Anda di halaman 1dari 38

UNIVERSITAS DIPONEGORO

ANALISIS DEBIT ANDALAN METODE FJ MOCK DAS GINTUNG

TUGAS MATA KULIAH

ANALISA DAN PEMODELAN HIDRO-METEOROLOGI

Hendri Wijaya

NIM 21010123413030

FAKULTAS TEKNIK

PROGRAM STUDI MAGISTER TEKNIK SIPIL

SEMARANG
FEBRUARI 2024

i
DAFTAR ISI

DAFTAR GAMBAR.....................................................................................................................iii
DAFTAR TABEL ......................................................................................................................... iv
BAB I............................................................................................................................................... 1
1.1 Latar Belakang ................................................................................................................. 1
1.2 Perumusan Masalah ......................................................................................................... 1
1.3 Maksud dan tujuan laporan ............................................................................................. 1
1.4 Pembatasan Masalah ....................................................................................................... 2
BAB II ............................................................................................................................................. 3
2.1 Debit Andalan .................................................................................................................. 3
2.2 Evapotranspirasi Terbatas (Et) ....................................................................................... 3
2.3 Keseimbangan Air di Permukaan Tanah ....................................................................... 4
2.4 Aliran dan Penyimpangan Air Tanah (Run Off And Groundwater Storage)............... 5
2.5 Aliran Hujan Lebat (Storm Run Off) .............................................................................. 6
BAB III ............................................................................................................................................ 9
3.1 Hasil Perhitungan Debit Andalan Metode Fj. Mock Tiap Tahun ................................ 9
3.2 Reablitas yang Dipakai di Bendungan Gintung .......................................................... 31
BAB IV.......................................................................................................................................... 33
4.1 Kesimpulan .................................................................................................................... 33
4.2 Saran ............................................................................................................................... 33
DAFTAR PUSTAKA ................................................................................................................... 34

ii
DAFTAR GAMBAR

Gambar 2.1 Diagram Alir Analisis Metode Mock ....................................................................... 7


Gambar 3.1 Grafik Debit Bulanan Metode FJ. Mock Bendungan Gintung ............................. 30

iii
DAFTAR TABEL

Tabel 2.1 Nilai Evapotraspirasi Potensial (ET 0) ........................................................................... 4


Tabel 3.2 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2001 ............. 11
Tabel 3.3 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2002 ............. 12
Tabel 3.4 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2003 ............. 13
Tabel 3.5 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2004 ............. 14
Tabel 3.6 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2005 ............. 15
Tabel 3.7 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2006 ............. 16
Tabel 3.8 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2007 ............. 17
Tabel 3.9 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2008 ....................... 18
Tabel 3.10 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2009 ..................... 19
Tabel 3.11 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2010 ..................... 20
Tabel 3.12 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2011 ..................... 21
Tabel 3.13 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2012 ..................... 22
Tabel 3.14 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2013 ..................... 23
Tabel 3.15 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2014 ..................... 24
Tabel 3.16 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2015 ..................... 25
Tabel 3.17 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2016 ..................... 26
Tabel 3.18 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2017 ..................... 27
Tabel 3.19 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2018 ..................... 28
Tabel 3.20 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2019 ..................... 29
Tabel 3.21 Rekapitulasi Perhitungan Debit Andalan dengan FJ. Mock Bendungan Gintung
(Periode 2000 – 2019) .................................................................................................................. 30
Gambar 3.1 Grafik Debit Bulanan Metode FJ. Mock Bendungan Gintung ............................. 30
Tabel 3.22 Penentuan Debit Andalan 90% Berdasarkan Berdasarkan FJ. Mock Basic Year 31
Tabel 3.23 Debit Keandalan 90% (Tahun Keandalan 2009) .................................................... 32

iv
BAB I
PENDAHULUAN

1.1 Latar Belakang


Bendungan merupakan salah satu bangunan penangkap air yang menyimpan air pada saat
musim hujan, saat debit sungai mengalir pada jumlah yang besar. Pembangunan bendungan
baru masih menjadi prioritas sebagai salah satu upaya penyedian air baku, irigasi, Pembangkit
Listrik Tenaga Air (PLTA), dan pengendalian banjir pada saat musim penghujan. Rencana
pembangunan Bendungan Gintung masih dalam tahap Detail Engineering Design (DED),
sebelum pelaksanaan konstruksi perlu adanya kajian terkait perencanaan Bendungan Gintung
sehingga dapat dijadikan sebagai referensi terhadap pelaksanaan konstruksi. Rencana
Bendungan Gintung mempunyai fungsi untuk air baku dan irigasi. Salah satu yang dianalisis
dalam perencanaan bendungan adalah rencana menghitung debit andalan, debit andalan
digunakan dalam penyediaan air dengan risiko kegagalan yang diperhitungkan. Selain sebagai
referensi perhitungan yang nantinya digunakan untuk perencanaan pembangunan Bendungan
Gintung, analisis debit andalan menggunakan metode F.J. Mock ini juga sebagai tugas mata
kuliah Analisa Dan Pemodelan Hidro-Meteorologi. Diharapkan dengan tugas ini mampu
memahami tata cara perhitungan debit andalan dengan menggunakan metode F.J. Mock.

1.2 Perumusan Masalah


Bedasarkan latar belakang di atas, maka permasalahan yang dapat dirumuskan adalah
sebagai berikut:
1. Bagaimana hasil perhitungan debit andalan pada Daerah Aliran Sungai (DAS) Gintung
menggunakan metode F.J. Mock?
2. Berapa reablitas yang dipakai di Bendungan Gintung yang mempunyai fungsi untuk air
baku dan irigasi?

1.3 Maksud dan Tujuan Laporan


Maksud kegiatan laporan ini adalah untuk memahami tata cara perhitungan debit andalan
dengan menggunakan metode F.J. Mock, rekomendasi perhitungan debit andalan, dan sebagai
salah satu tugas mata kuliah “Analisa Dan Pemodelan Hidro-Meteorologi”.
Tujuan laporan ini adalah:
1. Menganalisis debit andalah tiap tahunnya periode Tahun 2000-2019.
2. Menganalisis reabilitas yang cocok untuk perhitungan debit andalah DAS Gintung.

1
1.4 Pembatasan Masalah
Adapun batasan dalam laporan ini adalah sebagai berikut:
1. Lokasi yang dibuat sebagai bahan laporan adalah DAS Gintung.
2. Perhitungan debit andalan hanya menggunakan metode F.J. Mock.
3. Data curah hujan yang digunakan pada Tahun 2000-2019.
4. Kajian pustaka berupa pengumpulan data dan informasi yang bersumber dari buku,
laporan penelitian, studi terdahulu dan dokumen lainnya.
5. Data yang digunakan adalah data yang diberikan atas seijin BBWS Serayu Opak.
6. Perhitungan dilakukan sampai dengan debit andalan.

