Anda di halaman 1dari 30

PEMBANGUNAN PERPIPAAN AIR LIMBAH ZONA UTARA KOTA PEKANBARU

( PEKANBARU NORTH SEWERAGE NC)

ANALISA GALIAN DAN PERKUATAN PIT

PEMBERI TUGAS : KEMENTERIAN PEKERJAAN UMUM DAN


PERUMAHAN RAKYAT
KONSULTAN : PISC - MSMIP
KONTRAKTOR : ADHI – JAYA KONSTRUKSI, KSO

Ir. Firman
SKA no 1.2.201.22.148.10595568

Page 1 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

ANALISA GALIAN PIT DAN PERKUATANNYA


1) DATA TANAH

GEOLOGIC DRILLING LOG

PROJECT : SOIL INVESTIGATION PROYEK PEMASANGAN JARINGAN IPAL KOTA PEKANBARU


LOCATION : JL. AHMAD YANI, KOTA PEKANBARU, PROVINSI RIAU
BORE HOLE MH. 30
START : 07 Februari 2021 BORING MACHINE : YBM S 01
FINISH : 07 Februari 2021 DRILL MASTER : INDRA GINTING
TOTAL DEPTH : 15,00 METER LOGGED BY : INDRA GINTING
FINAL GWL : 4.10 METER CHECKED BY : PATUH SEMBIRING, ST
ROCK/SOIL (M

SOIL AND/OR ROCK DESCRIPTION KOORDINAT :


End of Depth
TICKNESS OF

N / 15 cm
SOIL TYPE

NO.OF BLOW
DEPTH (M)

N / 15 cm

SOIL SAMPLE
G.W.L (m)

DEPTH (M)
GRAPH X : 771867.621
DATE

CM
(M)

N - VOLUE Y : 58530.791
N1 N2 N3 # # # # # # # PHOTO OF CORE
0.25 0.25 Aspal, Hitam.
0.25 0.50 Grefel Campur Pasir, Putih Kekuningan, Tidak Berplastis,
"01 "01
1.00 1.50 Kadar Air Rendah, Kepadatan Padat.
4.10

"02 Pasir Sedikit Lempung, Coklat Kekuningan, Plastis "02


2 4 6 10
1.50 Sedang, Kadar Air Sedang, Kepadatan Sedang.
"03 3.00 "03
Pasir Sedang, Kuning Kecoklatan, Plastis Sedang, Kadar
"04 Air Sedang, Kepadatan Sedang. "04
1 1 3 4

"05 Pasir Sedang Berlanau, Abu-abu Cerah, Plastis Sedang, "05

3.00 Kadar Air Sedang, Kepadatan Sangat Longgar.


"06 6.00 "06
1 1 2 3
07 Februari 2021

"07 Lanau Sedikit Pasir, Abu-abu, Plastis Sedang, Kadar Air "07
UDS
Sedang, Kekakuan Lunak.
"08 "08
2.45 8.45 1 2 2 4

"09 "09

"10 "10
5 5 8 13

"11 "11

Pasir Halus Berlanau, Abu-abu Cerah, Plastis Sedang,


"12 Kadar Air Sedang, Kepadatan Sedang. "12
2 4 5 9

"13 "13

"14 "14
5 6 7 13
6.55 15.00
"15 "15

"16 "16
STOP BOR
"17 15,00 M "17

Page 2 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

Page 3 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

Page 4 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

Page 5 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

2) INPUT DATA

A. Pembebanan
1) Beban mati adalah akibat berat sendiri
2) Beban hidup exavator 800 kg/m2 pada permukaan tanah ini adalah beban kerja operasional
dipermukaan tanah
3) Beban Tekanan tanah terantun dari jenis tanah, karakterristik tanah dan perbedaan permukaan
tanah di depan dan belakang sheet pile
4) Beban tekanan hidrostatis akibat perbedaan muka air tanah didepan dan belakang sheet pile.

