INSERT

Skala 100 m

Tiang beton 13 m 350 daN = btg


Tiang beton 11 m 200 daN = - btg
Tiang beton 11 m 200 daN (E) E = - btg
Tiang beton 9 m 200 daN (T.bnt TM) = - btg
Tiang beton 9 m 200 daN (T.bnt TR) = - btg

A3C-S 3 x 70 mm² = KmS


SKTM 240 mm2 = 0,696 Kms
Tumpu Tunggal T1 = Set
Tumpu Ganda T2 = Set
Aspan Ganda A2 = Set

Realisasi SKTM 240mm2


AtU
Aspan Ganda T.U. = Set
2 x Aspan Ganda T.U 2xAtU = Set
Aspan Type H AtH = - Set
Tupang Tarik = Set
Tupang Tarik T.Bantu = Set
Tupang Tekan = - Set
Tupang Tarik Khusus = Set

GD 3 phs 25 kVA = - bh
GD 3 phs 50 kVA = - bh
GD 3 phs 100 kVA = - bh

GH Gubernur
LVTC 3 x 35 +25 mm² DT = - Kms
LVTC 3 x 35 +25 mm² TT = - Kms
LVTC 3 x 70 +25 mm² DT = - Kms
LVTC 3 x 70 +25 mm² TT = - Kms
Small Angle Assembly SA = - set
Large Angle Assembly LA = - set
Dead End Assembly DE = - set
Pentanahn Biasa = - bh
Pentanahn Type E E = - bh
Tupang Tarik = - Set
Tupang Tarik T.Bantu = - Set

PARAF TANGGAL KETERANAGAN:


PT PLN (PERSERO) WIL. SULSELRABAR
DIGAMBAR PT. KRISTAL PURI KENCANA Tiang Beton Existing
UP3 MAMUJU
Patok Beton
JTR Existing
DIPERIKSA AGIL DEMONTARA
REALISASI PEMBANGUNAN SKTM DAN SUTM UNTUK No. Lembar : 1/1
DAERAH OBJEK VITAL/VIP
DISETUJUI AGIL DEMONTARA Tanggal : 26 Mei 2023