2
BAB II
KAJIAN PUSTAKA

2.1 Debit Andalan


Debit andalan adalah debit yang diperhitungkan untuk keperluan tertentu (irigasi, air
minum, PLTA) sepanjang tahun dengan resiko yang telah diperhitungkan. Karena perubahan
nilai debit tidaklah besar, sehingga dapat dengan mudah diambil nilai debit andalan yang akan
digunakan untuk pembangkit listrik tenaga mikrohidro. Pada PLTMH ini digunakan cara coba-
coba/trial dan error sampai ditemukan pada debit andalan berapa persen agar tingkat kegagalan
dapat ditekan seminimal mungkin.
Pada perhitungan metode Mock ini, untuk setiap bulannya pertama-tama dihitung
penyimpangan kelembaban tanah (soil moisture storage = SMS) pada akhir bulan. Jika SMS
akhir lebih besar dari kelembaban tanah (soil moisture capacity = SMC), maka akan ada
kelebihan air (Water Surplus = WS). Dan jika SMS akhir lebih kecil dari SMC, maka WS = 0.
Walaupun tidak terjadi kelebihan air (WS = 0), aliran langsung tetap dapat terjadi akibat
limpasan hujan lebat (storm run off). Besarnya aliran dan penyimpanan air tanah (ground water
storage) diperoleh dengan menghitung infiltrasi dari volume penyimpanan, dimana faktor
infiltrasi (I), resesi aliran tanah (k) dan aliran hujan lebat (PF) ditentukan.
Dasar pendekatan yang dipakai pada metode ini antara lain :
- Curah Hujan
- Evapotranspirasi Terbatas
- Keseimbangan Air Di Permukaan Tanah
- Kandungan Air Tanah

2.2 Evapotranspirasi Terbatas (Et)


Evapotranspirasi potensial (ET 0) dihitung dengan menggunakan aplikasi Cropwatt. Nilai
ET0 tersebut nantinya akan digunakan dalam perhitungan ketersediaan debit atau debit andalan.
Hasil analisa ET 0 Stasiun Geofisika Banjarnegara selengkapnya dapat dilihat pada Tabel 2.1 di
bawah ini.

3
Tabel 2.1 Nilai Evapotraspirasi Potensial (ET0)
dari Data Klimatologi Stasiun Geofisika Banjarnegara

Sumber: Hasil Perhitungan

2.3 Keseimbangan Air di Permukaan Tanah


Keseimbangan air adalah siklus air yang berhubungan dengan kuantitas badan air pada
suatu daerah, dimana besarnya jumlah air tersedia dan jumlah kebutuhan air adalah seimbang.
Suatd u aerah dikatakan seimbang ketika jumlah ketersediaan air dan jumlah kebutuhan air
adalah sama besarnya. Komponen dari ketersediaan air berasal dari air sungai, air hujan, mata
air dan air tanah. Sedangkan komponen dari kebutuhan air adalah air baku, evaporasi,
evapotranspirasi, air untuk irigasi dan air konsumtif. Faktor-faktor yang mempengaruhi
keseimbangan air permukaan adalah sebagai berikut:
a. Air hujan yang mencapai permukaan tanah dapat dirumuskan sebagai berikut :
s = P – Et
Bila harga s positif (P > Et), maka air akan masuk kedalam tanah bila kapasitas
kelembaban tanah belum terpenuhi, dan sebaliknya akan melimpas bila kondisi tanah
jenuh. Bila harga s negatif (P < Et), sebagian air tanah akan keluar dan terjadi
kekurangan (defisit).
b. Perubahan kandungan air tanah (Soil Storage) tergantung dari harga s.
Bila harga s negatif, maka kapasitas kelembaban tanah akan berkurang dan bila harga
s positif akan menambah kekurangan kapasitas kelembaban tanah bulan sebelumnya.

4
c. Kapasitas kelembaban tanah (Soil Moisture Capacity)
Perkiraan kapasitas kelembaban tanah awal diperlukan pada saat dimulainya simulasi,
dan besarnya tergantung dari kondisi porositas lapisan tanah atas daerah pengaliran.
Biasanya diambil 50 s/d 250 mm, yaitu kapasitas kandungan air dalam tanah per m2. Jika
porositas tanah lapisan atas tersebut makin besar, maka kapasitas kelembaban tanah akan
semakin besar pula.
Untuk kapasitas kelembaban tanah (Soil Moisture Capacity) di DAS Gintung diambil
150 mm.

2.4 Aliran dan Penyimpangan Air Tanah (Run Off And Groundwater Storage)
Faktor-faktor yang mempengaruhi aliran dan penyimpangan air tanah (Run Off And
Groundwater Storage) adalah sebagai berikut:
a. Koefisien Infiltrasi (I)
Koefisien infiltrasi ditaksir berdasarkan kondisi porositas tanah dan kemiringan daerah
pengaliran. Lahan yang porous misalnya pasir halus mempunyai infiltrasi lebih tinggi
dibandingkan tanah lempung berat. Sedangkan lahan yang terjal, dimana air tidak sempat
infiltrasi kedalam tanah, maka koefisien infiltrasi akan kecil. Batasan koefisien infiltrasi
adalah 0 – 1,0. Di daerah aliran sungai (DAS) Gintung berdasarkan pengamatan kondisi
tanahnya tidak begitu porous karena mengandung clay dan daerahnya yang cukup landai,
maka untuk koefisien infiltrasinya (l) untuk di daerah aliran sungai (DAS) Bendungan
Gintung sebesar 0,80.
b. Penyimpanan Air Tanah (Groundwater Storage)
Pada permulaan simulasi harus ditentukan penyimpangan awal (initial storage) yang
besarnya tergantung dari kondisi geologi setempat dan waktu, sebagai contoh: dalam
daerah pengaliran kecil, dimana kondisi geologi lapisan bawah adalah tidak tembus air
dan mungkin tidak ada air di sungai pada musim kemarau, maka penyimpanan air tanah
menjadi nol. Di daerah aliran sungai (DAS) Bendungan Gintung berdasarkan
pengamatan untuk kondisi geologi lapisan bawah cukup porous dan dapat tembus air
karena mengandung pasir, dimana pada musim kemarau masih ada air di sungai. Maka
untuk permulaan simulasi penyimpanan awal (initial storage) di daerah aliran sungai
(DAS) Bendungan Gintung diambil sebesar 200 mm. Rumus yang digunakan adalah:

