KOTA SAMARINDA
JLN. TIRTA KENCANA TELP. 741460
SAMARINDA
GAMBAR RENCANA
KEGIATAN :
PENGENTASAN PERMUKIMAN KUMUH TERPADU
PEKERJAAN :
PENGADAAN DAN PEMASANGAN PIPA HDPE PN-10 SNI, ND-4", POMPA DAN ACC
LOKASI :
JL. OTTO ISKANDARDINATA RT. 17 KEL. SIDODAMAI KEC. SAMARINDA ILIR
KETERANGAN
PEKERJAAN
LOKASI
DIRENCANAKAN
ASISTEN MANAJER PERENCANAAN TEKNIK
M. SOKHIEF AMIRSYAH
DIPERIKSA
MANAJER PERENCANAAN TEKNIK
H. M. ADY FACHRUDI, ST
DIKETAHUI/DISETUJUI
DIREKTUR TEKNIK
DIGAMBAR BLN/THN
PERUMDAM
JULI/22
TIRTA KENCANA
01 03
PERUSAHAAN DAERAH AIR MINUM
KOTA SAMARINDA
JLN. TIRTA KENCANA TELP. 741460
SAMARINDA
PEKERJAAN
LOKASI
DIRENCANAKAN
ASISTEN MANAJER PERENCANAAN TEKNIK
M. SOKHIEF AMIRSYAH
DIPERIKSA
H. M. ADY FACHRUDI, ST
DIKETAHUI/DISETUJUI
DIREKTUR TEKNIK
DIGAMBAR BLN/THN
PERUMDAM
JULI/22
TIRTA KENCANA
02 03
KETERANGAN
T
IS
EX
".
R
4
MT
D- N
MT C
C
34
MT
PV
96 REN
R
PA
R
27
MT
PI
".
NC
-4
4
RE
20
R
NC
MT E N
MT
".
RE
-4
2
96 HDP
R
16
ND
" .
-4
PA
PE
ND
PI
HD
Gg. DAMAI
C
PE
N
PA
RE
HD
PI
".
PA
-4
PI
ND
PE
NC
HD
R
RE
MT
20
4
PA
MT
2
".
R
16
PI
-4
ND
PE
HD
PA
R
MT
PI
0
27
R
MT
2
R
34
MT
0
75
Gg. DAMAI
LOKASI PROYEK
PEKERJAAN
LIM
MUS
PENGADAAN DAN PEMASANGAN
MAI
AN
DA
BUR
Gg.
KU
PIPA HDPE S-8 SDR-17 PN-10 SNI, ND-4"
POMPA SERTA ACC
LOKASI
RENC
BOOSTER
Gg.Tir
ta Ke
KEL. SIDODAMAI
TR
78 M
TR
DIRENCANAKAN
96 M
96
8
10
96
36
M. SOKHIEF AMIRSYAH
78
SDN 081
DIPERIKSA
B
lo
ck
4
MANAJER PERENCANAAN TEKNIK
78
84
MTR
750
JL.
OTTO
84
ISKA
ND SD
ARDI
NA Lang Ra Islam
TA ga bi
r Athf atul
EX.T al
a
EN
nalis
GG
IRI PU
H. M. ADY FACHRUDI, ST
Mo
SK
ES
Gg.
MAS
DIKETAHUI/DISETUJUI
. 12
Gg
LRI
DIREKTUR TEKNIK
PO
ma
MAS
Asra
WAH JID
ADA
Apel
aru
B
Gg.
ng
Ga
C
PV
MM
0
∅5
PA
PI
GE TK
LA
TIK MU
SL
ALI RACHMAN AS, ST, MT
RA IMA
NT H
IN NU
ga
G
luar
DIGAMBAR
Ke
BLN/THN
.
Gg
I
MA
PIPA ∅50
DA
MM PVC
ah
Ind
MAS
an
.
Gg
JID
Gg. Budim
Gg.
ur
. Tim
PIPA ∅75 MM
PVC
PERUMDAM
Gg
JL. OTTO
JULI/22
Bonsai
ISKANDARD
INATA
Gg. Stelling
Gg.
