal
GTM1
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Bolt & Nut M16 x 30 + Washer untuk Earth Terminal set 1
WILAYAH SUMBAR
2. BC Conductor 50 mm2 Mtr 1
3. Stainless Steel Strap Mtr 1,75
4. Stoping Buckle bh 2
GROUNDING TM PADA TIANG
5. Link bh 2 DENGAN EARTH TERMINAL
6. Kabel Schoon bh 2 GAMBAR NO.
7. PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
GTM-1
6
2
3
GTM2
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Grounding Rod 16 mm (2,5 Mtr) + Clamp set 1
WILAYAH SUMBAR
2. BC Conductor 50 mm2 Mtr 11
3. Stainless Steel Strap Mtr 9
4. Stoping Buckle bh 6 GROUNDING TM PADA TIANG
5. Link bh 6
6. Kabel Schoon bh 1 GAMBAR NO.
7. Pipa Galvanized ¾” - 3 Mtr btg 1 PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
GTM-2
7
5
BC Conductor dihubungkan
Earth Terminal
2
3
6
4
1
Earth Terminal
GTR1
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Bolt & Nut M16 x 30 + Washer untuk Earth Terminal set 1
WILAYAH SUMBAR
2. BC Conductor 50 mm2 Mtr 1
3. Stainless Steel Strap Mtr 1,75
GROUNDING TR PADA TIANG PENYANGGA
4. Stoping Buckle bh 2
SKUTR DGN EARTH TERMINAL
5. Link bh 2
6. Kabel Schoon bh 1 GAMBAR NO.
7. Tap Connector / Compression Connector bh 1 PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
GTR-1
6
2
3
GTR2
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Grounding Rod 16 mm (1,5 Mtr) + Clamp set 1
WILAYAH SUMBAR
2. BC Conductor 50 mm2 Mtr 11
3. Stainless Steel Strap Mtr 9
4. Stoping Buckle bh 6
GROUNDING TR PADA TIANG
5. Link bh 6 PENYANGGA SKUTR
6. Tap Connector / Compression Connector bh 1 GAMBAR NO.
7. Pipa Galvanized ¾” - 3 Mtr btg 1 PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
GTR-2
7
5
BC Conductor dihubungkan
Earth Terminal
2
3
6
4
1
Earth Terminal
GTR3
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Bolt & Nut M16 x 30 + Washer untuk Earth Terminal set 1
WILAYAH SUMBAR
2. BC Conductor 50 mm2 Mtr 1
3. Stainless Steel Strap Mtr 1,75
GROUNDING TR PADA TIANG AKHIR SKUTR
4. Stoping Buckle bh 2
DGN EARTH TERMINAL
5. Link bh 2
6. Kabel Schoon bh 1 GAMBAR NO.
7. Tap Connector / Compression Connector bh 1 PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
GTR-3
6
2
3
GTR4
CATATAN
No. NAMA MATERIAL STN JUMLAH
PT PLN (PERSERO)
1. Grounding Rod 16 mm (1,5 Mtr) + Clamp set 1
WILAYAH SUMBAR
2. BC Conductor 50 mm2 Mtr 11
3. Stainless Steel Strap Mtr 9
4. Stoping Buckle bh 6
GROUNDING TR PADA TIANG
5. Link bh 6 AKHIR SKUTR
6. Tap Connector / Compression Connector bh 1 GAMBAR NO.
7. Pipa Galvanized ¾” - 3 Mtr btg 1 PARAF TANGGAL KODE KONSTRUKSI
8. DIGAMBAR : BUYUNG SOFIARTO M
9.
10.