Vn  k Vn 1   1  k   ln
1
2

5
dimana:
Vn = volume air tanah
k = qt/qo = faktor resesi aliran tanah
qt = aliran air tanah pada waktu t (bulan ke-t)
qo = aliran air tanah pada awal (bulan ke-0)
ln = koefisien infiltrasi bulan ke-n
Vn = Vn – Vn-1
Vn = perubahan volume aliran air tanah
Vn = volume air tanah bulan ke-n
Vn-1 = volume air tanah bulan ke – (n-1)
Faktor resesi aliran air tanah (k) adalah 0 – 1,0.
Harga k yang tinggi akan memberikan resesi yang lambat seperti pada kondisi geologis
lapisan bawah yang sangat lulus air (permeable).
c. Aliran (Run Off)
Aliran dasar : Infiltrasi dikurangai perubahan volume aliran air
dalam tanah
Aliran permukaan (langsung) : kelebihan air (water surplus – infiltrasi)
Aliran : aliran dasar + aliran langsung
Debit Andalan : aliran sungai dinyatakan dalam m3/bulan

2.5 Aliran Hujan Lebat (Storm Run Off)


Selama bulan-bulan kering, dimana intensitas hujan melampaui harga infiltrasi tanah,
sejumlah kecil debit aliran air dalam tanah dapat terjadi akibat hujan lebat pada bulan basah
sebelumnya. Debit aliran ini adalah beberapa persen dari curah hujan (P) sebelumnya dikurangi
evapotranspirasi terbatas (Et) dan akan terlihat pada debit aliran langsung (Direct Run Off).
Ada beberapa cara untuk menentukan debit andalan, masing-masing cara mempunyai ciri
khas tersendiri. Pemilihan metode yang sesuai umumnya didasarkan atas pertimbangan data
yang tersedia, jenis kepentingan dan pengalaman. Metode-metode untuk analisis debit andalan
tersebut antara lain sebagai berikut :
a. Metode karakteristik aliran (flow characteristic)
Perhitungan debit andalan dengan metode ini antara lain memakai data yang di dapat
berdasarkan karakteristik aliran. Metode ini umumnya dipakai untuk:

6
1. Daerah Aliran sungai (DAS) dengan fluktuasi debit maksimum dan minimumnya
relatif besar dari tahun ke tahun.
2. Kebutuhan yang relatif tidak konstan sepanjang tahun.
3. Data yang tersedia cukup panjang.
b. Metode tahun penentu (Basic year)
Penentuan debit andalan dengan menggunakan metode ini antara lain dengan
menentukan suatu tahun tertentu sebagai dasar perencanaan.
c. Metode bulan penentu
Metode ini seperti pada karakteristik aliran tetapi bulan tertentu sebagai dasar
perencanaan.
d. Metode Q rata-rata minimum
Penentuan debit andalan dengan metode ini berdasar data debit rata-rata bulanan yang
minimum dari tiap-tiap tahun yang tersedia. Metode ini biasanya dipakai untuk DAS
dengan fluktuasi debit maksimum dan minimum tidak terlalu besar dari tahun ke tahun.
Kebutuhan relatif konstan sepanjang tahun.
Untuk pengamatan debit juga dianalisis berdasarkan data hujan yang terjadi di dan sekitar
Daerah Aliran Sungai (DAS) tersebut dengan metode MOCK dengan skema/ Bagan Alir pada
Gambar 2.1 sebagai berikut:
Daerah Tangkapan Air

Perhitungan Evapotranspirasi
Aktual (Et)

Perkiraan Tampungan Kelengasan Akhir Bulan


(Soil Moisture Storage, SMS)
SMSakhir = P – Et + SMSawal

Kandungan Air dalam Tidak


Debit Akibat Ya Soil of field capacity
Tanah Soil di bawah
Hujan Lebat SMSakhir > SMC WS = SMSend – SMS
Kapasitas SMSend = SMC
QF = P x PF
WS = 0

Perkiraan Ulang Tampungan


Keseimbangan Air Tanah Perkolasi ke Air Tanah
Kelengasan Akhir Bulan
GSakhir = k x GSawal + 0,5(k+1) x I I = WS x I
SMSakhir = P(1-PF) – Et + SMSawal

Aliran Dasar Aliran Permukaan


BF = (I – GS akhir) + GS awal DR = WS x (H)

Aliran Permukaan Total


TR = QS + BF + DR

Gambar 2.1 Diagram Alir Analisis Metode Mock

7
Keterangan :
SMC : Kapasitas kelembaban tanah
SMS : Penyimpanan kelembaban tanah
I : Koefisien infiltrasi
k : Faktor resesi aliran air tanah
PF : Faktor aliran hujan lebat
GS : Keseimbangan air tanah

8
BAB III
PEMBAHASAN DAN HASIL

3.1 Hasil Perhitungan Debit Andalan Metode Fj. Mock Tiap Tahun
Debit andalan adalah debit yang dapat diandalkan untuk suatu tingkat keandalan atau
reliabilitas tertentu. Untuk keperluan irigasi biasa digunakan debit andalan dengan reliabilitas
80% sebagaimana ditetapkan dalam Kriteria Perencanaan Irigasi (Ditjen Pengairan, 1985).
Artinya dengan kemungkinan 80% debit yang terjadi adalah lebih besar atau sama dengan debit
tersebut, atau dengan kata lain sistem irigasi boleh gagal sekali dalam lima tahun. Untuk
keperluan air minum dan industri dituntut reliabilitas yang lebih tinggi, yaitu sekitar 90%
sampai dengan 95%. Jika air sungai digunakan untuk pembangkitan listrik tenaga air, maka
diperlukan reliabilitas yang sangat tinggi, yaitu antara 95% sampai dengan 99% (Goodman,
1984). Debit tersebut digunakan sebagai patokan ketersediaan debit yang masuk ke waduk pada
saat pengoperasiannya. Untuk menghitung debit andalan tersebut, dihitung peluang 90 % dari
debit infow sumber air pada pencatatan debit pada periode tertentu. Adapun metode
perhitungan debit andalan untuk pekerjaan ini menggunakan metode FJ. MOCK.
Hasil perhitungan Debit Andalan Bendungan Gintung tiap tahun dengan Metode F.J.
Mock disajikan pada Tabel 3.1 sampai Tabel 3.21 dan Gambar 3.1 sebagai berikut:

9
Tabel 3.1 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2000
Tabel Perhitungan Debit Andalan Bulanan Dengan Metode F.J.Mock Th. 2000

