A MATERIAL & CONSUMABLE
a.1. Fuel Ls 1 2,062.17 2,062.17
a.2. Chemical Ls 1 6,704.34 6,704.34
a.3. Vehycle Ls 1 4,152.26 4,152.26
Subtotal A 12,918.77

B MANPOWER (Salary & Wages)


b.1. Leading Hand Person 3 654.08 1,962.25
b.2. Staf Elektrikal, Mechanical & Plumber Person 7 402.59 2,818.10
b.3. Operator Person 12 294.35 3,532.15
b.4. PM Fire System Person 2 335.15 670.30
b.5. Roving Person 10 335.15 3,351.50

Subtotal B 12,334.30

C MAINTENANCE COST
c.1. Preventive Maintenance Ls 1 1,113.89 1,113.89
c.2. Maintenance Ls 1 9,468.33 9,468.33

Subtotal C 10,582.22

D OTHER
d.1. Safety Ls 1 767.69 767.69
d.2. Cleaning Services Ls 2 75.00 150.00
d.3. Communication Ls 1 138.89 138.89
d.4. Biaya Lain Ls 1 55.56 55.56
d.5. Risk [ 0.5% x (Sub Tot A+B+C)] Ls 1 179.18 179.18

Subtotal D 1,291.31

E PROFIT [ 15%(Sub Tot A+B+C+D)] 5,568.99

TOTAL COST (USD/Mn) 42,695.59


PRODUCTION OF POTABLE WATER (M3)/Mn 158,333.33
RATE PER M3 (USD) 0.2697
Analisa Harga Satuan-Potable Water
Analisa Harga Satuan
POTABLE WATER SANGATTA BARU DAN TANJUNG BARA
Refer to : Schedule A.II.3.

Code No. : A.II.3.a.


Subjek : Material & Consumable
Sub Objek : Kendaraan Operasional
Lokasi : WTP Sangatta Baru & WTP Tj. Bara
Kendaraan Operasional per Bulan $2,733.33
Bahan Bakar (Fuel) per Bulan $2,062.17
Harga Satuan Jumlah Harga
No. Uraian Satuan Jumlah
( Rp. ) ( Rp. ) ( USD )
1 Kendaraan Operasional
a. Shift Operator Unit 12 277,777.78 3,333,333.33 370.37
- Jenis Kendaraan : Honda 125cc
- Tahun Pembuatan : 2006
- Jumlah : 1 unit
- Harga Saat ini : Rp 15,000,000.00
- Harga 3 thn mendtg : Rp 5,000,000.00
- Depresiasi : Rp 277,777.78
- Prosen Depresiasi : 1.85%
b. Perawatan Pipa Transmisi Unit 1 2,022,222.22 2,022,222.22 224.69
- Jenis Kendaraan : Daihatsu Rocky
- Tahun Pembuatan : 1996
- Jumlah : 1 unit
- Harga Saat ini : Rp 60,000,000.00
- Harga 3 thn mendtg : Rp -
- Depresiasi : Rp 2,022,222.22
- Prosen Depresiasi : 6,1 %
c. Preventive Maintenace Fire System Unit 1 2,190,740.74 2,190,740.74 243.42
- Jenis Kendaraan : Daihatsu Rocky
- Tahun Pembuatan : 1996
- Jumlah : 1 unit
- Harga Saat ini : Rp 60,000,000.00
- Harga 3 thn mendtg : Rp -
- Depresiasi : Rp 2,190,740.74
- Prosen Depresiasi : 6,1 %
d. Preventive Maintenace Mechanical & Electrical Unit 1 1,516,666.67 1,516,666.67 168.52
- Jenis Kendaraan : Daihatsu Taft GT
- Tahun Pembuatan : 1996
- Jumlah : 1 unit
- Harga Saat ini : Rp 45,000,000.00
- Harga 3 thn mendtg : Rp -
- Depresiasi : Rp 1,516,666.67
- Prosen Depresiasi : 6,1 %
e. Roving Unit 2 1,853,703.70 3,707,407.41 411.93
- Jenis Kendaraan : Daihatsu hyline
- Tahun Pembuatan : 2000
- Jumlah : 1 unit
- Harga Saat ini : Rp 55,000,000.00
- Harga 3 thn mendtg : Rp -
- Depresiasi : Rp 1,853,703.70
- Prosen Depresiasi : 6,1 %
Sub Total 1 1,418.93
2 Perawatan Kendaraan Ls 5 4,500,000.00 22,500,000.00 2,500.00
Kendaraan R-4
- Ganti Olie
- Preventive Maintenance
- Ganti Ban
- Over Haul
Kendaraan R-2
- Ganti Olie Ls 12 175,000.00 2,100,000.00 233.33
- Preventive Maintenance
- Ganti Ban
Sub Total 2 2,733.33
3 Konsumsi Bahan Bakar
a. Kendaraan R-2
BBM - Bensin Premium : 18 Liter Premium/hari Ltr 414 4,250.00 1,759,500.00 195.50
Jumlah Motor : 12 unit
b. Perawatan Pipa Transmisi & Preventive Maintenace Ltr 2800 6,000.00 16,800,000.00 1,866.67
- Inspeksi dan PM
Sub Total 3. 2,062.17