B. Jenis lapisan tanah dan karakteristiknya


1) 0.00 s/d 1,50m Grafel Campur Pasir, Putih Kekuningan, Tidak Berplastis,
Kadar Air Rendah, Kepadatan Padat. N=10 ϕ=30.50
2) 1.50 s/d 3,00 m Pasir Sedang, Kuning Kecoklatan, Plastis Sedang, Kadar
Air Sedang, Kepadatan Sedang. N=4 ϕ=29.0 0
3) 3.00 s/d 6,00m Pasir Sedang Berlanau, Abu-abu Cerah, Plastis Sedang,
Kadar Air Sedang, Kepadatan Sangat Longgar. N=3 ϕ=28.0 0
4) 6.00 s/d 8,5m Lanau Sedikit Pasir, Abu-abu, Plastis Sedang, Kadar Air
Sedang, Kekakuan Lunak N=4 ϕ=29.0 0
1. 8,50 s/d 15,0m Pasir Halus Berlanau, Abu-abu Cerah, Plastis Sedang,
Kadar Air Sedang, Kepadatan Sedang. Nav=11 ϕ=30.8 0
C. Muka air tanah
Bagian Muka -13.3 m
Bagian Belakang 6,00 m
D. Perhitungan Menggunakan Software SAP 2000

Page 6 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

3)TAHAP-2
PERHITUNGAN TEKANAN
PASANG STRUTT-1 TANAHDAN GALI S/D -4.00 M
EL -1.50M
Koef Tekanan Tanah Aktif REFERENSI SOIL SUBGRADE MODULUS
Ka = (1-sinφ)/(1+sinφ)
Koef Tekanan Tanah Pasif
Kp = 1/Ka
Tekanan Tanah aktif
pa = γHKa -2CKa0.5
Pa = 1/2γH2Ka -2CHKa0.5
Tekanan Tanah Pasif
pp = γHKp +2CKp0.5
Pp = 1/2γH2Kp +2CHKp0.5

1) 0.00 s/d 1,50m Grafel Campur Pasir, Putih Kekuningan, Tidak Berplastis,
Kadar Air Rendah, Kepadatan Padat. N=10 ϕ=30.50 γ=1,60
Ka 1= 0.327
Kp1 =1/Ka1 = 3.061
h= 1.500 m
pa1.5 = γHKa + qKa 1.045 t/m2

2) 1.50 s/d 3,00 m Pasir Sedang, Kuning Kecoklatan, Plastis Sedang, Kadar
Air Sedang, Kepadatan Sedang. N=4 ϕ=29.0 0 γ = 1.500
Ka2 = 0.347
Kp2 =1/Ka2 = 2.882
h= 1.500 m
pa3 = γHKa2 + qKa2 1.891 t/m2

Page 7 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

3)TAHAP-2
3.00 s/d PASANG
6,00m Pasir Sedang Berlanau,
STRUTT-1 EL -1.50MAbu-abu
DANCerah,
GALIPlastis Sedang,
S/D -4.00 M
Kadar Air Sedang, Kepadatan Sangat Longgar. N=3 ϕ=28.0 0 γ = 1.500 MTA -4.00
Muka air tanah disisi luar diturunkan sedalam 2.00 m KE ELEVASI -6.00
Ka3 = 0.361
Kp3 =1/Ka3 = 2.770
pa6 = γH1 Ka3 +γH2*Ka3+ qKa3
pa6 = 3.592 t/m2

4) 6.00 s/d 8,5m Lanau Sedikit Pasir, Abu-abu, Plastis Sedang, Kadar Air
Sedang, Kekakuan Lunak N=4 ϕ=29.0 0 γ=1.600
Ka4 = 0.347
Kp4 =1/Ka4 = 2.882
pa8.5 = γH1 Ka4 +(γ-1)H2*Ka4+ qKa4+γwH3
pa8.5 = 6.577 t/m2

5) 8,50 s/d 15,0m Pasir Halus Berlanau, Abu-abu Cerah, Plastis Sedang,
Kadar Air Sedang, Kepadatan Sedang. Nav=11 ϕ=30.8 0 γ=1.650
Ka5 = 0.323
Kp5=1/Ka5 = 3.098
pa8.5 = γH1 Ka4 +(γ-1)H2*Ka4+ qKa4+γwH4
pa8.5 = 14.059 t/m2