DAS : Gintung
Luas DAS : 88,3 km2

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN
1 Curah Hujan (P) Data mm/15hr 308,70 162,72 105,29 398,35 220,48 184,31 160,66 164,38 184,06 112,13 112,26 18,82 5,66 13,73 6,69 13,64 24,55 61,74 155,82 179,93 489,89 201,72 307,94 101,96
2 Hari Hujan (h) Data hari 11,00 12,00 10,00 12,00 10,00 10,00 14,00 9,00 7,00 8,00 3,00 2,00 1,00 4,00 2,00 3,00 3,00 3,00 7,00 9,00 9,00 14,00 6,00 6,00
II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92
4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00
5 (m/20) * (18 - h) Hitungan - 0,11 0,09 0,12 0,09 0,12 0,12 0,06 0,14 0,17 0,15 0,23 0,24 0,26 0,21 0,24 0,23 0,23 0,23 0,17 0,14 0,14 0,06 0,18 0,18
6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,87 5,37 6,46 4,52 5,51 5,88 3,04 6,84 7,77 7,54 9,08 9,68 10,63 9,34 11,05 11,05 12,05 12,05 9,48 8,27 8,57 3,81 10,45 11,15
7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,08 54,31 47,39 45,74 40,39 43,08 47,66 43,86 39,33 42,70 31,27 30,67 31,07 35,14 35,00 38,07 41,50 41,50 47,97 53,01 54,88 59,64 47,60 50,77
III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 258,63 108,41 57,90 352,62 180,09 141,23 113,00 120,53 144,73 69,43 80,98 -11,85 -25,40 -21,41 -28,31 -24,43 -16,95 20,24 107,85 126,93 435,01 142,08 260,34 51,19
9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -11,85 -25,40 -21,41 -28,31 -24,43 -16,95 0,00 0,00 0,00 0,00 0,00 0,00 0,00
10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 188,15 162,75 141,33 113,03 88,60 71,65 200,00 200,00 200,00 200,00 200,00 200,00 200,00
11 Kelebihan Air (WS) (8)- (9) mm/15hr 258,63 108,41 57,90 352,62 180,09 141,23 113,00 120,53 144,73 69,43 80,98 0,00 0,00 0,00 0,00 0,00 0,00 20,24 107,85 126,93 435,01 142,08 260,34 51,19
IV ALIRAN DAN PENYIMPANAN

AIR TANAH
12 Infiltrasi (I) (11) * (i) mm/15hr 206,90 86,73 46,32 282,09 144,07 112,98 90,40 96,42 115,78 55,54 64,79 0,00 0,00 0,00 0,00 0,00 0,00 16,19 86,28 101,54 348,01 113,66 208,27 40,95
13 0.5 (1 + k) In Hitungan - 186,21 78,05 41,69 253,88 129,66 101,68 81,36 86,78 104,20 49,99 58,31 0,00 0,00 0,00 0,00 0,00 0,00 14,57 77,65 91,39 313,21 102,30 187,45 36,86
14 k * V (n - 1) Hitungan - 744,86 744,86 658,33 560,01 651,12 624,62 581,04 529,92 493,36 478,05 422,43 384,59 307,67 246,14 196,91 157,53 126,02 100,82 92,31 135,97 181,89 396,07 398,70 468,92
15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 931,07 822,91 700,01 813,89 780,78 726,30 662,41 616,70 597,57 528,04 480,74 384,59 307,67 246,14 196,91 157,53 126,02 115,39 169,96 227,36 495,09 498,37 586,14 505,77
16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 0,00 -108,16 -122,89 113,88 -33,12 -54,47 -63,90 -45,70 -19,14 -69,53 -47,30 -96,15 -76,92 -61,53 -49,23 -39,38 -31,51 -10,63 54,58 57,39 267,73 3,28 87,77 -80,37
17 Aliran Dasar (BF) (12) - (16) mm/15hr 206,90 194,89 169,21 168,21 177,19 167,45 154,30 142,12 134,92 125,07 112,09 96,15 76,92 61,53 49,23 39,38 31,51 26,82 31,71 44,15 80,27 110,38 120,50 121,32
18 Aliran Langsung (DR) (11) - (12) mm/15hr 51,73 21,68 11,58 70,52 36,02 28,25 22,60 24,11 28,95 13,89 16,20 0,00 0,00 0,00 0,00 0,00 0,00 4,05 21,57 25,39 87,00 28,42 52,07 10,24
19 Aliran (R) (17) + (18) mm/15hr 258,63 216,57 180,79 238,74 213,20 195,70 176,90 166,23 163,86 138,95 128,28 96,15 76,92 61,53 49,23 39,38 31,51 30,87 53,28 69,53 167,27 138,80 172,57 131,56
V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 17,6 13,8 12,3 17,4 14,5 12,5 12,1 11,3 11,2 8,9 8,7 6,6 5,2 3,9 3,4 2,5 2,1 2,1 3,6 4,4 11,4 9,5 11,8 8,4
22 Jumlah hari hari 15 16 15 14 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16
23 Debit Aliran (dibaca : 10E^6) m3/15hr 22,84 19,13 15,97 21,09 18,83 17,29 15,63 14,68 14,47 12,27 11,33 8,49 6,79 5,44 4,35 3,48 2,78 2,73 4,71 6,14 14,78 12,26 15,24 11,62
Sumber : Perhitungan

Parameter terpakai : Ketentuan :


- m = 30 - 50% untuk lahan pertanian yang diolah - Koefisien infiltrasi i = 0,8 m = prosentase lahan tak tertutup vegetasi, dari peta tata guna lahan
- Kapasitas kelembaban tanah SMC (Soil Moisture Contents) = 200 mm - Faktor resesi aliran air tanah k = 0,8 m = 0% untuk lahan dg hutan lebat
- Daerah Aliran Sungai = 88,3 km2 - Penyimpanan awal (initial storage) IS = 50 mm m= 0% pd akhir musim hujan, dan bertambah 10 % setiap bulan keing untuk lahan dg hutan sekunder
- m ditentukan m= 30 m=10% - 40% untuk lahan yg tererosi
m= 30% - 50% untuk lahan pertanian yg diolah (mis: sawah, ladang)
Musim kemarau m harus dibesarkan sekitar 10% dr musim hujan
494,000
SMC = berdasarkan kondisi porositas lapisan tanah atas dari catchment area.
Ketentuan : SMC = 50 - 250 mm, kapasitas kandungan air dalam tanah per m2, porositas makin besar, SMC makin besar pula
m = prosentase lahan tak tertutup vegetasi, dari peta tata guna lahan SMC = 100 + 0.2 * hj rerata tahunan
m = 0% untuk lahan dg hutan lebat koefisien infiltrasi : tergantung kondisi porositas tanah dan kemiringan daerah pengaliran
m= 0% pd akhir musim hujan, dan bertambah 10 % setiap bulan keing untuk lahan dg hutan sekunder lahan yg porous infiltrasi besar, lahan yg terjal korf. Infiltrasi kecil
m=10% - 40% untuk lahan yg tererosi besar i < 1

