Anda di halaman 1dari 4

A B C D E F G

1400
N
400 100 300 300 300
KETERANGAN : TEKNIK KONSTRUKSI
7 DAN PERUMAHAN
100

BORDES NAIK LL2


= LC (LED Strip Drop Ceilling)
FFL+2.60 = SK (Stop Kontak)
6
LD2 LD2
= S (Saklar Tunggal) TUGAS AKHIR
NAIK

LD2 LD2

400
LL1
= SG (Saklar Ganda) TERINTEGRASI - APL - KUG - ESTIMASI
Tahun Pelajaran 2023/2024
= KWH (Kwh Meter)
400

LG2 LL1 LD2 LD2


= MCB (Mini Circuit Breaker)
5
4
LL2
KETERANGAN :
DPIB

100
LD2 LD2
DESAIN PERMODELAN DAN
3 INFORMASI BANGUNAN
LP KODE NAMA JMLH

1130
LD1 LD1 LD1 LD1

LG1 Lampu Gantung LED 1 bh Nomor Presensi:


24
LG2 Lampu Gantung LED 1 bh
350

350
LL1 LG1
LP LD1 Downlight 10watt 7 bh
Nama Siswa:
LD2 Downlight 8watt 8 bh
LD1 LD1 LD1
LL1 Lampu LED 18watt 3 bh
FADHIL AINUR ROHMAT
2 LL2 Lampu LED 15watt 2 bh
LP Judul Gambar Skala
LP Lampu LED 8watt 10 bh

LC Lampu LED Strip 15,8m RENCANA TITIK


280

280
1:100
LAMPU LANTAI 1
SG
SK Lampu
StopLED 8watt
Kontak 10 bh
8 bh
1 LP LP LP LP LP
S Saklar 3 bh
LP LP
SG Saklar Ganda 4 bh
Catatan :
400 400 100 200 300 MCB Mini Circuit Breaker 1 bh

1400 KWH KWH Meter 1 bh

1 RENC. INS. TITIK LAMPU LT.1 KODE HAL JML

ME-1 Skala 1 : 100


Me 1
A B C D E F G
1400
N
400 100 300 300 300
KETERANGAN : TEKNIK KONSTRUKSI
7 DAN PERUMAHAN
100

BORDES NAIK
= LC (LED Strip Drop Ceilling)
LD1 LD1 LD1 LD1
FFL+2.60 = SK (Stop Kontak)
6
VOID = S (Saklar Tunggal) TUGAS AKHIR
NAIK

400
LL1
= SG (Saklar Ganda) TERINTEGRASI - APL - KUG - ESTIMASI
Tahun Pelajaran 2023/2024
LG1
400

LD1 LD1

5 KETERANGAN :
4
LL2 KODE NAMA JMLH
DPIB

100
LD1 LD1 LD1 LD1
DESAIN PERMODELAN DAN
LG1 Lampu Gantung LED 2 bh
3 INFORMASI BANGUNAN
LD1 Downlight 10watt 15 bh

1130
LD1 LD1

LG1 LD2
LL1 Lampu
Downlight
LED 8watt
18watt 81 bh Nomor Presensi:
24
LL2
LL1 Lampu LED 15watt
18watt 31 bh
350

350
LL1
LC Lampu LED Strip 30m
Nama Siswa:
SK Stop Kontak 6 bh
LD1 LD1 LD1
FADHIL AINUR ROHMAT
SG
S Saklar Tunggal 15,8m
53 bh
2 SG
SK Lampu
StopLED
Saklar 8watt
Ganda
Kontak 10 bh
51 bh
Judul Gambar Skala

RENCANA TITIK
280

280
1:100
LAMPU LANTAI 2

Catatan :
400 400 100 200 300

1400

1 RENC. INS. TITIK LAMPU LT.2 KODE HAL JML

ME-2 Skala 1 : 100


Me 2
A B C D E F G
1400 N
400 100 300 300 300
TEKNIK KONSTRUKSI
7 DAN PERUMAHAN

100
BORDES NAIK
FFL+2.60
6
DAPUR
FFL ±0.00
TUGAS AKHIR
GARASI

NAIK

400
TERINTEGRASI - APL - KUG - ESTIMASI
FFL ±0.00 Tahun Pelajaran 2023/2024

R. KELUARGA R. TIDUR 2
400

FFL ±0.00 FFL ±0.00

4
5
KM/WC
DPIB

100
FFL -0.05 DESAIN PERMODELAN DAN
INFORMASI BANGUNAN
3
1130

1130
Nomor Presensi:

TERAS 24
R. TIDUR 1 FFL +0.10
R. TAMU
350

350
FFL ±0.00
FFL +0.10 Nama Siswa:

FADHIL AINUR ROHMAT


IN D+AC HALAMAN
2 Judul Gambar Skala
OUT GL -0.03

RENCANA TITIK
1:100
280

280
AC LANTAI 1

Catatan :
400 400 100 200 300
KETERANGAN :
Indoor AC Split 1 PK KLASIFIKASI AC :
IN
(Paard Kracht) Indoor Unit Outdoor Unit ABBREVIATION :
Outdoor AC Split FFL : Finished Floor Level
OUT
(Elevasi Muka Lantai) 1 RENC. TITIK AC LT.1 KODE HAL JML
D+AC Stop Kontak AC Evaporator AC Condensor AC GL : Ground Level ME-3 Skala 1 : 100
Arah Selang AC Split 1 bh Split 1 bh (Elevasi Muka Tanah)
Me 3
A B C D E F G
1400 N
400 100 300 300 300
TEKNIK KONSTRUKSI
7 DAN PERUMAHAN

100
BORDES NAIK
FFL+2.60
6
VOID TUGAS AKHIR
BALKON

NAIK

400
TERINTEGRASI - APL - KUG - ESTIMASI
FFL +4.30 Tahun Pelajaran 2023/2024

R. SANTAI
400

FFL +4.30

4
5
KM/WC
DPIB

100
FFL -4.25 DESAIN PERMODELAN DAN
INFORMASI BANGUNAN
3
1130

1130
R. KERJA Nomor Presensi:
FFL +4.30 24
R. TIDUR 3
350

350
FFL +4.30 R. SANTAI
Nama Siswa:

IN
FFL +4.30
FADHIL AINUR ROHMAT
IN D+AC D+AC
2 HALAMAN
GL -0.03 Judul Gambar Skala
OUT OUT

RENCANA TITIK
1:100
280

280
AC LANTAI 2

Catatan :
400 400 100 200 300
KETERANGAN :
Indoor AC Split 1 PK KLASIFIKASI AC :
IN
(Paard Kracht) Indoor Unit Outdoor Unit ABBREVIATION :
Outdoor AC Split FFL : Finished Floor Level
OUT
(Elevasi Muka Lantai) 1 RENC. TITIK AC LT.2 KODE HAL JML
D+AC Stop Kontak AC Evaporator AC Condensor AC GL : Ground Level ME-4 Skala 1 : 100
Arah Selang AC Split 1 bh Split 1 bh (Elevasi Muka Tanah)
Me 4

Anda mungkin juga menyukai