Page 2 of 9
Analisa Harga Satuan-Potable Water
Code No. : A.II.3.b.
Subjek : Material & Consumable
Sub Objek : Chemical
Lokasi : WTP Sangatta Baru & WTP Tj. Bara
Kebutuhan Bahan Kimia per Bulan $6,704.34
Harga Satuan Jumlah Harga
No. Uraian Satuan Jumlah
( USD ) ( USD )
a. Aluminium Sulfat Sak 58 28.00 1,624.00
b. Soda Ash Sak 44.4 35.00 1,554.00
c. Ph Paper Box 18 20.88 375.84
d. Polymer Sak 2.72 365.00 992.80
e. Chlorine 70% Can 9.4 210.00 1,974.00
f. Analisa Alum
- Aluver 3 Al Bag 0.5 170.00 85.00
- Ascorbat acid Bag 0.5 98.70 49.35
- Bleaching 3 Bag 0.5 98.70 49.35
Sub Total Chemical 6,704.34

Code No. : A.II.3.c.


Subjek : Man Power
Sub Objek : Salary & Wages
Lokasi : WTP Sangatta Baru & WTP Tj. Bara
Harga Satuan Jumlah Harga
No. Uraian Satuan Jumlah
( Rp. ) ( Rp. ) ( USD )
1 Tenaga Mekanik
- Basic Leading Hand Bln 1 3,500,000.00 3,500,000.00
- Tunjangan Jabatan : Rp. 650.000,- Bln 1 650,000.00 650,000.00
- Tunjangan Hari Raya : Rp. Bln 1 291,666.67 291,666.67
- Uang Makan : Rp. 15.000/hari Bln 1 390,000.00 390,000.00
- Uang Transport : Rp. 7.000.- Bln 1 182,000.00 182,000.00
- Jamsostek : Rp. 60.000,-/bln Bln 1 60,000.00 60,000.00
- PPh : 3% dari Basic Bln 1 105,000.00 105,000.00
- Over Time (Jam/bln) : 70 Bln 1 708,092.49 708,092.49
Jumlah Personal : 1 Orang
5,886,759.15 654.08
- Basic Staf Mekanik Bln 1 2,200,000.00 2,200,000.00
- Tunjangan Jabatan : Rp. Bln 650,000.00 -
- Tunjangan Hari Raya : Rp. Bln 1 183,333.33 183,333.33
- Uang Makan : Rp. 12.500/hari Org 1 325,000.00 325,000.00
- Uang Transport : Rp. 7.000.- Bln 1 182,000.00 182,000.00
- Jamsostek : Rp. 50.000,-/bln Bln 1 60,000.00 60,000.00
- PPh : 3% dari Basic Bln 1 66,000.00 66,000.00
- Over Time (Jam/bln) : 70 Bln 1 606,936.42 606,936.42
Jumlah Personal : 2 Orang
3,623,269.75 402.59
2 Tenaga Electric
- Basic Leading Hand Bln 1 3,500,000.00 3,500,000.00
- Tunjangan Jabatan : Rp. 650.000,- Bln 1 650,000.00 650,000.00