10
Tabel 3.2 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2001
DAS : Gintung
Luas DAS : 88,330 km2

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 94,28 308,10 274,25 40,77 247,89 353,25 336,52 185,92 61,40 99,79 145,44 0,00 27,21 32,77 0,00 16,49 61,09 17,77 109,00 866,29 221,99 294,23 87,02 115,42

2 Hari Hujan (h) Data hari 10,00 16,00 11,00 4,00 10,00 15,00 13,00 5,00 4,00 11,00 12,00 0,00 2,00 5,00 0,00 1,00 3,00 3,00 7,00 15,00 7,00 12,00 5,00 5,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,12 0,03 0,11 0,21 0,12 0,05 0,08 0,20 0,21 0,11 0,09 0,27 0,24 0,20 0,27 0,26 0,23 0,23 0,17 0,05 0,17 0,09 0,20 0,20

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 6,71 1,79 5,65 9,80 5,51 2,20 3,80 9,89 9,89 5,28 3,63 10,89 10,01 8,67 12,43 12,53 12,05 12,05 9,48 2,76 10,47 5,71 11,32 12,07

7 Et = (ETo) - (E) (3) - (6) mm/15hr 49,24 57,89 48,20 36,87 40,39 46,76 46,90 40,81 37,21 44,96 36,72 29,46 31,69 35,81 33,62 36,59 41,50 41,50 47,97 58,52 52,98 57,74 46,73 49,85

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 45,05 250,21 226,06 3,90 207,49 306,50 289,62 145,11 24,19 54,82 108,72 -29,46 -4,49 -3,04 -33,62 -20,10 19,59 -23,74 61,03 807,76 169,01 236,49 40,29 65,58

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -29,46 -4,49 -3,04 -33,62 -20,10 0,00 -23,74 0,00 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 170,54 166,06 163,02 129,40 109,30 200,00 176,26 200,00 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 45,05 250,21 226,06 3,90 207,49 306,50 289,62 145,11 24,19 54,82 108,72 0,00 0,00 0,00 0,00 0,00 19,59 0,00 61,03 807,76 169,01 236,49 40,29 65,58

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 36,04 200,17 180,85 3,12 166,00 245,20 231,70 116,09 19,35 43,86 86,98 0,00 0,00 0,00 0,00 0,00 15,67 0,00 48,82 646,21 135,21 189,19 32,23 52,46

13 0.5 (1 + k) In Hitungan - 32,43 180,15 162,76 2,81 149,40 220,68 208,53 104,48 17,42 39,47 78,28 0,00 0,00 0,00 0,00 0,00 14,11 0,00 43,94 581,59 121,69 170,27 29,01 47,22

14 k * V (n - 1) Hitungan - 404,62 349,64 423,84 469,28 377,67 421,65 513,87 577,91 545,91 450,66 392,11 376,31 301,05 240,84 192,67 154,14 123,31 109,93 87,95 105,51 549,68 537,10 565,89 475,92

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 437,05 529,79 586,60 472,09 527,07 642,33 722,39 682,39 563,33 490,14 470,39 376,31 301,05 240,84 192,67 154,14 137,42 109,93 131,89 687,10 671,37 707,37 594,90 523,14

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -68,72 92,74 56,80 -114,51 54,98 115,26 80,06 -40,00 -119,06 -73,19 -19,75 -94,08 -75,26 -60,21 -48,17 -38,53 -16,72 -27,48 21,96 555,21 -15,73 36,00 -112,47 -71,76

17 Aliran Dasar (BF) (12) - (16) mm/15hr 104,76 107,43 124,04 117,63 111,02 129,93 151,64 156,09 138,41 117,05 106,73 94,08 75,26 60,21 48,17 38,53 32,39 27,48 26,87 91,00 150,94 153,19 144,70 124,23

18 Aliran Langsung (DR) (11) - (12) mm/15hr 9,01 50,04 45,21 0,78 41,50 61,30 57,92 29,02 4,84 10,96 21,74 0,00 0,00 0,00 0,00 0,00 3,92 0,00 12,21 161,55 33,80 47,30 8,06 13,12

19 Aliran (R) (17) + (18) mm/15hr 113,77 157,47 169,26 118,41 152,52 191,23 209,56 185,11 143,25 128,02 128,47 94,08 75,26 60,21 48,17 38,53 36,31 27,48 39,07 252,55 184,74 200,49 152,75 137,34

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 7,754 10,062 11,536 9,312 10,395 12,219 14,283 12,616 9,763 8,180 8,756 6,412 5,130 3,847 3,283 2,462 2,475 1,873 2,663 16,137 12,591 13,665 10,411 8,776

22 Debit Aliran Sungai lt/det 7753,90 10061,71 11535,74 9312,12 10394,87 12219,02 14282,76 12616,22 9763,39 8179,74 8755,99 6411,97 5129,58 3847,18 3282,93 2462,20 2474,94 1873,13 2663,18 16137,04 12591,36 13664,64 10411,13 8775,65

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 10,05 13,91 14,95 10,46 13,47 16,89 18,51 16,35 12,65 11,31 11,35 8,31 6,65 5,32 4,25 3,40 3,21 2,43 3,45 22,31 16,32 17,71 13,49 12,13
Sumber : Perhitungan

11
Tabel 3.3 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2002
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 36,23 373,96 244,88 132,17 59,36 246,32 100,89 225,30 210,31 0,00 42,34 0,00 11,02 0,00 0,00 0,76 0,00 0,00 0,00 142,37 216,05 221,21 126,24 239,16

2 Hari Hujan (h) Data hari 6,00 15,00 14,00 10,00 9,00 13,00 10,00 9,00 4,00 0,00 5,00 0,00 2,00 0,00 0,00 1,00 0,00 0,00 0,00 2,00 7,00 11,00 11,00 13,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,18 0,05 0,06 0,12 0,14 0,08 0,12 0,14 0,21 0,27 0,20 0,27 0,24 0,27 0,27 0,26 0,27 0,27 0,27 0,24 0,17 0,11 0,11 0,08

