Anda di halaman 1dari 58

REKAPITULASI TOTAL

RENCANA ANGGARAN BIAYA (RAB)


P E K E R J A A N S T R U K T U R, A R S I T E K T U R, M & E

Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar


Lokasi : Makassar
Tahun Anggaran : 2020

JUMLAH HARGA ( Rp )
No. URAIAN PEKERJAAN
Kontrak MC 0 / ADD Balance

1 PEKERJAAN PERSIAPAN Rp 517,233,534 Rp 517,233,534 Rp -


2 PEKERJAAN STRUKTURAL Rp 2,524,052,786 #VALUE! #VALUE!
3 PEKERJAAN ARSITEKTURAL Rp 3,465,628,524 Rp 3,465,628,524 Rp -
4 PEKERJAAN ELEKTRIKAL MEKANIKAL PLUMBING Rp 2,537,999,172 Rp 2,620,674,683 Rp 106,109,801

TOTAL BIAYA KONSTRUKSI Rp 9,044,914,016 #VALUE! #VALUE!


PPN 10 % Rp 904,491,402 #VALUE! #VALUE!
BIAYA PENYAMBUNGAN LISTRIK by Owner by Owner by Owner
IMB by Owner by Owner by Owner
TOTAL PROYEK KANTOR SI 3 LANTAI : Rp 9,949,405,418 #VALUE! #VALUE!
DIBULATKAN : Rp 9,949,400,000 #VALUE! #VALUE!
Terbilang:
#VALUE!

Surabaya, 27 Januari 2021


Dibuat Oleh
PT. CITRA MANDIRI CIPTA

HARIYADI
Direktur Utama

REKAP TOTAL (2) 1 / 58


REKAPITULASI TOTAL
RENCANA ANGGARAN BIAYA (RAB)
P E K E R J A A N S T R U K T U R, A R S I T E K T U R, M & E

Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar


Lokasi : Makassar
Tahun Anggaran : 2020

JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

1 PEKERJAAN PERSIAPAN #NAME?


2 PEKERJAAN STRUKTURAL Rp 2,524,052,786
3 PEKERJAAN ARSITEKTURAL Rp 3,465,628,524
4 PEKERJAAN ELEKTRIKAL MEKANIKAL PLUMBING Rp 2,537,999,172

TOTAL BIAYA KONSTRUKSI #NAME?


PPN 10 % #NAME?
BIAYA PENYAMBUNGAN LISTRIK by Owner
IMB by Owner
TOTAL PROYEK KANTOR SI 3 LANTAI : #NAME?
DIBULATKAN : #NAME?
Terbilang:
Sembilan Milyar Sembilan Ratus Empat Puluh Sembilan Juta Empat Ratus Ribu Rupiah

Surabaya, 10 Nopember 2020


Dibuat Oleh
PT. CITRA MANDIRI CIPTA

HARIYADI
Direktur Utama

REKAP TOTAL 2 / 58
REKAPITULASI RENCANA ANGGARAN BIAYA
Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar
Tipe Prototipe : Bangunan Kantor
Jumlah Lantai : 3 Lantai
Lokasi : Jl. Kumala 128 Makassar
Tahun Anggaran : 2020

II. PEKERJAAN STRUKTUR

JUMLAH HARGA
NO. URAIAN PEKERJAAN
Kontrak MC 0 / ADD Balance

A. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)

1 Pekerjaan Pancang Rp 714,612,000 Rp 1,225,533,170 Rp 510,921,170

2 Pekerjaan Pilecap Rp 77,446,378 Rp 106,877,415 Rp 29,431,037

3 Pekerjaan Tie Beam (sloof) Rp 89,239,263 Rp 98,818,746 Rp 9,579,483

4 Pekerjaan Galian Tanah Rp 4,399,487 Rp 8,919,238 Rp 4,519,751

5 Pekerjaan Urugan Pasir Rp 2,570,305 Rp 2,916,775 Rp 346,470

6 Pekerjaan Lantai Kerja Rp 5,083,874 Rp 5,879,197 Rp 795,323

7 Urugan tanah kembali bekas galian Rp 546,471 Rp 546,471 Rp -

8 Tanah urug peninggian lantai t=53 cm (dalam bangunan) Rp 15,458,400 Rp 15,458,400 Rp -

9 Pasir urug diatas tanah urug t=10 cm (dalam bangunan) Rp 7,268,160 Rp 7,268,160 Rp -

10 Pekerjaan Test PDA Tiang Bore Rp 74,156,250 Rp 148,312,500 Rp 74,156,250

11 Peninggian Semua Site setinggi 35 cm tanah urug padat mesin Rp 54,915,966 Rp 54,915,966 Rp -

12 Penambahan camp. Waterproffing (integral) pada beton Bawah Rp 7,471,810 Rp 7,471,810 Rp -

13 Anti Rayap suntik pada tanah urug sebelum lantai dasar Rp 8,678,400 Rp 8,678,400 Rp -

Sub total A Rp 1,061,846,764 Rp 1,691,596,248 Rp 629,749,484

B. PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE)

1 Pekerjaan Struktur Lantai Dasar Rp 166,384,173 Rp 244,908,578 Rp 78,524,405

2 Pekerjaan Struktur Lantai 2 Rp 558,848,919 Rp 570,342,761 Rp 11,493,842

REKAP STR (2) 3 / 58


3 Pekerjaan Struktur Lantai 3 Rp 530,703,966 Rp 534,841,715 Rp 4,137,749

4 Pekerjaan Struktur Lantai Dak (ATAP) Rp 206,268,964 #VALUE! #VALUE!

Sub total A Rp 1,462,206,022 #VALUE! #VALUE!

Jumlah Total Harga Pekerjaan Struktur (A + B) Rp 2,524,052,786 #VALUE! #VALUE!

REKAP STR (2) 4 / 58


REKAPITULASI RENCANA ANGGARAN BIAYA
Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar
Tipe Prototipe : Bangunan Kantor
Jumlah Lantai : 3 Lantai
Lokasi : Jl. Kumala 128 Makassar
Tahun Anggaran : 2020

II. PEKERJAAN STRUKTUR

JUMLAH HARGA
NO. URAIAN PEKERJAAN
( Rp)

A. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE) Rp 1,061,846,764

1 Pekerjaan Pancang Rp 714,612,000

2 Pekerjaan Pilecap Rp 77,446,378

3 Pekerjaan Tie Beam (sloof) Rp 89,239,263

4 Pekerjaan Galian Tanah Rp 4,399,487

5 Pekerjaan Urugan Pasir Rp 2,570,305

6 Pekerjaan Lantai Kerja Rp 5,083,874

7 Urugan tanah kembali bekas galian Rp 546,471

8 Tanah urug peninggian lantai t=53 cm (dalam bangunan) Rp 15,458,400

9 Pasir urug diatas tanah urug t=10 cm (dalam bangunan) Rp 7,268,160

10 Pekerjaan Test PDA Tiang Bore Rp 74,156,250

11 Peninggian Semua Site setinggi 35 cm tanah urug padat mesin Rp 54,915,966

12 Penambahan camp. Waterproffing (integral) pada beton Bawah Rp 7,471,810

13 Anti Rayap suntik pada tanah urug sebelum lantai dasar Rp 8,678,400

B. PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE) Rp 1,462,206,022

1 Pekerjaan Struktur Lantai Dasar Rp 166,384,173

2 Pekerjaan Struktur Lantai 2 Rp 558,848,919

3 Pekerjaan Struktur Lantai 3 Rp 530,703,966

4 Pekerjaan Struktur Lantai Dak (ATAP) Rp 206,268,964

Jumlah Total Harga Pekerjaan Struktur (A + B) Rp 2,524,052,786

REKAP STR 5 / 58
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB) - PEKERJAAN ARSITEKTUR
Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar
Lokasi : Makassar
Tahun Anggaran : 2020

JUMLAH HARGA (Rp.)


No. URAIAN PEKERJAAN
Kontrak MC 0 / ADD Balance

A. PEKERJAAN ARSITEKTUR STANDART Rp 2,889,739,217 Rp 2,889,739,217 Rp - ###


A.1. PEKERJAAN LANTAI Rp 454,374,361 Rp 454,374,361 Rp - ###
I LANTAI DASAR Rp 146,502,586 Rp 146,502,586 Rp -
II LANTAI DUA Rp 141,996,271 Rp 141,996,271 Rp -
III LANTAI TIGA Rp 136,823,891 Rp 136,823,891 Rp -
IV LANTAI ATAP DAN ROOF TANK Rp 29,051,613 Rp 29,051,613 Rp -

A.2. PEKERJAAN DINDING Rp 1,809,531,581 Rp 1,809,531,581 Rp - ###


A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN Rp 692,942,806 Rp 692,942,806 Rp - ###
I LANTAI DASAR Rp 194,716,129 Rp 194,716,129 Rp -
II LANTAI DUA Rp 196,960,978 Rp 196,960,978 Rp -
III LANTAI TIGA Rp 245,128,522 Rp 245,128,522 Rp -
IV LANTAI ATAP DAN ROOF TANK Rp 56,137,177 Rp 56,137,177 Rp -
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES Rp 1,116,588,775 Rp 1,116,588,775 Rp - ###
I LANTAI DASAR Rp 397,769,441 Rp 397,769,441 Rp -
II LANTAI DUA Rp 336,537,167 Rp 336,537,167 Rp -
III LANTAI TIGA Rp 382,282,167 Rp 382,282,167 Rp -
IV LANTAI ATAP DAN ROOF TANK Rp - Rp - Rp -

A.3. PEKERJAAN PLAFOND Rp 218,897,347 Rp 218,897,347 Rp - ###


I LANTAI DASAR Rp 96,036,382 Rp 96,036,382 Rp -
II LANTAI DUA Rp 67,136,327 Rp 67,136,327 Rp -
III LANTAI TIGA Rp 55,724,638 Rp 55,724,638 Rp -
IV LANTAI ATAP DAN ROOF TANK Rp - Rp - Rp -

A.4. PEKERJAAN ATAP Rp 128,342,858 Rp 128,342,858 Rp - ###


I LANTAI ATAP Rp 128,342,858 Rp 128,342,858 Rp -

A.5. PEKERJAAN UTILITAS Rp 70,812,981 Rp 70,812,981 Rp - ###


I LANTAI DASAR Rp 22,217,982 Rp 22,217,982 Rp -
II LANTAI DUA Rp 22,412,963 Rp 22,412,963 Rp -
III LANTAI TIGA Rp 22,060,900 Rp 22,060,900 Rp -
IV LANTAI ATAP DAN ROOF TANK Rp 4,121,136 Rp 4,121,136 Rp -

A.6. PEKERJAAN FINISHING Rp 207,780,089 Rp 207,780,089 Rp - ###


A.6.A. PEKERJAAN PENGECATAN Rp 207,780,089 Rp 207,780,089 Rp - ###
I LANTAI DASAR Rp 76,607,655 Rp 76,607,655 Rp -
II LANTAI DUA Rp 50,227,155 Rp 50,227,155 Rp -
III LANTAI TIGA Rp 72,683,679 Rp 72,683,679 Rp -
IV LANTAI ATAP DAN ROOF TANK Rp 8,261,599 Rp 8,261,599 Rp -

2.2.B. PEKERJAAN ARSITEKTUR NON STANDART (SITE WORK) Rp 575,889,307 Rp 575,889,307 Rp - ###

SUB TOTAL PEKERJAAN STANDART DAN NON STANDART : Rp 3,465,628,524 Rp 3,465,628,524 Rp - ###

REKAP ARS 6 / 58
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PERSIAPAN

Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar


Lokasi : Makassar
Tahun Anggaran : 2020

PERSIAPAN STANDART
URAIAN PEKERJAAN VOLUME
NO.
Kontrak MC 0
1 2 3 4

PEKERJAAN PERSIAPAN STANDART


I. Pekerjaan Persiapan
Pembersihan Lokasi
1 Pengukuran dan Pemasangan Bouwplank 282.50 282.50
2 Direksi Keet (menggunaka bgn yg ada, dibangun setelah lt 2 di cor) 16.00 16.00
3 Gudang Kerja (idem kondisi direksi keet) 24.00 24.00
4 Papan Nama Proyek 1.00 1.00
5 Foto Proyek 3 Fase (warna) 3.00 3.00
6 Air Kerja 8.00 8.00
7 Listrik Kerja 8.00 8.00
8 Pagar Seng Keliling (area depan) Proyek 18.00 18.00
9 Pekerjaan Perancah keliling +Jaring pengaman 1.00 1.00
10 Shop dwg, As. Buil dan Administrasi Lapangan 1.00 1.00
11 Akomodasi Rapat Lapangan 1.00 1.00
12 K3 1.00 1.00
13 Asuransi Pekerjaan, Pemberi Tugas dan Wakil Konsultan 1.00 1.00
14 Mobilisasi/ Demobilisasi tenaga kerja 1.00 1.00
15 Keamanan, koordinasi lingkungan sekitar dan aparat 1.00 1.00

II. PEKERJAAN BONGKARAN


- pekerjaan pembongkaran untuk seluruh bangunan, dinding, partisi, pintu, jendela, konstruksi atap dan penutup atap
- pembongkaran tangga bangunan ke lantai 2
- dinding lama dan beton lama yang terkena peninggian bangunan, apabila tidak mengganggu diperbolehkan dibong-
kar sebatas ketinggian peil lantai dasar bangunan baru
- lantai bangunan lama yang terkena peninggian bangunan baru tidak perlu dibongkar, hanya area yang terkena pile
pondasi bangunan baru yang dibongkar
- seluruh dinding pagar lama, depan-belakang dan samping : dibongkar
Tambahan dari Lokasi:
- penambahan ketinggian lantai/ urugan pada seluruh site dari setinggi 40 cm dari posisi saat ini
- bongkaran termasuk bangunan di depan/ di bawah pohon mangga
- penebangan pohon mangga, termasuk pembuangan bekas tebangan
- pemanfaatan sumur bor yang selama ini digunakan
- pemindahan saluran pam/ pdam yang selama ini digunakan ke area pos satpam yang baru
- pemindahan antena tv kabel yang menempel pada bangunan lama
- pengelompokan bongkaran kayu kosntruksi lantai 2, papan lantai, kusen material elektrikal yang masih
mempunyai nilai ekonomis dan memindahkannya ke area yang ditunjuk oleh user (kota Makassar)
1 Pembongkaran Lantai 0.00 0.00
2 Pembongkaran Plafond 0.00 0.00
3 Pembongkaran Pintu dan Jendela utk disimpan 0.00 0.00
4 Pembongkaran Dinding 0.00 0.00
5 Pembongkaran Atap dan Tritisan 0.00 0.00
6 Pembongkaran Beton (kolom), balok lantai, kolom praktis 0.00 0.00
7 Pembongkaran Lisplank Beton 0.00 0.00
8 Pembongkaran Kuda Kuda-kuda dan rangka kayu lantai 0.00 0.00
9 Pembongkaran Pagar samping-belakang, sampai slof lama 292.50 292.50
10 Pembongkaran pagar depan sampai sloff pondasi lama 13.00 13.00
11 Penebangan pohon mangga, termasuk pembuangan 0.00 0.00
12 Pemindahan tv kabel eksisiting 1.00 1.00
13 Pengelompokan bongkaran kayu kosntruksi lantai 2, 0.00 0.00
papan lantai, kusen dan menyimpannya
14 Pengangkutan puing dg bak terbuka 3,5 m3 0.00 0.00
15 Pembersihan Site pasca pembangunan 1.00 1.00
jumlah Pek Persiapan Standar

Keterangan : Pembongkaran kuda3 adalah seluruh kuda2 bangunan, volume 2 setdengan luasan atap kurang lebih 507 m2

PERSIAPAN 7 / 58
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar
Tipe Prototipe : Bangunan Kantor
Jumlah Lantai : 3 Lantai
Lokasi : Jl. Kumala 128 Makassar
Tahun Anggaran : 2020

II. PEKERJAAN STRUKTUR


VOLUME Jumlah Harga (Rp)
Harga Satuan
NO. URAIAN PEKERJAAN UNIT
(Rp)
Kontrak MC 0 Deviasi Kontrak MC 0 / ADD Balance
1 2 3 4 5 6 7 8 9 10

A. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)


1 Pekerjaan Pondasi Tiang Pancang dengan sistem Tekan (jack hidrolic)
Tipe Tiang Pancang Pondasi 25/25 cm, L = 20 m
Pemotongan kepala tiang
- Persiapan 1.000 1.000 0.000 ls Rp 74,964,200 Rp 74,964,200 Rp 74,964,200 Rp -
- Tiang Pancang berikut pemancangan' @ 20M 1,240.00 1,240.000 0.000 M' Rp 510,195 Rp 632,641,800 Rp 632,641,800 Rp -
Pemotongan/perapihan kepala tiang pile 62.00 64.000 2.000 Titik Rp 113,000 Rp 7,006,000 Rp 7,232,000 Rp 226,000

1.1. Pekerjaan Redrive Tiang Pancang :


Mobilisasi & Dmobilisasi Alat Pancang HSDP 120 T - 0.000 0.000 ls Rp 74,964,200 Rp - Rp - Rp -
Pekerjaan Repair ting pancang untuk di redrive /penekanan ulang 19.000 19.000 titik Rp 949,300 Rp - Rp 18,036,700 Rp 18,036,700
Penekanan ulang tiang pancang existing dengan dummy pile /dolly - 25.000 25.000 Titik Rp 500,000 Rp - Rp 12,500,000 Rp 12,500,000

1.2 Pekerjaan Pengadaan dan Pemcangan Tiang Pancang Tambahan Baru


Mobilisasi & Dmobilisasi Alat Pancang HSDP 120 T - 1.000 1.000 ls Rp 74,964,200 Rp - Rp 74,964,200 Rp 74,964,200
Tiang Pancang berikut pemancangan'@ 20M 280.000 280.000 M' Rp 510,195 Rp - Rp 142,854,600 Rp 142,854,600
Pemotongan/perapihan kepala tiang bore pile 14.000 14.000 Titik Rp 113,000 Rp - Rp 1,582,000 Rp 1,582,000

1.3 Pekerjaan Pengadaan dan Pemcangan Tiang Pancang Tambahan Baru


Mobilisasi & Dmobilisasi Alat Pancang HSDP 120 T - 0.000 0.000 ls Rp 74,964,200 Rp - Rp - Rp -
Tiang Pancang berikut pemancangan'@ 22M 506.000 506.000 M' Rp 510,195 Rp - Rp 258,158,670 Rp 258,158,670
Pemotongan/perapihan kepala tiang bore pile 23.000 23.000 Titik Rp 113,000 Rp - Rp 2,599,000 Rp 2,599,000

2 Pekerjaan Pilecap
2.1 Tipe PC-1 600x600 mm
Beton K-350 0.50 0.000 -0.504 m3 Rp 1,124,510 Rp 566,753 Rp - -Rp 566,753
Besi beton 153.75 0.000 -153.750 kg Rp 11,570 Rp 1,778,812 Rp - -Rp 1,778,812
Bekisting 3.28 0.000 -3.280 m2 Rp 98,991 Rp 324,690 Rp - -Rp 324,690
2.2 Tipe PC-2 500x1250 mm
Beton K-350 2.19 0.000 -2.188 m3 Rp 1,124,510 Rp 2,459,866 Rp - -Rp 2,459,866
Besi beton 828.78 0.000 -828.778 kg Rp 11,570 Rp 9,588,543 Rp - -Rp 9,588,543
Bekisting 12.38 0.000 -12.375 m2 Rp 98,991 Rp 1,225,014 Rp - -Rp 1,225,014

RAB STR (2) 8 / 58


II. PEKERJAAN STRUKTUR
2.3 Tipe PC-3 1180x1250 mm (modifikasi model tie beam)
Beton K-350 14.46 0.000 -14.455 m3 Rp 1,124,510 Rp 16,254,792 Rp - -Rp 16,254,792
Besi beton 2,786.56 0.000 -2786.556 kg Rp 11,570 Rp 32,239,063 Rp - -Rp 32,239,063
Bekisting 47.28 0.000 -47.278 m2 Rp 98,991 Rp 4,680,096 Rp - -Rp 4,680,096
2.4 Tipe PC-4 1250x1250 mm (modifikasi model tie beam)
Beton K-350 2.19 0.000 -2.188 m3 Rp 1,124,510 Rp 2,459,866 Rp - -Rp 2,459,866
Besi beton 446.31 0.000 -446.309 kg Rp 11,570 Rp 5,163,572 Rp - -Rp 5,163,572
Bekisting 7.13 0.000 -7.125 m2 Rp 98,991 Rp 705,311 Rp - -Rp 705,311
2.5 TYPE PC1a 1150x500x700 mm (2 pcs)
Beton K-350 0.805 0.805 m3 Rp 1,124,510 Rp - Rp 905,231 Rp 905,231
Besi beton 165.268 165.268 kg Rp 11,570 Rp - Rp 1,912,068 Rp 1,912,068
Bekisting 4.620 4.620 m2 Rp 98,991 Rp - Rp 457,338 Rp 457,338
2.6 TYPE PC2a 1250-875x500x700 mm ( 2 pcs)
Beton K-350 1.671 1.671 m3 Rp 1,124,510 Rp - Rp 1,879,056 Rp 1,879,056
Besi beton 263.222 263.222 kg Rp 11,570 Rp - Rp 3,045,347 Rp 3,045,347
Bekisting 3.066 3.066 m2 Rp 98,991 Rp - Rp 303,506 Rp 303,506
2.7 TYPE PC2b 2000x500x700 mm (1 pc)
Beton K-350 0.700 0.700 m3 Rp 1,124,510 Rp - Rp 787,157 Rp 787,157
Besi beton 118.500 118.500 kg Rp 11,570 Rp - Rp 1,370,986 Rp 1,370,986
Bekisting 3.500 3.500 m2 Rp 98,991 Rp - Rp 346,469 Rp 346,469
2.8 TYPE PC2c 1250x1250x700 mm (1 pc)
Beton K-350 1.094 1.094 m3 Rp 1,124,510 Rp - Rp 1,230,214 Rp 1,230,214
Besi beton 160.212 160.212 kg Rp 11,570 Rp - Rp 1,853,573 Rp 1,853,573
Bekisting 3.500 3.500 m2 Rp 98,991 Rp - Rp 346,469 Rp 346,469
2.9 TYPE PC2d 1800-1150x500-750-375x700 mm (1 pc)
Beton K-350 1.536 1.536 m3 Rp 1,124,510 Rp - Rp 1,727,247 Rp 1,727,247
Besi beton 207.555 207.555 kg Rp 11,570 Rp - Rp 2,401,308 Rp 2,401,308
Bekisting 3.836 3.836 m2 Rp 98,991 Rp - Rp 379,729 Rp 379,729
2.8 TYPE PC3 1250-875x500-650x700 mm (3 pcs)
Beton K-350 2.507 2.507 m3 Rp 1,124,510 Rp - Rp 2,819,147 Rp 2,819,147
Besi beton 394.833 394.833 kg Rp 11,570 Rp - Rp 4,568,020 Rp 4,568,020
Bekisting 4.599 4.599 m2 Rp 98,991 Rp - Rp 455,260 Rp 455,260
2.9 TYPE PC3a 2000-1625x650-500x700 mm ( 2 pcs)
Beton K-350 2.879 2.879 m3 Rp 1,124,510 Rp - Rp 3,237,464 Rp 3,237,464
Besi beton 403.633 403.633 kg Rp 11,570 Rp - Rp 4,669,832 Rp 4,669,832
Bekisting 8.050 8.050 m2 Rp 98,991 Rp - Rp 796,878 Rp 796,878
2.10 TYPE PC3b 2190x700 mm (1 pc)
Beton K-350 1.533 1.533 m3 Rp 1,124,510 Rp - Rp 1,723,874 Rp 1,723,874
Besi beton 293.798 293.798 kg Rp 11,570 Rp - Rp 3,399,096 Rp 3,399,096
Bekisting 4.123 4.123 m2 Rp 98,991 Rp - Rp 408,140 Rp 408,140
2.11 TYPE PC3c 1250-875x650-500x700 mm ( 2 pcs)
Beton K-350 2.468 2.468 m3 Rp 1,124,510 Rp - Rp 2,774,728 Rp 2,774,728
Besi beton 356.258 356.258 kg Rp 11,570 Rp - Rp 4,121,732 Rp 4,121,732
Bekisting 7.000 7.000 m2 Rp 98,991 Rp - Rp 692,937 Rp 692,937
2.12 TYPE PC3d (luas hitung acad) 2,190 m2x700 mm ( 4 pcs)
Beton K-351 6.132 6.132 m4 Rp 1,124,510 Rp - Rp 6,895,495 Rp 6,895,495
Besi beton 955.016 955.016 kg Rp 11,570 Rp - Rp 11,049,058 Rp 11,049,058

RAB STR (2) 9 / 58


II. PEKERJAAN STRUKTUR
Bekisting 16.100 16.100 m3 Rp 98,991 Rp - Rp 1,593,755 Rp 1,593,755
2.13 TYPE PC3e 2000-1250x650-500x700 mm ( 1 pcs)
Beton K-350 1.269 1.269 m3 Rp 1,124,510 Rp - Rp 1,427,003 Rp 1,427,003
Besi beton 987.500 987.500 kg Rp 11,570 Rp - Rp 11,424,881 Rp 11,424,881
Bekisting 4.550 4.550 m2 Rp 98,991 Rp - Rp 450,409 Rp 450,409
2.14 TYPE PC3f (luas hitung acad) 2,870 m2x700 mm ( 1pcs)
Beton K-351 2.009 2.009 m4 Rp 1,124,510 Rp - Rp 2,259,141 Rp 2,259,141
Besi beton 262.865 262.865 kg Rp 11,570 Rp - Rp 3,041,217 Rp 3,041,217
Bekisting 4.648 4.648 m3 Rp 98,991 Rp - Rp 460,110 Rp 460,110
2.15 TYPE PC4a 2750-1625-2100x500-1250-350x700 ( 2 pcs)
Beton K-352 5.871 5.871 m5 Rp 1,124,510 Rp - Rp 6,601,998 Rp 6,601,998
Besi beton 1,035.410 1035.410 kg Rp 11,570 Rp - Rp 11,979,176 Rp 11,979,176
Bekisting 10.934 10.934 m4 Rp 98,991 Rp - Rp 1,082,368 Rp 1,082,368

3 Pekerjaan Tie Beam (sloof)


Tipe TB-1 25x50 cm
L = 5.200 m
Beton K-350 2.40 3.197 0.802 m3 Rp 1,124,510 Rp 2,693,201 Rp 3,594,918 Rp 901,716
Besi beton 485.13 485.132 0.000 kg Rp 11,570 Rp 5,612,734 Rp 5,612,734 Rp -
Bekisting 19.75 25.575 5.825 m2 Rp 98,991 Rp 1,955,072 Rp 2,531,695 Rp 576,623
L = 6.870 m
Beton K-350 7.39 7.73 0.344 m3 Rp 1,124,510 Rp 8,304,506 Rp 8,691,057 Rp 386,550
Besi beton 1,441.85 1,441.85 0.000 kg Rp 11,570 Rp 16,681,525 Rp 16,681,525 Rp -
Bekisting 59.85 61.83 1.980 m2 Rp 98,991 Rp 5,924,611 Rp 6,120,614 Rp 196,002
L = 2.780 m
Beton K-350 0.84 1.74 0.896 m3 Rp 1,124,510 Rp 945,994 Rp 1,953,836 Rp 1,007,842
Besi beton 191.60 191.60 0.000 kg Rp 11,570 Rp 2,216,740 Rp 2,216,740 Rp -
Bekisting 7.61 13.90 6.288 m2 Rp 98,991 Rp 753,569 Rp 1,375,975 Rp 622,406
L = 5.30 m
Beton K-350 1.85 2.30 0.458 m3 Rp 1,124,510 Rp 2,076,127 Rp 2,590,590 Rp 514,463
Besi beton 372.42 372.42 0.000 kg Rp 11,570 Rp 4,308,686 Rp 4,308,686 Rp -
Bekisting 14.56 18.43 3.868 m2 Rp 98,991 Rp 1,441,556 Rp 1,824,404 Rp 382,848
L = 5.05 m
Beton K-350 7.77 10.33 2.554 m3 Rp 1,124,510 Rp 8,743,065 Rp 11,614,783 Rp 2,871,717
Besi beton 1,624.56 1,624.56 0.000 kg Rp 11,570 Rp 18,795,297 Rp 18,795,297 Rp -
Bekisting 63.25 82.63 19.380 m2 Rp 98,991 Rp 6,261,181 Rp 8,179,626 Rp 1,918,446
L = 2.70 m
Beton K-350 0.56 0.68 0.126 m3 Rp 1,124,510 Rp 626,914 Rp 768,884 Rp 141,969
Besi beton 122.38 122.38 0.000 kg Rp 11,570 Rp 1,415,902 Rp 1,415,902 Rp -
Bekisting 4.88 5.47 0.595 m2 Rp 98,991 Rp 482,581 Rp 541,481 Rp 58,900

4 Pekerjaan Galian Tanah


Galian Tanah Pondasi < 1 m
Tipe PC-1 600x600 mm 0.61 0.000 -0.612 m3 Rp 100,000 Rp 61,200 Rp - -Rp 61,200
Tipe PC-2 500x1250 mm 2.66 0.000 -2.656 m3 Rp 100,000 Rp 265,625 Rp - -Rp 265,625
Tipe PC-3 1180x1250 mm (modifikasi model tie beam) 17.14 0.000 -17.140 m3 Rp 100,000 Rp 1,713,950 Rp - -Rp 1,713,950

RAB STR (2) 10 / 58


II. PEKERJAAN STRUKTUR
Tipe PC-4 1250x1250 mm (modifikasi model tie beam) 2.67 0.000 -2.674 m3 Rp 100,000 Rp 267,375 Rp - -Rp 267,375
TYPE PC1a 1150x500x700 mm (2 pcs) 0.00 2.372 2.372 m3 Rp 100,000 Rp - Rp 237,200 Rp 237,200
TYPE PC2a 1250-875x500x700 mm ( 2 pcs) 0.00 3.723 3.723 m3 Rp 100,000 Rp - Rp 372,300 Rp 372,300
TYPE PC2b 2000x500x700 mm (1 pc) 0.00 1.683 1.683 m3 Rp 100,000 Rp - Rp 168,300 Rp 168,300
TYPE PC2c 1250x1250x700 mm (1 pc) 0.00 1.787 1.787 m3 Rp 100,000 Rp - Rp 178,700 Rp 178,700
TYPE PC2d 1800-1150x500-750-375x700 mm (1 pc) 0.00 2.907 2.907 m3 Rp 100,000 Rp - Rp 290,700 Rp 290,700
TYPE PC3 1250-875x500-650x700 mm (3 pcs) 0.00 5.585 5.585 m3 Rp 100,000 Rp - Rp 558,500 Rp 558,500
TYPE PC3a 2000-1625x650-500x700 mm ( 2 pcs) 0.00 5.695 5.695 m3 Rp 100,000 Rp - Rp 569,500 Rp 569,500
TYPE PC3b 2190x700 mm (1 pc) 0.00 2.992 2.992 m3 Rp 100,000 Rp - Rp 299,200 Rp 299,200
TYPE PC3c 1250-875x650-500x700 mm ( 2 pcs) 0.00 4.925 4.925 m3 Rp 100,000 Rp - Rp 492,500 Rp 492,500
TYPE PC3d (luas hitung acad) 2,190 m2x700 mm ( 4 pcs) 0.00 11.832 11.832 m3 Rp 100,000 Rp - Rp 1,183,200 Rp 1,183,200
TYPE PC3e 2000-1250x650-500x700 mm ( 1 pcs) 0.00 3.460 3.460 m4 Rp 100,000 Rp - Rp 346,000 Rp 346,000
TYPE PC3f (luas hitung acad) 2,870 m2x700 mm ( 1pcs) 0.00 3.689 3.689 m5 Rp 100,000 Rp - Rp 368,900 Rp 368,900
TYPE PC4a 2750-1625-2100x500-1250-350x700 ( 2 pcs) 0.00 10.013 10.013 m6 Rp 100,000 Rp - Rp 1,001,300 Rp 1,001,300

Galian Tanah Pondasi < 1 m untuk Tie Beam


Tipe TB-1 25x50 cm
L = 5.200 m 2.66 3.45 0.784 m3 Rp 100,000 Rp 266,250 Rp 344,688 Rp 78,438
L = 6.870 m 7.35 8.18 0.828 m3 Rp 100,000 Rp 735,050 Rp 817,875 Rp 82,825
L = 2.780 m 0.85 1.99 1.134 m3 Rp 100,000 Rp 85,400 Rp 198,750 Rp 113,350
L = 5.30 m 1.68 2.50 0.826 m4 Rp 100,000 Rp 167,812 Rp 250,375 Rp 82,563
L = 5.05 m 7.83 11.63 3.796 m5 Rp 100,000 Rp 783,250 Rp 1,162,875 Rp 379,625
L = 2.70 m 0.54 0.78 0.248 m2 Rp 100,000 Rp 53,574 Rp 78,375 Rp 24,801
5 Pekerjaan Urugan Pasir
Urugan Pasir dibawah Pondasi t = 10 cm
Tipe PC-1 600x600 mm 0.07 0.000 -0.072 m3 Rp 227,130 Rp 16,353 Rp - -Rp 16,353
Tipe PC-2 500x1250 mm 0.63 0.000 -0.625 m3 Rp 227,130 Rp 141,956 Rp - -Rp 141,956
Tipe PC-3 1180x1250 mm (modifikasi model tie beam) 6.19 0.000 -6.195 m3 Rp 227,130 Rp 1,407,070 Rp - -Rp 1,407,070
Tipe PC-4 1250x1250 mm (modifikasi model tie beam) 0.31 0.000 -0.313 m3 Rp 227,130 Rp 70,978 Rp - -Rp 70,978
TYPE PC1a 1150x500x700 mm (2 pcs) 0.00 0.279 0.279 m3 Rp 227,130 Rp - Rp 63,369 Rp 63,369
TYPE PC2a 1250-875x500x700 mm ( 2 pcs) 0.00 0.438 0.438 m3 Rp 227,130 Rp - Rp 99,483 Rp 99,483
TYPE PC2b 2000x500x700 mm (1 pc) 0.00 0.198 0.198 m3 Rp 227,130 Rp - Rp 44,972 Rp 44,972
TYPE PC2c 1250x1250x700 mm (1 pc) 0.00 0.210 0.210 m3 Rp 227,130 Rp - Rp 47,697 Rp 47,697
TYPE PC2d 1800-1150x500-750-375x700 mm (1 pc) 0.00 0.342 0.342 m3 Rp 227,130 Rp - Rp 77,678 Rp 77,678
TYPE PC3 1250-875x500-650x700 mm (3 pcs) 0.00 0.657 0.657 m3 Rp 227,130 Rp - Rp 149,224 Rp 149,224
TYPE PC3a 2000-1625x650-500x700 mm ( 2 pcs) 0.00 0.670 0.670 m3 Rp 227,130 Rp - Rp 152,177 Rp 152,177
TYPE PC3b 2190x700 mm (1 pc) 0.00 0.352 0.352 m3 Rp 227,130 Rp - Rp 79,950 Rp 79,950
TYPE PC3c 1250-875x650-500x700 mm ( 2 pcs) 0.00 0.579 0.579 m3 Rp 227,130 Rp - Rp 131,508 Rp 131,508
TYPE PC3d (luas hitung acad) 2,190 m2x700 mm ( 4 pcs) 0.00 1.392 1.392 m3 Rp 227,130 Rp - Rp 316,165 Rp 316,165
TYPE PC3e 2000-1250x650-500x700 mm ( 1 pcs) 0.00 0.407 0.407 m3 Rp 227,130 Rp - Rp 92,442 Rp 92,442
TYPE PC3f (luas hitung acad) 2,870 m2x700 mm ( 1pcs) 0.00 0.434 0.434 m3 Rp 227,130 Rp - Rp 98,574 Rp 98,574
TYPE PC4a 2750-1625-2100x500-1250-350x700 ( 2 pcs) 0.00 1.178 1.178 m3 Rp 227,130 Rp - Rp 267,559 Rp 267,559

Urugan Pasir dibawah Tie Beam t = 10 cm


Tipe TB-1 25x50 cm
L = 5.200 m 0.45 0.689 0.244 m3 Rp 227,130 Rp 101,073 Rp 156,578 Rp 55,505

RAB STR (2) 11 / 58


II. PEKERJAAN STRUKTUR
L = 6.870 m 1.51 1.636 0.121 m3 Rp 227,130 Rp 344,034 Rp 371,528 Rp 27,494
L = 2.780 m 0.21 0.398 0.189 m3 Rp 227,130 Rp 47,357 Rp 90,284 Rp 42,928
L = 5.30 m 0.34 0.501 0.160 m4 Rp 227,130 Rp 77,508 Rp 113,735 Rp 36,227
L = 5.05 m 1.51 2.326 0.821 m5 Rp 227,130 Rp 341,831 Rp 528,248 Rp 186,417
L = 2.70 m 0.10 0.157 0.059 m2 Rp 227,130 Rp 22,145 Rp 35,603 Rp 13,457

6 Pekerjaan Lantai Kerja


Lantai Kerja dibawah Pondasi t = 5 cm
Tipe PC-1 600x600 mm 0.04 0.000 -0.036 m3 Rp 915,344 Rp 32,952 Rp - -Rp 32,952
Tipe PC-2 500x1250 mm 0.21 0.000 -0.208 m3 Rp 915,344 Rp 190,697 Rp - -Rp 190,697
Tipe PC-3 1180x1250 mm (modifikasi model tie beam) 3.10 0.000 -3.097 m3 Rp 915,344 Rp 2,835,278 Rp - -Rp 2,835,278
Tipe PC-4 1250x1250 mm (modifikasi model tie beam) 0.16 0.000 -0.156 m3 Rp 915,344 Rp 143,023 Rp - -Rp 143,023
TYPE PC1a 1150x500x700 mm (2 pcs) 0.00 0.140 0.140 m3 Rp 915,344 Rp - Rp 128,148 Rp 128,148
TYPE PC2a 1250-875x500x700 mm ( 2 pcs) 0.00 0.219 0.219 m3 Rp 915,344 Rp - Rp 200,460 Rp 200,460
TYPE PC2b 2000x500x700 mm (1 pc) 0.00 0.099 0.099 m3 Rp 915,344 Rp - Rp 90,619 Rp 90,619
TYPE PC2c 1250x1250x700 mm (1 pc) 0.00 0.105 0.105 m3 Rp 915,344 Rp - Rp 96,111 Rp 96,111
TYPE PC2d 1800-1150x500-750-375x700 mm (1 pc) 0.00 0.171 0.171 m3 Rp 915,344 Rp - Rp 156,524 Rp 156,524
TYPE PC3 1250-875x500-650x700 mm (3 pcs) 0.00 0.329 0.329 m3 Rp 915,344 Rp - Rp 301,148 Rp 301,148
TYPE PC3a 2000-1625x650-500x700 mm ( 2 pcs) 0.00 0.335 0.335 m3 Rp 915,344 Rp - Rp 306,640 Rp 306,640
TYPE PC3b 2190x700 mm (1 pc) 0.00 0.176 0.176 m3 Rp 915,344 Rp - Rp 161,101 Rp 161,101
TYPE PC3c 1250-875x650-500x700 mm ( 2 pcs) 0.00 0.290 0.290 m3 Rp 915,344 Rp - Rp 265,450 Rp 265,450
TYPE PC3d (luas hitung acad) 2,190 m2x700 mm ( 4 pcs) 0.00 0.696 0.696 m3 Rp 915,344 Rp - Rp 637,079 Rp 637,079
TYPE PC3e 2000-1250x650-500x700 mm ( 1 pcs) 0.00 0.204 0.204 m3 Rp 915,344 Rp - Rp 186,730 Rp 186,730
TYPE PC3f (luas hitung acad) 2,870 m2x700 mm ( 1pcs) 0.00 0.217 0.217 m3 Rp 915,344 Rp - Rp 198,630 Rp 198,630
TYPE PC4a 2750-1625-2100x500-1250-350x700 ( 2 pcs) 0.00 0.589 0.589 m3 Rp 915,344 Rp - Rp 539,138 Rp 539,138

Lantai Kerja dibawah Tie Beam t = 5 cm


Tipe TB-1 25x50 cm
L = 5.200 m 0.22 0.345 0.122 m3 Rp 915,344 Rp 203,664 Rp 315,508 Rp 111,844
L = 6.870 m 0.76 0.818 0.061 m3 Rp 915,344 Rp 693,236 Rp 748,637 Rp 55,401
L = 2.780 m 0.10 0.199 0.095 m3 Rp 915,344 Rp 95,425 Rp 181,925 Rp 86,500
L = 5.30 m 0.17 0.250 0.080 m4 Rp 915,344 Rp 156,181 Rp 229,179 Rp 72,999
L = 5.05 m 0.75 1.163 0.410 m5 Rp 915,344 Rp 688,796 Rp 1,064,431 Rp 375,634
L = 2.70 m 0.05 0.078 0.030 m2 Rp 915,344 Rp 44,623 Rp 71,740 Rp 27,117
7 Urugan tanah kembali bekas galian 32.24 32.240 0.000 m3 Rp 16,950 Rp 546,471 Rp 546,471 Rp -
8 Tanah urug peninggian lantai t=53 cm (dalam bangunan) 80.00 80.000 0.000 m3 Rp 193,230 Rp 15,458,400 Rp 15,458,400 Rp -
9 Pasir urug diatas tanah urug t=10 cm (dalam bangunan) 32.00 32.000 0.000 m3 Rp 227,130 Rp 7,268,160 Rp 7,268,160 Rp -
10 Pekerjaan Test PDA Tiang Bore 3.00 6.000 3.000 ttk Rp 24,718,750 Rp 74,156,250 Rp 148,312,500 Rp 74,156,250
11 Peninggian Semua Site setinggi 35 cm tanah urug padat mesin 284.20 284.200 0.000 m2 Rp 193,230 Rp 54,915,966 Rp 54,915,966 Rp -
12 Penambahan camp. Waterproffing (integral) pada beton Bawah 77.79 77.791 0.000 m3 Rp 96,050 Rp 7,471,810 Rp 7,471,810 Rp -
13 Anti Rayap suntik pada tanah urug sebelum lantai dasar 384.00 384.000 0.000 m2 Rp 22,600 Rp 8,678,400 Rp 8,678,400 Rp -

B. PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE)


1 Pekerjaan Struktur Lantai Dasar
a Komponen Kolom
Tipe C1 40x40 cm

RAB STR (2) 12 / 58


II. PEKERJAAN STRUKTUR
Beton K-350 10.57 10.512 -0.060 m3 Rp 1,124,510 Rp 11,888,320 Rp 11,820,849 -Rp 67,471
Besi beton 3,768.35 7,085.556 3317.207 kg Rp 11,570 Rp 43,597,909 Rp 81,976,340 Rp 38,378,432
Bekisting 110.72 105.120 -5.600 m2 Rp 165,889 Rp 18,367,230 Rp 17,438,252 -Rp 928,978
Tipe C2 30x30 cm
Beton K-350 0.63 0.630 0.001 m3 Rp 1,124,510 Rp 707,317 Rp 708,441 Rp 1,125
Besi beton 207.21 413.418 206.212 kg Rp 11,570 Rp 2,397,275 Rp 4,783,040 Rp 2,385,765
Bekisting 8.42 8.400 -0.020 m2 Rp 165,889 Rp 1,396,785 Rp 1,393,468 -Rp 3,318
Tipe C3 50x60 cm
Beton K-350 2.13 1.980 -0.150 m3 Rp 1,124,510 Rp 2,395,206 Rp 2,226,530 -Rp 168,677
Besi beton 424.86 991.584 566.727 kg Rp 11,570 Rp 4,915,384 Rp 11,472,131 Rp 6,556,747
Bekisting 17.82 14.520 -3.300 m2 Rp 165,889 Rp 2,956,142 Rp 2,408,708 -Rp 547,434
b Komponen Pelat Lantai
Pelat t = 120 mm
Beton K-350 37.66 44.173 6.516 m3 Rp 1,124,510 Rp 42,345,493 Rp 49,673,232 Rp 7,327,739
Besi beton wire mesh m8 rangkap 1,387.20 2,607.000 1219.800 kg Rp 12,683 Rp 17,593,166 Rp 33,063,278 Rp 15,470,112
c Komponen Tangga
Tangga Utama (Depan)
Beton K-350 3.96 6.718 2.760 m3 Rp 1,124,510 Rp 4,451,809 Rp 7,554,930 Rp 3,103,121
Besi beton 219.93 219.930 0.000 kg Rp 11,570 Rp 2,544,478 Rp 2,544,478 Rp -
Bekisting 8.06 27.249 19.189 m2 Rp 156,000 Rp 1,257,360 Rp 4,250,875 Rp 2,993,515
Tangga Utama
Beton K-350 4.88 6.080 1.198 m3 Rp 1,124,510 Rp 5,490,092 Rp 6,836,779 Rp 1,346,687
Besi beton 243.99 243.990 0.000 kg Rp 11,570 Rp 2,822,847 Rp 2,822,847 Rp -
Bekisting 8.06 25.221 17.161 m2 Rp 156,000 Rp 1,257,360 Rp 3,934,400 Rp 2,677,040

2 Pekerjaan Struktur Lantai 2


a Komponen Kolom
Tipe C1 40x40 cm
Beton K-350 11.66 9.984 -1.680 m3 Rp 1,124,510 Rp 13,116,285 Rp 11,227,108 -Rp 1,889,177
Besi beton 3,770.96 4,395.384 624.422 kg Rp 11,570 Rp 43,628,145 Rp 50,852,395 Rp 7,224,250
Bekisting 116.64 99.840 -16.800 m2 Rp 165,889 Rp 19,349,293 Rp 16,562,358 -Rp 2,786,935
Tipe C2 30x30 cm
Beton K-350 0.73 0.630 -0.099 m3 Rp 1,124,510 Rp 819,768 Rp 708,441 -Rp 111,326
Besi beton 232.84 274.266 41.424 kg Rp 11,570 Rp 2,693,860 Rp 3,173,120 Rp 479,260
Bekisting 9.72 8.400 -1.320 m2 Rp 165,889 Rp 1,612,441 Rp 1,393,468 -Rp 218,973
Tipe C3 50x60 cm
Beton K-350 2.43 1.860 -0.570 m3 Rp 1,124,510 Rp 2,732,559 Rp 2,091,589 -Rp 640,971
Besi beton 562.40 648.288 85.891 kg Rp 11,570 Rp 6,506,647 Rp 7,500,368 Rp 993,721
Bekisting 17.82 13.640 -4.180 m2 Rp 165,889 Rp 2,956,142 Rp 2,262,726 -Rp 693,416
b. Komponen Balok
1 B-1 250 x 550 ; L = 6.87 M
Beton K-350 8.11 6.492 -1.622 m3 Rp 1,124,510 Rp 9,124,443 Rp 7,300,488 -Rp 1,823,955
Besi beton 1,478.31 1,478.313 0.000 kg Rp 11,570 Rp 17,103,340 Rp 17,103,340 Rp -
Bekisting 80.61 67.395 -13.216 m2 Rp 170,128 Rp 13,714,103 Rp 11,465,726 -Rp 2,248,378
2 B-1 250 x 550 ; L = 5.36 M

RAB STR (2) 13 / 58


II. PEKERJAAN STRUKTUR
Beton K-350 1.34 1.126 -0.216 m3 Rp 1,124,510 Rp 1,508,643 Rp 1,265,748 -Rp 242,894
Besi beton 288.20 288.200 0.000 kg Rp 11,570 Rp 3,334,335 Rp 3,334,335 Rp -
Bekisting 13.39 11.685 -1.707 m2 Rp 170,128 Rp 2,278,354 Rp 1,987,912 -Rp 290,443
3 B-1 250 x 550 ; L = 2.78 M
Beton K-350 0.70 0.584 -0.116 m3 Rp 1,124,510 Rp 786,932 Rp 656,489 -Rp 130,443
Besi beton 150.92 150.917 0.000 kg Rp 11,570 Rp 1,746,038 Rp 1,746,038 Rp -
Bekisting 6.83 6.060 -0.766 m2 Rp 170,128 Rp 1,161,294 Rp 1,031,044 -Rp 130,250
4 B-1 250 x 550 ; L = 5.05 M
Beton K-350 1.48 1.061 -0.416 m3 Rp 1,124,510 Rp 1,660,339 Rp 1,192,543 -Rp 467,796
Besi beton 253.06 253.059 0.000 kg Rp 11,570 Rp 2,927,770 Rp 2,927,770 Rp -
Bekisting 14.06 11.009 -3.046 m2 Rp 170,128 Rp 2,391,149 Rp 1,872,939 -Rp 518,210
5 B-1 250 x 550 ; L = 4.50 M
Beton K-350 0.53 0.473 -0.058 m3 Rp 1,124,510 Rp 596,553 Rp 531,331 -Rp 65,222
Besi beton 107.64 107.638 0.000 kg Rp 11,570 Rp 1,245,319 Rp 1,245,319 Rp -
Bekisting 8.92 4.905 -4.015 m2 Rp 170,128 Rp 1,517,542 Rp 834,478 -Rp 683,064
6 B-2 300 x 750 ; L = 5.20 M
Beton K-350 3.68 2.902 -0.777 m3 Rp 1,124,510 Rp 4,136,398 Rp 3,262,878 -Rp 873,519
Besi beton 514.58 514.576 0.000 kg Rp 11,570 Rp 5,953,384 Rp 5,953,384 Rp -
Bekisting 26.23 24.024 -2.206 m2 Rp 170,128 Rp 4,462,457 Rp 4,087,155 -Rp 375,302
7 B-3 200 x 450 ; L = 5.05 M
Beton K-350 0.90 0.962 0.067 m3 Rp 1,124,510 Rp 1,006,661 Rp 1,081,833 Rp 75,171
Besi beton 128.43 128.426 0.000 kg Rp 11,570 Rp 1,485,829 Rp 1,485,829 Rp -
Bekisting 6.04 12.627 6.592 m2 Rp 170,128 Rp 1,026,722 Rp 2,148,186 Rp 1,121,463
8 B-4 300 x 550 ; L = 1.80 M
Beton K-350 0.33 0.227 -0.100 m3 Rp 1,124,510 Rp 367,040 Rp 255,039 -Rp 112,001
Besi beton 54.44 54.435 0.000 kg Rp 11,570 Rp 629,789 Rp 629,789 Rp -
Bekisting 2.76 2.052 -0.708 m2 Rp 170,128 Rp 469,553 Rp 349,103 -Rp 120,451
9 B-7 250 x 450 ; L = 2.70 M
Beton K-350 0.28 0.216 -0.068 m3 Rp 1,124,510 Rp 319,361 Rp 242,894 -Rp 76,467
Besi beton 45.74 45.743 0.000 kg Rp 11,570 Rp 529,218 Rp 529,218 Rp -
Bekisting 2.65 2.403 -0.242 m2 Rp 170,128 Rp 449,989 Rp 408,818 -Rp 41,171
10 G-1 250 x 550 ; L = 6.87 M
Beton K-350 5.08 4.328 -0.748 m3 Rp 1,124,510 Rp 5,708,125 Rp 4,866,992 -Rp 841,133
Besi beton 894.07 894.075 0.000 kg Rp 11,570 Rp 10,343,996 Rp 10,343,996 Rp -
Bekisting 52.41 44.930 -7.477 m2 Rp 170,128 Rp 8,915,898 Rp 7,643,817 -Rp 1,272,081
11 G-1 250 x 550 ; L = 6.87 M
Beton K-350 0.97 0.000 -0.970 m3 Rp 1,124,510 Rp 1,090,437 Rp - -Rp 1,090,437
Besi beton 175.62 0.000 -175.620 kg Rp 11,570 Rp 2,031,831 Rp - -Rp 2,031,831
Bekisting 9.64 0.000 -9.639 m2 Rp 170,128 Rp 1,639,864 Rp - -Rp 1,639,864
12 G-1 250 x 550 ; L = 2.78 M
Beton K-350 2.06 0.876 -1.187 m3 Rp 1,124,510 Rp 2,319,189 Rp 984,733 -Rp 1,334,456
Besi beton 346.12 346.116 0.000 kg Rp 11,570 Rp 4,004,387 Rp 4,004,387 Rp -
Bekisting 20.09 9.091 -10.997 m2 Rp 170,128 Rp 3,417,531 Rp 1,546,566 -Rp 1,870,966
13 G-1 250 x 550 ; L = 5.36 M
Beton K-350 0.62 1.688 1.064 m3 Rp 1,124,510 Rp 701,694 Rp 1,898,623 Rp 1,196,928
Besi beton 116.03 116.033 0.000 kg Rp 11,570 Rp 1,342,448 Rp 1,342,448 Rp -

RAB STR (2) 14 / 58


II. PEKERJAAN STRUKTUR
Bekisting 6.48 17.527 11.047 m2 Rp 170,128 Rp 1,102,429 Rp 2,981,867 Rp 1,879,438
14 G-1 250 x 550 ; L = 5.20 M
Beton K-350 6.88 0.546 -6.337 m3 Rp 1,124,510 Rp 7,739,440 Rp 613,982 -Rp 7,125,458
Besi beton 1,089.79 1,089.787 0.000 kg Rp 11,570 Rp 12,608,288 Rp 12,608,288 Rp -
Bekisting 62.78 5.668 -57.107 m2 Rp 170,128 Rp 10,679,785 Rp 964,286 -Rp 9,715,500
15 G-1 250 x 550 ; L = 5.05 M
Beton K-350 2.08 5.303 3.223 m3 Rp 1,124,510 Rp 2,338,756 Rp 5,962,714 Rp 3,623,958
Besi beton 310.02 310.020 0.000 kg Rp 11,570 Rp 3,586,779 Rp 3,586,779 Rp -
Bekisting 16.74 55.045 38.305 m2 Rp 170,128 Rp 2,847,943 Rp 9,364,696 Rp 6,516,753
16 G-2 300 x 750 ; L = 5.05 M
Beton K-350 2.19 3.131 0.945 m3 Rp 1,124,510 Rp 2,457,729 Rp 3,520,841 Rp 1,063,112
Besi beton 317.18 317.179 0.000 kg Rp 11,570 Rp 3,669,605 Rp 3,669,605 Rp -
Bekisting 17.28 30.098 12.818 m2 Rp 170,128 Rp 2,939,812 Rp 5,120,513 Rp 2,180,701
17 G-2 300 x 750 ; L = 5.20 M
Beton K-350 0.25 1.612 1.358 m3 Rp 1,124,510 Rp 285,626 Rp 1,812,710 Rp 1,527,085
Besi beton 50.86 50.865 0.000 kg Rp 11,570 Rp 588,481 Rp 588,481 Rp -
Bekisting 2.65 15.496 12.851 m2 Rp 170,128 Rp 449,989 Rp 2,636,303 Rp 2,186,315
18 G-3 250 x 450 ; L = 2.70 M
Beton K-350 3.74 0.216 -3.527 m3 Rp 1,124,510 Rp 4,209,345 Rp 242,894 -Rp 3,966,450
Besi beton 629.36 629.359 0.000 kg Rp 11,570 Rp 7,281,374 Rp 7,281,374 Rp -
Bekisting 28.14 2.403 -25.741 m2 Rp 170,128 Rp 4,788,167 Rp 408,818 -Rp 4,379,350
19 G-9 350 x 550 ; L = 6.87 M
Beton K-350 1.25 3.030 1.783 m3 Rp 1,124,510 Rp 1,401,983 Rp 3,406,894 Rp 2,004,911
Besi beton 355.41 355.413 0.000 kg Rp 11,570 Rp 4,111,947 Rp 4,111,947 Rp -
Bekisting 12.67 24.526 11.853 m2 Rp 170,128 Rp 2,155,947 Rp 4,172,542 Rp 2,016,595
20 CB1-250 x 550 ; L= 2,87 M
Beton K-350 3.36 1.100 -2.256 m3 Rp 1,124,510 Rp 3,774,440 Rp 1,237,411 -Rp 2,537,030
Besi beton 543.05 543.051 0.000 kg Rp 11,570 Rp 6,282,828 Rp 6,282,828 Rp -
Bekisting 26.68 11.423 -15.253 m2 Rp 170,128 Rp 4,538,335 Rp 1,943,406 -Rp 2,594,928
21 CB2-300 x 750 ; L= 2,87 M
Beton K-350 1.15 3.203 2.054 m3 Rp 1,124,510 Rp 1,292,343 Rp 3,601,716 Rp 2,309,372
Besi beton 208.01 208.009 0.000 kg Rp 11,570 Rp 2,406,562 Rp 2,406,562 Rp -
Bekisting 9.68 26.519 16.844 m2 Rp 170,128 Rp 1,645,988 Rp 4,511,590 Rp 2,865,602
22 CB4-300 x 600 ; L= 1,6 M
Beton K-350 0.00 1.128 1.128 m3 Rp 1,124,510 Rp - Rp 1,268,447 Rp 1,268,447
Besi beton 0.00 208.009 208.009 kg Rp 11,570 Rp - Rp 2,406,562 Rp 2,406,562
Bekisting 0.00 9.920 9.920 m2 Rp 170,128 Rp - Rp 1,687,670 Rp 1,687,670
23 B-8 150 x 300 ; L= 1,4 M
Beton K-350 0.00 0.036 0.036 m3 Rp 1,124,510 Rp - Rp 40,145 Rp 40,145
Besi beton 0.00 208.009 208.009 kg Rp 11,570 Rp - Rp 2,406,562 Rp 2,406,562
Bekisting 0.00 0.686 0.686 m2 Rp 170,128 Rp - Rp 116,708 Rp 116,708

c Komponen Pelat Lantai


Pelat t = 130 mm
Beton K-350 59.95 61.568 1.622 m3 Rp 1,124,510 Rp 67,409,868 Rp 69,233,514 Rp 1,823,646
Besi beton 6,189.60 6,189.605 0.000 kg Rp 11,570 Rp 71,610,631 Rp 71,610,631 Rp -