- Tunjangan Hari Raya : Rp. Bln 1 291,666.67 291,666.67
- Uang Makan : Rp. 15.000/hari Org 1 390,000.00 390,000.00
- Uang Transport : Rp. 7.000.- Bln 1 182,000.00 182,000.00
- Jamsostek : Rp. 60.000,-/bln Bln 1 60,000.00 60,000.00
- PPh : 3% dari Basic Bln 1 105,000.00 105,000.00
- Over Time (Jam/bln) : 70 Bln 1 708,092.49 708,092.49
Jumlah Personal : 1 Orang
5,886,759.15 654.08
- Basic Staf Electric Bln 1 2,200,000.00 2,200,000.00
- Tunjangan Jabatan : Rp. Bln 650,000.00 -
- Tunjangan Hari Raya : Rp. Bln 1 183,333.33 183,333.33
- Uang Makan : Rp. 12.500/hari Org 1 325,000.00 325,000.00
- Uang Transport : Rp. 7.000.- Bln 1 182,000.00 182,000.00
- Jamsostek : Rp. 50.000,-/bln Bln 1 60,000.00 60,000.00
- PPh : 3% dari Basic Bln 1 66,000.00 66,000.00
- Over Time (Jam/bln) : 70 Bln 1 606,936.42 606,936.42
Jumlah Personal : 2 Orang
3,623,269.75 402.59
3 Salary Plumber
Basic Leading Hand Bln 1 3,500,000.00 3,500,000.00
- Tunjangan Jabatan : Rp. 650.000,- Bln 1 650,000.00 650,000.00
- Tunjangan Hari Raya : Rp. Bln 1 291,666.67 291,666.67
- Uang Makan : Rp. 15.000/hari Org 1 390,000.00 390,000.00
- Uang Transport : Rp. 7.000.- Bln 1 182,000.00 182,000.00
- Jamsostek : Rp. 60.000,-/bln Bln 1 60,000.00 60,000.00
- PPh : 3% dari Basic Bln 1 105,000.00 105,000.00
- Over Time (Jam/bln) : 70 Bln 1 708,092.49 708,092.49
Jumlah Personal : 1 Orang
5,886,759.15 654.08
Basic Staf Plumber/Fire System Bln 1 2,200,000.00 2,200,000.00
Page 3 of 9
- Tunjangan Jabatan : Rp. Bln 650,000.00 Analisa Harga- Satuan-Potable Water
- Tunjangan Hari Raya : Rp. Bln 1 183,333.33 183,333.33
- Uang Makan : Rp. 12.500/hari Org 1 325,000.00 325,000.00
- Uang Transport : Rp. 7.000.- Bln 1 182,000.00 182,000.00
- Jamsostek : Rp. 50.000,-/bln Bln 1 60,000.00 60,000.00
- PPh : 3% dari Basic Bln 1 66,000.00 66,000.00
- Over Time (Jam/bln) : 70 Bln 1 606,936.42 606,936.42
Jumlah Personal : 3 Orang
3,623,269.75 402.59