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 10,07 2,69 3,23 5,60 6,20 3,67 6,08 6,84 9,89 13,56 7,87 10,89 10,01 12,01 12,43 12,53 14,46 14,46 15,51 14,71 10,47 6,66 6,10 4,64

7 Et = (ETo) - (E) (3) - (6) mm/15hr 45,88 56,99 50,62 41,07 39,70 45,29 44,62 43,86 37,21 36,68 32,48 29,46 31,69 32,47 33,62 36,59 39,09 39,09 41,94 46,57 52,98 56,79 51,95 57,28

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr -9,65 316,97 194,26 91,10 19,66 201,03 56,28 181,44 173,10 -36,68 9,85 -29,46 -20,68 -32,47 -33,62 -35,84 -39,09 -39,09 -41,94 95,80 163,07 164,42 74,29 181,89

9 Kandungan Air Tanah mm/15hr -9,65 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -36,68 0,00 -29,46 -20,68 -32,47 -33,62 -35,84 -39,09 -39,09 -41,94 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 163,32 200,00 170,54 149,87 117,40 83,78 47,94 8,85 -30,24 -72,18 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 0,00 316,97 194,26 91,10 19,66 201,03 56,28 181,44 173,10 0,00 9,85 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 95,80 163,07 164,42 74,29 181,89

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 0,00 253,57 155,41 72,88 15,73 160,82 45,02 145,15 138,48 0,00 7,88 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 76,64 130,46 131,54 59,43 145,51

13 0.5 (1 + k) In Hitungan - 0,00 228,21 139,87 65,59 14,16 144,74 40,52 130,64 124,63 0,00 7,10 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 68,97 117,41 118,39 53,49 130,96

14 k * V (n - 1) Hitungan - 418,51 334,81 450,42 472,23 430,25 355,53 400,22 352,59 386,58 408,97 327,18 267,42 213,93 171,15 136,92 109,53 87,63 70,10 56,08 44,86 91,07 166,79 228,14 225,30

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 418,51 563,02 590,28 537,82 444,41 500,27 440,74 483,23 511,21 408,97 334,27 267,42 213,93 171,15 136,92 109,53 87,63 70,10 56,08 113,84 208,48 285,17 281,62 356,26

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -104,63 144,51 27,26 -52,47 -93,41 55,86 -59,53 42,49 27,98 -102,24 -74,70 -66,85 -53,48 -42,79 -34,23 -27,38 -21,91 -17,53 -14,02 57,76 94,64 76,69 -3,55 74,63

17 Aliran Dasar (BF) (12) - (16) mm/15hr 104,63 109,06 128,15 125,34 109,14 104,96 104,56 102,66 110,49 102,24 82,58 66,85 53,48 42,79 34,23 27,38 21,91 17,53 14,02 18,88 35,81 54,85 62,98 70,88

18 Aliran Langsung (DR) (11) - (12) mm/15hr 0,00 63,39 38,85 18,22 3,93 40,21 11,26 36,29 34,62 0,00 1,97 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 19,16 32,61 32,88 14,86 36,38

19 Aliran (R) (17) + (18) mm/15hr 104,63 172,45 167,00 143,56 113,07 145,17 115,81 138,95 145,11 102,24 84,55 66,85 53,48 42,79 34,23 27,38 21,91 17,53 14,02 38,04 68,43 87,74 77,84 107,25

V DEBIT ALIRAN SUNGAI


3
21 Debit Aliran Sungai A * (19) m /dtk 7,131 11,019 11,382 11,290 7,706 9,276 7,893 9,470 9,890 6,533 5,763 4,556 3,645 2,734 2,333 1,750 1,493 1,194 0,956 2,431 4,664 5,980 5,305 6,853

22 Debit Aliran Sungai lt/det 7130,99 11019,04 11381,81 11290,12 7706,31 9275,85 7893,27 9470,32 9890,26 6532,88 5762,78 4556,49 3645,20 2733,90 2332,92 1749,69 1493,07 1194,46 955,57 2430,57 4663,76 5979,68 5304,92 6853,06

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 9,24 15,23 14,75 12,68 9,99 12,82 10,23 12,27 12,82 9,03 7,47 5,91 4,72 3,78 3,02 2,42 1,94 1,55 1,24 3,36 6,04 7,75 6,88 9,47
Sumber : Perhitungan

12
Tabel 3.4 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2003
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 100,97 363,84 284,81 306,97 287,20 253,61 107,15 48,37 267,96 2,44 1,90 4,77 1,67 0,86 0,00 0,65 3,40 3,19 0,94 299,44 39,30 333,20 559,63 120,27

2 Hari Hujan (h) Data hari 4,00 12,00 12,00 11,00 11,00 9,00 4,00 7,00 5,00 1,00 1,00 2,00 1,00 1,00 0,00 1,00 1,00 2,00 1,00 6,00 7,00 11,00 9,00 7,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,21 0,09 0,09 0,11 0,11 0,14 0,21 0,17 0,20 0,26 0,26 0,24 0,26 0,26 0,27 0,26 0,26 0,24 0,26 0,18 0,17 0,11 0,14 0,17

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 11,75 5,37 4,85 4,90 4,82 6,61 10,65 8,37 9,18 12,81 10,29 9,68 10,63 11,34 12,43 12,53 13,66 12,85 14,65 11,03 10,47 6,66 7,84 10,22

7 Et = (ETo) - (E) (3) - (6) mm/15hr 44,20 54,31 49,00 41,77 41,08 42,35 40,05 42,33 37,92 37,43 30,06 30,67 31,07 33,14 33,62 36,59 39,89 40,70 42,80 50,25 52,98 56,79 50,21 51,70

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 56,77 309,53 235,80 265,20 246,12 211,26 67,10 6,03 230,05 -34,99 -28,16 -25,90 -29,39 -32,27 -33,62 -35,95 -36,49 -37,51 -41,86 249,19 -13,68 276,41 509,42 68,56

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -34,99 -28,16 -25,90 -29,39 -32,27 -33,62 -35,95 -36,49 -37,51 -41,86 0,00 -13,68 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 165,01 136,84 110,94 81,55 49,28 15,66 -20,29 -56,78 -94,29 -136,15 200,00 186,32 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 56,77 309,53 235,80 265,20 246,12 211,26 67,10 6,03 230,05 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 249,19 0,00 276,41 509,42 68,56

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 45,42 247,62 188,64 212,16 196,90 169,01 53,68 4,83 184,04 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 199,35 0,00 221,13 407,53 54,85

13 0.5 (1 + k) In Hitungan - 40,88 222,86 169,78 190,95 177,21 152,11 48,31 4,34 165,64 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 179,42 0,00 199,02 366,78 49,37

