CLIENT :
RUANG DAN PERUMAHAN RAKYAT ,
PROJECT : SID.BENDUNG SUNGAI BONTANG
Easting : 548972900 Meter Geologist : M.DJUNAIDI Hole No. : B-1 (30 m) Tumpuan Kiri As Bendung Sungai Bontang
Northing : 15019.00 Meter Driller : HENDI ARDIANSAH Type of Boring : Rotary drilling
Elevation : 32.00 m dpl Prepared by : Type of Core Barrel : Singgle and Double core Barrel
Date : Start, 29/ 9/ 2023 Approved by : Diameter of Core : 56 mm & 53 mm
: Finish, 01/10/ 2023 Diameter of Hole : Outer Diameter of core Barrel
DRILLING LOG
G.W.L
Permeability
STANDARD PENETRATION TEST
CORING DETAILS SAMPLES
DEPTH (m)
(Ground
Test ( K )
Tanggal
(SPT)
Cuaca
Water Level)
LEGEND DESCRIPTION
Thick (m)
RQD %
TCR %
N GRAPH (N
TYPE
Sore
Pagi
N1 N2 N3
Total Value)
3
0 0.00 - 0.45 m : LANAU LEMPUNGAN
5 10
0
2 2 44 5
60
045m
100 Coklat tua, lunak, plastisitas sedang, X
2.05m
100
--5
TIDAK ADA AIR TANAH
K = 3.08 x 10
-2
SPT Coklat kekuningan, lembab, konsistensi
100 teguh, plastisitas tinggi, kekuatan lemah,
29-Sep-23
CERAH
3.00 m
4.70 m
-5
UDS 5.00 - 7.00 m : LEMPUNG LANAUAN .
100 Abu-abu kecoklatan, konsistensi lunak,
plastisitas tinggi , kelembaban tinggi-basah. 1 1 2 3 N= 3
-6
SPT
100
--6
K = 2.27 x 10
-7
100 SPT
3.00 m
7.10 m
3 8 6 14 N= 14
-8 7.00 - 12.80 m : LEMPUNG
2.80 m
1 1 1 2 N= 2
K = 3.20 x 10
12
7.10 m
6.50 m
SPT
100
13 12.80 - 17.00 m : LEMPUNG LANAUAN
6.50 m
30-Jul-23
CERAH
100
-15
100
1 2 2 4 N= 4
-16
SPT
100
--4
-17
K = 2.35 x 10
1.00 m
100
21 20.00 - 25.00 m : PASIR KASAR
100 Coklat terang-gelap, ukuran butir kasar,
--4
1 3
22 urai, looses/lepas, kelembaban tinggi-
SPT
100 basah.
1.00 m
2.80 m
23
100
1 1 2 3 N= 3
24
SPT
100
CERAH
1-Oct-23
25
100
25.00 - 30.00 m : LEMPUNG PASIRAN. 1 2 3 5 N= 5
26
SPT Abu-abu gelap, lunak - teguh ,berbutir
100
--5
5.50 m
1.50 m
100
2 2 7 9 N= 9
28
SPT
100
29
100
100
30 Akhir Pemboran 30.00 m 2 3 7 11 N= 11