RAB STR (2) 15 / 58


II. PEKERJAAN STRUKTUR
Bekisting 454.05 484.381 30.335 m2 Rp 199,789 Rp 90,713,415 Rp 96,773,973 Rp 6,060,557
d Komponen Tangga
Tangga Utama
Beton K-350 3.96 6.767 2.808 m3 Rp 1,124,510 Rp 4,451,809 Rp 7,608,997 Rp 3,157,188
Besi beton 219.93 219.930 0.000 kg Rp 11,570 Rp 2,544,478 Rp 2,544,478 Rp -
Bekisting 8.06 28.441 20.381 m2 Rp 156,000 Rp 1,257,360 Rp 4,436,827 Rp 3,179,467
Tangga Utama
Beton K-350 4.18 6.129 1.947 m3 Rp 1,124,510 Rp 4,702,935 Rp 6,892,485 Rp 2,189,550
Besi beton 243.99 243.990 0.000 kg Rp 11,570 Rp 2,822,847 Rp 2,822,847 Rp -
Bekisting 8.26 26.417 18.157 m2 Rp 156,000 Rp 1,288,560 Rp 4,121,111 Rp 2,832,551

3 Pekerjaan Struktur Lantai 3


a Komponen Kolom
Tipe C1 40x40 cm
Beton K-350 8.66 8.304 -0.360 m3 Rp 1,124,510 Rp 9,742,755 Rp 9,337,931 -Rp 404,824
Besi beton 3,070.96 3,662.820 591.858 kg Rp 11,570 Rp 35,529,495 Rp 42,376,996 Rp 6,847,501
Bekisting 88.64 83.040 -5.600 m2 Rp 165,889 Rp 14,704,401 Rp 13,775,423 -Rp 928,978
Tipe C2 30x30 cm
Beton K-350 0.67 0.630 -0.036 m3 Rp 1,124,510 Rp 748,924 Rp 708,441 -Rp 40,482
Besi beton 202.14 274.266 72.123 kg Rp 11,570 Rp 2,338,693 Rp 3,173,120 Rp 834,428
Bekisting 8.88 8.400 -0.480 m2 Rp 165,889 Rp 1,473,094 Rp 1,393,468 -Rp 79,627
Tipe C3 50x60 cm
Beton K-350 2.22 1.980 -0.240 m3 Rp 1,124,510 Rp 2,496,412 Rp 2,226,530 -Rp 269,882
Besi beton 562.40 648.288 85.891 kg Rp 11,570 Rp 6,506,647 Rp 7,500,368 Rp 993,721
Bekisting 16.28 14.520 -1.760 m2 Rp 165,889 Rp 2,700,673 Rp 2,408,708 -Rp 291,965
b. Komponen Balok
1 B-1 250 x 550.L = 6.87 M
Beton K-350 8.11 6.492 -1.622 m3 Rp 1,124,510 Rp 9,124,443 Rp 7,300,488 -Rp 1,823,955
Besi beton 1,477.31 1,477.313 0.000 kg Rp 11,570 Rp 17,091,770 Rp 17,091,770 Rp -
Bekisting 79.61 67.395 -12.216 m2 Rp 170,128 Rp 13,543,975 Rp 11,465,726 -Rp 2,078,250
2 B-1 250 x 550 ; L = 6.87 M
Beton K-350 1.44 0.000 -1.442 m3 Rp 1,124,510 Rp 1,621,094 Rp - -Rp 1,621,094
Besi beton 293.00 0.000 -293.000 kg Rp 11,570 Rp 3,389,869 Rp - -Rp 3,389,869
Bekisting 13.39 0.000 -13.392 m2 Rp 170,128 Rp 2,278,354 Rp - -Rp 2,278,354
3 B-1 250 x 550 ; L = 5.36 M
Beton K-350 0.65 1.126 0.476 m3 Rp 1,124,510 Rp 730,707 Rp 1,265,748 Rp 535,042
Besi beton 150.92 150.917 0.000 kg Rp 11,570 Rp 1,746,038 Rp 1,746,038 Rp -
Bekisting 6.63 11.685 5.059 m2 Rp 170,128 Rp 1,127,268 Rp 1,987,912 Rp 860,644
4 B-1 250 x 550 ; L = 2.78 M
Beton K-350 1.43 0.584 -0.842 m3 Rp 1,124,510 Rp 1,603,481 Rp 656,489 -Rp 946,992
Besi beton 168.53 168.531 0.000 kg Rp 11,570 Rp 1,949,820 Rp 1,949,820 Rp -
Bekisting 14.72 6.060 -8.658 m2 Rp 170,128 Rp 2,503,944 Rp 1,031,044 -Rp 1,472,900
5 B-1 250 x 550 ; L = 5.05 M
Beton K-350 0.93 1.061 0.135 m3 Rp 1,124,510 Rp 1,040,397 Rp 1,192,543 Rp 152,146

RAB STR (2) 16 / 58


II. PEKERJAAN STRUKTUR
Besi beton 119.31 119.306 0.000 kg Rp 11,570 Rp 1,380,311 Rp 1,380,311 Rp -
Bekisting 11.23 11.009 -0.221 m2 Rp 170,128 Rp 1,910,537 Rp 1,872,939 -Rp 37,598
6 B-6 400 x 850 ; L = 1.80 M
Beton K-350 1.07 0.518 -0.553 m3 Rp 1,124,510 Rp 1,204,575 Rp 582,946 -Rp 621,629
Besi beton 235.89 235.890 0.000 kg Rp 11,570 Rp 2,729,124 Rp 2,729,124 Rp -
Bekisting 9.40 3.312 -6.088 m2 Rp 170,128 Rp 1,599,203 Rp 563,464 -Rp 1,035,739
7 B-5 300 x 850 ; L = 4.50 M
Beton K-350 0.59 0.972 0.379 m3 Rp 1,124,510 Rp 667,059 Rp 1,093,024 Rp 425,964
Besi beton 50.77 50.769 0.000 kg Rp 11,570 Rp 587,373 Rp 587,373 Rp -
Bekisting 3.64 7.830 4.190 m2 Rp 170,128 Rp 619,266 Rp 1,332,102 Rp 712,836
8 B-6 400 x 850 ; L = 1.80 M
Beton K-350 6.33 0.000 -6.330 m3 Rp 1,124,510 Rp 7,117,698 Rp - -Rp 7,117,698
Besi beton 557.70 0.000 -557.698 kg Rp 11,570 Rp 6,452,292 Rp - -Rp 6,452,292
Bekisting 40.32 0.000 -40.320 m2 Rp 170,128 Rp 6,859,561 Rp - -Rp 6,859,561
9 B-6 400 x 850 ; L = 5.20 M
Beton K-350 6.35 5.990 -0.357 m3 Rp 1,124,510 Rp 7,137,546 Rp 6,736,265 -Rp 401,281
Besi beton 1,199.89 1,199.886 0.000 kg Rp 11,570 Rp 13,882,076 Rp 13,882,076 Rp -
Bekisting 63.61 38.272 -25.336 m2 Rp 170,128 Rp 10,821,417 Rp 6,511,139 -Rp 4,310,278
10 G-1 250 x 550 ; L = 5.05 M
Beton K-350 0.95 5.303 4.353 m3 Rp 1,124,510 Rp 1,067,947 Rp 5,962,714 Rp 4,894,767
Besi beton 194.53 194.531 0.000 kg Rp 11,570 Rp 2,250,624 Rp 2,250,624 Rp -
Bekisting 12.41 55.045 42.638 m2 Rp 170,128 Rp 2,110,778 Rp 9,364,696 Rp 7,253,918
11 G-1 250 x 550 ; L = 2.78 M
Beton K-350 2.06 0.876 -1.187 m3 Rp 1,124,510 Rp 2,319,189 Rp 984,733 -Rp 1,334,456
Besi beton 385.58 385.578 0.000 kg Rp 11,570 Rp 4,460,940 Rp 4,460,940 Rp -
Bekisting 19.64 9.091 -10.548 m2 Rp 170,128 Rp 3,341,144 Rp 1,546,566 -Rp 1,794,578
12 G-1 250 x 550 ; L = 5.36 M
Beton K-350 0.25 1.688 1.434 m3 Rp 1,124,510 Rp 285,626 Rp 1,898,623 Rp 1,612,997
Besi beton 45.74 45.743 0.000 kg Rp 11,570 Rp 529,218 Rp 529,218 Rp -
Bekisting 3.09 17.527 14.439 m2 Rp 170,128 Rp 525,355 Rp 2,981,867 Rp 2,456,512
13 G-3 250 x 450 ; L = 2.70 M
Beton K-350 1.14 0.216 -0.921 m3 Rp 1,124,510 Rp 1,278,343 Rp 242,894 -Rp 1,035,449
Besi beton 138.54 138.539 0.000 kg Rp 11,570 Rp 1,602,824 Rp 1,602,824 Rp -
Bekisting 8.48 2.403 -6.077 m2 Rp 170,128 Rp 1,442,685 Rp 408,818 -Rp 1,033,868
14 G-5 300 x 850 ; L = 5.20 M
Beton K-350 1.38 1.310 -0.072 m3 Rp 1,124,510 Rp 1,554,523 Rp 1,473,558 -Rp 80,965
Besi beton 181.94 181.944 0.000 kg Rp 11,570 Rp 2,104,995 Rp 2,104,995 Rp -
Bekisting 14.77 9.308 -5.467 m2 Rp 170,128 Rp 2,513,641 Rp 1,583,551 -Rp 930,090
15 G-6 400 x 850 ; L = 5.20 M
Beton K-350 3.17 1.498 -1.668 m3 Rp 1,124,510 Rp 3,559,749 Rp 1,684,066 -Rp 1,875,683
Besi beton 358.05 358.054 0.000 kg Rp 11,570 Rp 4,142,506 Rp 4,142,506 Rp -
Bekisting 19.74 9.568 -10.172 m2 Rp 170,128 Rp 3,358,327 Rp 1,627,785 -Rp 1,730,542
16 G-6 400 x 850 ; L = 5,05 \M
Beton K-350 2.76 2.909 0.146 m3 Rp 1,124,510 Rp 3,107,021 Rp 3,270,975 Rp 163,954
Besi beton 328.94 328.938 0.000 kg Rp 11,570 Rp 3,805,648 Rp 3,805,648 Rp -
Bekisting 12.28 18.584 6.304 m2 Rp 170,128 Rp 2,089,172 Rp 3,161,659 Rp 1,072,487

RAB STR (2) 17 / 58


II. PEKERJAAN STRUKTUR
17 G-6 400 x 850 ; L = 5,05 \M
Beton K-350 2.58 0.000 -2.579 m3 Rp 1,124,510 Rp 2,899,926 Rp - -Rp 2,899,926
Besi beton 287.21 0.000 -287.210 kg Rp 11,570 Rp 3,322,876 Rp - -Rp 3,322,876
Bekisting 11.65 0.000 -11.645 m2 Rp 170,128 Rp 1,981,141 Rp - -Rp 1,981,141
18 G-9 350 x 600 ; L = 6.87 M
Beton K-350 1.20 3.390 2.187 m3 Rp 1,124,510 Rp 1,352,786 Rp 3,812,477 Rp 2,459,691
Besi beton 279.02 279.016 0.000 kg Rp 11,570 Rp 3,228,078 Rp 3,228,078 Rp -
Bekisting 11.14 26.587 15.442 m2 Rp 170,128 Rp 1,895,991 Rp 4,523,176 Rp 2,627,185
19 CB-1 250 x 550 ; L = 2.12 M
Beton K-350 1.16 1.113 -0.048 m3 Rp 1,124,510 Rp 1,306,006 Rp 1,251,580 -Rp 54,426
Besi beton 314.21 314.208 0.000 kg Rp 11,570 Rp 3,635,232 Rp 3,635,232 Rp -
Bekisting 9.67 11.554 1.881 m2 Rp 170,128 Rp 1,645,563 Rp 1,965,659 Rp 320,096
20 CB-4 300 x 600 ; L = 1.75 M
Beton K-350 3.97 1.234 -2.741 m3 Rp 1,124,510 Rp 4,469,253 Rp 1,387,364 -Rp 3,081,888
Besi beton 872.40 872.397 0.000 kg Rp 11,570 Rp 10,093,202 Rp 10,093,202 Rp -
Bekisting 26.68 10.850 -15.826 m2 Rp 170,128 Rp 4,538,335 Rp 1,845,889 -Rp 2,692,446
21 CB-5 400 x 850 ; L = 2.70 M
Beton K-350 0.25 3.577 3.323 m3 Rp 1,124,510 Rp 285,626 Rp 4,022,327 Rp 3,736,702
Besi beton 45.74 45.743 0.000 kg Rp 11,570 Rp 529,218 Rp 529,218 Rp -
Bekisting 8.78 22.853 14.078 m2 Rp 170,128 Rp 1,492,873 Rp 3,887,901 Rp 2,395,028
22 B-3 200 x 450 ; L = 5.05 M
Beton K-350 0.00 0.962 0.962 m3 Rp 1,124,510 Rp - Rp 1,081,833 Rp 1,081,833
Besi beton 0.00 0.000 0.000 kg Rp 11,570 Rp - Rp - Rp -
Bekisting 0.00 12.627 12.627 m2 Rp 170,128 Rp - Rp 2,148,186 Rp 2,148,186
23 B-7 250 x 450 ; L = 2.70 M
Beton K-350 0.00 0.216 0.216 m3 Rp 1,124,510 Rp - Rp 242,894 Rp 242,894
Besi beton 0.00 0.000 0.000 kg Rp 11,570 Rp - Rp - Rp -
Bekisting 0.00 2.403 2.403 m2 Rp 170,128 Rp - Rp 408,818 Rp 408,818
24 B-8 150 x 300 ; L= 1,4 M
Beton K-350 0.00 0.036 0.036 m3 Rp 1,124,510 Rp - Rp 40,145 Rp 40,145
Besi beton 0.00 0.000 0.000 kg Rp 11,570 Rp - Rp - Rp -
Bekisting 0.00 0.686 0.686 m2 Rp 170,128 Rp - Rp 116,708 Rp 116,708
25 G-1 250 x 550 ; L = 6.87 M
Beton K-350 0.00 4.328 4.328 m3 Rp 1,124,510 Rp - Rp 4,866,992 Rp 4,866,992
Besi beton 0.00 0.000 0.000 kg Rp 11,570 Rp - Rp - Rp -
Bekisting 0.00 44.930 44.930 m2 Rp 170,128 Rp - Rp 7,643,817 Rp 7,643,817
26 G-7 500 x 950 ; L = 5.05 M
Beton K-350 0.00 2.260 2.260 m3 Rp 1,124,510 Rp - Rp 2,541,651 Rp 2,541,651
Besi beton 0.00 0.000 0.000 kg Rp 11,570 Rp - Rp - Rp -
Bekisting 0.00 17.725 17.725 m2 Rp 170,128 Rp - Rp 3,015,451 Rp 3,015,451

c Komponen Pelat Lantai


Pelat t = 130 mm
Beton K-350 59.95 61.568 1.622 m3 Rp 1,124,510 Rp 67,409,868 Rp 69,233,514 Rp 1,823,646
Besi beton 7,389.60 7,389.605 0.000 kg Rp 11,570 Rp 85,494,031 Rp 85,494,031 Rp -
Bekisting 454.05 484.897 30.850 m2 Rp 199,789 Rp 90,713,415 Rp 96,876,988 Rp 6,163,573

RAB STR (2) 18 / 58


II. PEKERJAAN STRUKTUR

4 Pekerjaan Struktur Lantai Dak (ATAP)


a Komponen Kolom
Tipe K1 30x40 cm
Beton K-350 1.50 1.500 0.000 m3 Rp 1,124,510 Rp 1,686,765 Rp 1,686,765 Rp -
Besi beton 422.61 422.608 0.000 kg Rp 11,570 Rp 4,889,369 Rp 4,889,369 Rp -
Bekisting 30.00 30.000 0.000 m2 Rp 165,889 Rp 4,976,670 Rp 4,976,670 Rp -
Tipe C4 20x20 cm
Beton K-350 0.00 0.979 0.979 m3 Rp 1,124,510 Rp - Rp 1,101,120 Rp 1,101,120
Besi beton 0.00 160.735 160.735 kg Rp 11,570 Rp - Rp 1,859,624 Rp 1,859,624
Bekisting 0.00 19.584 19.584 m2 Rp 165,889 Rp - Rp 3,248,770 Rp 3,248,770
b. Komponen Balok
1 B1-5 250 x 550 ; L = 5.05 M
Beton K-350 1.36 1.389 0.032 m3 Rp 1,124,510 Rp 1,525,398 Rp 1,561,663 Rp 36,265
Besi beton 141.64 141.641 0.000 kg Rp 11,570 Rp 1,638,715 Rp 1,638,715 Rp -
Bekisting 12.56 13.635 1.080 m2 Rp 170,128 Rp 2,135,957 Rp 2,319,695 Rp 183,738
2 B1-5 250 x 550 ; L = 5.05 M
Beton K-350 3.21 3.208 0.000 m3 Rp 1,124,510 Rp 3,607,878 Rp 3,607,878 Rp -
Besi beton 514.58 514.576 0.000 kg Rp 11,570 Rp 5,953,384 Rp 5,953,384 Rp -
Bekisting 26.12 26.120 0.000 m2 Rp 170,128 Rp 4,443,743 Rp 4,443,743 Rp -
3 B2-2 300 x 750 ; L = 5.20 M
Beton K-350 0.24 3.510 3.268 m3 Rp 1,124,510 Rp 272,491 Rp 3,947,030 Rp 3,674,539
Besi beton 42.45 42.447 0.000 kg Rp 11,570 Rp 491,091 Rp 491,091 Rp -
Bekisting 2.62 28.080 25.462 m2 Rp 170,128 Rp 445,395 Rp 4,777,194 Rp 4,331,799
4 B3-1 200 x 450 ; L = 2.78 M
Beton K-350 0.29 0.167 -0.120 m3 Rp 1,124,510 Rp 322,172 Rp 187,568 -Rp 134,604
Besi beton 47.25 47.246 0.000 kg Rp 11,570 Rp 546,614 Rp 546,614 Rp -
Bekisting 3.21 2.224 -0.986 m2 Rp 170,128 Rp 546,111 Rp 378,365 -Rp 167,746
5 B3-1 200 x 450 ; L = 1.50 M
Beton K-350 1.73 2.000 0.269 m3 Rp 1,124,510 Rp 1,946,212 Rp 2,249,020 Rp 302,808
Besi beton 326.90 326.901 0.000 kg Rp 11,570 Rp 3,782,082 Rp 3,782,082 Rp -
Bekisting 21.15 2.400 -18.753 m2 Rp 170,128 Rp 3,598,718 Rp 408,307 -Rp 3,190,410
6 B3-1 200 x 450 ; L = 6.81 M
Beton K-350 0.43 2.452 2.024 m3 Rp 1,124,510 Rp 480,391 Rp 2,756,849 Rp 2,276,458
Besi beton 90.15 90.153 0.000 kg Rp 11,570 Rp 1,043,025 Rp 1,043,025 Rp -
Bekisting 5.28 32.688 27.408 m2 Rp 170,128 Rp 898,276 Rp 5,561,144 Rp 4,662,868
7 B3-2 200 x 450 ; L = 5.20 M
Beton K-350 0.60 0.312 -0.283 m3 Rp 1,124,510 Rp 669,308 Rp 350,847 -Rp 318,461
Besi beton 160.31 160.306 0.000 kg Rp 11,570 Rp 1,854,661 Rp 1,854,661 Rp -
Bekisting 10.23 4.160 -6.070 m2 Rp 170,128 Rp 1,740,409 Rp 707,732 -Rp 1,032,677
8 B3-1 200 x 450 ; L = 5.05 M
Beton K-350 2.55 2.553 0.000 m3 Rp 1,124,510 Rp 2,870,874 Rp 2,870,874 Rp -
Besi beton 432.31 432.315 0.000 kg Rp 11,570 Rp 5,001,665 Rp 5,001,665 Rp -
Bekisting 25.11 8.080 -17.030 m2 Rp 170,128 Rp 4,271,914 Rp 1,374,634 -Rp 2,897,280
8 B3-1 200 x 450 ; L = 2.07 M
Beton K-350 0.00 0.124 0.124 m3 Rp 1,124,510 Rp - Rp 139,664 Rp 139,664

RAB STR (2) 19 / 58


II. PEKERJAAN STRUKTUR
Besi beton 0.00 - #VALUE! kg Rp 11,570 Rp - #VALUE! #VALUE!
Bekisting 0.00 1.656 1.656 m2 Rp 170,128 Rp - Rp 281,732 Rp 281,732
8 B-7 250 x 450 ; L = 2.70 M
Beton K-350 0.00 0.216 0.216 m3 Rp 1,124,510 Rp - Rp 242,894 Rp 242,894
Besi beton 0.00 - #VALUE! kg Rp 11,570 Rp - #VALUE! #VALUE!
Bekisting 0.00 2.403 2.403 m2 Rp 170,128 Rp - Rp 408,818 Rp 408,818
9 G1-1 250 x 550 ; L = 5.05 M
Beton K-350 0.95 2.020 1.070 m3 Rp 1,124,510 Rp 1,067,947 Rp 2,271,510 Rp 1,203,563
Besi beton 222.90 222.897 0.000 kg Rp 11,570 Rp 2,578,812 Rp 2,578,812 Rp -
Bekisting 9.64 21.210 11.571 m2 Rp 170,128 Rp 1,639,864 Rp 3,608,415 Rp 1,968,551
10 G1-6 250 x 550 ; L = 2,780 M
Beton K-350 2.66 0.834 -1.827 m3 Rp 1,124,510 Rp 2,992,715 Rp 937,841 -Rp 2,054,873
Besi beton 409.65 409.647 0.000 kg Rp 11,570 Rp 4,739,407 Rp 4,739,407 Rp -
Bekisting 25.72 8.757 -16.968 m2 Rp 170,128 Rp 4,376,458 Rp 1,489,811 -Rp 2,886,647
11 G1-1 250 x 550 ; L = 6.87 M
Beton K-350 2.38 0.000 -2.381 m3 Rp 1,124,510 Rp 2,677,233 Rp - -Rp 2,677,233
Besi beton 294.87 0.000 -294.869 kg Rp 11,570 Rp 3,411,483 Rp - -Rp 3,411,483
Bekisting 18.24 0.000 -18.240 m2 Rp 170,128 Rp 3,103,135 Rp - -Rp 3,103,135
12 G2-4 300 x 750 ; L = 5.20 M
Beton K-350 2.09 2.340 0.252 m3 Rp 1,124,510 Rp 2,347,977 Rp 2,631,353 Rp 283,377
Besi beton 345.48 345.483 0.000 kg Rp 11,570 Rp 3,997,069 Rp 3,997,069 Rp -
Bekisting 21.39 18.720 -2.670 m2 Rp 170,128 Rp 3,639,038 Rp 3,184,796 -Rp 454,242
13 G3-1 250 x 450 ;L=5,050 M
Beton K-350 0.50 2.273 1.769 m3 Rp 1,124,510 Rp 566,753 Rp 2,555,449 Rp 1,988,696
Besi beton 86.42 86.420 0.000 kg Rp 11,570 Rp 999,833 Rp 999,833 Rp -
Bekisting 5.52 23.230 17.710 m2 Rp 170,128 Rp 939,107 Rp 3,952,073 Rp 3,012,967
14 G3=1 250 x 450 : L=5,200 M
Beton K-350 4.31 0.585 -3.721 m3 Rp 1,124,510 Rp 4,841,690 Rp 657,838 -Rp 4,183,852
Besi beton 805.83 805.832 0.000 kg Rp 11,570 Rp 9,323,074 Rp 9,323,074 Rp -
Bekisting 44.64 5.980 -38.663 m2 Rp 170,128 Rp 7,595,024 Rp 1,017,365 -Rp 6,577,659
15 G3-2 250 x 450 ;L=6,870 M
Beton K-350 2.63 3.864 1.234 m3 Rp 1,124,510 Rp 2,958,417 Rp 4,345,528 Rp 1,387,111
Besi beton 239.89 239.887 0.000 kg Rp 11,570 Rp 2,775,371 Rp 2,775,371 Rp -
Bekisting 18.13 41.220 23.085 m2 Rp 170,128 Rp 3,085,271 Rp 7,012,676 Rp 3,927,405
15 G3-2 250 x 450 ;L=2,700 M
Beton K-350 0.00 0.203 0.203 m3 Rp 1,124,510 Rp - Rp 227,713 Rp 227,713
Besi beton 0.00 - #VALUE! kg Rp 11,570 Rp - #VALUE! #VALUE!
Bekisting 0.00 2.295 2.295 m2 Rp 170,128 Rp - Rp 390,444 Rp 390,444
16 G8-1 350 x 800 L-5,050 M
Beton K-350 2.06 1.414 -0.646 m3 Rp 1,124,510 Rp 2,316,266 Rp 1,590,057 -Rp 726,209
Besi beton 279.67 279.667 0.000 kg Rp 11,570 Rp 3,235,610 Rp 3,235,610 Rp -
Bekisting 16.74 9.848 -6.892 m2 Rp 170,128 Rp 2,847,943 Rp 1,675,335 -Rp 1,172,607
17 G2-4 300 x 750 L;5,050 M
Beton K-350 0.51 2.273 1.766 m3 Rp 1,124,510 Rp 569,564 Rp 2,555,449 Rp 1,985,885
Besi beton 371.47 371.473 0.000 kg Rp 11,570 Rp 4,297,760 Rp 4,297,760 Rp -
Bekisting 5.66 18.180 12.525 m2 Rp 170,128 Rp 962,074 Rp 3,092,927 Rp 2,130,853

RAB STR (2) 20 / 58


II. PEKERJAAN STRUKTUR
17 G-10 300 x 450 ; L = 6.87 M
Beton K-350 0.00 3.390 3.390 m3 Rp 1,124,510 Rp - Rp 3,812,477 Rp 3,812,477
Besi beton 0.00 - #VALUE! kg Rp 11,570 Rp - #VALUE! #VALUE!
Bekisting 0.00 24.732 24.732 m2 Rp 170,128 Rp - Rp 4,207,606 Rp 4,207,606
18 CB1-1 250 x 550 L; 5,500 M
Beton K-350 1.85 0.150 -1.703 m3 Rp 1,124,510 Rp 2,083,829 Rp 168,677 -Rp 1,915,153
Besi beton 297.75 297.752 0.000 kg Rp 11,570 Rp 3,444,839 Rp 3,444,839 Rp -
Bekisting 14.63 1.575 -13.055 m2 Rp 170,128 Rp 2,488,973 Rp 267,952 -Rp 2,221,021
19 CB2-2 300 x 750 L:2,070
Beton K-350 0.85 2.329 1.481 m3 Rp 1,124,510 Rp 953,584 Rp 2,618,703 Rp 1,665,118
Besi beton 172.65 172.646 0.000 kg Rp 11,570 Rp 1,997,429 Rp 1,997,429 Rp -
Bekisting 9.32 18.630 9.315 m2 Rp 170,128 Rp 1,584,742 Rp 3,169,485 Rp 1,584,742
19 CB-3 250 x 450 ; L = 1.65 M
Beton K-350 0.85 0.619 -0.229 m3 Rp 1,124,510 Rp 953,584 Rp 695,791 -Rp 257,794
Besi beton 172.65 172.646 0.000 kg Rp 11,570 Rp 1,997,429 Rp 1,997,429 Rp -
Bekisting 9.32 7.012 -2.303 m2 Rp 170,128 Rp 1,584,742 Rp 1,193,023 -Rp 391,720

c Komponen Pelat Lantai


Pelat t = 130 mm
Beton K-350 12.13 22.853 10.719 m3 Rp 1,124,510 Rp 13,644,371 Rp 25,697,936 Rp 12,053,565
Besi beton 1,374.27 1,374.269 0.000 kg Rp 11,570 Rp 15,899,607 Rp 15,899,607 Rp -
Bekisting 93.34 174.569 81.234 m2 Rp 199,789 Rp 18,647,406 Rp 34,877,001 Rp 16,229,595

Rp 2,528,588,542 #VALUE! #VALUE!

RAB STR (2) 21 / 58


RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar
Tipe Prototipe : Bangunan Kantor
Jumlah Lantai : 3 Lantai
Lokasi : Jl. Kumala 128 Makassar
Tahun Anggaran : 2020

II. PEKERJAAN STRUKTUR


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN UNIT Volume
(Rp) (Rp)

A. PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE)


1 Pekerjaan Pondasi Tiang Pancang dengan sistem Tekan (jack hidrolic)
Tipe Tiang Pancang Pondasi 25/25 cm, L = 20 m
Pemotongan kepala tiang
- Persiapan 1.00 ls Rp 74,964,200 Rp 74,964,200
- Tiang Pancang berikut pemancangan' 1,240.00 M' Rp 510,195 Rp 632,641,800
Pemotongan/perapihan kepala tiang bore pile 62.00 Titik Rp 113,000 Rp 7,006,000

2 Pekerjaan Pilecap
Tipe PC-1 600x600 mm
Beton K-350 m3 0.50 Rp 1,124,510 Rp 566,753
Besi beton kg 153.75 Rp 11,570 Rp 1,778,812
Bekisting m2 3.28 Rp 98,991 Rp 324,690
Tipe PC-2 500x1250 mm
Beton K-350 m3 2.19 Rp 1,124,510 Rp 2,459,866
Besi beton kg 828.78 Rp 11,570 Rp 9,588,543
Bekisting m2 12.38 Rp 98,991 Rp 1,225,014
Tipe PC-3 1180x1250 mm (modifikasi model tie beam)
Beton K-350 m3 14.46 Rp 1,124,510 Rp 16,254,792
Besi beton kg 2,786.56 Rp 11,570 Rp 32,239,063
Bekisting m2 47.28 Rp 98,991 Rp 4,680,096
Tipe PC-4 1250x1250 mm (modifikasi model tie beam)
Beton K-350 m3 2.19 Rp 1,124,510 Rp 2,459,866
Besi beton kg 446.31 Rp 11,570 Rp 5,163,572
Bekisting m2 7.13 Rp 98,991 Rp 705,311

3 Pekerjaan Tie Beam (sloof)


Tipe TB-1 25x50 cm
L = 5.200 m
Beton K-350 m3 2.40 Rp 1,124,510 Rp 2,693,201
Besi beton kg 485.13 Rp 11,570 Rp 5,612,734
Bekisting m2 19.75 Rp 98,991 Rp 1,955,072
L = 6.870 m
Beton K-350 m3 7.39 Rp 1,124,510 Rp 8,304,506
Besi beton kg 1,441.85 Rp 11,570 Rp 16,681,525
Bekisting m2 59.85 Rp 98,991 Rp 5,924,611
L = 2.780 m
Beton K-350 m3 0.84 Rp 1,124,510 Rp 945,994
Besi beton kg 191.60 Rp 11,570 Rp 2,216,740
Bekisting m2 7.61 Rp 98,991 Rp 753,569
L = 5.30 m
Beton K-350 m3 1.85 Rp 1,124,510 Rp 2,076,127
Besi beton kg 372.42 Rp 11,570 Rp 4,308,686
Bekisting m2 14.56 Rp 98,991 Rp 1,441,556
L = 5.05 m
Beton K-350 m3 7.77 Rp 1,124,510 Rp 8,743,065
Besi beton kg 1,624.56 Rp 11,570 Rp 18,795,297
Bekisting m2 63.25 Rp 98,991 Rp 6,261,181
L = 2.70 m
Beton K-350 m3 0.56 Rp 1,124,510 Rp 626,914
Besi beton kg 122.38 Rp 11,570 Rp 1,415,902
Bekisting m2 4.88 Rp 98,991 Rp 482,581
4 Pekerjaan Galian Tanah
Galian Tanah Pondasi < 1 m
Tipe PC-1 600x600 mm m3 0.61 Rp 100,000 Rp 61,200
Tipe PC-2 500x1250 mm m3 2.66 Rp 100,000 Rp 265,625
Tipe PC-3 1180x1250 mm (modifikasi model tie beam) m3 17.14 Rp 100,000 Rp 1,713,950
Tipe PC-4 1250x1250 mm (modifikasi model tie beam) m3 2.67 Rp 100,000 Rp 267,375

Galian Tanah Pondasi < 1 m untuk Tie Beam


Tipe TB-1 25x50 cm
L = 5.200 m m3 2.66 Rp 100,000 Rp 266,250
L = 6.870 m m3 7.35 Rp 100,000 Rp 735,050
L = 2.780 m m3 0.85 Rp 100,000 Rp 85,400
L = 5.30 m m4 1.68 Rp 100,000 Rp 167,812
L = 5.05 m m5 7.83 Rp 100,000 Rp 783,250
L = 2.70 m m2 0.54 Rp 100,000 Rp 53,574
5 Pekerjaan Urugan Pasir
Urugan Pasir dibawah Pondasi t = 10 cm
Tipe PC-1 600x600 mm m3 0.07 Rp 227,130 Rp 16,353
Tipe PC-2 500x1250 mm m3 0.63 Rp 227,130 Rp 141,956
Tipe PC-3 1180x1250 mm (modifikasi model tie beam) m3 6.19 Rp 227,130 Rp 1,407,070
Tipe PC-4 1250x1250 mm (modifikasi model tie beam) m3 0.31 Rp 227,130 Rp 70,978

Urugan Pasir dibawah Tie Beam t = 10 cm


Tipe TB-1 25x50 cm
L = 5.200 m m3 0.45 Rp 227,130 Rp 101,073
L = 6.870 m m3 1.51 Rp 227,130 Rp 344,034
L = 2.780 m m3 0.21 Rp 227,130 Rp 47,357
L = 5.30 m m4 0.34 Rp 227,130 Rp 77,508
L = 5.05 m m5 1.51 Rp 227,130 Rp 341,831
L = 2.70 m m2 0.10 Rp 227,130 Rp 22,145

6 Pekerjaan Lantai Kerja


Lantai Kerja dibawah Pondasi t = 5 cm
Tipe PC-1 600x600 mm m3 0.04 Rp 915,344 Rp 32,952
Tipe PC-2 500x1250 mm m3 0.21 Rp 915,344 Rp 190,697
Tipe PC-3 1180x1250 mm (modifikasi model tie beam) m3 3.10 Rp 915,344 Rp 2,835,278
Tipe PC-4 1250x1250 mm (modifikasi model tie beam) m3 0.16 Rp 915,344 Rp 143,023

Lantai Kerja dibawah Tie Beam t = 5 cm


Tipe TB-1 25x50 cm
L = 5.200 m m3 0.22 Rp 915,344 Rp 203,664
L = 6.870 m m3 0.76 Rp 915,344 Rp 693,236
L = 2.780 m m3 0.10 Rp 915,344 Rp 95,425
L = 5.30 m m4 0.17 Rp 915,344 Rp 156,181
L = 5.05 m m5 0.75 Rp 915,344 Rp 688,796
L = 2.70 m m2 0.05 Rp 915,344 Rp 44,623
7 Urugan tanah kembali bekas galian m3 32.24 Rp 16,950 Rp 546,471
8 Tanah urug peninggian lantai t=53 cm (dalam bangunan) m3 80.00 Rp 193,230 Rp 15,458,400
9 Pasir urug diatas tanah urug t=10 cm (dalam bangunan) m3 32.00 Rp 227,130 Rp 7,268,160
10 Pekerjaan Test PDA Tiang Bore ttk 3.00 Rp 24,718,750 Rp 74,156,250
11 Peninggian Semua Site setinggi 35 cm tanah urug padat mesin m2 284.20 Rp 193,230 Rp 54,915,966
12 Penambahan camp. Waterproffing (integral) pada beton Bawah m3 77.79 Rp 96,050 Rp 7,471,810
13 Anti Rayap suntik pada tanah urug sebelum lantai dasar m2 384.00 Rp 22,600 Rp 8,678,400

B. PEKERJAAN STRUKTUR ATAS (UPPER STRUCTURE)


1 Pekerjaan Struktur Lantai Dasar
a Komponen Kolom
Tipe C1 40x40 cm
Beton K-350 m3 10.57 Rp 1,124,510 Rp 11,888,320
Besi beton kg 3,768.35 Rp 11,570 Rp 43,597,909
Bekisting m2 110.72 Rp 165,889 Rp 18,367,230
Tipe C2 30x30 cm
Beton K-350 m3 0.63 Rp 1,124,510 Rp 707,317
Besi beton kg 207.21 Rp 11,570 Rp 2,397,275
Bekisting m2 8.42 Rp 165,889 Rp 1,396,785
Tipe C3 50x60 cm
Beton K-350 m3 2.13 Rp 1,124,510 Rp 2,395,206
Besi beton kg 424.86 Rp 11,570 Rp 4,915,384
Bekisting m2 17.82 Rp 165,889 Rp 2,956,142
b Komponen Pelat Lantai
Pelat t = 120 mm
Beton K-350 m3 37.66 Rp 1,124,510 Rp 42,345,493
Besi beton wire mesh m8 rangkap kg 1,387.20 Rp 12,683 Rp 17,593,166
c Komponen Tangga
Tangga Utama (Depan)
Beton K-350 m3 3.96 Rp 1,124,510 Rp 4,451,809
Besi beton kg 219.93 Rp 11,570 Rp 2,544,478
Bekisting m2 8.06 Rp 156,000 Rp 1,257,360
Tangga Utama
Beton K-350 m3 4.88 Rp 1,124,510 Rp 5,490,092
Besi beton kg 243.99 Rp 11,570 Rp 2,822,847
Bekisting m2 8.06 Rp 156,000 Rp 1,257,360

2 Pekerjaan Struktur Lantai 2


a Komponen Kolom
Tipe C1 40x40 cm
Beton K-350 m3 11.66 Rp 1,124,510 Rp 13,116,285
Besi beton kg 3,770.96 Rp 11,570 Rp 43,628,145
Bekisting m2 116.64 Rp 165,889 Rp 19,349,293
Tipe C2 30x30 cm
Beton K-350 m3 0.73 Rp 1,124,510 Rp 819,768
Besi beton kg 232.84 Rp 11,570 Rp 2,693,860
Bekisting m2 9.72 Rp 165,889 Rp 1,612,441
Tipe C3 50x60 cm
Beton K-350 m3 2.43 Rp 1,124,510 Rp 2,732,559
Besi beton kg 562.40 Rp 11,570 Rp 6,506,647
Bekisting m2 17.82 Rp 165,889 Rp 2,956,142
b. Komponen Balok
1 B-1 250 x 550 ; L = 6.87 M
Beton K-350 m3 8.11 Rp 1,124,510 Rp 9,124,443
Besi beton kg 1,478.31 Rp 11,570 Rp 17,103,340
Bekisting m2 80.61 Rp 170,128 Rp 13,714,103
2 B-1 250 x 550 ; L = 5.36 M
Beton K-350 m3 1.34 Rp 1,124,510 Rp 1,508,643
Besi beton kg 288.20 Rp 11,570 Rp 3,334,335
Bekisting m2 13.39 Rp 170,128 Rp 2,278,354
3 B-1 250 x 550 ; L = 2.78 M
Beton K-350 m3 0.70 Rp 1,124,510 Rp 786,932
Besi beton kg 150.92 Rp 11,570 Rp 1,746,038
Bekisting m2 6.83 Rp 170,128 Rp 1,161,294
4 B-1 250 x 550 ; L = 5.05 M
Beton K-350 m3 1.48 Rp 1,124,510 Rp 1,660,339
Besi beton kg 253.06 Rp 11,570 Rp 2,927,770
Bekisting m2 14.06 Rp 170,128 Rp 2,391,149
5 B-1 250 x 550 ; L = 4.50 M
Beton K-350 m3 0.53 Rp 1,124,510 Rp 596,553
Besi beton kg 107.64 Rp 11,570 Rp 1,245,319
Bekisting m2 8.92 Rp 170,128 Rp 1,517,542
6 B-2 300 x 750 ; L = 5.20 M
Beton K-350 m3 3.68 Rp 1,124,510 Rp 4,136,398
Besi beton kg 514.58 Rp 11,570 Rp 5,953,384
Bekisting m2 26.23 Rp 170,128 Rp 4,462,457
7 B-3 200 x 450 ; L = 5.05 M
Beton K-350 m3 0.90 Rp 1,124,510 Rp 1,006,661
Besi beton kg 128.43 Rp 11,570 Rp 1,485,829
Bekisting m2 6.04 Rp 170,128 Rp 1,026,722
8 B-4 300 x 550 ; L = 1.80 M
Beton K-350 m3 0.33 Rp 1,124,510 Rp 367,040
Besi beton kg 54.44 Rp 11,570 Rp 629,789
Bekisting m2 2.76 Rp 170,128 Rp 469,553
9 B-7 250 x 450 ; L = 2.70 M
Beton K-350 m3 0.28 Rp 1,124,510 Rp 319,361
Besi beton kg 45.74 Rp 11,570 Rp 529,218
Bekisting m2 2.65 Rp 170,128 Rp 449,989
10 G-1 250 x 550 ; L = 6.87 M
Beton K-350 m3 5.08 Rp 1,124,510 Rp 5,708,125
Besi beton kg 894.07 Rp 11,570 Rp 10,343,996
Bekisting m2 52.41 Rp 170,128 Rp 8,915,898
11 G-1 250 x 550 ; L = 6.87 M
Beton K-350 m3 0.97 Rp 1,124,510 Rp 1,090,437
Besi beton kg 175.62 Rp 11,570 Rp 2,031,831
Bekisting m2 9.64 Rp 170,128 Rp 1,639,864
12 G-1 250 x 550 ; L = 2.78 M
Beton K-350 m3 2.06 Rp 1,124,510 Rp 2,319,189
Besi beton kg 346.12 Rp 11,570 Rp 4,004,387
Bekisting m2 20.09 Rp 170,128 Rp 3,417,531
13 G-1 250 x 550 ; L = 5.36 M
Beton K-350 m3 0.62 Rp 1,124,510 Rp 701,694
Besi beton kg 116.03 Rp 11,570 Rp 1,342,448
Bekisting m2 6.48 Rp 170,128 Rp 1,102,429
14 G-1 250 x 550 ; L = 5.20 M
Beton K-350 m3 6.88 Rp 1,124,510 Rp 7,739,440
Besi beton kg 1,089.79 Rp 11,570 Rp 12,608,288
Bekisting m2 62.78 Rp 170,128 Rp 10,679,785
15 G-1 250 x 550 ; L = 5.05 M
Beton K-350 m3 2.08 Rp 1,124,510 Rp 2,338,756
Besi beton kg 310.02 Rp 11,570 Rp 3,586,779
Bekisting m2 16.74 Rp 170,128 Rp 2,847,943
16 G-2 300 x 750 ; L = 5.05 M
Beton K-350 m3 2.19 Rp 1,124,510 Rp 2,457,729
Besi beton kg 317.18 Rp 11,570 Rp 3,669,605
Bekisting m2 17.28 Rp 170,128 Rp 2,939,812
17 G-2 300 x 750 ; L = 5.20 M
Beton K-350 m3 0.25 Rp 1,124,510 Rp 285,626
Besi beton kg 50.86 Rp 11,570 Rp 588,481
Bekisting m2 2.65 Rp 170,128 Rp 449,989
18 G-3 250 x 450 ; L = 2.70 M
Beton K-350 m3 3.74 Rp 1,124,510 Rp 4,209,345
Besi beton kg 629.36 Rp 11,570 Rp 7,281,374
Bekisting m2 28.14 Rp 170,128 Rp 4,788,167
19 G-9 350 x 550 ; L = 6.87 M
Beton K-350 m3 1.25 Rp 1,124,510 Rp 1,401,983
Besi beton kg 355.41 Rp 11,570 Rp 4,111,947
Bekisting m2
12.67 Rp 170,128 Rp 2,155,947
20 CB1-250 x 550 ; L= 2,87 M
Beton K-350 m3 3.36 Rp 1,124,510 Rp 3,774,440
Besi beton kg 543.05 Rp 11,570 Rp 6,282,828
Bekisting m2 26.68 Rp 170,128 Rp 4,538,335
21 CB2-300 x 750 ; L= 2,87 M
Beton K-350 m3 1.15 Rp 1,124,510 Rp 1,292,343
Besi beton kg 208.01 Rp 11,570 Rp 2,406,562
Bekisting m2 9.68 Rp 170,128 Rp 1,645,988

c Komponen Pelat Lantai


Pelat t = 130 mm
Beton K-350 m3 59.95 Rp 1,124,510 Rp 67,409,868
Besi beton kg 6,189.60 Rp 11,570 Rp 71,610,631
Bekisting m2 454.05 Rp 199,789 Rp 90,713,415
d Komponen Tangga
Tangga Utama
Beton K-350 m3 3.96 Rp 1,124,510 Rp 4,451,809
Besi beton kg 219.93 Rp 11,570 Rp 2,544,478
Bekisting m2 8.06 Rp 156,000 Rp 1,257,360
Tangga Utama
Beton K-350 m3 4.18 Rp 1,124,510 Rp 4,702,935
Besi beton kg 243.99 Rp 11,570 Rp 2,822,847
Bekisting m2 8.26 Rp 156,000 Rp 1,288,560

3 Pekerjaan Struktur Lantai 3


a Komponen Kolom
Tipe C1 40x40 cm
Beton K-350 m3 8.66 Rp 1,124,510 Rp 9,742,755
Besi beton kg 3,070.96 Rp 11,570 Rp 35,529,495
Bekisting m2 88.64 Rp 165,889 Rp 14,704,401
Tipe C2 30x30 cm
Beton K-350 m3 0.67 Rp 1,124,510 Rp 748,924
Besi beton kg 202.14 Rp 11,570 Rp 2,338,693
Bekisting m2 8.88 Rp 165,889 Rp 1,473,094
Tipe C3 50x60 cm
Beton K-350 m3 2.22 Rp 1,124,510 Rp 2,496,412
Besi beton kg 562.40 Rp 11,570 Rp 6,506,647
Bekisting m2 16.28 Rp 165,889 Rp 2,700,673
b. Komponen Balok
1 B-1 250 x 550.L = 6.87 M
Beton K-350 m3 8.11 Rp 1,124,510 Rp 9,124,443
Besi beton kg 1,477.31 Rp 11,570 Rp 17,091,770
Bekisting m2 79.61 Rp 170,128 Rp 13,543,975
2 B-1 250 x 550 ; L = 6.87 M
Beton K-350 m3 1.44 Rp 1,124,510 Rp 1,621,094
Besi beton kg 293.00 Rp 11,570 Rp 3,389,869
Bekisting m2 13.39 Rp 170,128 Rp 2,278,354
3 B-1 250 x 550 ; L = 5.36 M
Beton K-350 m3 0.65 Rp 1,124,510 Rp 730,707
Besi beton kg 150.92 Rp 11,570 Rp 1,746,038
Bekisting m2 6.63 Rp 170,128 Rp 1,127,268
4 B-1 250 x 550 ; L = 2.78 M
Beton K-350 m3 1.43 Rp 1,124,510 Rp 1,603,481
Besi beton kg 168.53 Rp 11,570 Rp 1,949,820
Bekisting m2 14.72 Rp 170,128 Rp 2,503,944
5 B-1 250 x 550 ; L = 5.05 M
Beton K-350 m3 0.93 Rp 1,124,510 Rp 1,040,397
Besi beton kg 119.31 Rp 11,570 Rp 1,380,311
Bekisting m2 11.23 Rp 170,128 Rp 1,910,537
6 B-6 400 x 850 ; L = 1.80 M
Beton K-350 m3 1.07 Rp 1,124,510 Rp 1,204,575
Besi beton kg 235.89 Rp 11,570 Rp 2,729,124
Bekisting m2 9.40 Rp 170,128 Rp 1,599,203
7 B-5 300 x 850 ; L = 4.50 M
Beton K-350 m3 0.59 Rp 1,124,510 Rp 667,059
Besi beton kg 50.77 Rp 11,570 Rp 587,373
Bekisting m2 3.64 Rp 170,128 Rp 619,266
8 B-6 400 x 850 ; L = 1.80 M
Beton K-350 m3
6.33 Rp 1,124,510 Rp 7,117,698
Besi beton kg 557.70 Rp 11,570 Rp 6,452,292
Bekisting m2 40.32 Rp 170,128 Rp 6,859,561
9 B-6 400 x 850 ; L = 5.20 M
Beton K-350 m3 6.35 Rp 1,124,510 Rp 7,137,546
Besi beton kg 1,199.89 Rp 11,570 Rp 13,882,076
Bekisting m2 63.61 Rp 170,128 Rp 10,821,417
10 G-1 250 x 550 ; L = 5.05 M
Beton K-350 m3 0.95 Rp 1,124,510 Rp 1,067,947
Besi beton kg 194.53 Rp 11,570 Rp 2,250,624
Bekisting m2 12.41 Rp 170,128 Rp 2,110,778
11 G-1 250 x 550 ; L = 2.78 M
Beton K-350 m3 2.06 Rp 1,124,510 Rp 2,319,189
Besi beton kg 385.58 Rp 11,570 Rp 4,460,940
Bekisting m2 19.64 Rp 170,128 Rp 3,341,144
12 G-1 250 x 550 ; L = 5.36 M
Beton K-350 m3 0.25 Rp 1,124,510 Rp 285,626
Besi beton kg 45.74 Rp 11,570 Rp 529,218
Bekisting m2 3.09 Rp 170,128 Rp 525,355
13 G-3 250 x 450 ; L = 2.70 M
Beton K-350 m3 1.14 Rp 1,124,510 Rp 1,278,343
Besi beton kg 138.54 Rp 11,570 Rp 1,602,824
Bekisting m2 8.48 Rp 170,128 Rp 1,442,685
14 G-5 300 x 850 ; L = 5.20 M
Beton K-350 m3 1.38 Rp 1,124,510 Rp 1,554,523
Besi beton kg 181.94 Rp 11,570 Rp 2,104,995
Bekisting m2 14.77 Rp 170,128 Rp 2,513,641
15 G-6 400 x 850 ; L = 5.20 M
Beton K-350 m3 3.17 Rp 1,124,510 Rp 3,559,749
Besi beton kg 358.05 Rp 11,570 Rp 4,142,506
Bekisting m2 19.74 Rp 170,128 Rp 3,358,327
16 G-6 400 x 850 ; L = 5,05 \M
Beton K-350 m3 2.76 Rp 1,124,510 Rp 3,107,021
Besi beton kg 328.94 Rp 11,570 Rp 3,805,648
Bekisting m2 12.28 Rp 170,128 Rp 2,089,172
17 G-6 400 x 850 ; L = 5,05 \M
Beton K-350 m3 2.58 Rp 1,124,510 Rp 2,899,926
Besi beton kg 287.21 Rp 11,570 Rp 3,322,876
Bekisting m2 11.65 Rp 170,128 Rp 1,981,141
18 G-9 350 x 600 ; L = 6.87 M
Beton K-350 m3 1.20 Rp 1,124,510 Rp 1,352,786
Besi beton kg 279.02 Rp 11,570 Rp 3,228,078
Bekisting m2 11.14 Rp 170,128 Rp 1,895,991
19 CB-1 250 x 550 ; L = 2.12 M
Beton K-350 m3 1.16 Rp 1,124,510 Rp 1,306,006
Besi beton kg 314.21 Rp 11,570 Rp 3,635,232
Bekisting m2 9.67 Rp 170,128 Rp 1,645,563
20 CB-4 300 x 600 ; L = 1.75 M
Beton K-350 m3 3.97 Rp 1,124,510 Rp 4,469,253
Besi beton kg 872.40 Rp 11,570 Rp 10,093,202
Bekisting m2 26.68 Rp 170,128 Rp 4,538,335
21 CB-5 400 x 850 ; L = 2.70 M
Beton K-350 m3 0.25 Rp 1,124,510 Rp 285,626
Besi beton kg 45.74 Rp 11,570 Rp 529,218
Bekisting m2 8.78 Rp 170,128 Rp 1,492,873

c Komponen Pelat Lantai


Pelat t = 130 mm
Beton K-350 m3 59.95 Rp 1,124,510 Rp 67,409,868
Besi beton kg 7,389.60 Rp 11,570 Rp 85,494,031
Bekisting m2 454.05 Rp 199,789 Rp 90,713,415

4 Pekerjaan Struktur Lantai Dak (ATAP)


a Komponen Kolom
Tipe K1 30x40 cm
Beton K-350 m3 1.50 Rp 1,124,510 Rp 1,686,765
Besi beton kg 422.61 Rp 11,570 Rp 4,889,369
Bekisting m2 30.00 Rp 165,889 Rp 4,976,670
b. Komponen Balok
1 B1-5 250 x 550 ; L = 5.05 M
Beton K-350 m3 1.36 Rp 1,124,510 Rp 1,525,398
Besi beton kg 141.64 Rp 11,570 Rp 1,638,715
Bekisting m2 12.56 Rp 170,128 Rp 2,135,957
2 B1-5 250 x 550 ; L = 5.05 M
Beton K-350 m3 3.21 Rp 1,124,510 Rp 3,607,878
Besi beton kg 514.58 Rp 11,570 Rp 5,953,384
Bekisting m2 26.12 Rp 170,128 Rp 4,443,743
3 B2-2 300 x 750 ; L = 5.20 M
Beton K-350 m3 0.24 Rp 1,124,510 Rp 272,491
Besi beton kg 42.45 Rp 11,570 Rp 491,091
Bekisting m2 2.62 Rp 170,128 Rp 445,395
4 B3-1 200 x 450 ; L = 2.78 M
Beton K-350 m3 0.29 Rp 1,124,510 Rp 322,172
Besi beton kg 47.25 Rp 11,570 Rp 546,614
Bekisting m2 3.21 Rp 170,128 Rp 546,111
5 B3-1 200 x 450 ; L = 1.50 M
Beton K-350 m3 1.73 Rp 1,124,510 Rp 1,946,212
Besi beton kg 326.90 Rp 11,570 Rp 3,782,082
Bekisting m2 21.15 Rp 170,128 Rp 3,598,718
6 B3-1 200 x 450 ; L = 6.81 M
Beton K-350 m3 0.43 Rp 1,124,510 Rp 480,391
Besi beton kg 90.15 Rp 11,570 Rp 1,043,025
Bekisting m2 5.28 Rp 170,128 Rp 898,276
7 B3-2 200 x 450 ; L = 5.20 M
Beton K-350 m3 0.60 Rp 1,124,510 Rp 669,308
Besi beton kg 160.31 Rp 11,570 Rp 1,854,661
Bekisting m2 10.23 Rp 170,128 Rp 1,740,409
8 B3-1 200 x 450 ; L = 5.05 M
Beton K-350 m3 2.55 Rp 1,124,510 Rp 2,870,874
Besi beton kg 432.31 Rp 11,570 Rp 5,001,665
Bekisting m2 25.11 Rp 170,128 Rp 4,271,914
9 G1-1 250 x 550 ; L = 5.05 M
Beton K-350 m3 0.95 Rp 1,124,510 Rp 1,067,947
Besi beton kg 222.90 Rp 11,570 Rp 2,578,812
Bekisting m2 9.64 Rp 170,128 Rp 1,639,864
10 G1-6 250 x 550 ; L = 2,780 M
Beton K-350 m3 2.66 Rp 1,124,510 Rp 2,992,715
Besi beton kg 409.65 Rp 11,570 Rp 4,739,407
Bekisting m2 25.72 Rp 170,128 Rp 4,376,458
11 G1-1 250 x 550 ; L = 6.87 M
Beton K-350 m3 2.38 Rp 1,124,510 Rp 2,677,233
Besi beton kg 294.87 Rp 11,570 Rp 3,411,483
Bekisting m2 18.24 Rp 170,128 Rp 3,103,135
12 G2-4 300 x 750 ; L = 5.20 M
Beton K-350 m3 2.09 Rp 1,124,510 Rp 2,347,977
Besi beton kg 345.48 Rp 11,570 Rp 3,997,069
Bekisting m2 21.39 Rp 170,128 Rp 3,639,038
13 G3-1 250 x 450 ;L=5,050 M
Beton K-350 m3 0.50 Rp 1,124,510 Rp 566,753
Besi beton kg 86.42 Rp 11,570 Rp 999,833
Bekisting m2 5.52 Rp 170,128 Rp 939,107
14 G3=1 250 x 450 : L=5,200 M
Beton K-350 m3 4.31 Rp 1,124,510 Rp 4,841,690
Besi beton kg 805.83 Rp 11,570 Rp 9,323,074
Bekisting m2 44.64 Rp 170,128 Rp 7,595,024
15 G3-2 250 x 450 ;L=6,870 M
Beton K-350 m3 2.63 Rp 1,124,510 Rp 2,958,417
Besi beton kg 239.89 Rp 11,570 Rp 2,775,371
Bekisting m2 18.13 Rp 170,128 Rp 3,085,271
16 G8-1 350 x 800 L-5,050 M
Beton K-350 m3 2.06 Rp 1,124,510 Rp 2,316,266
Besi beton kg 279.67 Rp 11,570 Rp 3,235,610
Bekisting m2 16.74 Rp 170,128 Rp 2,847,943
17 C2-4 300 x 750 L;5,050 M
Beton K-350 m3 0.51 Rp 1,124,510 Rp 569,564
Besi beton kg 371.47 Rp 11,570 Rp 4,297,760
Bekisting m2 5.66 Rp 170,128 Rp 962,074

