Tugas FJ Mock - Prof Suhar Ok
Tugas FJ Mock - Prof Suhar Ok
Hendri Wijaya
NIM 21010123413030
FAKULTAS TEKNIK
SEMARANG
FEBRUARI 2024
i
DAFTAR ISI
DAFTAR GAMBAR.....................................................................................................................iii
DAFTAR TABEL ......................................................................................................................... iv
BAB I............................................................................................................................................... 1
1.1 Latar Belakang ................................................................................................................. 1
1.2 Perumusan Masalah ......................................................................................................... 1
1.3 Maksud dan tujuan laporan ............................................................................................. 1
1.4 Pembatasan Masalah ....................................................................................................... 2
BAB II ............................................................................................................................................. 3
2.1 Debit Andalan .................................................................................................................. 3
2.2 Evapotranspirasi Terbatas (Et) ....................................................................................... 3
2.3 Keseimbangan Air di Permukaan Tanah ....................................................................... 4
2.4 Aliran dan Penyimpangan Air Tanah (Run Off And Groundwater Storage)............... 5
2.5 Aliran Hujan Lebat (Storm Run Off) .............................................................................. 6
BAB III ............................................................................................................................................ 9
3.1 Hasil Perhitungan Debit Andalan Metode Fj. Mock Tiap Tahun ................................ 9
3.2 Reablitas yang Dipakai di Bendungan Gintung .......................................................... 31
BAB IV.......................................................................................................................................... 33
4.1 Kesimpulan .................................................................................................................... 33
4.2 Saran ............................................................................................................................... 33
DAFTAR PUSTAKA ................................................................................................................... 34
ii
DAFTAR GAMBAR
iii
DAFTAR TABEL
iv
BAB I
PENDAHULUAN
1
1.4 Pembatasan Masalah
Adapun batasan dalam laporan ini adalah sebagai berikut:
1. Lokasi yang dibuat sebagai bahan laporan adalah DAS Gintung.
2. Perhitungan debit andalan hanya menggunakan metode F.J. Mock.
3. Data curah hujan yang digunakan pada Tahun 2000-2019.
4. Kajian pustaka berupa pengumpulan data dan informasi yang bersumber dari buku,
laporan penelitian, studi terdahulu dan dokumen lainnya.
5. Data yang digunakan adalah data yang diberikan atas seijin BBWS Serayu Opak.
6. Perhitungan dilakukan sampai dengan debit andalan.
2
BAB II
KAJIAN PUSTAKA
3
Tabel 2.1 Nilai Evapotraspirasi Potensial (ET0)
dari Data Klimatologi Stasiun Geofisika Banjarnegara
4
c. Kapasitas kelembaban tanah (Soil Moisture Capacity)
Perkiraan kapasitas kelembaban tanah awal diperlukan pada saat dimulainya simulasi,
dan besarnya tergantung dari kondisi porositas lapisan tanah atas daerah pengaliran.
Biasanya diambil 50 s/d 250 mm, yaitu kapasitas kandungan air dalam tanah per m2. Jika
porositas tanah lapisan atas tersebut makin besar, maka kapasitas kelembaban tanah akan
semakin besar pula.
Untuk kapasitas kelembaban tanah (Soil Moisture Capacity) di DAS Gintung diambil
150 mm.
2.4 Aliran dan Penyimpangan Air Tanah (Run Off And Groundwater Storage)
Faktor-faktor yang mempengaruhi aliran dan penyimpangan air tanah (Run Off And
Groundwater Storage) adalah sebagai berikut:
a. Koefisien Infiltrasi (I)
Koefisien infiltrasi ditaksir berdasarkan kondisi porositas tanah dan kemiringan daerah
pengaliran. Lahan yang porous misalnya pasir halus mempunyai infiltrasi lebih tinggi
dibandingkan tanah lempung berat. Sedangkan lahan yang terjal, dimana air tidak sempat
infiltrasi kedalam tanah, maka koefisien infiltrasi akan kecil. Batasan koefisien infiltrasi
adalah 0 – 1,0. Di daerah aliran sungai (DAS) Gintung berdasarkan pengamatan kondisi
tanahnya tidak begitu porous karena mengandung clay dan daerahnya yang cukup landai,
maka untuk koefisien infiltrasinya (l) untuk di daerah aliran sungai (DAS) Bendungan
Gintung sebesar 0,80.
b. Penyimpanan Air Tanah (Groundwater Storage)
Pada permulaan simulasi harus ditentukan penyimpangan awal (initial storage) yang
besarnya tergantung dari kondisi geologi setempat dan waktu, sebagai contoh: dalam
daerah pengaliran kecil, dimana kondisi geologi lapisan bawah adalah tidak tembus air
dan mungkin tidak ada air di sungai pada musim kemarau, maka penyimpanan air tanah
menjadi nol. Di daerah aliran sungai (DAS) Bendungan Gintung berdasarkan
pengamatan untuk kondisi geologi lapisan bawah cukup porous dan dapat tembus air
karena mengandung pasir, dimana pada musim kemarau masih ada air di sungai. Maka
untuk permulaan simulasi penyimpanan awal (initial storage) di daerah aliran sungai
(DAS) Bendungan Gintung diambil sebesar 200 mm. Rumus yang digunakan adalah:
Vn k Vn 1 1 k ln
1
2
5
dimana:
Vn = volume air tanah
k = qt/qo = faktor resesi aliran tanah
qt = aliran air tanah pada waktu t (bulan ke-t)
qo = aliran air tanah pada awal (bulan ke-0)
ln = koefisien infiltrasi bulan ke-n
Vn = Vn – Vn-1
Vn = perubahan volume aliran air tanah
Vn = volume air tanah bulan ke-n
Vn-1 = volume air tanah bulan ke – (n-1)
Faktor resesi aliran air tanah (k) adalah 0 – 1,0.
Harga k yang tinggi akan memberikan resesi yang lambat seperti pada kondisi geologis
lapisan bawah yang sangat lulus air (permeable).
c. Aliran (Run Off)
Aliran dasar : Infiltrasi dikurangai perubahan volume aliran air
dalam tanah
Aliran permukaan (langsung) : kelebihan air (water surplus – infiltrasi)
Aliran : aliran dasar + aliran langsung
Debit Andalan : aliran sungai dinyatakan dalam m3/bulan
6
1. Daerah Aliran sungai (DAS) dengan fluktuasi debit maksimum dan minimumnya
relatif besar dari tahun ke tahun.
2. Kebutuhan yang relatif tidak konstan sepanjang tahun.
3. Data yang tersedia cukup panjang.
b. Metode tahun penentu (Basic year)
Penentuan debit andalan dengan menggunakan metode ini antara lain dengan
menentukan suatu tahun tertentu sebagai dasar perencanaan.
c. Metode bulan penentu
Metode ini seperti pada karakteristik aliran tetapi bulan tertentu sebagai dasar
perencanaan.
d. Metode Q rata-rata minimum
Penentuan debit andalan dengan metode ini berdasar data debit rata-rata bulanan yang
minimum dari tiap-tiap tahun yang tersedia. Metode ini biasanya dipakai untuk DAS
dengan fluktuasi debit maksimum dan minimum tidak terlalu besar dari tahun ke tahun.
Kebutuhan relatif konstan sepanjang tahun.
Untuk pengamatan debit juga dianalisis berdasarkan data hujan yang terjadi di dan sekitar
Daerah Aliran Sungai (DAS) tersebut dengan metode MOCK dengan skema/ Bagan Alir pada
Gambar 2.1 sebagai berikut:
Daerah Tangkapan Air
Perhitungan Evapotranspirasi
Aktual (Et)
7
Keterangan :
SMC : Kapasitas kelembaban tanah
SMS : Penyimpanan kelembaban tanah
I : Koefisien infiltrasi
k : Faktor resesi aliran air tanah
PF : Faktor aliran hujan lebat
GS : Keseimbangan air tanah
8
BAB III
PEMBAHASAN DAN HASIL
3.1 Hasil Perhitungan Debit Andalan Metode Fj. Mock Tiap Tahun
Debit andalan adalah debit yang dapat diandalkan untuk suatu tingkat keandalan atau
reliabilitas tertentu. Untuk keperluan irigasi biasa digunakan debit andalan dengan reliabilitas
80% sebagaimana ditetapkan dalam Kriteria Perencanaan Irigasi (Ditjen Pengairan, 1985).
Artinya dengan kemungkinan 80% debit yang terjadi adalah lebih besar atau sama dengan debit
tersebut, atau dengan kata lain sistem irigasi boleh gagal sekali dalam lima tahun. Untuk
keperluan air minum dan industri dituntut reliabilitas yang lebih tinggi, yaitu sekitar 90%
sampai dengan 95%. Jika air sungai digunakan untuk pembangkitan listrik tenaga air, maka
diperlukan reliabilitas yang sangat tinggi, yaitu antara 95% sampai dengan 99% (Goodman,
1984). Debit tersebut digunakan sebagai patokan ketersediaan debit yang masuk ke waduk pada
saat pengoperasiannya. Untuk menghitung debit andalan tersebut, dihitung peluang 90 % dari
debit infow sumber air pada pencatatan debit pada periode tertentu. Adapun metode
perhitungan debit andalan untuk pekerjaan ini menggunakan metode FJ. MOCK.
Hasil perhitungan Debit Andalan Bendungan Gintung tiap tahun dengan Metode F.J.
Mock disajikan pada Tabel 3.1 sampai Tabel 3.21 dan Gambar 3.1 sebagai berikut:
9
Tabel 3.1 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2000
Tabel Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock Th. 2000
DAS : Gintung
Luas DAS : 88,3 km2
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 308,70 162,72 105,29 398,35 220,48 184,31 160,66 164,38 184,06 112,13 112,26 18,82 5,66 13,73 6,69 13,64 24,55 61,74 155,82 179,93 489,89 201,72 307,94 101,96
2 Hari Hujan (h) Data hari 11,00 12,00 10,00 12,00 10,00 10,00 14,00 9,00 7,00 8,00 3,00 2,00 1,00 4,00 2,00 3,00 3,00 3,00 7,00 9,00 9,00 14,00 6,00 6,00
II EVAPOTRANSPIRASI TERBATAS (Et)
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,11 0,09 0,12 0,09 0,12 0,12 0,06 0,14 0,17 0,15 0,23 0,24 0,26 0,21 0,24 0,23 0,23 0,23 0,17 0,14 0,14 0,06 0,18 0,18
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,87 5,37 6,46 4,52 5,51 5,88 3,04 6,84 7,77 7,54 9,08 9,68 10,63 9,34 11,05 11,05 12,05 12,05 9,48 8,27 8,57 3,81 10,45 11,15
7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,08 54,31 47,39 45,74 40,39 43,08 47,66 43,86 39,33 42,70 31,27 30,67 31,07 35,14 35,00 38,07 41,50 41,50 47,97 53,01 54,88 59,64 47,60 50,77
III KESEIMBANGAN AIR
8 Ds = P - Et (1) - (7) mm/15hr 258,63 108,41 57,90 352,62 180,09 141,23 113,00 120,53 144,73 69,43 80,98 -11,85 -25,40 -21,41 -28,31 -24,43 -16,95 20,24 107,85 126,93 435,01 142,08 260,34 51,19
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -11,85 -25,40 -21,41 -28,31 -24,43 -16,95 0,00 0,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 188,15 162,75 141,33 113,03 88,60 71,65 200,00 200,00 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 258,63 108,41 57,90 352,62 180,09 141,23 113,00 120,53 144,73 69,43 80,98 0,00 0,00 0,00 0,00 0,00 0,00 20,24 107,85 126,93 435,01 142,08 260,34 51,19
IV ALIRAN DAN PENYIMPANAN
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 206,90 86,73 46,32 282,09 144,07 112,98 90,40 96,42 115,78 55,54 64,79 0,00 0,00 0,00 0,00 0,00 0,00 16,19 86,28 101,54 348,01 113,66 208,27 40,95
13 0.5 (1 + k) In Hitungan - 186,21 78,05 41,69 253,88 129,66 101,68 81,36 86,78 104,20 49,99 58,31 0,00 0,00 0,00 0,00 0,00 0,00 14,57 77,65 91,39 313,21 102,30 187,45 36,86