SUBGRADE MODULUS YANG DIPERGUNAKAN

1 S/D 3 Grafel Campur Pasir N=10 ks = 7500 kN/m2 750 t/m2


3 S/D 6 Pasir Sedang Berlanau n=3 ks = 6000 kN/m2 600 t/m2
6 S/D 8.5 Lanau Sedikit Pasir, Abu-abu N=4 ks = 7500 kN/m2 750 t/m2
8.5 D/D 15 Pasir Halus Berlanau N=11 ks = 9000 kN/m2 900 t/m2

Page 8 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

TAHAP-2 PASANG STRUTT-1 EL -1.50M DAN GALI S/D -4.00 M


q=0.800 t/m2
depth
0.0 0.261 t/m2 Grafel Campur Pasir
1.5 1.045 t/m2
3.0 1.891 t/m2 Pasir Sedang, Kuning Kecoklatan
4.0 2.458 t/m2
5.0 3.025 t/m2 Pasir Sedang Berlanau, Abu-abu
6.0 3.592 t/m2
7.0 4.786 t/m2
8.0 5.980 t/m2 Lanau Sedikit Pasir, Abu-abu
8.5 6.577 t/m2
9.0 7.153 t/m2
10.0 8.304 t/m2
11.0 9.455 t/m2
12.0 10.606 t/m2 Pasir Halus Berlanau, Abu-abu
13.0 11.757 t/m2
14.0 12.908 t/m2
15.0 14.059 t/m2

Page 9 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

4) TAHAPAN
TAHAP-2 KONSTRUKSI
PASANG STRUTT-1 EL -1.50M DAN GALI S/D -4.00 M
TAHAP-1 GALIAN S/D 2M
q=0.800 t/m2
depth
0.0 0.261 t/m2
1.5 1.045 t/m2 -2.00
3.0 1.891 t/m2 Pasir Sedang, Kuning Kecoklatan
4.0 2.458 t/m2
5.0 3.025 t/m2 Pasir Sedang Berlanau, Abu-abu
6.0 3.592 t/m2
7.0 4.786 t/m2
8.0 5.980 t/m2 Lanau Sedikit Pasir, Abu-abu
8.5 6.577 t/m2
9.0 7.153 t/m2
10.0 8.304 t/m2
11.0 9.455 t/m2
12.0 10.606 t/m2 Pasir Halus Berlanau, Abu-abu
13.0 11.757 t/m2
14.0 12.908 t/m2
15.0 14.059 t/m2

Mmax 4.020 tm Vmax=6.80 ton

Page 10 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

TAHAP-2 PASANG STRUTT-1 EL -1.50M DAN GALI S/D -4.00 M

q=0.800 t/m2
depth
0.0 0.261 t/m2
1.5 1.045 t/m2 -1.50
3.0 1.891 t/m2
4.0 2.458 t/m2 -4.00
5.0 3.025 t/m2 Pasir Sedang Berlanau, Abu-abu
6.0 3.592 t/m2
7.0 4.786 t/m2
8.0 5.980 t/m2 Lanau Sedikit Pasir, Abu-abu
8.5 6.577 t/m2
9.0 7.153 t/m2
10.0 8.304 t/m2
11.0 9.455 t/m2
12.0 10.606 t/m2 Pasir Halus Berlanau, Abu-abu
13.0 11.757 t/m2
14.0 12.908 t/m2
15.0 14.059 t/m2

Strut R1 =4.77 ton/m Mmax =4.16 tm Vmax=4.05 ton

Page 11 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

TAHAP-3 PASANG STRUTT-2 EL -4.00 M DAN GALI S/D -7.00 M


q=0.800 t/m2

depth
0.0 0.261 t/m2
1.5 1.045 t/m2 -1.50
3.0 1.891 t/m2
4.0 2.458 t/m2 -4.00
5.0 3.025 t/m2 Pasir Sedang Berlanau, Abu-abu
6.0 3.592 t/m2
7.0 4.786 t/m2 -7.00
8.0 5.980 t/m2 Lanau Sedikit Pasir, Abu-abu
8.5 6.577 t/m2
9.0 7.153 t/m2
10.0 8.304 t/m2
11.0 9.455 t/m2
12.0 10.606 t/m2 Pasir Halus Berlanau, Abu-abu
13.0 11.757 t/m2
14.0 12.908 t/m2
15.0 14.059 t/m2
Strut R1 =1.11 ton/m R2=13.30 t/m Mmax =7.51 tm Vmax=8.08 ton