RAB STR 22 / 58
II. PEKERJAAN STRUKTUR
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN UNIT Volume
(Rp) (Rp)

18 CB1-1 250 x 550 L; 5,500 M


Beton K-350 m3 1.85 Rp 1,124,510 Rp 2,083,829
Besi beton kg 297.75 Rp 11,570 Rp 3,444,839
Bekisting m2 14.63 Rp 170,128 Rp 2,488,973
19 CB2-2 300 x 750 L:2,070
Beton K-350 m3 0.85 Rp 1,124,510 Rp 953,584
Besi beton kg 172.65 Rp 11,570 Rp 1,997,429
Bekisting m2 9.32 Rp 170,128 Rp 1,584,742

c Komponen Pelat Lantai


Pelat t = 130 mm
Beton K-350 m3 12.13 Rp 1,124,510 Rp 13,644,371
Besi beton kg 1,374.27 Rp 11,570 Rp 15,899,607
Bekisting m2 93.34 Rp 199,789 Rp 18,647,406

Rp 2,524,052,786

RAB STR 23 / 58
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN ARSITEKTUR

Pekerjaan : Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar


Lokasi : Makassar
Tahun Anggaran : 2020

PEKERJAAN ARSITEKTUR

VOLUME Harga Satuan Jumlah Harga (Rp)


NO. JENIS PEKERJAAN UNIT
(Rp)
Kontrak MC 0 Deviasi Kontrak

A. PEKERJAAN ARSITEKTUR STANDART TOTAL Rp 2,889,739,217

A.1. PEKERJAAN LANTAI SUB TOTAL Rp 454,374,361

I LANTAI DASAR Rp 146,502,586


1 Pasang keramik Aea Entrance dan Tangga Entrance HT : 60/60 9.42 9.42 0.00 M2 Rp 224,029 Rp 2,110,353
2 Keramik di Ruang Utama HT : 60/60 265.87 265.87 0.00 M2 Rp 224,029 Rp 59,561,672
3 Pasangan Area Samping Kolam Renang :HT Motif Unpolish (60/60)/Keramik Motif Grid Kotak2 36.95 36.95 0.00 M2 Rp 264,332 Rp 9,766,539
4 Perkerasan Area Koridor Samping Bangunan (menuju ke parkir) : Conblock/ Grass Block 67.96 67.96 0.00 M2 Rp 174,121 Rp 11,833,698
5 Perkerasan Area Parkir Motor : Grass/ Conblok 51.31 51.31 0.00 M2 Rp 174,121 Rp 8,933,800
6 Area Bawah Tangga Belakang (EPOXY 500 micron) 14.04 14.04 0.00 M2 Rp 150,000 Rp 2,105,850
7 Area Locker Belakang (epoxy) 20.69 20.69 0.00 M2 Rp 150,000 Rp 3,103,200
8 Area Bawah tangga Depan (EPOXY) 7.86 7.86 0.00 M2 Rp 150,000 Rp 1,178,730
9 Pasang keramik (HT) tangga 40x40 33.62 33.62 0.00 M2 Rp 188,884 Rp 6,349,600
10 Pasang Step nozing 10 x 40 cm 65.00 65.00 0.00 M' Rp 65,000 Rp 4,225,000
11 Pasang lantai keramik km/wc + Janitor HT : 60 x 60 19.32 19.32 0.00 M2 Rp 261,319 Rp 5,048,291
12 Area menuju ke Toilet Bawah Tangga Depan 7.72 7.72 0.00 M2 Rp 261,319 Rp 2,016,546
13 Pasang keramik dinding km/wc 60x60 + Janitor 86.76 86.76 0.00 M2 Rp 272,318 Rp 23,626,582
14 Meja Pantri 1.98 1.98 0.00 M2 Rp 1,036,548 Rp 2,049,670
15 Waterproofing (liquid/cement base) di daerah lantai km/wc 11.37 11.37 0.00 M2 Rp 60,000 Rp 681,996
16 Waterproofing (liquid/cement base) di daerah km wc termasuk dinding T = 120 cm 22.14 22.14 0.00 M2 Rp 60,000 Rp 1,328,520
17 Waterproofing (liquid/cement base) + screed pada canopy jendela 32.28 32.28 0.00 M2 Rp 80,000 Rp 2,582,538

II LANTAI DUA Rp 141,996,271


1 Pasang lantai keramik HT ruang utama 60x60 400.26 400.26 0.00 M2 Rp 224,029 Rp 89,668,772
2 Pasang Keramik Lantai HT kamar mandi 60/60 15.26 15.26 0.00 M2 Rp 261,319 Rp 3,986,892
3 Keramik Balkon (atas kolam renang) motif kotak-kotak grid (nat) 22.08 22.08 0.00 M2 Rp 264,332 Rp 5,836,318
4 Pasang keramik dinding km/wc 62.09 62.09 0.00 M2 Rp 272,318 Rp 16,909,586
5 Area Luar Epoxy 8.38 8.38 0.00 M2 Rp 150,000 Rp 1,256,400
6 Pasang keramik tangga 40x40 32.38 32.38 0.00 M2 Rp 188,884 Rp 6,115,837
7 Pasang Step nozing 10 x 40 cm 59.80 59.80 0.00 M' Rp 65,000 Rp 3,887,000
8 Waterproofing (bitumen) tahap 1 di atas lantai beton (area kamar mandi topi2) 45.71 45.71 0.00 M2 Rp 175,150 Rp 8,006,509
9 Waterproofing (liquid/cement base) tahap 2 di atas plester 42.71 42.71 0.00 M2 Rp 60,000 Rp 2,562,738
10 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T = 120 cm 19.73 19.73 0.00 M2 Rp 60,000 Rp 1,183,680
11 Waterproofing (liquid/cement base) + screed pada canopy jendela 32.28 32.28 0.00 M2 Rp 80,000 Rp 2,582,538

III LANTAI TIGA Rp 136,823,891


1 Pasang lantai keramik utama HT 60/60 245.28 245.28 0.00 M2 Rp 224,029 Rp 54,948,780
2 Pasang Keramik HT 60/60 unpolish ruang luar (garden roof) 65.55 65.55 0.00 M2 Rp 264,332 Rp 17,326,434
3 Keramik Balokn Atas Kolam 24.18 24.18 0.00 M2 Rp 264,332 Rp 6,391,416
4 HT Motif kayu 60/60 pada rg. Musholla 34.69 34.69 0.00 M2 Rp 224,029 Rp 7,772,350
5 HT Motif kayu 60/60 pada rg. Gym 30.33 30.33 0.00 M2 Rp 224,029 Rp 6,794,172
6 Pasang Keramik Lantai HT 60/60 pada km dan musholla 21.83 21.83 0.00 M2 Rp 261,319 Rp 5,704,071
7 Pasang keramik dinding km/wc dan area wudlu 77.72 77.72 0.00 M2 Rp 272,318 Rp 21,164,283
8 Area Luar Epoxy 14.12 14.12 0.00 M2 Rp 150,000 Rp 2,118,600
9 Waterproofing (bitumen) tahap 1 di atas lantai beton (area kamar mandi topi2) 45.71 45.71 0.00 M2 Rp 175,150 Rp 8,006,509
10 Waterproofing (liquid/cement base) tahap 2 di atas plester 42.71 42.71 0.00 M2 Rp 60,000 Rp 2,562,738
11 Waterproofing (liquid/cement base) di daerah km/wc pada dinding T = 120 cm 24.20 24.20 0.00 M2 Rp 60,000 Rp 1,452,000
12 Waterproofing (liquid/cement base) + screed pada canopy jendela 32.28 32.28 0.00 M2 Rp 80,000 Rp 2,582,538

IV LANTAI ATAP DAN ROOF TANK Rp 29,051,613


1 Screed + Waterproofing (membrane) di daerah lantai dak beton, roof tank dan dak beton 101.60 101.60 0.00 M2 Rp 253,032 Rp 25,706,913
2 Waterproofing (liquid/cement base) di dinding parapet T = 15 cm + kantilever 55.75 55.75 0.00 M2 Rp 60,000 Rp 3,344,700

A.2. PEKERJAAN DINDING SUB TOTAL Rp 1,809,531,581

A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN SUB TOTAL Rp 692,942,806


- pekerjaan besi dan ornamen dalam bangunan bagian interior, partisi gypsum masuk arsitektur
I LANTAI DASAR Rp 194,716,129
1 Pasangan dinding bata ringan 10 cm termasuk tangga & dinding shaft 377.15 377.15 0.00 M2 Rp 120,713 Rp 45,526,727
2 Pasangan dinding bata merah penahan tanah urugan keliling bangunan tinggi 60 cm 62.50 62.50 0.00 M2 Rp 166,000 Rp 10,375,664
3 Pasangan dinding kamar mandi transram , tinggi 1 m1 17.00 17.00 0.00 M2 Rp 120,713 Rp 2,052,121
4 Plester dinding kamar mandi trasram tinggi 1 m1 34.00 34.00 0.00 M2 Rp 44,591 Rp 1,516,094
5 Plester + aci dinding bata ringan 703.54 703.54 0.00 M2 Rp 65,919 Rp 46,376,390
6 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium 32.85 32.85 0.00 M1 Rp 90,807 Rp 2,982,626
7 Perapihan kolom beton 60.52 60.52 0.00 M2 Rp 35,000 Rp 2,118,200
8 Perapihan pelat beton bawah tangga + bordes 25.80 25.80 0.00 M2 Rp 35,000 Rp 902,894
9 Perapihan sudut kolom beton balok beton + balok tangga + balustrade 625.32 625.32 0.00 M1 Rp 35,000 Rp 21,886,200
10 Pas. BSP railling dg kaki tangga depan dan belakang sesuai design finish cat (terpasang) 13.48 13.48 0.00 M1 Rp 497,250 Rp 6,704,521
11 Pasang dudukan railling tangga depan dan tangga belakang 20.00 20.00 0.00 Bh Rp 50,000 Rp 1,000,000
12 Pas. Plint Keramik 10x60 dinding corridor/selasar dan ruang (tidak ada) 0.00 0.00 0.00 M1 Rp 78,036 Rp -
13 Perapihan topi jendela 32.28 32.28 0.00 M1 Rp 35,000 Rp 1,129,860
14 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 200 rangkap) M3 Rp 2,845,153 Rp -
15 Partisi Gypsum 12 mm Rangka Metal Furing dengan Lapis Rockwoll 101.15 101.15 0.00 m2 Rp 280,000 Rp 28,321,720
16 Railling Luar (kolam ikan) area ini tidak ada 0.00 0.00 0.00 M1 Rp 497,250 Rp -
17 Kisi2 luar depan (bagian lantai 1 tidak ada) 0.00 0.00 0.00 m2 Rp 575,000 Rp -
18 Kisi2 luar area tangga bahan besi holo 20/20-2, dudukan 40/40-2,7. finish cat duko 41.43 41.43 0.00 m2 Rp 575,000 Rp 23,823,113

II LANTAI DUA Rp 196,960,978


1 Pasangan dinding bata ringan 10 cm termasuk tangga & dinding shaft 309.93 309.93 0.00 M2 Rp 120,713 Rp 37,412,339
2 Plester + aci dinding bata ringan 555.76 555.76 0.00 M2 Rp 65,919 Rp 36,635,209
3 Pasangan dinding kamar mandi transram , tinggi 1 m1 16.10 16.10 0.00 M2 Rp 120,713 Rp 1,943,479
4 Plester dinding kamar mandi trasram tinggi 1 m1 32.20 32.20 0.00 M2 Rp 44,591 Rp 1,435,830
5 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium 27.17 27.17 0.00 M Rp 90,807 Rp 2,467,140
6 Perapihan kolom beton 60.52 60.52 0.00 M2 Rp 35,000 Rp 2,118,200
7 Perapihan pelat beton bawah tangga + bordes 25.80 25.80 0.00 M2 Rp 35,000 Rp 902,894
8 Perapihan sudut kolom beton balok beton + balok tangga + balustrade 625.32 625.32 0.00 M1 Rp 35,000 Rp 21,886,200
9 Pas. BSP railling dg kaki tangga depan dan belakang sesuai design finish cat (terpasang) 13.48 13.48 0.00 M1 Rp 497,250 Rp 6,704,521
10 Pasang dudukan railling tangga depan dan tangga belakang 20.00 20.00 0.00 Bh Rp 50,000 Rp 1,000,000
11 Pas. Plint Keramik 10x60 dinding corridor/selasar dan ruang (tidak ada) 0.00 M1 Rp 78,036 Rp -
12 Perapihan topi jendela 27.46 27.46 0.00 unit Rp 35,000 Rp 960,943
13 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 200 rangkap) 0.17 0.17 0.00 unit Rp 2,845,153 Rp 469,450
14 Partisi Gypsum 12 mm Rangka Metal Furing dengan Lapis Rockwoll 111.58 111.58 0.00 M2 Rp 280,000 Rp 31,241,280
15 Railling Balkon tinggi 90 cm 20.61 20.61 0.00 m1 Rp 497,250 Rp 10,248,323
16 Pasang dudukan railling balkon 14.00 14.00 0.00 bh Rp 50,000 Rp 700,000
17 Kisi-kisi luar depan bahan besi holo 20/20-2, dudukan 40/40-2,7. finish cat duko 21.04 21.04 0.00 m2 Rp 575,000 Rp 12,099,150
18 Kisi2 luar area tangga bahan besi holo 20/20-2, dudukan 40/40-2,7. finish cat duko 41.43 41.43 0.00 m2 Rp 575,000 Rp 23,823,113
19 Kolom 15/30 pada dinding terluar (batas tetangga) BARU 0.91 0.91 0.00 m3 Rp 5,391,394 Rp 4,912,908

III LANTAI TIGA Rp 245,128,522


1 Pasangan dinding bata ringan 10 cm termasuk tangga & dinding shaft 546.11 546.11 0.00 M2 Rp 120,713 Rp 65,922,878
2 Plester + aci dinding bata ringan 1,014.51 1,014.51 0.00 M2 Rp 65,919 Rp 66,875,221
3 Pasangan dinding kamar mandi transram , tinggi 1 m1 17.80 17.80 0.00 M2 Rp 120,713 Rp 2,148,691
4 Plester dinding kamar mandi trasram tinggi 1 m1 35.60 35.60 0.00 M2 Rp 44,591 Rp 1,587,440
5 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium 47.59 47.59 0.00 M3 Rp 90,807 Rp 4,321,760
6 Perapihan kolom beton 60.52 60.52 0.00 M2 Rp 35,000 Rp 2,118,200
7 Perapihan pelat beton bawah tangga + bordes 25.80 25.80 0.00 M2 Rp 35,000 Rp 902,894
8 Perapihan sudut kolom beton balok beton + balok tangga + balustrade 625.32 625.32 0.00 M1 Rp 35,000 Rp 21,886,200
9 Pas. BSP railling dg kaki tangga depan dan belakang sesuai design finish cat (terpasang) 0.00 0.00 0.00 M1 Rp 497,250 Rp -
10 Pasang dudukan railling tangga depan dan tangga belakang 0.00 0.00 0.00 Bh Rp 50,000 Rp -
11 Pas. Plint Keramik 10x60 dinding corridor/selasar dan ruang (tidak ada) 0.00 0.00 0.00 M1 Rp 78,036 Rp -
12 Perapihan topi jendela 27.46 27.46 0.00 unit Rp 35,000 Rp 960,943
13 Cor topi jendela t= 8 cm (termasuk bekisting dan pembesian Φ 8 - 200 rangkap) 0.17 0.17 0.00 unit Rp 2,845,153 Rp 469,450
14 Partisi Gypsum 12 mm Rangka Metal Furing dengan Lapis Rockwoll 100.75 100.75 0.00 M2 Rp 280,000 Rp 28,210,140
15 Railling Balkon tinggi 90 cm 20.61 20.61 0.00 M1 Rp 497,250 Rp 10,248,323
16 Pasang dudukan railling balkon 14.00 14.00 0.00 Bh Rp 50,000 Rp 700,000
17 Kisi-kisi luar depan bahan besi holo 20/20-2, dudukan 40/40-2,7. finish cat duko 21.04 21.04 0.00 m2 Rp 575,000 Rp 12,099,150
19 Kisi2 luar area tangga bahan besi holo 20/20-2, dudukan 40/40-2,7. finish cat duko 37.85 37.85 0.00 m2 Rp 575,000 Rp 21,764,325
20 Kolom 15/30 pada dinding terluar (batas tetangga) BARU 0.91 0.91 0.00 m3 Rp 5,391,394 Rp 4,912,908

VI LANTAI ATAP DAN ROOF TANK Rp 56,137,177


1 Pasangan dinding bata merah 1:5 (talang beton) 228.94 228.94 0.00 M2 Rp 120,713 Rp 27,636,034
2 Plester + aci dinding bata merah exterior/dind. Terluar 228.94 228.94 0.00 M2 Rp 65,919 Rp 15,091,496
3 Plester dinding bata merah Bag dalam 228.94 228.94 0.00 M2 Rp 41,132 Rp 9,416,760
4 Kolom praktis & balok praktis 11/11 termasuk opening kusen aluminium 19.08 19.08 0.00 M1 Rp 90,807 Rp 1,732,450
5 Tangga Maintenace Bahan Sesuai gambar Pipa Gip 1,5" finish cat 1.00 1.00 0.00 set Rp 2,260,437 Rp 2,260,437

A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES SUB TOTAL Rp 1,116,588,775

I LANTAI DASAR Rp 397,769,441


- Pintu Frameless kaca tempered 12 mm, warna polos beserta asseroies
- Kusen Pintu dan Jendela 4" warna putih, produk Alexindo setara, kaca polos 8mm
- Assesories : Floor Hinge : Dorma setara, lainnya Dekson (setara)
1 Pintu P1 Frameless, Tempered 12 mm berikut accesories Area Lobby 1.00 1.00 0.00 Unit Rp 36,094,000 Rp 36,094,000
2 Kusen Aluminium dan Daun Pintu Kaca 8 mm P2 2.00 2.00 0.00 Unit Rp 16,511,000 Rp 33,022,000
3 Kusen Aluminium dan Daun Pintu Engineering door P3 7.00 7.00 0.00 Unit Rp 6,063,000 Rp 42,441,000
4 Kusen Aluminium dan Daun Pintu Engineering door P4 3.00 3.00 0.00 Unit Rp 6,847,000 Rp 20,541,000
5 Kusen Aluminium dan Daun Pintu Kaca 8 mm P5 (pada area rapat) 2.00 2.00 0.00 Unit Rp 18,870,000 Rp 37,740,000
6 Kusen Aluminium dan Daun Pintu Engineering P6 Sesuai Ukuran 1.00 1.00 0.00 Unit Rp 5,383,000 Rp 5,383,000
7 Partisi PR pada area raung rapat beserta assesories 1.00 1.00 0.00 Unit Rp 53,120,274 Rp 53,120,274
8 Kusen Aluminium dan Daun Jendela Kaca 8 mm J1 pada area Lobby 1.00 1.00 0.00 Unit Rp 19,269,000 Rp 19,269,000
9 Kusen Aluminium dan Daun Jendela Kaca 8 mm J2 pada area tangga 1.00 1.00 0.00 Unit Rp 3,461,000 Rp 3,461,000
10 Kusen Aluminium dan Daun Jendela Kaca 8 mm J2'' pada area tangga 1.00 1.00 0.00 Unit Rp 6,801,000 Rp 6,801,000
11 Kusen Aluminium dan Daun Jendela Kaca 8 mm J3 pada area locker 1.00 1.00 0.00 Unit Rp 8,908,000 Rp 8,908,000
12 Kusen Aluminium dan Daun Jendela Kaca 8 mm J9 pada area rg. Rapat 2.00 2.00 0.00 Unit Rp 4,744,000 Rp 9,488,000
13 Bouvenight BV 7.00 7.00 0.00 Unit Rp 943,000 Rp 6,601,000
14 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ1 3.00 3.00 0.00 Unit Rp 37,151,000 Rp 111,453,000
15 Pintu Shaft PS1 Ukuran 0,6*1,00 mtr, bahan frame aluminium, finsih akuminum flat 3.00 3.00 0.00 Unit Rp 734,642 Rp 2,203,926
16 Pintu Shaft PS1 Ukuran 0,3*1,00 mtr, bahan frame aluminium, finsih akuminum flat 2.00 2.00 0.00 Unit Rp 621,620 Rp 1,243,240

II LANTAI DUA Rp 336,537,167


- Pintu Frameless kaca tempered 12 mm, warna polos beserta asseroies
- Kusen Pintu dan Jendela 4" warna putih, produk Alexindo setara, kaca polos 8mm
- Assesories : Floor Hinge : Dorma setara, lainnya Dekson (setara)
1 Kusen Aluminium dan Daun Pintu Engineering door P3 3.00 3.00 0.00 Unit Rp 6,063,000 Rp 18,189,000
2 Kusen Aluminium dan Daun Pintu Kaca 8 mm P5 (pada area war room) 1.00 1.00 0.00 Unit Rp 18,870,000 Rp 18,870,000
3 Kusen Aluminium dan Daun Jendela Kaca 8 mm J2' pada area tangga 1.00 1.00 0.00 Unit Rp 7,361,000 Rp 7,361,000
4 Kusen Aluminium dan Daun Jendela Kaca 8 mm J2'' pada area tangga 1.00 1.00 0.00 Unit Rp 6,801,000 Rp 6,801,000
5 Kusen Aluminium dan Daun Jendela Kaca 8 mm J4 pada area war room 2.00 2.00 0.00 Unit Rp 7,141,000 Rp 14,282,000
6 Kusen Aluminium dan Daun Jendela Kaca 8 mm J5 pada area kacab 1.00 1.00 0.00 Unit Rp 24,273,000 Rp 24,273,000
7 Kusen Aluminium dan Daun Jendela Kaca 8 mm J6 pada area war room 1.00 1.00 0.00 Unit Rp 10,583,000 Rp 10,583,000
8 Kusen Aluminium dan Daun Jendela Kaca 8 mm J8 pada area war room 1.00 1.00 0.00 Unit Rp 3,982,000 Rp 3,982,000
9 Bouvenight BV 2.00 2.00 0.00 Unit Rp 943,000 Rp 1,886,000
10 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ1 3.00 3.00 0.00 Unit Rp 37,151,000 Rp 111,453,000
11 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ2 1.00 1.00 0.00 Unit Rp 18,871,000 Rp 18,871,000
12 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ3 2.00 2.00 0.00 Unit Rp 17,376,000 Rp 34,752,000
13 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ4 2.00 2.00 0.00 Unit Rp 12,185,000 Rp 24,370,000
14 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ5 1.00 1.00 0.00 Unit Rp 27,896,000 Rp 27,896,000
15 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ14 1.00 1.00 0.00 Unit Rp 9,521,000 Rp 9,521,000
16 Pintu Shaft PS1 Ukuran 0,6*1,00 mtr, bahan frame aluminium, finsih akuminum flat 3.00 3.00 0.00 Unit Rp 734,642 Rp 2,203,926
17 Pintu Shaft PS1 Ukuran 0,3*1,00 mtr, bahan frame aluminium, finsih akuminum flat 2.00 2.00 0.00 Unit Rp 621,620 Rp 1,243,240

III LANTAI TIGA Rp 382,282,167


- Pintu Frameless kaca tempered 12 mm, warna polos beserta asseroies
- Kusen Pintu dan Jendela 4" warna putih, produk Alexindo setara, kaca polos 8mm
- Assesories : Floor Hinge : Dorma setara, lainnya Dekson (setara)
1 Kusen Aluminium dan Daun Pintu Engineering door P3 3.00 3.00 0.00 Unit Rp 6,063,000 Rp 18,189,000
2 Kusen Aluminium dan Daun Pintu Kaca 8 mm P4 1.00 1.00 0.00 Unit Rp 6,847,000 Rp 6,847,000
3 Kusen Aluminium dan Daun Pintu Kaca 8 mm P7 1.00 1.00 0.00 Unit Rp 17,015,000 Rp 17,015,000
4 Kusen Aluminium dan Daun Jendela Kaca 8 mm J2' pada area tangga 1.00 1.00 0.00 Unit Rp 7,361,000 Rp 7,361,000
5 Kusen Aluminium dan Daun Jendela Kaca 8 mm J2'' pada area tangga 1.00 1.00 0.00 Unit Rp 6,801,000 Rp 6,801,000
6 Kusen Aluminium dan Daun Jendela Kaca 8 mm J5 pada area war room 0.00 0.00 0.00 Unit Rp 24,273,000 Rp -
7 Kusen Aluminium dan Daun Jendela Kaca 8 mm J5' pada area kacab 1.00 1.00 0.00 Unit Rp 24,052,000 Rp 24,052,000
8 Kusen Aluminium dan Daun Jendela Kaca 8 mm J6 pada area war room 1.00 1.00 0.00 Unit Rp 10,583,000 Rp 10,583,000
9 Kusen Aluminium dan Daun Jendela Kaca 8 mm J7 1.00 1.00 0.00 Unit Rp 6,493,000 Rp 6,493,000
10 Kusen Aluminium dan Daun Jendela Kaca 8 mm J8 1.00 1.00 0.00 Unit Rp 3,982,000 Rp 3,982,000
11 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ1 3.00 3.00 0.00 Unit Rp 37,151,000 Rp 111,453,000
12 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ6 1.00 1.00 0.00 Unit Rp 13,902,000 Rp 13,902,000
13 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ7 2.00 2.00 0.00 Unit Rp 28,190,000 Rp 56,380,000
14 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ8 1.00 1.00 0.00 Unit Rp 20,766,000 Rp 20,766,000
15 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ9 1.00 1.00 0.00 Unit Rp 17,270,000 Rp 17,270,000
16 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ10 1.00 1.00 0.00 Unit Rp 15,717,000 Rp 15,717,000
17 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ11 1.00 1.00 0.00 Unit Rp 14,215,000 Rp 14,215,000
18 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ12 1.00 1.00 0.00 Unit Rp 13,317,000 Rp 13,317,000
19 Kusen Aluminium dan Daun Pintu dan Jendela, kaca 8 mm polos PJ13 1.00 1.00 0.00 Unit Rp 12,606,000 Rp 12,606,000
20 Bouvenight BV 2.00 2.00 0.00 Unit Rp 943,000 Rp 1,886,000
21 Pintu Shaft PS1 Ukuran 0,6*1,00 mtr, bahan frame aluminium, finsih akuminum flat 3.00 3.00 0.00 Unit Rp 734,642 Rp 2,203,926
22 Pintu Shaft PS1 Ukuran 0,3*1,00 mtr, bahan frame aluminium, finsih akuminum flat 2.00 2.00 0.00 Unit Rp 621,620 Rp 1,243,240

IV LANTAI ATAP DAN ROOF TANK Rp -

A.3. PEKERJAAN PLAFOND SUB TOTAL Rp 218,897,347

I LANTAI DASAR Rp 96,036,382


1 Plafond Entrance (aluminium strip, ex Luxalon/ setara) 32.04 32.04 0.00 m2 Rp 678,131 Rp 21,725,288
2 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x60 cm 293.19 293.19 0.00 M2 Rp 158,231 Rp 46,392,295
3 List plafond gypsum 5/5 (tidak menggunakan)
4 Plafond parkir, teras, kamar mandi calsiboard 6 mm + rangka metal furing 60x60 cm 132.69 132.69 0.00 M2 Rp 178,000 Rp 23,618,019
5 Plafond Beton Exposed 47.25 47.25 0.00 M2 Rp 35,000 Rp 1,653,582
6 Drop Ceiling Area Rg Rapat 33.46 33.46 0.00 M1 Rp 79,115 Rp 2,647,198

II LANTAI DUA Rp 67,136,327


1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x60 cm 400.79 400.79 0.00 M2 Rp 158,231 Rp 63,416,769
2 List plafond gypsum 5/5 (tidak menggunakan)
3 Plafond calsiboard 6 mm + rangka metal furing 60x60 cm 9.73 9.73 0.00 M2 Rp 178,000 Rp 1,731,050
4 Plafond Beton Exposed 56.81 56.81 0.00 m2 Rp 35,000 Rp 1,988,507

III LANTAI TIGA Rp 55,724,638


1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x60 cm 331.14 331.14 0.00 M2 Rp 158,231 Rp 52,397,115
2 List plafond gypsum 5/5 (tidak menggunakan)
3 Plafond calsiboard 6 mm + rangka metal furing 60x60 cm 9.73 9.73 0.00 M2 Rp 178,000 Rp 1,731,050
4 Plafond Beton Exposed 45.61 45.61 0.00 M2 Rp 35,000 Rp 1,596,472

IV LANTAI ATAP DAN ROOF TANK Rp -


1 Penutup plafond Gypsum T=9 MM + rangka metal furring uk 60x60 cm M2 Rp 158,231 Rp -
2 List plafond gypsum 5/5 M' Rp -

A.4. PEKERJAAN PENUTUP ATAP SUB TOTAL Rp 128,342,858

I LANTAI ATAP Rp 128,342,858


1 Atap genteng metal T=0.35 MM 312.77 312.77 0.00 M2 Rp 82,500 Rp 25,803,360
2 Nok genteng (termasuk jurai) 28.96 28.96 0.00 M' Rp 33,000 Rp 955,680
3 Lisplang GRC tebal 9 mm lebar 15 cm sesuai desain terlihat di detail 50.78 50.78 0.00 M' Rp 62,150 Rp 3,155,728
4 Aluminium Foil dengan Roch woll, double muka 312.77 312.77 0.00 Ls Rp 100,000 Rp 31,276,800
5 Rangka Atap Baja Ringan 312.77 312.77 0.00 M2 Rp 214,700 Rp 67,151,290

A.5. PEKERJAAN SANITARY FIXTURES SUB TOTAL Rp 70,812,981

I LANTAI DASAR Rp 22,217,982


1 Pasang closet duduk American Standart atau setara(lengkap terpasang) 3.00 3.00 0.00 Buah Rp 2,659,280 Rp 7,977,840
2 Wastafel Area Lobby/ Entrance 1.00 1.00 0.00 buah Rp 1,398,216 Rp 1,398,216
3 Wastafel Kamar mandi Belakang 1.00 1.00 0.00 buah Rp 1,398,216 Rp 1,398,216
4 Wastafel Kamar mandi 1.00 1.00 0.00 buah Rp 1,398,216 Rp 1,398,216
5 Pasang kran 0,5" area kolam renang dan parkir motor dan janitor 3.00 3.00 0.00 Buah Rp 267,702 Rp 803,106
6 Pasang shower + kran type double (terpasang) 0.00 0.00 0.00 Buah Rp 1,936,625 Rp -
7 Jet WasherToto/ Setara ) 3.00 3.00 0.00 set Rp 337,385 Rp 1,012,155
8 Pasangan floor drain stainless 4.00 4.00 0.00 Buah Rp 343,428 Rp 1,373,712
9 Meja Pantry berikut (masuk interior) 0.00 0.00 0.00 M' Rp -
10 Kitchen zing kantin + kran (interior), outlet air bersih danpembuangan arsitek 0.00 0.00 0.00 Buah Rp 585,768 Rp -
11 Paper Holder 3.00 3.00 0.00 set Rp 543,662 Rp 1,630,986
12 Soap Holder (Toto Setara) 3.00 3.00 0.00 set Rp 371,715 Rp 1,115,145
13 Hand Dryer ex Krisbow (setara) 2.00 2.00 0.00 set Rp 2,055,195 Rp 4,110,390

II LANTAI DUA Rp 22,412,963


1 Pasang closet duduk American Standart atau setara(lengkap terpasang) 3.00 3.00 0.00 Buah Rp 2,659,280 Rp 7,977,840
2 Wastafel Kamar mandi Belakang 1.00 1.00 0.00 Buah Rp 1,398,216 Rp 1,398,216
3 Wastafel Kamar mandi 1.00 1.00 0.00 Buah Rp 1,398,216 Rp 1,398,216
4 Shower Lengkap Berikut Kran dan Mixer 1.00 1.00 0.00 set Rp 1,936,625 Rp 1,936,625
5 Pasang kran 0,5" 3.00 3.00 0.00 Buah Rp 267,702 Rp 803,106
6 Jet WasherToto/ Setara ) 3.00 3.00 0.00 Buah Rp 337,385 Rp 1,012,155
7 Pasangan floor drain stainless 3.00 3.00 0.00 buah Rp 343,428 Rp 1,030,284
8 Meja Pantry berikut (masuk interior) 0.00 0.00 0.00 set Rp 5,651,093 Rp -
9 Outlet Air Bersih dan Air Kotor Pantry (pekerjaan masuk interior) 0.00 0.00 0.00 buah Rp 5,651,093 Rp -
10 Paper Holder 3.00 3.00 0.00 set Rp 543,662 Rp 1,630,986
11 Soap Holder 3.00 3.00 0.00 set Rp 371,715 Rp 1,115,145
12 Hand Dryer ex Krisbow (setara) 2.00 2.00 0.00 set Rp 2,055,195 Rp 4,110,390

III LANTAI TIGA Rp 22,060,900


1 Pasang closet duduk American Standart atau setara(lengkap terpasang) 3.00 3.00 0.00 Buah Rp 2,659,280 Rp 7,977,840
2 Wastafel Kamar mandi Belakang 1.00 1.00 0.00 Buah Rp 1,398,216 Rp 1,398,216
3 Wastafel Kamar mandi 1.00 1.00 0.00 Buah Rp 1,398,216 Rp 1,398,216
4 Pasang kran 0,5" 1.00 1.00 0.00 set Rp 267,702 Rp 267,702
5 Jet WasherToto/ Setara ) 3.00 3.00 0.00 Buah Rp 337,385 Rp 1,012,155
6 Pasangan floor drain stainless 3.00 3.00 0.00 Buah Rp 343,428 Rp 1,030,284
7 Kran Musholla 5.00 5.00 0.00 set Rp 267,702 Rp 1,338,510
8 Meja Pantry berikut (masuk interior) 0.00 0.00 0.00 set Rp 5,651,093 Rp -
9 Kitchen zing kantin + kran (interior), outlet air bersih danpembuangan arsitek 0.00 0.00 0.00 M1 Rp 585,768 Rp -
10 Paper Holder 3.00 3.00 0.00 set Rp 543,662 Rp 1,630,986
11 Soap Holder 3.00 3.00 0.00 set Rp 371,715 Rp 1,115,145
12 Hand Dryer ex Krisbow (setara) 2.00 2.00 0.00 set Rp 2,055,195 Rp 4,110,390
14 Roof Drain Area Green Roof 2.00 2.00 0.00 set Rp 390,728 Rp 781,456

IV LANTAI ATAP DAN ROOF TANK Rp 4,121,136


1 Pasangan floor drain stainless 12.00 12.00 0.00 Buah Rp 343,428 Rp 4,121,136
2 Torn Air Bersih (by MEP) 2.00 2.00 0.00 Buah Rp - Rp -

A.6. PEKERJAAN FINISHING SUB TOTAL Rp 207,780,089

A.6.A. PEKERJAAN PENGECATAN SUB TOTAL Rp 207,780,089

I LANTAI DASAR Rp 76,607,655


1 Cat dinding bag. Luar termasuk kolom (exterior) 1,110.62 1,110.62 0.00 M2 Rp 35,945 Rp 39,921,307
2 Cat dinding bag. Dalam termasuk kolom (interior) 1,131.98 1,131.98 0.00 M2 Rp 21,131 Rp 23,919,892
3 Cat balok beton + pelat bawah tangga 47.25 47.25 0.00 M2 Rp 21,131 Rp 998,338
4 Cat plafond 426.68 426.68 0.00 M2 Rp 21,131 Rp 9,016,169
5 Cat topi beton 76.56 76.56 0.00 M2 Rp 35,945 Rp 2,751,949

II LANTAI DUA Rp 50,227,155


1 Cat dinding bag. Luar termasuk kolom (exterior) 662.20 662.20 0.00 M2 Rp 35,945 Rp 23,802,941
2 Cat dinding bag. Luar termasuk kolom (interior) 685.86 685.86 0.00 M2 Rp 21,131 Rp 14,492,878
3 Cat balok beton + pelat bawah tangga 57.48 57.48 0.00 M2 Rp 21,131 Rp 1,214,610
4 Cat plafond 410.51 410.51 0.00 M2 Rp 21,131 Rp 8,674,529
5 Cat topi beton 56.81 56.81 0.00 M2 Rp 35,945 Rp 2,042,197

III LANTAI TIGA Rp 72,683,679


1 Cat dinding bag. Luar termasuk kolom (exterior) 1,110.62 1,110.62 0.00 M2 Rp 35,945 Rp 39,921,307
2 Cat dinding bag. Luar termasuk kolom (interior) 1,131.98 1,131.98 0.00 M2 Rp 21,131 Rp 23,919,892
3 Cat balok beton + pelat bawah tangga M2 Rp 21,131 Rp -
4 Cat plafond 340.87 340.87 0.00 M2 Rp 21,131 Rp 7,202,903
5 Cat topi beton 45.61 45.61 0.00 M2 Rp 35,945 Rp 1,639,577

VI LANTAI ATAP DAN ROOF TANK Rp 8,261,599


1 Cat dinding bag. Luar termasuk kolom (exterior) 228.94 228.94 0.00 M2 Rp 35,945 Rp 8,229,248
2 Cat dinding bag. Luar termasuk kolom (interior) M2 Rp 21,131 Rp -
3 Cat balok beton + pelat bawah tangga M2 Rp 21,131 Rp -
4 Cat plafond 0.00 0.00 0.00 M2 Rp 21,131 Rp -
5 Cat topi beton 0.90 0.90 0.00 M2 Rp 35,945 Rp 32,350
6 Cat pelat beton/dak beton/kantilever talang beton M2 Rp 35,945 Rp -

RAB ARS STD 24 / 58


RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN ARSITEKTUR

VOLUME Jumlah Harga (Rp)


NO URAIAN PEKERJAAN UNIT Harga Satuan (Rp)
Kontrak MC 0 Deviasi Kontrak

PEKERJAAN ARSITEKTUR NON STANDART Rp 575,889,307

Pekerjaan Site Work


II. Pasang Pagar (Depan) Baru Sesuai Desain
Galian dan Urugan Rp 27,010,447
1 Pek. Galian Pondasi/ Tie Beam 4.53 4.53 0.00 m3 Rp 100,000 Rp 452,632
2 Pondasi Beton setempat pada tiang 0,14/04-20 dalam 60 cm 0.19 0.19 0.00 m3 Rp 5,001,332 Rp 960,256
3 Tie Beam 0.84 0.84 0.00 m3 Rp 5,000,000 Rp 4,202,519
4 Urugan Pasir pada bawah pondasi 0.05 0.05 0.00 m3 Rp 227,130 Rp 10,902
5 Urugan pasir bawah tie beam 0.14 0.14 0.00 m3 Rp 227,130 Rp 31,296
6 Pek. Lantai Kerja Bawah Pondasi dan Tie Beam 0.19 0.19 0.00 m3 Rp 915,344 Rp 170,059
7 Pengurukan kembali bekas galian 3.12 3.12 0.00 m3 Rp 16,950 Rp 52,922
8 Pemindahan tanah sisa galian ke area peninggian bangunan 1.40 1.40 0.00 m3 Rp 11,300 Rp 15,866
9 Kolom Praktis beton 0.22 0.22 0.00 m3 Rp 7,504,726 Rp 1,654,792
10 Rink Balk 12/15 0.13 0.13 0.00 m3 Rp 6,048,069 Rp 766,411
11 Pasangan Batu Bata 25.55 25.55 0.00 m2 Rp 120,713 Rp 3,084,459
12 Plester dan acian 53.20 53.20 0.00 m2 Rp 65,919 Rp 3,507,154
13 Pasangan batu bronjong pada dinding tebal 50 cm rangka besi sesuai gbr 3.57 3.57 0.00 m3 Rp 355,950 Rp 1,269,446
14 Konstruksi Kawat bronjong besi siku 25.32 25.32 0.00 m2 Rp 352,208 Rp 8,919,315
L 50.50-5 finish besi epoxy, wiremesh ex lionmesh atau setara
15 Pengecatan luar 53.20 53.20 0.00 m2 Rp 35,945 Rp 1,912,418

III Pintu Gerbang Utama dan Pintu Pagar Depan Pos Rp 12,500,360
1 Galian dudukan rel pintu dan pondasi tiang ujung pagar 2.30 2.30 0.00 m3 Rp 100,000Rp 230,250
2 Dududukan rel beton : 15/40 dan pondasi tiang ujung pagar 0.75 0.75 0.00 m3 Rp 4,396,742Rp 3,316,814
3 Urugan pasir bawah dudukan pintu dan pondasi tiang ujung pagar 0.25 0.25 0.00 m3 Rp 227,130Rp 56,351
4 Lantai Kerja area dudukan pintu dan pondasi tiang ujung pagar 0.24 0.24 0.00 m3 Rp 915,344Rp 217,852
5 Urug Kembali area dudukan dan pondasi tiang ujung pagar 1.06 1.06 0.00 m3 Rp 16,950Rp 18,001
6 Pemindahan tanah sisa galian ke area peninggian bangunan 1.24 1.24 0.00 m3 Rp 11,300Rp 14,017
7 Tiang Beton 20x10 pd sudut pas. 30/50 area pintu masuk, T sesuai desain 0.17 0.17 0.00 m3 Rp 5,062,168Rp 850,444
8 Pasangan batu bata pada tiang area pintu gerbang 0.01 0.01 0.00 m3 Rp 175,477Rp 2,106
9 Pagar besi lengkap berserta roda, dg tinggi 135 cm material utama 6.98 6.98 0.00 m2 Rp 960,686 Rp 6,705,107
hollo 40/80-2, material bantu hollo 30/30-1,8, berikut anti karat dan finish Rp -
10 Pagar besi lengkap berserta roda, dg ensel dan kunci tinggi 135 cm material utama 1.13 1.13 0.00 m2 Rp 960,686 Rp 1,089,418
hollow 40/80-2,1 material bantu hollo 30/30-1,8, berikut anti karat dan finish

IV Ramp dan Jembatan Masuk Rp 11,002,261


1 Galian pondasi pada area gorong2 jembatan masuk 0.83 0.83 0.00 m3 Rp 100,000 Rp 82,720
2 Pondasi batu kali-2 sisi area gorong utk jembatan T 80 cm lebar 40 cm 3.39 3.39 0.00 m3 Rp 656,878 Rp 2,226,060
3 Ramp dan jembatan, tebal 12 cm besi rangkap 2.01 2.01 0.00 m3 Rp 4,022,065 Rp 8,097,212
4 Finish Beton 17.04 17.04 0.00 m2 Rp 35,000 Rp 596,269

V Pagar Samping dan Belakang Rp 208,659,617


1 Pek. Galian sloof dan Pondasi 15.80 15.80 0.00 m3 Rp 100,000 Rp 1,579,500
2 Galian Tie Beam 12.83 12.83 0.00 m3 Rp 100,000 Rp 1,282,500
3 Pek. Urugan Pasir Bawah Pondasi dan Tie Beam 1.86 1.86 0.00 m3 Rp 227,130 Rp 422,462
4 Pek. Lantai Kerja Bawah Pondasi dan Tie Beam 3.73 3.73 0.00 m3 Rp 915,344 Rp 3,416,064
5 Pek. Beton Pondasi 4.19 4.19 0.00 m3 Rp 5,000,000 Rp 20,940,000
6 Pek. Beton Tie Beam 13.26 13.26 0.00 m3 Rp 5,000,000 Rp 66,305,250
7 Pek. Tiang Beton 3.44 3.44 0.00 m3 Rp 3,300,000 Rp 11,351,340
8 Pengurukan Kembali 2.14 2.14 0.00 m3 Rp 16,950 Rp 36,259
9 Pek. Rink Balk 2.05 2.05 0.00 m3 Rp 6,048,069 Rp 12,410,637
10 Pek. Pasangan Bata Merah 279.30 279.30 0.00 m2 Rp 120,713 Rp 33,715,141
11 Plester dan Aci 558.60 558.60 0.00 m2 Rp 65,919 Rp 36,822,353
12 Pengecatan Pagar 558.60 558.60 0.00 m2 Rp 35,945 Rp 20,078,877
13 Pemindahan tanah sisa galian ke area peninggian bangunan 26.48 26.48 0.00 m3 Rp 11,300 Rp 299,234

VI Logo Pada Pagar Rp 12,325,500


1 Tulisan "SI Makassar" terpasang pada pagar (Acrylic) 1.00 1.00 0.00 set Rp 9,500,000 Rp 9,500,000
2 Tulisan Alamat dan Nomor Kavling 1.00 1.00 0.00 set Rp 2,825,500 Rp 2,825,500

VII Tiang Bendera Rp 14,032,543


1 Pek. Galian Pondasi Bendera 0.45 0.45 0.00 m3 Rp 100,000 Rp 44,800
2 Pondasi Straus 0.29 0.29 0.00 m3 Rp 2,905,750 Rp 849,932
3 Pek. Pasangan 0.29 0.29 0.00 m2 Rp 120,713 Rp 35,309
4 Finish batu alam tebal 1,5 cm motif sesuai gambar 2.52 2.52 0.00 m2 Rp 250,000 Rp 630,000
5 Pedestal/ dudukan/ plin granit tebal 50 mm 0.52 0.52 0.00 m2 Rp 308,923 Rp 162,185
6 Pinggulan granit/ router/ bevel/ tali air 7.40 7.40 0.00 M1 Rp 41,132 Rp 304,377
Lainnya : Rp -
7 Tiang bendera +accesories, stainless stell dia 21/2" dan 2" panjang 5,15 mtr 2.00 2.00 0.00 set Rp 6,000,000 Rp 12,000,000
8 Pengurukan Kembali 0.16 0.16 0.00 m3 Rp 16,950 Rp 2,636
Pemindahan tanah sisa galian ke area peninggian bangunan 0.29 0.29 0.00 m3 Rp 11,300 Rp 3,305

VIII Tiang Spanduk/ Umbul-umbul Rp 10,351,075


1 Galian Pondasi Tiang Spanduk 0.77 0.77 0.00 m3 Rp 100,000 Rp 76,800
2 Pondasi Straus 0.38 0.38 0.00 m3 Rp 2,905,750 Rp 1,098,374
3 Finising Plester/ Aci 1.62 1.62 0.00 m2 Rp 65,919 Rp 106,789
4 Finish Cat Akhir 1.62 1.62 0.00 m2 Rp 35,945 Rp 58,231
5 Tiang Poster/ Spanduk berikut accesories, stainless stell dia 2"- 5 mtr 6.00 6.00 0.00 set Rp 1,500,000 Rp 9,000,000
6 Pengurukan Kembali 0.39 0.39 0.00 m3 Rp 16,950 Rp 6,611
7 Pemindahan tanah sisa galian ke area peninggian bangunan 0.38 0.38 0.00 m3 Rp 11,300 Rp 4,271

IX Pos Jaga dan Ruang Genset


9.1 Galian dan Urugan Rp 696,274
1 Pek. Galian dan Pondasi 1.99 1.99 0.00 m3 Rp 100,000 Rp 198,900
2 Galian Tie Beam 0.92 0.92 0.00 m3 Rp 100,000 Rp 92,000
3 Galian Pondasi Genset 0.77 0.77 0.00 m3 Rp 100,000 Rp 76,800
4 Pasir Urug Bawah Pondasi 0.29 0.29 0.00 m3 Rp 227,130 Rp 65,413
5 Pasir Urug Bawah Tie beam 0.14 0.14 0.00 m3 Rp 227,130 Rp 31,344
6 Urug Pasir Bawah Lantai 0.81 0.81 0.00 m3 Rp 227,130 Rp 182,840
7 Urugan Peninggian Lantai 15 cm (tidak ada biaya, kebutuhan dari tamah galian) 1.21 1.21 0.00 m3 Rp 16,950 Rp 20,467
8 Urug Kembali Bekas Galian 0.11 0.11 0.00 m3 Rp 16,950 Rp 1,814
9 Pemindahan tanah sisa galian ke area peninggian bangunan 2.36 2.36 0.00 m3 Rp 11,300 Rp 26,696

9.2 Lantai Kerja dan Beton Pondasi Rp 8,226,450


1 Lantai Kerja Bawah Pondasi 0.14 0.14 0.00 m3 Rp 915,344 Rp 131,810
2 Lantai Kerja Bawah Tie Beam 0.07 0.07 0.00 m3 Rp 915,344 Rp 63,159
3 Lantai Kerja Bawah Lantai 0.40 0.40 0.00 m3 Rp 915,344 Rp 368,426
4 Pondasi Plat (60/60/20) dalam 75 cm 0.43 0.43 0.00 m3 Rp 5,001,332 Rp 2,160,575
5 Tie Beam 15/35 0.48 0.48 0.00 m3 Rp 4,675,649 Rp 2,258,338
6 Pedestal pondasi 15/15 dalam 55 0.04 0.04 0.00 m3 Rp 5,000,000 Rp 202,500
7 Pondasi Dudukan Genset 0.77 0.77 0.00 m3 Rp 3,960,472 Rp 3,041,642

9.3 Pekerjaan Beton Lainnya Rp 10,093,584


1 Kolom Pos 0.32 0.32 0.00 m3 Rp 5,799,679 Rp 1,839,948
2 Rink Balk 12/15 0.21 0.21 0.00 m3 Rp 6,048,069 Rp 1,262,837
3 Plat Atap 11 cm 0.65 0.65 0.00 m3 Rp 4,444,809 Rp 2,910,016
4 Lantai Plat Beton tebal 15 cm 0.53 0.53 0.00 m3 Rp 3,960,472 Rp 2,100,783
5 Pedestal beton 0.40 0.40 0.00 m3 Rp 5,000,000 Rp 1,980,000

9.4 Pekerjaan Pasangan, Lantai dan Plafond Rp 14,824,782


1 Pasangan AAC ex Hebel tebal 7,5 cm 24.34 24.34 0.00 m2 Rp 120,713 Rp 2,938,335
2 Plester dan Aci 48.68 48.68 0.00 m2 Rp 65,919 Rp 3,209,135
3 Pasangan Keramik Lantai Teras HT/60-60 0.76 0.76 0.00 m2 Rp 224,029 Rp 170,262
4 Pasangan Keramik Lantai Pos HT/60-60 3.52 3.52 0.00 m2 Rp 224,029 Rp 787,462
5 Finish Floor Hardener pada area genset 3.78 3.78 0.00 m2 Rp 56,500 Rp 213,288
6 Waterproffing Area Atap dan pedestal keliling 10.82 10.82 0.00 m2 Rp 80,000 Rp 865,905
7 Plester beton dan perapihan 2.76 2.76 0.00 m2 Rp 35,000 Rp 96,600
8 Benangan Sudut 55.00 55.00 0.00 m1 Rp 35,000 Rp 1,925,000
9 Pasangan Batu Alam pada dinding 2.55 2.55 0.00 m2 Rp 250,000 Rp 637,500
10 Konstruksi Kawat bronjong besi siku 7.90 7.90 0.00 m2 Rp 352,208 Rp 2,782,443
L 50.50-5 finish besi epoxy, wiremesh ex lionmesh atau setara Rp -
12 Pasangan batu bronjong pada dinding tebal 10 cm rangka besi sesuai gambar 0.35 0.35 0.00 m2 Rp 39,155 Rp 13,704
13 Plafond Gypsum 9 mm, rangka metal furing 4.29 4.29 0.00 m2 Rp 158,231 Rp 678,809
14 Plafond Gypsum Area Pos 3.20 3.20 0.00 m2 Rp 158,231 Rp 506,338

9.5 Finishing dan Pintu Rp 17,126,561


1 Pengecatan Luar Pos 19.47 19.47 0.00 m2 Rp 35,945 Rp 699,964
2 Pengecatan Dalam 29.21 29.21 0.00 m2 Rp 21,131 Rp 617,232
3 Pengecatan Plafond 7.49 7.49 0.00 m2 Rp 21,131 Rp 158,271
4 Saklar Lampu (masuk ME) 0.00 0.00 0.00 Rp -
5 Stop Kontak (masuk ME) 0.00 0.00 0.00 Rp -
6 Lampu (masuk ME) 0.00 0.00 0.00 Rp -
7 Pintu Pos (PP) 1.00 1.00 0.00 set Rp 5,651,093 Rp 5,651,093
8 Pintu Besi Genset (PB) 1.00 1.00 0.00 set Rp 10,000,000 Rp 10,000,000

IX, Pekerjaan Site Work


9.1. Parkir/ Perkerasan Halaman Parkir Depan dan Belakang Rp 57,631,485
1 Krosekan/ Kupasan permukaan sedalam 5 cm seluruh area parkir 260.97 260.97 0.00 m2 Rp 5,000 Rp 1,304,836
2 Kupasan/galian area utk pas. grass block/ conblock 8 cm, sedalam 18 cm 45.93 45.93 0.00 m2 Rp 18,000 Rp 826,744
3 Pemadatan dengan stamper kodok area samping dan belakang 102.06 102.06 0.00 m2 Rp 8,500 Rp 867,476
4 Pemadatan dengan mini wales (4-6 Ton) pada area depan 260.97 260.97 0.00 m2 Rp 4,900 Rp 1,278,739
5 Timbunan dasar, batu kerikil 3/4 setebal 10 cm 26.10 26.10 0.00 m3 Rp 254,250 Rp 6,635,090
6 Pemadatan pada timbunan/ sebaran batu kerikil dg mini wales 260.97 260.97 0.00 m2 Rp 4,900 Rp 1,278,739
7 Pemasangan Conblock T=8 cm, mutu K=300 260.97 260.97 0.00 m2 Rp 174,121 Rp 45,439,862

9.2 Pekerjaan Stopper parkir dan pengecatan area parkir Rp 2,355,239


1 Pas. Kansteen utk stopper pada roda (hanya 1 sisi roda) @0,5 mtr 10.00 10.00 0.00 bh Rp 59,038 Rp 590,375
2 Pengecatan marka parkir tebal 12 cm, cat epoxy 76.60 76.60 0.00 m1 Rp 23,040 Rp 1,764,864

9.30 Pedestal/ kansteen pada area parkir/ bak tanaman Rp 8,761,770


1 Pas. Pedestal/ kansteen area parkir depan, dan parkir belakang 39.60 39.60 0.00 m1 Rp 118,075 Rp 4,675,770
2 Bak Tanaman (galian dan media tanam, tanaman perdu) depan dan belakang 27.24 27.24 0.00 m2 Rp 150,000 Rp 4,086,000

9.4. Septik Tank dan Resapan Rp 41,817,873


1 Membuat 1 UNIT Septictank 2,95 X 1,5 X 1,5 M ( kantor tipe besar) - dalam 1,5 M 2.00 2.00 0.00 set Rp 6,781,312 Rp 13,562,623
2 Membuat 1 rembesannya/ sumur resapan ( kantor tipe besar)-dalam 2 m 2.00 2.00 0.00 set Rp 5,651,050 Rp 11,302,100
3 Resapan Air Hujan 3.00 3.00 0.00 set Rp 5,651,050 Rp 16,953,150

X Membuat 1 UNIT GWT 1,3 X 1,6 X 2 M (kapasitas 4-,004,16 M3)-dalam 1,3 m Rp 28,500,000
Bak Penyimpanan 1.00 1.00 0.00 set Rp 28,500,000 Rp 28,500,000
Pemipaan 1.00 1.00 0.00 lsm include Rp -

9.6. Kolam Air Hujan Rp 10,000,000


Bak Penyimpanan (Pasangan Bata) 1.00 1.00 0.00 set Rp 10,000,000 Rp 10,000,000
Pemipaan 1.00 1.00 0.00 lsm include Rp -

9.7. Kolam Ikan Rp 31,273,487


1 Galian (kolam dalam bersih 50 cm), galian dalam 65 cm 16.60 16.60 0.00 m3 Rp 100,000 Rp 1,660,198
2 Pasir urug 2.55 2.55 0.00 m3 Rp 227,130 Rp 580,124
3 Lantai Kerja 1.28 1.28 0.00 m3 Rp 915,344 Rp 1,168,963
4 Pasangan bata tidur pada dasar kolam 25.54 25.54 0.00 m2 Rp 120,713 Rp 3,083,191
5 Pasangan bata 1/2 bata transram keliling kolam 23.36 23.36 0.00 m2 Rp 120,713 Rp 2,819,856
6 Waterproofing dinding dan dasar kolam 51.24 51.24 0.00 m2 Rp 80,000 Rp 4,099,000
7 Plester 46.72 46.72 0.00 m2 Rp 44,591 Rp 2,083,292
8 Pasangan keramik pada dinding dan dasar kolam 51.24 51.24 0.00 m2 Rp 188,884 Rp 9,677,944
9 Pembesian kolom praktis, ring balk praktis, balok praktis 11/11 0.65 0.65 0.00 m3 Rp 7,504,726 Rp 4,850,920
9 Bak Sirkulasi 1.00 1.00 0.00 set Rp 500,000 Rp 500,000
10 Pompa Sirkulasi 1.00 1.00 0.00 set Rp 250,000 Rp 250,000
11 Pemipaan 1.00 1.00 0.00 lsm Rp 500,000 Rp 500,000