TIRTA KENCANA
I
MA
DA
PIP
A
.
∅7
JL
5
MM
PVC
03 03
RENCANA ANGGARAN BIAYA
Nama Pekerjaan : Pengadaan dan Pemasangan Pipa HDPE S-8 SDR-17 PN-4" SNI dan Pompa Lengkap serta Acc.
Lokasi : Jl. Damai RT.17 Kel. Sidodamai Kec. Samarinda Ilir - Samarinda
HARGA
NO. URAIAN PEKERJAAN VOLUME / SATUAN SATUAN JUMLAH
( Rp. ) ( Rp. )
1 2 3 4 5
I Pekerjaan Pengadaan :
A. Pekerjaan Pengadaan Pipa dan Acc. :
1 Pipa HDPE S-8 SDR-17 PN-10 SNI, ND-4" 2.478 mtr 195.700,00 484.944.600,00
2 Tee HDPE S-8 SDR 17 PN 10 ND-4" x ND-4" 9 bh 436.000,00 3.924.000,00
3 Tee PVC All Socket ND-4" x ND-4" 2 bh 554.000,00 1.108.000,00
4 Giboult Joint DCI ND-4" 2 bh 987.000,00 1.974.000,00
5 Flange Spigot PVC ND-4" 2 bh 317.000,00 634.000,00
6 Bend 45° HDPE PN-10, ND-4" 15 bh 593.000,00 8.895.000,00
7 Bend 90° HDPE PN-10, ND-4" 11 bh 732.000,00 8.052.000,00
8 Stub End HDPE PN-10 + Backing Ring Steel ND-4" 17 bh 509.000,00 8.653.000,00
9 Gate Valve CI MS, ND-4" 1 bh 5.201.000,00 5.201.000,00
10 Street Box utk GV. ND-4" 1 bh 657.500,00 657.500,00
11 Blind Flange Steel ND-4" 15 bh 558.100,00 8.371.500,00
12 Paking Karet ND-4" 17 bh 60.000,00 1.020.000,00
13 Baut/Mur 5/8"x3" 136 bh 15.000,00 2.040.000,00
Jumlah I. A 535.474.600,00
B. Pekerjaan Pengadaan Pompa Lengkap dan Acc. :
1 Pompa Grunfos 5 ltr/dtk 2 bh 395.000.000,00 790.000.000,00
2 Panel Pompa Star delta 2 x 5,5 kw 1 set 175.000.000,00 175.000.000,00
(Pressure control, high level, phasa protec)
3 Pemasangan Daya Listrik 10.000 Va (BP UJL + SLO) 1 bh 15.000.000,00 15.000.000,00
4 Reduser Steel All Flange ND-2" x ND-3" 4 bh 1.485.000,00 5.940.000,00
5 Flexible Joint 2 gel, ND-3'' 2 bh 981.000,00 1.962.000,00
6 Check Valve ND-3'' 2 bh 2.608.000,00 5.216.000,00
7 Butterfly Valve ND-3'' 4 bh 1.474.000,00 5.896.000,00
8 Blind Flange PN.10, ND-4'' 1 bh 1.174.000,00 1.174.000,00
9 Pipa Steel SC.40 Seamless, ND-3" (Incian di Pompa ) 12 mtr 265.000,00 3.180.000,00
10 Pipa Steel SC.40 Seamless, ND-4" ( Pipa Inlet Pompa ) 40 mtr 405.000,00 16.200.000,00
11 Pipa Steel SC.40 Seamless, ND-4" ( Pipa Outlet Pompa ) 40 mtr 405.000,00 16.200.000,00
12 Bend 45° Steel SC.40 Polos, ND-4" 2 bh 360.300,00 720.600,00
13 Bend 90° Steel SC.40 Polos, ND-4" 1 bh 299.400,00 299.400,00
14 Bend 90° Steel SC.40 Polos, ND-3" 2 bh 139.500,00 279.000,00
15 Tee Steel All Flange ND-4" x ND-4" 1 bh 3.369.000,00 3.369.000,00