Page 12 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

TAHAP-4 PASANG STRUTT-3 EL -6.50 M DAN GALI S/D 9.5 M

q=0.800 t/m2
depth
0.0 0.261 t/m2
1.5 1.045 t/m2 -1.50
3.0 1.891 t/m2
4.0 2.458 t/m2 -4.00
5.0 3.025 t/m2
6.0 3.592 t/m2
7.0 4.786 t/m2 -6.50
8.0 5.980 t/m2
8.5 6.577 t/m2
9.0 7.153 t/m2
10.0 8.304 t/m2
11.0 9.455 t/m2
12.0 10.606 t/m2 Pasir Halus Berlanau, Abu-abu
13.0 11.757 t/m2
14.0 12.908 t/m2
15.0 14.059 t/m2

Strut R1 =3.32 ton/m R2=1.21 t/m R3=21.1 t/m Mmax =10.70 tm Vmax=12.28 ton

Page 13 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

TAHAP 5 PASANG STRUTT-4 EL -9.00 M DAN GALI S/D 12.00 M

q=0.800 t/m2
depth
0.0 0.261 t/m2
1.5 1.045 t/m2 -1.50
3.0 1.891 t/m2
4.0 2.458 t/m2 -4.00
5.0 3.025 t/m2
6.0 3.592 t/m2
7.0 4.786 t/m2 -6.50
8.0 5.980 t/m2
8.5 6.577 t/m2
9.0 7.153 t/m2 -9.00
10.0 8.304 t/m2
11.0 9.455 t/m2 -12.00
12.0 10.606 t/m2 Pasir Halus Berlanau, Abu-abu
13.0 11.757 t/m2
14.0 12.908 t/m2
15.0 14.059 t/m2

Strut R1 =2.4ton/m R2=7.47t/m R3=3.63t/m R4=31.62t/m Mmax =15.4 tm Vmax=17.86 ton

Page 14 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

TAHAP 6 PASANG STRUTT-5 EL -11.5 M DAN GALI S/D -13.00 M

q=0.800 t/m2
depth
0.0 0.261 t/m2
1.5 1.045 t/m2 -1.50
3.0 1.891 t/m2
4.0 2.458 t/m2 -4.00
5.0 3.025 t/m2
6.0 3.592 t/m2
7.0 4.786 t/m2 -6.50
8.0 5.980 t/m2
8.5 6.577 t/m2
9.0 7.153 t/m2 -9.00
10.0 8.304 t/m2
11.0 9.455 t/m2
12.0 10.606 t/m2 -11.50
13.0 11.757 t/m2 -13.00
14.0 12.908 t/m2 Pasir Halus Berlanau, Abu-abu
15.0 14.059 t/m2
Strut R1 =2.66ton/m R2=5.73t/m R3=11.97t/m R4=10.662T/m R5=33.34t/m Mmax =14.27 tm Vmax=18.21 ton

Page 15 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH
5) ANALISA SHEET PILE
Properties :

Kontrol Tegangan :
Mmax= 15.40tm/m = 1540000 kgcm
Sheet pile Hot Rolled 400x100 Zxx= 874 cm3
Tegangan max = 1540000/874 =1762 kg/cm2 < 275x10,197x0,8=2243 kg/cm2 OK

Page 16 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH
6) ANALISA STRUTT & WALLER ATAS
ELEVASI -1,50,-4,00 m
Dimensi Struktur
H Beam = 250x250x9x14
H Beam = 200x200x8x12

TEKANAN TANAH = Reaksi STRUTT =13.3 ton/m


>> Reaksi STRUTT =13.3 ton/m diambil dari reaksi pada Tahap 3 Pasang Strut El. 4.00 dan galian s.d kedalaman 7 meter

