Es = 2.10E+05 Mpa
Ec = 2.53E+04 Mpa
n = 8.29
60
46
10
30 30
A B
Ket : A. Tumpuan
B. Lapangan
Lx = 4 m
Ly = 8 m
2
Luas penampang precast Apr = 804.00 cm
Berat sendiri precast = 192.96 kg/m'
yL1 = 28.29 cm
yL2 = 17.71 cm
It = 174,814.97 cm4
IL = 189,699.01 cm4
W t1 = 6,357.67 cm3
W t2 = 9,447.78 cm3
W L1 = 6,705.32 cm3
W L2 = 10,711.90 cm3
W T1 = 4,098.44 cm3
W T2 = 6,845.53 cm3
L= 7.775 m
qu = 1.2 * 188.4 = 231.6 kg/m'
Qu = 1.5 * qu = 347.3 kg/m' Faktor kejut = 1.5
M t 1.651 kg/cm2 < fr Oke !
W
L 1.566 kg/cm2 < fr Oke !
precast
balok kayu 5/7 cm
1/3 L 1/3 L 1/3 L
balok precast
scafolding
7.775 m
M
= 45.15 kg/cm
2
> fr Not Oke ! ---> perlu dipasang scafolding tengah
W
7.775 m
M
= 8.303 kg/cm
2
< fr Oke ! ---> perlu dipasang scafolding tengah
W
7.775 m
MT = (1/8)qu .(0.25xL)2= 1,006.50 kg.m'
2
ML = (1/10)qu .(0.25xL) + (0.25Pu (0.25xL)) = 882.952 kg.m
Faktor kejut = 1.5 MT = 1509.754 kg.m
= 150975.436 kg.cm
ML = 1324.428 kg.m
= 132442.849 kg.cm
36
10
864 kg/m2
ka .g .h
1
F .ka.g .h2 = 155.52 kg
2
1
M F . .h = 18.662 kg.m
3 = 1866.24 kg.cm
M
= 2.285 kg/cm
2
< fr Oke !
W
2
Dipakai tulangan D - 16 As = 2.01 cm Oke !