KETERANGAN GAMBAR

1. EXISTING
JTM Topang Tekan
JTR Tiang Beton (TB)
Topang Tarik Tiang Besi (TS)
15 Topang Tarik Tiang Bantu

BT/11-200 2. RENCANA PEMASANGAN

A. JARINGAN TEGANGAN MENENGAH


FDE & BEP
1, 2, dst. = Nomor Tiang

BT/11-200E = Tipe Tiang

T1F, T2F, A1V = Asesoris JTM

SA, DE = Asesoris JTR

= SUTM 3Ф, A3CS 3 x 70 mm² = kms


= TB (Tiang Beton) 11 – 200 = 22 btg
14
= TB (Tiang Beton) 13 – 350 = btg
BT/11-200 GD PA-007 = TB (Tiang Beton) 13 – 350E = btg
SA 3P 200 kVA
= Pembetonan = 4 btg
= Konsul (KS) = btg
= LBS (Load Break Switch) = set
13
DS = Disconnecting Switch = set
BT/11-200
TITIK KOORDINAT LOKASI T1 = Travers Tumpu Tunggal = set
SA
-3.997446, 119.815988 T2 = Travers tumpu Ganda = set
A1 = Travers Afspan Tunggal = set

JALAN POROS TETEAJI


A2 = Travers Afspan Ganda = set
A2V = Travers Afspan Tambah = set
= TT (Topang Tarik) = set
12
11 = TK (Topang Tekan) = set
BT/11-200
BT/11-200 = TTB (Topang Tarik Tiang Bantu Beton = set
SA
= TTS (Topang Tarik Tiang Bantu Besi) = set
SA
B. GARDU DISTRIBUSI

3Ф = Jumlah Phasa

SINTRA = Merk Trafo


4
5 123456789 = Nomor Seri Trafo
BT/11-200 200 kVA = Kapasitas Trafo
BT/11-200
SA
LA & FDE
EKSIST = Gardu Distribusi 1 Tiang (Cantol) = unit

FDE BS/11-200
LVTC 70 = Gardu Distribusi 2 Tiang (Portal) = unit

SA C. JARINGAN TEGANGAN RENDAH (JTR)


3
10 9 8 7 6 16 2 1
BT/11-200 = LVTC 4 x 70 mm² = 0,85 kms
BT/11-200 BT/11-200 BT/11-200 BT/11-200 BT/11-200 BT/11-200 BT/11-200 BT/11-200 = Tiang Beton 9M = btg
SA
FDE & BEP SA SA SA & FDE SA SA SA SA SA = Small Angle (SA) Assembly = 17 set
LA = Large Angle (LA) Assembly = 2 set
FDE = Fixed Dead End (FDE) Assembly = 6 set
22 BEP = Bundled End Protection = 3 set
BT/11-200 = TT (Topang Tarik) = 2 set
= TK (Topang Tekan) = set
FDE & BEP 20 19 18 17 = TTB (Topang Tarik Tiang Bantu Beton) = set
21
BT/11-200 BT/11-200 = TTS (Topang Tarik Tiang Bantu Besi) = set
BT/11-200 BT/11-200 BT/11-200
SA SA = ED (Pembumian Ujung Dalam JTR) = 3 set
SA SA LA
= EL (Pembumian Ujung Luar JTR) = set
PT PLN (PERSERO) UP3 PAREPARE

RENCANA
PENARIKAN JTR LVTC 4X70 MM UNTUK PERBAIKAN DROP TEGANGAN
DAN SR SERI BANYAK

Lokasi JL POROS TETEAJI


DIGAMBAR IRWAN PRIBADI 15/03/2024
DIPERIKSA GUNAWAN F1 AMPARITA

DISETUJUI ADRYANI
No. Gambar 014/NIAGA/ULP PSD/2024