Anda di halaman 1dari 1

KETERANGAN

I. EXISTING
: JTM / JTR EXISTING
UPRATING TRAFO KE
250 kVA 3 PHASE : T.BETON 11 EXISTING

: T.BESI 11 EXISTING

: T.BETON 9 EXISTING

: T.BESI 9 EXISTING

: G.DIST 3 FASA

: TUPANG TARIK

: TUPANG TEKAN

: TUPANG TARIK TIANG BANTU

II. PEMASANGAN
EXIST. GD 100 A. JARINGAN TEGANGAN MENEGAH (JTM)

Kva 3 Phase
: JTM A3C 3 FASA 70MM2

: T.BETON 11 350 daN = 1 Btg

ALBS : T.BESI 11 200 daN

: TT ( Tupang Tarik)

: TK (Tupang Tekan)

: TTB (Tupang Tarik Tiang Bantu)

1, 2, dst. = Nomor Tiang


BT/11-200E = Tipe Tiang
T1F, T2F, A1V = Asesoris JTM
SA, DE = Asesoris JTR

B. GARDU DISTRIBUSI

: GD 3 Fasa 2T 160 KVA 20KV/B2

: GD 3 Fasa 1T 50 KVA 20KV/B2 = 1 Set

: GD 1 Fasa 1T KVA 20KV/B2

C. JARINGAN TEGANGAN RENDAH (JTR)

: JTR LVTC 3 PH 35 MM2 = 400 Mtr

: T.BETON 9 200 daN = Btg

: T.BESI 9 90 daN

: Tupang Tarik = Set

: Tupang Tekan

: TTB (Tupang Tarik Tiang Bantu)

: E (Pentanahan Ujung JTR) = Set

RENCANA UPRATING TRAFO dan


RENCANA UPRATING TRAFO DAN PEMASANGAN PENARIKAN SUTR UNTUK MR DIY
SUTR UNTUK MR DIY KOLAKA UTARA KOLAKA UTARA
CALON PELANGGAN
MR DIY PD 1300 VA KE 53000 VA DIRENCANA DANANG
DIGAMBAR DANANG
-3.506122° , 120.885060° DIPERIKSA ANDRI AGUSTA
DISETUJUI ANDRI AGUSTA

GBR 1