Anda di halaman 1dari 2

DRILL LOG Hole No : TR-01 Sheet No.

: 1 of 2

Project Pembangunan Bangunan Pengarah Bendungan Rukoh Depth 47.00 Meter Drill Rig KOKEN OE-2E

Site Terowongan Koordinat X= 825704 Y= 570930 Inclination Vertical Drilled By Hendri

Elevation 181 Meter Date 6-Feb-2022 to 17 Februari 2022 GWL 8,2 m Logged By Frans

Unit Lithology
S P T N - Value

Classification
UDS Sample

Core Barrel
& Bit Type
Permeability
Column
Number of Blows per Core Recovery RQD

Lugeon /
Section
G.W.L
Depth

Depth
Rock
Date

(m)

(m)
Description 30 Cm Penetration % %

0 10 20 30 40 50 60 0 25 50 75 100 0 25 50 75 100

0.0 ~ 47.0 m, Batulanau. 98


1 1
00 01
Top Soil
Berwarna coklat hingga coklat tua
kondisi lapuk, ukuran butir 98
01 02

Residual Soil
2 lempung, agak keras - lunak, 2

CL
9
6-Feb-22

sangat lapuk, sebagian agak


getas, lempung organik, terdapat 80
3 banyak akar tanaman, plastisitas 3 02 03
sedang.
UDS
80
4 4 03 04
12

40 04 05
5 5
Batulanau
Berwarna abu-abu cerah pada 66 05 06
6 kondisi segar dan bewarna coklat 6
hingga coklat tua pada kondisi 19
lapuk, pada kedalaman 5 - 7 06 07
66
7 meter tingkat pelapukan sedang - 7
tinggi, ukuran butir lanau, 07 08
membundar - membundar 56
8 tanggung, kompak, kemas 8
7-Feb-22

32
tertutup, pemilahan baik, porositas 08 09

CL - CM
sedang - tinggi, permeabilitas 56
9 sedang - tinggi, menyerpih. 9

09 10
78
10 Kekar pada kedalaman 10
33
14.65 - 14.67 = 80
16.30 - 16.32 = 70 78 10
17.15 - 17.17 = 65 11
11 11
23.80 - 23.12 = 80
25.05 - 25.10 = 65
11

Singgle Core Barrel


25.30 - 25.32 = 80 80 24 12
12 26.70 - 26.72 = 50 12
29.15 - 29.17 = 75 50
31.40 - 31.50 = <45 80 21
12 13
32.50 - 32.55 = 45
13 33.70 - 33.72 = 60 13
8-Feb-22

35.15 - 35.17 = 50 13


36.40 - 36.42 = 60 20
14
100
39.35 - 39.37 = 65
14 44.05. - 44.07 = 45 50
14
45.25 - 45.27 = 50
44.50 - 44.52 = 45 14 15
Batulanau

90
15 44.65 - 44.67 = 50 15
#######

84 15 15
16 16
16
50
16
84 11 17
17 17
17
30
18
18 18
50 18 19
30 10
10-Feb-22

CL - CM
19 19
19 20
70 14
20 20
50

70 30
20 21
21 21

84 21 22
22 22

73 22 23
23 23
12-Feb-22

73
23 24
24 24
24 25
81
25 25
DRILL LOG Hole No : TR-01 Sheet No. : 2 of 2

Project Pembangunan Bangunan Pengarah Bendungan Rukoh Depth 47.00 Meter Drill Rig KOKEN OE-2E

Site Terowongan Pelaksana Zefrianto Ilham Inclination Vertical Drilled By Hendri

Elevation 181,000 Meter Date 6-Feb-2022 to 17 Februari 2022 GWL 8,2 m Logged By Frans

Unit Lithology
S P T N - Value

Classification
UDS Sample

Core Barrel
& Bit Type
Permeability
Number of Blows

Column
Core Recovery RQD

Lugeon /
Section
G.W.L
Depth

Depth
Rock
Date

(m)

(m)
Description per 30 Cm % %
Penetration
0 10 20 30 40 50 60 0 25 50 75 100 0 25 50 75 100

12-Feb-22 Batulanau 81 43
Berwarna abu-abu cerah pada 26
26 26 25
kondisi segar dan bewarna coklat
hingga coklat tua pada kondisi 97 12 27
lapuk, ukuran butir lanau, 26
27 27
membundar - membundar
tanggung, kompak, kemas 97 65 28
27
28 tertutup, pemilahan baik, 28
porositas sedang - tinggi,
13-Feb-22

98 70 29
permeabilitas sedang - tinggi, 28
29 menyerpih, terdapat gravel - 29
gravel. 30
81 90 29
30 30

94 24
30
30 31
31 31 31
31
31 32

Single Core Barrel


95 50
32 32 32

CL - CM
32
32 33
95 65
14-Feb-22

33 33
33
33
33 34
61 13 34
34 34
34
35
61 12 34 35
35 35
Batulanau

90 30
36 36 35 36

84 25 37
15-Feb-22

37 37
36

100 40 37 38
38 38

95 65
39
38
39 39

84 30 39 40
40 40

84 51
16-Feb-22

41 41 41
40
82 42
42 42 41

CL - CM
43
80 42
43 43
44
89 35 43
44 44
45
45
44
87
17-Feb-22

45 45

85 30
46 46 45 46

85 28
46 47
47 47
END OF BORE HOLE 47 M