14 k * V (n - 1) Hitungan - 285,01 260,71 386,85 445,31 509,00 548,97 560,86 487,34 393,35 447,18 357,75 286,20 228,96 183,17 146,53 117,23 93,78 75,03 60,02 48,02 181,95 145,56 275,66 513,95

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 325,88 483,57 556,63 636,25 686,21 701,08 609,17 491,68 558,98 447,18 357,75 286,20 228,96 183,17 146,53 117,23 93,78 75,03 60,02 227,44 181,95 344,58 642,44 563,32

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -30,38 157,68 73,07 79,62 49,96 14,87 -91,90 -117,49 67,30 -111,80 -89,44 -71,55 -57,24 -45,79 -36,63 -29,31 -23,45 -18,76 -15,01 167,42 -45,49 162,63 297,86 -79,12

17 Aliran Dasar (BF) (12) - (16) mm/15hr 75,79 89,94 115,58 132,54 146,94 154,14 145,58 122,32 116,74 111,80 89,44 71,55 57,24 45,79 36,63 29,31 23,45 18,76 15,01 31,94 45,49 58,50 109,67 133,97

18 Aliran Langsung (DR) (11) - (12) mm/15hr 11,35 61,91 47,16 53,04 49,22 42,25 13,42 1,21 46,01 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 49,84 0,00 55,28 101,88 13,71

19 Aliran (R) (17) + (18) mm/15hr 87,15 151,84 162,74 185,58 196,16 196,40 159,00 123,52 162,75 111,80 89,44 71,55 57,24 45,79 36,63 29,31 23,45 18,76 15,01 81,78 45,49 113,79 211,55 147,69

V DEBIT ALIRAN SUNGAI


3
21 Debit Aliran Sungai A * (19) m /dtk 5,940 9,702 11,092 14,595 13,370 12,549 10,837 8,419 11,092 7,143 6,096 4,877 3,901 2,926 2,497 1,873 1,598 1,278 1,023 5,225 3,100 7,755 14,418 9,437

22 Debit Aliran Sungai lt/det 5939,65 9702,27 11091,59 14594,55 13369,72 12548,89 10837,01 8418,85 11092,36 7143,33 6095,64 4876,52 3901,21 2925,91 2496,78 1872,58 1597,94 1278,35 1022,68 5225,31 3100,21 7755,14 14418,48 9436,53

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 7,70 13,41 14,37 16,39 17,33 17,35 14,04 10,91 14,38 9,87 7,90 6,32 5,06 4,04 3,24 2,59 2,07 1,66 1,33 7,22 4,02 10,05 18,69 13,05
Sumber : Perhitungan

13
Tabel 3.5 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2004
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 67,67 345,83 121,31 277,05 293,88 119,61 239,94 56,89 30,95 373,25 43,20 0,00 74,62 6,63 2,97 0,00 0,86 10,85 0,00 136,60 130,65 593,81 119,70 471,62

2 Hari Hujan (h) Data hari 8,00 15,00 5,00 13,00 13,00 9,00 7,00 6,00 3,00 9,00 5,00 0,00 6,00 2,00 3,00 0,00 1,00 2,00 0,00 4,00 5,00 11,00 9,00 13,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,15 0,05 0,20 0,08 0,08 0,14 0,17 0,18 0,23 0,14 0,20 0,27 0,18 0,24 0,23 0,27 0,26 0,24 0,27 0,21 0,20 0,11 0,14 0,08

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 8,39 2,69 10,50 3,77 3,44 6,61 8,37 9,13 10,60 6,78 7,87 10,89 7,51 10,68 10,36 13,26 13,66 12,85 15,51 12,87 12,37 6,66 7,84 4,64

7 Et = (ETo) - (E) (3) - (6) mm/15hr 47,56 56,99 43,35 46,49 42,46 42,35 42,33 41,57 36,50 43,46 32,48 29,46 34,19 33,80 35,69 35,86 39,89 40,70 41,94 48,41 51,08 56,79 50,21 57,28

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 20,11 288,83 77,96 230,56 251,43 77,26 197,61 15,32 -5,55 329,79 10,72 -29,46 40,42 -27,17 -32,72 -35,86 -39,03 -29,84 -41,94 88,19 79,57 537,02 69,49 414,35

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -5,55 0,00 0,00 -29,46 0,00 -27,17 -32,72 -35,86 -39,03 -29,84 -41,94 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 194,45 200,00 200,00 170,54 200,00 172,83 140,11 104,25 65,22 35,38 -6,56 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 20,11 288,83 77,96 230,56 251,43 77,26 197,61 15,32 0,00 329,79 10,72 0,00 40,42 0,00 0,00 0,00 0,00 0,00 0,00 88,19 79,57 537,02 69,49 414,35

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 16,09 231,07 62,37 184,45 201,14 61,81 158,09 12,25 0,00 263,83 8,57 0,00 32,34 0,00 0,00 0,00 0,00 0,00 0,00 70,55 63,66 429,62 55,59 331,48

13 0.5 (1 + k) In Hitungan - 14,48 207,96 56,13 166,00 181,03 55,63 142,28 11,03 0,00 237,45 7,72 0,00 29,10 0,00 0,00 0,00 0,00 0,00 0,00 63,50 57,29 386,65 50,03 298,33

14 k * V (n - 1) Hitungan - 450,65 372,11 464,05 416,15 465,72 517,40 458,42 480,56 393,27 314,62 441,65 359,50 287,60 253,36 202,69 162,15 129,72 103,78 83,02 66,42 103,93 128,98 412,51 370,03

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 465,13 580,07 520,19 582,16 646,75 573,03 600,70 491,59 393,27 552,07 449,37 359,50 316,70 253,36 202,69 162,15 129,72 103,78 83,02 129,92 161,22 515,63 462,54 668,36

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -98,18 114,93 -59,88 61,97 64,60 -73,72 27,67 -109,11 -98,32 158,80 -102,70 -89,87 -42,80 -63,34 -50,67 -40,54 -32,43 -25,94 -20,76 46,89 31,31 354,41 -53,10 205,82

17 Aliran Dasar (BF) (12) - (16) mm/15hr 114,27 116,13 122,25 122,48 136,55 135,53 130,41 121,37 98,32 105,04 111,27 89,87 75,13 63,34 50,67 40,54 32,43 25,94 20,76 23,66 32,35 75,21 108,69 125,66

18 Aliran Langsung (DR) (11) - (12) mm/15hr 4,02 57,77 15,59 46,11 50,29 15,45 39,52 3,06 0,00 65,96 2,14 0,00 8,08 0,00 0,00 0,00 0,00 0,00 0,00 17,64 15,91 107,40 13,90 82,87