14 k * V (n - 1) Hitungan - 744,86 744,86 658,33 560,01 651,12 624,62 581,04 529,92 493,36 478,05 422,43 384,59 307,67 246,14 196,91 157,53 126,02 100,82 92,31 135,97 181,89 396,07 398,70 468,92
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 931,07 822,91 700,01 813,89 780,78 726,30 662,41 616,70 597,57 528,04 480,74 384,59 307,67 246,14 196,91 157,53 126,02 115,39 169,96 227,36 495,09 498,37 586,14 505,77
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 0,00 -108,16 -122,89 113,88 -33,12 -54,47 -63,90 -45,70 -19,14 -69,53 -47,30 -96,15 -76,92 -61,53 -49,23 -39,38 -31,51 -10,63 54,58 57,39 267,73 3,28 87,77 -80,37
17 Aliran Dasar (BF) (12) - (16) mm/15hr 206,90 194,89 169,21 168,21 177,19 167,45 154,30 142,12 134,92 125,07 112,09 96,15 76,92 61,53 49,23 39,38 31,51 26,82 31,71 44,15 80,27 110,38 120,50 121,32
18 Aliran Langsung (DR) (11) - (12) mm/15hr 51,73 21,68 11,58 70,52 36,02 28,25 22,60 24,11 28,95 13,89 16,20 0,00 0,00 0,00 0,00 0,00 0,00 4,05 21,57 25,39 87,00 28,42 52,07 10,24
19 Aliran (R) (17) + (18) mm/15hr 258,63 216,57 180,79 238,74 213,20 195,70 176,90 166,23 163,86 138,95 128,28 96,15 76,92 61,53 49,23 39,38 31,51 30,87 53,28 69,53 167,27 138,80 172,57 131,56
V DEBIT ALIRAN SUNGAI
21 Debit Aliran Sungai A * (19) m3/dtk 17,6 13,8 12,3 17,4 14,5 12,5 12,1 11,3 11,2 8,9 8,7 6,6 5,2 3,9 3,4 2,5 2,1 2,1 3,6 4,4 11,4 9,5 11,8 8,4
22 Jumlah hari hari 15 16 15 14 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16
23 Debit Aliran (dibaca : 10E^6) m3/15hr 22,84 19,13 15,97 21,09 18,83 17,29 15,63 14,68 14,47 12,27 11,33 8,49 6,79 5,44 4,35 3,48 2,78 2,73 4,71 6,14 14,78 12,26 15,24 11,62
Sumber : Perhitungan
10
Tabel 3.2 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2001
DAS : Gintung
Luas DAS : 88,330 km2
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 94,28 308,10 274,25 40,77 247,89 353,25 336,52 185,92 61,40 99,79 145,44 0,00 27,21 32,77 0,00 16,49 61,09 17,77 109,00 866,29 221,99 294,23 87,02 115,42
2 Hari Hujan (h) Data hari 10,00 16,00 11,00 4,00 10,00 15,00 13,00 5,00 4,00 11,00 12,00 0,00 2,00 5,00 0,00 1,00 3,00 3,00 7,00 15,00 7,00 12,00 5,00 5,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,12 0,03 0,11 0,21 0,12 0,05 0,08 0,20 0,21 0,11 0,09 0,27 0,24 0,20 0,27 0,26 0,23 0,23 0,17 0,05 0,17 0,09 0,20 0,20
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 6,71 1,79 5,65 9,80 5,51 2,20 3,80 9,89 9,89 5,28 3,63 10,89 10,01 8,67 12,43 12,53 12,05 12,05 9,48 2,76 10,47 5,71 11,32 12,07
7 Et = (ETo) - (E) (3) - (6) mm/15hr 49,24 57,89 48,20 36,87 40,39 46,76 46,90 40,81 37,21 44,96 36,72 29,46 31,69 35,81 33,62 36,59 41,50 41,50 47,97 58,52 52,98 57,74 46,73 49,85
8 Ds = P - Et (1) - (7) mm/15hr 45,05 250,21 226,06 3,90 207,49 306,50 289,62 145,11 24,19 54,82 108,72 -29,46 -4,49 -3,04 -33,62 -20,10 19,59 -23,74 61,03 807,76 169,01 236,49 40,29 65,58
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -29,46 -4,49 -3,04 -33,62 -20,10 0,00 -23,74 0,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 170,54 166,06 163,02 129,40 109,30 200,00 176,26 200,00 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 45,05 250,21 226,06 3,90 207,49 306,50 289,62 145,11 24,19 54,82 108,72 0,00 0,00 0,00 0,00 0,00 19,59 0,00 61,03 807,76 169,01 236,49 40,29 65,58
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 36,04 200,17 180,85 3,12 166,00 245,20 231,70 116,09 19,35 43,86 86,98 0,00 0,00 0,00 0,00 0,00 15,67 0,00 48,82 646,21 135,21 189,19 32,23 52,46
13 0.5 (1 + k) In Hitungan - 32,43 180,15 162,76 2,81 149,40 220,68 208,53 104,48 17,42 39,47 78,28 0,00 0,00 0,00 0,00 0,00 14,11 0,00 43,94 581,59 121,69 170,27 29,01 47,22
14 k * V (n - 1) Hitungan - 404,62 349,64 423,84 469,28 377,67 421,65 513,87 577,91 545,91 450,66 392,11 376,31 301,05 240,84 192,67 154,14 123,31 109,93 87,95 105,51 549,68 537,10 565,89 475,92
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 437,05 529,79 586,60 472,09 527,07 642,33 722,39 682,39 563,33 490,14 470,39 376,31 301,05 240,84 192,67 154,14 137,42 109,93 131,89 687,10 671,37 707,37 594,90 523,14
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -68,72 92,74 56,80 -114,51 54,98 115,26 80,06 -40,00 -119,06 -73,19 -19,75 -94,08 -75,26 -60,21 -48,17 -38,53 -16,72 -27,48 21,96 555,21 -15,73 36,00 -112,47 -71,76
17 Aliran Dasar (BF) (12) - (16) mm/15hr 104,76 107,43 124,04 117,63 111,02 129,93 151,64 156,09 138,41 117,05 106,73 94,08 75,26 60,21 48,17 38,53 32,39 27,48 26,87 91,00 150,94 153,19 144,70 124,23
18 Aliran Langsung (DR) (11) - (12) mm/15hr 9,01 50,04 45,21 0,78 41,50 61,30 57,92 29,02 4,84 10,96 21,74 0,00 0,00 0,00 0,00 0,00 3,92 0,00 12,21 161,55 33,80 47,30 8,06 13,12
19 Aliran (R) (17) + (18) mm/15hr 113,77 157,47 169,26 118,41 152,52 191,23 209,56 185,11 143,25 128,02 128,47 94,08 75,26 60,21 48,17 38,53 36,31 27,48 39,07 252,55 184,74 200,49 152,75 137,34
21 Debit Aliran Sungai A * (19) m3/dtk 7,754 10,062 11,536 9,312 10,395 12,219 14,283 12,616 9,763 8,180 8,756 6,412 5,130 3,847 3,283 2,462 2,475 1,873 2,663 16,137 12,591 13,665 10,411 8,776
22 Debit Aliran Sungai lt/det 7753,90 10061,71 11535,74 9312,12 10394,87 12219,02 14282,76 12616,22 9763,39 8179,74 8755,99 6411,97 5129,58 3847,18 3282,93 2462,20 2474,94 1873,13 2663,18 16137,04 12591,36 13664,64 10411,13 8775,65
24 Debit Aliran (dibaca : 10E^6) m3/15hr 10,05 13,91 14,95 10,46 13,47 16,89 18,51 16,35 12,65 11,31 11,35 8,31 6,65 5,32 4,25 3,40 3,21 2,43 3,45 22,31 16,32 17,71 13,49 12,13
Sumber : Perhitungan
11
Tabel 3.3 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2002
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 36,23 373,96 244,88 132,17 59,36 246,32 100,89 225,30 210,31 0,00 42,34 0,00 11,02 0,00 0,00 0,76 0,00 0,00 0,00 142,37 216,05 221,21 126,24 239,16
2 Hari Hujan (h) Data hari 6,00 15,00 14,00 10,00 9,00 13,00 10,00 9,00 4,00 0,00 5,00 0,00 2,00 0,00 0,00 1,00 0,00 0,00 0,00 2,00 7,00 11,00 11,00 13,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,18 0,05 0,06 0,12 0,14 0,08 0,12 0,14 0,21 0,27 0,20 0,27 0,24 0,27 0,27 0,26 0,27 0,27 0,27 0,24 0,17 0,11 0,11 0,08
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 10,07 2,69 3,23 5,60 6,20 3,67 6,08 6,84 9,89 13,56 7,87 10,89 10,01 12,01 12,43 12,53 14,46 14,46 15,51 14,71 10,47 6,66 6,10 4,64
7 Et = (ETo) - (E) (3) - (6) mm/15hr 45,88 56,99 50,62 41,07 39,70 45,29 44,62 43,86 37,21 36,68 32,48 29,46 31,69 32,47 33,62 36,59 39,09 39,09 41,94 46,57 52,98 56,79 51,95 57,28
8 Ds = P - Et (1) - (7) mm/15hr -9,65 316,97 194,26 91,10 19,66 201,03 56,28 181,44 173,10 -36,68 9,85 -29,46 -20,68 -32,47 -33,62 -35,84 -39,09 -39,09 -41,94 95,80 163,07 164,42 74,29 181,89
9 Kandungan Air Tanah mm/15hr -9,65 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -36,68 0,00 -29,46 -20,68 -32,47 -33,62 -35,84 -39,09 -39,09 -41,94 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 163,32 200,00 170,54 149,87 117,40 83,78 47,94 8,85 -30,24 -72,18 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 0,00 316,97 194,26 91,10 19,66 201,03 56,28 181,44 173,10 0,00 9,85 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 95,80 163,07 164,42 74,29 181,89
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 0,00 253,57 155,41 72,88 15,73 160,82 45,02 145,15 138,48 0,00 7,88 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 76,64 130,46 131,54 59,43 145,51
13 0.5 (1 + k) In Hitungan - 0,00 228,21 139,87 65,59 14,16 144,74 40,52 130,64 124,63 0,00 7,10 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 68,97 117,41 118,39 53,49 130,96
14 k * V (n - 1) Hitungan - 418,51 334,81 450,42 472,23 430,25 355,53 400,22 352,59 386,58 408,97 327,18 267,42 213,93 171,15 136,92 109,53 87,63 70,10 56,08 44,86 91,07 166,79 228,14 225,30
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 418,51 563,02 590,28 537,82 444,41 500,27 440,74 483,23 511,21 408,97 334,27 267,42 213,93 171,15 136,92 109,53 87,63 70,10 56,08 113,84 208,48 285,17 281,62 356,26
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -104,63 144,51 27,26 -52,47 -93,41 55,86 -59,53 42,49 27,98 -102,24 -74,70 -66,85 -53,48 -42,79 -34,23 -27,38 -21,91 -17,53 -14,02 57,76 94,64 76,69 -3,55 74,63
17 Aliran Dasar (BF) (12) - (16) mm/15hr 104,63 109,06 128,15 125,34 109,14 104,96 104,56 102,66 110,49 102,24 82,58 66,85 53,48 42,79 34,23 27,38 21,91 17,53 14,02 18,88 35,81 54,85 62,98 70,88
18 Aliran Langsung (DR) (11) - (12) mm/15hr 0,00 63,39 38,85 18,22 3,93 40,21 11,26 36,29 34,62 0,00 1,97 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 19,16 32,61 32,88 14,86 36,38
19 Aliran (R) (17) + (18) mm/15hr 104,63 172,45 167,00 143,56 113,07 145,17 115,81 138,95 145,11 102,24 84,55 66,85 53,48 42,79 34,23 27,38 21,91 17,53 14,02 38,04 68,43 87,74 77,84 107,25
22 Debit Aliran Sungai lt/det 7130,99 11019,04 11381,81 11290,12 7706,31 9275,85 7893,27 9470,32 9890,26 6532,88 5762,78 4556,49 3645,20 2733,90 2332,92 1749,69 1493,07 1194,46 955,57 2430,57 4663,76 5979,68 5304,92 6853,06
24 Debit Aliran (dibaca : 10E^6) m3/15hr 9,24 15,23 14,75 12,68 9,99 12,82 10,23 12,27 12,82 9,03 7,47 5,91 4,72 3,78 3,02 2,42 1,94 1,55 1,24 3,36 6,04 7,75 6,88 9,47
Sumber : Perhitungan
12
Tabel 3.4 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2003
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 100,97 363,84 284,81 306,97 287,20 253,61 107,15 48,37 267,96 2,44 1,90 4,77 1,67 0,86 0,00 0,65 3,40 3,19 0,94 299,44 39,30 333,20 559,63 120,27
2 Hari Hujan (h) Data hari 4,00 12,00 12,00 11,00 11,00 9,00 4,00 7,00 5,00 1,00 1,00 2,00 1,00 1,00 0,00 1,00 1,00 2,00 1,00 6,00 7,00 11,00 9,00 7,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,21 0,09 0,09 0,11 0,11 0,14 0,21 0,17 0,20 0,26 0,26 0,24 0,26 0,26 0,27 0,26 0,26 0,24 0,26 0,18 0,17 0,11 0,14 0,17
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 11,75 5,37 4,85 4,90 4,82 6,61 10,65 8,37 9,18 12,81 10,29 9,68 10,63 11,34 12,43 12,53 13,66 12,85 14,65 11,03 10,47 6,66 7,84 10,22
7 Et = (ETo) - (E) (3) - (6) mm/15hr 44,20 54,31 49,00 41,77 41,08 42,35 40,05 42,33 37,92 37,43 30,06 30,67 31,07 33,14 33,62 36,59 39,89 40,70 42,80 50,25 52,98 56,79 50,21 51,70
8 Ds = P - Et (1) - (7) mm/15hr 56,77 309,53 235,80 265,20 246,12 211,26 67,10 6,03 230,05 -34,99 -28,16 -25,90 -29,39 -32,27 -33,62 -35,95 -36,49 -37,51 -41,86 249,19 -13,68 276,41 509,42 68,56
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -34,99 -28,16 -25,90 -29,39 -32,27 -33,62 -35,95 -36,49 -37,51 -41,86 0,00 -13,68 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 165,01 136,84 110,94 81,55 49,28 15,66 -20,29 -56,78 -94,29 -136,15 200,00 186,32 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 56,77 309,53 235,80 265,20 246,12 211,26 67,10 6,03 230,05 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 249,19 0,00 276,41 509,42 68,56
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 45,42 247,62 188,64 212,16 196,90 169,01 53,68 4,83 184,04 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 199,35 0,00 221,13 407,53 54,85
13 0.5 (1 + k) In Hitungan - 40,88 222,86 169,78 190,95 177,21 152,11 48,31 4,34 165,64 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 179,42 0,00 199,02 366,78 49,37
14 k * V (n - 1) Hitungan - 285,01 260,71 386,85 445,31 509,00 548,97 560,86 487,34 393,35 447,18 357,75 286,20 228,96 183,17 146,53 117,23 93,78 75,03 60,02 48,02 181,95 145,56 275,66 513,95