9.8 Lain-lain Rp 48,700,000


1 Bak Sampah Plastik (model 3 bak jadi satu) 2.00 2.00 0.00 set Rp 850,000 Rp 1,700,000
2 Pintu Masuk Area KolamIkan 1.00 1.00 0.00 set Rp 2,000,000 Rp 2,000,000
3 Rambu-rambu dan logo pada parkir 1.00 1.00 0.00 lsm Rp 5,000,000 Rp 5,000,000
3 Logo pada Tampak bangunan Atas 1.00 1.00 0.00 lsm Rp 25,000,000 Rp 25,000,000
4 Logo pada Tampak Bangunan Bawah 1.00 1.00 0.00 lsm Rp 15,000,000 Rp 15,000,000

RAB ARS NON STD 25 / 58


C. PEKERJAAN ELEKTRIKAL

KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR


LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020

Jumlah Harga (Rp)


No. URAIAN PEKERJAAN Keterangan
Kontrak MC 0 / ADD Balance

I PEKERJAAN STANDARD Rp 2,250,350,986.90 Rp 2,333,026,498.32 Rp 106,109,801.42

I. PEKERJAAN ELEKTRIKAL
A PEKERJAAN INSTALASI TATA UDARA Rp 761,475,346.17 Rp 761,475,346.17 Rp -
B PEKERJAAN PERIJINAN DAYA PLN ,PANEL dan FEEDER Rp 298,494,596.99 Rp 269,280,621.81 -Rp 29,213,975.19
C PEKERJAAN LISTRIK Rp 386,731,035.42 Rp 415,891,535.42 Rp 29,160,500.00
D PEKERJAAN FIRE ALARM Rp 99,724,814.66 Rp 99,724,814.66 Rp 23,434,290.00
E PEKERJAAN TELEPHONE Rp 119,106,162.00 Rp 150,994,212.28 Rp 31,888,050.28
F PEKERJAAN DATA LAN Rp 85,845,390.79 Rp 128,230,878.97 Rp 42,385,488.18
G PEKERJAAN INSTALASI CCTV Rp 133,134,647.97 Rp 138,084,647.97 Rp 4,950,000.00
H PEKERJAAN PENTANAHAN Rp 22,967,644.57 Rp 22,967,644.57 Rp -
I PEKERJAAN SOUND Rp 189,447,148.23 Rp 192,952,596.38 Rp 3,505,448.15
J PEKERJAAN PLUMBING Rp 153,424,200.10 Rp 153,424,200.10 Rp -

II Pekerjaan Non Standard Rp 287,648,185.16 Rp 287,648,185.16 Rp -


A Penambahan Daya Rp - Rp - Rp -
B Pekerjaan Genset Rp 287,648,185.16 Rp 287,648,185.16 Rp -
C Pekerjaan Pemindahan Meter PDAM Rp - Rp - Rp -

TOTAL PEKERJAAN M E P (standar dan Non Standar) Rp 2,537,999,172.06 Rp 2,620,674,683.48 Rp 106,109,801.42

REKAP MEP 26 / 58
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR


LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020

PEKERJAAN ELEKTRIKAL
VOLUME JUMLAH
NO. JENIS PEKERJAAN SAT HARGA
kontrak MC-0 BALANCE KONTRAK
PEKERJAAN LISTRIK
I PEKERJAAN INSTALASI LISTRIK LANTAI - 1
Pemasangan fixture dan armateur lampu lengkap dengan accesoriess :
1 - DL LED type RD 150 HRZ LED BULB 6W 6.00 6.00 - bh Rp 246,000 Rp 1,476,000
2 - FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W 80.00 80.00 - bh Rp 477,000 Rp 38,160,000
3 - FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W + BATTERY 2.00 2.00 - bh Rp 1,285,000 Rp 2,570,000
4 - TL OUTBOW type GMS T8 1x36 SAVY 2.00 - (2.00) bh Rp 611,000 Rp 1,222,000
5 - TL OUTBOW type GMS T8 1x36 SAVY + BATTERY 2.00 2.00 bh Rp 1,220,000 Rp -
6 - TL OUTBOW type TK CG T8 1x36 SAVY 5.00 5.00 - bh Rp 470,000 Rp 2,350,000
7 - TL OUTBOW type TK CG T8 1x36 SAVY c/w BATT 2.00 2.00 - bh Rp 1,254,000 Rp 2,508,000
8 - TL OUTBOW type BL CG T8 1x36 SAVY 4.00 4.00 - bh Rp 397,000 Rp 1,588,000
9 - EXIT LAMP LED 1MK HUGO 2.00 2.00 - bh Rp 1,187,000 Rp 2,374,000
10 - LP WASTAFEL type WL TRAPESIUM LED OSR Basic 2.00 2.00 - bh Rp 625,000 Rp 1,250,000
11 - Lampu STRIPLIGHT 7W 27.00 27.00 - m' Rp 193,000 Rp 5,211,000
12 - Saklar Tunggal 10 A 23.00 23.00 - bh Rp 50,930 Rp 1,171,393
13 - Saklar Serie 10 A 13.00 13.00 - bh Rp 63,600 Rp 826,806
14 - Stop Kontak 1 phase 16 A 37.00 37.00 - bh Rp 66,153 Rp 2,447,657
15 - Stop Kontak lantai 1 phase 16 A 6.00 6.00 bh Rp 700,000 Rp -
16 Instalasi penerangan 105.00 105.00 - titik Rp 303,000 Rp 31,815,000
17 Instalasi stop kontak 37.00 37.00 - titik Rp 355,000 Rp 13,135,000
SUB TOTAL (I) PEKERJAAN INSTALASI LISTRIK LANTAI 1 Sub Jumlah Rp 108,104,856
II PEKERJAAN INSTALASI LISTRIK LANTAI - 2
Pemasangan fixture dan armateur lampu lengkap dengan accesoriess :
1 - DL LED type RD 150 HRZ LED BULB 6W 6.00 6.00 - bh Rp 246,000 Rp 1,476,000
2 - FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W 109.00 109.00 - bh Rp 477,000 Rp 51,993,000
3 - FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W + BATTERY 2.00 2.00 - bh Rp 1,285,000 Rp 2,570,000
4 - TL OUTBOW type GMS T8 1x36 SAVY 2.00 2.00 - bh Rp 611,000 Rp 1,222,000
5 - TL OUTBOW type GMS T8 1x36 SAVY + BATTERY 2.00 2.00 bh Rp 1,220,000 Rp -
6 - EXIT LAMP LED 1MK HUGO 2.00 2.00 - bh Rp 1,187,000 Rp 2,374,000
7 - LP WASTAFEL type WL TRAPESIUM LED OSR Basic 2.00 2.00 - bh Rp 625,000 Rp 1,250,000
8 - LP SPOT type RIO HALOGEN MASTER LED MR.16 7-50W 18.00 18.00 - bh Rp 370,000 Rp 6,660,000
9 - Saklar Tunggal 10 A 5.00 5.00 - bh Rp 50,930 Rp 254,651
10 - Saklar Serie 10 A 19.00 19.00 - bh Rp 63,600 Rp 1,208,409
11 - Stop Kontak 1 phase 16 A 54.00 54.00 - bh Rp 66,153 Rp 3,572,256
12 Instalasi penerangan 141.00 141.00 - titik Rp 303,000 Rp 42,723,000
13 Instalasi stop kontak 54.00 54.00 - titik Rp 355,000 Rp 19,170,000
SUB TOTAL (II) PEKERJAAN INSTALASI LISTRIK LANTAI 2 Sub Jumlah Rp 134,473,315
III PEKERJAAN INSTALASI LISTRIK LANTAI - 3
Pemasangan fixture dan armateur lampu lengkap dengan accesoriess :
1 - DL LED type RD 150 HRZ LED BULB 6W 7.00 7.00 - bh Rp 246,000 Rp 1,722,000
2 - FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W 82.00 82.00 - bh Rp 477,000 Rp 39,114,000
3 - FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W + BATTERY 2.00 2.00 - bh Rp 1,285,000 Rp 2,570,000
4 - TL OUTBOW type GMS T8 1x36 SAVY 2.00 2.00 - bh Rp 611,000 Rp 1,222,000
5 - EXIT LAMP LED 1MK HUGO 2.00 2.00 - bh Rp 625,000 Rp 1,250,000
6 - LP WASTAFEL type WL TRAPESIUM LED OSR Basic 2.00 2.00 - bh Rp 625,000 Rp 1,250,000
7 - LP SPOT type RIO HALOGEN MASTER LED MR.16 7-50W 18.00 18.00 bh Rp 997,500 Rp -
8 - LP TAMAN type AGL FG 151 32.1 W 2.00 2.00 - bh Rp 5,410,000 Rp 10,820,000
9 - LP SOROT type SPOT MARESCA HLG LED ESS 7 -50W 2.00 2.00 - bh Rp 1,469,000 Rp 2,938,000
10 - Saklar Tunggal 10 A 12.00 12.00 - bh Rp 50,930 Rp 611,162
11 - Saklar Serie 10 A 11.00 11.00 - bh Rp 63,600 Rp 699,605
12 - Stop Kontak 1 phase 16 A 56.00 56.00 - bh Rp 66,153 Rp 3,704,562
13 Instalasi penerangan 101.00 101.00 - titik Rp 303,000 Rp 30,603,000
14 Instalasi stop kontak 56.00 56.00 - titik Rp 355,000 Rp 19,880,000
SUB TOTAL (III) PEKERJAAN INSTALASI LISTRIK LANTAI 3 Sub Jumlah Rp 116,384,329
IV PEKERJAAN INSTALASI LISTRIK AREA LUAR
Pemasangan fixture dan armateur lampu lengkap dengan accesoriess :
1 - DL LED type RD 150 HRZ LED BULB 6W 4.00 4.00 - bh Rp 246,000 Rp 984,000
2 - LP PJU type RL OPTICA P 80 LED c/w TIANG H=7m 3.00 3.00 - bh Rp 5,134,000 Rp 15,402,000
3 - LP SOROT type SPOT MARESCA HLG LED ESS 7 -50W 3.00 3.00 - bh Rp 1,469,000 Rp 4,407,000
4 - Saklar Tunggal 10 A 1.00 1.00 - bh Rp 50,930 Rp 50,930
5 - Saklar Serie 10 A 2.00 2.00 - bh Rp 63,600 Rp 127,201
6 - Stop Kontak 1 phase 16 A 9.00 9.00 - bh Rp 63,600 Rp 572,404
7 Instalasi Lampu PJU NYY 3x2,5mm 80.00 80.00 m Rp 32,500 Rp -
8 Instalasi Lampu Sorot Taman NYY 3x2,5mm 23.00 23.00 m Rp 32,500 Rp -
9 Instalasi penerangan 10.00 10.00 - titik Rp 303,000 Rp 3,030,000
10 Instalasi stop kontak 9.00 9.00 - titik Rp 355,000 Rp 3,195,000
SUB TOTAL (IV) PEKERJAAN INSTALASI LISTRIK AREA LUAR Sub Jumlah Rp 27,768,535
TOTAL PEKERJAAN INSTALASI LISTRIK TOTAL Rp 386,731,035

ELEKTRIKAL 27 / 58
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA
LOKASI : (PERSERO) CABANG
JL.KUMALA NO 128 - MAKASSAR
MAKASAR
TAHUN ANGGARAN : 2020

PEKERJAAN INSTALASI TATA UDARA


VOLUME JUMLAH HARGA ( RP
NO URAIAN PEKERJAAN Sat HARGA SATUAN
KONTRAK MC-0 / ADD BALANCE KONTRAK
PEKERJAAN AC
I PEKERJAAN AC LANTAI -1
Pemasangan indoor dan outdoor unit AC lengkap dengan accesoriess :
1 Type : SCF 50DVL 1 PHASE INVERTER 3 3 0 unit Rp 18,182,000 Rp 54,546,000
Model : Ceiling Cassete-Round Flow White panel
BTU/H: 17.100
Merk : Daikin
Lokasi : R.PERPUSTAKKAN dan R.TUNGGU
2 Type : STKC 25 TV STAR INVERTER R32 2 2 0 unit Rp 6,579,000 Rp 13,158,000
Model : Wall Mounted Split
BTU/H: 9.000
Merk : Daikin
Lokasi : R.RAPAT
3 Instalasi pipa refrigerant + isolasi ( kap 17.100 Btuh ) 5/8" + 3/8" + Isolasi 113 113 0 m' Rp 228,964 Rp 25,872,908
4 Instalasi pipa refrigerant + isolasi ( kap 9.000 Btuh ) 1/4" + 3/8" + Isolasi 45 45 0 m' Rp 156,295 Rp 7,033,271
5 Instalasi kelistrikan AC : 0
Instalasi Power AC ( NYM 3X2.5mm ) 114 114 0 m' Rp 27,000 Rp 3,078,000
Instalasi kontrol AC ( NYM 3X2.5mm ) 158 158 0 m' Rp 27,000 Rp 4,266,000
6 Exhaust Fan 50 CFM 7 7 0 unit Rp 510,000 Rp 3,570,000
7 Instalasi pipa exhaust fan pvc aw 100mm 35 35 0 m' Rp 126,000 Rp 4,410,000
8 Instalasi pipa drain AC :
Instalasi Drain AC dia 50mm 4 4 0 m' Rp 125,515 Rp 502,058
Instalasi Drain AC dia 40mm 35 35 0 m' Rp 113,356 Rp 3,967,467
Instalasi Drain AC dia 25mm 25 25 0 m' Rp 83,931 Rp 2,098,286
9 Test commisioinig 1 1 0 ls Rp 1,695,328 Rp 1,695,328
Sub TOTAL PEKERJAAN AC Lantai 1 SUB TOTAL Rp 124,197,318
II PEKERJAAN AC LANTAI -2
Pemasangan indoor dan outdoor unit AC lengkap dengan accesoriess :
1 Type : SCF 50DVL 1 PHASE INVERTER 8 8 0 unit Rp 18,182,000 Rp 145,456,000
Model : Ceiling Cassete-Round Flow White panel
BTU/H: 17.100
Merk : Daikin
Lokasi : R.KACAB, R.STAF KERJA, R.PERSIAPAN , R.WAR ROOM
2 Type : STKC 25 TV STAR INVERTER R32 4 4 0 unit Rp 6,579,000 Rp 26,316,000
Model : Wall Mounted Split
BTU/H: 9.000
Merk : Daikin
Lokasi : R.KABAG , R.WAR ROOM
3 Type : STKC 20 TV STAR INVERTER R32 1 1 0 unit Rp 6,313,000 Rp 6,313,000
Model : Wall Mounted Split
BTU/H: 6.800
Merk : Daikin
Lokasi : R.SEKRETARIAT
4 Instalasi pipa refrigerant + isolasi ( kap 17.100 Btuh ) 5/8" + 3/8" + Isolasi 425 425 0 m' Rp 228,964 Rp 97,309,609
5 Instalasi pipa refrigerant + isolasi ( kap 9.000 Btuh ) 1/4" + 3/8" + Isolasi 61 61 0 m' Rp 156,295 Rp 9,533,990
6 Instalasi pipa refrigerant + isolasi ( kap 6.800 Btuh ) 1/4" + 3/8" + Isolasi 17 17 0 m' Rp 156,295 Rp 2,657,014
7 Instalasi kelistrikan AC :
Instalasi Power AC ( NYM 3X2.5mm ) 315 315 0 m' Rp 27,000 Rp 8,505,000
Instalasi kontrol AC ( NYM 3X2.5mm ) 462 462 0 m' Rp 27,000 Rp 12,474,000

8 Exhaust Fan 50 CFM 7 7 0 unit Rp 510,000 Rp 3,570,000


9 Instalasi pipa exhaust fan pvc aw 100mm 17 17 0 m' Rp 126,000 Rp 2,142,000
Instalasi pipa drain AC :
Instalasi Drain AC dia 50mm 4 4 0 m' Rp 125,515 Rp 502,058
Instalasi Drain AC dia 40mm 35 35 0 m' Rp 113,356 Rp 3,967,467
Instalasi Drain AC dia 25mm 90 90 0 m' Rp 83,931 Rp 7,553,830
10 Test commisioinig 1 1 0 set Rp 1,695,328 Rp 1,695,328
Sub TOTAL PEKERJAAN AC Lantai 2 Rp 327,995,296
III PEKERJAAN AC LANTAI -3
Pemasangan indoor dan outdoor unit AC lengkap dengan accesoriess :
1 Type : SCF 50DVL 1 PHASE INVERTER 7 7 0 unit Rp 18,182,000 Rp 127,274,000
Model : Ceiling Cassete-Round Flow White panel
BTU/H: 17.100
Merk : Daikin
Lokasi : R.KASUM , R.STAF KASUM , R.WAR ROOM
2 Type : STKC 25 TV STAR INVERTER R32 4 4 0 unit Rp 6,579,000 Rp 26,316,000
Model : Wall Mounted Split
BTU/H: 9.000
Merk : Daikin
Lokasi : R.GYM dan R.MUSHOLLA
3 Type : STKC 20 TV STAR INVERTER R32 3 3 0 unit Rp 6,313,000 Rp 18,939,000
Model : Wall Mounted Split
BTU/H: 6.800
Merk : Daikin
Lokasi : R.WAR ROOM , R.SERVER
4 Type : STKC 15 TV STAR INVERTER R32 2 2 0 unit Rp 6,257,000 Rp 12,514,000
Model : Wall Mounted Split
BTU/H: 5.100
Merk : Daikin
Lokasi : R.LAKTASI dan R.KEUANGAN
5 Instalasi pipa refrigerant + isolasi ( kap 17.100 Btuh ) 5/8" + 3/8" + Isolasi 280 280 0 m' Rp 228,964 Rp 64,109,860
6 Instalasi pipa refrigerant + isolasi ( kap 9.000 Btuh ) 1/4" + 3/8" + Isolasi 56 56 0 m' Rp 156,295 Rp 8,752,515
7 Instalasi pipa refrigerant + isolasi ( kap 6.800 Btuh ) 1/4" + 3/8" + Isolasi 42 42 0 m' Rp 156,295 Rp 6,564,386
8 Instalasi pipa refrigerant + isolasi ( kap 5.100 Btuh ) 1/4" + 3/8" + Isolasi 28 28 0 m' Rp 156,295 Rp 4,376,258
9 Instalasi kelistrikan AC :
Instalasi Power AC ( NYM 3X2.5mm ) 351 351 0 m' Rp 27,000 Rp 9,477,000
Instalasi kontrol AC ( NYM 3X2.5mm ) 452 452 0 m' Rp 27,000 Rp 12,204,000
10 Exhaust Fan 50 CFM 3 3 0 unit Rp 510,000 Rp 1,530,000
11 Instalasi pipa exhaust fan pvc aw 100mm 21 21 0 m' Rp 126,000 Rp 2,646,000
Instalasi pipa drain AC :
Instalasi Drain AC dia 50mm 4 4 0 m' Rp 125,515 Rp 502,058
Instalasi Drain AC dia 40mm 50 50 0 m' Rp 113,356 Rp 5,667,810
Instalasi Drain AC dia 25mm 80 80 0 m' Rp 83,931 Rp 6,714,516
12 Test commisioinig 1 1 0 set Rp 1,695,328 Rp 1,695,328
Sub TOTAL PEKERJAAN AC Lantai 3 Rp 309,282,732
TOTAL HARGA UNIT AC UTAMA DAN ACCESORIESSNYA Rp 761,475,346

TATA UDARA 28 / 58
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR


LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020
PEKERJAAN PERIJINAN DAYA PLN ,PANEL dan FEEDER

VOLUME JUMLAH HARGA ( Rp )


NO. JENIS PEKERJAAN SAT HARGA
KONTRAK MC-0 BALANCE KONYTAK
PEKERJAAN PANEL LISTRIK
I PANEL MDP LENGKAP INTERLOCK TERDIRI : 1.00 1.00 0.00 unit Rp 96,072,933 Rp 96,072,933
1 - Pilot Lamp + Fuse 6.00 6.00 0.00 Buah include
2 - Surge Arresster 3P + 1N 40 KA 1.00 1.00 0.00 Buah include
3 - CT 400/5A 2.00 2.00 0.00 Buah include
4 - Interlock 1.00 1.00 0.00 Buah include
5 - Power Meter Seri PM5350 1.00 1.00 0.00 Buah include
Push button 4.00 4.00 Buah include
A-O-M Selector switch 2.00 2.00 Buah include
Time Reley H3CR 3.00 3.00 Buah include
6 - MCCB 3P 4P 112-160A 50KA 2.00 2.00 0.00 Buah include
7 - MCCB 3P 28 - 40A 25KA 3.00 3.00 0.00 Buah include
8 - MCCB 3P 22.4 - 32A 25KA 1.00 1.00 0.00 Buah include
9 - MCCB 3P 17.5 - 25A 25KA 1.00 1.00 0.00 Buah include
10 - MCCB 3P 11.2 - 16 25KA 2.00 2.00 0.00 Buah include
11 MCB 3P 25A 10KA 1.00 1.00 0.00 Buah include
MCB 3P 20A 4.5KA 2.00 2.00 Buah include
12 - Wiring dan Accessories 1.00 1.00 0.00 ls include
13 - Box Panel 1.00 1.00 0.00 unit include
SUB TOTAL (I) TOTAL Rp 96,072,933
II PANEL LISTRIK LT 1 (P.1), TERDIRI: 1.00 1.00 0.00 unit Rp 7,309,519 Rp 7,309,519
1 - Pilot Lamp + Fuse 3.00 3.00 0.00 Buah include
2 - Voltmeter 1.00 1.00 0.00 Buah include
3 - Amperemeter 3.00 3.00 0.00 Buah include
4 - Selector Switch 1.00 1.00 0.00 Buah include
5 - MCB 1P 6A 10 kA 6.00 6.00 0.00 Buah include
6 - MCB 1P 10A 10kA 12.00 12.00 0.00 Buah include
7 - MCCB 3P 17.5 - 25A 25KA 1.00 1.00 0.00 Buah include
8 - Wiring dan Accessories 1.00 1.00 0.00 set include
9 - Box panel 1.00 1.00 0.00 unit include
SUB TOTAL (II) Sub Jumlah Rp 7,309,519
III PANEL LISTRIK LT.2 (P.2), TERDIRI : 1.00 1.00 0.00 unit Rp 9,257,790 Rp 9,257,790
1 - Pilot Lamp + Fuse 3.00 3.00 0.00 Buah include
2 - Voltmeter 1.00 1.00 0.00 Buah include
3 - Amperemeter 3.00 3.00 0.00 Buah include
4 - Selector Switch 1.00 1.00 0.00 Buah include
5 - MCB 1P 6A 10 kA 9.00 9.00 0.00 Buah include
6 - MCB 1P 10A 10kA 22.00 22.00 0.00 Buah include
7 - MCCB 3P 28 - 40A 25KA 1.00 1.00 0.00 Buah include
8 - Wiring dan Accessories 1.00 1.00 0.00 set include
9 - Box panel 1.00 1.00 0.00 unit include
SUB TOTAL (II) Sub Jumlah Rp 9,257,790
IV PANEL LISTRIK LT 3. (P.3), TERDIRI: 1.00 1.00 0.00 unit Rp 9,200,488 Rp 9,200,488
1 - Pilot Lamp + Fuse 3.00 3.00 0.00 Buah include
2 - Voltmeter 1.00 1.00 0.00 Buah include
3 - Amperemeter 3.00 3.00 0.00 Buah include
4 - Selector Switch 1.00 1.00 0.00 Buah include
5 - MCB 1P 6A 10 kA 9.00 9.00 0.00 Buah include
6 - MCB 1P 10A 10kA 15.00 15.00 0.00 Buah include
7 - MCCB 3P 28 - 40A 25KA 1.00 1.00 0.00 Buah include
8 - Wiring dan Accessories 1.00 1.00 0.00 set include
9 - Box panel 1.00 1.00 0.00 unit include
SUB TOTAL (IV) Sub Jumlah Rp 9,200,488
V PANEL LISTRIK AREA LUAR (P.EX ), TERDIRI: 1.00 1.00 0.00 unit Rp 6,395,625 Rp 6,395,625
1 - Pilot Lamp + Fuse 3.00 3.00 0.00 Buah include
2 - Voltmeter 1.00 1.00 0.00 Buah include
3 - Amperemeter 3.00 3.00 0.00 Buah include
4 - Selector Switch 1.00 1.00 0.00 Buah include
5 - MCB 1P 6A 10 kA 7.00 7.00 0.00 Buah include
6 - MCB 1P 10A 10kA 3.00 3.00 0.00 Buah include
7 - MCB 3P 25A 10KA 1.00 1.00 0.00 Buah include
8 - Wiring dan Accessories 1.00 1.00 0.00 set include
9 - Box panel 1.00 1.00 0.00 unit include
SUB TOTAL (V) Sub Jumlah Rp 6,395,625
VI PANEL AC LT.1 (P.AC.A), TERDIRI: 1.00 1.00 0.00 unit Rp 6,778,769 Rp 6,778,769
1 - Pilot Lamp + Fuse 3.00 3.00 0.00 Buah include
2 - Voltmeter 1.00 1.00 0.00 Buah include
3 - Amperemeter 3.00 3.00 0.00 Buah include
4 - Selector Switch 1.00 1.00 0.00 Buah include
5 - MCB 1P 6A 10 kA 1.00 1.00 0.00 Buah include
6 - MCB 1P 10A 10kA 21.00 21.00 0.00 Buah include
7 - MCCB 3P 28 - 40A 25KA 1.00 1.00 0.00 Buah include
8 - Wiring dan Accessories 1.00 1.00 0.00 set include
9 - Box panel 1.00 1.00 0.00 unit include
SUB TOTAL (VI) Sub Jumlah Rp 6,778,769
VII PANEL AC LT.2 (P.AC.B), TERDIRI: 1.00 1.00 0.00 unit Rp 6,778,769 Rp 6,778,769
1 - Pilot Lamp + Fuse 3.00 3.00 0.00 Buah include
2 - Voltmeter 1.00 1.00 0.00 Buah include
3 - Amperemeter 3.00 3.00 0.00 Buah include
4 - Selector Switch 1.00 1.00 0.00 Buah include
5 - MCB 1P 6A 10 kA 1.00 1.00 0.00 Buah include
6 - MCB 1P 10A 10kA 21.00 21.00 0.00 Buah include
7 - MCCB 3P 22.4 - 32A 25KA 1.00 1.00 0.00 Buah include
8 - Wiring dan Accessories 1.00 1.00 0.00 set include
9 - Box panel 1.00 1.00 0.00 unit include
SUB TOTAL (VII) Sub Jumlah Rp 6,778,769
TOTAL PANEL TOTAL Rp 141,793,892
X PEKERJAAN CABLE TRAY :
1 Pemasangan instalasi kabel tray lengkap dengan accessories :
2 - Kabel tray lantai 1 ( uk.500 x 100mm ) 1,2 mm Hot Dip 28.00 0.00 !(28.00!) m' Rp 498,000 Rp 13,944,000
3 - Kabel tray lantai 2 ( uk.500 x 100mm ) 1,2 mm Hot Dip 25.00 0.00 !(25.00!) m' Rp 498,000 Rp 12,450,000
4 - Kabel tray lantai 3 ( uk.500 x 100mm ) 1,2 mm Hot Dip 26.00 0.00 !(26.00!) m' Rp 498,000 Rp 12,948,000
5 - Kabel tray vertical/riser ( uk.500 x 100mm ) 1,2 mm Hot Dip 12.00 20.00 8.00 m' Rp 498,000 Rp 5,976,000
6 Material bantu 1.00 1.00 0.00 ls Rp 6,797,700 Rp 6,797,700
7 Kabel tray lantai 1 ( uk.300 x 150mm ) Elektrikal 42.32 42.32 m' Rp 449,150 Rp -
8 Kabel tray lantai 1 ( uk.300 x 150mm ) Elektronik 30.54 30.54 m' Rp 449,150 Rp -
9 Kabel tray lantai 2 ( uk.400 x 150mm ) Elektrikal 21.56 21.56 m' Rp 478,500 Rp -
10 Kabel tray lantai 2 ( uk.300 x 150mm ) Elektronik 29.34 29.34 m' Rp 449,150 Rp -
11 Kabel tray lantai 3 ( uk.400 x 150mm ) Elektrikal 23.56 23.56 m' Rp 478,500 Rp -
12 Kabel tray lantai 3 ( uk.300 x 150mm ) Elektronik 24.76 24.76 m' Rp 449,150 Rp -

SUB TOTAL (IX) CABLE TRAY Sub Jumlah Rp 52,115,700


X PEKERJAAN KABEL FEDEER
1 Kabel NYFGBY 4 x 1 x 185 MM² (dari MDP ke TRAFO PLN ) 50.00 52.00 2.00 m' Rp 1,592,000 Rp 79,600,000
2 Kabel NYY 4 x 2.5 MM² ( dari MDP ke P.1) 3.80 6.00 2.20 m' Rp 54,000 Rp 205,200
3 Kabel NYY 4 x 4 MM² ( dari MDP ke P.2) 27.00 35.80 8.80 m' Rp 62,000 Rp 1,674,000
4 Kabel NYY 4 x 4 MM² ( dari MDP ke P.3) 35.00 43.80 8.80 m' Rp 62,000 Rp 2,170,000
5 Kabel NYY 4 x 4 MM² ( dari MDP ke P.AC.A) 6.00 8.00 2.00 m' Rp 62,000 Rp 372,000
6 Kabel NYY 4 x 4 MM² ( dari MDP ke P.AC.B) 32.00 45.80 13.80 m' Rp 62,000 Rp 1,984,000
7 Kabel NYY 4 x 2.5 MM² ( dari MDP ke P.EX) 58.00 58.00 0.00 m' Rp 54,000 Rp 3,132,000
Grounding
1 Kabel NYA 185 MM² (dari MDP ke TRAFO PLN ) 50.00 52.00 2.00 m' Rp 297,021 Rp 14,851,072
2 Kabel NYA 2.5 MM² ( dari MDP ke P.1) 3.80 6.00 2.20 m' Rp 1,243 Rp 4,724
3 Kabel NYA 4 MM² ( dari MDP ke P.2) 27.00 35.80 8.80 m' Rp 5,199 Rp 140,373
4 Kabel NYA 4 MM² ( dari MDP ke P.3) 35.00 43.80 8.80 m' Rp 5,199 Rp 181,965
5 Kabel NYA 4 MM² ( dari MDP ke P.AC.A) 6.00 8.00 2.00 m' Rp 5,199 Rp 31,194
6 Kabel NYA 4 MM² ( dari MDP ke P.AC.B) 32.00 45.80 13.80 m' Rp 5,199 Rp 166,368
7 Kabel NYA 2.5 MM² ( dari MDP ke P.EX) 58.00 58.00 0.00 m' Rp 1,243 Rp 72,108

SUB TOTAL KABEL FEDEER Sub Jumlah Rp 104,585,005


Total Pekerjaan Cable Tray Rp 298,494,597

XII PEKERJAAN PERIZINAN PENYAMBUNGAN DAYA (non standar) by Owner


1 Perijinan PLN 110 kVA ( Penyambungan baru ) 1.00 1.00 0.00 ls SBO Rp -
2 Uang Jaminan langganan 1.00 1.00 0.00 ls SBO Rp -
3 Perijinan Konsuil dan Jasa Sertifikasi 1.00 1.00 0.00 ls SBO Rp -
Sub Jumlah Rp -
TOTAL

PANEL, FEEDER, PLN 29 / 58


RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020
PEKERJAAN ELEKTRIKAL - FIRE ALARM

VOLUME JUMLAH
NO. JENIS PEKERJAAN SAT HARGA
KONTRAK MC-0 / ADD BALANCE KONTRAK
II.E PEKERJAAN FIRE ALARM
I PERALATAN UTAMA FIRE ALARM
1 MCFA 10 COnventional 10 zone + Battery + Surge Protector Set 230VAC 1.00 1.00 - unit Rp 18,900,170.82 Rp 18,900,170.82
2 Annunciator RLCD-C 1.00 1.00 - unit Rp 6,784,676.70 Rp 6,784,676.70
Tarikan kabel feeder Fire Alarm 1.00 1.00 - unit Rp - Rp -
Tarikan dari MCFA ke TB lantai 1 Kabel NYM 3 x 2 x 1,5 mm² dalam conduit
48.00 48.00 m Rp 54,450.00 Rp -
PVC HI 20 mm²
Tarikan dari MCFA ke TB lantai 2 Kabel NYM 3 x 2 x 1,5 mm² dalam conduit
19.00 19.00 m Rp 54,450.00 Rp -
PVC HI 20 mm²
Tarikan dari MCFA ke TB lantai 3 Kabel NYM 3 x 2 x 1,5 mm² dalam conduit
6.00 6.00 m Rp 54,450.00 Rp -
PVC HI 20 mm²
Tarikan dari MCFA ke Anuciator Kabel NYY 9 x 2 x 1,5 mm² dalam conduit
104.00 104.00 m Rp 187,110.00 Rp -
PVC HI 20 mm²
SUB TOTAL (I) PEKERJAAN UTAMA FIRE ALARM Sub Jumlah Rp 25,684,847.52
II PEKERJAAN INSATALASI FIRE ALARM LANTAI I
1 - ROR Heat Detector 8.00 8.00 - bh Rp 307,329.04 Rp 2,458,632.34
2 - Smoke Detector 9.00 9.00 - bh Rp 745,944.28 Rp 6,713,498.50
3 - Fix Detector 2.00 2.00 - bh Rp 307,329.04 Rp 614,658.08
4 Indicator lamp 1.00 1.00 - titik Rp 1,243,240.46 Rp 1,243,240.46
5 Break Glass Alarm ( Manual Call Point) 1.00 1.00 - titik Rp 318,269.56 Rp 318,269.56
6 Monitor modul for Indicator & Horn-Strobe - - - titik Rp 2,188,103.21 Rp -
7 End Of Line ( EOL ) 3.00 3.00 - bh Rp 45,208.74 Rp 135,626.23
8 Terminal BOX FA 1.00 1.00 - ls Rp 569,717.27 Rp 569,717.27
9 Instalasi Fire Alarm Kabel NYA 2 x 1,5 mm² dalam conduit PVC HI 20 mm² 19.00 19.00 - titik Rp 303,000.00 Rp 5,757,000.00
10 Instalasi Manual Push Button, Alarm Bell, Indicator Lamp NYM 2 X 1,5 mm² da 3.00 3.00 - titik Rp 647,514.70 Rp 1,942,544.09
SUB TOTAL (I) PEKERJAAN INSTALASI FIRE ALARM LANTAI I Sub Jumlah Rp 19,753,186.54
III PEKERJAAN INSATALASI FIRE ALARM LANTAI - 2
1 - ROR Heat Detector 4.00 4.00 - bh Rp 307,329.04 Rp 1,229,316.17
2 - Smoke Detector 24.00 24.00 - bh Rp 745,944.28 Rp 17,902,662.67
3 - Fix Detector 2.00 2.00 - bh Rp 307,329.04 Rp 614,658.08
4 Indicator lamp 1.00 1.00 - titik Rp 1,243,240.46 Rp 1,243,240.46
5 Break Glass Alarm ( Manual Call Point) 1.00 1.00 - titik Rp 318,269.56 Rp 318,269.56
6 Monitor modul for Indicator & Horn-Strobe - - - titik Rp 2,188,103.21 Rp -
7 End Of Line ( EOL ) 3.00 3.00 - bh Rp 45,208.74 Rp 135,626.23
8 Terminal BOX FA 1.00 1.00 - bh Rp 569,717.27 Rp 569,717.27
9 Instalasi Fire Alarm Kabel NYA 2 x 1,5 mm² dalam conduit PVC HI 20 mm² 30.00 30.00 - bh Rp 303,000.00 Rp 9,090,000.00
10 Instalasi Manual Push Button, Alarm Bell, Indicator Lamp NYM 2 X 1,5 mm² da 3.00 3.00 - bh Rp 647,514.70 Rp 1,942,544.09
SUB TOTAL (II) PEKERJAAN INSTALASI FIRE ALARM LANTAI 2 Sub Jumlah Rp 33,046,034.54
IV PEKERJAAN INSATALASI FIRE ALARM LANTAI - 3
1 - ROR Heat Detector 8.00 8.00 - bh Rp 307,329.04 Rp 2,458,632.34
2 - Smoke Detector 11.00 11.00 - bh Rp 745,944.28 Rp 8,205,387.05
3 - Fix Detector 1.00 1.00 - bh Rp 307,329.04 Rp 307,329.04
4 Indicator lamp 1.00 1.00 - titik Rp 1,243,240.46 Rp 1,243,240.46
5 Break Glass Alarm ( Manual Call Point) 1.00 1.00 - titik Rp 318,269.56 Rp 318,269.56
6 Monitor modul for Indicator & Horn-Strobe - - - titik Rp 2,188,103.21 Rp -
7 End Of Line ( EOL ) 3.00 3.00 - bh Rp 45,208.74 Rp 135,626.23
8 Terminal BOX FA 1.00 1.00 - ttk Rp 569,717.27 Rp 569,717.27
9 Instalasi Fire Alarm Kabel NYA 2 x 1,5 mm² dalam conduit PVC HI 20 mm² 20.00 20.00 - titik Rp 303,000.00 Rp 6,060,000.00
10 Instalasi Manual Push Button, Alarm Bell, Indicator Lamp NYM 2 X 1,5 mm² da 3.00 3.00 - titik Rp 647,514.70 Rp 1,942,544.09
SUB TOTAL (IV) PEKERJAAN INSTALASI FIRE ALARM LANTAI 3 Sub Jumlah Rp 21,240,746.06
TOTAL (I,II,III,IV) PEKERJAAN FIRE ALARM TOTAL Rp 99,724,814.66

FIRE ALARM 30 / 58
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020

PEKERJAAN TELEPHONE

VOLUME JUMLAH
HARGA SATUAN
NO. JENIS PEKERJAAN SAT
( Rp )
KONTRAK MC-0/ADD BALANCE (Rp)
TELEPHONE
I PEKERJAAN PERALATAN UTAMA/PABX
1 Peralatan utama PABX , 8 Trunk line,60 Extention 1.00 - (1.00) unit Rp 46,178,924 Rp 46,178,924
1 Peralatan utama PABX , 8 Trunk line,90 Extention 1.00 1.00 unit Rp 80,400,000 Rp -
2 Terminal Boks c/w LSA 1 x 20 pairs 1.00 1.00 - unit Rp 678,131 Rp 678,131
3 MDF 2x200 peir solderless w/Arrester LSA 20 peir 1.00 1.00 - unit Rp 1,582,306 Rp 1,582,306
4 Back up baterry / UPS 1.00 1.00 - unit Rp 8,001,948 Rp 8,001,948
5 Testing commisioning 1.00 1.00 - ls Rp 4,520,874 Rp 4,520,874
Sub Jumlah Rp 60,962,183
II PEKERJAAN INSTALASI TELEPHONE LANTAI - 1
1 Terminal Boks c/w LSA 1 x 20 pairs 1.00 1.00 - unit Rp 678,131 Rp 678,131
2 Outlet telephon 3.00 3.00 - bh Rp 76,855 Rp 230,565
3 Instalasi telepon 3.00 3.00 - titik Rp 516,928 Rp 1,550,783
4 Kabel fedeer 20 peir TB lt 1 ke MDF 55.00 - (55.00) m' Rp 56,827 Rp 3,125,507
5 Kabel fedeer 4 peir TB lt 1 ke MDF 55.00 55.00 m' Rp 17,060 Rp -
5 IDF 4 peir solderless 1.00 1.00 - unit Rp 226,044 Rp 226,044
Sub Jumlah Rp 5,811,029
III PEKERJAAN INSTALASI TELEPHONE LANTAI - 2
1 Terminal Boks c/w LSA 1 x 80 pairs 1.00 1.00 - unit Rp 678,131 Rp 678,131
2 Outlet telephon 51.00 51.00 - bh Rp 76,855 Rp 3,919,598
3 Instalasi telepon 51.00 51.00 - titik Rp 516,928 Rp 26,363,315
4 Kabel fedeer 4 peir TB lt 1 ke MDF 25.00 - (25.00) m' Rp 84,269 Rp 2,106,727
4 Kabel fedeer 60 peir TB lt 2 ke MDF 25.00 25.00 m' Rp 148,758 Rp -
5 IDF 4 peir solderless 1.00 1.00 - unit Rp 226,044 Rp 226,044
Sub Jumlah Rp 33,293,816
III PEKERJAAN INSTALASI TELEPHONE LANTAI - 3
1 Terminal Boks c/w LSA 1 x 80 pairs 1.00 1.00 - unit Rp 678,131 Rp 678,131
2 Outlet telephon 26.00 26.00 - bh Rp 76,855 Rp 1,998,226
3 Instalasi telepon 26.00 26.00 - titik Rp 516,928 Rp 13,440,121
4 Kabel fedeer 4 peir TB lt 1 ke MDF 32.00 (32.00) m' Rp 84,269 Rp 2,696,611
4 Kabel fedeer 30 peir TB lt 3 ke MDF 12.00 12.00 m' Rp 78,212 Rp -
5 IDF 4 peir solderless 1.00 1.00 - unit Rp 226,044 Rp 226,044
Sub Jumlah Rp 19,039,134
TOTAL PEKERJAAN TELEPHONE TOTAL Rp 119,106,162

TELEPON 31 / 58
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020

PEKERJAAN DATA LAN

VOLUME JUMLA
NO. JENIS PEKERJAAN SAT HARGA
KONTRAK MC-0 / ADD BALANCE KONTRAK

PEKERJAAN LAN ( INSTALASI DATA)


I PERALATAN UTAMA LAN INSTALASI DATA
1 Rack kabinet 1.00 1.00 - unit Rp 15,144,929.27 Rp 15,144,929.27
3 Fiber optic cable 200.00 200.00 - m Rp 59,539.92 Rp 11,907,983.20
Sub Jumlah Rp 27,052,912.47
II PEKERJAAN INSATALASI DATA LANTAI 1 s/d 3
1 Outlet Data, icl. Trimping Patch Cord RJ 45 43.00 83.00 40.00 bh Rp 131,105.36 Rp 5,637,530.39
2 Instalasi kabel UTP Cat 6e 43.00 83.00 40.00 ttk Rp 756,738.62 Rp 32,539,760.62
3 Switch HUB 24 port 3.00 4.00 1.00 unit Rp 4,385,248.18 Rp 13,155,744.53
4 Patch Panel 24 port 3.00 4.00 1.00 unit Rp 2,486,480.93 Rp 7,459,442.78
Sub Jumlah Rp 58,792,478.32
TOTAL Rp 85,845,390.79

DATA 32 / 58
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020
PEKERJAAN CCTV

VOLUME JUMLAH
HARGA SATUAN
NO. JENIS PEKERJAAN SAT
( RP )
KONTRAK MC-0/ADD BALANCE KONTRAK

PEKERJAAN INSTALASI CCTV


I PERALATAN UTAMA
1 DVR multiplexer 16 Chanel 2 Tera byte 2.00 2.00 - unit Rp 15,782,111.80 Rp 31,564,223.61
HDMI Splitter 1 : 5 1.00 1.00 unit Rp 1,450,000.00 Rp -
Instalasi Kabel DVR 1.00 1.00 ls Rp 3,500,000.00 Rp -
3 Rack cabinet 1.00 1.00 - ls Rp 8,815,705.10 Rp 8,815,705.10
4 Monitor LCD 32" 5.00 5.00 - unit Rp 3,481,073.30 Rp 17,405,366.48
5 UPS 2KVA + External Battery 1.00 1.00 - unit Rp 11,302,186.03 Rp 11,302,186.03
Sub Jumlah Rp 69,087,481.22
II PEKERJAAN INSTALASI CCTV LANTAI- 1
Fixed Dome Camera With Housing 5.00 5.00 - titik Rp 2,862,782.65 Rp 14,313,913.27
Stand Fixed Camera Wiht Housing 3.00 2.00 (1.00) titik Rp 3,213,327.47 Rp 9,639,982.41
Instalasi CCTV Coaxial Cable RG6 + NYYHy 2 x 1.5 mm² dalam conduit PVC 20 mm² 8.00 7.00 (1.00) titik Rp 1,173,331.92 Rp 9,386,655.35
Sub Jumlah Rp 33,340,551.03
III PEKERJAAN INSTALASI CCTV LANTAI- 2
Fixed Dome Camera With Housing 4.00 4.00 - titik Rp 3,213,327.47 Rp 12,853,309.88
Instalasi CCTV Coaxial Cable RG6 + NYYHy 2 x 1.5 mm² dalam conduit PVC 20 mm² 4.00 4.00 - titik Rp 1,173,331.92 Rp 4,693,327.68
Sub Jumlah Rp 17,546,637.55
IV PEKERJAAN INSTALASI CCTV LANTAI- 3
Fixed Dome Camera With Housing 3.00 4.00 1.00 titik Rp 3,213,327.47 Rp 9,639,982.41
Instalasi CCTV Coaxial Cable RG6 + NYYHy 2 x 1.5 mm² dalam conduit PVC 20 mm² 3.00 4.00 1.00 titik Rp 1,173,331.92 Rp 3,519,995.76
Sub Jumlah Rp 13,159,978.17
TOTAL Rp 133,134,647.97

CCTV 33 / 58
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020

PEKERJAAN SOUND
VOLUME HARGA SATUAN JUMLA
NO. JENIS PEKERJAAN SAT
( RP )
KONTRAK MC-0/ADD BALANCE KONTRAK

E PEKERJAAN SOUND SISTEM


I PERALATAN UTAMA
PEKERJAAN INSTALASI SOUND R.SERVER
Pengadaan dan pemasangan sistem SOUND lengkap dengan
semua acessories yang di perlukan ( Sesuai Gambar )

1 Mixer Pre-Amplifier TOA Z-FV200PP-AS 1.00 1.00 - Unit Rp 13,575,643 Rp 13,575,643


2 Emergency Control Panel TOA Z-FV200EV-AS 1.00 1.00 - Unit Rp 12,385,071 Rp 12,385,071
3 Power Amplifier 240W TOA ZP-2240 4.00 4.00 - Unit Rp 4,732,135 Rp 18,928,539
4 Speaker Selector 10 Zone TOA Z-SS1010R 2.00 2.00 - Unit Rp 4,679,105 Rp 9,358,210
5 Graphic Equalizer DBX 231 1.00 1.00 - Unit Rp 3,481,073 Rp 3,481,073
6 Pre-Record Message TOA EV-20R 1.00 1.00 - Unit Rp 14,410,604 Rp 14,410,604
7 CD/MP3/USB Player + FM Tuner TOA Z-CD2011 1.00 1.00 - Unit Rp 6,238,807 Rp 6,238,807
8 Paging Microphone c/w Keypad TOA RM-200M 1.00 1.00 - Unit Rp 7,008,260 Rp 7,008,260
9 Change Over Switch Lokal 1.00 1.00 - Unit Rp 3,164,612 Rp 3,164,612
10 Cabinet Rack 23U c/w Accessories Lokal 1.00 1.00 - Set Rp 8,815,705 Rp 8,815,705
Car Call
1 Mixer Pre-Amplifier TOA ZA-2120 1.00 1.00 - Unit Rp 4,367,165 Rp 4,367,165
2 Graphic Equalizer DBX 231 1.00 1.00 - Unit Rp 3,481,073 Rp 3,481,073
3 Power Amplifier 240W TOA ZP-2240 1.00 1.00 - Unit Rp 4,732,135 Rp 4,732,135
4 Paging Microphone TOA ZM-380C-AS 1.00 1.00 - Unit Rp 1,923,632 Rp 1,923,632
5 Cabinet 15U c/w Accessories Lokal 1.00 1.00 - Set Rp 7,097,773 Rp 7,097,773

SUB TOTAL (I) PEKERJAAN INSTALASI SOUND Sub Jumlah Rp 118,968,302


II PEKERJAAN INSTALASI SOUND LANTAI 2
Pengadaan dan pemasangan sistem SOUND lengkap dengan
semua acessories yang di perlukan
Ceiling Speaker 8.00 8.00 - unit Rp 169,081 Rp 1,352,646
Atteunator 2.00 2.00 - unit Rp 154,162 Rp 308,324
Horn Speaker 2.00 2.00 - unit Rp 691,694 Rp 1,383,388
Instalasi kabel NYMHY 2 X 1,5 mm² dalam conduit PVC HI 20 mm² 10.00 12.00 2.00 titik Rp 1,752,724 Rp 17,527,241
SUB TOTAL (II) PEKERJAAN INSTALASI SOUND Sub Jumlah Rp 20,571,598
III PEKERJAAN INSTALASI SOUND LANTAI 2
Pengadaan dan pemasangan sistem SOUND lengkap dengan
semua acessories yang di perlukan
Ceiling Speaker 10.00 10.00 - unit Rp 169,081 Rp 1,690,807
Atteunator 2.00 2.00 - unit Rp 154,162 Rp 308,324
Instalasi kabel NYMHY 2 X 1,5 mm² dalam conduit PVC HI 20 mm² 12.00 12.00 - titik Rp 1,752,724 Rp 21,032,689
SUB TOTAL (II) PEKERJAAN INSTALASI SOUND Sub Jumlah Rp 23,031,820
IV PEKERJAAN INSTALASI SOUND LANTAI 3
Pengadaan dan pemasangan sistem SOUND lengkap dengan
semua acessories yang di perlukan
Ceiling Speaker 12.00 12.00 - unit Rp 169,081 Rp 2,028,968
Atteunator 2.00 2.00 - unit Rp 154,162 Rp 308,324
Instalasi kabel NYMHY 2 X 1,5 mm² dalam conduit PVC HI 20 mm² 14.00 14.00 - titik Rp 1,752,724 Rp 24,538,137
SUB TOTAL (III) PEKERJAAN INSTALASI SOUND Sub Jumlah Rp 26,875,429
TOTAL (I,II,III) PEKERJAAN SOUND TOTAL Rp 189,447,148

TATA SUARA 34 / 58
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020

PEKERJAAN PENTANAHAN

VOLUME JUMLAH HARGA ( Rp )


HARGA SATUAN
NO. JENIS PEKERJAAN SAT
KONTRAK MC-0/ADD BALANCE ( RP ) KONTRAK MC-0/ADD BALANCE

PEKERJAAN PENTANAHAN
I PERALATAN UTAMA
1 Pemasangan Splitzen 4.00 4.00 4.00 unit Rp 290,000.00 Rp 1,160,000.00 Rp 1,160,000.00 Rp -
2 Cabel BC 50mm ( GROUNDING ) 50.00 50.00 50.00 m' Rp 106,900.43 Rp 5,345,021.34 Rp 5,345,021.34 Rp -
3 Box Grounding , terdiri dari : 3.00 3.00 3.00 set Rp 3,955,765.11 Rp 11,867,295.33 Rp 11,867,295.33 Rp -
- PIPA TEMBAGA 5/8 inch
- Busbar tembaga c/w accessories
4 Perijinan DEPNAKER 1.00 1.00 1.00 ls Rp 2,900,000.00 Rp 2,900,000.00 Rp 2,900,000.00 Rp -

5 Testing dan commissioning 1.00 1.00 1.00 set Rp 1,695,327.90 Rp 1,695,327.90 Rp 1,695,327.90 Rp -

Sub Jumlah Rp 22,967,644.57 Rp 22,967,644.57 Rp -


TOTAL Rp 22,967,644.57 Rp 22,967,644.57 Rp -

PENANGKAL PETIR 35 / 58
Title : Pekerjaan Plumbing
Project : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
Lokasi : jl. Kumala 128 Makassar

VOLUME JUMLAH HARGA ( Rp )


NO. JENIS PEKERJAAN SAT HARGA
KONTRAK MC-0 / ADD BALANCE KONTRAK MC-0 / ADD BALANCE

I. Pekerjaan Lain-lain (Non Standar)


- Pemindahan meteran air 1 1 0 lsm Rp 5,085,984 Rp 5,085,984 Rp 5,085,984 Rp -
Rp -
II. Pekerjaan Plumbing :
A Pekerjaan Pengadaan Peralatan Utama
1 Peralatan Sistem Air Bersih
Delivery Pump 1 1 0 unit Rp 6,724,801 Rp 6,724,801 Rp 6,724,801 Rp -
Tipe : Centrifugal End Suction Pump
Kapasitas : 50 liter/menit
Head : 50 m
Daya : ± 0,8 kW
Karakt. Listrik : 220/380 V, 3 phase, 50 Hz
Panel kontrol berikut pengabelan dan perlengkapan

2 Peralatan Sistem Air Bersih


Delivery Pump (dari sumur lama) 1 1 0 unit Rp 5,379,841 Rp 5,379,841 Rp 5,379,841 Rp -
Tipe : Centrifugal End Suction Pump
Kapasitas : 50 liter/menit
Head : 40 m
Daya : ± 0,8 kW
Karakt. Listrik : 220/380 V, 3 phase, 50 Hz
Panel kontrol berikut pengabelan dan perlengkapan

3 Pompa Supply 1 1 0 unit Rp 2,073,951 Rp 2,073,951 Rp 2,073,951 Rp -


Tipe : Centrifugal End Suction Pump
Kapasitas : 25 LPM
Head : 30m
Daya : 0,55 kw
Karakt. Listrik : 220/380 V,phase, 50 Hz
Panel kontrol berikut pengabelan dan perlengkapan

4 Booster Pump 1 1 0 set Rp 5,275,860 Rp 5,275,860 Rp 5,275,860 Rp -


Variable Speed Constant Pressure Packaged unit, lengkap
satu paket dengan Pressure Tank (PT) dan perlengkapannya dari Walrus/setara
Tipe : Centrifugal End Suction Pump
Kapasitas : 70 Lpm
Head : 28m
Daya : 0,37 kw
Karakt. Listrik : 220/380 V, 3 phase, 50 Hz
Panel kontrol berikut pengabelan dan perlengkapan

PLUMBING 36 / 58
Title : Pekerjaan Plumbing
Project : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
Lokasi : jl. Kumala 128 Makassar

VOLUME JUMLAH HARGA ( Rp )


NO. JENIS PEKERJAAN SAT HARGA
5 Roof Tank 2 2 0 unit Rp 4,407,853 Rp 8,815,705 Rp 8,815,705 Rp -
Tipe : Tank Vertical
Kapasitas : 2x1000 liter
Material : Fibre Glass
Kelengkapan : Man hole, pipa drain, pipa over flow,

Material , stop kran, dan alat bantu lainnya 1 1 1 lot Rp 13,562,623 Rp 13,562,623 Rp 13,562,623 Rp -
Sub Jumlah Pekerjaan Peralatan Utama - Plumbing Rp 41,832,781 Rp 41,832,781 Rp -

B Pekerjaan Instalasi Plumbing Lantai 1


1 Pekerjaan Pipa Air Bersih dan perlengkapan
Pemipaan
Bahan PVC AW
Diameter 15 mm 51 51 0 M Rp 30,441 Rp 1,552,478 Rp 1,552,478 Rp -
20 mm 29 29 0 M Rp 31,342 Rp 908,921 Rp 908,921 Rp -
25 mm 100 100 0 M Rp 37,869 Rp 3,786,910 Rp 3,786,910 Rp -
50 mm - - 0 M Rp 53,000 Rp - Rp - Rp -
Fitting-fitting, accessories dan finishing Lot Include Include Inckude Include
2 Valve-valve 125 psi
Gate valve SS
Diameter 20 mm 6 6 0 Buah Rp 314,000 Rp 1,884,000 Rp 1,884,000 Rp -
25 mm 4 4 0 Buah Rp 404,000 Rp 1,616,000 Rp 1,616,000 Rp -
50 mm - - 0 Buah Rp 970,000 Rp - Rp - Rp -

3 Pekerjaan Pipa Air Kotor, Air Buangan, Vent dan perlengkapan


Pemipaan
Bahan PVC Kelas AW
Diameter 40 mm 4 4 0 m Rp 43,035 Rp 172,139 Rp 172,139 Rp -
50 mm 19 19 0 m Rp 53,000 Rp 1,007,000 Rp 1,007,000 Rp -
80 mm 13 13 0 m Rp 80,000 Rp 1,040,000 Rp 1,040,000 Rp -
100 mm 41 41 0 m Rp 126,000 Rp 5,166,000 Rp 5,166,000 Rp -
150 mm 77 77 0 m Rp 242,000 Rp 18,634,000 Rp 18,634,000 Rp -
Bahan PVC Kelas D
Diameter 32 mm 16 16 0 m Rp 28,000 Rp 448,000 Rp 448,000 Rp -
50 mm 24 24 0 m Rp 33,000 Rp 792,000 Rp 792,000 Rp -

Fitting-fitting, stop kran, accessories dan finishing Lot Include Include Inckude Include
Clean Out
Diameter 100mm 6 6 0 Buah Rp 413,000 Rp 2,478,000 Rp 2,478,000 Rp -

Sub Jumlah Pekerjaan Lantai 1 - Plumbing Rp 39,485,448 Rp 39,485,448 Rp -

C Pekerjaan Instalasi Plumbing Lantai 2


1 Pekerjaan Pipa Air Bersih dan perlengkapan

PLUMBING 37 / 58
Title : Pekerjaan Plumbing
Project : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
Lokasi : jl. Kumala 128 Makassar

VOLUME JUMLAH HARGA ( Rp )