DIRENCANA
DIPERIKSA
: REN SIS
:
GTR-4
L1 L2 L3
1/6XL
Ground
D1 D2 D3
TIANG LISTRIK
300 300
100 300 100
50 100 50
Las Pen
Las Pen Las Garis tanah
Las Pen
Pen Pipa selongsong
Selongsong (protective
Sok pen Reduser - pres pen sieeve)
50 100 50
Uraian
7M 9M 11 M 12 M 13 M
Panjang Total (L)
BEBAN KERJA ( DA N ) 90 100 90 100 156 200 156 200 350 140 200 350 200 350
Las
BAGIAN ATAS Las (spot-weld)
Las (spot-weld)
Diameter luar (mm) D1 89,1 89,1 89,1 89,1 114,3 114,3 114,3 114,3 165,2 114,3 114,3 139,8 101,6 114,3
Sistim sambungan
Tebal ( mm ) 3,2 3,2 3,5 4,0 4,5 4,5 4,5 5,6 4,5 4,5 4,5 6,0 4,0 5,6 tiang baja
Panjang section (mm) L1 1500 1500 2000 2000 2000 2000 2000 2500 2500 2250 2000 2000 1500 1500
Reduser - pres
BAGIAN TENGAH
Diameter luar (mm) D2 114,3 114,3 114,3 114,3 139,8 139,8 139,8 165,2 190,7 139,8 139,8 190,7 190,7 216,3
Tebal ( mm ) 3,2 3,2 3,6 4,5 4,5 6,0 4,5 6,0 7,0 4,5 6,0 6,0 6,0 7,0
CATATAN
Panjang section (mm) L2 2000 1500 2000 2000 2000 2000 2000 2500 2500 2250 2000 2000 5500 5500
PT PLN (PERSERO)
BAGIAN BAWAH
WILAYAH SUMBAR Bahan : Pipa Baja Karbon
Diameter luar (mm) D3 139,8 139,8 139,8 139,8 165,2 190,7 165,2 190,7 267,4 165,2 216,3 267,4 216,3 267,4 SII 0295 - 80 / SNI 2699 -
92.
Tebal ( mm ) 3,6 4,0 4,5 6,0 4,5 6,0 4,5 7,0 7,0 4,5 6,0 7,0 7,0 8,0 TIANG BESI Kuat Tarik : Min. 41 Kg /
STANDAR PLN = SPLN : 54 - 1983. mm2.
Panjang section (mm) L3 3500 4000 5000 5000 5000 5000 7000 6000 6000 7500 8000 8000 6000 6000
GAMBAR NO.
SELONGSONG PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
Panjang (mm) 600 600 600 600 600 600 600 600 600 600 600 600 600 600
BERAT TIANG ( KG ) 93 102 121 162 168 233 185 306 446 217 347 505 421 585
DIRENCANA
DIPERIKSA
: REN SIS
:
BS
Upper Cover Spiral Wire PC Wire Lower Cover
Db
Da
L (LENGTH)
Ta Tb
Uraian
7M 9M 11 M 12 M 13 M
Panjang Total (L)
BEBAN KERJA ( DA N ) 100 200 100 200 350 500 200 350 500 850 350 500 350 500 850
CATATAN
BAGIAN ATAS
PT PLN (PERSERO)
Diameter luar (mm) Da 160 160 160 160 160 190 190 190 190 220 190 190 190 190 220
WILAYAH SUMBAR
BAGIAN BAWAH
Diameter luar (mm) Db 250 250 280 280 280 310 340 340 340 370 350 350 360 360 390 TIANG BETON
STANDAR PLN = SPLN : 93 - 1991.
GROUND LEVEL (MM) 1200 1200 1500 1500 1500 1500 1900 1900 1900 1900 2000 2000 2200 2200 2200
GAMBAR NO.
STEEL PARAF TANGGAL KODE KONSTRUKSI
DIGAMBAR : BUYUNG SOFIARTO M
PC Wire 3 x 7,0 4 x 7,0 3 x 7,0 4 x 7,0 6 x 7,0 12x7,0 4 x 7,0 6 x 7,0 12x7,0 16x7,0 6x7,0 12x7,0 6x7,0 12x7,0 16x7,0
Reinforcing Bar 0x7,0 0x7,0 0x7,0 2x7,0 3x7,0 3x7,0 2x7,0 2x7,0 4x7,0 10x7,0 4x7,0 6x7,0 4x7,0 6x7,0 12x7,0
DIRENCANA
DIPERIKSA
: REN SIS
:
BT
BEBAN KERJA TIANG ( DA N )
Ukuran Penghantar Andongan Maksimum
(mm2) 2%
90 100 140 156 200 350 400 500 700 800
CATATAN
PT PLN (PERSERO)
WILAYAH SUMBAR BS = Tiang Besi
BT = Tiang Beton
DIRENCANA
DIPERIKSA
: REN SIS
:
SP-2