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 325,88 483,57 556,63 636,25 686,21 701,08 609,17 491,68 558,98 447,18 357,75 286,20 228,96 183,17 146,53 117,23 93,78 75,03 60,02 227,44 181,95 344,58 642,44 563,32
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -30,38 157,68 73,07 79,62 49,96 14,87 -91,90 -117,49 67,30 -111,80 -89,44 -71,55 -57,24 -45,79 -36,63 -29,31 -23,45 -18,76 -15,01 167,42 -45,49 162,63 297,86 -79,12
17 Aliran Dasar (BF) (12) - (16) mm/15hr 75,79 89,94 115,58 132,54 146,94 154,14 145,58 122,32 116,74 111,80 89,44 71,55 57,24 45,79 36,63 29,31 23,45 18,76 15,01 31,94 45,49 58,50 109,67 133,97
18 Aliran Langsung (DR) (11) - (12) mm/15hr 11,35 61,91 47,16 53,04 49,22 42,25 13,42 1,21 46,01 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 49,84 0,00 55,28 101,88 13,71
19 Aliran (R) (17) + (18) mm/15hr 87,15 151,84 162,74 185,58 196,16 196,40 159,00 123,52 162,75 111,80 89,44 71,55 57,24 45,79 36,63 29,31 23,45 18,76 15,01 81,78 45,49 113,79 211,55 147,69
22 Debit Aliran Sungai lt/det 5939,65 9702,27 11091,59 14594,55 13369,72 12548,89 10837,01 8418,85 11092,36 7143,33 6095,64 4876,52 3901,21 2925,91 2496,78 1872,58 1597,94 1278,35 1022,68 5225,31 3100,21 7755,14 14418,48 9436,53
24 Debit Aliran (dibaca : 10E^6) m3/15hr 7,70 13,41 14,37 16,39 17,33 17,35 14,04 10,91 14,38 9,87 7,90 6,32 5,06 4,04 3,24 2,59 2,07 1,66 1,33 7,22 4,02 10,05 18,69 13,05
Sumber : Perhitungan
13
Tabel 3.5 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2004
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 67,67 345,83 121,31 277,05 293,88 119,61 239,94 56,89 30,95 373,25 43,20 0,00 74,62 6,63 2,97 0,00 0,86 10,85 0,00 136,60 130,65 593,81 119,70 471,62
2 Hari Hujan (h) Data hari 8,00 15,00 5,00 13,00 13,00 9,00 7,00 6,00 3,00 9,00 5,00 0,00 6,00 2,00 3,00 0,00 1,00 2,00 0,00 4,00 5,00 11,00 9,00 13,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,15 0,05 0,20 0,08 0,08 0,14 0,17 0,18 0,23 0,14 0,20 0,27 0,18 0,24 0,23 0,27 0,26 0,24 0,27 0,21 0,20 0,11 0,14 0,08
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 8,39 2,69 10,50 3,77 3,44 6,61 8,37 9,13 10,60 6,78 7,87 10,89 7,51 10,68 10,36 13,26 13,66 12,85 15,51 12,87 12,37 6,66 7,84 4,64
7 Et = (ETo) - (E) (3) - (6) mm/15hr 47,56 56,99 43,35 46,49 42,46 42,35 42,33 41,57 36,50 43,46 32,48 29,46 34,19 33,80 35,69 35,86 39,89 40,70 41,94 48,41 51,08 56,79 50,21 57,28
8 Ds = P - Et (1) - (7) mm/15hr 20,11 288,83 77,96 230,56 251,43 77,26 197,61 15,32 -5,55 329,79 10,72 -29,46 40,42 -27,17 -32,72 -35,86 -39,03 -29,84 -41,94 88,19 79,57 537,02 69,49 414,35
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -5,55 0,00 0,00 -29,46 0,00 -27,17 -32,72 -35,86 -39,03 -29,84 -41,94 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 194,45 200,00 200,00 170,54 200,00 172,83 140,11 104,25 65,22 35,38 -6,56 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 20,11 288,83 77,96 230,56 251,43 77,26 197,61 15,32 0,00 329,79 10,72 0,00 40,42 0,00 0,00 0,00 0,00 0,00 0,00 88,19 79,57 537,02 69,49 414,35
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 16,09 231,07 62,37 184,45 201,14 61,81 158,09 12,25 0,00 263,83 8,57 0,00 32,34 0,00 0,00 0,00 0,00 0,00 0,00 70,55 63,66 429,62 55,59 331,48
13 0.5 (1 + k) In Hitungan - 14,48 207,96 56,13 166,00 181,03 55,63 142,28 11,03 0,00 237,45 7,72 0,00 29,10 0,00 0,00 0,00 0,00 0,00 0,00 63,50 57,29 386,65 50,03 298,33
14 k * V (n - 1) Hitungan - 450,65 372,11 464,05 416,15 465,72 517,40 458,42 480,56 393,27 314,62 441,65 359,50 287,60 253,36 202,69 162,15 129,72 103,78 83,02 66,42 103,93 128,98 412,51 370,03
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 465,13 580,07 520,19 582,16 646,75 573,03 600,70 491,59 393,27 552,07 449,37 359,50 316,70 253,36 202,69 162,15 129,72 103,78 83,02 129,92 161,22 515,63 462,54 668,36
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -98,18 114,93 -59,88 61,97 64,60 -73,72 27,67 -109,11 -98,32 158,80 -102,70 -89,87 -42,80 -63,34 -50,67 -40,54 -32,43 -25,94 -20,76 46,89 31,31 354,41 -53,10 205,82
17 Aliran Dasar (BF) (12) - (16) mm/15hr 114,27 116,13 122,25 122,48 136,55 135,53 130,41 121,37 98,32 105,04 111,27 89,87 75,13 63,34 50,67 40,54 32,43 25,94 20,76 23,66 32,35 75,21 108,69 125,66
18 Aliran Langsung (DR) (11) - (12) mm/15hr 4,02 57,77 15,59 46,11 50,29 15,45 39,52 3,06 0,00 65,96 2,14 0,00 8,08 0,00 0,00 0,00 0,00 0,00 0,00 17,64 15,91 107,40 13,90 82,87
19 Aliran (R) (17) + (18) mm/15hr 118,29 173,90 137,84 168,60 186,83 150,98 169,94 124,43 98,32 171,00 113,41 89,87 83,22 63,34 50,67 40,54 32,43 25,94 20,76 41,30 48,26 182,61 122,58 208,52
21 Debit Aliran Sungai A * (19) m3/dtk 8,062 11,112 9,395 12,312 12,734 9,647 11,582 8,481 6,701 10,926 7,730 6,125 5,672 4,047 3,454 2,590 2,210 1,768 1,415 2,639 3,289 12,446 8,355 13,324
22 Debit Aliran Sungai lt/det 8062,49 11111,55 9394,84 12311,51 12733,61 9647,24 11582,11 8480,55 6700,93 10925,96 7729,85 6125,44 5671,75 4047,19 3453,60 2590,20 2210,30 1768,24 1414,60 2638,78 3289,44 12446,00 8354,76 13323,91
24 Debit Aliran (dibaca : 10E^6) m3/15hr 10,45 15,36 12,18 14,89 16,50 13,34 15,01 10,99 8,68 15,10 10,02 7,94 7,35 5,59 4,48 3,58 2,86 2,29 1,83 3,65 4,26 16,13 10,83 18,42
Sumber : Perhitungan
14
Tabel 3.6 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2005
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 240,45 253,54 245,90 277,29 165,23 401,60 126,89 135,31 74,70 115,82 19,20 252,33 103,88 2,16 10,74 41,03 0,00 54,58 78,10 280,34 121,18 346,38 166,89 319,17
2 Hari Hujan (h) Data hari 6,00 13,00 10,00 11,00 11,00 10,00 12,00 6,00 6,00 3,00 2,00 8,00 4,00 1,00 2,00 2,00 0,00 5,00 3,00 10,00 4,00 9,00 14,00 15,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,18 0,08 0,12 0,11 0,11 0,12 0,09 0,18 0,18 0,23 0,24 0,15 0,21 0,26 0,24 0,24 0,27 0,20 0,23 0,12 0,21 0,14 0,06 0,05
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 10,07 4,48 6,46 4,90 4,82 5,88 4,56 9,13 8,48 11,30 9,68 6,05 8,76 11,34 11,05 11,79 14,46 10,44 12,93 7,35 13,32 8,57 3,48 2,79
7 Et = (ETo) - (E) (3) - (6) mm/15hr 45,88 55,20 47,39 41,77 41,08 43,08 46,14 41,57 38,62 38,94 30,67 34,30 32,94 33,14 35,00 37,33 39,09 43,11 44,52 53,93 50,13 54,88 54,57 59,13
8 Ds = P - Et (1) - (7) mm/15hr 194,57 198,33 198,51 235,52 124,15 358,51 80,75 93,74 36,08 76,89 -11,47 218,03 70,94 -30,98 -24,25 3,70 -39,09 11,47 33,57 226,42 71,06 291,50 112,32 260,04
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -11,47 0,00 0,00 -30,98 -24,25 0,00 -39,09 0,00 0,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 188,53 200,00 200,00 169,02 144,76 200,00 160,91 200,00 200,00 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 194,57 198,33 198,51 235,52 124,15 358,51 80,75 93,74 36,08 76,89 0,00 218,03 70,94 0,00 0,00 3,70 0,00 11,47 33,57 226,42 71,06 291,50 112,32 260,04
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 155,65 158,67 158,81 188,41 99,32 286,81 64,60 74,99 28,86 61,51 0,00 174,43 56,75 0,00 0,00 2,96 0,00 9,17 26,86 181,13 56,85 233,20 89,86 208,03
13 0.5 (1 + k) In Hitungan - 140,09 142,80 142,93 169,57 89,39 258,13 58,14 67,49 25,98 55,36 0,00 156,98 51,07 0,00 0,00 2,66 0,00 8,26 24,17 163,02 51,16 209,88 80,87 187,23
14 k * V (n - 1) Hitungan - 534,69 539,82 546,10 551,22 576,63 532,82 632,76 552,72 496,17 417,72 378,46 302,77 367,80 335,10 268,08 214,46 173,70 138,96 117,77 113,56 221,26 217,94 342,26 338,50
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 674,78 682,62 689,02 720,79 666,02 790,95 690,90 620,21 522,14 473,07 378,46 459,75 418,87 335,10 268,08 217,13 173,70 147,22 141,95 276,58 272,42 427,82 423,13 525,73
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 6,42 7,84 6,40 31,77 -54,77 124,93 -100,05 -70,69 -98,07 -49,07 -94,61 81,29 -40,88 -83,77 -67,02 -50,95 -43,43 -26,48 -5,27 134,63 -4,15 155,40 -4,69 102,60
17 Aliran Dasar (BF) (12) - (16) mm/15hr 149,24 150,82 152,40 156,65 154,09 161,89 164,65 145,68 126,93 110,58 94,61 93,13 97,62 83,77 67,02 53,91 43,43 35,66 32,13 46,50 61,00 77,80 94,55 105,43
18 Aliran Langsung (DR) (11) - (12) mm/15hr 38,91 39,67 39,70 47,10 24,83 71,70 16,15 18,75 7,22 15,38 0,00 43,61 14,19 0,00 0,00 0,74 0,00 2,29 6,71 45,28 14,21 58,30 22,46 52,01
19 Aliran (R) (17) + (18) mm/15hr 188,15 190,49 192,11 203,75 178,92 233,59 180,80 164,43 134,14 125,96 94,61 136,74 111,81 83,77 67,02 54,65 43,43 37,95 38,84 91,79 75,21 136,10 117,01 157,44
21 Debit Aliran Sungai A * (19) m3/dtk 12,824 12,171 13,093 16,023 12,194 14,925 12,323 11,207 9,143 8,048 6,449 9,320 7,621 5,353 4,568 3,492 2,960 2,587 2,647 5,865 5,126 9,276 7,975 10,060
22 Debit Aliran Sungai lt/det 12823,60 12171,46 13093,16 16023,11 12194,47 14925,39 12322,55 11206,61 9142,68 8048,14 6448,53 9319,68 7620,65 5352,88 4567,79 3492,04 2959,70 2586,61 2647,47 5864,80 5126,14 9276,35 7975,21 10059,60
24 Debit Aliran (dibaca : 10E^6) m3/15hr 16,62 16,83 16,97 18,00 15,80 20,63 15,97 14,52 11,85 11,13 8,36 12,08 9,88 7,40 5,92 4,83 3,84 3,35 3,43 8,11 6,64 12,02 10,34 13,91
Sumber : Perhitungan
15
Tabel 3.7 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2006
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 237,10 259,17 157,67 228,91 300,60 142,65 171,01 227,52 47,34 170,22 5,67 1,03 0,00 0,00 0,00 0,00 0,00 0,00 3,83 0,00 95,04 111,01 93,21 323,59
2 Hari Hujan (h) Data hari 11,00 13,00 8,00 11,00 7,00 12,00 12,00 5,00 6,00 10,00 2,00 1,00 0,00 0,00 0,00 0,00 0,00 0,00 2,00 0,00 4,00 4,00 9,00 13,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,11 0,08 0,15 0,11 0,17 0,09 0,09 0,20 0,18 0,12 0,24 0,26 0,27 0,27 0,27 0,27 0,27 0,27 0,24 0,27 0,21 0,21 0,14 0,08
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,87 4,48 8,08 4,90 7,57 4,41 4,56 9,89 8,48 6,03 9,68 10,29 11,26 12,01 12,43 13,26 14,46 14,46 13,79 16,55 13,32 13,32 7,84 4,64
7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,08 55,20 45,77 41,77 38,33 44,55 46,14 40,81 38,62 44,21 30,67 30,06 30,44 32,47 33,62 35,86 39,09 39,09 43,66 44,73 50,13 50,13 50,21 57,28
8 Ds = P - Et (1) - (7) mm/15hr 187,03 203,97 111,90 187,14 262,28 98,10 124,88 186,70 8,72 126,01 -25,00 -29,03 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -39,83 -44,73 44,91 60,88 43,00 266,32
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -25,00 -29,03 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -39,83 -44,73 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 175,00 145,97 115,53 83,06 49,44 13,58 -25,51 -64,60 -104,43 -149,16 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 187,03 203,97 111,90 187,14 262,28 98,10 124,88 186,70 8,72 126,01 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 44,91 60,88 43,00 266,32
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 149,62 163,18 89,52 149,71 209,82 78,48 99,90 149,36 6,98 100,81 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 35,93 48,71 34,40 213,05
13 0.5 (1 + k) In Hitungan - 134,66 146,86 80,57 134,74 188,84 70,63 89,91 134,43 6,28 90,73 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 32,34 43,84 30,96 191,75
14 k * V (n - 1) Hitungan - 420,58 444,20 472,84 442,73 461,97 520,65 473,03 450,35 467,82 379,28 376,01 300,81 240,65 192,52 154,01 123,21 98,57 78,85 63,08 50,47 40,37 58,17 81,60 90,05