NO. JENIS PEKERJAAN SAT HARGA
Pemipaan
Bahan : Pvc AW
Diameter
15 mm 40 40 0 M Rp 30,441 Rp 1,217,630 Rp 1,217,630 Rp -
20 mm 12 12 0 M Rp 31,342 Rp 376,105 Rp 376,105 Rp -
25 mm 16 16 0 M Rp 37,869 Rp 605,906 Rp 605,906 Rp -
50 mm - - 0 M Rp 53,000 Rp - Rp - Rp -
Fitting-fitting, stop kran, accessories dan finishing Lot Include Include Inckude Include
2 Valve-valve 125 psi
Gate valve SS
Diameter 25 mm 2 2 0 Buah Rp 404,000 Rp 808,000 Rp 808,000 Rp -
3 Pekerjaan Pipa Air Kotor, Air Buangan, Vent dan perlengkapan
Pemipaan
Bahan PVC Kelas AW
Diameter 40 mm 8 8 0 M Rp 43,035 Rp 344,278 Rp 344,278 Rp -
50 mm 10 10 0 M Rp 53,000 Rp 530,000 Rp 530,000 Rp -
80 mm 8 8 0 M Rp 80,000 Rp 640,000 Rp 640,000 Rp -
100 mm 16 16 0 M Rp 126,000 Rp 2,016,000 Rp 2,016,000 Rp -
Bahan PVC Kelas D
Diameter 32 mm 16 16 0 m Rp 28,000 Rp 448,000 Rp 448,000 Rp -
50 mm 14 14 0 m Rp 33,000 Rp 462,000 Rp 462,000 Rp -
Fitting-fitting,stop kran, accessories dan finishing Lot Include Include Inckude Include
Clean Out
Diameter
- Ø 4" 3 3 0 Buah Rp 413,000 Rp 1,239,000 Rp 1,239,000 Rp -

Sub Jumlah Pekerjaan Lantai 2 - Plumbing Rp 8,686,919 Rp 8,686,919 Rp -

D Pekerjaan Instalasi Plumbing Lantai 3


1 Pekerjaan Pipa Air Bersih dan perlengkapan
Pemipaan
Bahan : Pvc AW
Diameter
15 mm 56 56 0 M Rp 30,441 Rp 1,704,682 Rp 1,704,682 Rp -
20 mm 10 10 0 M Rp 31,342 Rp 313,421 Rp 313,421 Rp -
25 mm 29 29 0 M Rp 37,869 Rp 1,079,269 Rp 1,079,269 Rp -
50 mm - - 0 M Rp 53,000 Rp - Rp - Rp -
Fitting-fitting, accessories dan finishing 1 1 0 Lot Include Include Inckude Include
2 Valve-valve 125 psi
Gate valve SS
Diameter 25mm 3 3 0 Buah Rp 404,000 Rp 1,212,000 Rp 1,212,000 Rp -
3 Pekerjaan Pipa Air Kotor, Air Buangan, Vent dan perlengkapan
Pemipaan
Bahan PVC Kelas AW

PLUMBING 38 / 58
Title : Pekerjaan Plumbing
Project : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
Lokasi : jl. Kumala 128 Makassar

VOLUME JUMLAH HARGA ( Rp )


NO. JENIS PEKERJAAN SAT HARGA
Diameter 40 mm 6 6 0 M Rp 43,035 Rp 258,209 Rp 258,209 Rp -
50 mm 15 15 0 M Rp 53,000 Rp 795,000 Rp 795,000 Rp -
80 mm 8 8 0 M Rp 80,000 Rp 640,000 Rp 640,000 Rp -
100 mm 8 8 0 M Rp 126,000 Rp 1,008,000 Rp 1,008,000 Rp -
Bahan PVC Kelas D
Diameter 32 mm 8 8 0 m Rp 28,000 Rp 224,000 Rp 224,000 Rp -
50 mm 10 10 0 m Rp 33,000 Rp 330,000 Rp 330,000 Rp -
Fitting-fitting, stop kran, accessories dan finishing Lot Include Include Inckude Include
Clean Out
Diameter
100 mm 3 3 0 Buah Rp 413,000 Rp 1,239,000 Rp 1,239,000 Rp -
Sub Jumlah Pekerjaan Lantai 3 - Plumbing Rp 8,803,581 Rp 8,803,581 Rp -

E Pekerjaan Instalasi Plumbing Lantai Atap


1 Pekerjaan Pipa Air Bersih dan perlengkapan
Pemipaan
Bahan : Pvc AW
Diameter
25 mm 122 122 0 M Rp 37,869 Rp 4,620,031 Rp 4,620,031 Rp -
32 mm 8 8 0 M Rp 40,155 Rp 321,241 Rp 321,241 Rp -
Fitting-fitting, accessories dan finishing Lot Include Include Inckude Include
2 Valve-valve 125 psi
Gate valve SS
Diameter 25mm 14 14 0 Buah Rp 404,000 Rp 5,656,000 Rp 5,656,000 Rp -

Sub Jumlah Pekerjaan Lantai Atap - Plumbing Rp 10,597,272 Rp 10,597,272 Rp -


E Pekerjaan Instalasi Air Hujan
1 RD SS Dia 3" dari San Ei/ setara 10 10 0 buah Rp 301,000 Rp 3,010,000 Rp 3,010,000 Rp -

2 Pemipaan
Bahan PVC Kelas AW
Diameter 80 mm 78 78 0 M1 Rp 80,000 Rp 6,268,000 Rp 6,268,000 Rp -
100 mm 97 97 0 M1 Rp 126,000 Rp 12,247,200 Rp 12,247,200 Rp -
125 mm M1 Rp 159,000 Rp - Rp - Rp -
150 mm 81 81 0 M1 Rp 242,000 Rp 19,602,000 Rp 19,602,000 Rp -
Fitting-fitting, accessories dan finishing 1 1 0 Lot Include Include Inckude Include
Clean Out
Diameter
100 mm 7 7 0 buah Rp 413,000 Rp 2,891,000 Rp 2,891,000 Rp -

Sub Jumlah Pekerjaan Pembuangan Air Hujan Bangunan dan Site Rp 44,018,200 Rp 44,018,200 Rp -

Total Pekerjaan Plumbing Rp 153,424,200 Rp 153,424,200 Rp -

PLUMBING 39 / 58
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA (PERSERO) CABANG MAKASSAR
LOKASI : JL.KUMALA NO 128 - MAKASAR
TAHUN ANGGARAN : 2020

PEKERJAAN GENSET

VOLUME JUMLAH HARGA ( Rp )


NO. JENIS PEKERJAAN SAT HARGA
KONTRAK MC-0 / ADD BALANCE KONTRAK MC-0 / ADD BALANCE

PEKERJAAN GENSET

I
PERALATAN UTAMA

1 1.00 1.00 - unit Rp 214,741,534.50 Rp 214,741,534.50 Rp 214,741,534.50 Rp -


BP-30 kap 30kVA ( type SILENT ) merk FPT ITALY

2 52.00 52.00 - m' Rp 866,000.00 Rp 45,032,000.00 Rp 45,032,000.00 Rp -


Feeder NYY 4c-95mm (incl Grounding )

3 2.00 2.00 - set Rp 5,199,005.57 Rp 10,398,011.14 Rp 10,398,011.14 Rp -


Box Grounding ( genset & body genset ), terdiri dari :

- PIPA TEMBAGA 5/8 inch

- Busbar tembaga c/w accessories

4 1.00 1.00 - ls Rp 9,000,000.00 Rp 9,000,000.00 Rp 9,000,000.00 Rp -


SLO

5 Testing dan commissioning 1.00 1.00 - set Rp 8,476,639.52 Rp 8,476,639.52 Rp 8,476,639.52 Rp -

Sub Jumlah Rp 287,648,185.16 Rp 287,648,185.16 Rp -

TOTAL Rp 287,648,185.16 Rp 287,648,185.16 Rp -

GENSET 40 / 58
ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
Pembangunan Gedung PT Surveyor Indonesia Cabang Makassar

NO URAIAN PEKERJAAN SATUAN QTY HARGA SATUAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN
Pembersihan Lokasi

01 Pengukuran dan Bouwplank m' 1 Rp 14,127,732.53


m' 1 Rp 14,127,732.53 Rp 14,127,732.53

02 Kantor Direksi di Lapangan


Bangunan Triplek, Lantai Keramik Atap Seng Gelombang (SEWA) ls 1 Rp 10,567,543.93 Rp 10,567,543.93

03 Gudang Bahan dan Los Kerja


Bangunan Triplek, Lantai rabat Atap Seng Gelombang (SEWA) m2 1 Rp 621,620.23 Rp 621,620.23

04 Papan Nama
Papan Nama Proyek bh 1 Rp 282,554.65 Rp 282,554.65

05 Laporan Mingguan, Bulanan, Progress dan Laporan Lainnya


Cetak Foto sesuai Progress dan laporan set 1 Rp 3,390,655.81 Rp 3,390,655.81

06 Pengadaan Sumber Air bulan 1 Rp 9,889,412.77


Suplay Air bersih dengan truck Tank @ 5000 ltr ls 1 Rp 56,510,930.13 Rp 56,510,930.13
Pengadaan Peralatan Bantu seperti Slang Air, Tanki Portabel dan
ls 1 Rp 22,604,372.05 Rp 22,604,372.05
Pompa Air
Jumlah Rp 79,115,302.18

07 Pengadaan Tenaga Listrik bulan 1 Rp 21,191,598.80


Sambungan PLN Sementara 33 KVA ls 1 Rp 113,021,860.26 Rp 113,021,860.26
Kabel-kabel dan Lampu ls 1 Rp 11,302,186.03 Rp 11,302,186.03
Biaya Bulanan PLN bln 8 Rp 5,651,093.01 Rp 45,208,744.10
Jumlah Rp 169,532,790.39

08 Pagar sementara Proyek


Pagar pengaman proyek T=180 (keliling site) m' 1 Rp 226,043.72 Rp 226,043.72

09 Pekerjaan Perancah keliling +Jaring pengaman m2 1 Rp 10,171,967.42 Rp 10,171,967.42

10 Pembuatan Shop Drawing dan Asbuilt Drawing ls Rp 8,476,639.52


Shop Drawing Biaya Cetak dan Penggandaan (4 Set) ls 1 Rp 5,651,093.01 Rp 5,651,093.01
As Built Biaya Cetak dan Penggandaan (3 Set) ls 1 Rp 2,825,546.51 Rp 2,825,546.51

11 Akomodasi Rapat Lapangan ls 1 Rp 14,127,732.53 Rp 14,127,732.53

12 Biaya K3 ls Rp 51,764,577.11
a) Alat Pelindung Diri (Helm, Sepatu Safety, Tali Pengaman)
1 Penyusunan dokumen K3 ls 1 Rp 4,956,008.57 Rp 4,956,008.57
2 Helm buah 80 Rp 28,255.47 Rp 2,260,437.21
3 Full body harnes buah 6 Rp 395,576.51 Rp 2,373,459.07
4 Safety line / police line buah 10 Rp 111,609.09 Rp 1,116,090.87
5 P3K/ruang poliklinik buah/set 1 Rp 1,858,644.49 Rp 1,858,644.49
6 Sepatu boat buah 100 Rp 68,378.23 Rp 6,837,822.55
7 Rompi keselamatan buah 100 Rp 24,864.81 Rp 2,486,480.93
8 Tempat sampah set/drum 8 Rp 74,594.43 Rp 596,755.42
9 Sarung tangan buah 100 Rp 4,520.87 Rp 452,087.44
10 Sepatu safety (kantor) buah 7 Rp 339,065.58 Rp 2,373,459.07
11 Papan informasi K3 buah 2 Rp 495,600.86 Rp 991,201.71
12 Tongkat pengatur lalu lintas buah 2 Rp 99,176.68 Rp 198,353.36
13 Kerucut lalu lintas buah 8 Rp 215,589.20 Rp 1,724,713.59
14 Bendera PT CMC buah 1 Rp 74,594.43 Rp 74,594.43
15 Bendera K3 buah 1 Rp 74,594.43 Rp 74,594.43
16 Bendera merah putih buah 1 Rp 74,594.43 Rp 74,594.43
17 lampu darurat buah 2 Rp 867,442.78 Rp 1,734,885.56
18 Emergency ls 0 Rp 18,584,749.59 Rp -
19 APAR 3 kg buah 8 Rp 361,952.51 Rp 2,895,620.06
20 Kacamata Las buah 5 Rp 62,162.02 Rp 310,810.12
21 Tameng muka las buah 6 Rp 101,719.67 Rp 610,318.05
22 Lampu senter buah 2 Rp 185,920.96 Rp 371,841.92
23 Stiker orang 100 Rp 12,432.40 Rp 1,243,240.46

Covid 19
1 Termo gun buah 2 Rp 847,663.95 Rp 1,695,327.90
2 Tempat cuci tangan (sabun) / hand sanitizer buah 2 Rp 1,858,644.49 Rp 3,717,288.98
3 Masker box 15 Rp 161,338.71 Rp 2,420,080.58
4 Face Shield Mask buah 100 Rp 18,648.61 Rp 1,864,860.69
5 Penyemprotan Disinfektan ls 1 Rp 1,858,644.49 Rp 1,858,644.49

e) Rambu-rambu K3
1 Banner awas kejatuhan 80x80 buah 8 Rp 86,744.28 Rp 693,954.22
2 Banner wajib apd 60x90 buah 6 Rp 74,594.43 Rp 447,566.57
3 Banner jagalah kebersihan proyek 80x80 buah 6 Rp 86,744.28 Rp 520,465.67
4 Banner no telp darurat 60x90 buah 4 Rp 74,594.43 Rp 298,377.71
5 Banner awas tegangan tinggi 40x60 buah 6 Rp 74,594.43 Rp 447,566.57
6 Banner awas ada lubang 40x60 buah 6 Rp 74,594.43 Rp 447,566.57
7 Banner Maaf aktifitas anda terganggu 100x120 buah 9 Rp 99,176.68 Rp 892,590.14
8 Banner kendaraan keluar masuk proyek 100x120 buah 4 Rp 99,176.68 Rp 396,706.73
9 Rambu Petunjuk 60x90 buah 4 Rp 74,594.43 Rp 298,377.71
10 Rambu Larangan 60x90 buah 2 Rp 74,594.43 Rp 149,188.86

13 Asuransi Pekerjaan, Pemberi Tugas dan Wakil Konsultan ls 1 Rp 33,906,558.08 Rp 33,906,558.08

14 Mobilisasi dan Demobilisasi ls Rp 56,510,930.13


Mobilisasi dan Demobilasasi Peralatan Kerja ls 1 Rp 28,255,465.07 Rp 28,255,465.07
Mobilisasi dan Demobilasasi Tenaga Kerja ls 1 Rp 28,255,465.07 Rp 28,255,465.07

15 Keamanan, koordinasi lingkungan sekitar dan aparat bln 8 Rp 4,520,874.41 Rp 36,166,995.28

ANL-PERSIAPAN 41 / 58
ANALISA PEKERJAAN STRUKTUR

A.1 Pengecoran Ready Mix 1 m3 beton mutu K-350


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Cor Ready Mix m3 1.0000 152,550.00 152,550.00
JUMLAH TENAGA KERJA 152,550.00
B BAHAN
Ready Mix K-350 m3 1.1000 883,600.00 971,960.00
JUMLAH HARGA BAHAN 971,960.00
C PERALATAN -

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,124,510.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 1,124,510.00

A.2 Pembesian 10 kg dengan besi ulir/polos


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pembesian kg 10.0000 1,950.00 19,500.00
JUMLAH TENAGA KERJA 19,500.00
B BAHAN
Besi Beton ulir / Polos kg 10.5000 9,000.00 94,500.00
Kawat beton kg 0.1500 11,300.00 1,695.00
JUMLAH HARGA BAHAN 96,195.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 115,695.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 115,695.00
G Per KG 11,569.50

A.3 (K3) Pemasangan 1 m2 bekisting pile cap


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Bekisting Pile Cap
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Kayu kelas III m3 0.0225 1,808,300.00 40,686.75
Paku 5 - 10 cm kg 0.3000 19,200.00 5,760.00
Minyak bekisting Liter 0.1000 16,950.00 1,695.00
JUMLAH HARGA BAHAN 2.00 48,141.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 98,991.75
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 98,991.00

A.4 (K3) Pemasangan 1 m2 bekisting untuk sloof


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Bekisting Sloof
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Kayu kelas III m3 0.0225 1,808,300.00 40,686.75
Paku 5 - 10 cm kg 0.3000 19,200.00 5,760.00
Minyak bekisting Liter 0.1000 16,950.00 1,695.00
JUMLAH HARGA BAHAN 2.00 48,141.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 98,991.75
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 98,991.00

A.5 Penggalian 1 m3 tanah biasa sedalam 1 m


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Upah Pekerjaan Penggalian
m3 1.0000 124,300.00 124,300.00
Tanah Pondasi
JUMLAH TENAGA KERJA 124,300.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 124,300.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 124,300.00

A.6 Pengurugan 1 m3 dengan pasir urug


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Upah Pekerjaan Pengurugan
M3 1.0000 50,850.00 50,850.00
Pasir Bawah Pondasi
JUMLAH TENAGA KERJA 50,850.00
B BAHAN -
Pasir Urug M3 1.2000 146,900.00 176,280.00
JUMLAH HARGA BAHAN 176,280.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 227,130.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 227,130.00

A.7 Membuat 1 m3 lantai kerja beton mutu K-125 t = 5cm


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Cor In Situ m3 1.0000 152,550.00 152,550.00
JUMLAH TENAGA KERJA 152,550.00
B BAHAN
Semen portland kg 276.0000 1,550.00 427,800.00
Pasir Beton m3 0.5914 333,400.00 197,182.29
Kerikil (Maks 30 mm) m3 0.7496 169,500.00 127,062.22
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 762,794.51
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 915,344.51
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 915,344.00

A.8 Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Upah Pekerjaan Penggalian
m3 0.3333 50,850.00 16,950.00
Tanah Pondasi
JUMLAH TENAGA KERJA 16,950.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,950.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 16,950.00

A.9 (K3) Pemasangan 1 m2 bekisting untuk kolom


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Bekisting Kolom
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Kayu kelas III m3 0.0200 1,808,300.00 36,166.00
Paku 5 - 12 cm kg 0.4000 19,200.00 7,680.00
Minyak bekisting Liter 0.2000 16,950.00 3,390.00
Balok kayu kelas II m3 0.0075 2,825,500.00 21,191.25
Multiplex 12 mm 120x240 Lbr 0.1750 169,500.00 29,662.50
Dolken kayu Ø 8-10/400 cm Batang 1.0000 16,950.00 16,950.00
JUMLAH HARGA BAHAN 2.00 115,039.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 165,889.75
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 165,889.00

A.10 Pemasangan 10 kg jaring kawat baja (wiremesh) M.8


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pembesian
kg 10.0000 1,100.00 11,000.00
Wiremesh
JUMLAH TENAGA KERJA 11,000.00
B BAHAN
Wiremesh M.8 kg 10.2000 11,300.00 115,260.00
Kawat beton kg 0.0500 11,300.00 565.00
JUMLAH HARGA BAHAN 115,825.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 126,825.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 126,825.00
G Per KG 12,682.50

A.11 (K3) Pemasangan 1 m2 bekisting untuk tangga


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Bekisting Tangga
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Kayu kelas III m3 0.0150 1,808,300.00 27,124.50
Paku 5 - 12 cm kg 0.4000 19,200.00 7,680.00
Minyak bekisting Liter 0.1500 16,950.00 2,542.50
Balok kayu kelas II m3 0.0075 2,825,500.00 21,191.25
Multiplex 12 mm 120x240 Lbr 0.1750 169,500.00 29,662.50
Dolken kayu Ø 8-10/400 cm Batang 1.0000 16,950.00 16,950.00
JUMLAH HARGA BAHAN 2.00 105,150.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 156,000.75
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 156,000.00

A.12 (K3) Pemasangan 1 m2 bekisting untuk balok


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Bekisting Balok
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Kayu kelas III m3 0.0200 1,808,300.00 36,166.00
Paku 5 - 12 cm kg 0.4000 19,200.00 7,680.00
Minyak bekisting Liter 0.2000 16,950.00 3,390.00
Balok kayu kelas II m3 0.0090 2,825,500.00 25,429.50
Multiplex 12 mm 120x240 Lbr 0.1750 169,500.00 29,662.50
Dolken kayu Ø 8-10/400 cm Batang 1.0000 16,950.00 16,950.00
JUMLAH HARGA BAHAN 2.00 119,278.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 170,128.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 170,128.00

A.13 (K3) Pemasangan 1 m2 bekisting untuk lantai (plat)


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Bekisting Plat Lantai
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Kayu kelas III m3 0.0200 1,808,300.00 36,166.00
Paku 5 - 12 cm kg 0.4000 19,200.00 7,680.00
Minyak bekisting Liter 0.2000 16,950.00 3,390.00
Balok kayu kelas II m3 0.0075 2,825,500.00 21,191.25
Multiplex 12 mm 120x240 Lbr 0.1750 169,500.00 29,662.50
Dolken kayu Ø 8-10/400 cm Batang 3.0000 16,950.00 50,850.00
JUMLAH HARGA BAHAN 2.00 148,939.75
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 199,789.75
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 199,789.00

ANALISA PEKERJAAN ARSITEKTUR STANDARD

B.1 Pemasangan 1m2 Homogenous Tile uk. 600x600 (POLISHED) - Utama


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Homogeneous Tile uk. 600x600
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Homogeneous Tile uk. 60x60
m2 1.1000 135,600.00 149,160.00
(polished)
Semen portland Kg 8.1900 1,550.00 12,694.50
Pasir Pasang M3 0.0450 186,450.00 8,390.25
Nat Keramik Kg 0.2597 11,300.00 2,935.06
JUMLAH HARGA BAHAN 173,179.81
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 224,029.81
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 224,029.00

B.2 Pemasangan 1m2 Homogenous Tile uk.600x600 (UnPolished) Motif Grid Kotak2 - Area Kolam
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Homogeneous Tile uk. 600x600
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Homogeneous Tile uk. 600x600
m2 1.1000 169,500.00 186,450.00
Unpolished Motif Grid Kotak2
Semen portland Kg 8.1900 1,550.00 12,694.50
Pasir Pasang M3 0.0450 186,450.00 8,390.25
Nat Keramik Kg 0.5263 11,300.00 5,947.37
JUMLAH HARGA BAHAN 213,482.12
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 264,332.12
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 264,332.00

B.3 Pemasangan 1 m2 Paving tebal 8 cm - Area Parkir


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Paving Block m2 1.0000 28,250.00 28,250.00
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Paving block t=8cm K-300 M2 1.0100 127,100.00 128,371.00
Abu Batu M3 0.1400 125,000.00 17,500.00
JUMLAH HARGA BAHAN 145,871.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 174,121.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 174,121.00

B.4 Pemasangan 1m2 Pas.Lantai Homogeneous Tile 40x40 cm - Area tangga


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Homogeneous Tile uk. 400x400
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Homogeneous Tile uk. 400x400 m2 1.1000 103,650.00 114,015.00
Semen portland Kg 8.1900 1,550.00 12,694.50
Pasir Pasang M3 0.0450 186,450.00 8,390.25
Nat Keramik Kg 0.2597 11,300.00 2,934.61
JUMLAH HARGA BAHAN 138,034.36
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 188,884.36
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 188,884.00

B.5 Pemasangan 1 m1 Stepnosing 10x40 cm


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m' 0.1480 28,250.00 4,179.87
Stepnosing 10x40
JUMLAH TENAGA KERJA 4,179.87
B BAHAN
Stepnosing 10x40 cm m1 1.1000 103,650.00 114,015.00
Semen portland Kg 0.9300 1,550.00 1,441.50
Pasir Pasang M3 0.0018 186,450.00 335.61
Nat Keramik Kg 0.0526 11,300.00 594.74
JUMLAH HARGA BAHAN 116,386.85
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 120,566.72
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 120,566.00

B.6 Pemasangan 1m2 Homogenous Tile uk. 600x600 (unpolished) - Kamar mandi & Janitor
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Homogeneous Tile uk. 600x600
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Homogeneous Tile uk. 600x600
m2 1.1000 169,500.00 186,450.00
(Unpolished) - KM&Janitor
Semen portland Kg 8.1900 1,550.00 12,694.50
Pasir Pasang M3 0.0450 186,450.00 8,390.25
Nat Keramik Kg 0.2597 11,300.00 2,935.06
JUMLAH HARGA BAHAN 210,469.81
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 261,319.81
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 261,319.00

B.7 Pemasangan 1m2 Homogenous Tile uk. 600x600 (POLISHED) Motif Kayu - Mushola
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 50,850.00 50,850.00
Homogeneous Tile uk. 600x600
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
Homogeneous Tile uk. 60x60
m2 1.1000 135,600.00 149,160.00
(polished) Motif Kayu
Semen portland Kg 8.1900 1,550.00 12,694.50
Pasir Pasang M3 0.0450 186,450.00 8,390.25
Nat Keramik Kg 0.2597 11,300.00 2,935.06
JUMLAH HARGA BAHAN 173,179.81
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 224,029.81
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 224,029.00

B.8 Pemasangan 1 m2 screed + Waterproofing (membrane) di daerah lantai dak beton, roof tank dan dak beton 1SP : 3PP tebal 30mm.
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Plester Lantai /
m2 1.0000 45,200.00 45,200.00
Screed
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Semen portland Kg 15.5520 1,550.00 24,105.60
Pasir Pasang m3 0.0460 186,450.00 8,576.70
Waterproofing Membrane m2 1.0000 175,150.00 175,150.00
JUMLAH HARGA BAHAN 207,832.30
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 253,032.30
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 253,032.00

B.9 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Dinding
m2 1.0000 28,250.00 28,250.00
Bata Ringan
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Bata ringan tebal 10 cm m3 0.1050 801,400.00 84,147.00
Mortar siap pakai Kg 4.6200 1,800.00 8,316.00
JUMLAH HARGA BAHAN 92,463.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 120,713.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 120,713.00

B.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Dinding
m2 1.0000 31,050.00 31,050.00
Bata Merah 1SP : 5PP
JUMLAH TENAGA KERJA 31,050.00
B BAHAN
Bata merah m3 140.0000 650.00 91,000.00
Semen portland Kg 22.2000 1,550.00 34,410.00
Pasir Pasang m3 0.1020 186,450.00 19,017.90
JUMLAH HARGA BAHAN 144,427.90
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 175,477.90
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 175,477.00

B.11 Pekerjaan 1 m2 plesteran 1SP : 3PP tebal 15mm. - Dinding Trasram


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Plesteran
m2 1.0000 28,250.00 28,250.00
Dinding Trasram
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Semen portland Kg 7.7760 1,550.00 12,052.80

ANL SPL 42 / 58
Pasir Pasang m3 0.0230 186,450.00 4,288.35
JUMLAH HARGA BAHAN 16,341.15
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 44,591.15
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 44,591.00

B.12 Pekerjaan 1 m2 plesteran 1SP : 5PP tebal 15 mm - Bata ringan


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA

Upah Pekerjaan Plesteran Dinding m2 1.0000 28,250.00 28,250.00

JUMLAH TENAGA KERJA 28,250.00


B BAHAN
Semen portland Kg 5.1840 1,550.00 8,035.20
Pasir Pasang m3 0.0260 186,450.00 4,847.70
JUMLAH HARGA BAHAN 12,882.90
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,132.90
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 41,132.00

B.13 Pemasangan 1 m2 acian.


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Acian Dinding m2 1.0000 19,750.00 19,750.00
JUMLAH TENAGA KERJA 19,750.00
B BAHAN
Semen portland Kg 3.2500 1,550.00 5,037.50
JUMLAH HARGA BAHAN 5,037.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 24,787.50
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 24,787.00

B.14 Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Cor In Situ m3 1.0000 152,550.00 152,550.00
JUMLAH TENAGA KERJA 152,550.00
B BAHAN
Semen portland kg 326.0000 1,550.00 505,300.00
Pasir Beton m3 0.5429 333,400.00 180,988.57
Kerikil (Maks 30 mm) m3 0.7622 169,500.00 129,196.67
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 826,235.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 978,785.24
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 978,785.00

B.15 Pemasangan 1 m’ Plint Keramik 10x60 dinding corridor/selasar dan ruang


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Plint
m' 1.0000 16,950.00 16,950.00
Keramik
JUMLAH TENAGA KERJA 16,950.00
B BAHAN
Plint Keramik uk. 10cm x 60cm Bh 1.7000 33,900.00 57,630.00
Semen portland kg 1.1400 1,550.00 1,767.00
Semen Warna Kg 0.1000 11,300.00 1,130.00
Pasir Pasang M3 0.0030 186,450.00 559.35
JUMLAH HARGA BAHAN 61,086.35
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 78,036.35
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 78,036.00

B.16 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Plesteran
m2 1.0000 28,250.00 28,250.00
Dinding Bata Merah
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Semen portland Kg 10.2240 1,550.00 15,847.20
Pasir Pasang m3 0.0200 186,450.00 3,729.00
JUMLAH HARGA BAHAN 19,576.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,826.20
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 47,826.00

B.17 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Plesteran
m2 1.0000 28,250.00 28,250.00
Dinding Bata Merah
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Semen portland Kg 10.2240 1,550.00 15,847.20
Pasir Pasang m3 0.0200 186,450.00 3,729.00
JUMLAH HARGA BAHAN 19,576.20
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,826.20
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 47,826.00

B.18 Pemasangan 1 m2 plesteran skoning 1SP : 2PP tebal 15 mm.


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Plesteran
m2 1.0000 28,250.00 28,250.00
Dinding Bata Merah
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Semen portland Kg 5.1840 1,550.00 8,035.20
Pasir Pasang m3 0.0260 186,450.00 4,847.70
JUMLAH HARGA BAHAN 12,882.90
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 41,132.90
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 41,132.00

B.19 Pemasangan 1m2 Pas. Keramik dinding 60 x 60 cm


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA

Upah Pekerjaan Keramik Dinding m2 1.0000 62,150.00 62,150.00

JUMLAH TENAGA KERJA 62,150.00


B BAHAN
Dinding Keramik 60x60 cm m2 1.1000 169,500.00 186,450.00
Semen portland Kg 9.3000 1,550.00 14,415.00
Pasir Pasang M3 0.0180 186,450.00 3,356.10
Nat Keramik Kg 0.5263 11,300.00 5,947.37
JUMLAH HARGA BAHAN 210,168.47
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 272,318.47
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 272,318.00

B.20 Pemasangan 1 m2 screed + Waterproofing (membrane) di daerah lantai dak beton, roof tank dan dak beton 1SP : 3PP tebal 30mm.
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Plester Lantai /
m2 1.0000 45,200.00 45,200.00
Screed
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Semen portland Kg 15.5520 1,550.00 24,105.60
Pasir Pasang m3 0.0460 186,450.00 8,576.70

Waterprofing (liquid/cement base) m2 1.0000 96,050.00 96,050.00

JUMLAH HARGA BAHAN 128,732.30


C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 173,932.30
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 173,932.00

B. Pemasangan 1 buah closet duduk type Newton Razor SmartWasher - Putih


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Kloset
bh 1.0000 141,250.00 141,250.00
Duduk
JUMLAH TENAGA KERJA 141,250.00
B BAHAN
Closet toto CW660nj/sw660 Unit 1.0000 2,375,500.00 2,375,500.00
Perlengkapan % 0.0600 2,375,500.00 142,530.00
JUMLAH HARGA BAHAN 2,518,030.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,659,280.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 2,659,280.00

B. (K3) Pemasangan 1 buah wastafel meja - Lobby / Entrance


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA

Upah Pekerjaan Pasang Wastafel bh 1.0000 113,000.00 113,000.00

JUMLAH TENAGA KERJA 113,000.00


B BAHAN
Wastafel Lengkap Unit 1.0000 1,136,350.00 1,136,350.00
Semen portland Kg 6.0000 1,550.00 9,300.00
Pasir pasang M3 0.0100 186,450.00 1,864.50
Perlengkapan % 12.0000 11,475.15 137,701.74
JUMLAH HARGA BAHAN 1,285,216.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,398,216.24
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 1,398,216.00

B. (K3) Pemasangan 1 buah wastafel meja - KM belakang


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA

Upah Pekerjaan Pasang Wastafel bh 1.0000 113,000.00 113,000.00

JUMLAH TENAGA KERJA 113,000.00


B BAHAN
Wastafel Lengkap Unit 1.0000 1,136,350.00 1,136,350.00
Semen portland Kg 6.0000 1,550.00 9,300.00
Pasir pasang M3 0.0100 186,450.00 1,864.50
Perlengkapan % 12.0000 11,475.15 137,701.74
JUMLAH HARGA BAHAN 1,285,216.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,398,216.24
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 1,398,216.00

B. (K3) Pemasangan 1 buah wastafel meja - Kamar mandi


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA

Upah Pekerjaan Pasang Washtafel bh 1.0000 113,000.00 113,000.00

JUMLAH TENAGA KERJA 113,000.00


B BAHAN
Wastafel Lengkap Unit 1.0000 1,136,350.00 1,136,350.00
Semen portland Kg 6.0000 1,550.00 9,300.00
Pasir pasang M3 0.0100 186,450.00 1,864.50
Perlengkapan % 12.0000 11,475.15 137,701.74
JUMLAH HARGA BAHAN 1,285,216.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,398,216.24
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 1,398,216.00

B. Pemasangan 1 buah Pas. Kran dinding - Kolam, Parkir, Janitor


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Kran
bh 1.0000 28,250.00 28,250.00
Dinding
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Kran ex. Toto T23B13 bh 1.0000 228,050.00 228,050.00
Perlengkapan % 5.0000 2,280.50 11,402.50
JUMLAH HARGA BAHAN 239,452.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 267,702.50
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 267,702.00

B. Pemasangan 1 buah Shower Spray + Kran Doble


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Kran
bh 1.0000 28,250.00 28,250.00
Dinding
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
toto TX 465MZ / TX 405 SDN bh 1.0000 1,589,450.00 1,589,450.00
Kran ex. Toto T23B13 bh 1.0000 228,050.00 228,050.00
Perlengkapan % 5.0000 18,175.00 90,875.00
JUMLAH HARGA BAHAN 1,908,375.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,936,625.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 1,936,625.00

B. Pemasangan 1 buah Jet Washer (Toto/setara)


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Jet
bh 1.0000 113,000.00 113,000.00
Washer
JUMLAH TENAGA KERJA 113,000.00
B BAHAN
THX 20 NBW bh 1.0000 213,700.00 213,700.00
Perlengkapan % 5.0000 2,137.00 10,685.00
JUMLAH HARGA BAHAN 224,385.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 337,385.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 337,385.00

B. Pemasangan 1 buah floor drain stainless


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Floor
bh 1.0000 45,200.00 45,200.00
Drain
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Floor drain ex. Toto TX1BN Unit 1.0000 263,950.00 263,950.00
Semen PC kg 1.5000 1,550.00 2,325.00
Perlengkapan % 12.0000 2,662.75 31,953.00
JUMLAH HARGA BAHAN 298,228.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 343,428.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 343,428.00

B. Pemasangan 1 buah bak cuci piring stainlessteel


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Kitchen
buah 1.0000 113,000.00 113,000.00
Sink
JUMLAH TENAGA KERJA 113,000.00
B BAHAN
Kitchen Sink Unit 1.0000 410,950.00 410,950.00
Semen portland Kg 6.0000 1,550.00 9,300.00
Pasir pasang M3 0.0100 186,450.00 1,864.50
Perlengkapan % 12.0000 4,221.15 50,653.74
JUMLAH HARGA BAHAN 472,768.24
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 585,768.24
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 585,768.00

B. Pemasangan 1 set Paper Holder


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Paper
set 1.0000 22,600.00 22,600.00
Holder
JUMLAH TENAGA KERJA 22,600.00
B BAHAN
Tissue holder TX 703 AM set 1.0000 496,250.00 496,250.00
Perlengkapan % 5.0000 4,962.50 24,812.50
JUMLAH HARGA BAHAN 521,062.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 543,662.50
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 543,662.00

B Pemasangan 1 buah Tempat Sabun


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Tempat
bh 1.0000 84,750.00 84,750.00
Sabun
JUMLAH TENAGA KERJA 84,750.00
B BAHAN
Soap holder ex. Toto S11N Unit 1.0000 273,300.00 273,300.00
Perlengkapan % 5.0000 2,733.00 13,665.00
JUMLAH HARGA BAHAN 286,965.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 371,715.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 371,715.00

B. Pemasangan 1 set Hand Dryer ex. Krisbow atau setara


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Hand
set 1.0000 169,500.00 169,500.00
Dryer
JUMLAH TENAGA KERJA 169,500.00
B BAHAN
Hand Dryer ex. Krisbow set 1.0000 1,795,900.00 1,795,900.00
Perlengkapan % 5.0000 17,959.00 89,795.00
JUMLAH HARGA BAHAN 1,885,695.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 2,055,195.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 2,055,195.00

B. Pemasangan 1 buah roof drain


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA

Upah Pekerjaan Pasang Roof Drain OH 1.0000 169,500.00 169,500.00

JUMLAH TENAGA KERJA 169,500.00


B BAHAN
Roof Drain Unit 1.0000 195,200.00 195,200.00
Semen PC kg 1.5000 1,550.00 2,325.00
Perlengkapan % 12.0000 1,975.25 23,703.00
JUMLAH HARGA BAHAN 221,228.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 390,728.00

ANL SPL 43 / 58
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 390,728.00

B. Pemasangan 1 buah Toren Air Bersih


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Toren
set 1.0000 282,550.00 282,550.00
Air Bersih
JUMLAH TENAGA KERJA 282,550.00
B BAHAN
Torn Air Bersih set 1.0000 5,289,400.00 5,289,400.00
Perlengkapan % 5.0000 52,894.00 264,470.00
JUMLAH HARGA BAHAN 5,553,870.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 5,836,420.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 5,836,420.00

B.50 Pengecatan 1 m2 tembok baru Eksterior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pengecatan
m2 1.0000 12,400.00 12,400.00
Dinding
JUMLAH TENAGA KERJA 12,400.00
B BAHAN
Plamuur Kg 0.1000 11,300.00 1,130.00
Cat Dasar Exterior Kg 0.1000 37,600.00 3,760.00
Cat Tembok Exterior Kg 0.2600 71,750.00 18,655.00
JUMLAH HARGA BAHAN 23,545.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 35,945.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 35,945.00

B.51 Pengecatan 1 m2 tembok baru Interior ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pengecatan
m2 1.0000 12,400.00 12,400.00
Dinding
JUMLAH TENAGA KERJA 12,400.00
B BAHAN
Plamuur Kg 0.1000 11,300.00 1,130.00
Cat Dasar Interior Kg 0.1000 16,600.00 1,660.00
Cat Tembok Interior Kg 0.2600 22,850.00 5,941.00
JUMLAH HARGA BAHAN 8,731.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 21,131.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 21,131.00

B.52 Pengecatan 1 m2 Plafond Interior


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pengecatan
m2 1.0000 12,400.00 12,400.00
Plafond
JUMLAH TENAGA KERJA 12,400.00
B BAHAN
Plamuur Kg 0.1000 11,300.00 1,130.00
Cat Dasar Interior Kg 0.1000 16,600.00 1,660.00
Cat Plafon Interior Kg 0.2600 22,850.00 5,941.00
JUMLAH HARGA BAHAN 8,731.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 21,131.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 21,131.00

ANL SPL 44 / 58
C.1 Pemasangan 1m2 floor harderner
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Floor Harderner m2 0.0000 16,950.00 -
JUMLAH TENAGA KERJA -
B BAHAN
floor harderner m2 1.0000 56,500.00 56,500.00
JUMLAH HARGA BAHAN 56,500.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 56,500.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 56,500.00

C.2 Pemadatan 1 m2 dengan Hand Stamper


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pemadatan
50,850.00
Tanah m2 1.0000 50,850.00
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Stamper OH 0.0500 11,300 565.00
JUMLAH HARGA ALAT 565.00
D Jumlah (A+B+C) 51,415.00
E Overhead & Profit 10% 0% -
F Harga Satuan Pekerjaan (D+E) 51,415.00

C.3 Pemadatan 1 m2 dengan Mini Wales


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pemadatan
Tanah m2 1.0000 50,850.00 50,850.00
JUMLAH TENAGA KERJA 50,850.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Mini Wales OH 0.0500 1,949,600 97,480.00
JUMLAH HARGA ALAT 97,480.00
D Jumlah (A+B+C) 148,330.00
E Overhead & Profit 10% 0% -
F Harga Satuan Pekerjaan (D+E) 148,330.00

C.4 Pemasangan 1 m1 'Kansteen uk. 40x28x15 K-250


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m1 1.0000 19,200.00 19,200.00
Kansteen
JUMLAH TENAGA KERJA 19,200.00
B BAHAN
Kansteen uk. 40x28x15 K-250 bh 2.5000 39,550.00 98,875.00
JUMLAH HARGA BAHAN 98,875.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 118,075.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 118,075.00

C.5 Timbunan 1 m3 kerikil 3/4


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Upah Pekerjaan Timbunan M3 1.0000 50,850.00 50,850.00
JUMLAH TENAGA KERJA 50,850.00
B BAHAN -
Kerikil 3/4 M3 1.2000 169,500.00 203,400.00
JUMLAH HARGA BAHAN 203,400.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 254,250.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 254,250.00

C.6 Pekerjaan 1m3 Pasangan batu bronjong t=50cm


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Upah Pekerjaan Pasang Batu
M3 1.0000 169,500.00 169,500.00
Bronjong
JUMLAH TENAGA KERJA 169,500.00
B BAHAN -
Batu Belah M3 1.1000 169,500.00 186,450.00
JUMLAH HARGA BAHAN 186,450.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 355,950.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 355,950.00

C.6 Pekerjaan 1m2 Konstruksi kawat bronjong besi siku


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Upah Pekerjaan Pasang Batu
M3 1.0000 141,250.00 141,250.00
Bronjong
JUMLAH TENAGA KERJA 141,250.00
B BAHAN -
Kawat Bronjong besi siku lbr 0.5000 327,750.00 163,875.00
Besi Siku btg 0.6667 141,250.00 94,166.67
JUMLAH HARGA BAHAN 163,875.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 352,208.33
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 352,208.00

C.7 Pengurugan 1 m3 Tanah Urug


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Upah Pekerjaan Pengurugan
m3 1.0000 50,850.00 50,850.00
Tanah
JUMLAH TENAGA KERJA 50,850.00
B BAHAN -
Tanah Urug m3 1.2000 118,650.00 142,380.00
JUMLAH HARGA BAHAN 142,380.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 193,230.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 193,230.00

C.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Bata
OH 1.0000 31,050.00 31,050.00
Merah 1SP : 3PP
JUMLAH TENAGA KERJA 31,050.00
B BAHAN
Bata merah m3 140.0000 650.00 91,000.00
Semen portland Kg 32.9500 1,550.00 51,072.50
Pasir Pasang m3 0.0910 186,450.00 16,966.95
JUMLAH HARGA BAHAN 159,039.45
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 190,089.45
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 190,089.00

C.10 1m3 Pemindahan Tanah Sisa Galian


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA -
Upah Pekerjaan Pindah Tanah
m3 1.0000 11,300.00 11,300.00
Sisa Galian
JUMLAH TENAGA KERJA 11,300.00
B BAHAN -
JUMLAH HARGA BAHAN -
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,300.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 11,300.00

C.11 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pondasi Batu
m3 1.0000 141,250.00 141,250.00
Kali
JUMLAH TENAGA KERJA 141,250.00
B BAHAN -
Batu belah m3 1.2000 169,500.00 203,400.00
Semen portland Kg 136.0000 1,550.00 210,800.00
Pasir Pasang m3 0.5440 186,450.00 101,428.80
JUMLAH HARGA BAHAN 515,628.80
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 656,878.80
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 656,878.00

C.12 Pemasangan 1 m2 dinding/lantai batu tempel / Batu Alam hitam


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang Batu
m2 1.0000 163,850.00 163,850.00
Alam
JUMLAH TENAGA KERJA 163,850.00
B BAHAN
Batu Alam Motif M2 1.1000 84,750.00 93,225.00
Semen portland Kg 11.7500 1,550.00 18,212.50
Pasir Pasang M3 0.0350 186,450.00 6,525.75
JUMLAH HARGA BAHAN 117,963.25
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 281,813.25
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 281,813.00

C.13 (K3) Pemasangan 1 m2 bekisting untuk cor jalan dengan batako


No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Upah Pekerjaan Pasang
m2 1.0000 28,250.00 28,250.00
Bekisting Batako
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Batako bh 14.0000 4,500.00 63,000.00
Semen portland Kg 7.5000 1,550.00 11,625.00
Pasir Pasang m3 0.0270 186,450.00 5,034.15
JUMLAH HARGA BAHAN 79,659.15
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 107,909.15
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 107,909.00
0.0480 5,179.63

ANL ARS non 45 / 58


ANALISA HARGA SATUAN PEKERJAAN BETON

Harga Satuan Jumlah Harga


No. Uraian Satuan Volume
(Rp.) (Rp.)
1 2 3 4 5 6

Pekerjaan Tiang Beton 30/50 m3 5,062,167.67


Cor Beton Ready Mix K-350 m3 1.00 978,785.00 978,785.00
Pembesian kg 200.00 11,569.50 2,313,900.00
Bekisting Kolom m2 10.67 165,889.00 1,769,482.67

Pek Beton Kolom Praktis KP 11/11, Beton K.175,tulangan 168,57 kg/m3 m3 8,961,382.89
Cor Beton Ready Mix K-175 m3 1.00 978,785.00 978,785.00
Pembesian kg 168.57 11,569.50 1,950,270.62
Bekisting Kolom m2 36.36 165,889.00 6,032,327.27

Pek Beton Balok Lintle Kusen, Beton K.175 m3 6,048,068.95


Cor Beton Ready Mix K-175 m3 1.00 978,785.00 978,785.00
Pembesian kg 168.57 11,569.50 1,950,270.62
Bekisting Balok m2 18.33 170,128.00 3,119,013.33

Pek. Kolom 15/15 m3 6,471,637.23


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 127.61 11,569.50 1,476,383.89
Bekisting Kolom m2 23.33 165,889.00 3,870,743.33

Pek. Balok 15/25 m3 5,799,678.93


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 134.51 11,569.50 1,556,155.60
Bekisting Balok m2 18.33 170,128.00 3,119,013.33

Pek. Kolom 15/30 m3 5,391,393.93


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 82.04 11,569.50 949,103.93
Bekisting Kolom m2 20.00 165,889.00 3,317,780.00

Pekerjaan Tie Beam 15/30 m3 5,047,527.50


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 225.00 11,569.50 2,603,137.50
Bekisting Sloof m2 13.33 98,991.00 1,319,880.00

Pekerjaan Tiang Bendera Beton m3 3,300,874.00


Cor Beton Ready Mix K-175 m3 1.00 978,785.00 978,785.00
Pembesian kg 86.00 11,569.50 994,977.00
Bekisting m2 8.00 165,889.00 1,327,112.00

Pekerjaan Tie Beam 15/35 m3 4,675,649.06


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 192.86 11,569.50 2,231,259.06
Bekisting Sloof m2 13.33 98,991.00 1,319,880.00

Pek.Beton Plat Lantai t=15 cm m3 3,960,471.67


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 130.00 11,569.50 1,504,035.00
Bekisting Plat m2 6.67 199,789.00 1,331,926.67

Dudukan rel beton rel pagar 15/40 m3 4,396,741.68


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 168.75 11,569.50 1,952,351.68
Bekisting Sloof m2 13.33 98,991.00 1,319,880.00

Pekerjaan Cor Ramp t 12 cm m3 4,022,064.63


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 250.00 11,569.50 2,892,375.00
Bekisting Sloof m2 1.00 5,179.63 5,179.63

Pekerjaan Strouss m3 2,905,750.22


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 153.96 11,569.50 1,781,240.22
Bekisting Sloof m2 - 165,889.00 -

Pekerjaan Kolom Pedestal 15/15 m3 7,024,600.56


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 127.61 11,569.50 1,476,383.89
Bekisting Kolom m2 26.67 165,889.00 4,423,706.67

Pile Cap m3 5,001,331.92


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 239.50 11,569.50 2,770,895.25
Bekisting Sloof m2 6.67 165,889.00 1,105,926.67

Plat Kanopi m3 2,845,152.80


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 128.00 11,569.50 1,480,896.00
Bekisting Plat m2 1.20 199,789.00 239,746.80

Pek.Beton Plat Atap t=11 cm m3 4,444,808.64


Cor Beton Ready Mix K-350 m3 1.00 1,124,510.00 1,124,510.00
Pembesian kg 130.00 11,569.50 1,504,035.00
Bekisting Plat m2 9.09 199,789.00 1,816,263.64

AN.BETON-RINCI 46 / 58
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

PA NEL
1 bh Panel Incoming 20 kV Rp 336,977,737
Incoming MC SET AD4 SCHNEIDER Set 1.00 Rp 265,601,372 Rp 265,601,372
VCB/SF6 CB 630 A,motoriize,25 KA withdrawable
Manual Load Fixed Type C/W
SF6 Load Break Switch 630A
3 Phase Busbar 630A
CIT LBS Operating Mechanism
Earthing Switch
Heater 220 V/AC 50W
Alat dan Material Bantu ( apabila ada di
gambar, Kabel Control, dan aksesoris lain
sesuai gambar) lot 1.00 Rp 39,840,206 Rp 39,840,206

Upah Pasang
Mandor oh 0.25 Rp 141,277 Rp 35,319
Kepala Tukang listrik oh 0.83 Rp 117,543 Rp 97,952
Tukang Listrik oh 2.50 Rp 108,501 Rp 271,252
Pekerja oh 5.00 Rp 99,459 Rp 497,296
Jumlah Rp 306,343,398
Keuntungan 10% Rp 30,634,340
Total = Jumlah+(Keuntungan 10%) Rp 336,977,737

1 bh Panel Outgoing 20 kV Rp 36,735,166


Outgoing Cubicle TM 20 KV MC SET CL4 GL4 SC Set 1.00 Rp 28,255,465 Rp 28,255,465
VCB/SF6 CB 630 A,motoriize,25 KA withdrawable
Alat dan Material Bantu ( apabila ada di
gambar, Kabel Control, dan aksesoris lain
sesuai gambar) lot 1.00 Rp 4,238,320 Rp 4,238,320

Upah Pasang
Mandor oh 0.25 Rp 141,277 Rp 35,319
Kepala Tukang listrik oh 0.83 Rp 117,543 Rp 97,952
Tukang Listrik oh 2.50 Rp 108,501 Rp 271,252
Pekerja oh 5.00 Rp 99,459 Rp 497,296
Jumlah Rp 33,395,605
Keuntungan 10% Rp 3,339,561
Total = Jumlah+(Keuntungan 10%) Rp 36,735,166

1 bh Panel LVMDP W1 Rp 465,309,504


Box Panel ( 180 x 80 x 60 ) cm bh 1.00 Rp 8,137,574 Rp 8,137,574
ACB 3200 A, 3P bh 2.00 Rp 41,196,468 Rp 82,392,936
ACB 2500 A, 3P bh 1.00 Rp 37,240,703 Rp 37,240,703
MCCB 630-1000 A, 65 kA bh 4.00 Rp 24,029,578 Rp 96,118,311
MCCB 400-630 A, 65 kA bh 3.00 Rp 12,480,439 Rp 37,441,317
MCCB 160-240 A, 65 kA bh 3.00 Rp 8,579,489 Rp 25,738,468
Current Transformer 3200/5A bh 6.00 Rp 1,939,455 Rp 11,636,731
Current Transformer 2500/5A bh 3.00 Rp 1,789,023 Rp 5,367,069
Automatic Transfer Switch bh 1.00 Rp - Rp -
Power Meter Digital bh 1.00 Rp 4,832,476 Rp 4,832,476
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Grounding BC 120 mm m 10.00 Rp 174,919 Rp 1,749,194
EGB bh 3.00 Rp 1,356,262 Rp 4,068,787
Busbar (100x10) bh 6.00 Rp 8,074,282 Rp 48,445,690
Lightning Arrester bh 1.00 Rp 3,704,857 Rp 3,704,857
Alat dan Material Bantu ( apabila ada di
gambar, Kabel Control, dan aksesoris lain
sesuai gambar) lot 1.00 Rp 55,057,411 Rp 55,057,411

Upah Pasang
Mandor oh 0.25 Rp 141,277 Rp 35,319
Kepala Tukang listrik oh 0.83 Rp 117,543 Rp 97,952
Tukang Listrik oh 2.50 Rp 108,501 Rp 271,252
Pekerja oh 5.00 Rp 99,459 Rp 497,296
Jumlah Rp 423,008,640
Keuntungan 10% Rp 42,300,864
Total = Jumlah+(Keuntungan 10%) Rp 465,309,504

1 bh Panel Kontrol Genset Rp 193,618,948


Box Panel ( 120 x 80 x 30 ) cm bh 1.00 Rp 7,218,706 Rp 7,218,706
ACB 3200 A, 3P bh 2.00 Rp 41,196,468 Rp 82,392,936
Automatic Transfer Switch bh 1.00 Rp - Rp -
Power Meter Digital bh 1.00 Rp 4,832,476 Rp 4,832,476
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Grounding BC 120 mm m 10.00 Rp 174,919 Rp 1,749,194
EGB bh 3.00 Rp 1,356,262 Rp 4,068,787
Busbar (100x10) bh 6.00 Rp 8,074,282 Rp 48,445,690
Lightning Arrester bh 1.00 Rp 3,704,857 Rp 3,704,857
Alat dan Material Bantu ( apabila ada di
gambar, Kabel Control, dan aksesoris lain
sesuai gambar) lot 1.00 Rp 22,888,191 Rp 22,888,191

Upah Pasang
Mandor oh 0.15 Rp 141,277 Rp 21,192
Kepala Tukang listrik oh 0.50 Rp 117,543 Rp 58,771
Tukang Listrik oh 1.50 Rp 108,501 Rp 162,751
Pekerja oh 3.00 Rp 99,459 Rp 298,378
Jumlah Rp 176,017,226
Keuntungan 10% Rp 17,601,723
Total = Jumlah+(Keuntungan 10%) Rp 193,618,948

1 bh CAPACITOR BANK 100 KVAR Rp 386,686,000


Box Panel ( 180 x 80 x 60 ) cm bh 1.00 Rp 7,500,000 Rp 7,500,000
Push Button Switch bh 2.00 Rp 850,000 Rp 1,700,000
MCCB 160 A, 36 kA bh 11.00 Rp 4,217,072 Rp 46,387,788
Kapasitor Bank 100 kVAR + Detuned Reactor bh 11.00 Rp 16,388,170 Rp 180,269,867
Busbar Tembaga Solid Standard NEMA (300x10 bh 1.00 Rp 4,942,300 Rp 4,942,300
Current Transformer 2500/5A bh 3.00 Rp 1,789,023 Rp 5,367,069
Interlock bh 11.00 Rp 1,250,000 Rp 13,750,000
Power Meter Digital bh 3.00 Rp 4,832,476 Rp 14,497,427
Selector Switch M-O-A 2P bh 6.00 Rp 116,500 Rp 699,000
Grounding BC 120 mm m 1.00 Rp 174,919 Rp 174,919
Contactor 185 A bh 3.00 Rp 2,206,187 Rp 6,618,560
Pilot Lamp bh 10.00 Rp 58,432 Rp 584,323
Lightning Arrester bh 6.00 Rp 3,704,857 Rp 22,229,139
Shun trip bh 1.00 Rp 489,500 Rp 489,500
Material Bantu Ls 1.00 Rp 45,781,484 Rp 45,781,484
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.15 Rp 141,277 Rp 21,192
Kepala Tukang listrik oh 0.50 Rp 117,543 Rp 58,771
Tukang Listrik oh 1.50 Rp 108,501 Rp 162,751
Pekerja oh 3.00 Rp 99,459 Rp 298,378
Jumlah Rp 351,532,470
Keuntungan 10% Rp 35,153,247
Total = Jumlah+(Keuntungan 10%) Rp 386,685,716

1 bh PANEL MDP - 1 Gd A Rp 128,342,000


Box Panel ( 120 x 80 x 30 ) cm bh 1.00 Rp 7,218,706 Rp 7,218,706
MCCB 630-1000 A/3 Phasa bh 1.00 Rp 24,029,578 Rp 24,029,578
MCCB 240-320 A/3 Phasa bh 1.00 Rp 4,849,881 Rp 4,849,881
MCCB 160-240 A/3 Phasa bh 2.00 Rp 4,217,072 Rp 8,434,143
MCCB 70-100 A 3 Phase bh 6.00 Rp 2,230,373 Rp 13,382,240
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 120 mm² m 10.00 Rp 174,919 Rp 1,749,194
Busbar (100 x 10) bh 5.00 Rp 8,074,282 Rp 40,371,408
Material Bantu Ls 1.00 Rp 15,147,833 Rp 15,147,833
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.15 Rp 141,277 Rp 21,192
Kepala Tukang listrik oh 0.50 Rp 117,543 Rp 58,771
Tukang Listrik oh 1.50 Rp 108,501 Rp 162,751
Pekerja oh 3.00 Rp 99,459 Rp 298,378
#REF! Rp 116,674,476
#REF! Rp 11,667,448
#REF! Rp 128,341,924