Page 4 of 9
Salary Operator Analisa Harga Satuan-Potable Water
4
- Basic Bln 1 1,750,000.00 1,750,000.00 194.44
- Tunjangan Shift III : Rp. 25.000,-/hari Bln 1 150,000.00 150,000.00 16.67
Jumlah hari Shift III : 6 Hari
- Tunjangan Hari Raya Bln 1 145,833.33 145,833.33 16.20
- Uang Makan : Rp. 15.000/hari Bln 1 15,000.00 15,000.00 1.67
- Uang Transport : Rp. Bln 1 - -
(dari rumah ke Kantor)
- Jamsostek : Rp. 30.000,-/bln Bln 1 30,000.00 30,000.00 3.33
- PPh : 3% dari Basic Bln 1 52,500.00 52,500.00 5.83
- Over Time (Jam/bln) : 70 Bln 1 505,780.35 505,780.35 56.20
Jumlah Personal : 12 Orang
294.35
5 Salary Roving Bln 1 2,200,000.00 2,200,000.00
- Tunjangan Jabatan : Rp. Bln 650,000.00 -
- Tunjangan Hari Raya : Rp. Bln 1 183,333.33 183,333.33
- Uang Makan : Rp. 12.500/hari Org 1 325,000.00 325,000.00
- Uang Transport : Rp. 7.000.- Bln 1 182,000.00 182,000.00
- Jamsostek : Rp. 50.000,-/bln Bln 1 60,000.00 60,000.00
- PPh : 3% dari Basic Bln 1 66,000.00 66,000.00
Jumlah Personal : 10 Orang
3,016,333.33 335.15

Code No. : A.II.3.d.


Subjek : Maintenance Repairing
Sub Objek : Mchanical & Electrical
Lokasi : WTP Sangatta Baru dan WTP Tj. Bara

Estimate Biaya
Estimate Satuan Harga Satuan
No. U R A I A N
Vol / Qtt Jumlah USD
IDR
1 Preventive Maintenance
- Lubrication (Grease) 1 x/Bln 750,000.00 750,000.00
- Peminyakan 1 x/Bln 250,000.00 250,000.00
- Check setting 1 x/Bln 350,000.00 350,000.00
- Pengukuran Tegangan, Arus beban dan Tahanan Isolasi. 4 x/Bln 125,000.00 500,000.00
- Perawatan jalan inspeksi pipa 0.6 x/Bln 5,000,000.00 3,000,000.00
- Pembersihan Filter, Clarifier & Treated Water 0.6 x/Bln 7,500,000.00 4,500,000.00
- Pembersihan Lingkungan 1 x/Bln 675,000.00 675,000.00
10,025,000.00 1,113.89
2 Perbaikan / Penggantian Komponen
- Electromotor pompa 1 x/Bln 5,500,000.00 5,500,000.00
- Komponen panel kontrol pompa 1 x/Bln 1,250,000.00 1,250,000.00
- Valve & Accessories lain 1 x/Bln 3,500,000.00 3,500,000.00
- Pompa Fire & Hydrant & lainya 1.00 x/Bln 15,000,000.00 15,000,000.00
- Water Meter 1 x/Bln 1,500,000.00 1,500,000.00
- Pipa Distribusi 5 x/Bln 9,500,000.00 47,500,000.00
- Bearing pompa centrifugal 0.6 x/Bln 2,275,000.00 1,365,000.00
- Mechanical seal pompa centrifugal 0.6 x/Bln 2,250,000.00 1,350,000.00
- Pompa kimia (dozing pump) 0.6 x/Bln 7,500,000.00 4,500,000.00
- Cubicle box Panel Control 0.6 x/Bln 6,250,000.00 3,750,000.00
85,215,000.00 9,468.33
3 Other
- Telekomunikasi 1 Ls 1,250,000.00 1,250,000.00
- Lain-lain 1 Ls 500,000.00 500,000.00
1,750,000.00

