Tugas Arlan
Tugas Arlan
A. UPAH
NO. URAIAN SATUAN HARGA DASAR (Rp) JASA KONTRAKTOR 10%
1 Pekerja OH 60,000.00
2 Tukang cat OH 90,000.00
3 Tukang besi OH 90,000.00
4 Tukang batu OH 90,000.00
5 Tukang kayu OH 90,000.00
6 Tukang listrik OH 90,000.00
7 Kepala tukang OH 100,000.00
8 Mandor OH 110,000.00
JUMLAH (Rp)
60,000.00
90,000.00
90,000.00
90,000.00
90,000.00
90,000.00
100,000.00
110,000.00