1 bh Panel 160 x 180 x 80 , lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse Rp 31,516,000
isolator, kabel skun, internal wiring, kabel duct, Selector Switch ( Terpasang )
Box Panel ( 120 x 80 x 30 ) cm bh 1.00 Rp 14,437,412 Rp 14,437,412
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 1.00 Rp 193,606 Rp 193,606
BCC 240 mm² m 10.00 Rp 338,692 Rp 3,386,918
Busbar (30 x 5) bh 5.00 Rp 1,211,142 Rp 6,055,711
Material Bantu Ls 1.00 Rp 3,666,484 Rp 3,666,484
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.15 Rp 141,277 Rp 21,192
Kepala Tukang listrik oh 0.50 Rp 117,543 Rp 58,771
Tukang Listrik oh 1.50 Rp 108,501 Rp 162,751
Pekerja oh 3.00 Rp 99,459 Rp 298,378
Rp - Rp 28,650,806
0 Rp 2,865,081
PANEL MDP - 1 Gd A Rp 31,515,886

1 bh Panel 80 x 120 x 40 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse Rp 22,384,000
Box Panel ( 120 x 80 x 30 ) cm bh 1.00 Rp 7,218,706 Rp 7,218,706
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 1.00 Rp 193,606 Rp 193,606
BCC 240 mm² m 10.00 Rp 338,692 Rp 3,386,918
Busbar (30 x 5) bh 5.00 Rp 1,211,142 Rp 6,055,711
Material Bantu Ls 1.00 Rp 2,583,678 Rp 2,583,678
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.15 Rp 141,277 Rp 21,192
Kepala Tukang listrik oh 0.50 Rp 117,543 Rp 58,771
Tukang Listrik oh 1.50 Rp 108,501 Rp 162,751
Pekerja oh 3.00 Rp 99,459 Rp 298,378
#REF! Rp 20,349,294
#REF! Rp 2,034,929
#REF! Rp 22,384,223

1 bh SDP-ATAP Gd. A Rp 47,748,000


Box Panel ( 120 x 80 x 30 ) cm bh 1.00 Rp 7,218,706 Rp 7,218,706
MCCB 240-320 A/3 Phasa bh 1.00 Rp 4,849,881 Rp 4,849,881
MCCB 160-240 A/3 Phasa bh 1.00 Rp 4,217,072 Rp 4,217,072
MCCB 70-100 A 3 Phase bh 5.00 Rp 2,230,373 Rp 11,151,867
MCCB 25 A/3 Phasa 25 kA bh 2.00 Rp 2,056,320 Rp 4,112,639
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
Grounding BC 95 mm Meter 10.00 Rp 136,233 Rp 1,362,335
Busbar (40 x 5) bh 5.00 Rp 1,937,828 Rp 9,689,138
Material Bantu Ls 1.00 Rp 6,532,806 Rp 6,532,806
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.15 Rp 141,277 Rp 21,192
Kepala Tukang listrik oh 0.50 Rp 117,543 Rp 58,771
Tukang Listrik oh 1.50 Rp 108,501 Rp 162,751
Pekerja oh 3.00 Rp 99,459 Rp 298,378
Jumlah Rp 43,407,231
Keuntungan 10% Rp 4,340,723
Total = Jumlah+(Keuntungan 10%) Rp 47,747,954

1 bh SDP-UPS Gedung A 50 kVA Rp 45,476,000


Box Panel ( 60 x 40 x 30 ) cm bh 1.00 Rp 1,690,807 Rp 1,690,807
CT 100/5A bh 3.00 Rp 384,161 Rp 1,152,484
MCCB 70-100 A 3 Phase bh 2.00 Rp 2,230,373 Rp 4,460,747
MCCB 25 A/3 Phasa bh 6.00 Rp 2,056,320 Rp 12,337,918
EGB bh 3.00 Rp 1,356,262 Rp 4,068,787
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 16 mm² m 10.00 Rp 23,482 Rp 234,816
Busbar (30 x 5) bh 5.00 Rp 1,211,142 Rp 6,055,711
Lightning Arrester 40 kA bh 1.00 Rp 3,704,857 Rp 3,704,857
Kontaktor Elektronik bh 1.00 Rp 2,292,535 Rp 2,292,535
Material Bantu Ls 1.00 Rp 5,542,360 Rp 5,542,360
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.15 Rp 141,277 Rp 21,192
Kepala Tukang listrik oh 0.50 Rp 117,543 Rp 58,771
Tukang Listrik oh 1.50 Rp 108,501 Rp 162,751
Pekerja oh 3.00 Rp 99,459 Rp 298,378
Jumlah Rp 41,341,708
Keuntungan 10% Rp 4,134,171
Total = Jumlah+(Keuntungan 10%) Rp 45,475,879

1 bh UPS KAPASITAS 50 KvA Rp 466,319,000


UPS kapasitas 50 Kva bh 1.00 Rp 403,711,598 Rp 403,711,598
Sewa alat 5% dari harga bahan lot 1.00 Rp 20,185,580 Rp 20,185,580

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 423,926,397
Keuntungan 10% Rp 42,392,640
Total = Jumlah+(Keuntungan 10%) Rp 466,319,037

1 bh Panel 60 x 80 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse Rp 5,491,000


Box Panel ( 80 x 60 x 25 ) cm bh 1.00 Rp 2,806,333 Rp 2,806,333
BCC 4 mm² m 10.00 Rp 5,807 Rp 58,073
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 604,065 Rp 604,065
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.10 Rp 141,277 Rp 14,128
Kepala Tukang listrik oh 0.33 Rp 117,543 Rp 39,181
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 2.00 Rp 99,459 Rp 198,918
Jumlah Rp 4,991,896
Keuntungan 10% Rp 499,190
Total = Jumlah+(Keuntungan 10%) Rp 5,491,086

1 bh Panel 50 x 70 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse Rp 4,825,000


Box Panel ( 60 x 60 x 30 ) cm bh 1.00 Rp 2,279,651 Rp 2,279,651
BCC 4 mm² m 10.00 Rp 5,807 Rp 58,073
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 525,063 Rp 525,063
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.10 Rp 141,277 Rp 14,128
Kepala Tukang listrik oh 0.33 Rp 117,543 Rp 39,181
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 2.00 Rp 99,459 Rp 198,918
Jumlah Rp 4,386,212
Keuntungan 10% Rp 438,621
Total = Jumlah+(Keuntungan 10%) Rp 4,824,833

1 bh PANEL PP- 1 Gd A Lt.1 Rp 13,981,000


Box Panel ( 40 x 30 x 20 ) cm bh 1.00 Rp 1,086,140 Rp 1,086,140
MCB 50 A/3 Phasa bh 1.00 Rp 2,185,617 Rp 2,185,617
MCB 16 A/1 Phasa bh 15.00 Rp 341,270 Rp 5,119,043
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 16 mm² m 10.00 Rp 23,482 Rp 234,816
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 1,610,807 Rp 1,610,807
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.10 Rp 141,277 Rp 14,128
Kepala Tukang listrik oh 0.33 Rp 117,543 Rp 39,181
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 2.00 Rp 99,459 Rp 198,918
Jumlah Rp 12,710,248
Keuntungan 10% Rp 1,271,025
Total = Jumlah+(Keuntungan 10%) Rp 13,981,273

1 bh PANEL PP- U1 Gd A Lt.1 Rp 9,242,000


Box Panel ( 40 x 30 x 20 ) cm bh 1.00 Rp 1,086,140 Rp 1,086,140
MCB 25 A/3 Phasa bh 1.00 Rp 1,571,456 Rp 1,571,456
MCB 16 A/1 Phasa bh 6.00 Rp 341,270 Rp 2,047,617
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Fuse & Indicator bh 1.00 Rp 116,186 Rp 116,186
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 4 mm² m 10.00 Rp 5,807 Rp 58,073
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 1,048,886 Rp 1,048,886
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.10 Rp 141,277 Rp 14,128
Kepala Tukang listrik oh 0.33 Rp 117,543 Rp 39,181
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 2.00 Rp 99,459 Rp 198,918
Jumlah Rp 8,402,184
Keuntungan 10% Rp 840,218
Total = Jumlah+(Keuntungan 10%) Rp 9,242,402

1 bh PANEL LP- 2 Gd. A Lt.2 Rp 11,937,000


Box Panel ( 40 x 30 x 20 ) cm bh 1.00 Rp 1,086,140 Rp 1,086,140
MCB 25 A/3 Phasa bh 1.00 Rp 1,571,456 Rp 1,571,456
MCB 10 A/1 Phasa bh 12.00 Rp 341,270 Rp 4,095,234
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Fuse & Indicator bh 1.00 Rp 116,186 Rp 116,186
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 10 mm² m 10.00 Rp 14,053 Rp 140,533
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 1,368,397 Rp 1,368,397
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.10 Rp 141,277 Rp 14,128
Kepala Tukang listrik oh 0.33 Rp 117,543 Rp 39,181
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 2.00 Rp 99,459 Rp 198,918
Jumlah Rp 10,851,772
Keuntungan 10% Rp 1,085,177
Total = Jumlah+(Keuntungan 10%) Rp 11,936,949

1 bh PANEL PP- 2 Gd A Lt.2 Rp 14,413,000


Box Panel ( 40 x 30 x 20 ) cm bh 1.00 Rp 1,086,140 Rp 1,086,140
MCB 50 A/3 Phasa bh 1.00 Rp 2,185,617 Rp 2,185,617
MCB 16 A/1 Phasa bh 16.00 Rp 341,270 Rp 5,460,312
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 16 mm² m 10.00 Rp 23,482 Rp 234,816
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 1,661,997 Rp 1,661,997
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.10 Rp 141,277 Rp 14,128
Kepala Tukang listrik oh 0.33 Rp 117,543 Rp 39,181
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 2.00 Rp 99,459 Rp 198,918
Jumlah Rp 13,102,708
Keuntungan 10% Rp 1,310,271
Total = Jumlah+(Keuntungan 10%) Rp 14,412,979

1 bh PANEL PP- U2 Gd A Lt.2 Rp 12,549,000


Box Panel ( 40 x 30 x 20 ) cm bh 1.00 Rp 1,086,140 Rp 1,086,140
MCB 25 A/3 Phasa bh 1.00 Rp 1,571,456 Rp 1,571,456
MCB 16 A/1 Phasa bh 14.00 Rp 341,270 Rp 4,777,773
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 4 mm² m 10.00 Rp 5,807 Rp 58,073
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 1,440,981 Rp 1,440,981
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

AHS ELK 47 / 58
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

Upah Pasang
Mandor oh 0.10 Rp 141,277 Rp 14,128
Kepala Tukang listrik oh 0.33 Rp 117,543 Rp 39,181
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 2.00 Rp 99,459 Rp 198,918
Jumlah Rp 11,408,249
Keuntungan 10% Rp 1,140,825
Total = Jumlah+(Keuntungan 10%) Rp 12,549,074

1 bh PANEL LP- 3 Gd. A Lt.3 Rp 11,686,000


Box Panel ( 40 x 30 x 20 ) cm bh 1.00 Rp 1,086,140 Rp 1,086,140
MCB 25 A/3 Phasa bh 1.00 Rp 1,571,456 Rp 1,571,456
MCB 10 A/1 Phasa bh 12.00 Rp 341,270 Rp 4,095,234
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 4 mm² m 10.00 Rp 5,807 Rp 58,073
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 1,338,600 Rp 1,338,600
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
-Mur Baut

Upah Pasang
Mandor oh 0.10 Rp 141,277 Rp 14,128
Kepala Tukang listrik oh 0.33 Rp 117,543 Rp 39,181
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 2.00 Rp 99,459 Rp 198,918
Jumlah Rp 10,623,329
Keuntungan 10% Rp 1,062,333
Total = Jumlah+(Keuntungan 10%) Rp 11,685,662

1 bh PANEL PP- 3 Gd D Lt.3 Rp 16,884,000


Box Panel ( 40 x 30 x 20 ) cm bh 1.00 Rp 1,086,140 Rp 1,086,140
MCB 50 A/3 Phasa bh 1.00 Rp 2,185,617 Rp 2,185,617
MCB 16 A/1 Phasa bh 22.00 Rp 341,270 Rp 7,507,929
Pilot Lamp bh 3.00 Rp 58,432 Rp 175,297
Voltmeter bh 1.00 Rp 194,285 Rp 194,285
Amperemeter bh 3.00 Rp 193,606 Rp 580,819
BCC 10 mm² m 10.00 Rp 14,053 Rp 140,533
Busbar (12 x 2) bh 5.00 Rp 232,539 Rp 1,162,697
Material Bantu Ls 1.00 Rp 1,954,997 Rp 1,954,997
-CU Bars
-Sepatu Kabel
-Roll Isolator
-Sepiral duck kabel
-Duck Kabel
Tukang listrik oh 0.02 Rp 108,501 Rp 1,808

1 bh PEKERJAAN DEEPWELL Rp 342,586,200

FILTER&TANKY

KABEL
1 1 meter Kabel N2XSEFGbY 3 x 120 mm2 Rp 1,477,000
Kabel N2XSEFGbY 3 x 120 mm2 meter 1.05 Rp 1,181,644 Rp 1,240,726
Galian & urugan M1 1.00 Rp 28,000 Rp 28,000

Mandor oh 0.02 Rp 141,277 Rp 2,903


Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 8,052
Tukang Listrik oh 0.21 Rp 108,501 Rp 22,298
Pekerja oh 0.41 Rp 99,459 Rp 40,879
Jumlah Rp 1,342,858
Keuntungan 10% Rp 134,286
Total = Jumlah+(Keuntungan 10%) Rp 1,477,144

1 1 meter Kabel N2XSEFGbY 3 x 150 mm2 Rp 1,778,000


Kabel N2XSEFGbY 3 x 150 mm2 meter 1.05 Rp 1,405,427 Rp 1,475,698
Galian & urugan M1 1.00 Rp 28,000 Rp 28,000

Upah Pasang
Mandor oh 0.03 Rp 141,277 Rp 4,426
Kepala Tukang listrik oh 0.10 Rp 117,543 Rp 12,275
Tukang Listrik oh 0.31 Rp 108,501 Rp 33,992
Pekerja oh 0.63 Rp 99,459 Rp 62,318
Jumlah Rp 1,616,708
Keuntungan 10% Rp 161,671
Total = Jumlah+(Keuntungan 10%) Rp 1,778,379

1 1 meter Kabel N2XSEFGbY 3 x 300 mm2 Rp 3,297,000


Kabel N2XSEFGbY 3 x 300 mm2 meter 1.05 Rp 2,720,436 Rp 2,856,458
Galian & urugan M1 1.00 Rp 28,000 Rp 28,000

Upah Pasang
Mandor oh 0.03 Rp 141,277 Rp 4,426
Kepala Tukang listrik oh 0.10 Rp 117,543 Rp 12,275
Tukang Listrik oh 0.31 Rp 108,501 Rp 33,992
Pekerja oh 0.63 Rp 99,459 Rp 62,318
Jumlah Rp 2,997,468
Keuntungan 10% Rp 299,747
Total = Jumlah+(Keuntungan 10%) Rp 3,297,215

1 meter KABEL TR, NYM 3 X 2,5 mm2 Rp 27,000


Kabel NYM 3x2,5 mm2 meter 1.00 Rp 15,000 Rp 15,000
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 824 Rp 824

Upah Pasang
Mandor oh 0.00 Rp 141,277 Rp 283
Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 784
Tukang Listrik oh 0.02 Rp 108,501 Rp 2,170
Pekerja oh 0.04 Rp 99,459 Rp 3,978
Jumlah Rp 24,513
Keuntungan 10% Rp 2,451
Total = Jumlah+(Keuntungan 10%) Rp 26,965

1 meter KABEL TR, NYY 3 X 4 mm2 Rp 45,000


Kabel NYY 3x4 mm2 meter 1.05 Rp 27,295 Rp 28,660
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 1,507 Rp 1,507

Upah Pasang
Mandor oh 0.00 Rp 141,277 Rp 372
Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,031
Tukang Listrik oh 0.03 Rp 108,501 Rp 2,855
Pekerja oh 0.05 Rp 99,459 Rp 5,235
Jumlah Rp 41,134
Keuntungan 10% Rp 4,113
Total = Jumlah+(Keuntungan 10%) Rp 45,247

1 meter KABEL TR, NYY 3 X 6 mm2 Rp 62,000


Kabel NYY 3X6 mm2 meter 1.05 Rp 37,975 Rp 39,874
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 2,067 Rp 2,067

Upah Pasang
Mandor oh 0.00 Rp 141,277 Rp 505
Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,399
Tukang Listrik oh 0.04 Rp 108,501 Rp 3,875
Pekerja oh 0.07 Rp 99,459 Rp 7,104
Jumlah Rp 56,300
Keuntungan 10% Rp 5,630
Total = Jumlah+(Keuntungan 10%) Rp 61,930

1 meter KABEL TR, NYY 3 X 10 mm2 Rp 100,000


Kabel NYY 3X10 mm2 meter 1.05 Rp 65,824 Rp 69,115
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 3,530 Rp 3,530

Mandor oh 0.00 Rp 141,277 Rp 670


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 1,857
Tukang Listrik oh 0.05 Rp 108,501 Rp 5,142
Pekerja oh 0.09 Rp 99,459 Rp 9,427
Jumlah Rp 91,216
Keuntungan 10% Rp 9,122
Total = Jumlah+(Keuntungan 10%) Rp 100,337

1 meter KABEL TR, NYY 3 X 16 mm2 Rp 136,000


Kabel NYY 3X16 mm2 meter 1.05 Rp 90,417 Rp 94,938
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 4,821 Rp 4,821

Mandor oh 0.01 Rp 141,277 Rp 894


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,480
Tukang Listrik oh 0.06 Rp 108,501 Rp 6,867
Pekerja oh 0.13 Rp 99,459 Rp 12,590
Jumlah Rp 124,065
Keuntungan 10% Rp 12,406
Total = Jumlah+(Keuntungan 10%) Rp 136,471

1 meter KABEL TR, NYY 3 X 25 mm2 Rp 203,000


Kabel NYY 3X25 mm2 meter 1.05 Rp 138,339 Rp 145,256
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 7,337 Rp 7,337

Mandor oh 0.01 Rp 141,277 Rp 1,197


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,320
Tukang Listrik oh 0.08 Rp 108,501 Rp 9,195
Pekerja oh 0.17 Rp 99,459 Rp 16,857
Jumlah Rp 184,637
Keuntungan 10% Rp 18,464
Total = Jumlah+(Keuntungan 10%) Rp 203,101

1 meter KABEL TR, NYY 3 X 35 mm2 Rp 272,000


Kabel NYY 3X35 mm2 meter 1.05 Rp 186,260 Rp 195,573
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 9,852 Rp 9,852

Mandor oh 0.01 Rp 141,277 Rp 1,587


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,402
Tukang Listrik oh 0.11 Rp 108,501 Rp 12,191
Pekerja oh 0.22 Rp 99,459 Rp 22,350
Jumlah Rp 247,432
Keuntungan 10% Rp 24,743
Total = Jumlah+(Keuntungan 10%) Rp 272,175

1 meter KABEL TR, NYY 3 X 50 mm2 Rp 361,000


Kabel NYY 3X50 mm2 meter 1.05 Rp 246,840 Rp 259,182
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 13,033 Rp 13,033

Mandor oh 0.02 Rp 141,277 Rp 2,121


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,883
Tukang Listrik oh 0.15 Rp 108,501 Rp 16,291
Pekerja oh 0.30 Rp 99,459 Rp 29,868
Jumlah Rp 327,853
Keuntungan 10% Rp 32,785
Total = Jumlah+(Keuntungan 10%) Rp 360,638

1 meter KABEL TR, NYY 3 X 70 mm2 Rp 498,000


Kabel NYY 3X70 mm2 meter 1.05 Rp 354,437 Rp 372,158
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 18,682 Rp 18,682

Mandor oh 0.02 Rp 141,277 Rp 2,355


Kepala Tukang listrik oh 0.06 Rp 117,543 Rp 6,530
Tukang Listrik oh 0.17 Rp 108,501 Rp 18,083
Pekerja oh 0.33 Rp 99,459 Rp 33,153
Jumlah Rp 452,436
Keuntungan 10% Rp 45,244
Total = Jumlah+(Keuntungan 10%) Rp 497,680

1 meter KABEL TR, NYY 3 X 95 mm2 Rp 666,000


Kabel NYY 3X95mm2 meter 1.05 Rp 487,350 Rp 511,718
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 25,660 Rp 25,660

Mandor oh 0.02 Rp 141,277 Rp 2,616


Kepala Tukang listrik oh 0.06 Rp 117,543 Rp 7,256
Tukang Listrik oh 0.19 Rp 108,501 Rp 20,093
Pekerja oh 0.37 Rp 99,459 Rp 36,837
Jumlah Rp 605,654
Keuntungan 10% Rp 60,565
Total = Jumlah+(Keuntungan 10%) Rp 666,219

1 meter KABEL TR, NYY 3 X 120 mm2 Rp 789,000


Kabel NYY 3X120 mm2 meter 1.05 Rp 581,837 Rp 610,928
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 30,620 Rp 30,620

Mandor oh 0.02 Rp 141,277 Rp 2,903


Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 8,052
Tukang Listrik oh 0.21 Rp 108,501 Rp 22,298
Pekerja oh 0.41 Rp 99,459 Rp 40,879
Jumlah Rp 717,156
Keuntungan 10% Rp 71,716
Total = Jumlah+(Keuntungan 10%) Rp 788,871

1 meter KABEL TR, NYY 3 X 150 mm2 Rp 959,000


Kabel NYY 3X150 mm2 meter 1.05 Rp 714,750 Rp 750,488
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 37,598 Rp 37,598

Mandor oh 0.02 Rp 141,277 Rp 3,227


Kepala Tukang listrik oh 0.08 Rp 117,543 Rp 8,950
Tukang Listrik oh 0.23 Rp 108,501 Rp 24,783
Pekerja oh 0.46 Rp 99,459 Rp 45,436
Jumlah Rp 871,956
Keuntungan 10% Rp 87,196
Total = Jumlah+(Keuntungan 10%) Rp 959,152

1 meter KABEL TR, NYY 4 X 2,5 mm2 Rp 54,000


Kabel NYY 4X2,5 mm2 meter 1.05 Rp 31,646 Rp 33,228
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 1,735 Rp 1,735

Mandor oh 0.00 Rp 141,277 Rp 502


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,393
Tukang Listrik oh 0.04 Rp 108,501 Rp 3,858
Pekerja oh 0.07 Rp 99,459 Rp 7,074
Jumlah Rp 49,267
Keuntungan 10% Rp 4,927
Total = Jumlah+(Keuntungan 10%) Rp 54,193

1 meter KABEL TR, NYY 4 X 4 mm2 Rp 62,000


Kabel NYY 4X4 mm2 meter 1.05 Rp 37,975 Rp 39,874
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 2,067 Rp 2,067

Mandor oh 0.00 Rp 141,277 Rp 502


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,393
Tukang Listrik oh 0.04 Rp 108,501 Rp 3,858
Pekerja oh 0.07 Rp 99,459 Rp 7,074
Jumlah Rp 56,245
Keuntungan 10% Rp 5,624
Total = Jumlah+(Keuntungan 10%) Rp 61,869

1 meter KABEL TR, NYY 4 X 6 mm2 Rp 85,000


Kabel NYY 4 X 6 mm2 meter 1.05 Rp 52,894 Rp 55,539
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 2,851 Rp 2,851

Mandor oh 0.00 Rp 141,277 Rp 670


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 1,857
Tukang Listrik oh 0.05 Rp 108,501 Rp 5,142
Pekerja oh 0.09 Rp 99,459 Rp 9,427
Jumlah Rp 76,961
Keuntungan 10% Rp 7,696
Total = Jumlah+(Keuntungan 10%) Rp 84,657

1 meter KABEL TR, NYY 4 X 10 mm2 Rp 130,000


Kabel NYY 4 X 10 mm2 meter 1.05 Rp 84,812 Rp 89,052
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 4,526 Rp 4,526

Mandor oh 0.01 Rp 141,277 Rp 893


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,477
Tukang Listrik oh 0.06 Rp 108,501 Rp 6,858
Pekerja oh 0.13 Rp 99,459 Rp 12,574
Jumlah Rp 117,856
Keuntungan 10% Rp 11,786
Total = Jumlah+(Keuntungan 10%) Rp 129,641

1 meter KABEL TR, NYY 4 X 16 mm2 Rp 176,000


Kabel NYY 4 X 16 mm2 meter 1.05 Rp 115,734 Rp 121,521
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 6,150 Rp 6,150

Mandor oh 0.01 Rp 141,277 Rp 1,191


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,302
Tukang Listrik oh 0.08 Rp 108,501 Rp 9,144
Pekerja oh 0.17 Rp 99,459 Rp 16,764
Jumlah Rp 159,546
Keuntungan 10% Rp 15,955
Total = Jumlah+(Keuntungan 10%) Rp 175,501

1 meter KABEL TR, NYY 4 X 25 mm2 Rp 263,000


Kabel NYY 4 X 25 mm2 meter 1.05 Rp 178,575 Rp 187,503
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 9,449 Rp 9,449

Mandor oh 0.01 Rp 141,277 Rp 1,588


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,403
Tukang Listrik oh 0.11 Rp 108,501 Rp 12,194
Pekerja oh 0.22 Rp 99,459 Rp 22,355
Jumlah Rp 238,967
Keuntungan 10% Rp 23,897
Total = Jumlah+(Keuntungan 10%) Rp 262,864

1 meter KABEL TR, NYY 4 X 35 mm2 Rp 356,000


Kabel NYY 4 X 35 mm2 meter 1.05 Rp 243,223 Rp 255,384
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 12,843 Rp 12,843

Mandor oh 0.01 Rp 141,277 Rp 2,117


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,871
Tukang Listrik oh 0.15 Rp 108,501 Rp 16,257
Pekerja oh 0.30 Rp 99,459 Rp 29,805
Jumlah Rp 323,752
Keuntungan 10% Rp 32,375
Total = Jumlah+(Keuntungan 10%) Rp 356,127

1 meter KABEL TR, NYY 4 X 50 mm2 Rp 473,000


Kabel NYY 4 X 50 mm2 meter 1.05 Rp 323,243 Rp 339,405
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 17,044 Rp 17,044

Mandor oh 0.02 Rp 141,277 Rp 2,822


Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 7,827
Tukang Listrik oh 0.20 Rp 108,501 Rp 21,674
Pekerja oh 0.40 Rp 99,459 Rp 39,736
Jumlah Rp 429,983
Keuntungan 10% Rp 42,998
Total = Jumlah+(Keuntungan 10%) Rp 472,981

1 meter KABEL TR, NYY 4 X 70 mm2 Rp 646,000


Kabel NYY 4 X 70 mm2 meter 1.05 Rp 458,417 Rp 481,337
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 24,141 Rp 24,141

Mandor oh 0.02 Rp 141,277 Rp 3,135


Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 8,695
Tukang Listrik oh 0.22 Rp 108,501 Rp 24,079
Pekerja oh 0.44 Rp 99,459 Rp 44,145
Jumlah Rp 587,008
Keuntungan 10% Rp 58,701
Total = Jumlah+(Keuntungan 10%) Rp 645,709

1 meter KABEL TR, NYY 4 X 95 mm2 Rp 866,000


Kabel NYY 4 X 95 mm2 meter 1.05 Rp 631,566 Rp 663,144
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 33,231 Rp 33,231

Mandor oh 0.02 Rp 141,277 Rp 3,485


Kepala Tukang listrik oh 0.08 Rp 117,543 Rp 9,665
Tukang Listrik oh 0.25 Rp 108,501 Rp 26,764
Pekerja oh 0.49 Rp 99,459 Rp 49,067
Jumlah Rp 786,831
Keuntungan 10% Rp 78,683
Total = Jumlah+(Keuntungan 10%) Rp 865,514

1 meter KABEL TR, NYY 4 X 120 mm2 Rp 1,074,000


Kabel NYY 4 X 120 mm2 meter 1.05 Rp 794,770 Rp 834,508
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 41,799 Rp 41,799

Mandor oh 0.03 Rp 141,277 Rp 3,871


Kepala Tukang listrik oh 0.09 Rp 117,543 Rp 10,734
Tukang Listrik oh 0.27 Rp 108,501 Rp 29,726
Pekerja oh 0.55 Rp 99,459 Rp 54,498
Jumlah Rp 976,612
Keuntungan 10% Rp 97,661
Total = Jumlah+(Keuntungan 10%) Rp 1,074,273

1 meter KABEL TR, NYY 1 X 150 mm2 Rp 411,000


Kabel NYY 1 X 150 mm2 meter 1.05 Rp 238,250 Rp 250,163
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 12,582 Rp 12,582

Mandor oh 0.03 Rp 141,277 Rp 4,302


Kepala Tukang listrik oh 0.10 Rp 117,543 Rp 11,931
Tukang Listrik oh 0.30 Rp 108,501 Rp 33,039
Pekerja oh 0.61 Rp 99,459 Rp 60,572
Jumlah Rp 374,064
Keuntungan 10% Rp 37,406
Total = Jumlah+(Keuntungan 10%) Rp 411,470

1 meter KABEL TR, NYY 4 X 150 mm2 Rp 1,308,000


AHS ELK 48 / 58
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

Kabel NYY 4 X 150 mm2 meter 1.05 Rp 977,865 Rp 1,026,758


Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 51,412 Rp 51,412

Mandor oh 0.03 Rp 141,277 Rp 4,302


Kepala Tukang listrik oh 0.10 Rp 117,543 Rp 11,931
Tukang Listrik oh 0.30 Rp 108,501 Rp 33,039
Pekerja oh 0.61 Rp 99,459 Rp 60,572
Jumlah Rp 1,189,489
Keuntungan 10% Rp 118,949
Total = Jumlah+(Keuntungan 10%) Rp 1,308,438

1 meter KABEL TR, NYY 4 X 185 mm2 Rp 1,624,000


Kabel NYY 4 X 185 mm2 meter 1.05 Rp 1,227,417 Rp 1,288,788
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 64,513 Rp 64,513

Mandor oh 0.03 Rp 141,277 Rp 4,779


Kepala Tukang listrik oh 0.11 Rp 117,543 Rp 13,255
Tukang Listrik oh 0.34 Rp 108,501 Rp 36,705
Pekerja oh 0.68 Rp 99,459 Rp 67,293
Jumlah Rp 1,476,809
Keuntungan 10% Rp 147,681
Total = Jumlah+(Keuntungan 10%) Rp 1,624,490

1 meter KABEL TR, NYY 1 X 240 mm2 Rp 624,000


Kabel NYY 1x240 mm2 meter 1.05 Rp 390,151 Rp 409,659
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 20,557 Rp 20,557

Mandor oh 0.04 Rp 141,277 Rp 5,311


Kepala Tukang listrik oh 0.13 Rp 117,543 Rp 14,730
Tukang Listrik oh 0.38 Rp 108,501 Rp 40,790
Pekerja oh 0.75 Rp 99,459 Rp 74,781
Jumlah Rp 567,303
Keuntungan 10% Rp 56,730
Total = Jumlah+(Keuntungan 10%) Rp 624,033
1 meter KABEL TR, NYY 4 X 240 mm2 Rp 2,102,000
Kabel NYY 4 X 240 mm2 meter 1.05 Rp 1,608,527 Rp 1,688,953
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 84,521 Rp 84,521

Mandor oh 0.04 Rp 141,277 Rp 5,311


Kepala Tukang listrik oh 0.13 Rp 117,543 Rp 14,730
Tukang Listrik oh 0.38 Rp 108,501 Rp 40,790
Pekerja oh 0.75 Rp 99,459 Rp 74,781
Jumlah Rp 1,910,562
Keuntungan 10% Rp 191,056
Total = Jumlah+(Keuntungan 10%) Rp 2,101,618

1 meter KABEL TR, NYY 4 X 300 mm2 Rp 2,601,000


Kabel NYY 4 X 300 mm2 meter 1.05 Rp 2,006,816 Rp 2,107,157
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 105,432 Rp 105,432

Mandor oh 0.04 Rp 141,277 Rp 5,901


Kepala Tukang listrik oh 0.14 Rp 117,543 Rp 16,366
Tukang Listrik oh 0.42 Rp 108,501 Rp 45,322
Pekerja oh 0.84 Rp 99,459 Rp 83,090
Jumlah Rp 2,364,744
Keuntungan 10% Rp 236,474
Total = Jumlah+(Keuntungan 10%) Rp 2,601,218

1 meter Kabel NYY 1 x 150 mm2 Rp 398,000


Kabel NYY 1 x 150 mm2 meter 1.00 Rp 238,250 Rp 238,250
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 11,986 Rp 11,986

Mandor oh 0.03 Rp 141,277 Rp 4,302


Kepala Tukang listrik oh 0.10 Rp 117,543 Rp 11,931
Tukang Listrik oh 0.30 Rp 108,501 Rp 33,039
Pekerja oh 0.61 Rp 99,459 Rp 60,572
Jumlah Rp 361,555
Keuntungan 10% Rp 36,156
Total = Jumlah+(Keuntungan 10%) Rp 397,711

1 meter Kabel NYY 1 x 185 mm2 Rp 479,000


Kabel NYY 1 x 185 mm2 meter 1.00 Rp 297,021 Rp 297,021
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 14,925 Rp 14,925

Mandor oh 0.03 Rp 141,277 Rp 4,779


Kepala Tukang listrik oh 0.11 Rp 117,543 Rp 13,255
Tukang Listrik oh 0.34 Rp 108,501 Rp 36,705
Pekerja oh 0.68 Rp 99,459 Rp 67,293
Jumlah Rp 435,454
Keuntungan 10% Rp 43,545
Total = Jumlah+(Keuntungan 10%) Rp 478,999

1 meter Kabel NYY 1 x 240 mm2 Rp 602,000


Kabel NYY 1 x 240 mm2 meter 1.00 Rp 390,151 Rp 390,151
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 19,581 Rp 19,581

Mandor oh 0.04 Rp 141,277 Rp 5,311


Kepala Tukang listrik oh 0.13 Rp 117,543 Rp 14,730
Tukang Listrik oh 0.38 Rp 108,501 Rp 40,790
Pekerja oh 0.75 Rp 99,459 Rp 74,781
Jumlah Rp 546,820
Keuntungan 10% Rp 54,682
Total = Jumlah+(Keuntungan 10%) Rp 601,502

1 meter Kabel NYY 1 x 300 mm2 Rp 730,000


Kabel NYY 1 x 300 mm2 meter 1.00 Rp 487,350 Rp 487,350
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 24,441 Rp 24,441

Mandor oh 0.04 Rp 141,277 Rp 5,901


Kepala Tukang listrik oh 0.14 Rp 117,543 Rp 16,366
Tukang Listrik oh 0.42 Rp 108,501 Rp 45,322
Pekerja oh 0.84 Rp 99,459 Rp 83,090
Jumlah Rp 663,947
Keuntungan 10% Rp 66,395
Total = Jumlah+(Keuntungan 10%) Rp 730,341

1 meter Kabel NYFGbY 3x4 mm2 Rp 71,000


Kabel NYFGbY 3x4 mm2 meter 1.05 Rp 51,090 Rp 53,645
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 2,756 Rp 2,756

Mandor oh 0.00 Rp 141,277 Rp 251


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 697
Tukang Listrik oh 0.02 Rp 108,501 Rp 1,929
Pekerja oh 0.04 Rp 99,459 Rp 3,536
Jumlah Rp 64,288
Keuntungan 10% Rp 6,429
Total = Jumlah+(Keuntungan 10%) Rp 70,717

1 meter Kabel NYFGbY 4x4 mm2 Rp 81,000


Kabel NYFGbY 4x4 mm2 meter 1.05 Rp 59,766 Rp 62,754
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 3,211 Rp 3,211

Mandor oh 0.00 Rp 141,277 Rp 251


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 697
Tukang Listrik oh 0.02 Rp 108,501 Rp 1,929
Pekerja oh 0.04 Rp 99,459 Rp 3,536
Jumlah Rp 73,854
Keuntungan 10% Rp 7,385
Total = Jumlah+(Keuntungan 10%) Rp 81,239

1 meter Kabel NYFGbY 4x6 mm2 Rp 106,000


Kabel NYFGbY 4x6 mm2 meter 1.05 Rp 78,482 Rp 82,406
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 4,194 Rp 4,194

Mandor oh 0.00 Rp 141,277 Rp 335


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 929
Tukang Listrik oh 0.02 Rp 108,501 Rp 2,572
Pekerja oh 0.05 Rp 99,459 Rp 4,715
Jumlah Rp 96,626
Keuntungan 10% Rp 9,663
Total = Jumlah+(Keuntungan 10%) Rp 106,289

1 meter Kabel NYFGbY 4x10 mm2 Rp 150,000


Kabel NYFGbY 4x10 mm2 meter 1.05 Rp 111,937 Rp 117,534
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 5,950 Rp 5,950

Mandor oh 0.00 Rp 141,277 Rp 447


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,238
Tukang Listrik oh 0.03 Rp 108,501 Rp 3,429
Pekerja oh 0.06 Rp 99,459 Rp 6,287
Jumlah Rp 136,360
Keuntungan 10% Rp 13,636
Total = Jumlah+(Keuntungan 10%) Rp 149,996

1 meter Kabel NYFGbY 4x16 mm2 Rp 177,000


Kabel NYFGbY 4x16 mm2 meter 1.05 Rp 130,653 Rp 137,186
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 6,933 Rp 6,933

Mandor oh 0.00 Rp 141,277 Rp 595


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,651
Tukang Listrik oh 0.04 Rp 108,501 Rp 4,572
Pekerja oh 0.08 Rp 99,459 Rp 8,383
Jumlah Rp 160,795
Keuntungan 10% Rp 16,080
Total = Jumlah+(Keuntungan 10%) Rp 176,875

1 meter Kabel NYFGbY 4x25 mm2 Rp 271,000


Kabel NYFGbY 4x25 mm2 meter 1.05 Rp 203,439 Rp 213,611
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 10,754 Rp 10,754

Mandor oh 0.01 Rp 141,277 Rp 794


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,201
Tukang Listrik oh 0.06 Rp 108,501 Rp 6,096
Pekerja oh 0.11 Rp 99,459 Rp 11,176
Jumlah Rp 246,108
Keuntungan 10% Rp 24,611
Total = Jumlah+(Keuntungan 10%) Rp 270,719

1 meter Kabel NYFGbY 4x35 mm2 Rp 348,000


Kabel NYFGbY 4x35 mm2 meter 1.05 Rp 261,307 Rp 274,372
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 13,792 Rp 13,792

Mandor oh 0.01 Rp 141,277 Rp 1,058


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,935
Tukang Listrik oh 0.07 Rp 108,501 Rp 8,129
Pekerja oh 0.15 Rp 99,459 Rp 14,902
Jumlah Rp 316,664
Keuntungan 10% Rp 31,666
Total = Jumlah+(Keuntungan 10%) Rp 348,330

1 meter Kabel NYFGbY 4x50 mm2 Rp 457,000


Kabel NYFGbY 4x50 mm2 meter 1.05 Rp 342,682 Rp 359,816
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 18,065 Rp 18,065

Mandor oh 0.01 Rp 141,277 Rp 1,411


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,913
Tukang Listrik oh 0.10 Rp 108,501 Rp 10,837
Pekerja oh 0.20 Rp 99,459 Rp 19,868
Jumlah Rp 415,385
Keuntungan 10% Rp 41,539
Total = Jumlah+(Keuntungan 10%) Rp 456,924

1 meter Kabel NYFGbY 4x70 mm2 Rp 631,000


Kabel NYFGbY 4x70 mm2 meter 1.05 Rp 482,377 Rp 506,496
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 25,399 Rp 25,399

Mandor oh 0.01 Rp 141,277 Rp 1,568


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,349
Tukang Listrik oh 0.11 Rp 108,501 Rp 12,042
Pekerja oh 0.22 Rp 99,459 Rp 22,078
Jumlah Rp 573,406
Keuntungan 10% Rp 57,341
Total = Jumlah+(Keuntungan 10%) Rp 630,747

1 meter Kabel NYFGbY 4x95 mm2 Rp 850,000


Kabel NYFGbY 4x95 mm2 meter 1.05 Rp 659,143 Rp 692,101
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 34,679 Rp 34,679

Mandor oh 0.01 Rp 141,277 Rp 1,742


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,831
Tukang Listrik oh 0.12 Rp 108,501 Rp 13,379
Pekerja oh 0.25 Rp 99,459 Rp 24,528
Jumlah Rp 772,734
Keuntungan 10% Rp 77,273
Total = Jumlah+(Keuntungan 10%) Rp 850,007

1 meter Kabel NYFGbY 4x120 mm2 Rp 1,058,000


Kabel NYFGbY 4x120 mm2 meter 1.05 Rp 826,416 Rp 867,737
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 43,461 Rp 43,461

Mandor oh 0.01 Rp 141,277 Rp 1,936


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,369
Tukang Listrik oh 0.14 Rp 108,501 Rp 14,867
Pekerja oh 0.27 Rp 99,459 Rp 27,257
Jumlah Rp 962,100
Keuntungan 10% Rp 96,210
Total = Jumlah+(Keuntungan 10%) Rp 1,058,311

1 meter Kabel NYFGbY 4x150 mm2 Rp 1,290,000


Kabel NYFGbY 4x150 mm2 meter 1.05 Rp 1,012,224 Rp 1,062,835
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 53,215 Rp 53,215

Mandor oh 0.02 Rp 141,277 Rp 2,150


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,964
Tukang Listrik oh 0.15 Rp 108,501 Rp 16,515
Pekerja oh 0.30 Rp 99,459 Rp 30,277
Jumlah Rp 1,172,431
Keuntungan 10% Rp 117,243
Total = Jumlah+(Keuntungan 10%) Rp 1,289,674

1 meter Kabel NYFGbY 4x185 mm2 Rp 1,592,000


Kabel NYFGbY 4x185 mm2 meter 1.05 Rp 1,255,899 Rp 1,318,694
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 66,008 Rp 66,008

Mandor oh 0.02 Rp 141,277 Rp 2,390


Kepala Tukang listrik oh 0.06 Rp 117,543 Rp 6,627
Tukang Listrik oh 0.17 Rp 108,501 Rp 18,353
Pekerja oh 0.34 Rp 99,459 Rp 33,647
Jumlah Rp 1,447,193
Keuntungan 10% Rp 144,719
Total = Jumlah+(Keuntungan 10%) Rp 1,591,913

1 meter Kabel NYFGbY 4x240 mm2 Rp 2,069,000


Kabel NYFGbY 4x240 mm2 meter 1.05 Rp 1,642,886 Rp 1,725,030
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 86,325 Rp 86,325

Mandor oh 0.02 Rp 141,277 Rp 2,656


Kepala Tukang listrik oh 0.06 Rp 117,543 Rp 7,365
Tukang Listrik oh 0.19 Rp 108,501 Rp 20,395 Rp 1,121,727
Pekerja oh 0.38 Rp 99,459 Rp 37,391
Jumlah Rp 1,880,636
Keuntungan 10% Rp 188,064
Total = Jumlah+(Keuntungan 10%) Rp 2,068,700

1 meter Kabel NYFGbY 4x300 mm2 Rp 2,564,000


Kabel NYFGbY 4x300 mm2 meter 1.05 Rp 2,044,791 Rp 2,147,031
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 107,425 Rp 107,425

Mandor oh 0.02 Rp 141,277 Rp 2,951


Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 8,183
Tukang Listrik oh 0.21 Rp 108,501 Rp 22,661
Pekerja oh 0.42 Rp 99,459 Rp 41,545
Jumlah Rp 2,331,271
Keuntungan 10% Rp 233,127
Total = Jumlah+(Keuntungan 10%) Rp 2,564,398

1 meter Kabel FRC 3x2,5 mm2 Rp 59,000


Kabel FRC 3x2,5 mm2 meter 1.05 Rp 40,467 Rp 42,491
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 2,198 Rp 2,198

Upah Pasang
Mandor oh 0.00 Rp 141,277 Rp 283
Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 784
Tukang Listrik oh 0.02 Rp 108,501 Rp 2,170
Pekerja oh 0.04 Rp 99,459 Rp 3,978
Jumlah Rp 53,379
Keuntungan 10% Rp 5,338
Total = Jumlah+(Keuntungan 10%) Rp 58,717

1 meter Kabel FRC 3x4 mm2 Rp 101,000


Kabel FRC 3x4 mm2 meter 1.05 Rp 73,052 Rp 76,704
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 3,909 Rp 3,909

Upah Pasang
Mandor oh 0.00 Rp 141,277 Rp 372
Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,031
Tukang Listrik oh 0.03 Rp 108,501 Rp 2,855
Pekerja oh 0.05 Rp 99,459 Rp 5,235
Jumlah Rp 91,581
Keuntungan 10% Rp 9,158
Total = Jumlah+(Keuntungan 10%) Rp 100,739

1 meter Kabel FRC 3X6 mm2 Rp 130,000


Kabel FRC 3X6 mm2 meter 1.05 Rp 94,074 Rp 98,777
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 5,013 Rp 5,013

Upah Pasang
Mandor oh 0.00 Rp 141,277 Rp 505
Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,399
Tukang Listrik oh 0.04 Rp 108,501 Rp 3,875
Pekerja oh 0.07 Rp 99,459 Rp 7,104
Jumlah Rp 118,148
Keuntungan 10% Rp 11,815
Total = Jumlah+(Keuntungan 10%) Rp 129,963

1 meter Kabel FRC 3X10 mm2 Rp 195,000


Kabel FRC 3X10 mm2 meter 1.05 Rp 143,476 Rp 150,649
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 7,606 Rp 7,606

Mandor oh 0.00 Rp 141,277 Rp 670


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 1,857
Tukang Listrik oh 0.05 Rp 108,501 Rp 5,142
Pekerja oh 0.09 Rp 99,459 Rp 9,427
Jumlah Rp 176,827
Keuntungan 10% Rp 17,683
Total = Jumlah+(Keuntungan 10%) Rp 194,509

1 meter Kabel FRC 3X16 mm2 Rp 254,000


Kabel FRC 3X16 mm2 meter 1.05 Rp 187,622 Rp 197,003
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 9,924 Rp 9,924

Mandor oh 0.01 Rp 141,277 Rp 894


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,480
Tukang Listrik oh 0.06 Rp 108,501 Rp 6,867
Pekerja oh 0.13 Rp 99,459 Rp 12,590
Jumlah Rp 231,233
Keuntungan 10% Rp 23,123
Total = Jumlah+(Keuntungan 10%) Rp 254,356

1 meter Kabel FRC 3X25 mm2 Rp 372,000


Kabel FRC 3X25 mm2 meter 1.05 Rp 277,491 Rp 291,366
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 14,642 Rp 14,642

Mandor oh 0.01 Rp 141,277 Rp 1,197


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,320
Tukang Listrik oh 0.08 Rp 108,501 Rp 9,195
Pekerja oh 0.17 Rp 99,459 Rp 16,857
Jumlah Rp 338,053
Keuntungan 10% Rp 33,805
Total = Jumlah+(Keuntungan 10%) Rp 371,858

1 meter Kabel FRC 3X35 mm2 Rp 482,000


Kabel FRC 3X35 mm2 meter 1.05 Rp 359,477 Rp 377,451
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 18,946 Rp 18,946

Mandor oh 0.01 Rp 141,277 Rp 1,587


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,402
Tukang Listrik oh 0.11 Rp 108,501 Rp 12,191
Pekerja oh 0.22 Rp 99,459 Rp 22,350
Jumlah Rp 438,404
Keuntungan 10% Rp 43,840
Total = Jumlah+(Keuntungan 10%) Rp 482,244

1 meter Kabel FRC 3X50 mm2 Rp 660,000


Kabel FRC 3X50 mm2 meter 1.05 Rp 493,493 Rp 518,168
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068

AHS ELK 49 / 58
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

Isolasi roll 0.05 Rp 8,138 Rp 407


Sewa alat 5% dari harga bahan lot 1.00 Rp 25,982 Rp 25,982

Mandor oh 0.02 Rp 141,277 Rp 2,121


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,883
Tukang Listrik oh 0.15 Rp 108,501 Rp 16,291
Pekerja oh 0.30 Rp 99,459 Rp 29,868
Jumlah Rp 599,788
Keuntungan 10% Rp 59,979
Total = Jumlah+(Keuntungan 10%) Rp 659,767

1 meter Kabel FRC 3X70 mm2 Rp 775,000


Kabel FRC 3X70 mm2 meter 1.05 Rp 583,362 Rp 612,530
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 30,700 Rp 30,700

Mandor oh 0.02 Rp 141,277 Rp 2,355


Kepala Tukang listrik oh 0.06 Rp 117,543 Rp 6,530
Tukang Listrik oh 0.17 Rp 108,501 Rp 18,083
Pekerja oh 0.33 Rp 99,459 Rp 33,153
Jumlah Rp 704,827
Keuntungan 10% Rp 70,483
Total = Jumlah+(Keuntungan 10%) Rp 775,310

1 meter Kabel FRC 4x4 mm2 Rp 123,000


Kabel FRC 4x4 mm2 meter 1.05 Rp 94,074 Rp 98,777
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 5,013 Rp 5,013

Mandor oh 0.00 Rp 141,277 Rp 251


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 697
Tukang Listrik oh 0.02 Rp 108,501 Rp 1,929
Pekerja oh 0.04 Rp 99,459 Rp 3,536
Jumlah Rp 111,678
Keuntungan 10% Rp 11,168
Total = Jumlah+(Keuntungan 10%) Rp 122,846

1 meter Kabel FRC 4x6 mm2 Rp 160,000


Kabel FRC 4x6 mm2 meter 1.05 Rp 122,454 Rp 128,576
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 6,503 Rp 6,503

Mandor oh 0.00 Rp 141,277 Rp 335


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 929
Tukang Listrik oh 0.02 Rp 108,501 Rp 2,572
Pekerja oh 0.05 Rp 99,459 Rp 4,715
Jumlah Rp 145,104
Keuntungan 10% Rp 14,510
Total = Jumlah+(Keuntungan 10%) Rp 159,615

1 meter Kabel FRC 4x10 mm2 Rp 237,000


Kabel FRC 4x10 mm2 meter 1.05 Rp 183,943 Rp 193,140
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 9,731 Rp 9,731

Mandor oh 0.00 Rp 141,277 Rp 447


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,238
Tukang Listrik oh 0.03 Rp 108,501 Rp 3,429
Pekerja oh 0.06 Rp 99,459 Rp 6,287
Jumlah Rp 215,747
Keuntungan 10% Rp 21,575
Total = Jumlah+(Keuntungan 10%) Rp 237,322

1 meter Kabel FRC 4x16 mm2 Rp 320,000


Kabel FRC 4x16 mm2 meter 1.05 Rp 248,586 Rp 261,015
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 13,125 Rp 13,125

Mandor oh 0.00 Rp 141,277 Rp 595


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,651
Tukang Listrik oh 0.04 Rp 108,501 Rp 4,572
Pekerja oh 0.08 Rp 99,459 Rp 8,383
Jumlah Rp 290,816
Keuntungan 10% Rp 29,082
Total = Jumlah+(Keuntungan 10%) Rp 319,898

1 meter Kabel FRC 4x25 mm2 Rp 464,000


Kabel FRC 4x25 mm2 meter 1.05 Rp 363,156 Rp 381,314
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 19,139 Rp 19,139

Mandor oh 0.01 Rp 141,277 Rp 794


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,201
Tukang Listrik oh 0.06 Rp 108,501 Rp 6,096
Pekerja oh 0.11 Rp 99,459 Rp 11,176
Jumlah Rp 422,196
Keuntungan 10% Rp 42,220
Total = Jumlah+(Keuntungan 10%) Rp 464,416

1 meter Kabel FRC 4x35 mm2 Rp 611,000


Kabel FRC 4x35 mm2 meter 1.05 Rp 478,252 Rp 502,165
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 25,182 Rp 25,182

Mandor oh 0.01 Rp 141,277 Rp 1,058


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,935
Tukang Listrik oh 0.07 Rp 108,501 Rp 8,129
Pekerja oh 0.15 Rp 99,459 Rp 14,902
Jumlah Rp 555,846
Keuntungan 10% Rp 55,585
Total = Jumlah+(Keuntungan 10%) Rp 611,431

1 meter Kabel FRC 4x50 mm2 Rp 825,000


Kabel FRC 4x50 mm2 meter 1.05 Rp 646,429 Rp 678,750
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 34,011 Rp 34,011

Mandor oh 0.01 Rp 141,277 Rp 1,411


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,913
Tukang Listrik oh 0.10 Rp 108,501 Rp 10,837
Pekerja oh 0.20 Rp 99,459 Rp 19,868
Jumlah Rp 750,266
Keuntungan 10% Rp 75,027
Total = Jumlah+(Keuntungan 10%) Rp 825,292

1 meter Kabel FRC 4x70 mm2 Rp 1,136,000


Kabel FRC 4x70 mm2 meter 1.05 Rp 898,693 Rp 943,628
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 47,255 Rp 47,255

Mandor oh 0.01 Rp 141,277 Rp 1,568


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,349
Tukang Listrik oh 0.11 Rp 108,501 Rp 12,042
Pekerja oh 0.22 Rp 99,459 Rp 22,078
Jumlah Rp 1,032,394
Keuntungan 10% Rp 103,239
Total = Jumlah+(Keuntungan 10%) Rp 1,135,634

1 meter Kabel FRC 4x95 mm2 Rp 1,325,000


Kabel FRC 4x95 mm2 meter 1.05 Rp 1,051,103 Rp 1,103,658
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 55,257 Rp 55,257

Mandor oh 0.01 Rp 141,277 Rp 1,742


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,831
Tukang Listrik oh 0.12 Rp 108,501 Rp 13,379
Pekerja oh 0.25 Rp 99,459 Rp 24,528
Jumlah Rp 1,204,869
Keuntungan 10% Rp 120,487
Total = Jumlah+(Keuntungan 10%) Rp 1,325,356

1 meter Kabel FRC 4x120 mm2 Rp 1,841,000


Kabel FRC 4x120 mm2 meter 1.05 Rp 1,471,545 Rp 1,545,122
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 77,330 Rp 77,330

Mandor oh 0.01 Rp 141,277 Rp 1,936


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,369
Tukang Listrik oh 0.14 Rp 108,501 Rp 14,867
Pekerja oh 0.27 Rp 99,459 Rp 27,257
Jumlah Rp 1,673,355
Keuntungan 10% Rp 167,335
Total = Jumlah+(Keuntungan 10%) Rp 1,840,690

1 meter Kabel FRC 4x150 mm2 Rp 2,148,000


Kabel FRC 4x150 mm2 meter 1.05 Rp 1,720,131 Rp 1,806,137
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 90,381 Rp 90,381

Mandor oh 0.02 Rp 141,277 Rp 2,150


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,964
Tukang Listrik oh 0.15 Rp 108,501 Rp 16,515
Pekerja oh 0.30 Rp 99,459 Rp 30,277
Jumlah Rp 1,952,898
Keuntungan 10% Rp 195,290
Total = Jumlah+(Keuntungan 10%) Rp 2,148,188

1 meter Kabel FRC 4x185 mm2 Rp 2,433,000


Kabel FRC 4x185 mm2 meter 1.05 Rp 1,949,797 Rp 2,047,286
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 102,438 Rp 102,438

Mandor oh 0.02 Rp 141,277 Rp 2,390


Kepala Tukang listrik oh 0.06 Rp 117,543 Rp 6,627
Tukang Listrik oh 0.17 Rp 108,501 Rp 18,353
Pekerja oh 0.34 Rp 99,459 Rp 33,647
Jumlah Rp 2,212,216
Keuntungan 10% Rp 221,222
Total = Jumlah+(Keuntungan 10%) Rp 2,433,437

KABEL BC
1 meter Kabel BC 4 mm2 Rp 13,000
Kabel BC 4 mm2 meter 1.05 Rp 5,807 Rp 6,098
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 379 Rp 379

Mandor oh 0.00 Rp 141,277 Rp 147


Kepala Tukang listrik oh 0.00 Rp 117,543 Rp 407
Tukang Listrik oh 0.01 Rp 108,501 Rp 1,127
Pekerja oh 0.02 Rp 99,459 Rp 2,067
Jumlah Rp 11,699
Keuntungan 10% Rp 1,170
Total = Jumlah+(Keuntungan 10%) Rp 12,869

1 meter Kabel BC 6 mm2 Rp 21,000


Kabel BC 6 mm2 meter 1.05 Rp 8,362 Rp 8,780
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 513 Rp 513

Mandor oh 0.00 Rp 141,277 Rp 335


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 929
Tukang Listrik oh 0.02 Rp 108,501 Rp 2,572
Pekerja oh 0.05 Rp 99,459 Rp 4,715
Jumlah Rp 19,318
Keuntungan 10% Rp 1,932
Total = Jumlah+(Keuntungan 10%) Rp 21,250

1 meter Kabel BC 10 mm2 Rp 31,000


Kabel BC 10 mm2 meter 1.05 Rp 14,053 Rp 14,756
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 812 Rp 812

Mandor oh 0.00 Rp 141,277 Rp 447


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,238
Tukang Listrik oh 0.03 Rp 108,501 Rp 3,429
Pekerja oh 0.06 Rp 99,459 Rp 6,287
Jumlah Rp 28,443
Keuntungan 10% Rp 2,844
Total = Jumlah+(Keuntungan 10%) Rp 31,288

1 meter Kabel BC 16 mm2 Rp 47,000


Kabel BC 16 mm2 meter 1.05 Rp 23,482 Rp 24,656
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 1,307 Rp 1,307

Mandor oh 0.00 Rp 141,277 Rp 595


Kepala Tukang listrik oh 0.01 Rp 117,543 Rp 1,651
Tukang Listrik oh 0.04 Rp 108,501 Rp 4,572
Pekerja oh 0.08 Rp 99,459 Rp 8,383
Jumlah Rp 42,639
Keuntungan 10% Rp 4,264
Total = Jumlah+(Keuntungan 10%) Rp 46,902