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 555,24 591,05 553,41 577,47 650,81 591,28 562,94 584,78 474,10 470,01 376,01 300,81 240,65 192,52 154,01 123,21 98,57 78,85 63,08 50,47 72,71 102,01 112,56 281,80
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 29,51 35,81 -37,64 24,06 73,35 -59,53 -28,35 21,84 -110,67 -4,09 -94,00 -75,20 -60,16 -48,13 -38,50 -30,80 -24,64 -19,71 -15,77 -12,62 22,24 29,30 10,56 169,24
17 Aliran Dasar (BF) (12) - (16) mm/15hr 120,11 127,37 127,16 125,65 136,48 138,01 128,25 127,52 117,65 104,90 94,00 75,20 60,16 48,13 38,50 30,80 24,64 19,71 15,77 12,62 13,69 19,41 23,84 43,82
18 Aliran Langsung (DR) (11) - (12) mm/15hr 37,41 40,79 22,38 37,43 52,46 19,62 24,98 37,34 1,74 25,20 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 8,98 12,18 8,60 53,26
19 Aliran (R) (17) + (18) mm/15hr 157,51 168,16 149,54 163,08 188,93 157,63 153,22 164,86 119,40 130,10 94,00 75,20 60,16 48,13 38,50 30,80 24,64 19,71 15,77 12,62 22,67 31,59 32,44 97,08
21 Debit Aliran Sungai A * (19) m3/dtk 10,736 10,745 10,192 12,825 12,877 10,072 10,443 11,236 8,138 8,313 6,407 5,125 4,100 3,075 2,624 1,968 1,680 1,344 1,075 0,806 1,545 2,153 2,211 6,203
22 Debit Aliran Sungai lt/det 10735,50 10744,79 10192,16 12824,92 12876,76 10072,00 10442,99 11236,48 8137,66 8313,13 6406,79 5125,44 4100,35 3075,26 2624,22 1968,17 1679,50 1343,60 1074,88 806,16 1545,01 2153,03 2210,98 6203,12
24 Debit Aliran (dibaca : 10E^6) m3/15hr 13,91 14,85 13,21 14,40 16,69 13,92 13,53 14,56 10,55 11,49 8,30 6,64 5,31 4,25 3,40 2,72 2,18 1,74 1,39 1,11 2,00 2,79 2,87 8,58
Sumber : Perhitungan
16
Tabel 3.8 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2007
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 15,39 210,94 161,89 299,03 55,23 358,40 257,36 258,39 109,58 115,99 17,28 7,61 0,00 0,00 0,92 5,83 0,00 0,00 0,00 282,24 463,55 13,67 341,99 283,36
2 Hari Hujan (h) Data hari 1,00 6,00 11,00 12,00 8,00 12,00 12,00 8,00 6,00 8,00 6,00 2,00 0,00 0,00 1,00 2,00 0,00 0,00 0,00 8,00 13,00 3,00 15,00 11,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,26 0,18 0,11 0,09 0,15 0,09 0,09 0,15 0,18 0,15 0,18 0,24 0,27 0,27 0,26 0,24 0,27 0,27 0,27 0,15 0,08 0,23 0,05 0,11
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 14,27 10,74 5,65 4,20 6,89 4,41 4,56 7,61 8,48 7,54 7,26 9,68 11,26 12,01 11,74 11,79 14,46 14,46 15,51 9,19 4,76 14,28 2,61 6,50
7 Et = (ETo) - (E) (3) - (6) mm/15hr 41,68 48,94 48,20 42,47 39,02 44,55 46,14 43,10 38,62 42,70 33,09 30,67 30,44 32,47 34,31 37,33 39,09 39,09 41,94 52,09 58,69 49,17 55,44 55,42
8 Ds = P - Et (1) - (7) mm/15hr -26,29 162,00 113,69 256,56 16,22 313,85 211,23 215,29 70,95 73,29 -15,81 -23,05 -30,44 -32,47 -33,39 -31,50 -39,09 -39,09 -41,94 230,16 404,86 -35,50 286,55 227,94
9 Kandungan Air Tanah mm/15hr -26,29 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -15,81 -23,05 -30,44 -32,47 -33,39 -31,50 -39,09 -39,09 -41,94 0,00 0,00 -35,50 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 184,19 161,14 130,70 98,23 64,84 33,34 -5,75 -44,84 -86,78 200,00 200,00 164,50 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 0,00 162,00 113,69 256,56 16,22 313,85 211,23 215,29 70,95 73,29 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 230,16 404,86 0,00 286,55 227,94
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 0,00 129,60 90,95 205,25 12,97 251,08 168,98 172,23 56,76 58,63 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 184,12 323,89 0,00 229,24 182,36
13 0.5 (1 + k) In Hitungan - 0,00 116,64 81,86 184,73 11,68 225,97 152,08 155,01 51,09 52,77 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 165,71 291,50 0,00 206,32 164,12
14 k * V (n - 1) Hitungan - 225,44 180,35 237,59 255,56 352,23 291,12 413,68 452,61 486,09 429,75 386,01 308,81 247,05 197,64 158,11 126,49 101,19 80,95 64,76 51,81 174,02 372,41 297,93 403,40
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 225,44 296,99 319,45 440,29 363,90 517,09 565,76 607,62 537,18 482,51 386,01 308,81 247,05 197,64 158,11 126,49 101,19 80,95 64,76 217,52 465,52 372,41 504,25 567,52
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -56,36 71,55 22,46 120,84 -76,38 153,19 48,66 41,86 -70,44 -54,67 -96,50 -77,20 -61,76 -49,41 -39,53 -31,62 -25,30 -20,24 -16,19 152,76 247,99 -93,10 131,84 63,27
17 Aliran Dasar (BF) (12) - (16) mm/15hr 56,36 58,05 68,49 84,41 89,35 97,89 120,32 130,38 127,20 113,30 96,50 77,20 61,76 49,41 39,53 31,62 25,30 20,24 16,19 31,36 75,89 93,10 97,41 119,09
18 Aliran Langsung (DR) (11) - (12) mm/15hr 0,00 32,40 22,74 51,31 3,24 62,77 42,25 43,06 14,19 14,66 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 46,03 80,97 0,00 57,31 45,59
19 Aliran (R) (17) + (18) mm/15hr 56,36 90,45 91,23 135,73 92,60 160,66 162,56 173,43 141,39 127,96 96,50 77,20 61,76 49,41 39,53 31,62 25,30 20,24 16,19 77,40 156,86 93,10 154,72 164,67
21 Debit Aliran Sungai A * (19) m3/dtk 3,841 5,779 6,218 10,674 6,311 10,265 11,080 11,821 9,637 8,176 6,577 5,262 4,209 3,157 2,694 2,021 1,724 1,379 1,103 4,945 10,691 6,346 10,545 10,522
22 Debit Aliran Sungai lt/det 3841,24 5779,22 6217,97 10673,81 6311,05 10265,46 11079,58 11820,53 9636,61 8175,94 6577,20 5261,76 4209,41 3157,06 2694,02 2020,52 1724,17 1379,34 1103,47 4945,30 10691,25 6345,52 10544,89 10522,03
24 Debit Aliran (dibaca : 10E^6) m3/15hr 4,98 7,99 8,06 11,99 8,18 14,19 14,36 15,32 12,49 11,30 8,52 6,82 5,46 4,36 3,49 2,79 2,23 1,79 1,43 6,84 13,86 8,22 13,67 14,55
Sumber : Perhitungan
17
Tabel 3.9 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2008
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 69,91 258,57 324,60 234,74 174,32 222,51 158,52 52,15 95,52 2,44 2,11 0,00 0,00 0,00 2,70 0,00 0,00 0,00 112,86 221,47 394,33 196,65 48,08 81,67
2 Hari Hujan (h) Data hari 7,00 7,00 9,00 11,00 13,00 9,00 11,00 4,00 3,00 1,00 1,00 0,00 0,00 0,00 1,00 0,00 0,00 0,00 3,00 9,00 14,00 9,00 5,00 9,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,17 0,17 0,14 0,11 0,08 0,14 0,11 0,21 0,23 0,26 0,26 0,27 0,27 0,27 0,26 0,27 0,27 0,27 0,23 0,14 0,06 0,14 0,20 0,14
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 9,23 9,85 7,27 5,28 3,44 6,61 5,32 10,65 10,60 12,81 10,29 10,89 11,26 12,01 11,74 13,26 14,46 14,46 12,93 8,27 3,81 8,57 11,32 8,36
7 Et = (ETo) - (E) (3) - (6) mm/15hr 46,72 49,83 46,58 44,98 42,46 42,35 45,38 40,05 36,50 37,43 30,06 29,46 30,44 32,47 34,31 35,86 39,09 39,09 44,52 53,01 59,64 54,88 46,73 53,56
8 Ds = P - Et (1) - (7) mm/15hr 23,19 208,74 278,02 189,76 131,86 180,16 113,15 12,09 59,02 -34,99 -27,95 -29,46 -30,44 -32,47 -31,61 -35,86 -39,09 -39,09 68,34 168,46 334,68 141,77 1,35 28,11
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -34,99 -27,95 -29,46 -30,44 -32,47 -31,61 -35,86 -39,09 -39,09 0,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 165,01 137,05 107,60 77,16 44,69 13,08 -22,78 -61,87 -100,96 200,00 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 23,19 208,74 278,02 189,76 131,86 180,16 113,15 12,09 59,02 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 68,34 168,46 334,68 141,77 1,35 28,11
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 18,55 166,99 222,41 151,81 105,49 144,13 90,52 9,67 47,21 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 54,67 134,77 267,75 113,41 1,08 22,48
13 0.5 (1 + k) In Hitungan - 16,70 150,29 200,17 136,63 94,94 129,72 81,46 8,71 42,49 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 49,21 121,29 240,97 102,07 0,97 20,24
14 k * V (n - 1) Hitungan - 454,01 376,57 421,49 497,33 507,17 481,68 489,12 456,47 372,14 331,71 265,36 212,29 169,83 135,87 108,69 86,95 69,56 55,65 44,52 74,98 157,02 318,39 336,37 269,87
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 470,71 526,86 621,66 633,96 602,11 611,40 570,59 465,18 414,63 331,71 265,36 212,29 169,83 135,87 108,69 86,95 69,56 55,65 93,73 196,27 397,99 420,47 337,34 290,11
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -96,81 56,15 94,80 12,30 -31,85 9,30 -40,82 -105,41 -50,54 -82,93 -66,34 -53,07 -42,46 -33,97 -27,17 -21,74 -17,39 -13,91 38,07 102,55 201,72 22,47 -83,12 -47,23
17 Aliran Dasar (BF) (12) - (16) mm/15hr 115,36 110,84 127,61 139,51 137,34 134,83 131,33 115,08 97,76 82,93 66,34 53,07 42,46 33,97 27,17 21,74 17,39 13,91 16,60 32,22 66,03 90,94 84,20 69,72
18 Aliran Langsung (DR) (11) - (12) mm/15hr 4,64 41,75 55,60 37,95 26,37 36,03 22,63 2,42 11,80 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 13,67 33,69 66,94 28,35 0,27 5,62
19 Aliran (R) (17) + (18) mm/15hr 120,00 152,59 183,22 177,47 163,71 170,87 153,96 117,50 109,56 82,93 66,34 53,07 42,46 33,97 27,17 21,74 17,39 13,91 30,27 65,92 132,97 119,29 84,47 75,34
21 Debit Aliran Sungai A * (19) m3/dtk 8,178 9,750 12,487 12,959 11,158 10,918 10,493 8,009 7,467 5,299 4,522 3,617 2,894 2,170 1,852 1,389 1,185 0,948 2,063 4,212 9,062 8,131 5,757 4,814
22 Debit Aliran Sungai lt/det 8178,49 9749,86 12487,29 12959,25 11157,98 10917,74 10493,36 8008,54 7467,12 5298,67 4521,53 3617,23 2893,78 2170,34 1852,02 1389,01 1185,29 948,23 2062,77 4211,71 9062,45 8130,51 5757,16 4813,81
24 Debit Aliran (dibaca : 10E^6) m3/15hr 10,60 13,48 16,18 15,68 14,46 15,09 13,60 10,38 9,68 7,32 5,86 4,69 3,75 3,00 2,40 1,92 1,54 1,23 2,67 5,82 11,74 10,54 7,46 6,65
Sumber : Perhitungan
18
Tabel 3.10 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2009
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 93,51 327,75 52,44 297,22 22,42 276,39 183,35 109,95 89,37 185,56 135,82 0,00 0,00 0,00 0,00 4,29 4,27 0,00 3,03 375,39 97,65 235,45 105,74 310,17
2 Hari Hujan (h) Data hari 11,00 14,00 6,00 9,00 5,00 11,00 13,00 6,00 5,00 7,00 4,00 0,00 0,00 0,00 0,00 1,00 1,00 0,00 1,00 5,00 7,00 9,00 7,00 9,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,11 0,06 0,18 0,14 0,20 0,11 0,08 0,18 0,20 0,17 0,21 0,27 0,27 0,27 0,27 0,26 0,26 0,27 0,26 0,20 0,17 0,14 0,17 0,14
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,87 3,58 9,69 6,30 8,95 5,14 3,80 9,13 9,18 8,29 8,47 10,89 11,26 12,01 12,43 12,53 13,66 14,46 14,65 11,95 10,47 8,57 9,58 8,36
7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,08 56,10 44,16 40,37 36,95 43,82 46,90 41,57 37,92 41,95 31,88 29,46 30,44 32,47 33,62 36,59 39,89 39,09 42,80 49,33 52,98 54,88 48,47 53,56
8 Ds = P - Et (1) - (7) mm/15hr 43,44 271,65 8,29 256,85 -14,53 232,57 136,45 68,38 51,46 143,61 103,95 -29,46 -30,44 -32,47 -33,62 -32,31 -35,63 -39,09 -39,77 326,06 44,67 180,57 57,27 256,61
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 -14,53 0,00 0,00 0,00 0,00 0,00 0,00 -29,46 -30,44 -32,47 -33,62 -32,31 -35,63 -39,09 -39,77 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 185,47 200,00 200,00 200,00 200,00 200,00 200,00 170,54 140,10 107,63 74,02 41,71 6,08 -33,01 -72,78 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 43,44 271,65 8,29 256,85 0,00 232,57 136,45 68,38 51,46 143,61 103,95 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 326,06 44,67 180,57 57,27 256,61
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 34,75 217,32 6,63 205,48 0,00 186,06 109,16 54,70 41,17 114,89 83,16 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 260,85 35,73 144,45 45,81 205,29
13 0.5 (1 + k) In Hitungan - 31,27 195,59 5,97 184,93 0,00 167,45 98,24 49,23 37,05 103,40 74,84 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 234,76 32,16 130,01 41,23 184,76
