PONDASI CSP
LOKASI STA 0+858 DAN 1+925
RENCANA DESAIN CSP
PLAN PONDASI CSP
POTONGAN B-B
DATA TANAH
DATA TANAH STA 0+850
Tanah Lunak
Dari hasil interpretasi data bor tersebut, diketahui bahwa lapisan permukaan di lokasi
tersebut adalah clay dan terdapat lapisan tanah lunak di kedalaman 0 – 9 m dengan N
rata-rata = 2. Selanjutnya ditemukan lapisan sand medium dense dengan N = 21.
Kemudian ditemukan tanah keras dikedalaman 18 m dengan N> 50.
DATA TANAH STA 1+850
DRILLING LOG
Coordinate N: E:
PT. MEDAN GEOTEKNIK DAN
Elevation Z: m
STRUKTUR KONSULTAN Bore Master : Thomson Nababan
Bore No. : BH - STA 1 + 850 CSP Description By : Sabas Tony Sibagariang, ST
PROJECT : PEMBANGUNAN JALAN TOL BINJAI-LANGSA
Bengining : June 11 th 2022 Drilling Rig : YBM S01
Ending : June 12 th 2022 Engine : Dompeng
LOCATION : STA 1 + 850 CSP
GWL : 0,30 m Check By : Samsuardi Batubara , Ir.MT.
Standart Penetration Test (SPT)
Thickness (m)
Core
Thickness
G.WL (M)
Methode
Depth(m)
Blows Penetration
Depth
Symbol
N Value Graph
Scala
N Blows
(m)
Description Consistency Recovery in of sample Each 15cm N2+N3
(%) UDS/SPT 30cm
15 cm 15 cm 15 cm
100
25
50
75
0
0.00
0.0 10.0 20.0 30.0 40.0 50.0 60.0
-0.5 Sandy clay, yellowish grey, medium -0.5 1
-2.5 -2.5 5
Tanah Lunak
-3.0 -3.0 6
-3.5 -3.5 7
-5.5 -5.5 11
-6.5 -6.5 13
-7.0 -7.0 14
-7.5
-8.0 Clay, grey, high plasticity, low Hard
-7.5
-8.0 8 14 18 32
15 Dari hasil interpretasi data bor tersebut, diketahui
bahwa lapisan permukaan di lokasi tersebut adalah
16
depth.
sandy clay dan terdapat lapisan tanah lunak di
-9.0 -9.0 18
-9.5 -9.5 19
-10.0
-10.5
Very hard -10.0
-10.5
18 22 32 54 20
21
kedalaman 0 – 7 m dengan N rata-rata = 2.
-11.0
-11.5
-11.0
-11.5
22
Selanjutnya ditemukan lapisan clay hard dengan N =
32. Kemudian ditemukan tanah keras dikedalaman 8 m
23
-12.5 -12.5
dengan N> 30.
25
-13.0 -13.0 26
-15.0 -15.0 30
-15.5 -15.5 31
-16.5 -16.5 33
-17.0 -17.0 34
-17.5 -17.5 35
-18.5 -18.5 37
ANALISIS DAYA DUKUNG
ANALISIS DAYA DUKUNG STA 0+858
AXIAL COMPRESSION CAPACITY ANALYSIS OF PILE AXIAL TENSION (PULL OUT) CAPACITY ANALYSIS OF PILE
Project : CSP STA 0+850 Diameter, D : 0.6 m Project : CSP STA 0+850 Diameter, D : 0.6 m
Location : Binbran Width, B : m Location : Width, B : m
Client : - Length, L : m Client : - Length, L : m
Date: : 3/1/2024 Effective Length, LEff : 18 m Date: : 2/29/2024 Effective Length, LEff : 18 m
Qall
Σ Qsf (kN) Qp (kN) Qu (kN) FSSide FSTip
kN Ton
1437.28 1441.99 2879.27 2.5 2.5 1151.71 115.17
Clay: Sand: Weak Rock: ULTIMATE TENSION BEARING CAPACITY, Qu-po & ALLOWABLE TENSION CAPACITY, Qall-po
ΣQsf = Σ(cu.α).p.∆h ΣQsf = Σfs.p.∆h Su = 0.4.qu 0.5 MN/m2 (Rosenberg & Journeaux, 1976)
qu = 1-5 MPa (Singh & Goel, 2011)
Σ 70%Qsf-n Qall-po
Σ Qpo (kN) FSSide
(kN) kN Ton
ULTIMATE TIP RESISTANCE, Qp
798.28 798.28 2.50 319.31 31.93
Qp Qu-po = Σ70%Qsf Qall-po = Σ70%Qsf/FSSide
Soil Type at qu
Nave (blow/ft) Cu (kN/m2 ) 2
The Tip (kN/m ) kN Ton
SUMMARY OF TENSION CAPACITY
WEAK ROCK 250.00 5600.00 1583.36 158.34
Qall
Σ Qsf (kN) Qp (kN) Qu (kN) FSSide FSTip
kN Ton
1140.40 1583.36 2723.76 2.5 2.5 1089.50 108.95
fc Bar Momen Momen Isian Eff Qall - Tekan Qall - Tarik Qall - Tekan NSF QEQ - Tekan QEQ - Tarik
30 - 250 - 1.00 1152 402 1050 1797 627
STA 0+850 Driven Pile 60 18 1 - 1727 511 395 63.410 7.854 718 CEK OK CEK CEK 0.67 0.8 0.1
ANALISI PONDASI GROUP STA 1+950
Tampak Atas Model Group Pile
fc Bar Momen Momen Isian Eff Qall - Tekan Qall - Tarik Qall - Tekan NSF QEQ - Tekan QEQ - Tarik
30 - 250 - 1.00 1090 319 1010 1700 498
STA 1+950 Driven Pile 60 12 1 - 1406 210 381 67.060 10.220 368 CEK OK CEK CEK 0.77 1.5 0.1
ANALISIS PONDASI GROUP PILE
SPASI 1.5 X 1.8
ANALISI PONDASI GROUP STA 0+858
Tampak Atas Model Group Pile
fc Bar Momen Momen Isian Eff Qall - Tekan Qall - Tarik Qall - Tekan NSF QEQ - Tekan QEQ - Tarik
30 - 250 - 1.00 1152 402 1050 1797 627
STA 0+850 Driven Pile 60 18 1 - 1039 433 177 11.130 0.601 609 OK OK CEK CEK 1.11 0.9 0.4
ANALISI PONDASI GROUP STA 1+925
Tampak Atas Model Group Pile
fc Bar Momen Momen Isian Eff Qall - Tekan Qall - Tarik Qall - Tekan NSF QEQ - Tekan QEQ - Tarik
30 - 250 - 1.00 1090 319 1010 1700 498
STA 1+950 Driven Pile 60 12 1 - 957 351 173 6.923 0.501 527 OK OK CEK CEK 1.14 0.9 0.7