DATA JTM :
TG. BETON 13 M; 350 daN : BTG
TG. BETON 11 M; 200 daN : BTG
TM 3 PHS A3C/S 70 mm2 : KMS
TM 3 PHS A3C/S 150 mm : KMS
TM 1 PHS A3C/S 70 mm2 : KMS
TUMPU TUNGGAL (T') : SET
TUMPU GANDA (T") : SET
:
SET
SET
LA ASPAN TUNGGAL EKSISTING (A'T) : SET
KONSUL T.ASPAN GANDA (KA") TR : SET
KONSUL T.ASPAN TUNGGAL (KA') TM : SET
ASPAN TUNGGAL (A') : SET
DE SA LA
SA SA SA SA TP. TARIK T.BANTU : SET
SA SA SA
LA SA SA SA ARRESTER JARING : SET
LA SA DATA GD :
GC. 3 PHS 25 KVA : 1 BH
GP. 3 PHS 160 KVA : BH
Pembangunan gardu tiang 3 phasa 20 kV (1 tiang). : 1 SET
SA DATA JTR :
TG. BETON 11 M; 200 daN : BTG
TG.BETON 9 M; 200 daN : 29 BTG
JTR 3 PHASA LVTC 3x35+25 mm2 : 1.10 KMS
ULP SINJAI
DISURVEY : Yogi NO. GBR :
DIPERIKSA : Akhmad