Anda di halaman 1dari 1

A Siku 50.50.

Siku 50.50.3 Pipa Besi Ø4"


Rangka ACP
10500

680 .40
.1,2

300 500 Ho
llow4
0
ACP Hitam
Hollow 40.40.1,2

1
Rangka ACP
ACP Hitam Potongan 1
Hollow 40.40.1,2
2000

Hollow 40.40.1,2
H
oll
ow
40
.4
0.
1,
2

Sloof 1000
10500
500 1388 1330 1605 2826 2072 1108 500

1500 500

Besi Tulangan Pipa Besi Ø4"


D10 - 250
1000 Potongan 2
Tampak Depan Konstruksi
Siku 50.50.3 500

Letter
Siku 50.50.3 Pipa Besi Ø4" tb.150 mm

680 ACP Hitam


300
500
Rangka ACP 100 Hollow 40.40.1,2
2000
ACP Hitam Hollow 40.40.1,2
2000
Tanah Urug
Hollow 40.40.1,2

2
1,
0.
.4
40
ow
oll
H

1100
Batu Kali Besi Tulangan
1000 D10 - 250
1000 Sloof

200 Aanstamping
100 Pasir Urug 1500
1500
1000

1000
Detail Pondasi
Tampak Belakang Konstruksi 1000
Potongan A

NAMA PROYEK KONSULTAN PERENCANA JUDUL GAMBAR DISETUJUI DIPERIKSA DIGAMBAR DATA
PM ENG DRF SKALA : 1 : 100
DIGAMBAR :
KODE : LETTER
LETTER TAMPAK NO. GAMBAR : 02
Ruko Jemur Raya Blok B17-18
Jl. Jemursari 203 Surabaya TGL : 1-Dec-20
Phone : 031.8497404 Fax. : 031.8497405 :
A. SYAIFUL RIDHWAN L A. KHOLIL FILE

Anda mungkin juga menyukai