14 k * V (n - 1) Hitungan - 232,09 210,69 325,02 264,79 359,78 287,82 364,22 369,97 335,36 297,93 321,06 316,73 253,38 202,70 162,16 129,73 103,78 83,03 66,42 53,14 230,32 209,98 271,99 250,58
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 263,36 406,28 330,99 449,72 359,78 455,28 462,47 419,20 372,41 401,33 395,91 316,73 253,38 202,70 162,16 129,73 103,78 83,03 66,42 287,90 262,48 339,99 313,23 435,34
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -26,75 142,91 -75,29 118,74 -89,94 95,50 7,19 -43,26 -46,79 28,92 -5,42 -79,18 -63,35 -50,68 -40,54 -32,43 -25,95 -20,76 -16,61 221,48 -25,42 77,51 -26,77 122,12
17 Aliran Dasar (BF) (12) - (16) mm/15hr 61,50 74,40 81,92 86,75 89,94 90,56 101,97 97,96 87,96 85,97 88,58 79,18 63,35 50,68 40,54 32,43 25,95 20,76 16,61 39,37 61,15 66,94 72,58 83,17
18 Aliran Langsung (DR) (11) - (12) mm/15hr 8,69 54,33 1,66 51,37 0,00 46,51 27,29 13,68 10,29 28,72 20,79 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 65,21 8,93 36,11 11,45 51,32
19 Aliran (R) (17) + (18) mm/15hr 70,18 128,73 83,58 138,12 89,94 137,08 129,26 111,64 98,25 114,69 109,37 79,18 63,35 50,68 40,54 32,43 25,95 20,76 16,61 104,58 70,09 103,05 84,03 134,50
21 Debit Aliran Sungai A * (19) m3/dtk 4,783 8,226 5,696 10,862 6,130 8,759 8,810 7,609 6,696 7,328 7,454 5,397 4,317 3,238 2,763 2,072 1,768 1,415 1,132 6,682 4,777 7,024 5,727 8,594
22 Debit Aliran Sungai lt/det 4783,45 8225,60 5696,16 10861,63 6130,25 8758,67 8809,92 7608,84 6696,23 7328,49 7454,29 5396,67 4317,33 3238,00 2763,09 2072,32 1768,38 1414,70 1131,76 6682,31 4776,85 ##### 5727,33 8593,82
24 Debit Aliran (dibaca : 10E^6) m3/15hr 6,20 11,37 7,38 12,20 7,94 12,11 11,42 9,86 8,68 10,13 9,66 6,99 5,60 4,48 3,58 2,86 2,29 1,83 1,47 9,24 6,19 9,10 7,42 11,88
Sumber : Perhitungan
19
Tabel 3.11 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2010
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 120,01 287,60 180,41 196,67 339,31 238,36 157,10 102,54 165,31 197,53 194,84 74,84 149,72 31,75 42,35 163,78 269,47 142,71 69,51 332,09 189,75 197,33 387,89 202,53
2 Hari Hujan (h) Data hari 9,00 14,00 12,00 8,00 6,00 13,00 8,00 8,00 13,00 10,00 5,00 4,00 8,00 2,00 3,00 6,00 10,00 11,00 8,00 15,00 11,00 9,00 14,00 8,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,14 0,06 0,09 0,15 0,18 0,08 0,15 0,15 0,08 0,12 0,20 0,21 0,15 0,24 0,23 0,18 0,12 0,11 0,15 0,05 0,11 0,14 0,06 0,15
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 7,55 3,58 4,85 7,00 8,26 3,67 7,61 7,61 3,53 6,03 7,87 8,47 6,26 10,68 10,36 8,84 6,43 5,62 8,62 2,76 6,66 8,57 3,48 9,29
7 Et = (ETo) - (E) (3) - (6) mm/15hr 48,40 56,10 49,00 39,67 37,64 45,29 43,10 43,10 43,57 44,21 32,48 31,88 35,45 33,80 35,69 40,28 47,12 47,93 48,83 58,52 56,79 54,88 54,57 52,63
8 Ds = P - Et (1) - (7) mm/15hr 71,62 231,50 131,41 157,00 301,67 193,07 114,00 59,45 121,74 153,32 162,36 42,97 114,27 -2,06 6,66 123,50 222,35 94,79 20,68 273,57 132,96 142,45 333,33 149,90
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -2,06 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 197,94 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 71,62 231,50 131,41 157,00 301,67 193,07 114,00 59,45 121,74 153,32 162,36 42,97 114,27 0,00 6,66 123,50 222,35 94,79 20,68 273,57 132,96 142,45 333,33 149,90
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 57,29 185,20 105,13 125,60 241,34 154,46 91,20 47,56 97,39 122,66 129,89 34,37 91,42 0,00 5,33 98,80 177,88 75,83 16,54 218,85 106,37 113,96 266,66 119,92
13 0.5 (1 + k) In Hitungan - 51,56 166,68 94,61 113,04 217,20 139,01 82,08 42,80 87,65 110,39 116,90 30,93 82,28 0,00 4,80 88,92 160,09 68,25 14,89 196,97 95,73 102,56 240,00 107,93
14 k * V (n - 1) Hitungan - 348,27 319,87 389,24 387,08 400,09 493,84 506,28 470,69 410,79 398,76 407,32 419,37 360,25 354,02 283,22 230,41 255,46 332,44 320,55 268,35 372,26 374,39 381,56 497,25
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 399,84 486,55 483,85 500,12 617,30 632,85 588,36 513,49 498,45 509,15 524,22 450,31 442,52 354,02 288,01 319,33 415,56 400,69 335,44 465,32 467,99 476,95 621,56 605,18
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -35,51 86,71 -2,70 16,27 117,18 15,55 -44,49 -74,87 -15,04 10,70 15,07 -73,91 -7,78 -88,50 -66,01 31,32 96,23 -14,86 -65,25 129,88 2,67 8,96 144,60 -16,38
17 Aliran Dasar (BF) (12) - (16) mm/15hr 92,80 98,49 107,82 109,33 124,16 138,91 135,69 122,43 112,44 111,96 114,82 108,28 99,20 88,50 71,34 67,48 81,65 90,69 81,79 88,97 103,70 104,99 122,06 136,30
18 Aliran Langsung (DR) (11) - (12) mm/15hr 14,32 46,30 26,28 31,40 60,33 38,61 22,80 11,89 24,35 30,66 32,47 8,59 22,85 0,00 1,33 24,70 44,47 18,96 4,14 54,71 26,59 28,49 66,67 29,98
19 Aliran (R) (17) + (18) mm/15hr 107,12 144,79 134,10 140,73 184,49 177,52 158,49 134,32 136,79 142,62 147,29 116,87 122,06 88,50 72,67 92,18 126,12 109,65 85,93 143,69 130,29 133,48 188,72 166,28
21 Debit Aliran Sungai A * (19) m3/dtk 7,301 9,251 9,140 11,067 12,574 11,343 10,802 9,155 9,323 9,113 10,039 7,966 8,319 5,655 4,953 5,890 8,596 7,473 5,856 9,181 8,880 9,098 12,863 10,625
22 Debit Aliran Sungai lt/det 7300,9 9251,3 9139,9 11067,1 12574,2 11342,8 10802,1 9154,6 9322,8 9112,8 10038,7 7965,6 8319,0 5655,1 4952,8 5890,1 8596,1 7473,4 5856,5 9181,0 8880,3 9097,6 12862,5 10624,9
24 Debit Aliran (dibaca : 10E^6) m3/15hr 9,46 12,79 11,85 12,43 16,30 15,68 14,00 11,86 12,08 12,60 13,01 10,32 10,78 7,82 6,42 8,14 11,14 9,69 7,59 12,69 11,51 11,79 16,67 14,69
Sumber : Perhitungan
20
Tabel 3.12 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2011
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 227,55 205,06 147,75 243,69 107,76 211,84 198,83 230,44 270,23 18,47 16,15 3,78 2,70 15,48 0,00 0,00 0,00 0,00 0,00 119,38 268,61 255,95 76,23 323,82
2 Hari Hujan (h) Data hari 9,00 11,00 11,00 11,00 11,00 11,00 13,00 8,00 11,00 1,00 2,00 1,00 1,00 1,00 0,00 0,00 0,00 0,00 0,00 6,00 15,00 13,00 7,00 13,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,14 0,11 0,11 0,11 0,11 0,11 0,08 0,15 0,11 0,26 0,24 0,26 0,26 0,26 0,27 0,27 0,27 0,27 0,27 0,18 0,05 0,08 0,17 0,08
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 7,55 6,27 5,65 4,90 4,82 5,14 3,80 7,61 4,95 12,81 9,68 10,29 10,63 11,34 12,43 13,26 14,46 14,46 15,51 11,03 2,86 4,76 9,58 4,64
7 Et = (ETo) - (E) (3) - (6) mm/15hr 48,40 53,41 48,20 41,77 41,08 43,82 46,90 43,10 42,15 37,43 30,67 30,06 31,07 33,14 33,62 35,86 39,09 39,09 41,94 50,25 60,59 58,69 48,47 57,28
8 Ds = P - Et (1) - (7) mm/15hr 179,16 151,65 99,55 201,92 66,68 168,03 151,94 187,34 228,08 -18,96 -14,52 -26,28 -28,37 -17,66 -33,62 -35,86 -39,09 -39,09 -41,94 69,13 208,02 197,26 27,76 266,54
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -18,96 -14,52 -26,28 -28,37 -17,66 -33,62 -35,86 -39,09 -39,09 -41,94 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 181,04 166,52 140,24 111,88 94,22 60,60 24,75 -14,35 -53,44 -95,38 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 179,16 151,65 99,55 201,92 66,68 168,03 151,94 187,34 228,08 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 69,13 208,02 197,26 27,76 266,54
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 143,33 121,32 79,64 161,53 53,34 134,42 121,55 149,87 182,46 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 55,30 166,41 157,81 22,21 213,23
13 0.5 (1 + k) In Hitungan - 128,99 109,18 71,68 145,38 48,01 120,98 109,39 134,89 164,22 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 49,77 149,77 142,03 19,99 191,91
14 k * V (n - 1) Hitungan - 484,14 490,51 479,75 441,14 469,22 413,78 427,81 429,76 451,72 492,75 394,20 315,36 252,29 201,83 161,46 129,17 103,34 82,67 66,14 52,91 82,14 185,53 262,05 225,63
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 613,13 599,69 551,43 586,52 517,22 534,76 537,20 564,65 615,93 492,75 394,20 315,36 252,29 201,83 161,46 129,17 103,34 82,67 66,14 102,68 231,91 327,56 282,04 417,54
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 7,96 -13,44 -48,26 35,09 -69,30 17,53 2,44 27,45 51,29 -123,19 -98,55 -78,84 -63,07 -50,46 -40,37 -32,29 -25,83 -20,67 -16,53 36,54 129,23 95,65 -45,52 135,50
17 Aliran Dasar (BF) (12) - (16) mm/15hr 135,37 134,76 127,90 126,44 122,64 116,89 119,11 122,43 131,18 123,19 98,55 78,84 63,07 50,46 40,37 32,29 25,83 20,67 16,53 18,76 37,18 62,16 67,73 77,73
18 Aliran Langsung (DR) (11) - (12) mm/15hr 35,83 30,33 19,91 40,38 13,34 33,61 30,39 37,47 45,62 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 13,83 41,60 39,45 5,55 53,31
19 Aliran (R) (17) + (18) mm/15hr 171,20 165,09 147,81 166,82 135,97 150,49 149,49 159,90 176,79 123,19 98,55 78,84 63,07 50,46 40,37 32,29 25,83 20,67 16,53 32,58 78,78 101,62 73,28 131,04
21 Debit Aliran Sungai A * (19) m3/dtk 11,668 10,548 10,074 13,119 9,267 9,616 10,189 10,898 12,049 7,871 6,717 5,373 4,299 3,224 2,751 2,063 1,761 1,409 1,127 2,082 5,369 6,926 4,995 8,373
22 Debit Aliran Sungai lt/det 11668,2 10548,4 10074,3 13119,1 9267,4 9615,9 10188,9 10897,8 12049,4 7871,2 6716,7 5373,4 4298,7 3224,0 2751,2 2063,4 1760,7 1408,6 1126,9 2081,9 5369,3 6925,7 4994,8 8372,9
24 Debit Aliran (dibaca : 10E^6) m3/15hr 15,12 14,58 13,06 14,74 12,01 13,29 13,20 14,12 15,62 10,88 8,70 6,96 5,57 4,46 3,57 2,85 2,28 1,83 1,46 2,88 6,96 8,98 6,47 11,57
Sumber : Perhitungan
21
Tabel 3.13 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2012
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 398,94 127,77 118,96 288,90 311,77 80,75 143,13 215,86 231,06 32,32 9,12 1,95 0,00 0,00 0,00 0,00 0,00 7,34 49,51 118,28 20,74 458,92 227,33 279,40
2 Hari Hujan (h) Data hari 14,00 12,00 8,00 13,00 10,00 7,00 13,00 3,00 11,00 5,00 5,00 1,00 0,00 0,00 0,00 0,00 0,00 1,00 4,00 6,00 6,00 15,00 14,00 14,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,06 0,09 0,15 0,08 0,12 0,17 0,08 0,23 0,11 0,20 0,20 0,26 0,27 0,27 0,27 0,27 0,27 0,26 0,21 0,18 0,18 0,05 0,06 0,06
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 3,36 5,37 8,08 3,77 5,51 8,08 3,80 11,41 4,95 9,80 7,87 10,29 11,26 12,01 12,43 13,26 14,46 13,66 12,06 11,03 11,42 2,86 3,48 3,72
7 Et = (ETo) - (E) (3) - (6) mm/15hr 52,59 54,31 45,77 46,49 40,39 40,88 46,90 39,29 42,15 40,44 32,48 30,06 30,44 32,47 33,62 35,86 39,09 39,89 45,39 50,25 52,03 60,59 54,57 58,20
8 Ds = P - Et (1) - (7) mm/15hr 346,34 73,46 73,19 242,41 271,38 39,87 96,23 176,57 188,91 -8,12 -23,36 -28,11 -30,44 -32,47 -33,62 -35,86 -39,09 -32,55 4,12 68,03 -31,29 398,33 172,76 221,20
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -8,12 -23,36 -28,11 -30,44 -32,47 -33,62 -35,86 -39,09 -32,55 0,00 0,00 -31,29 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 191,88 168,52 140,41 109,97 77,49 43,88 8,02 -31,07 -63,62 200,00 200,00 168,71 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 346,34 73,46 73,19 242,41 271,38 39,87 96,23 176,57 188,91 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4,12 68,03 0,00 398,33 172,76 221,20
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 277,08 58,77 58,55 193,93 217,10 31,90 76,99 141,25 151,13 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3,30 54,42 0,00 318,66 138,21 176,96
13 0.5 (1 + k) In Hitungan - 249,37 52,89 52,70 174,53 195,39 28,71 69,29 127,13 136,01 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 2,97 48,98 0,00 286,80 124,39 159,26