Page 17 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

GAYA DALAM STRUKTUR

MOMENT ( ton m)

SHEAR ( ton)

Page 18 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

Axial ( ton)

LOAD COMBINATION

C1 = 1,4 DL

C22 = 1,2 DL +1,6 LL

Page 19 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

Frame Element PM-Interaction Ratio

Tampak dari frame PM-Interaction Ratio max= 0,920< 0,950 Profil yang digunakan Aman

Page 20 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH
7) ANALISA WALLER & STRUTT BAWAH
ELEVASI -6,50
DIMENSI STRUKTUR
H Beam = 300x300x10x15

H Beam = 200x200x8x12

TEKANAN TANAH (ton/m)


>> Reaksi STRUTT = 21.1 ton/m diambil dari reaksi pada Tahap 4 Pasang Strut El. 6.00 dan galian s.d kedalaman 9.5 meter

Page 21 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH
Moment (t-m)

Shear (ton)

Page 22 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

Axial (ton)

LOAD COMBINATION

C1 = 1,4 DL

C22 = 1,2 DL +1,6 LL

Page 23 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH
Frame Element PM-Interaction Ratio

Tampak dari frame PM-Interaction Ratio max= 0,792 < 0,950 OK


Kesimpulan: Profil yang dipergunakan Memenuhi persyaratan dan Aman ..

Page 24 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH
8) ANALISA WALLER & STRUTT BAWAH
ELEVASI -9,00 dan -11,50 m
DIMENSI STRUKTUR
H Beam = 350 x350x 12x19

H Beam = 250x250x9x14

TEKANAN TANAH (ton/m)

>> Reaksi STRUTT = 33.34 ton/m diambil dari reaksi pada Tahap 6 Pasang Strut El. 11.50 dan galian s.d kedalaman 13 meter

Page 25 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

Moment (t-m)

Shear (ton)

Page 26 of 28
ANALISA GALIAN DAN STRUKTUR PENAHAN TANAH

Axial (ton)

LOAD COMBINATION

C1 = 1,4 DL

C22 = 1,2 DL +1,6 LL


Tolerances on Sheet Piles
All sheet piles are formed in continuous rolling process to the required sections with interlock able to fit into each other
Tolerances on Sheet Piles (reference standard: BS EN 10249)

Characteristics Figures Nominal size Tolerances

h ≤ 200mm ± 4mm
e
Sectional Height (h) 200 < h ≤ 300 ± 6mm
300 < h ≤ 400 ± 8mm
400 < h ± 10mm

Single sheet pile ± 2% b


Sectional Width (w)
e e
Double sheet piles ± 3% b

e=3 ± 0.26
3.00 < e ≤ 4.00 ± 0.27
4.00 < e ≤ 5.00 ± 0.29
5.00 < e ≤ 6.00 ± 0.31
Sectional thickness (e) 6.00 < e ≤ 8.00 ± 0.35
8.00 < e ≤ 10.0 ± 0.40
10.0 < e ≤ 12.7 ± 0.46
12.7 < e ≤ 15.0 ± 0.48

Bending (Deflection s) 0.25% L

Curving (Deflection c) 0.25% L

Length (L) ± 50mm

2% L with max
Twist (Dimension v) 100mm

Squareness of ends 2% of width


(Out of squareness of
end cuts)
b
Mass of Section ± 7% max
(Difference between
total actual and total
theoretical mass delivered)

Steel Grade
Min Yield Min Tensile Min Comparable to other standards
Grade Point Strength Enlongation UK
China Germany ASTM
N/mm² N/mm² % BS 4360

S 275 JRC 275 410 22 Q 290 Gr. 43B St 44−2 A 572 Gr. 42

S 355 J0C 355 490 22 Q 345 Gr. 50C St 52−3U A 572 Gr. 50

S 420 MC 420 480 19 Q 420 HR50F45 QStE420TM A 572 Gr. 60

*ASTM A690 345 485 21 − − − A690


*High-strength low alloy steel grade for use in Marine Environments