1 meter Kabel BC 25 mm2 Rp 68,000


Kabel BC 25 mm2 meter 1.05 Rp 36,442 Rp 38,264
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 1,987 Rp 1,987

Mandor oh 0.01 Rp 141,277 Rp 794


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,201
Tukang Listrik oh 0.06 Rp 108,501 Rp 6,096
Pekerja oh 0.11 Rp 99,459 Rp 11,176
Jumlah Rp 61,994
Keuntungan 10% Rp 6,199
Total = Jumlah+(Keuntungan 10%) Rp 68,193

1 meter Kabel BC 35 mm2 Rp 92,000


Kabel BC 35 mm2 meter 1.05 Rp 50,180 Rp 52,689
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 2,708 Rp 2,708

Mandor oh 0.01 Rp 141,277 Rp 1,058


Kepala Tukang listrik oh 0.02 Rp 117,543 Rp 2,935
Tukang Listrik oh 0.07 Rp 108,501 Rp 8,129
Pekerja oh 0.15 Rp 99,459 Rp 14,902
Jumlah Rp 83,897
Keuntungan 10% Rp 8,390
Total = Jumlah+(Keuntungan 10%) Rp 92,286

1 meter Kabel BC 50 mm2 Rp 130,000


Kabel BC 50 mm2 meter 1.05 Rp 72,994 Rp 76,644
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 3,906 Rp 3,906

Mandor oh 0.01 Rp 141,277 Rp 1,411


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,913
Tukang Listrik oh 0.10 Rp 108,501 Rp 10,837
Pekerja oh 0.20 Rp 99,459 Rp 19,868
Jumlah Rp 118,054
Keuntungan 10% Rp 11,805
Total = Jumlah+(Keuntungan 10%) Rp 129,859

1 meter Kabel BC 70 mm2 Rp 170,000


Kabel BC 70 mm2 meter 1.05 Rp 102,640 Rp 107,772
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 5,462 Rp 5,462

Mandor oh 0.01 Rp 141,277 Rp 1,568


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,349
Tukang Listrik oh 0.11 Rp 108,501 Rp 12,042
Pekerja oh 0.22 Rp 99,459 Rp 22,078
Jumlah Rp 154,746
Keuntungan 10% Rp 15,475
Total = Jumlah+(Keuntungan 10%) Rp 170,221

1 meter Kabel BC 95 mm2 Rp 216,000


Kabel BC 95 mm2 meter 1.05 Rp 136,233 Rp 143,045
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 7,226 Rp 7,226

Mandor oh 0.01 Rp 141,277 Rp 1,742


Kepala Tukang listrik oh 0.04 Rp 117,543 Rp 4,831
Tukang Listrik oh 0.12 Rp 108,501 Rp 13,379
Pekerja oh 0.25 Rp 99,459 Rp 24,528
Jumlah Rp 196,226
Keuntungan 10% Rp 19,623
Total = Jumlah+(Keuntungan 10%) Rp 215,848

1 meter Kabel BC 120 mm2 Rp 268,000


Kabel BC 120 mm2 meter 1.05 Rp 174,919 Rp 183,665
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 9,257 Rp 9,257

Mandor oh 0.01 Rp 141,277 Rp 1,936


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,369
Tukang Listrik oh 0.14 Rp 108,501 Rp 14,867
Pekerja oh 0.27 Rp 99,459 Rp 27,257
Jumlah Rp 243,826
Keuntungan 10% Rp 24,383
Total = Jumlah+(Keuntungan 10%) Rp 268,208

1 meter Kabel BC 150 mm2 Rp 323,000


Kabel BC 150 mm2 meter 1.05 Rp 214,888 Rp 225,632
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 11,355 Rp 11,355

Mandor oh 0.02 Rp 141,277 Rp 2,150


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,964
Tukang Listrik oh 0.15 Rp 108,501 Rp 16,515
Pekerja oh 0.30 Rp 99,459 Rp 30,277
Jumlah Rp 293,368
Keuntungan 10% Rp 29,337
Total = Jumlah+(Keuntungan 10%) Rp 322,704

1 meter Kabel BC 240 mm2 Rp 473,000


Kabel BC 240 mm2 meter 1.05 Rp 338,692 Rp 355,626
Kabel Ties buah 1.05 Rp 1,017 Rp 1,068
Isolasi roll 0.05 Rp 8,138 Rp 407
Sewa alat 5% dari harga bahan lot 1.00 Rp 17,855 Rp 17,855

Mandor oh 0.02 Rp 141,277 Rp 2,150


Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,964
Tukang Listrik oh 0.15 Rp 108,501 Rp 16,515
Pekerja oh 0.30 Rp 99,459 Rp 30,277
Jumlah Rp 429,862
Keuntungan 10% Rp 42,986
Total = Jumlah+(Keuntungan 10%) Rp 472,848

KABEL TRAY
1 meter Kabel Tray 200 x 100 mm² Rp 419,000
Kabel Tray 200 x 100 mm² meter 1.05 Rp 316,461 Rp 332,284
Sewa alat 5% dari harga bahan lot 1.00 Rp 16,614 Rp 16,614

Mandor oh 0.01 Rp 141,277 Rp 1,413


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,918
Tukang Listrik oh 0.07 Rp 108,501 Rp 7,233
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 381,355
Keuntungan 10% Rp 38,135
Total = Jumlah+(Keuntungan 10%) Rp 419,490

1 meter Kabel Tray 300 x 100 mm² Rp 461,000


Kabel Tray 300 x 100 mm² meter 1.05 Rp 350,368 Rp 367,886
Sewa alat 5% dari harga bahan lot 1.00 Rp 18,394 Rp 18,394

Mandor oh 0.01 Rp 141,277 Rp 1,413


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,918
Tukang Listrik oh 0.07 Rp 108,501 Rp 7,233
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 418,737
Keuntungan 10% Rp 41,874
Total = Jumlah+(Keuntungan 10%) Rp 460,610

1 meter Kabel Tray500 x 100 mm² (Hot Dip 1,2mm) Rp 498,000


Kabel Tray500 x 100 mm² (Hot Dip 1,2mm) meter 1.00 Rp 400,000 Rp 400,000
Sewa alat 5% dari harga bahan lot 1.00 Rp 20,000 Rp 20,000

Mandor oh 0.01 Rp 141,277 Rp 1,413


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,918
Tukang Listrik oh 0.07 Rp 108,501 Rp 7,233
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 452,456
Keuntungan 10% Rp 45,246
Total = Jumlah+(Keuntungan 10%) Rp 497,702

1 meter Kabel Tray 600 x 100 mm² Rp 803,000


Kabel Tray 600 x 100 mm² meter 1.05 Rp 632,922 Rp 664,569
Sewa alat 5% dari harga bahan lot 1.00 Rp 33,228 Rp 33,228

Mandor oh 0.01 Rp 141,277 Rp 1,413


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,918
Tukang Listrik oh 0.07 Rp 108,501 Rp 7,233
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 730,253
Keuntungan 10% Rp 73,025
Total = Jumlah+(Keuntungan 10%) Rp 803,278

1 meter Kabel Ladder 200 x 100 mm² Rp 365,000


Kabel Ladder 200 x 100 mm² meter 1.05 Rp 271,252 Rp 284,815
Sewa alat 5% dari harga bahan lot 1.00 Rp 14,241 Rp 14,241

Mandor oh 0.01 Rp 141,277 Rp 1,413


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,918
Tukang Listrik oh 0.07 Rp 108,501 Rp 7,233
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 331,512
Keuntungan 10% Rp 33,151
Total = Jumlah+(Keuntungan 10%) Rp 364,663

1 meter Kabel Ladder 300 x 100 mm² Rp 413,000


Kabel Ladder 300 x 100 mm² meter 1.05 Rp 310,810 Rp 326,351
Sewa alat 5% dari harga bahan lot 1.00 Rp 16,318 Rp 16,318

Mandor oh 0.01 Rp 141,277 Rp 1,413


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,918
Tukang Listrik oh 0.07 Rp 108,501 Rp 7,233
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 375,124
Keuntungan 10% Rp 37,512
Total = Jumlah+(Keuntungan 10%) Rp 412,637

1 meter Kabel Ladder 400 x 100 mm² Rp 36,000

AHS ELK 50 / 58
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

Kabel Ladder 400 x 100 mm² meter 1.05 Rp -


Sewa alat 5% dari harga bahan lot 1.00 Rp - Rp -

Mandor oh 0.01 Rp 141,277 Rp 1,413


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,918
Tukang Listrik oh 0.07 Rp 108,501 Rp 7,233
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 32,456
Keuntungan 10% Rp 3,246
Total = Jumlah+(Keuntungan 10%) Rp 35,702

1 meter Kabel tray 600 x 100 mm² Rp 611,000


Kabel tray 600 x 100 mm² meter 1.05 Rp 474,692 Rp 498,426
Sewa alat 5% dari harga bahan lot 1.00 Rp 24,921 Rp 24,921

Mandor oh 0.01 Rp 141,277 Rp 1,413


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,918
Tukang Listrik oh 0.07 Rp 108,501 Rp 7,233
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 555,804
Keuntungan 10% Rp 55,580
Total = Jumlah+(Keuntungan 10%) Rp 611,384

LAMPU
1 BH - DL LED type RD 150 HRZ LED BULB 6W Rp 246,000
- DL LED type RD 150 HRZ LED BULB 6W bh 1.00 Rp 185,367 Rp 185,367
Sewa alat 5% dari harga bahan lot 1.00 Rp 9,268 Rp 9,268

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 223,854
Keuntungan 10% Rp 22,385
Total = Jumlah+(Keuntungan 10%) Rp 246,240

1 BH - FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W Rp 477,000


- FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W bh 1.00 Rp 385,000 Rp 385,000
Sewa alat 5% dari harga bahan lot 1.00 Rp 19,250 Rp 19,250

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 433,469
Keuntungan 10% Rp 43,347
Total = Jumlah+(Keuntungan 10%) Rp 476,816

1 BH - FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W + BATTERY Rp 1,285,000


- FBH 032 1XPL-C 18W I WH + LED PL-C 8.5W bh 1.00 Rp 1,085,000 Rp 1,085,000
Sewa alat 5% dari harga bahan lot 1.00 Rp 54,250 Rp 54,250

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,168,469
Keuntungan 10% Rp 116,847
Total = Jumlah+(Keuntungan 10%) Rp 1,285,316

1 BH - TL OUTBOW type GMS T8 1x36 SAVY Rp 611,000


- TL OUTBOW type GMS T8 1x36 SAVY bh 1.00 Rp 500,850 Rp 500,850
Sewa alat 5% dari harga bahan lot 1.00 Rp 25,043 Rp 25,043

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 555,111
Keuntungan 10% Rp 55,511
Total = Jumlah+(Keuntungan 10%) Rp 610,623

1 BH - TL OUTBOW type TK CG T8 1x36 SAVY Rp 470,000


- TL OUTBOW type TK CG T8 1x36 SAVY bh 1.00 Rp 378,883 Rp 378,883
Sewa alat 5% dari harga bahan lot 1.00 Rp 18,944 Rp 18,944

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 427,046
Keuntungan 10% Rp 42,705
Total = Jumlah+(Keuntungan 10%) Rp 469,751

1 BH - TL OUTBOW type TK CG T8 1x36 SAVY c/w BATT Rp 1,254,000


- TL OUTBOW type TK CG T8 1x36 SAVY c/w B bh 1.00 Rp 1,057,692 Rp 1,057,692
Sewa alat 5% dari harga bahan lot 1.00 Rp 52,885 Rp 52,885

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,139,796
Keuntungan 10% Rp 113,980
Total = Jumlah+(Keuntungan 10%) Rp 1,253,776

1 BH - TL OUTBOW type BL CG T8 1x36 SAVY Rp 397,000


- TL OUTBOW type BL CG T8 1x36 SAVY bh 1.00 Rp 315,670 Rp 315,670
Sewa alat 5% dari harga bahan lot 1.00 Rp 15,784 Rp 15,784

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 360,673
Keuntungan 10% Rp 36,067
Total = Jumlah+(Keuntungan 10%) Rp 396,740

1 BH - EXIT LAMP LED 1MK HUGO Rp 1,187,000


- EXIT LAMP LED 1MK HUGO bh 1.00 Rp 999,543 Rp 999,543
Sewa alat 5% dari harga bahan lot 1.00 Rp 49,977 Rp 49,977

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,078,739
Keuntungan 10% Rp 107,874
Total = Jumlah+(Keuntungan 10%) Rp 1,186,613

1 BH - LP WASTAFEL type WL TRAPESIUM LED OSR Basic Rp 625,000


- LP WASTAFEL type WL TRAPESIUM LED OSR B bh 1.00 Rp 513,300 Rp 513,300
Sewa alat 5% dari harga bahan lot 1.00 Rp 25,665 Rp 25,665

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 568,184
Keuntungan 10% Rp 56,818
Total = Jumlah+(Keuntungan 10%) Rp 625,002

1 BH - Lampu STRIPLIGHT 7W Rp 193,000


- Lampu STRIPLIGHT 7W bh 1.00 Rp 139,021 Rp 139,021
Sewa alat 5% dari harga bahan lot 1.00 Rp 6,951 Rp 6,951

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 175,191
Keuntungan 10% Rp 17,519
Total = Jumlah+(Keuntungan 10%) Rp 192,711

1 BH - LP SPOT type RIO HALOGEN MASTER LED MR.16 7-50W Rp 370,000


- LP SPOT type RIO HALOGEN MASTER LED MR bh 1.00 Rp 292,557 Rp 292,557
Sewa alat 5% dari harga bahan lot 1.00 Rp 14,628 Rp 14,628

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 336,404
Keuntungan 10% Rp 33,640
Total = Jumlah+(Keuntungan 10%) Rp 370,044

1 BH - LP TAMAN type AGL FG 151 32.1 W Rp 5,410,000


- LP TAMAN type AGL FG 151 32.1 W bh 1.00 Rp 4,655,936 Rp 4,655,936
Sewa alat 5% dari harga bahan lot 1.00 Rp 232,797 Rp 232,797

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 4,917,951
Keuntungan 10% Rp 491,795
Total = Jumlah+(Keuntungan 10%) Rp 5,409,746

1 BH - LP PJU type RL OPTICA P 80 LED c/w TIANG H=7m Rp 5,134,000


- LP PJU type RL OPTICA P 80 LED c/w TIANG bh 1.00 Rp 4,417,245 Rp 4,417,245
Sewa alat 5% dari harga bahan lot 1.00 Rp 220,862 Rp 220,862

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 4,667,326
Keuntungan 10% Rp 466,733
Total = Jumlah+(Keuntungan 10%) Rp 5,134,058

1 BH - LP SOROT type SPOT MARESCA HLG LED ESS 7 -50W Rp 1,469,000


- LP SOROT type SPOT MARESCA HLG LED ESS bh 1.00 Rp 1,244,325 Rp 1,244,325
Sewa alat 5% dari harga bahan lot 1.00 Rp 62,216 Rp 62,216

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,335,761
Keuntungan 10% Rp 133,576
Total = Jumlah+(Keuntungan 10%) Rp 1,469,337

1 BH TL LED 2x18 Watt SM Rp 1,086,000


TL LED 2x18 Watt SM bh 1.00 Rp 912,440 Rp 912,440
Sewa alat 5% dari harga bahan lot 1.00 Rp 45,622 Rp 45,622

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 987,281
Keuntungan 10% Rp 98,728
Total = Jumlah+(Keuntungan 10%) Rp 1,086,009

1 BH TL LED 2x18 Watt SM NICAD Rp 2,334,000


TL LED 2x18 Watt SM NICAD bh 1.00 Rp 1,992,994 Rp 1,992,994
Sewa alat 5% dari harga bahan lot 1.00 Rp 99,650 Rp 99,650

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 2,121,862
Keuntungan 10% Rp 212,186
Total = Jumlah+(Keuntungan 10%) Rp 2,334,048

1 BH TL LED 1x18 Watt SM Rp 638,000


TL LED 1x18 Watt SM bh 1.00 Rp 524,139 Rp 524,139
Sewa alat 5% dari harga bahan lot 1.00 Rp 26,207 Rp 26,207

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 579,565
Keuntungan 10% Rp 57,956
Total = Jumlah+(Keuntungan 10%) Rp 637,521

1 BH TL LED 1x18 Watt SM C/W NICAD Rp 1,677,000


TL LED 1x18 Watt SM C/W NICAD bh 1.00 Rp 1,424,550 Rp 1,424,550
Sewa alat 5% dari harga bahan lot 1.00 Rp 71,228 Rp 71,228

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,524,997
Keuntungan 10% Rp 152,500
Total = Jumlah+(Keuntungan 10%) Rp 1,677,496

1 BH TL LED 1x8 Watt Wastafel Rp 183,000


TL LED 1x8 Watt Wastafel bh 1.00 Rp 130,399 Rp 130,399
Sewa alat 5% dari harga bahan lot 1.00 Rp 6,520 Rp 6,520

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 166,138
Keuntungan 10% Rp 16,614
Total = Jumlah+(Keuntungan 10%) Rp 182,752

1 BH Downlight LED 11 Watt C/W ACRILYC Rp 288,000


Downlight LED 11 Watt C/W ACRILYC bh 1.00 Rp 221,365 Rp 221,365
Sewa alat 5% dari harga bahan lot 1.00 Rp 11,068 Rp 11,068

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 261,652
Keuntungan 10% Rp 26,165
Total = Jumlah+(Keuntungan 10%) Rp 287,817

1 BH Downlight LED 11 Watt C/W ACRILYC C/W NICAD Rp 1,128,000


Downlight LED 11 Watt C/W ACRILYC C/W NICA bh 1.00 Rp 949,067 Rp 949,067
Sewa alat 5% dari harga bahan lot 1.00 Rp 47,453 Rp 47,453

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,025,739
Keuntungan 10% Rp 102,574
Total = Jumlah+(Keuntungan 10%) Rp 1,128,313

1 BH Downlight LED 11 Watt Rp 220,000


Downlight LED 11 Watt bh 1.00 Rp 163,057 Rp 163,057
Sewa alat 5% dari harga bahan lot 1.00 Rp 8,153 Rp 8,153

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 200,428
Keuntungan 10% Rp 20,043
Total = Jumlah+(Keuntungan 10%) Rp 220,471

1 BH Downlight LED 11 Watt C/W NICAD Rp 998,000


Downlight LED 11 Watt C/W NICAD bh 1.00 Rp 836,045 Rp 836,045
Sewa alat 5% dari harga bahan lot 1.00 Rp 41,802 Rp 41,802

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 907,067
Keuntungan 10% Rp 90,707
Total = Jumlah+(Keuntungan 10%) Rp 997,773

1 BH EXIT Lamp TL 1x8W Rp 1,187,000


EXIT Lamp TL 1x8W bh 1.00 Rp 999,543 Rp 999,543
Sewa alat 5% dari harga bahan lot 1.00 Rp 49,977 Rp 49,977

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,078,739
Keuntungan 10% Rp 107,874
Total = Jumlah+(Keuntungan 10%) Rp 1,186,613

1 BH HIGH BAY BY120 P LED 100 W Rp 1,765,000


HIGH BAY BY120 P LED 100 W bh 1.00 Rp 1,500,000 Rp 1,500,000
Sewa alat 5% dari harga bahan lot 1.00 Rp 75,000 Rp 75,000

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,604,219
Keuntungan 10% Rp 160,422
Total = Jumlah+(Keuntungan 10%) Rp 1,764,641

1 BH Wall Lamp Outdoor 1 x 23 Watt Rp 756,000


Wall Lamp Outdoor 1 x 23 Watt bh 1.00 Rp 626,751 Rp 626,751
Sewa alat 5% dari harga bahan lot 1.00 Rp 31,338 Rp 31,338

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 687,308
Keuntungan 10% Rp 68,731
Total = Jumlah+(Keuntungan 10%) Rp 756,039

1 BH LAMPU DOWN LIGHT LED 5 W Rp 1,827,000


Lampu Down Light LED 5 W bh 1.00 Rp 1,554,051 Rp 1,554,051
Sewa alat 5% dari harga bahan lot 1.00 Rp 77,703 Rp 77,703

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,660,972
Keuntungan 10% Rp 166,097
Total = Jumlah+(Keuntungan 10%) Rp 1,827,069

1 BH Emergency Lamp 10 Watt Rp 1,827,000


Emergency Lamp 10 Watt bh 1.00 Rp 1,554,051 Rp 1,554,051
Sewa alat 5% dari harga bahan lot 1.00 Rp 77,703 Rp 77,703

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,660,972
Keuntungan 10% Rp 166,097
Total = Jumlah+(Keuntungan 10%) Rp 1,827,069

1 BH Lampu Taman GL PILAR LED 23 Watt Rp 3,990,000


Lampu Taman GL PILAR LED 23 Watt bh 1.00 Rp 3,426,682 Rp 3,426,682
Sewa alat 5% dari harga bahan lot 1.00 Rp 171,334 Rp 171,334

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 3,627,235
Keuntungan 10% Rp 362,723
Total = Jumlah+(Keuntungan 10%) Rp 3,989,958

1 BH Lampu Underwater 18 Watt Rp 7,652,000


Lampu Underwater 18 Watt bh 1.00 Rp 6,597,651 Rp 6,597,651
Sewa alat 5% dari harga bahan lot 1.00 Rp 329,883 Rp 329,883

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 6,956,753
Keuntungan 10% Rp 695,675
Total = Jumlah+(Keuntungan 10%) Rp 7,652,428

1 BH Dustproof lamp 2 x 18 Watt Rp 2,153,000


Dustproof lamp 2 x 18 Watt bh 1.00 Rp 1,836,605 Rp 1,836,605
Sewa alat 5% dari harga bahan lot 1.00 Rp 91,830 Rp 91,830

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,957,654
Keuntungan 10% Rp 195,765
Total = Jumlah+(Keuntungan 10%) Rp 2,153,420

1 BH Dustproof lamp 1 x 18 Watt Rp 1,990,000


Dustproof lamp 1 x 18 Watt bh 1.00 Rp 1,695,328 Rp 1,695,328
Sewa alat 5% dari harga bahan lot 1.00 Rp 84,766 Rp 84,766

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 1,809,313
Keuntungan 10% Rp 180,931
Total = Jumlah+(Keuntungan 10%) Rp 1,990,245

1 BH Dustproof lamp 1 x 18 Watt C/W NICAD Rp 2,249,000


Dustproof lamp 1 x 18 Watt C/W NICAD bh 1.00 Rp 1,919,000 Rp 1,919,000
Sewa alat 5% dari harga bahan lot 1.00 Rp 95,950 Rp 95,950

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 2,044,169
Keuntungan 10% Rp 204,417
Total = Jumlah+(Keuntungan 10%) Rp 2,248,586

1 BH Lampu PJU type LED 120 Watt Single Rp 17,602,000


Lampu Jalan LED ( 1 x 120 W ) BRP711 bh 1.00 Rp 8,476,640 Rp 8,476,640
Tiang PJU 11 meter bh 1.00 Rp 6,677,473 Rp 6,677,473
Sewa alat 5% dari harga bahan lot 1.00 Rp 757,706 Rp 757,706

Mandor oh 0.03 Rp 141,277 Rp 3,532


Kepala Tukang listrik oh 0.08 Rp 117,543 Rp 9,795
Tukang Listrik oh 0.25 Rp 108,501 Rp 27,125
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Rp 16,002,000
Keuntungan 10% Rp 1,600,200
Total = Jumlah+(Keuntungan 10%) Rp 17,602,200

1 BH Lampu PJU type LED 120 Watt Double Rp 27,848,000


Lampu Jalan LED ( 1 x 120 W ) BRP711 bh 2.00 Rp 8,437,500 Rp 16,875,000
Tiang PJU 11 meter bh 1.00 Rp 7,150,000 Rp 7,150,000
Sewa alat 5% dari harga bahan lot 1.00 Rp 1,201,250 Rp 1,201,250

AHS ELK 51 / 58
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

Mandor oh 0.03 Rp 141,277 Rp 3,532


Kepala Tukang listrik oh 0.08 Rp 117,543 Rp 9,795
Tukang Listrik oh 0.25 Rp 108,501 Rp 27,125
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Rp 25,316,432
Keuntungan 10% Rp 2,531,643
Total = Jumlah+(Keuntungan 10%) Rp 27,848,075

1 BH Obstruction Lamp Rp 3,622,000


Obstruction Lamp bh 1.00 Rp 3,108,101 Rp 3,108,101
Sewa alat 5% dari harga bahan lot 1.00 Rp 155,405 Rp 155,405

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 3,292,725
Keuntungan 10% Rp 329,273
Total = Jumlah+(Keuntungan 10%) Rp 3,621,998

1 BH LAMPU SOROT HPIT 1000 WATT Rp 16,184,000


LAMPU SOROT HPIT 1000 WATT bh 1.00 Rp 14,543,100 Rp 14,543,100
Dudukan lampu bh 1.00 Rp 150,000 Rp 150,000
Mandor oh 0.03 Rp 141,277 Rp 4,709
Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 7,836
Tukang oh 0.07 Rp 108,501 Rp 7,233
Jumlah Rp 14,712,879
Keuntungan 10% Rp 1,471,288
Total = Jumlah+(Keuntungan 10%) Rp 16,184,167
1 BH Lampu sorot 500 W Rp 187,000
Lampu sorot 500 W bh 1.00 Rp - Rp -
Dudukan lampu bh 1.00 Rp 150,000 Rp 150,000
Mandor oh 0.03 Rp 141,277 Rp 4,709
Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 7,836
Tukang oh 0.07 Rp 108,501 Rp 7,233
Jumlah Rp 169,779
Keuntungan 10% Rp 16,978
Total = Jumlah+(Keuntungan 10%) Rp 186,757

1 BH High Bay 80 W Rp 187,000


High Bay 80 W bh 1.00 Rp - Rp -
Dudukan lampu bh 1.00 Rp 150,000 Rp 150,000
Mandor oh 0.03 Rp 141,277 Rp 4,709
Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 7,836
Tukang oh 0.07 Rp 108,501 Rp 7,233
Jumlah Rp 169,779
Keuntungan 10% Rp 16,978
Total = Jumlah+(Keuntungan 10%) Rp 186,757

1 BH LAMPU LED 12 W MENEMPEL DI PLAT BETON Rp 572,000


Lampu LED 12 W menempel di plat beton bh 1.00 Rp 500,000 Rp 500,000
Mandor oh 0.03 Rp 141,277 Rp 4,709
Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 7,836
Tukang oh 0.07 Rp 108,501 Rp 7,233
Jumlah Rp 519,779
Keuntungan 10% Rp 51,978
Total = Jumlah+(Keuntungan 10%) Rp 571,757
Total = Jumlah+(Keuntungan 10%) Rp 4,613,417
1 BH TIANG LAMPU JALAN Rp 5,893,000
Tiang Lampu Galvanised tinggi 7 M bh 1.00 Rp 5,137,500 Rp 5,137,500
Pondasi tiang bh 1.00 Rp 200,000 Rp 200,000
Mandor oh 0.03 Rp 141,277 Rp 4,709
Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 7,836
Tukang oh 0.07 Rp 108,501 Rp 7,233
Jumlah Rp 5,357,279
Keuntungan 10% Rp 535,728
Total = Jumlah+(Keuntungan 10%) Rp 5,893,007
1 BH LAMPU TAMAN 28 W + TIANG Rp 2,792,000
Lampu Taman 28 Watt + Tiang 2 1/2 Meter bh 1.00 Rp 2,318,500 Rp 2,318,500
Pondasi tiang bh 1.00 Rp 200,000 Rp 200,000
Mandor oh 0.03 Rp 141,277 Rp 4,709
Kepala Tukang listrik oh 0.07 Rp 117,543 Rp 7,836
Tukang oh 0.07 Rp 108,501 Rp 7,233
Jumlah Rp 2,538,279
Keuntungan 10% Rp 253,828
Total = Jumlah+(Keuntungan 10%) Rp 2,792,107
1 BH SAKLAR TUNGGAL Rp 46,000
Saklar tunggal 10 A bh 1.00 Rp 27,351 Rp 27,351
Mandor oh 0.03 Rp 141,277 Rp 3,532
Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,877
Tukang oh 0.05 Rp 108,501 Rp 5,425
Jumlah Rp 42,185
Keuntungan 10% Rp 4,219
Total = Jumlah+(Keuntungan 10%) Rp 46,404

1 BH SAKLAR GANDA Rp 75,000


Saklar ganda 10 A bh 1.00 Rp 53,290 Rp 53,290
Mandor oh 0.03 Rp 141,277 Rp 3,532
Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,877
Tukang oh 0.05 Rp 108,501 Rp 5,425
Jumlah Rp 68,124
Keuntungan 10% Rp 6,812
Total = Jumlah+(Keuntungan 10%) Rp 74,936

1 BH SAKLAR BEDHEAD Rp 75,000


Saklar ganda 10 A bh 1.00 Rp 53,290 Rp 53,290
Mandor oh 0.03 Rp 141,277 Rp 3,532
Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,877
Tukang oh 0.05 Rp 108,501 Rp 5,425
Jumlah Rp 68,124
Keuntungan 10% Rp 6,812
Total = Jumlah+(Keuntungan 10%) Rp 74,936

1 BH SAKLAR GANDA PUTAR Rp 9,341,000


Saklar ganda putar 10 A bh 1.00 Rp 8,476,640 Rp 8,476,640
Mandor oh 0.03 Rp 141,277 Rp 3,532
Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,877
Tukang oh 0.05 Rp 108,501 Rp 5,425
Jumlah Rp 8,491,474
Keuntungan 10% Rp 849,147
Total = Jumlah+(Keuntungan 10%) Rp 9,340,621

1 BH SAKLAR HOTEL Rp 65,000


Saklar hotel 10 A bh 1.00 Rp 44,135 Rp 44,135
Mandor oh 0.03 Rp 141,277 Rp 3,532
Kepala Tukang listrik oh 0.05 Rp 117,543 Rp 5,877
Tukang oh 0.05 Rp 108,501 Rp 5,425
Jumlah Rp 58,969
Keuntungan 10% Rp 5,897
Total = Jumlah+(Keuntungan 10%) Rp 64,866

1 BH SAKLAR GROUP 6 MODUL Rp 288,000


Saklar group 6 modul bh 1.00 Rp 244,500 Rp 244,500
Mandor oh 0.03 Rp 141,277 Rp 3,532
Kepala Tukang listrik oh 0.06 Rp 117,543 Rp 7,053
Tukang oh 0.06 Rp 108,501 Rp 6,510
Jumlah Rp 261,595
Keuntungan 10% Rp 26,159
Total = Jumlah+(Keuntungan 10%) Rp 287,754

INSTA LA SI
1 TTK TITIK INSTALASI PENERANGAN Rp 303,000
Kabel NYM 3x2,5 mm2 meter 9.00 Rp 15,000 Rp 135,000
Pipa Conduit meter 9.00 Rp 6,329 Rp 56,963
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.17 Rp 117,543 Rp 19,590
Tukang oh 0.17 Rp 108,501 Rp 18,083
Jumlah Rp 275,105
Keuntungan 10% Rp 27,510
Total = Jumlah+(Keuntungan 10%) Rp 302,615

1 TTK TITIK INSTALASI PENERANGAN LUAR Rp 663,000


Kabel NYFGbY 3x2,5 mm2 meter 9.00 Rp 48,102 Rp 432,919
Pipa Conduit meter 9.00 Rp 6,329 Rp 56,963
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.30 Rp 117,543 Rp 35,263
Tukang oh 0.30 Rp 108,501 Rp 32,550
Jumlah Rp 603,163
Keuntungan 10% Rp 60,316
Total = Jumlah+(Keuntungan 10%) Rp 663,479

1 TTK TITIK INSTALASI STOP KONTAK Rp 355,000


Kabel NYM 3x2,5 mm2 meter 11.00 Rp 15,427 Rp 169,702
Pipa Conduit meter 11.00 Rp 6,329 Rp 69,621
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.17 Rp 117,543 Rp 19,590
Tukang oh 0.17 Rp 108,501 Rp 18,083
Jumlah Rp 322,466
Keuntungan 10% Rp 32,247
Total = Jumlah+(Keuntungan 10%) Rp 354,712

1 TTK TITIK INSTALASI STOP KONTAK AC Rp 450,000


Kabel NYM 3x2,5 mm2 meter 15.00 Rp 15,427 Rp 231,412
Pipa Conduit meter 15.00 Rp 6,329 Rp 94,938
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.17 Rp 117,543 Rp 19,590
Tukang oh 0.17 Rp 108,501 Rp 18,083
Jumlah Rp 409,493
Keuntungan 10% Rp 40,949
Total = Jumlah+(Keuntungan 10%) Rp 450,442

1 TTK TITIK INSTALASI STOP KONTAK AC Rp 822,000


Kabel NYM 4x4 mm2 meter 15.00 Rp 37,975 Rp 569,630
Pipa Conduit meter 15.00 Rp 6,329 Rp 94,938
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.17 Rp 117,543 Rp 19,590
Tukang oh 0.17 Rp 108,501 Rp 18,083
Jumlah Rp 747,710
Keuntungan 10% Rp 74,771
Total = Jumlah+(Keuntungan 10%) Rp 822,481

1 TTK TITIK INSTALASI TELEPON Rp 515,000


Kabel ITC 2x2x0,6 mm2 meter 30.00 Rp 6,500 Rp 195,000
Pipa Conduit meter 30.00 Rp 6,329 Rp 189,877
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.17 Rp 117,543 Rp 19,590
Tukang oh 0.17 Rp 108,501 Rp 18,083
Jumlah Rp 468,019
Keuntungan 10% Rp 46,802
Total = Jumlah+(Keuntungan 10%) Rp 514,820

1 TTK TITIK INSTALASI DATA Rp 571,000


Kabel UTP Cat 6 meter 30.00 Rp 8,200 Rp 246,000
Pipa Conduit meter 30.00 Rp 6,329 Rp 189,877
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.17 Rp 117,543 Rp 19,590
Tukang oh 0.17 Rp 108,501 Rp 18,083
Jumlah Rp 519,019
Keuntungan 10% Rp 51,902
Total = Jumlah+(Keuntungan 10%) Rp 570,920

1 TTK TITIK INSTALASI CCTV Rp 904,200


Kabel RG 6 meter 30.00 Rp 8,200 Rp 246,000
Pipa Conduit meter 30.00 Rp 6,329 Rp 189,877
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.17 Rp 117,543 Rp 19,590
Tukang oh 0.17 Rp 108,501 Rp 18,083
Instalasi power ttk 1.00 Rp 303,000 Rp 303,000
Jumlah Rp 822,019
Keuntungan 10% Rp 82,202
Total = Jumlah+(Keuntungan 10%) Rp 904,220

1 TTK TITIK INSTALASI TATA SUARA Rp 331,200


Kabel NYNHY 2X1,5 MM meter 15.00 Rp 8,200 Rp 123,000
Pipa Conduit meter 15.00 Rp 6,329 Rp 94,938
Socket Pipa bh 1.00 Rp 910 Rp 910
Tee Doos bh 2.00 Rp 5,199 Rp 10,398
Klem Pipa bh 3.00 Rp 650 Rp 1,950
Fhiser bh 6.00 Rp 1,017 Rp 6,103
Las Doop bh 2.00 Rp 650 Rp 1,300
Isolasi ban bh 0.16 Rp 8,138 Rp 1,261
Mandor oh 0.17 Rp 141,277 Rp 23,546
Kepala Tukang listrik oh 0.17 Rp 117,543 Rp 19,590
Tukang oh 0.17 Rp 108,501 Rp 18,083
Jumlah Rp 301,080
Keuntungan 10% Rp 30,108
Total = Jumlah+(Keuntungan 10%) Rp 331,188

1 Pipa Tembaga Diameter 1/4 mm


* Pipa Tembaga Diameter 1/4 mm m 1.00 21,474.15 21,474.15
* Isolasi Pipa Tembaga m 1.00 16,639.33 16,639.33
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 19,778.83 19,778.83
* Material & Alat bantu Ls 17% 59,153.63 9,858.94
Jumlah 69,012.57

1 Pipa Tembaga Diameter 3/8 mm


* Pipa Tembaga Diameter 3/8 mm m 1.00 35,564.21 35,564.21
* Isolasi Pipa Tembaga m 1.00 18,209.08 18,209.08
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 19,778.83 19,778.83
* Material & Alat bantu Ls 17% 74,813.44 12,468.91
Jumlah 87,282.35

1 Pipa Tembaga Diameter 1/2 mm


* Pipa Tembaga Diameter 1/2 mm m 1.00 - -
* Isolasi Pipa Tembaga m 1.00 - -
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 19,778.83 19,778.83
* Material & Alat bantu Ls 17% 21,040.15 3,506.69
Jumlah 24,546.84

2 Pipa Tembaga Diameter 5/8 mm


* Pipa Tembaga Diameter 5/8 mm m 1.00 69,320.07 69,320.07
* Isolasi Pipa Tembaga m 1.00 22,604.37 22,604.37
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 28,255.47 28,255.47
* Material & Alat bantu Ls 17% 121,441.24 20,240.21
Jumlah 141,681.44

1 Pipa Tembaga Diameter 3/4mm


* Pipa Tembaga Diameter 3/4mm m 1.00 - -
* Isolasi Pipa Tembaga m 1.00 - -
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 28,255.47 28,255.47
* Material & Alat bantu Ls 17% 29,516.79 4,919.46
Jumlah 34,436.25

1 Pipa Tembaga Diameter 7/8 mm


* Pipa Tembaga Diameter 7/8 mm m 1.00 - -
* Isolasi Pipa Tembaga m 1.00 - -
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 28,255.47 28,255.47
* Material & Alat bantu Ls 17% 29,516.79 4,919.46
Jumlah 34,436.25

1 Pipa Tembaga Diameter 1 mm


* Pipa Tembaga Diameter 1 mm m 1.00 - -
* Isolasi Pipa Tembaga m 1.00 - -
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 28,255.47 28,255.47
* Material & Alat bantu Ls 17% 29,516.79 4,919.46
Jumlah 34,436.25

1 Pipa Tembaga Diameter 1 1/8 mm


* Pipa Tembaga Diameter 1 1/8 mm m 1.00 - -
* Isolasi Pipa Tembaga m 1.00 - -
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 28,255.47 28,255.47
* Material & Alat bantu Ls 17% 29,516.79 4,919.46
Jumlah 34,436.25

1 Pipa Tembaga Diameter 1 1/4 mm


* Pipa Tembaga Diameter 1 1/4 mm m 1.00 - -
* Isolasi Pipa Tembaga m 1.00 - -
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 35,000.00 35,000.00
* Material & Alat bantu Ls 17% 36,261.32 6,043.55
Jumlah 42,304.88

1 Pipa Tembaga Diameter 1 3/8 mm


* Pipa Tembaga Diameter 1 3/8 mm m 1.00 - -
* Isolasi Pipa Tembaga m 1.00 - -
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 35,000.00 35,000.00
* Material & Alat bantu Ls 17% 36,261.32 6,043.55
Jumlah 42,304.88

1 Pipa Tembaga Diameter 1 5/8 mm


* Pipa Tembaga Diameter 1 5/8 mm m 1.00 - -
* Isolasi Pipa Tembaga m 1.00 - -
Tarikan NYM 3 x 2.5 mm (Kabel Kontrol AC) m 1.00 1,261.32 1,261.32
* Ongkos pasang Ls 1.00 35,000.00 35,000.00
* Material & Alat bantu Ls 17% 36,261.32 6,043.55
Jumlah 42,304.88

1 Pipa Drain AC 25 mm
* Pipa PVC AW Dia. 25 mm m 4.00 12,234.62 48,938.47
* Isolasi Pipa Drain 25 mm m 4.00 47,921.27 191,685.08
* Ongkos pasang Ls 4.00 19,778.83 79,115.30
* Material & Alat bantu Ls 5% 319,738.84 15,986.94
Pipa Diameter 25 mm Jumlah 335,725.78
Harga Per M 83,931.45

1 Pipa Drain AC 40 mm
* Pipa PVC AW Dia. 40 mm m 4.00 20,246.45 80,985.81
* Isolasi Pipa Drain 40 mm m 4.00 58,545.32 234,181.29
* Ongkos pasang Ls 4.00 19,778.83 79,115.30
* Material & Alat bantu Ls 15% 394,282.41 59,142.36
Pipa Diameter 40 mm Jumlah 453,424.77
Harga Per M 113,356.19
1 Pipa Drain AC 50 mm
* Pipa PVC AW Dia. 50 mm m 4.00 22,864.32 91,457.29
* Isolasi Pipa Drain 50 mm m 4.00 66,500.00 266,000.00
* Ongkos pasang Ls 4.00 19,778.83 79,115.30
* Material & Alat bantu Ls 15% 436,572.59 65,485.89
Pipa Diameter 50 mm Jumlah 502,058.48
Harga Per M 125,514.62

Jumlah 1,272,139.58
1 BH Exhuuse Fan 100 CFM Type Ceiling Rp 510,000
Exhuuse Fan 100 CFM Type Ceiling bh 1.00 Rp 457,739 Rp 457,739
Sewa alat 5% dari harga bahan lot 1.00 Rp 22,887 Rp 22,887

Mandor oh 0.01 Rp 141,277 Rp 1,144


Kepala Tukang listrik oh 0.03 Rp 117,543 Rp 3,174
Tukang Listrik oh 0.08 Rp 108,501 Rp 8,789
Pekerja oh 0.16 Rp 99,459 Rp 16,112
Jumlah Rp 509,844
Keuntungan 10%
Total = Jumlah+(Keuntungan 10%) Rp 509,844

1 BH SCF 50DVL 1 PHASE INVERTER Rp 18,182,000


SCF 50DVL 1 PHASE INVERTER bh 1.00 Rp 17,100,207 Rp 17,100,207
Sewa alat 5% dari harga bahan lot 1.00 Rp 427,505 Rp 427,505

Mandor oh 0.15 Rp 141,277 Rp 21,192


Kepala Tukang listrik oh 1.00 Rp 117,543 Rp 117,543
Tukang Listrik oh 2.00 Rp 108,501 Rp 217,002
Pekerja oh 3.00 Rp 99,459 Rp 298,378
Jumlah Rp 18,181,827
Keuntungan 10%
Total = Jumlah+(Keuntungan 10%) Rp 18,181,827

1 BH STKC 25 TV STAR INVERTER R32 Rp 6,579,000


STKC 25 TV STAR INVERTER R32 bh 1.00 Rp 6,094,139 Rp 6,094,139
Sewa alat 5% dari harga bahan lot 1.00 Rp 152,353 Rp 152,353

Mandor oh 0.05 Rp 141,277 Rp 7,064


Kepala Tukang listrik oh 1.00 Rp 117,543 Rp 117,543
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 1.00 Rp 99,459 Rp 99,459
Jumlah Rp 6,579,059
Keuntungan 10%
Total = Jumlah+(Keuntungan 10%) Rp 6,579,059

1 BH STKC 20 TV STAR INVERTER R32 Rp 6,313,000


STKC 20 TV STAR INVERTER R32 bh 1.00 Rp 5,834,188 Rp 5,834,188
Sewa alat 5% dari harga bahan lot 1.00 Rp 145,855 Rp 145,855

Mandor oh 0.05 Rp 141,277 Rp 7,064


Kepala Tukang listrik oh 1.00 Rp 117,543 Rp 117,543
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 1.00 Rp 99,459 Rp 99,459
Jumlah Rp 6,312,610
Keuntungan 10%
Total = Jumlah+(Keuntungan 10%) Rp 6,312,610

1 BH STKC 15 TV STAR INVERTER R32 Rp 6,257,000


STKC 15 TV STAR INVERTER R32 bh 1.00 Rp 5,779,938 Rp 5,779,938
Sewa alat 5% dari harga bahan lot 1.00 Rp 144,498 Rp 144,498

AHS ELK 52 / 58
ANALISA HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

Mandor oh 0.05 Rp 141,277 Rp 7,064


Kepala Tukang listrik oh 1.00 Rp 117,543 Rp 117,543
Tukang Listrik oh 1.00 Rp 108,501 Rp 108,501
Pekerja oh 1.00 Rp 99,459 Rp 99,459
Jumlah Rp 6,257,003
Keuntungan 10%
Total = Jumlah+(Keuntungan 10%) Rp 6,257,003

AHS ELK 53 / 58
ANALISA HARGA SATUAN MEKANIKAL

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

PIPA PPR

PIPA PVC
1 Mtr Pipa PVC kelas AW Ø 20 mm Rp 30,441
Pipa PVC kelas AW Ø 20 mm Meter 1.00 Rp 11,415 Rp 11,415
Upah Pasang
Mandor oh 0.01 Rp 141,277 Rp 706
Kepala Tukang pipa oh 0.04 Rp 117,543 Rp 4,702
Tukang pipa oh 0.10 Rp 108,501 Rp 10,850
Jumlah Rp 27,673
Keuntungan 10% Rp 2,767
Total = Jumlah+(Keuntungan 10%) Rp 30,441

1 Mtr Pipa PVC kelas AW Ø 25 mm Rp 31,342


Pipa PVC kelas AW Ø 25 mm Meter 1.00 Rp 12,235 Rp 12,235
Upah Pasang
Mandor oh 0.01 Rp 141,277 Rp 706
Kepala Tukang pipa oh 0.04 Rp 117,543 Rp 4,702
Tukang pipa oh 0.10 Rp 108,501 Rp 10,850
Jumlah Rp 28,493
Keuntungan 10% Rp 2,849
Total = Jumlah+(Keuntungan 10%) Rp 31,342

1 Mtr Pipa PVC kelas AW Ø 32 mm Rp 37,869


Pipa PVC kelas AW Ø 32 mm Meter 1.00 Rp 18,168 Rp 18,168
Upah Pasang
Mandor oh 0.01 Rp 141,277 Rp 706
Kepala Tukang pipa oh 0.04 Rp 117,543 Rp 4,702
Tukang pipa oh 0.10 Rp 108,501 Rp 10,850
Jumlah Rp 34,426
Keuntungan 10% Rp 3,443
Total = Jumlah+(Keuntungan 10%) Rp 37,869

1 Mtr Pipa PVC kelas AW Ø 40 mm Rp 40,155


Pipa PVC kelas AW Ø 40 mm Meter 1.00 Rp 20,246 Rp 20,246
Upah Pasang
Mandor oh 0.01 Rp 141,277 Rp 706
Kepala Tukang pipa oh 0.04 Rp 117,543 Rp 4,702
Tukang pipa oh 0.10 Rp 108,501 Rp 10,850
Jumlah Rp 36,505
Keuntungan 10% Rp 3,650
Total = Jumlah+(Keuntungan 10%) Rp 40,155

1 Mtr Pipa PVC kelas AW Ø 50 mm Rp 43,035


Pipa PVC kelas AW Ø 50 mm Meter 1.00 Rp 22,864 Rp 22,864
Upah Pasang
Mandor oh 0.01 Rp 141,277 Rp 706
Kepala Tukang pipa oh 0.04 Rp 117,543 Rp 4,702
Tukang pipa oh 0.10 Rp 108,501 Rp 10,850
Jumlah Rp 39,123
Keuntungan 10% Rp 3,912
Total = Jumlah+(Keuntungan 10%) Rp 43,035

Keuntungan 10% Rp 3,912


Total = Jumlah+(Keuntungan 10%) Rp 3,912
1 Mtr Pipa PVC kelas AW Ø 65 mm Rp 53,000
Pipa PVC kelas AW Ø 65 mm Meter 1.00 Rp 33,144 Rp 33,144
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Rp 48,136
Keuntungan 10% Rp 4,814
Total = Jumlah+(Keuntungan 10%) Rp 52,950

1 Mtr Pipa PVC kelas AW Ø 80 mm Rp 80,000


Pipa PVC kelas AW Ø 80 mm Meter 1.00 Rp 46,978 Rp 46,978
Mandor oh 0.01 Rp 141,277 Rp 1,413
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.20 Rp 99,459 Rp 19,892
Jumlah Rp 72,622
Keuntungan 10% Rp 7,262
Total = Jumlah+(Keuntungan 10%) Rp 79,884

1 Mtr Pipa PVC kelas AW Ø 100 mm Rp 126,000


Pipa PVC kelas AW Ø 100 mm Meter 1.00 Rp 77,864 Rp 77,864
Mandor oh 0.02 Rp 141,277 Rp 2,119
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.30 Rp 99,459 Rp 29,838
Jumlah Rp 114,161
Keuntungan 10% Rp 11,416
Total = Jumlah+(Keuntungan 10%) Rp 125,577

1 Mtr Pipa PVC kelas AW Ø 125 mm Rp 159,000


Pipa PVC kelas AW Ø 125 mm Meter 1.00 Rp 108,501 Rp 108,501
Mandor oh 0.02 Rp 141,277 Rp 2,119
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.30 Rp 99,459 Rp 29,838
Jumlah Rp 144,798
Keuntungan 10% Rp 14,480
Total = Jumlah+(Keuntungan 10%) Rp 159,278

1 Mtr Pipa PVC kelas AW Ø 150 mm Rp 242,000


Pipa PVC kelas AW Ø 150 mm Meter 1.00 Rp 172,971 Rp 172,971
Mandor oh 0.02 Rp 141,277 Rp 2,826
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.40 Rp 99,459 Rp 39,784
Jumlah Rp 219,921
Keuntungan 10% Rp 21,992
Total = Jumlah+(Keuntungan 10%) Rp 241,913

1 Mtr Pipa PVC kelas AW Ø 200 mm Rp 383,000


Pipa PVC kelas AW Ø 200 mm Meter 1.00 Rp 290,271 Rp 290,271
Mandor oh 0.03 Rp 141,277 Rp 3,532
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Rp 347,873
Keuntungan 10% Rp 34,787
Total = Jumlah+(Keuntungan 10%) Rp 382,660

1 Mtr Pipa PVC kelas D Ø 32 mm Rp 28,000


Pipa PVC kelas D Ø 32 mm Meter 1.00 Rp 10,087 Rp 10,087
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Rp 25,080
Keuntungan 10% Rp 2,508
Total = Jumlah+(Keuntungan 10%) Rp 27,588

1 Mtr Pipa PVC kelas D Ø 50 mm Rp 33,000


Pipa PVC kelas D Ø 50 mm Meter 1.00 Rp 14,891 Rp 14,891
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Rp 29,883
Keuntungan 10% Rp 2,988
Total = Jumlah+(Keuntungan 10%) Rp 32,871

VALVE
1 bh Gate valve JIS 10K Ø 20 mm Rp 314,000
Gate valve JIS 10K Ø 20 mm bh 1.00 Rp 270,122 Rp 270,122
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Rp 285,115
Keuntungan 10% Rp 28,511
Total = Jumlah+(Keuntungan 10%) Rp 313,626

1 bh Gate valve JIS 10K Ø 25 mm Rp 404,000


Gate valve JIS 10K Ø 25 mm bh 1.00 Rp 352,628 Rp 352,628
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Rp 367,621
Keuntungan 10% Rp 36,762
Total = Jumlah+(Keuntungan 10%) Rp 404,383

1 bh Gate valve JIS 10K Ø 32 mm Rp 606,000


Gate valve JIS 10K Ø 32 mm bh 1.00 Rp 535,724 Rp 535,724
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Rp 550,716
Keuntungan 10% Rp 55,072
Total = Jumlah+(Keuntungan 10%) Rp 605,788

1 bh Gate valve JIS 10K Ø 40 mm Rp 772,000


Gate valve JIS 10K Ø 40 mm bh 1.00 Rp 687,173 Rp 687,173
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Rp 702,165
Keuntungan 10% Rp 70,217
Total = Jumlah+(Keuntungan 10%) Rp 772,382

1 bh Gate valve JIS 10K Ø 50 mm Rp 970,000


Gate valve JIS 10K Ø 50 mm bh 1.00 Rp 866,539 Rp 866,539
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.04 Rp 108,501 Rp 4,340
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Rp 881,531
Keuntungan 10% Rp 88,153
Total = Jumlah+(Keuntungan 10%) Rp 969,684

1 bh Gate valve JIS 10K Ø 65 mm Rp 1,663,000


Gate valve JIS 10K Ø 65 mm bh 1.00 Rp 1,446,680 Rp 1,446,680
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.08 Rp 108,501 Rp 8,680
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Rp 1,512,153
Keuntungan 10% Rp 151,215
Total = Jumlah+(Keuntungan 10%) Rp 1,663,369

1 bh Gate valve JIS 10K Ø 80 mm Rp 4,692,000


Gate valve JIS 10K Ø 80 mm bh 1.00 Rp 4,200,000 Rp 4,200,000
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.08 Rp 108,501 Rp 8,680
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Rp 4,265,474
Keuntungan 10% Rp 426,547
Total = Jumlah+(Keuntungan 10%) Rp 4,692,021

1 bh Gate valve JIS 10K Ø 100 mm Rp 9,254,000


Gate valve JIS 10K Ø 100 mm bh 1.00 Rp 8,345,102 Rp 8,345,102
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.10 Rp 108,501 Rp 10,850
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Rp 8,412,746
Keuntungan 10% Rp 841,275
Total = Jumlah+(Keuntungan 10%) Rp 9,254,021

1 bh Check valve JIS 10K Ø 40 mm Rp 895,000


Check valve JIS 10K Ø 40 mm bh 1.00 Rp 746,283 Rp 746,283
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.10 Rp 108,501 Rp 10,850
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Rp 813,927
Keuntungan 10% Rp 81,393
Total = Jumlah+(Keuntungan 10%) Rp 895,320
Tukang pipa oh 0.10 Rp 108,501 Rp 10,850
Pekerja oh 0.30 Rp 99,459 Rp 29,838
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 Mtr Err:509 Err:509


Err:509 Meter 1.00 Err:509 Err:509
Mandor oh 0.02 Rp 141,277 Rp 2,472
Tukang pipa oh 0.15 Rp 108,501 Rp 16,275
Pekerja oh 0.35 Rp 99,459 Rp 34,811
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 Mtr Err:509 Err:509


Err:509 Meter 1.00 Err:509 Err:509
Mandor oh 0.02 Rp 141,277 Rp 2,826
Tukang pipa oh 0.20 Rp 108,501 Rp 21,700
Pekerja oh 0.40 Rp 99,459 Rp 39,784
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 Mtr Err:509 Err:509


Err:509 Meter 1.00 Err:509 Err:509
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.20 Rp 108,501 Rp 21,700
Pekerja oh 0.45 Rp 99,459 Rp 44,757
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 Mtr Err:509 Err:509


Err:509 Meter 1.00 Err:509 Err:509
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.20 Rp 108,501 Rp 21,700
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 Mtr Err:509 Err:509


Err:509 Meter 1.00 Err:509 Err:509
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.20 Rp 108,501 Rp 21,700
Pekerja oh 0.55 Rp 99,459 Rp 54,703
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 Mtr Err:509 Err:509


Err:509 Meter 1.00 Err:509 Err:509
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.20 Rp 108,501 Rp 21,700
Pekerja oh 0.60 Rp 99,459 Rp 59,676
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 bh Err:509 Err:509
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 set Hydrant box indoor (1.250 mm x 750 mm x 180 mm), c/w : Rp 5,794,000
Hydrant box indoor (1.250 mm x 750 mm x 180 mm), c/w : bh 1.00 Rp 5,200,000 Rp 5,200,000
Mandor oh 0.10 Rp 125,000 Rp 12,500
Tukang pipa oh 0.30 Rp 96,000 Rp 28,800
Pekerja oh 0.30 Rp 88,000 Rp 26,400
Jumlah Rp 5,267,700
Keuntungan 10% Rp 526,770
Total = Jumlah+(Keuntungan 10%) Rp 5,794,470
Pekerja oh 0.30 Rp 88,000 Rp 26,400
Jumlah Rp 11,615,340
Keuntungan 10% Rp 1,161,534
Total = Jumlah+(Keuntungan 10%) Rp 12,776,874

Jumlah #REF!

-
-

PEKERJAAN TELEPON

Err:509 bh 1.00 Err:509 Err:509


Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.20 Rp 108,501 Rp 21,700
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 bh Err:509 Err:509
Err:509 bh 1.00 Err:509 Err:509
Mandor oh 0.05 Rp 141,277 Rp 7,064
Tukang pipa oh 0.20 Rp 108,501 Rp 21,700
Pekerja oh 0.50 Rp 99,459 Rp 49,730
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 Mtr Err:509 Err:509


Err:509 Meter 1.00 Err:509 Err:509
Mandor oh 0.01 Rp 141,277 Rp 706
Tukang pipa oh 0.02 Rp 108,501 Rp 1,808
Pekerja oh 0.10 Rp 99,459 Rp 9,946
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

1 Mtr Err:509 Err:509


Err:509 Meter 1.00 Err:509 Err:509
Mandor oh 0.02 Rp 141,277 Rp 2,826
Tukang pipa oh 0.03 Rp 108,501 Rp 3,255
Pekerja oh 0.15 Rp 99,459 Rp 14,919
Jumlah Err:509
Keuntungan 10% Err:509
Total = Jumlah+(Keuntungan 10%) Err:509

Jumlah #REF!