14 k * V (n - 1) Hitungan - 334,03 466,72 415,69 374,71 439,39 507,83 429,23 398,82 420,76 445,41 356,33 285,07 228,05 182,44 145,95 116,76 93,41 74,73 59,78 50,20 79,34 63,47 280,22 323,68
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 583,40 519,61 468,39 549,24 634,79 536,54 498,52 525,94 556,77 445,41 356,33 285,07 228,05 182,44 145,95 116,76 93,41 74,73 62,75 99,18 79,34 350,27 404,60 482,95
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 165,86 -63,79 -51,23 80,86 85,54 -98,25 -38,02 27,42 30,82 -111,35 -89,08 -71,27 -57,01 -45,61 -36,49 -29,19 -23,35 -18,68 -11,98 36,43 -19,84 270,93 54,33 78,34
17 Aliran Dasar (BF) (12) - (16) mm/15hr 111,22 122,56 109,78 113,07 131,56 130,15 115,01 113,83 120,30 111,35 89,08 71,27 57,01 45,61 36,49 29,19 23,35 18,68 15,28 17,99 19,84 47,73 83,88 98,62
18 Aliran Langsung (DR) (11) - (12) mm/15hr 69,27 14,69 14,64 48,48 54,28 7,97 19,25 35,31 37,78 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,82 13,61 0,00 79,67 34,55 44,24
19 Aliran (R) (17) + (18) mm/15hr 180,48 137,25 124,42 161,55 185,83 138,12 134,25 149,14 158,08 111,35 89,08 71,27 57,01 45,61 36,49 29,19 23,35 18,68 16,10 31,60 19,84 127,40 118,43 142,86
21 Debit Aliran Sungai A * (19) m3/dtk 12,301 8,770 8,480 11,797 12,666 8,825 9,150 10,165 10,774 7,115 6,072 4,857 3,886 2,914 2,487 1,865 1,592 1,273 1,097 2,019 1,352 8,683 8,071 9,128
22 Debit Aliran Sungai lt/det 12301,05 8769,70 8479,64 11797,15 12665,73 8825,44 9150,16 10164,95 10774,26 7115,06 6071,52 4857,21 3885,77 2914,33 2486,89 1865,17 1591,61 1273,29 1097,25 2018,94 1351,91 8683,11 8071,49 9127,95
24 Debit Aliran (dibaca : 10E^6) m3/15hr 15,94 12,12 10,99 14,27 16,41 12,20 11,86 13,17 13,96 9,84 7,87 6,29 5,04 4,03 3,22 2,58 2,06 1,65 1,42 2,79 1,75 11,25 10,46 12,62
Sumber : Perhitungan
22
Tabel 3.14 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2013
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 252,26 305,62 219,68 178,66 76,69 253,48 130,74 214,54 73,81 206,45 279,57 45,69 209,69 22,18 0,00 0,92 0,81 4,43 0,80 118,12 214,08 83,73 268,53 231,71
2 Hari Hujan (h) Data hari 13,00 12,00 10,00 10,00 9,00 9,00 10,00 8,00 9,00 12,00 9,00 7,00 8,00 2,00 0,00 1,00 1,00 1,00 1,00 8,00 11,00 4,00 11,00 7,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,08 0,09 0,12 0,12 0,14 0,14 0,12 0,15 0,14 0,09 0,14 0,17 0,15 0,24 0,27 0,26 0,26 0,26 0,26 0,15 0,11 0,21 0,11 0,17
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 4,20 5,37 6,46 5,60 6,20 6,61 6,08 7,61 6,36 4,52 5,45 6,66 6,26 10,68 12,43 12,53 13,66 13,66 14,65 9,19 6,66 13,32 6,10 10,22
7 Et = (ETo) - (E) (3) - (6) mm/15hr 51,75 54,31 47,39 41,07 39,70 42,35 44,62 43,10 40,74 45,72 34,90 33,69 35,45 33,80 33,62 36,59 39,89 39,89 42,80 52,09 56,79 50,13 51,95 51,70
8 Ds = P - Et (1) - (7) mm/15hr 200,51 251,31 172,29 137,59 36,98 211,13 86,13 171,45 33,07 160,73 244,66 12,00 174,24 -11,62 -33,62 -35,68 -39,08 -35,47 -42,00 66,03 157,30 33,61 216,58 180,00
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -11,62 -33,62 -35,68 -39,08 -35,47 -42,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 188,38 154,76 119,09 80,00 44,53 2,54 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 200,51 251,31 172,29 137,59 36,98 211,13 86,13 171,45 33,07 160,73 244,66 12,00 174,24 0,00 0,00 0,00 0,00 0,00 0,00 66,03 157,30 33,61 216,58 180,00
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 160,41 201,05 137,83 110,07 29,59 168,91 68,90 137,16 26,45 128,58 195,73 9,60 139,39 0,00 0,00 0,00 0,00 0,00 0,00 52,83 125,84 26,89 173,26 144,00
13 0.5 (1 + k) In Hitungan - 144,37 180,94 124,05 99,07 26,63 152,02 62,01 123,44 23,81 115,73 176,16 8,64 125,46 0,00 0,00 0,00 0,00 0,00 0,00 47,54 113,25 24,20 155,94 129,60
14 k * V (n - 1) Hitungan - 386,36 424,58 484,42 486,78 468,67 396,24 438,61 400,49 419,15 354,37 376,07 441,79 360,34 388,63 310,91 248,73 198,98 159,18 127,35 101,88 119,54 186,23 168,34 259,42
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 530,72 605,52 608,47 585,84 495,30 548,26 500,62 523,94 442,96 470,09 552,23 450,42 485,79 388,63 310,91 248,73 198,98 159,18 127,35 149,42 232,79 210,43 324,28 389,03
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 47,78 74,80 2,95 -22,63 -90,54 52,96 -47,64 23,32 -80,98 27,13 82,14 -101,81 35,37 -97,16 -77,73 -62,18 -49,75 -39,80 -31,84 22,07 83,37 -22,36 113,85 64,75
17 Aliran Dasar (BF) (12) - (16) mm/15hr 112,63 126,25 134,89 132,70 120,13 115,95 116,54 113,84 107,43 101,45 113,59 111,41 104,02 97,16 77,73 62,18 49,75 39,80 31,84 30,75 42,47 49,25 59,41 79,26
18 Aliran Langsung (DR) (11) - (12) mm/15hr 40,10 50,26 34,46 27,52 7,40 42,23 17,23 34,29 6,61 32,15 48,93 2,40 34,85 0,00 0,00 0,00 0,00 0,00 0,00 13,21 31,46 6,72 43,32 36,00
19 Aliran (R) (17) + (18) mm/15hr 152,73 176,51 169,35 160,22 127,52 158,18 133,77 148,13 114,05 133,60 162,52 113,81 138,87 97,16 77,73 62,18 49,75 39,80 31,84 43,96 73,93 55,97 102,73 115,26
21 Debit Aliran Sungai A * (19) m3/dtk 10,410 11,278 11,542 12,600 8,691 10,107 9,117 10,096 7,773 8,536 11,077 7,757 9,465 6,208 5,298 3,973 3,390 2,712 2,170 2,809 5,039 3,815 7,001 7,364
22 Debit Aliran Sungai lt/det ###### 11278,40 11541,96 12599,86 8691,48 10106,94 9117,00 10095,82 ##### 8536,25 11076,98 7756,50 9464,99 6208,06 5297,55 3973,16 3390,43 2712,34 2169,88 2808,82 5038,58 3814,58 7001,49 7364,50
24 Debit Aliran (dibaca : 10E^6) m3/15hr 13,49 15,59 14,96 14,15 11,26 13,97 11,82 13,08 10,07 11,80 14,36 10,05 12,27 8,58 6,87 5,49 4,39 3,52 2,81 3,88 6,53 4,94 9,07 10,18
Sumber : Perhitungan
23
Tabel 3.15 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2014
DAS : Gintung
Luas DAS : 88,33 km2
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 420,38 215,77 145,21 186,21 153,41 156,47 137,67 154,22 180,90 34,68 4,83 187,09 183,02 75,47 10,60 24,35 0,00 0,00 0,00 43,15 165,42 381,14 254,56 322,12
2 Hari Hujan (h) Data hari 12,00 13,00 10,00 8,00 10,00 10,00 13,00 7,00 7,00 3,00 1,00 5,00 3,00 1,00 2,00 2,00 0,00 0,00 0,00 3,00 7,00 12,00 12,00 13,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,09 0,08 0,12 0,15 0,12 0,12 0,08 0,17 0,17 0,23 0,26 0,20 0,23 0,26 0,24 0,24 0,27 0,27 0,27 0,23 0,17 0,09 0,09 0,08
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,04 4,48 6,46 7,00 5,51 5,88 3,80 8,37 7,77 11,30 10,29 7,87 9,38 11,34 11,05 11,79 14,46 14,46 15,51 13,79 10,47 5,71 5,22 4,64
7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,91 55,20 47,39 39,67 40,39 43,08 46,90 42,33 39,33 38,94 30,06 32,48 32,32 33,14 35,00 37,33 39,09 39,09 41,94 47,49 52,98 57,74 52,83 57,28
8 Ds = P - Et (1) - (7) mm/15hr 369,47 160,57 97,82 146,55 113,02 113,38 90,77 111,89 141,57 -4,26 -25,23 154,60 150,71 42,33 -24,39 -12,98 -39,09 -39,09 -41,94 -4,35 112,44 323,40 201,74 264,85
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -4,26 -25,23 0,00 0,00 0,00 -24,39 -12,98 -39,09 -39,09 -41,94 -4,35 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 195,74 170,52 200,00 200,00 200,00 175,61 162,63 123,53 84,44 42,50 38,16 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 369,47 160,57 97,82 146,55 113,02 113,38 90,77 111,89 141,57 0,00 0,00 154,60 150,71 42,33 0,00 0,00 0,00 0,00 0,00 0,00 112,44 323,40 201,74 264,85
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 295,58 128,45 78,26 117,24 90,42 90,70 72,62 89,51 113,26 0,00 0,00 123,68 120,57 33,86 0,00 0,00 0,00 0,00 0,00 0,00 89,95 258,72 161,39 211,88
13 0.5 (1 + k) In Hitungan - 266,02 115,61 70,43 105,51 81,38 81,63 65,36 80,56 101,93 0,00 0,00 111,31 108,51 30,48 0,00 0,00 0,00 0,00 0,00 0,00 80,96 232,85 145,25 190,69
14 k * V (n - 1) Hitungan - 311,22 461,79 461,92 425,88 425,11 405,19 389,46 363,85 355,53 365,97 292,78 234,22 276,43 307,95 270,74 216,59 173,27 138,62 110,90 88,72 70,97 121,54 283,52 343,01
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 577,24 577,40 532,35 531,39 506,49 486,83 454,82 444,41 457,46 365,97 292,78 345,54 384,94 338,43 270,74 216,59 173,27 138,62 110,90 88,72 151,93 354,39 428,77 533,70
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 188,21 0,16 -45,05 -0,96 -24,90 -19,66 -32,01 -10,41 13,05 -91,49 -73,19 52,76 39,40 -46,51 -67,69 -54,15 -43,32 -34,65 -27,72 -22,18 63,21 202,46 74,37 104,94
17 Aliran Dasar (BF) (12) - (16) mm/15hr 107,36 128,29 123,31 118,19 115,32 110,37 104,63 99,91 100,21 91,49 73,19 70,92 81,16 80,37 67,69 54,15 43,32 34,65 27,72 22,18 26,74 56,26 87,02 106,94
18 Aliran Langsung (DR) (11) - (12) mm/15hr 73,89 32,11 19,56 29,31 22,60 22,68 18,15 22,38 28,31 0,00 0,00 30,92 30,14 8,47 0,00 0,00 0,00 0,00 0,00 0,00 22,49 64,68 40,35 52,97
19 Aliran (R) (17) + (18) mm/15hr 181,26 160,41 142,87 147,50 137,92 133,04 122,78 122,29 128,52 91,49 73,19 101,84 111,31 88,84 67,69 54,15 43,32 34,65 27,72 22,18 49,23 120,94 127,37 159,91
21 Debit Aliran Sungai A * (19) m3/dtk 12,354 10,249 9,737 11,600 9,400 8,501 8,368 8,335 8,760 5,846 4,989 6,941 7,586 5,676 4,613 3,460 2,952 2,362 1,890 1,417 3,355 8,243 8,681 10,218
22 Debit Aliran Sungai lt/det ###### 10249,37 9737,40 11599,82 9400,38 8501,04 8368,28 8334,90 8759,61 5846,02 4988,61 6941,29 7586,09 5676,48 4613,14 3459,85 2952,41 2361,93 1889,54 1417,16 3355,10 8242,69 8680,72 10217,64
24 Debit Aliran (dibaca : 10E^6) m3/15hr 16,01 14,17 12,62 13,03 12,18 11,75 10,85 10,80 11,35 8,08 6,47 9,00 9,83 7,85 5,98 4,78 3,83 3,06 2,45 1,96 4,35 10,68 11,25 14,12
Sumber : Perhitungan
24
Tabel 3.16 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2015
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 66,75 354,83 332,04 54,18 237,18 248,87 101,47 323,93 146,42 63,98 26,21 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 160,22 264,12 413,53 59,25
2 Hari Hujan (h) Data hari 5,00 12,00 10,00 6,00 13,00 9,00 10,00 11,00 4,00 2,00 1,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 8,00 7,00 14,00 7,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,20 0,09 0,12 0,18 0,08 0,14 0,12 0,11 0,21 0,24 0,26 0,27 0,27 0,27 0,27 0,27 0,27 0,27 0,27 0,27 0,15 0,17 0,06 0,17
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 10,91 5,37 6,46 8,40 3,44 6,61 6,08 5,32 9,89 12,06 10,29 10,89 11,26 12,01 12,43 13,26 14,46 14,46 15,51 16,55 9,52 10,47 3,48 10,22
7 Et = (ETo) - (E) (3) - (6) mm/15hr 45,04 54,31 47,39 38,27 42,46 42,35 44,62 45,38 37,21 38,18 30,06 29,46 30,44 32,47 33,62 35,86 39,09 39,09 41,94 44,73 53,93 52,98 54,57 51,70
8 Ds = P - Et (1) - (7) mm/15hr 21,71 300,52 284,65 15,91 194,72 206,52 56,85 278,55 109,21 25,79 -3,85 -29,46 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -41,94 -44,73 106,29 211,14 358,97 7,54
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -3,85 -29,46 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -41,94 -44,73 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 196,15 166,70 136,26 103,79 70,17 34,31 -4,78 -43,87 -85,81 -130,54 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 21,71 300,52 284,65 15,91 194,72 206,52 56,85 278,55 109,21 25,79 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 106,29 211,14 358,97 7,54
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 17,36 240,42 227,72 12,73 155,78 165,21 45,48 222,84 87,36 20,64 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 85,03 168,91 287,17 6,04