Page 5 of 9
Analisa Harga Satuan-Potable Water
Code No. : A.II.3.e.
Subjek : Safety Equipment
Sub Objek : Personal Safety Equipment
Lokasi : OFFICE, STP & SWIMMING POOL
PPE per bulan $767.69
Harga Satuan Jumlah Harga
No. Uraian Satuan Jumlah
( Rp. ) ( Rp. ) ( USD )
1 Operator Org 12 125,833.33 1,510,000.00 167.78
- Seragam Kerja : 2 x/thn @ Rp.400.000,-
- Sepatu Safety : 2x/thn @ Rp. 325.000,-
- Kaca Mata : 1x / 6 bulan @Rp. 30.000,-
Jumlah : 125,833.33
2 WTP (Sangatta Baru & Tj. Bara) Bln 1 282,500.00 282,500.00 31.39
- Helmet safety : 1x / 1 tahun @ 150.000 x 3 Org
- Sarung Tangan karet : 1x / 3 bulan @ Rp. 160.000,-
- Life Jacket : 2x / thn @ Rp. 225.000,- x 3 Org
- Jas Hujan : 2 x (2x / thn) @ Rp. 75.000 x 3 Org
- P3K : 1 box / tahun @ Rp. 250.000,-
Jumlah : 282,500.00
3 Leading Hand & Helper Org 10 336,666.67 3,366,666.67 374.07
- Seragam Kerja : 2 x/thn @ Rp.400.000,-
- Sepatu Safety : 2x/thn @ Rp. 325.000,-
- Helmet safety : 1x / 1 tahun @ 150.000
- Sarung Tangan : 1x / 3 bulan @ Rp. 160.000,-
- Jas Hujan : 2 x /thn @ Rp. 75.000
- Kaca Mata : 1x / 6 bulan @Rp. 30.000,-
- Rompi : 2x/thn @ Rp. 250.000,-
- Life Jacket : 2x / thn @ Rp. 225.000,-
- Sepatu Boot : 1x / 6 bulan @ Rp. 2.400.000,-
Jumlah : 336,666.67
4 Roving Org 10 175,000.00 1,750,000.00 194.44
- Seragam Kerja : 2 x/thn @ Rp.400.000,-
- Sepatu Safety : 2x/thn @ Rp. 325.000,-
- Helmet safety
- Sarung Tangan
- Jas Hujan : 2 x /thn @ Rp. 75.000
- Kaca Mata
- Rompi : 2x/thn @ Rp. 250.000,-
- Life Jacket
- Sepatu Boot
Jumlah : 175,000.00
Sub Total PPE 6,909,166.67 767.69

Page 6 of 9
Tabel
NILAI DEPRESIASI BARANG / PERALATAN

No. Tahun ESTIMASI HARGA


Jenis Barang / Peralatan
Lambung Pembuatan Saat Ini 3 Thn Mendatang
KENDARAAN OPERASIONAL (VEHYCLE)
Daihatsu Rocky 1996 60,000,000.00 -
Daihatsu Taft 1996 45,000,000.00 -
Daihatsu Rocky 1996 65,000,000.00 -
Daihatsu Rocky 1996 65,000,000.00 -
Daihatsu Hiline 2000 55,000,000.00 -
NILAI DEPRESIASI Jumlah Harga Depr %
Tahun 1 Tahun 2 Tahun 3 Terdepresiasi per Bulan Depresiasi

20,000,000.00 24,000,000.00 28,800,000.00 72,800,000.00 2,022,222.22 3.37%


15,000,000.00 18,000,000.00 21,600,000.00 54,600,000.00 1,516,666.67 3.37%
21,666,666.67 26,000,000.00 31,200,000.00 78,866,666.67 2,190,740.74 3.37%
21,666,666.67 26,000,000.00 31,200,000.00 78,866,666.67 2,190,740.74 3.37%
18,333,333.33 22,000,000.00 26,400,000.00 66,733,333.33 1,853,703.70 3.37%
#DIV/0!
#DIV/0!
#DIV/0!
Depresiasi

Anda mungkin juga menyukai