AHS-MEK 54 / 58
DAFTAR HARGA SATUAN BAHAN DAN UPAH
PEMBANGUNAN GEDUNG PT SURVEYOR INDONESIA
CABANG MAKASSAR

No Uraian Bahan dan Tenaga Kerja Spesifikasi Harga Sat


1 2 3 4 5
UPAH TENAGA KERJA
1 Upah Pekerjaan Bowplank Rp 16,950 m1

1 Upah Pekerjaan Penggalian Tanah Pondasi Rp 124,300 m3

2 Upah Pekerjaan Pengurugan Pasir Bawah Pondasi Rp 50,850 m3

3 Upah Pekerjaan Pengurugan Tanah Padat Bawah Lantai Rp 50,850 m3

4 Upah Pekerjaan Pemadatan Tanah Rp 50,850 m3

5 Upah Pekerjaan Pindah Tanah Sisa Galian Rp 11,300 m3

6 Upah Pekerjaan Cor In Situ Rp 152,550 m3

7 Upah Pekerjaan Cor Ready Mix Rp 152,550 m3

8 Upah Pekerjaan Pembesian Rp 1,950 kg

9 Upah Pekerjaan Pembesian Wiremesh Rp 1,100 kg

10 Upah Pekerjaan Pasang Bekisting Batako Rp 28,250 m2

11 Upah Pekerjaan Pasang Bekisting Sloof Rp 50,850 m2

12 Upah Pekerjaan Pasang Bekisting Plat Lantai Rp 50,850 m2

13 Upah Pekerjaan Pasang Bekisting Kolom Rp 50,850 m2

14 Upah Pekerjaan Pasang Bekisting Balok Rp 50,850 m2

15 Upah Pekerjaan Pasang Bekisting Tangga Rp 50,850 m2

16 Upah Pekerjaan Pasang Pondasi Batu Kali Rp 141,250 m3

17 Upah Pekerjaan Pasang Batu Bronjong Rp 169,500

18 Upah Pekerjaan Pasang Dinding Bata Merah Rp 31,050 m2

19 Upah Pekerjaan Plesteran Dinding Bata Merah Rp 28,250 m2

20 Upah Pekerjaan Acian Dinding Bata Merah Rp 19,750 m2

21 Upah Pekerjaan Keramik / Homogenious Tile Lantai Rp 50,850 m2

22 Upah Pekerjaan Keramik / Homogenious Tile Tangga Rp 56,500 m2

23 Upah Pekerjaan Keramik Dinding Rp 62,150 m2

24 Upah Pekerjaan Pengecatan Dinding Rp 12,400 m2

25 Upah Pekerjaan Pengecatan Plafond Rp 12,400 m2

26 Upah Pekerjaan Pasang Kloset Duduk Rp 141,250 bh

27 Upah Pekerjaan Pasang Kran Dinding Rp 28,250 bh

28 Upah Pekerjaan Pasang Washtafel Rp 113,000 bh

29 Upah Pekerjaan Pasang Hand Dryer Rp 169,500 bh

30 Upah Pekerjaan Pasang Jet Shower Rp 113,000 bh

31 Upah Pekerjaan Pasang Kitchen Sink Rp 113,000 bh

32 Upah Pekerjaan Pasang Floor Drain Rp 45,200 bh

33 Upah Pekerjaan Pasang Roof Drain Rp 169,500 bh

34 Upah Pekerjaan Pasang Torn Air Bersih Rp 282,550 bh

35 Upah Pekerjaan Pasang Paving Rp 28,250 m2

36 Upah Pekerjaan Pasang Kansteen Rp 19,200 m1

37 Upah Pekerjaan Pasang Nok Atap Galvalum Rp 79,100 m1

38 Upah Pekerjaan Pasang Cermin Rp 28,250 m2

39 Upah Pekerjaan Pasang Paper Holder Rp 22,600 bh

40 Upah Pekerjaan Plint Lantai Rp 16,950 m1

41 Upah Pekerjaan Benangan Dinding Bata Merah Rp 14,100 m1

42 Upah Pekerjaan Plesteran Lantai / Screed Rp 45,200 m2

43 Upah Pekerjaan Pasang Tempat Sabun Rp 84,750 bh


44 Upah Pekerjaan Pasang Dinding Bata Ringan Rp 28,250 m2
45 Upah Pekerjaan Plesteran Dinding Bata Ringan Rp 28,250 m2
46 Upah Pekerjaan Acian Dinding Bata Ringan Rp 19,750 m2
47 Upah Pekerjaan Pasang Step Nosing Rp 28,250 m'
48 Upah Pekerjaan Floor Hardener Rp 16,950 m2

Pekerjaan Terpasang
1 water proofing intergral (dosis 2 ltr/m3)daerah basah km Rp 96,050 m3
2 Waterprofing (liquid/cement base)di daerah lantai km/wc Rp 96,050 M2
3 Waterprofing membran Rp 175,150 M2
4 Anti rayap Rp 22,600 M2
5 Atap genteng metal T=0,35 MM + Nok Rp 82,500 m2
6 Lisplang grc tebal 9 mm lebar 15 cm sesuai desain Rp 62,150 m1
7 Rangka atap baja ringan Rp 214,700 m2
8 Pekerjaan Pelapis Glasswool & Almunium foil Rp 113,000 m2
9 Tulisan ''SI Makassar'' terpasang pada pagar Rp 16,953,250 ls
10 Logo dan tulisan surveyor indonesia Rp 28,255,450 ls
11 Tulisan alamat dan nomor kavling Rp 2,825,500 ls
12 Batu alam tebal 1,5 cm motiv sesuai gambar Rp 163,850 m2
13 Pintu gerbang pagar depan T 1,5 M (finish cat duco) Rp 960,650 m2
14 Pasang Relling Tangga + Balkon (Hollow) Rp 497,250 m'
15 Sapitank ( Pas Bata ) Kap 2,95 x 1,5 x 1,5 Rp 5,085,950 unit
16 Sumur Resapan 2m3 Rp 5,651,050 unit
17 Dudukan Papan Kayu 3CM Finish Melamik Rp 282,550 Bh
18 GWT Rp 30,662,800 ls
19 Floor Hardener Rp 56,500 m2

BAHAN MENGGUNAKAN BESI/LOGAM


1 Besi Beton ulir / Polos SNI Rp 9,000 Kg
2 Wiremesh M8 SNI Rp 11,300 Kg
3 Kawat Bendrat SNI Rp 11,300 Kg
4 Kawat bronjong 2m x 1m x 0,5 Rp 327,750 lbr
5 Besi siku 40 x40 ( Rangka bronjong) Rp 141,250 btg

BAHAN MENGGUNAKAN BATU, PASIR, PC


1 Pasir Beton Lokal Rp 333,400 m3
2 Pasir Pasang Lokal Rp 186,450 m3
3 Pasir Urug Lokal Rp 146,900 m3
4 Sirtu (Area Parkir) Lokal Rp 180,800 m3
5 Abu Batu Lokal Rp 125,000 m3
6 Tanah Urug Lokal Rp 118,650 m3
7 Air Tawar Rp 50 lt
8 Semen Portland Rp 1,550 Kg
9 Semen Instan Acian MU 250 Rp 1,800 Kg
10 Semen Instan Plesteran MU 302 Rp 1,350 Kg
11 Semen Perekat Bata Ringan MU 382 Rp 1,800 Kg
12 Expose MU 202 Rp 2,500 Kg
13 Bata Ringan 10cm Rp 801,400 m3
14 Bata Ringan 7cm Rp 819,700 m3
15 Bata Merah Lokal Rp 650 bh
16 Batako Lokal Rp 4,500 bh
17 Batu pecah mesin 2/3 Lokal Rp 169,500 m3
18 Batu Belah Lokal
19 Batu Alam Rp 84,750 m2
20 Nat Keramik Rp 11,300 kg
21 Ready Mix K-350 Rp 883,600 m3

BAHAN CAT/MINYAK/KUAS
1 Cat Dasar Interior Jotun jotaplas primer Rp 16,600 Kg
2 Cat Dasar Exterior Jotun jotashild primer Rp 37,600 Kg
3 Cat Tembok Interior Jotun jotapalsh Rp 22,850 Kg
4 Cat Tembok Exterior Jotun antifad Rp 71,750 Kg
5 Cat Plafond Jotun Rp 22,850 Kg
6 Plamur Rp 11,300 Kg
7 Minyak begesting Rp 16,950 ltr

D BAHAN KAYU, TRIPLEK, MULTIPLEK


1 Kayu kelas III Bekisting Rp 1,808,300 m3
2 Kayu balok 5/7 Bekisting Rp 1,808,300 m3
3 Paku 5 - 12 cm Rp 19,200 kg
4 Kayu papan 3/20 Bekisting Rp 1,808,300 m3
5 Balok kayu kelas II Rp 2,825,500 m3
6 Multiplex 12 mm 120x240 Rp 169,500 Lbr
7 Dolken kayu Ø 8-10/400 cm Rp 16,950 btg
8 Bondek 0,75 mm Rp 113,000 m2

BAHAN PELAPIS LANTAI DAN DINDING


1 Homogeneus Tile 60x60 cm Polished Niro Granit Rp 135,600 m2
2 Homogeneus Tile 60x60 cm Unpolished Niro Granit Rp 169,500 m2
3 Keramik Lantai 40 x 40 cm Roman Rp 103,650 m2
4 Step Nozing 10 x 40 cm Rp 103,650 m1
5 Epoxy Lantai 500micron Rp 192,100 m2

SANITAIR
1 Closed Duduk CW.660 J. ex. Toto Rp 2,375,500 unit
2 Whastafel Lengkap TOTO TYPE LW 575 JR Rp 1,136,350 unit
3 Kran Westafel TX 109 ld Rp 578,450 unit
4 Jet shower THX 20 NBW Rp 213,700 unit
5 Floor Drain TOTO Type TX 1BN /TX 1 DA Rp 263,950 unit
6 Kran Air TOTO TYPE T23B13 Rp 228,050 unit
7 Paper Holder TOTO TYPE TX703 AM Rp 496,250 unit
8 Soap holder TOTO S211N Rp 273,300 unit
9 Hand Dryer Ex Krisbow Rp 1,795,900 unit
10 Roof Drain 3''San'ei Rp 195,200 unit
11 Kitchenzink type single Rp 410,950 unit
12 Kaca cermin 60x100 Rp 299,500 unit
13 Shower seet toto TX 465MZ / TX 405 SDN Rp 1,589,450 unit
14 Torn Air bersih roof tank 2000 ltr fiberglass Rp 5,289,400 unit

PEKERJAAN PONDASI PANCANG


Mob Demob Alat Pancang Hidrolis Rp - ls
Tiang Pancang Dia. 30 cm panjang 18 meter (9+9) 35 titik K-600 Rp - m1
Pemancangan dengan sistem hidrolis Rp - m1
Handling tiang pancang Rp - m1
Penyambungan tiang pancang Rp - titik
Potong kepala tiang pancang Rp - titik

1 Bahan pancang 250x250 Rp 236,200 m'


2 Persiapan Rp 74,978,700 ls
3 Handing Rp 38,400 m'
4 Jasa pemancangan Rp 219,250 m'
5 PDA Test Rp 24,723,500 titik

PEKERJAAN SITEPLAN
1 Kansteen uk. 40x28x15 K-250 CONBLOC / Setara Rp 39,550 bh
2 Paving t = 8 cm abu-abu K-300 CONBLOC / Setara Rp 127,100 m2

PEKERJAAN TIANG BENDERA


1 Tiang Bendera + Pondasi Stenlish 2" Rp 8,476,600 bh
2 Tiang Spanduk + Pondasi Blacksteel 2" ex. Lysaght/setara Rp 3,390,650 bh

SEWA ALAT
1 Stamper Rp 11,300 OH
2 Mini Wales Rp 1,949,600 OH

HB SPL 55 / 58
DAFTAR HARGA BAHAN DAN UPAH ELEKTRIKAL

NO URAIAN HARGA SATUAN


A. DAFTAR UPAH
1 Pekerja Rp 99,459 hari
2 Tukang pipa Rp 108,501 hari
3 Tukang listrik Rp 108,501 hari
4 Tukang AC Rp 108,501 hari
5 Kepala tukang AC Rp 117,543 hari
6 Kepala tukang listrik Rp 117,543 hari
7 Kepala tukang pipa Rp 117,543 hari
8 Mandor Rp 141,277 hari

B. PEKERJAAN ELEKTRIKAL
1 Cubicle Incoming Rp 265,601,372 bh
2 Cubicle Metering Rp 66,682,898 bh
3 Cubicle Outgoing Rp 28,255,465 bh
13 Transformator, Dry Type Cast Resin Cu, 1000 KvARp - unit
14 Transformator, Dry Type Cast Resin Cu, 1250 KvARp 474,691,813 unit
15 Transformator, Dry Type Cast Resin Cu, 1600 KvARp - unit
2 Transformator, Dry Type Cast Resin Cu, 2000 KvARp 508,598,371 unit
3 Isolation Transformer, 240Vac, 10 Kva, Single Phase
Rp 248,648,093 unit
3 Kabel FRC 3 x 2,5 mm2 Rp 40,467 m
4 Kabel FRC 3 x 4 mm2 Rp 73,052 m
5 Kabel FRC 3 x 6 mm2 Rp 94,074 m
6 Kabel FRC 3 x 10 mm2 Rp 143,476 m
7 Kabel FRC 3 x 16 mm2 Rp 187,622 m
8 Kabel FRC 3 x 25 mm2 Rp 277,491 m
9 Kabel FRC 3 x 35mm2 Rp 359,477 m
10 Kabel FRC 3 x 50 mm2 Rp 493,493 m
11 Kabel FRC 3 x 70 mm2 Rp 583,362 m
12 Kabel FRC 4x 2,5 mm2 Rp 52,030 m
13 Kabel FRC 4x 4 mm2 Rp 94,074 m
14 Kabel FRC 4x 6 mm2 Rp 122,454 m
15 Kabel FRC 4x10 mm2 Rp 183,943 m
16 Kabel FRC 4x16 mm2 Rp 248,586 m
17 Kabel FRC 4x25 mm2 Rp 363,156 m
18 Kabel FRC 4x35 mm2 Rp 478,252 m
19 Kabel FRC 4x50 mm2 Rp 646,429 m
20 Kabel FRC 4x70 mm2 Rp 898,693 m
21 Kabel FRC 4x90 mm2 Rp 1,051,103 m
22 Kabel FRC 4x120 mm2 Rp 1,471,545 m
23 Kabel FRC 4x150 mm2 Rp 1,720,131 m
24 Kabel FRC 4x 185 mm2 Rp 1,949,797 m
25 Kabel NYFGbY 3x2,5 mm3 Rp 37,930 m¹
26 Kabel NYFGbY 3x4 mm2 Rp 48,102 m¹
27 Kabel NYFGbY 4x4 mm2 Rp 59,766 m¹
28 Kabel NYFGbY 4x6 mm2 Rp 78,482 m¹
29 Kabel NYFGbY 4x10 mm2 Rp 111,937 m¹
30 Kabel NYFGbY 4x16 mm2 Rp 130,653 m¹
31 Kabel NYFGbY 4x25 mm2 Rp 203,439 m¹
32 Kabel NYFGbY 4x35 mm2 Rp 261,307 m¹
33 Kabel NYFGbY 4x50 mm2 Rp 342,682 m¹
34 Kabel NYFGbY 4x70 mm2 Rp 482,377 m¹
35 Kabel NYFGbY 4x95 mm2 Rp 659,143 m¹
36 Kabel NYFGbY 4x120 mm3 Rp 826,416 m¹
37 Kabel NYFGbY 4x150 mm2 Rp 1,012,224 m¹
38 Kabel NYFGbY 4x185 mm2 Rp 1,255,899 m¹
39 Kabel NYFGbY 4x240 mm2 Rp 1,642,886 m¹
40 Kabel NYFGbY 4x300 mm2 Rp 2,044,791 m¹
41 Kabel N2XSEFGbY 3 x 120 mm2 Rp 1,181,644 m¹
42 Kabel N2XSEFGbY 3 x 150 mm3 Rp 1,405,427 m¹
43 Kabel N2XSEFGbY 3 x 300 mm4 Rp 2,720,436 m¹
44 Kabel NYM 3x2,5 mm2 Rp 15,427 m¹
Kabel NYY 1x70 mm2 Rp 140,147 m¹
45 Kabel NYY 1x150 mm2 Rp 238,250 m¹
46 Kabel NYY 1x185 mm2 Rp 297,021 m¹
47 Kabel NYY 1x240 mm2 Rp 390,151 m¹
48 Kabel NYY 1x300 mm2 Rp 487,350 m¹
49 Kabel NYY 3x2,5 mm2 Rp 17,801 m¹
50 Kabel NYY 3x4 mm2 Rp 27,295 m¹
51 Kabel NYY 3x6 mm2 Rp 37,975 m¹
52 Kabel NYY 3x10 mm2 Rp 65,824 m¹
53 Kabel NYY 3x16 mm2 Rp 90,417 m¹
54 Kabel NYY 3x25 mm2 Rp 138,339 m¹
55 Kabel NYY 3x35 mm2 Rp 186,260 m¹
56 Kabel NYY 3x50mm2 Rp 246,840 m¹
57 Kabel NYY 3x70 mm2 Rp 354,437 m¹
58 Kabel NYY 3x95 mm2 Rp 487,350 m¹
59 Kabel NYY 3x120 mm2 Rp 581,837 m¹
60 Kabel NYY 3x150 mm2 Rp 714,750 m¹
61 Kabel NYY 3x185 mm2 Rp 891,064 m¹
62 Kabel NYY 3x240 mm2 Rp 1,170,454 m¹
63 Kabel NYY 4x2,5 mm2 Rp 31,646 m¹
64 Kabel NYY 4x4 mm2 Rp 37,975 m¹
65 Kabel NYY 4x6 mm2 Rp 52,894 m¹
66 Kabel NYY 4x10 mm2 Rp 84,812 m¹
67 Kabel NYY 4x16 mm2 Rp 115,734 m¹
68 Kabel NYY 4x25 mm2 Rp 178,575 m¹
69 Kabel NYY 4x35 mm2 Rp 243,223 m¹
70 Kabel NYY 4x50 mm2 Rp 323,243 m¹
71 Kabel NYY 4x70 mm2 Rp 458,417 m¹
72 Kabel NYY 4x95 mm2 Rp 631,566 m¹
73 Kabel NYY 4x120 mm2 Rp 794,770 m¹
74 Kabel NYY 4x150 mm2 Rp 977,865 m¹
75 Kabel NYY 4x185 mm2 Rp 1,227,417 m¹
76 Kabel NYY 4x240 mm2 Rp 1,608,527 m¹
77 Kabel NYY 4x300 mm2 Rp 2,006,816 m¹
78 Kabel Tray 200 x 100 Rp 316,461 m
79 Kabel Tray 300 x 100 Rp 350,368 m
79 Kabel Tray 500 x 100 Rp 519,901 m
80 Kabel Tray 600 x 100 Rp 632,922 m
81 Elbow 200 x 100 Rp 252,039 bh
82 Elbow 300 x 100 Rp 339,066 bh
83 Tee 200 x 100 Rp 376,363 bh
84 Tee 300 x 100 Rp 479,213 bh
85 Cross 200 x 100 Rp 593,365 bh
86 Cross 300 x 100 Rp 632,922 bh
87 Kabel Ladder 200 x 100 Rp 271,252 m¹
88 Kabel Ladder 300 x 100 Rp 310,810 m¹
89 Kabel Ladder 600 x 100 Rp 474,692 m¹
90 Elbow 600 x 100 Rp 231,681 bh
91 Tee 600 x 100 Rp 291,469 bh
92 TL LED 3x18 Watt RM C/W ACRILYC Rp 2,453,139 bh
93 TL LED 3x18 Watt RM C/W ACRILYC C/W NICAD Rp 3,865,913 bh
94 TL LED 2x18 Watt RM C/W ACRILYC Rp 1,320,514 bh
95 TL LED 2x18 Watt RM C/W ACRILYC C/W NICAD Rp 1,992,994 bh
96 TL LED 1x18 Watt RM C/W ACRILYC Rp 962,517 bh
97 TL LED 1x18 Watt RM C/W ACRILYC C/W NICAD Rp 1,634,997 bh
98 TL LED 4x10 Watt RM C/W ACRILYC Rp 1,910,635 bh
99 TL LED 4x10 Watt RM C/W ACRILYC C/W NICAD Rp 3,323,408 bh
100 TL LED 2x10 Watt RM C/W ACRILYC Rp 1,079,924 bh
101 TL LED 2x10 Watt RM C/W ACRILYC C/W NICAD Rp 2,492,697 bh
102 TL LED 2x18 Watt RM Rp 1,578,350 bh
103 TL LED 2x18 Watt RM C/W NICAD Rp 1,992,994 bh
104 TL LED 1x18 Watt RM Rp 752,070 bh
105 TL LED 1x18 Watt RM C/W NICAD Rp 1,424,550 bh
106 TL LED 2x18 Watt SM Rp 912,440 bh
107 TL LED 2x18 Watt SM NICAD Rp 1,992,994 bh
108 TL LED 1x18 Watt SM Rp 524,139 bh
109 TL LED 1x18 Watt SM C/W NICAD Rp 1,424,550 bh
110 TL LED 1x8 Watt Wastafel Rp 130,399 bh
111 Downlight LED 11 Watt Rp 163,057 bh
112 Downlight LED 11 Watt C/W NICAD Rp 836,045 bh
113 Downlight LED 11 Watt C/W ACRILYC Rp 221,365 bh
114 Downlight LED 11 Watt C/W ACRILYC C/W NICAD Rp 949,067 bh
115 EXIT Lamp TL 1x8W Rp 999,543 bh
116 Wall Lamp Outdoor 1 x 23 Watt Rp 626,751 bh
117 Emergency Lamp 10 Watt Rp 1,554,051 bh
118 Lampu Taman GL PILAR LED 23 Watt Rp 3,426,682 bh
119 Lampu Underwater 18 W Rp 6,597,651 bh
120 Obstruction Lamp Rp 3,108,101 bh
124 Lampu TL LED 1 x 18 w/Dust Proof Rp 1,695,328 bh
125 Lampu TL LED 2 x 18 w/Dust Proof Rp 1,836,605 bh
139 Lampu Jalan LED ( 1 x 120 W ) Rp 8,476,640 bh
141 Tiang PJU 11 meter single Rp 6,677,473 bh
142 Tiang PJU 11 meter double Rp 6,677,473 bh
143 Saklar ganda 10 A Rp 53,290 bh
144 Saklar BedHEad 10 A Rp 53,290 bh
145 Saklar hotel 10 A Rp 44,135 bh
146 Saklar tunggal 10 A Rp 27,351 bh
147 Stop kontak daya 16 A Rp 41,649 bh
148 Stop kontak daya 16 A (UPS) Rp 41,649 bh
149 Stop kontak daya 16 A - 3 Phase Rp 476,839 bh
150 Stop kontak daya lantai 16A Rp 507,242 bh
151 Stop Kontak Syam 22000 W 50 (UPS) Ruang OperasiRp 27,125,246 bh
152 Stop kontak daya 500 W 16 A Rp 97,594 bh
153 Stop kontak daya 3000 W 16 A Rp 308,550 bh
154 Stop kontak daya 4000 W 16 A Rp 847,664 bh
155 Box Floor Outlet Rp 586,188 bh
156 Socket Pipa Rp 910 bh
157 Tee Doos Rp 5,199 bh
158 Pipa Conduit Rp 6,329 m¹
159 Las Doop Rp 650 bh
160 Klem Pipa Rp 650 bh
161 Isolasi Rp 8,138 bh
162 Kabel Ties Rp 1,017 bh
163 NICAD Rp 1,130,219 bh
164 BCC 1,5 mm² Rp 2,277 bh
165 BCC 2,5 mm² Rp 4,024 bh
166 BCC 4 mm² Rp 5,807 m¹
167 BCC 6 mm² Rp 8,362 m¹
168 BCC 10 mm² Rp 14,053 m¹
169 BCC 16 mm² Rp 23,482 m¹
170 BCC 25 mm² Rp 36,442 m¹
171 BCC 35 mm² Rp 50,180 m¹
172 BCC 50 mm² Rp 72,994 m¹
173 BCC 70 mm² Rp 102,640 m¹
174 BCC 95 mm² Rp 136,233 m¹
175 BCC 120 mm² Rp 174,919 m¹
176 BCC 150 mm² Rp 214,888 bh
177 BCC 185 mm² Rp 269,540 bh
178 BCC 240 mm² Rp 338,692 bh
179 BCC 300 mm² Rp 437,364 bh
180 BCC 400 mm² Rp 584,455 bh
181 BCC 500 mm² Rp 730,070 bh
Rp -
1 MCB 1P 6 KA Rp -
2 MCB 6 A/1 Phasa Rp - bh
3 MCB 10 A/1 Phasa Rp - bh
4 MCB 16 A/1 Phasa Rp - bh
5 MCB 20 A/1 Phasa Rp - bh
6 MCB 25 A/1 Phasa Rp - bh
7 MCB 32 A/1 Phasa Rp - bh
8 MCB 40 A/1 Phasa Rp - bh
9 MCB 50 A/1 Phasa Rp - bh
10 MCB 63 A/1 Phasa Rp - bh
MCB 3P 6 KA Rp -
11 MCB 6 A/3 Phasa Rp - bh
12 MCB 10 A/3 Phasa Rp - bh
13 MCB 16 A/3 Phasa Rp - bh
14 MCB 20 A/3 Phasa Rp - bh
15 MCB 25 A/3 Phasa Rp - bh
16 MCB 32 A/3 Phasa Rp - bh
17 MCB 40 A/3 Phasa Rp - bh
18 MCB 50 A/3 Phasa Rp - bh
MCB 1P 10 KA Rp -
1 MCB 6 A/1 Phasa Rp 254,243 bh
2 MCB 10 A/1 Phasa Rp 254,243 bh
3 MCB 16 A/1 Phasa Rp 254,243 bh
4 MCB 20 A/1 Phasa Rp 254,243 bh
5 MCB 25 A/1 Phasa Rp 314,540 bh
6 MCB 32 A/1 Phasa Rp 328,215 bh
7 MCB 40 A/1 Phasa Rp 343,134 bh
8 MCB 50 A/1 Phasa Rp 432,648 bh
9 MCB 63 A/1 Phasa Rp 462,485 bh
MCB 3P 10 KA Rp -
10 MCB 6 A/3 Phasa Rp 1,151,241 bh
11 MCB 10 A/3 Phasa Rp 1,151,241 bh
12 MCB 16 A/3 Phasa Rp 1,151,241 bh
13 MCB 20 A/3 Phasa Rp 1,151,241 bh
14 MCB 25 A/3 Phasa Rp 1,202,835 bh
15 MCB 32 A/3 Phasa Rp 1,604,063 bh
16 MCB 40 A/3 Phasa Rp 1,619,321 bh
17 MCB 50 A/3 Phasa Rp 2,185,617 bh
18 MCB 63 A/3 Phasa Rp 2,295,644 bh
MCB 1P 15 KA Rp -
19 MCB 6 A/1 Phasa Rp 341,270 bh
20 MCB 10 A/1 Phasa Rp 341,270 bh
21 MCB 16 A/1 Phasa Rp 341,270 bh
22 MCB 20 A/1 Phasa Rp 341,270 bh
23 MCB 25 A/1 Phasa Rp 341,270 bh
24 MCB 32 A/1 Phasa Rp 394,107 bh
25 MCB 40 A/1 Phasa Rp 450,675 bh
26 MCB 50 A/1 Phasa Rp 505,999 bh
27 MCB 63 A/1 Phasa Rp 562,566 bh
MCB 3P 15 KA Rp -
28 MCB 6 A/3 Phasa Rp 1,377,510 bh
29 MCB 10 A/3 Phasa Rp 1,377,510 bh
30 MCB 16 A/3 Phasa Rp 1,353,889 bh
31 MCB 20 A/3 Phasa Rp 1,353,889 bh
32 MCB 25 A/3 Phasa Rp 1,571,456 bh
33 MCB 32 A/3 Phasa Rp 1,786,537 bh
34 MCB 40 A/3 Phasa Rp 1,786,537 bh
35 MCB 50 A/3 Phasa Rp 1,903,401 bh
36 MCB 63 A/3 Phasa Rp 2,001,617 bh
MCCB 3P 36 KA ADJUSTABLE Rp -
54 MCCB 16 A/3 Phasa Rp 2,056,320 bh
55 MCCB 32 A/3 Phasa Rp 2,056,320 bh
56 MCCB 63 A/3 Phasa Rp 2,118,482 bh
57 MCCB 50 A/3 Phasa Rp 2,056,320 bh
58 MCCB 40 A/3 Phasa Rp 2,056,320 bh
59 MCCB 25 A/3 Phasa Rp 2,056,320 bh
MCCB 3P 36 KA ADJUSTABLE Rp -
59 MCCB 630-800 A/3 Phasa Rp 6,707,282 bh
60 MCCB 400-630 A/3 Phasa Rp 8,258,846 bh
61 MCCB 350-500 A/3 Phasa Rp 5,969,815 bh
62 MCCB 320-400 A/3 Phasa Rp 7,704,361 bh
63 MCCB 240-320 A/3 Phasa Rp 4,849,881 bh
64 MCCB 160-240 A/3 Phasa Rp 4,217,072 bh
65 MCCB 140-200 A/3 Phasa Rp 4,217,072 bh
66 MCCB 120-160 A/3 Phasa Rp 3,694,911 bh
65 MCCB 100-120 A 3 Phase Rp 3,141,669 bh
66 MCCB 70-100 A 3 Phase Rp 2,230,373 bh
MCCB 3P 65 KA ADJUSTABLE Rp -
67 MCCB 630-800 A/3 Phasa Rp 18,938,508 bh
68 MCCB 400-630 A/3 Phasa Rp 12,480,439 bh
69 MCCB 350-500 A/3 Phasa Rp 9,757,742 bh
70 MCCB 300-400 A/3 Phasa Rp 9,757,742 bh
71 MCCB 250-350 A/3 Phasa Rp 9,177,375 bh
72 MCCB 175-250 A/3 Phasa Rp 8,579,489 bh
73 MCCB 140-200 A/3 Phasa Rp 4,176,158 bh
74 MCCB 70-100 A/3 Phasa Rp 2,987,507 bh
MCCB 3P 30 KA ADJUSTABLE Rp -
73 MCCB 320-400 A/3 Phasa Rp 4,994,097 bh
74 MCCB 160-240 A/3 Phasa Rp 3,484,803 bh
75 MCCB 125 A/3 Phasa Rp 2,670,481 bh
76 MCCB 20 A/3 Phasa Rp 1,703,239 bh
77 MCCB 75 A/3 Phasa Rp 1,752,969 bh
78 MCCB 50 A/3 Phasa Rp 1,752,969 bh
79 MCCB 16 A/3 Phasa Rp 1,703,239 bh
80 MCCB 60 A/3 Phasa Rp 1,752,969 bh
81 MCCB 100 A/3 Phasa Rp 2,188,103 bh
82 MCCB 500 A/3 Phasa 36 kA Rp 8,476,413 bh
MCCB 3P 70 KA ADJUSTABLE Rp -
83 MCCB 125-160 A/3 Phasa Rp 4,315,175 bh
84 MCCB 100-125 A/3 Phasa Rp 3,452,253 bh
85 MCCB 80-100 A/3 Phasa Rp 2,082,993 bh
86 MCCB 63-80 A/3 Phasa Rp 1,781,225 bh
87 MCCB 630-1000 A/3 Phasa Rp 24,029,578 bh
88 ELCB 32 A/3 Phasa Rp 883,944 bh
ACB 3P 55 KA Rp -
89 ACB 630 A, 3P Rp 21,809,263 bh
90 ACB 800 A, 3P Rp 24,521,788 bh
91 ACB 1000 A, 3P Rp 37,023,701 bh
92 ACB 1250 A, 3P 36 kA Rp 37,571,970 bh
ACB 3P 66 KA Rp -
93 ACB 800 A, 3P Rp 38,528,361 bh
94 ACB 1000 A, 3P Rp 39,771,460 bh
95 ACB 1250 A, 3P Rp 43,852,821 bh
96 ACB 1600 A, 3P Rp 56,604,738 bh
97 ACB 2000 A, 3P Rp 63,082,021 bh
98 ACB 2500 A, 3P Rp 37,240,703 bh
99 ACB 3200 A, 3P Rp 41,196,468 bh
100 ACB 4000 A, 3P Rp 143,969,732 bh
106 Current Transformator 32/5A Rp 365,513 bh
107 Current Transformator 160/5A Rp 384,161 bh
99 Current Transformator 240/5A Rp 384,161 bh
100 Current Transformator 400/5A Rp 494,188 bh
101 Current Transformator 630/5A Rp 562,566 bh
101 Current Transformator 2500/5A Rp 1,789,023 bh
102 Current Transformator 3200/5A Rp 1,939,455 bh
103 Current Transformator 4000/5A Rp 2,036,428 bh
103 EGB Rp 1,356,262 bh
104 Lightning Arrester 40 kA Rp 3,704,857 bh
105 Kapasitor Bank 100 kVAR + Detuned Reactor Rp 16,388,170 bh
106 Kontaktor 185 A 3 P Rp 2,206,187 bh
108 Kontaktor 1 Elektronik Rp 2,292,535 bh
109 Digital Power Meter C/W MODBUS RTU Rp 4,832,476 bh
122 Power Meter Rp 4,832,476 bh
123 Arrester Rp 2,712,525 bh
124 Ampere Meter 800/5A EC 96 Rp 193,606 bh
125 Fuse & Indicator Rp 116,186 bh
126 Fuse 6 A Rp 39,558 bh
126 Selector Switch M-O-A 2P Rp 131,670 bh
127 Volt Meter 0-500V EC 96 Rp 194,285 bh
128 Pilot Lamp Rp 58,432 bh
ATS / AMF control module Rp 29,385,684
129 Genset 2000 kVA Rp 6,175,683,977 bh
130 Busbar 2000 a Rp 8,074,282 bh
131 Busbar (12x2) Rp 232,539 bh
132 Busbar (15x3) Rp 610,318 bh
133 Busbar (25x3) Rp 732,382 bh
134 Busbar (30x5) Rp 1,211,142 bh
135 Busbar (40x5) Rp 1,937,828 bh
136 Busbar (50x5) Rp 2,422,285 bh
136 Busbar (80x5) Rp 3,875,655 bh
135 Busbar (100x10) Rp 8,074,282 bh
Shun Trip - Auxilarry Contact MCB Rp -
133 Auxilarry Contact Rp 187,616 unit
134 Shun trip Rp 553,242 unit
Shun Trip MCCB Rp -
135 Auxilarry Contact + Alarm Switch Rp 231,695 unit
136 Shun trip Rp 479,213 unit
137 Tangki BBM 3000 Liter Rp 22,604,372 unit
138 Tangki BBM 20000 Liter Rp 169,532,790 unit
139 Kontaktor Timer Rp 1,695,328 unit
Rp -
Rp -
1 Interlock Rp 6,451,627 unit
2 Contactor Rp 4,174,236 unit
3 Box Panel ( 180 x 80 x 60 ) cm Rp 8,137,574 bh
4 Box Panel ( 120 x 80 x 30 ) cm Rp 7,218,706 bh
5 Box Panel ( 40 x 30 x 20 ) cm Rp 1,086,140 bh
6 Box Panel ( 60 x 60 x 30 ) cm Rp 2,279,651 bh
7 Box Panel ( 30 x 25 x 15 ) cm Rp 870,494 bh
8 Box Panel ( 60 x 40 x 30 ) cm Rp 1,690,807 bh
9 Box Panel ( 80 x 60 x 25 ) cm Rp 2,806,333 bh
10 Grounding BC 120 mm2 Rp 2,778,245 LS
11 Grounding BC 70 mm2 Rp 2,404,540 LS
12 Grounding BC 50 mm2 Rp 2,002,397 LS
13 Grounding BC 35 mm2 Rp 1,494,714 LS
14 Grounding BC 25 mm2 Rp 1,234,764 LS
15 Grounding BC 16 mm2 Rp 974,814 LS
16 Grounding BC 6-10 mm2 Rp 897,608 LS
17 Premium Capasitor 40kVAR/3p/400V/50Hz/In = 1,7 Rp 8,626,450 bh
18 Capasitor Regulator, Type : RM 2112 (22 step) Rp 22,258,243 bh
19 Push Button Switch Rp 1,104,789 bh
20 Busbar Tembaga SolidStandard NEMA (300x100x10) Rp 6,423,761 bh
21 KWH Meter 1 Phase Rp 1,780,659 bh
22 KWH Meter 3 Phase Rp 3,709,750 bh
UPS UNIT Rp -

HB ELK 56 / 58
DAFTAR HARGA BAHAN DAN UPAH ELEKTRIKAL

NO URAIAN HARGA SATUAN


25 UPS kapasitas 150 Kva Rp 1,695,327,904 unit
26 UPS kapasitas 90 Kva Rp 1,017,196,742 unit
27 UPS kapasitas 80 Kva Rp 904,174,882 unit
28 UPS kapasitas 50 Kva Rp 403,711,598 unit
Rp -
G. PENANGKAL PETIR Rp -
1 Penangkal Petir - Radius 150 M Rp 14,864,809 unit
2 Obstraction Lamp Rp 4,831,685 bh
3 Splitzen Rp 395,577 bh
4 Coaxial Cable 2 x 35 mm Rp 543,946 m¹
5 Connecting Sleeve lengkap surge arester Rp 7,446,146 Set
6 Lightening Flash counter Rp 4,436,108 Set
7 Grounding sistem Rp 3,955,765 Set
- Copper road Rp -
- Pentanahan & pipa GIP dia. 1 1/2 " Rp -
- Bak kontrol ( 40x40) cm lengkap tutup Rp 960,686
- Kawat BCC dia. 70 mm Rp -
8 Testing/pengukuran pentanahan Rp 1,695,328 titik
Rp -
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa cond Rp -
2 - DL LED type RD 150 HRZ LED BULB 6W Rp 185,367
3 - DL LED type THEME 150 LED BENING LED CUBE 11.3W Rp 669,542
4 - DL LED type THEME 150 LED BENING LED CUBE 11.3W Rp 1,658,935
5 - TL OUTBOW type GMS T8 1x36 SAVY Rp 566,070
6 - TL OUTBOW type TK CG T8 1x36 SAVY Rp 378,883
7 - TL OUTBOW type TK CG T8 1x36 SAVY c/w BATT Rp 1,057,692
8 - TL OUTBOW type BL CG T8 1x36 SAVY Rp 315,670
9 - EXIT LAMP LED 1MK HUGO Rp 999,543
10 - LP WASTAFEL type WL TRAPESIUM LED OSR Basic Rp 513,300
11 - Lampu STRIPLIGHT 7W Rp 139,021
12 - LP SPOT type RIO HALOGEN MASTER LED MR.16 7-50W Rp 292,557
13 - LP TAMAN type AGL FG 151 32.1 W Rp 4,655,936
14 - LP SOROT type SPOT MARESCA HLG LED ESS 7 -50W Rp 1,244,325
15 - LP PJU type RL OPTICA P 80 LED c/w TIANG H=7m Rp 4,417,245
12 Exhaust fan 50 W (Lengkap dengan Flexibel Ducting) Rp 565,109
13 Stop Kontak 200 W Rp 37,897
2 Lampu Cleanroom LED 55W Rp 8,024,552
3 Lampu Tanda Operasi 5 W Rp 180,835

Saklar
1 Saklar Tunggal Rp 50,930
2 Saklar Ganda Rp 63,600
3 Saklar Tukar Rp 57,991
16 Stop Kontak 500 W Rp 135,626
4 Stop Kontak Tertutup 200 W Rp 66,153
4 Grid Switch 6 gang Rp 272,034
4 Grid Switch 8 gang Rp 320,399

- Cable Tray STU 500x50x2400x1.2mm (Elektrikal)


Rp 487,601
- Cable Tray STU 300x50x2400x1.2mm (Elektronika)
Rp 287,810
- Cable Ladder STU 500x100 (Elektrikal)
Rp 370,755
- Cable Ladder STU 300x100 (Elektronika)
Rp 266,636

PEKERJAAN AC
Type : SCF 50DVL 1 PHASE INVERTER Rp 17,100,207
Model : Ceiling Cassete-Round Flow White panel
BTU/H: 17.100
Merk : Daikin
Lokasi : R.PERPUSTAKKAN dan R.TUNGGU

Type : STKC 25 TV STAR INVERTER R32 Rp 6,094,139


Model : Wall Mounted Split
BTU/H: 9.000
Merk : Daikin
Lokasi : R.RAPAT

Type : STKC 20 TV STAR INVERTER R32 Rp 5,834,188


Model : Wall Mounted Split
BTU/H: 6.800
Merk : Daikin
Lokasi : R.SEKRETARIAT

Type : STKC 15 TV STAR INVERTER R32 Rp 5,779,938


Model : Wall Mounted Split
BTU/H: 5.100
Merk : Daikin

Exhaust Fan 50 CFM Rp 457,739

Pemasangan Dudukan Outdoor, Indoor & Ongkos Pasang Rp 8,476,640

1 Pipa tembaga dia. 1/4 " Rp 21,474


3 Pipa tembaga dia. 3/8 " Rp 35,564
2 Pipa tembaga dia. 1/2 " Rp 48,486
4 Pipa tembaga dia. 5/8 " Rp 69,320
3 Pipa tembaga dia. 3/4 " Rp 83,561
5 Pipa tembaga dia. 7/8 " Rp 120,622
4 Pipa tembaga dia. 1 " Rp 154,333
6 Pipa tembaga dia. 1 1/8" Rp 179,471
5 Pipa tembaga dia. 1 1/4" Rp 207,434
7 Pipa tembaga dia. 1 3/8" Rp 250,012
6 Pipa tembaga dia. 15/8" Rp 321,820

Insulflex 1/4 " Rp 16,639


Insulflex 3/8 " Rp 18,209
Insulflex 1/2 " Rp 20,721
Insulflex 5/8 " Rp 22,604
Insulflex 3/4 " Rp 24,802
Insulflex 7/8 " Rp 27,376
Insulflex 1 " Rp 28,758
Insulflex 1 1/8 " Rp 30,139
Insulflex 1 1/4 " Rp 32,965
Insulflex 1 3/8 " Rp 36,293
Insulflex 1 5/8 " Rp 41,755

5 Isolasi Pipa Tembaga Rp 31,985


6 Isolasi Duct Tape Rp 9,833
7 Isolasi Pipa Drain 15 mm Rp 31,985
8 Isolasi Pipa Drain 20 mm Rp 37,297
9 Isolasi Pipa Drain 32 mm Rp 40,462
10 Isolasi Pipa Drain 25 mm Rp 47,921
11 Isolasi Pipa Drain 40 mm Rp 58,545
12 Pipa PVC D Dia. 15 mm Rp 12,206
13 Pipa PVC D Dia. 20 mm Rp 13,450
14 Pipa PVC D Dia. 32 mm Rp 24,187
15 Pipa PVC D Dia. 25 mm Rp 26,899
16 Pipa PVC D Dia. 40 mm Rp 40,236

II.E PEKERJAAN FIRE ALARM


I PERALATAN UTAMA FIRE ALARM
1 MCFA 10 COnventional 10 zone + Battery + Surge Protector Set Rp 18,900,171
2 Annunciator RLCD-C Rp 6,784,677
SUB TOTAL (I) PEKERJAAN UTAMA FIRE ALARM
II PEKERJAAN INSATALASI FIRE ALARM LANTAI I
1 - ROR Heat Detector Rp 307,329
2 - Smoke Detector Rp 745,944
3 - Fix Detector Rp 307,329
4 Indicator lamp Rp 1,243,240
5 Break Glass Alarm ( Manual Call Point) Rp 318,270
6 Monitor modul for Indicator & Horn-Strobe Rp 2,188,103
7 End Of Line ( EOL ) Rp 45,209
8 Terminal BOX FA Rp 569,717
9 Instalasi Fire Alarm Kabel NYM 2 x 1,5 mm² dalam conduit PVC Rp 343,586
10 Instalasi Manual Push Button, Alarm Bell, Indicator Lamp NYM Rp 647,515

TELEPHONE
I PEKERJAAN PERALATAN UTAMA/PABX
1 Peralatan utama PABX , 8 Trunk line,60 Extention Rp 46,178,924
2 Terminal Boks c/w LSA 1 x 20 pairs Rp 678,131
3 MDF 2x200 peir solderless w/Arrester LSA 20 peir Rp 1,582,306
4 Back up baterry / UPS Rp 8,001,948
5 Testing commisioning Rp 4,520,874

II PEKERJAAN INSTALASI TELEPHONE LANTAI - 1


1 Terminal Boks c/w LSA 1 x 20 pairs Rp 678,131
2 Outlet telephon Rp 76,855
3 Instalasi telepon Rp 516,928
4 Kabel fedeer 20 peir TB lt 1 ke MDF Rp 56,827
5 IDF 4 peir solderless Rp 226,044

III PEKERJAAN INSTALASI TELEPHONE LANTAI - 2


1 Terminal Boks c/w LSA 1 x 80 pairs Rp 678,131
2 Outlet telephon
3 Instalasi telepon
4 Kabel fedeer 4 peir TB lt 1 ke MDF Rp 84,269

PEKERJAAN LAN ( INSTALASI DATA)


I PERALATAN UTAMA LAN INSTALASI DATA
1 Rack kabinet Rp 15,144,929
3 Fiber optic cable Rp 59,540

II PEKERJAAN INSATALASI DATA LANTAI 1 s/d 3


1 Outlet Data, icl. Trimping Patch Cord RJ 45 Rp 131,105
2 Instalasi kabel UTP Cat 6e Rp 756,739
3 Switch HUB 24 port Rp 4,385,248
4 Patch Panel 24 port Rp 2,486,481

PEKERJAAN INSTALASI CCTV


I PERALATAN UTAMA
1 DVR multiplexer 16 Chanel 2 Tera byte Rp 15,782,112
3 Rack cabinet Rp 8,815,705
4 Monitor LCD 32" Rp 3,481,073
5 UPS 2KVA + External Battery Rp 11,302,186

II PEKERJAAN INSTALASI CCTV LANTAI- 1


Fixed Dome Camera With Housing Rp 2,862,783
Stand Fixed Camera Wiht Housing Rp 3,213,327
Instalasi CCTV Coaxial Cable RG6 + NYYHy 2 x 1.5 mm² dalam c Rp 1,173,332

E PEKERJAAN SOUND SISTEM


I PERALATAN UTAMA
PEKERJAAN INSTALASI SOUND R.SERVER
Pengadaan dan pemasangan sistem SOUND lengkap dengan
semua acessories yang di perlukan
1 CD/MP3/DVD Player Rp 5,967,554
2 Wireless handheld Microphone Rp 15,144,929
3 Dynamic Vocal Mic w/Switch, Super-Cardioid Rp 2,622,107
4 Stand Microphone Rp 678,131
5 Inlet Mic 4 Ch. Rp 158,231
6 Mixer 24 Channel Toa Z-FV200PP-AS ) Rp 13,575,643
7 Digital Processor Rp 48,484,389
8 Multichannel Power Amplifier Rp 30,408,125
9 Dual Channel Amplifier 2x250W Rp 19,600,341
10 Cabinet Rack w/ Accs. Rp 8,815,705
11 2x Line Array Speaker (Rigging) Rp 63,254,266
12 Subwoofer System 15" Rp 16,659,784
13 Instalasi kabel NYMHY 2 X 1,5 mm² dalam conduit PVC HI 20 mm Rp 1,752,724
SUB TOTAL (I) PEKERJAAN INSTALASI SOUND
II PEKERJAAN INSTALASI SOUND LANTAI 2
Pengadaan dan pemasangan sistem SOUND lengkap dengan
semua acessories yang di perlukan
Ceiling Speaker Rp 169,081
Atteunator Rp 154,162
Horn Speaker Rp 691,694
Instalasi kabel NYMHY 2 X 1,5 mm² dalam conduit PVC HI 20 mm Rp 333,505

Public Address & BGM


1 Mixer Pre-Amplifier Rp 13,575,643
2 Emergency Control Panel Rp 12,385,071
3 Power Amplifier 240W Rp 4,732,135
4 Speaker Selector 10 Zone Rp 4,679,105
5 Graphic Equalizer Rp 3,481,073
6 Pre-Record Message Rp 14,410,604
7 CD/MP3/USB Player + FM Tuner Rp 6,238,807
8 Paging Microphone c/w Keypad Rp 7,008,260
9 Change Over Switch Rp 3,164,612
10 Cabinet Rack 23U c/w Accessories Rp 8,815,705
Car Call Rp -
1 Mixer Pre-Amplifier Rp 4,367,165
2 Graphic Equalizer Rp 3,481,073
3 Power Amplifier 240W Rp 4,732,135
4 Paging Microphone Rp 1,923,632
5 Cabinet 15U c/w Accessories Rp 7,097,773

PEKERJAAN GENSET
I PERALATAN UTAMA
1 BP-30 kap 30kVA ( type SILENT ) merk FPT ITALY Rp 214,741,534

PENYAMBUNGAN DAYA PLN


Biaya penyambungan (BP) 105 KVA dan Uang jaminan Rp 102,889,450
langganan (UJL), beserta semua biaya Rp 27,176,106
yang diperlukan untuk perijinan penyambungan daya Rp 28,255,465
S LO 9,000,000

HB ELK 57 / 58
DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL

NO URAIAN HARGA SATUAN


A. DAFTAR UPAH
1 Pekerja Rp 99,459 hari
2 Tukang pipa Rp 108,501 hari
3 Tukang listrik Rp 108,501 hari
4 Tukang AC Rp 108,501 hari
5 Kepala tukang AC Rp 117,543 hari
6 Kepala tukang listrik Rp 117,543 hari
7 Kepala tukang pipa Rp 117,543 hari
8 Mandor Rp 141,277 hari

ii. PEKERJAAN PLUMBING

A POMPA - POMPA
1 Pompa WTP Kap. 2x275 Lpm Head 25 m Rp 111,439,554 unit
2 Pompa WTP Kap. 2x238 Lpm Head 25 m Rp 98,781,106 unit
3 Pompa Transfer Kap. 2x799 Lpm Head 40 m Power 10,2 Kw Rp 259,950,279 unit
4 Pompa Booster Kap. 122 Lpm Head 25 m Power 1 Kw Rp 85,896,614 unit
5 Pompa Booster Kap. 284 Lpm Head 20 m Power 1,5 Kw Rp 107,370,767 unit
6 Heat Pump 2,7 Kw Rp 25,316,897 unit
7 Circulation Pump Rp 13,562,623 unit
8 Mixing Tank Kap.500 liter Rp 5,199,006 unit
9 Roof Tank 20 m3 Rp 91,547,707 unit
10 Carbon Filter Kap.17 m3/h Rp 47,469,181 unit
11 Sand FilterKap.17 m3/h Rp 47,469,181 unit
12 Zeolite FilterKap.17 m3/h Rp 47,469,181 unit
13 Carbon Filter Kap.15 m3/h Rp 45,886,875 unit
14 Sand FilterKap.15 m3/h Rp 45,886,875 unit
15 Zeolite FilterKap.15 m3/h Rp 45,886,875 unit

b Pipa Pipa
1 Pipa PPR PN-10 Ø 20 mm Rp 8,879 Meter
2 Pipa PPR PN-10 Ø 25 mm Rp 12,005 Meter
3 Pipa PPR PN-10 Ø 32 mm Rp 19,534 Meter
4 Pipa PPR PN-10 Ø 40 mm Rp 29,473 Meter
5 Pipa PPR PN-10 Ø 50 mm Rp 45,477 Meter
6 Pipa PPR PN-10 Ø 65 mm Rp 73,473 Meter
7 Pipa PPR PN-10 Ø 80 mm Rp 112,724 Meter

1 Pipa PPR PN-16 Ø 20 mm Rp 11,846 Meter


2 Pipa PPR PN-16 Ø 25 mm Rp 13,726 Meter
3 Pipa PPR PN-16 Ø 32 mm Rp 22,139 Meter
4 Pipa PPR PN-16 Ø 40 mm Rp 35,324 Meter
5 Pipa PPR PN-16 Ø 50 mm Rp 53,462 Meter
6 Pipa PPR PN-16 Ø 65 mm Rp 86,152 Meter
7 Pipa PPR PN-16 Ø 80 mm Rp 120,549 Meter

8 Pipa PPR PN-20 Ø 20 mm Rp 12,945 Meter


9 Pipa PPR PN-20 Ø 25 mm Rp 20,210 Meter
10 Pipa PPR PN-20 Ø 32 mm Rp 32,495 Meter
11 Pipa PPR PN-20 Ø 40 mm Rp 50,513 Meter
12 Pipa PPR PN-20 Ø 50 mm Rp 78,887 Meter
13 Pipa PPR PN-20 Ø 65 mm Rp 124,063 Meter
14 Pipa PPR PN-20 Ø 80 mm Rp 253,172 Meter
15 Pipa HeaderPPR PN-16 Ø 80 mm Rp 299,166 Meter
16 Pipa HeaderPPR PN-16 Ø 100 mm Rp 641,313 Meter
17 Pipa HeaderPPR PN-20 Ø 100 mm Rp 691,468 Meter
16 Pipa PVC kelas AW Ø 20 mm Rp 11,415 Meter
17 Pipa PVC kelas AW Ø 25 mm Rp 12,235 Meter
18 Pipa PVC kelas AW Ø 32 mm Rp 18,168 Meter
17 Pipa PVC kelas AW Ø 40 mm Rp 20,246 Meter
19 Pipa PVC kelas AW Ø 50 mm Rp 22,864 Meter
20 Pipa PVC kelas AW Ø 65 mm Rp 33,144 Meter
21 Pipa PVC kelas AW Ø 80 mm Rp 46,978 Meter
22 Pipa PVC kelas AW Ø 100 mm Rp 77,864 Meter
23 Pipa PVC kelas AW Ø 125 mm Rp 108,501 Meter
23 Pipa PVC kelas AW Ø 150 mm Rp 172,971 Meter
Pipa PVC kelas AW Ø 200 mm Rp 290,271 Meter
24 Pipa PVC kelas D Ø 32 mm Rp 10,087 Meter
25 Pipa PVC kelas D Ø 50 mm Rp 14,891 Meter

c Valve JIS 10k


1 Gate valve JIS 10K Ø 20 mm Rp 270,122 Buah
1 Gate valve JIS 10K Ø 25 mm Rp 352,628 Buah
2 Gate valve JIS 10K Ø 32 mm Rp 535,724 Buah
3 Gate valve JIS 10K Ø 40 mm Rp 687,173 Buah
4 Gate valve JIS 10K Ø 50 mm Rp 866,539 Buah
5 Gate valve JIS 10K Ø 65 mm Rp 1,446,680 Buah
6 Gate valve JIS 10K Ø 80 mm Rp 1,892,400 Buah
7 Gate valve JIS 10K Ø 100 mm Rp 8,345,102 Buah
8 Check valve JIS 10K Ø 40 mm Rp 746,283 Buah
9 Check valve JIS 10K Ø 50 mm Rp 1,152,823 Buah
10 Strainer JIS 10K Ø 40 mm Rp 657,053 Buah
11 Strainer JIS 10K Ø 65 mm Rp 4,453,061 Buah

d Accessories
1 Floor Drain Ø 50 mm Rp 141,390 Buah
2 Roof Drain Ø 100 mm Rp 247,631 Buah
3 Roof Drain Ø 150 mm Rp 371,446 Buah
4 Clean Out Ø 50 mm Rp 174,788 Buah
5 Clean Out Ø 100 mm Rp 349,577 Buah
6 Grease Trap Rp 5,707,604 Buah
6 Bioseptic tank kap.1m3 Rp 5,199,006 Buah

Pekerjaan Plumbing :
Pekerjaan Pengadaan Peralatan Utama
1 Peralatan Sistem Air Bersih
Delivery Pump Rp 6,724,801
Tipe : Centrifugal End Suction Pump
Kapasitas : 50 liter/menit
Head : 50 m
Daya : ± 0,8 kW
Karakt. Listrik : 220/380 V, 3 phase, 50 Hz
Panel kontrol berikut pengabelan dan perlengkapan

2 Peralatan Sistem Air Bersih


Delivery Pump (dari sumur lama) Rp 5,379,841
Tipe : Centrifugal End Suction Pump
Kapasitas : 50 liter/menit
Head : 40 m
Daya : ± 0,8 kW
Karakt. Listrik : 220/380 V, 3 phase, 50 Hz
Panel kontrol berikut pengabelan dan perlengkapan

3 Pompa Supply Rp 2,073,951


Tipe : Centrifugal End Suction Pump
Kapasitas : 25 LPM
Head : 30m
Daya : 0,55 kw
Karakt. Listrik : 220/380 V,phase, 50 Hz
Panel kontrol berikut pengabelan dan perlengkapan

4 Booster Pump Rp 5,275,860


Variable Speed Constant Pressure Packaged unit, lengkap
satu paket dengan Pressure Tank (PT) dan perlengkapannya dari Walrus/setara
Tipe : Centrifugal End Suction Pump
Kapasitas : 70 Lpm
Head : 28m
Daya : 0,37 kw
Karakt. Listrik : 220/380 V, 3 phase, 50 Hz
Panel kontrol berikut pengabelan dan perlengkapan

5 Roof Tank Rp 4,407,853


Tipe : Tank Vertical
Kapasitas : 2x1000 liter
Material : Fibre Glass
Kelengkapan : Man hole, pipa drain, pipa over flow,

Material , stop kran, dan alat bantu lainnya Rp 13,562,623

HB MEK 58 / 58

Anda mungkin juga menyukai