16 Gate Valve CI MS, ND-4" 2 bh 5.201.000,00 10.402.000,00
17 Flange Steel PN.10, ND-3" 6 bh 303.100,00 1.818.600,00
18 Flange Steel PN.10, ND-4" 1 bh 336.200,00 336.200,00
19 Packing Karet ND-2" 4 lbr 30.000,00 120.000,00
20 Packing Karet ND-3" 28 lbr 45.000,00 1.260.000,00
21 Packing Karet ND-4" 4 lbr 60.000,00 240.000,00
22 Baut/Mur 5/8" x 3" 264 bj 15.000,00 3.960.000,00
Jumlah I. B 1.058.572.800,00
Jumlah I 1.594.047.400,00
II Pekerjaan Pemasangan Pipa dan Acc :
A. Pekerjaan Persiapan :
1 Pengukuran lokasi pekerjaan 1 ls 500.000,00 500.000,00
2 Mobilisasi bahan ke lokasi pekerjaan 1 ls 10.000.000,00 10.000.000,00
3 Dokumentasi dan administrasi 1 ls 1.000.000,00 1.000.000,00
Jumlah II. A 11.500.000,00
B. Pekerjaan Galian dan Urugan :
1 Galian tanah keras 693,84 m³ 181.250,00 125.758.500,00
2 Pasir urug selimut pipa 89,46 m³ 201.020,00 17.983.249,20
3 Urugan kembali bekas galian 585,06 m³ 72.500,00 42.416.850,00
4 Bongkaran jalan cor beton 200,00 m² 341.000,00 68.200.000,00
Jumlah II. B 254.358.599,20
C. Pekerjaan Pemasangan Pipa dan Acc. :
1 Pipa HDPE S-8 SDR-17 PN-10 SNI, ND-4" 2.478 mtr 178.220,00 441.629.160,00
2 Tee HDPE S-8 SDR 17 PN 10 ND-4" x ND-4" 9 bh 226.320,00 2.036.880,00
3 Tee PVC All Socket ND-4" x ND-4" 2 bh 57.660,00 115.320,00
4 Giboult Joint DCI ND-4" 2 bh 136.510,00 273.020,00
5 Flange Spigot PVC ND-4" 2 bh 44.495,00 88.990,00
6 Bend 45° HDPE PN-10, ND-4" 15 bh 226.320,00 3.394.800,00
7 Bend 90° HDPE PN-10, ND-4" 11 bh 226.320,00 2.489.520,00
8 Stub End HDPE PN-10 + Backing Ring Steel ND-4" 17 bh 226.320,00 3.847.440,00
9 Gate Valve CI MS, ND-4" 1 bh 179.055,00 179.055,00
10 Street Box utk GV. ND-4" 1 bh 248.125,30 248.125,30
11 Blind Flange Steel ND-4" 15 bh 115.485,00 1.732.275,00
Jumlah II. C 456.034.585,30
Jumlah. I 1.594.047.400,00
II PEKERJAAN PEMASANGAN PIPA DAN ACC. 1.387.039.420,46
A. PEKERJAAN PERSIAPAN Rp 11.500.000,00
B. PEKERJAAN GALIAN & URUGAN Rp 254.358.599,20
C. PEKERJAAN PEMASANGAN PIPA DAN ACC Rp 456.034.585,30
D. PENGADAAN POMPA LENGKAP DAN ACC Rp 50.676.464,46
E. PEKERJAAN LAIN - LAIN Rp 614.469.771,50
Jumlah. II 1.387.039.420,46
Jumlah I s/d II 2.981.086.820,46
Dibulatkan 2.981.080.000,00
Ppn 11% 327.918.800,00
Jumlah Total 3.308.998.800,00
Terbilang : # Tiga Miliar Tiga Ratus Delapan Juta Sembilan Ratus Sembilan Puluh Delapan Ribu Delapan Ratus Rupiah #