13 0.5 (1 + k) In Hitungan - 15,63 216,37 204,95 11,45 140,20 148,69 40,93 200,56 78,63 18,57 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 76,53 152,02 258,46 5,43
14 k * V (n - 1) Hitungan - 426,96 354,07 456,36 529,04 432,40 458,08 485,42 421,08 497,31 460,75 383,46 306,77 245,41 196,33 157,06 125,65 100,52 80,42 64,33 51,47 41,17 94,16 196,94 364,32
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 442,59 570,45 661,31 540,50 572,60 606,77 526,35 621,64 575,94 479,32 383,46 306,77 245,41 196,33 157,06 125,65 100,52 80,42 64,33 51,47 117,70 246,18 455,40 369,75
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -91,11 127,86 90,86 -120,81 32,10 34,17 -80,42 95,29 -45,70 -96,62 -95,86 -76,69 -61,35 -49,08 -39,27 -31,41 -25,13 -20,10 -16,08 -12,87 66,23 128,48 209,22 -85,65
17 Aliran Dasar (BF) (12) - (16) mm/15hr 108,48 112,56 136,86 133,53 123,68 131,04 125,90 127,55 133,06 117,25 95,86 76,69 61,35 49,08 39,27 31,41 25,13 20,10 16,08 12,87 18,80 40,43 77,95 91,68
18 Aliran Langsung (DR) (11) - (12) mm/15hr 4,34 60,10 56,93 3,18 38,94 41,30 11,37 55,71 21,84 5,16 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 21,26 42,23 71,79 1,51
19 Aliran (R) (17) + (18) mm/15hr 112,82 172,66 193,79 136,72 162,62 172,34 137,27 183,26 154,91 122,41 95,86 76,69 61,35 49,08 39,27 31,41 25,13 20,10 16,08 12,87 40,05 82,66 149,75 93,19
21 Debit Aliran Sungai A * (19) m3/dtk 7,689 11,033 13,208 10,752 11,084 11,012 9,356 12,491 10,558 7,822 6,534 5,227 4,182 3,136 2,676 2,007 1,713 1,370 1,096 0,822 2,730 5,634 10,206 5,955
22 Debit Aliran Sungai lt/det 7689,21 11032,55 13208,02 10751,52 11083,66 11012,16 9355,98 12490,56 ##### 7821,54 6533,74 5226,99 4181,59 3136,19 2676,22 2007,16 1712,78 1370,22 1096,18 822,13 2729,94 5633,66 10206,08 5954,61
24 Debit Aliran (dibaca : 10E^6) m3/15hr 9,97 15,25 17,12 12,08 14,36 15,22 12,13 16,19 13,68 10,81 8,47 6,77 5,42 4,34 3,47 2,77 2,22 1,78 1,42 1,14 3,54 7,30 13,23 8,23
Sumber : Perhitungan
25
Tabel 3.17 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2016
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 214,40 170,92 326,35 136,15 104,01 226,97 268,72 153,86 295,92 99,25 194,96 122,76 189,55 114,26 27,41 127,72 51,95 393,53 466,26 235,63 216,12 333,29 266,69 155,31
2 Hari Hujan (h) Data hari 11,00 11,00 11,00 9,00 9,00 14,00 15,00 9,00 14,00 9,00 8,00 8,00 6,00 7,00 1,00 4,00 2,00 10,00 13,00 13,00 13,00 12,00 13,00 8,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,11 0,11 0,11 0,14 0,14 0,06 0,05 0,14 0,06 0,14 0,15 0,15 0,18 0,17 0,26 0,21 0,24 0,12 0,08 0,08 0,08 0,09 0,08 0,15
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,87 6,27 5,65 6,79 6,20 2,94 2,28 6,84 2,83 6,78 6,05 6,05 7,51 7,34 11,74 10,32 12,85 6,43 4,31 4,60 4,76 5,71 4,35 9,29
7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,08 53,41 48,20 43,47 39,70 46,02 48,42 43,86 44,27 43,46 34,30 34,30 34,19 37,14 34,31 38,80 40,70 47,12 53,14 56,68 58,69 57,74 53,70 52,63
8 Ds = P - Et (1) - (7) mm/15hr 164,33 117,51 278,15 92,68 64,30 180,95 220,30 110,00 251,64 55,79 160,66 88,47 155,36 77,12 -6,90 88,91 11,25 346,41 413,12 178,95 157,43 275,55 212,99 102,68
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -6,90 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 193,10 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 164,33 117,51 278,15 92,68 64,30 180,95 220,30 110,00 251,64 55,79 160,66 88,47 155,36 77,12 0,00 88,91 11,25 346,41 413,12 178,95 157,43 275,55 212,99 102,68
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 131,46 94,01 222,52 74,14 51,44 144,76 176,24 88,00 201,31 44,63 128,53 70,77 124,29 61,70 0,00 71,13 9,00 277,13 330,49 143,16 125,95 220,44 170,39 82,14
13 0.5 (1 + k) In Hitungan - 118,32 84,61 200,27 66,73 46,30 130,28 158,62 79,20 181,18 40,17 115,68 63,69 111,86 55,53 0,00 64,02 8,10 249,41 297,44 128,84 113,35 198,40 153,35 73,93
14 k * V (n - 1) Hitungan - 295,80 331,29 332,72 426,39 394,50 352,63 386,33 435,96 412,13 474,65 411,86 422,03 388,58 400,35 364,70 291,76 284,62 234,18 386,88 547,46 541,04 523,51 577,53 584,70
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 414,12 415,90 532,99 493,12 440,79 482,92 544,95 515,16 593,31 514,82 527,53 485,72 500,44 455,88 364,70 355,78 292,73 483,59 684,32 676,30 654,39 721,91 730,88 658,63
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 44,37 1,78 117,09 -39,87 -52,33 42,12 62,03 -29,79 78,15 -78,49 12,71 -41,81 14,71 -44,56 -91,18 -8,92 -63,05 190,87 200,73 -8,02 -21,91 67,52 8,97 -72,25
17 Aliran Dasar (BF) (12) - (16) mm/15hr 87,10 92,22 105,43 114,01 103,77 102,63 114,21 117,79 123,16 123,13 115,82 112,58 109,57 106,26 91,18 80,05 72,06 86,26 129,77 151,18 147,85 152,92 161,42 154,39
18 Aliran Langsung (DR) (11) - (12) mm/15hr 32,87 23,50 55,63 18,54 12,86 36,19 44,06 22,00 50,33 11,16 32,13 17,69 31,07 15,42 0,00 17,78 2,25 69,28 82,62 35,79 31,49 55,11 42,60 20,54
19 Aliran (R) (17) + (18) mm/15hr 119,96 115,73 161,06 132,55 116,63 138,82 158,27 139,79 173,49 134,28 147,95 130,28 140,64 121,68 91,18 97,84 74,31 155,54 212,39 186,97 179,34 208,03 204,02 174,93
21 Debit Aliran Sungai A * (19) m3/dtk 8,176 7,394 10,977 9,679 7,949 8,870 10,787 9,528 11,825 8,580 10,084 8,879 9,586 7,775 6,214 6,251 5,064 10,601 14,476 11,947 12,223 14,179 13,905 11,177
22 Debit Aliran Sungai lt/det 8176,10 7394,46 10977,41 9679,17 7948,93 8870,29 10786,89 9527,61 ##### 8580,22 10083,67 8879,15 9585,78 7774,96 6214,13 6251,33 5064,45 10600,93 14475,73 11946,67 12223,17 14178,63 13905,09 11177,12
24 Debit Aliran (dibaca : 10E^6) m3/15hr 10,60 10,22 14,23 11,71 10,30 12,26 13,98 12,35 15,32 11,86 13,07 11,51 12,42 10,75 8,05 8,64 6,56 13,74 18,76 16,52 15,84 18,38 18,02 15,45
Sumber : Perhitungan
26
Tabel 3.18 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2017
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 260,05 236,89 168,86 297,19 94,12 250,58 155,52 233,36 38,50 115,67 72,14 39,19 5,13 4,32 0,00 0,00 0,00 137,60 86,55 439,12 101,05 266,61 76,09 283,66
2 Hari Hujan (h) Data hari 12,00 11,00 10,00 10,00 8,00 9,00 7,00 13,00 5,00 4,00 5,00 6,00 1,00 1,00 0,00 0,00 0,00 6,00 5,00 6,00 9,00 14,00 9,00 10,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,09 0,11 0,12 0,12 0,15 0,14 0,17 0,08 0,20 0,21 0,20 0,18 0,26 0,26 0,27 0,27 0,27 0,18 0,20 0,18 0,14 0,06 0,14 0,12
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,04 6,27 6,46 5,60 6,89 6,61 8,37 3,80 9,18 10,55 7,87 7,26 10,63 11,34 12,43 13,26 14,46 9,64 11,20 11,03 8,57 3,81 7,84 7,43
7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,91 53,41 47,39 41,07 39,02 42,35 42,33 46,90 37,92 39,69 32,48 33,09 31,07 33,14 33,62 35,86 39,09 43,91 46,25 50,25 54,88 59,64 50,21 54,49
8 Ds = P - Et (1) - (7) mm/15hr 209,13 183,48 121,48 256,12 55,10 208,23 113,18 186,46 0,58 75,98 39,66 6,10 -25,94 -28,82 -33,62 -35,86 -39,09 93,69 40,30 388,87 46,17 206,97 25,88 229,17
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -25,94 -28,82 -33,62 -35,86 -39,09 0,00 0,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 174,06 145,25 111,63 75,77 36,68 200,00 200,00 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 209,13 183,48 121,48 256,12 55,10 208,23 113,18 186,46 0,58 75,98 39,66 6,10 0,00 0,00 0,00 0,00 0,00 93,69 40,30 388,87 46,17 206,97 25,88 229,17
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 167,31 146,78 97,18 204,90 44,08 166,58 90,55 149,17 0,47 60,79 31,73 4,88 0,00 0,00 0,00 0,00 0,00 74,95 32,24 311,10 36,93 165,57 20,70 183,34
13 0.5 (1 + k) In Hitungan - 150,58 132,10 87,46 184,41 39,67 149,92 81,49 134,25 0,42 54,71 28,55 4,39 0,00 0,00 0,00 0,00 0,00 67,46 29,02 279,99 33,24 149,01 18,63 165,00
14 k * V (n - 1) Hitungan - 526,91 541,99 539,27 501,39 548,64 470,65 496,46 462,36 477,29 382,17 349,50 302,44 245,47 196,38 157,10 125,68 100,54 80,44 118,31 117,87 318,28 281,22 344,19 290,26
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 677,48 674,09 626,74 685,80 588,31 620,57 577,95 596,61 477,71 436,88 378,06 306,84 245,47 196,38 157,10 125,68 100,54 147,89 147,33 397,85 351,52 430,23 362,82 455,26
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 18,85 -3,39 -47,36 59,06 -97,49 32,26 -42,62 18,66 -118,90 -40,83 -58,82 -71,22 -61,37 -49,09 -39,28 -31,42 -25,14 47,35 -0,56 250,52 -46,33 78,71 -67,41 92,44
17 Aliran Dasar (BF) (12) - (16) mm/15hr 148,46 150,18 144,54 145,84 141,57 134,32 133,17 130,51 119,37 101,62 90,55 76,10 61,37 49,09 39,28 31,42 25,14 27,60 32,80 60,58 83,26 86,86 88,12 90,90
18 Aliran Langsung (DR) (11) - (12) mm/15hr 41,83 36,70 24,30 51,22 11,02 41,65 22,64 37,29 0,12 15,20 7,93 1,22 0,00 0,00 0,00 0,00 0,00 18,74 8,06 77,77 9,23 41,39 5,18 45,83
19 Aliran (R) (17) + (18) mm/15hr 190,28 186,87 168,83 197,06 152,59 175,97 155,81 167,80 119,49 116,82 98,48 77,32 61,37 49,09 39,28 31,42 25,14 46,34 40,86 138,35 92,50 128,25 93,29 136,73
21 Debit Aliran Sungai A * (19) m3/dtk 12,969 11,940 11,507 15,497 10,400 11,244 10,619 11,436 8,144 7,464 6,712 5,270 4,183 3,137 2,677 2,008 1,713 3,158 2,785 8,840 6,304 8,741 6,358 8,737
22 Debit Aliran Sungai lt/det ###### 11940,31 11506,85 15497,16 10399,71 11243,50 10619,08 11436,46 ##### 7464,18 6711,97 5269,79 4182,56 3136,92 2676,84 2007,63 1713,18 3158,50 2785,06 8840,07 6304,23 8741,31 6358,44 8736,61
24 Debit Aliran (dibaca : 10E^6) m3/15hr 16,81 16,51 14,91 17,41 13,48 15,54 13,76 14,82 10,55 10,32 8,70 6,83 5,42 4,34 3,47 2,78 2,22 4,09 3,61 12,22 8,17 11,33 8,24 12,08
Sumber : Perhitungan
27
Tabel 3.19 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2018
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 243,93 147,88 170,41 327,35 304,01 78,86 158,29 165,01 0,91 75,21 0,00 13,30 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4,97 436,92 93,19 473,79 37,61
2 Hari Hujan (h) Data hari 12,00 12,00 10,00 11,00 9,00 4,00 8,00 6,00 1,00 5,00 0,00 3,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 2,00 11,00 4,00 10,00 4,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,09 0,09 0,12 0,11 0,14 0,21 0,15 0,18 0,26 0,20 0,27 0,23 0,27 0,27 0,27 0,27 0,27 0,27 0,27 0,24 0,11 0,21 0,12 0,21
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,04 5,37 6,46 4,90 6,20 10,28 7,61 9,13 12,01 9,80 10,89 9,08 11,26 12,01 12,43 13,26 14,46 14,46 15,51 14,71 6,66 13,32 6,97 13,00
7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,91 54,31 47,39 41,77 39,70 38,68 43,10 41,57 35,09 40,44 29,46 31,27 30,44 32,47 33,62 35,86 39,09 39,09 41,94 46,57 56,79 50,13 51,08 48,92
8 Ds = P - Et (1) - (7) mm/15hr 193,02 93,57 123,02 285,58 264,31 40,18 115,20 123,43 -34,18 34,77 -29,46 -17,97 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -41,94 -41,60 380,13 43,06 422,71 -11,31
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -34,18 0,00 -29,46 -17,97 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -41,94 -41,60 0,00 0,00 0,00 -11,31
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 165,82 200,00 170,54 152,57 122,13 89,66 56,04 20,19 -18,91 -58,00 -99,94 -141,54 200,00 200,00 200,00 188,69
11 Kelebihan Air (WS) (8)- (9) mm/15hr 193,02 93,57 123,02 285,58 264,31 40,18 115,20 123,43 0,00 34,77 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 380,13 43,06 422,71 0,00
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 154,41 74,85 98,42 228,46 211,44 32,14 92,16 98,75 0,00 27,81 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 304,11 34,45 338,17 0,00
13 0.5 (1 + k) In Hitungan - 138,97 67,37 88,58 205,62 190,30 28,93 82,94 88,87 0,00 25,03 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 273,70 31,00 304,35 0,00
14 k * V (n - 1) Hitungan - 364,21 402,54 375,93 371,60 461,78 521,66 440,47 418,73 406,08 324,87 279,92 223,94 179,15 143,32 114,66 91,72 73,38 58,70 46,96 37,57 30,06 243,00 219,20 418,84
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 503,18 469,91 464,51 577,22 652,08 550,59 523,42 507,61 406,08 349,90 279,92 223,94 179,15 143,32 114,66 91,72 73,38 58,70 46,96 37,57 303,75 274,00 523,56 418,84
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 47,92 -33,27 -5,41 112,72 74,86 -101,49 -27,17 -15,81 -101,52 -56,19 -69,98 -55,98 -44,79 -35,83 -28,66 -22,93 -18,34 -14,68 -11,74 -9,39 266,18 -29,75 249,55 -104,71
17 Aliran Dasar (BF) (12) - (16) mm/15hr 106,49 108,12 103,82 115,75 136,59 133,63 119,33 114,56 101,52 84,00 69,98 55,98 44,79 35,83 28,66 22,93 18,34 14,68 11,74 9,39 37,92 64,20 88,62 104,71
18 Aliran Langsung (DR) (11) - (12) mm/15hr 38,60 18,71 24,60 57,12 52,86 8,04 23,04 24,69 0,00 6,95 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 76,03 8,61 84,54 0,00
19 Aliran (R) (17) + (18) mm/15hr 145,10 126,83 128,43 172,86 189,45 141,67 142,37 139,24 101,52 90,95 69,98 55,98 44,79 35,83 28,66 22,93 18,34 14,68 11,74 9,39 113,95 72,81 173,16 104,71
21 Debit Aliran Sungai A * (19) m3/dtk 9,889 8,104 8,753 13,594 12,912 9,052 9,704 9,490 6,919 5,811 4,770 3,816 3,053 2,289 1,954 1,465 1,250 1,000 0,800 0,600 7,766 4,962 11,802 6,691
22 Debit Aliran Sungai lt/det 9889,15 8104,23 8753,17 13594,21 12912,12 9051,90 9703,64 9490,35 ##### 5811,45 4769,54 3815,63 3052,51 2289,38 1953,60 1465,20 1250,31 1000,25 800,20 600,15 7766,44 4962,23 11801,86 6690,63
24 Debit Aliran (dibaca : 10E^6) m3/15hr 12,82 11,20 11,34 15,27 16,73 12,51 12,58 12,30 8,97 8,03 6,18 4,95 3,96 3,16 2,53 2,03 1,62 1,30 1,04 0,83 10,07 6,43 15,30 9,25
Sumber : Perhitungan
28
Tabel 3.20 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2019
DAS : Gintung
2
Luas DAS : 88,33 km
Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II
I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 274,16 227,81 169,99 221,55 188,21 282,07 110,41 157,77 121,17 0,00 0,00 0,00 3,19 0,97 0,00 0,00 0,00 0,00 1,24 0,00 59,20 8,05 103,12 189,42
2 Hari Hujan (h) Data hari 7,00 14,00 11,00 11,00 11,00 10,00 10,00 8,00 4,00 0,00 0,00 0,00 1,00 1,00 0,00 0,00 0,00 0,00 1,00 0,00 4,00 2,00 11,00 12,00
3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,17 0,06 0,11 0,11 0,11 0,12 0,12 0,15 0,21 0,27 0,27 0,27 0,26 0,26 0,27 0,27 0,27 0,27 0,26 0,27 0,21 0,24 0,11 0,09
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 9,23 3,58 5,65 4,90 4,82 5,88 6,08 7,61 9,89 13,56 10,89 10,89 10,63 11,34 12,43 13,26 14,46 14,46 14,65 16,55 13,32 15,23 6,10 5,57
7 Et = (ETo) - (E) (3) - (6) mm/15hr 46,72 56,10 48,20 41,77 41,08 43,08 44,62 43,10 37,21 36,68 29,46 29,46 31,07 33,14 33,62 35,86 39,09 39,09 42,80 44,73 50,13 48,22 51,95 56,35
8 Ds = P - Et (1) - (7) mm/15hr 227,45 171,71 121,79 179,78 147,13 238,98 65,80 114,67 83,96 -36,68 -29,46 -29,46 -27,87 -32,17 -33,62 -35,86 -39,09 -39,09 -41,56 -44,73 9,08 -40,18 51,16 133,07
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -36,68 -29,46 -29,46 -27,87 -32,17 -33,62 -35,86 -39,09 -39,09 -41,56 -44,73 0,00 -40,18 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 163,32 133,87 104,41 76,54 44,37 10,75 -25,11 -64,20 -103,29 -144,85 -189,58 200,00 159,82 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 227,45 171,71 121,79 179,78 147,13 238,98 65,80 114,67 83,96 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 9,08 0,00 51,16 133,07
AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 181,96 137,37 97,43 143,83 117,70 191,19 52,64 91,74 67,17 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 7,26 0,00 40,93 106,46
13 0.5 (1 + k) In Hitungan - 163,76 123,63 87,69 129,44 105,93 172,07 47,37 82,57 60,45 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 6,54 0,00 36,84 95,81
14 k * V (n - 1) Hitungan - 335,08 399,07 418,16 404,68 427,30 426,58 478,92 421,04 402,88 370,66 296,53 237,22 189,78 151,82 121,46 97,17 77,73 62,19 49,75 39,80 31,84 30,70 24,56 49,12
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 498,84 522,70 505,85 534,12 533,23 598,65 526,29 503,60 463,33 370,66 296,53 237,22 189,78 151,82 121,46 97,17 77,73 62,19 49,75 39,80 38,37 30,70 61,40 144,93
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 79,99 23,87 -16,85 28,27 -0,89 65,42 -72,36 -22,69 -40,27 -92,67 -74,13 -59,31 -47,44 -37,96 -30,36 -24,29 -19,43 -15,55 -12,44 -9,95 -1,42 -7,67 30,70 83,53
17 Aliran Dasar (BF) (12) - (16) mm/15hr 101,96 113,50 114,28 115,55 118,59 125,76 124,99 114,43 107,44 92,67 74,13 59,31 47,44 37,96 30,36 24,29 19,43 15,55 12,44 9,95 8,69 7,67 10,23 22,93
18 Aliran Langsung (DR) (11) - (12) mm/15hr 45,49 34,34 24,36 35,96 29,43 47,80 13,16 22,93 16,79 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 1,82 0,00 10,23 26,61
19 Aliran (R) (17) + (18) mm/15hr 147,45 147,85 138,64 151,51 148,02 173,56 138,15 137,37 124,23 92,67 74,13 59,31 47,44 37,96 30,36 24,29 19,43 15,55 12,44 9,95 10,50 7,67 20,47 49,54
21 Debit Aliran Sungai A * (19) m3/dtk 10,050 9,447 9,449 11,915 10,088 11,090 9,416 9,362 8,467 5,921 5,053 4,042 3,234 2,425 2,070 1,552 1,325 1,060 0,848 0,636 0,716 0,523 1,395 3,165
22 Debit Aliran Sungai lt/det ###### 9446,84 9449,27 11914,90 10088,42 11089,86 9415,96 9362,41 ##### 5921,00 5052,58 4042,07 3233,65 2425,24 2069,54 1552,15 1324,50 1059,60 847,68 635,76 715,73 523,09 1394,83 3165,37
24 Debit Aliran (dibaca : 10E^6) m3/15hr 13,02 13,06 12,25 13,38 13,07 15,33 12,20 12,13 10,97 8,19 6,55 5,24 4,19 3,35 2,68 2,15 1,72 1,37 1,10 0,88 0,93 0,68 1,81 4,38
Sumber : Perhitungan
29
Tabel 3.21 Rekapitulasi Perhitungan Debit Andalan dengan FJ. Mock Bendungan Gintung (Periode 2000 – 2019)
Debit (m3/dt) Rerata
Bulan Periode
Bulanan
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Jan I 17.63 7.75 7.13 5.94 8.06 12.82 10.74 3.84 8.18 4.78 7.30 11.67 12.30 10.41 12.35 7.69 8.18 12.97 9.89 10.05 9.48
II 13.84 10.06 11.02 9.70 11.11 12.17 10.74 5.78 9.75 8.23 9.25 10.55 8.77 11.28 10.25 11.03 7.39 11.94 8.10 9.45 10.02
Feb I 12.32 11.54 11.38 11.09 9.39 13.09 10.19 6.22 12.49 5.70 9.14 10.07 8.48 11.54 9.74 13.21 10.98 11.51 8.75 9.45 10.31
II 17.43 9.31 11.29 14.59 12.31 16.02 12.82 10.67 12.96 10.86 11.07 13.12 11.80 12.60 11.60 10.75 9.68 15.50 13.59 11.91 12.50
Maret I 14.53 10.39 7.71 13.37 12.73 12.19 12.88 6.31 11.16 6.13 12.57 9.27 12.67 8.69 9.40 11.08 7.95 10.40 12.91 10.09 10.62
II 12.50 12.22 9.28 12.55 9.65 14.93 10.07 10.27 10.92 8.76 11.34 9.62 8.83 10.11 8.50 11.01 8.87 11.24 9.05 11.09 10.54
April I 12.06 14.28 7.89 10.84 11.58 12.32 10.44 11.08 10.49 8.81 10.80 10.19 9.15 9.12 8.37 9.36 10.79 10.62 9.70 9.42 10.37
II 11.33 12.62 9.47 8.42 8.48 11.21 11.24 11.82 8.01 7.61 9.15 10.90 10.16 10.10 8.33 12.49 9.53 11.44 9.49 9.36 10.06
Mei I 11.17 9.76 9.89 11.09 6.70 9.14 8.14 9.64 7.47 6.70 9.32 12.05 10.77 7.77 8.76 10.56 11.82 8.14 6.92 8.47 9.21
II 8.88 8.18 6.53 7.14 10.93 8.05 8.31 8.18 5.30 7.33 9.11 7.87 7.12 8.54 5.85 7.82 8.58 7.46 5.81 5.92 7.65
Juni I 8.74 8.76 5.76 6.10 7.73 6.45 6.41 6.58 4.52 7.45 10.04 6.72 6.07 11.08 4.99 6.53 10.08 6.71 4.77 5.05 7.03
II 6.55 6.41 4.56 4.88 6.13 9.32 5.13 5.26 3.62 5.40 7.97 5.37 4.86 7.76 6.94 5.23 8.88 5.27 3.82 4.04 5.87
Juli I 5.24 5.13 3.65 3.90 5.67 7.62 4.10 4.21 2.89 4.32 8.32 4.30 3.89 9.46 7.59 4.18 9.59 4.18 3.05 3.23 5.23
II 3.93 3.85 2.73 2.93 4.05 5.35 3.08 3.16 2.17 3.24 5.66 3.22 2.91 6.21 5.68 3.14 7.77 3.14 2.29 2.43 3.85
Agust I 3.36 3.28 2.33 2.50 3.45 4.57 2.62 2.69 1.85 2.76 4.95 2.75 2.49 5.30 4.61 2.68 6.21 2.68 1.95 2.07 3.26
II 2.52 2.46 1.75 1.87 2.59 3.49 1.97 2.02 1.39 2.07 5.89 2.06 1.87 3.97 3.46 2.01 6.25 2.01 1.47 1.55 2.63
Sept I 2.15 2.47 1.49 1.60 2.21 2.96 1.68 1.72 1.19 1.77 8.60 1.76 1.59 3.39 2.95 1.71 5.06 1.71 1.25 1.32 2.43
II 2.10 1.87 1.19 1.28 1.77 2.59 1.34 1.38 0.95 1.41 7.47 1.41 1.27 2.71 2.36 1.37 10.60 3.16 1.00 1.06 2.42
Okt I 3.63 2.66 0.96 1.02 1.41 2.65 1.07 1.10 2.06 1.13 5.86 1.13 1.10 2.17 1.89 1.10 14.48 2.79 0.80 0.85 2.49
II 4.44 16.14 2.43 5.23 2.64 5.86 0.81 4.95 4.21 6.68 9.18 2.08 2.02 2.81 1.42 0.82 11.95 8.84 0.60 0.64 4.69
Nop I 11.40 12.59 4.66 3.10 3.29 5.13 1.55 10.69 9.06 4.78 8.88 5.37 1.35 5.04 3.36 2.73 12.22 6.30 7.77 0.72 6.00
II 9.46 13.66 5.98 7.76 12.45 9.28 2.15 6.35 8.13 7.02 9.10 6.93 8.68 3.81 8.24 5.63 14.18 8.74 4.96 0.52 7.65
Des I 11.76 10.41 5.30 14.42 8.35 7.98 2.21 10.54 5.76 5.73 12.86 4.99 8.07 7.00 8.68 10.21 13.91 6.36 11.80 1.39 8.39
II 8.41 8.78 6.85 9.44 13.32 10.06 6.20 10.52 4.81 8.59 10.62 8.37 9.13 7.36 10.22 5.95 11.18 8.74 6.69 3.17 8.42
Rerata 8.97 8.53 5.89 7.11 7.33 8.55 6.08 6.46 6.22 5.72 8.94 6.74 6.47 7.43 6.90 6.60 9.84 7.58 6.10 5.14 7.13
Sumber : Perhitungan
Gambar 3.22 Grafik Debit Bulanan Metode FJ. Mock Bendungan Gintung
30
3.2 Reablitas yang Dipakai di Bendungan Gintung
Dari hasil perhitungan debit andalan dengan metode FJ. Mock diperoleh debit bulanan
rerata sebesar 7,13 m3 /dt untuk DAS Sungai Gintung. Dalam analisis ini tampungan air akan
dimanfaatkan untuk pemenuhan kebutuhan air baku, air irigasi dan PLTMH. Maka keandalan
debit yang digunakan adalah keandalan 90%.
Probabilitas tersebut dihitung dengan persamaan sebagai berikut :
Pr = m / (n+1) * 100 %
Dimana :
Pr = probabilitas (%)
m = nomer data
n = jumlah data
Penentuan Debit Andalan 90% berdasarkan FJ. Mock Basic Year dapat dilihat pada
Tabel 3.22 sebagai berikut:
Tabel 3.23 Penentuan Debit Andalan 90% Berdasarkan Berdasarkan FJ. Mock Basic
Year
Debit (m3/dt)
No. Tahun P (%) Tahun
asli urut
1 2000 8.9744 9.8386 4.76 2016
2 2001 8.5250 8.9744 9.52 2000
3 2002 5.8853 8.9359 14.29 2010
4 2003 7.1142 8.5520 19.05 2005
5 2004 7.3340 8.5250 23.81 2001
6 2005 8.5520 7.5768 28.57 2017
7 2006 6.0789 7.4262 33.33 2013
8 2007 6.4574 7.3340 38.10 2004
9 2008 6.2223 7.1142 42.86 2003
10 2009 5.7192 6.8972 47.62 2014
11 2010 8.9359 6.7404 52.38 2011
12 2011 6.7404 6.5954 57.14 2015
13 2012 6.4725 6.4725 61.90 2012
14 2013 7.4262 6.4574 66.67 2007
15 2014 6.8972 6.2223 71.43 2008
16 2015 6.5954 6.1020 76.19 2018
17 2016 9.8386 6.0789 80.95 2006
18 2017 7.5768 5.8853 85.71 2002
19 2018 6.1020 5.7192 90.48 2009
20 2019 5.1353 5.1353 95.24 2019
4.1 Kesimpulan
Dari hasil analisis perhitungan debit andalan DAS Gintung yang telah dilakukan, ada
beberapa kesimpulan yang dapat diambil sebagai berikut :
1. Dari hasil analisis perhitungan debit andalan DAS Gintung menggunakan metode F.J.
Mock periode Tahun 2000-2019 didapatkan debit rerata bulanan sebesar 7,13 m3/dt.
2. Analisis ini tampungan air akan dimanfaatkan untuk pemenuhan kebutuhan air baku, air
irigasi dan PLTMH. Maka keandalan debit yang digunakan adalah keandalan 90%. Debit
Andalan 90% berdasarkan perhitungan FJ. Mock Basic Year didapatkan pada Tahun
2009.
4.2 Saran
` Untuk menunjang perhitungan pada DAS Gintung, maka perlu dilakukan updating data
yaitu data hujan, data klimatologi, dan data DAS untuk memperoleh hasil analisis yang sesuai
dengan kondisi saat.
DAFTAR PUSTAKA