19 Aliran (R) (17) + (18) mm/15hr 118,29 173,90 137,84 168,60 186,83 150,98 169,94 124,43 98,32 171,00 113,41 89,87 83,22 63,34 50,67 40,54 32,43 25,94 20,76 41,30 48,26 182,61 122,58 208,52

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 8,062 11,112 9,395 12,312 12,734 9,647 11,582 8,481 6,701 10,926 7,730 6,125 5,672 4,047 3,454 2,590 2,210 1,768 1,415 2,639 3,289 12,446 8,355 13,324

22 Debit Aliran Sungai lt/det 8062,49 11111,55 9394,84 12311,51 12733,61 9647,24 11582,11 8480,55 6700,93 10925,96 7729,85 6125,44 5671,75 4047,19 3453,60 2590,20 2210,30 1768,24 1414,60 2638,78 3289,44 12446,00 8354,76 13323,91

23 Jumlah hari hari 15 16 15 14 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 10,45 15,36 12,18 14,89 16,50 13,34 15,01 10,99 8,68 15,10 10,02 7,94 7,35 5,59 4,48 3,58 2,86 2,29 1,83 3,65 4,26 16,13 10,83 18,42
Sumber : Perhitungan

14
Tabel 3.6 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2005
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 240,45 253,54 245,90 277,29 165,23 401,60 126,89 135,31 74,70 115,82 19,20 252,33 103,88 2,16 10,74 41,03 0,00 54,58 78,10 280,34 121,18 346,38 166,89 319,17

2 Hari Hujan (h) Data hari 6,00 13,00 10,00 11,00 11,00 10,00 12,00 6,00 6,00 3,00 2,00 8,00 4,00 1,00 2,00 2,00 0,00 5,00 3,00 10,00 4,00 9,00 14,00 15,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,18 0,08 0,12 0,11 0,11 0,12 0,09 0,18 0,18 0,23 0,24 0,15 0,21 0,26 0,24 0,24 0,27 0,20 0,23 0,12 0,21 0,14 0,06 0,05

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 10,07 4,48 6,46 4,90 4,82 5,88 4,56 9,13 8,48 11,30 9,68 6,05 8,76 11,34 11,05 11,79 14,46 10,44 12,93 7,35 13,32 8,57 3,48 2,79

7 Et = (ETo) - (E) (3) - (6) mm/15hr 45,88 55,20 47,39 41,77 41,08 43,08 46,14 41,57 38,62 38,94 30,67 34,30 32,94 33,14 35,00 37,33 39,09 43,11 44,52 53,93 50,13 54,88 54,57 59,13

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 194,57 198,33 198,51 235,52 124,15 358,51 80,75 93,74 36,08 76,89 -11,47 218,03 70,94 -30,98 -24,25 3,70 -39,09 11,47 33,57 226,42 71,06 291,50 112,32 260,04

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -11,47 0,00 0,00 -30,98 -24,25 0,00 -39,09 0,00 0,00 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 188,53 200,00 200,00 169,02 144,76 200,00 160,91 200,00 200,00 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 194,57 198,33 198,51 235,52 124,15 358,51 80,75 93,74 36,08 76,89 0,00 218,03 70,94 0,00 0,00 3,70 0,00 11,47 33,57 226,42 71,06 291,50 112,32 260,04

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 155,65 158,67 158,81 188,41 99,32 286,81 64,60 74,99 28,86 61,51 0,00 174,43 56,75 0,00 0,00 2,96 0,00 9,17 26,86 181,13 56,85 233,20 89,86 208,03

13 0.5 (1 + k) In Hitungan - 140,09 142,80 142,93 169,57 89,39 258,13 58,14 67,49 25,98 55,36 0,00 156,98 51,07 0,00 0,00 2,66 0,00 8,26 24,17 163,02 51,16 209,88 80,87 187,23

14 k * V (n - 1) Hitungan - 534,69 539,82 546,10 551,22 576,63 532,82 632,76 552,72 496,17 417,72 378,46 302,77 367,80 335,10 268,08 214,46 173,70 138,96 117,77 113,56 221,26 217,94 342,26 338,50

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 674,78 682,62 689,02 720,79 666,02 790,95 690,90 620,21 522,14 473,07 378,46 459,75 418,87 335,10 268,08 217,13 173,70 147,22 141,95 276,58 272,42 427,82 423,13 525,73

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 6,42 7,84 6,40 31,77 -54,77 124,93 -100,05 -70,69 -98,07 -49,07 -94,61 81,29 -40,88 -83,77 -67,02 -50,95 -43,43 -26,48 -5,27 134,63 -4,15 155,40 -4,69 102,60

17 Aliran Dasar (BF) (12) - (16) mm/15hr 149,24 150,82 152,40 156,65 154,09 161,89 164,65 145,68 126,93 110,58 94,61 93,13 97,62 83,77 67,02 53,91 43,43 35,66 32,13 46,50 61,00 77,80 94,55 105,43

18 Aliran Langsung (DR) (11) - (12) mm/15hr 38,91 39,67 39,70 47,10 24,83 71,70 16,15 18,75 7,22 15,38 0,00 43,61 14,19 0,00 0,00 0,74 0,00 2,29 6,71 45,28 14,21 58,30 22,46 52,01

19 Aliran (R) (17) + (18) mm/15hr 188,15 190,49 192,11 203,75 178,92 233,59 180,80 164,43 134,14 125,96 94,61 136,74 111,81 83,77 67,02 54,65 43,43 37,95 38,84 91,79 75,21 136,10 117,01 157,44

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 12,824 12,171 13,093 16,023 12,194 14,925 12,323 11,207 9,143 8,048 6,449 9,320 7,621 5,353 4,568 3,492 2,960 2,587 2,647 5,865 5,126 9,276 7,975 10,060

22 Debit Aliran Sungai lt/det 12823,60 12171,46 13093,16 16023,11 12194,47 14925,39 12322,55 11206,61 9142,68 8048,14 6448,53 9319,68 7620,65 5352,88 4567,79 3492,04 2959,70 2586,61 2647,47 5864,80 5126,14 9276,35 7975,21 10059,60

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 16,62 16,83 16,97 18,00 15,80 20,63 15,97 14,52 11,85 11,13 8,36 12,08 9,88 7,40 5,92 4,83 3,84 3,35 3,43 8,11 6,64 12,02 10,34 13,91

Sumber : Perhitungan

15
Tabel 3.7 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2006
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 237,10 259,17 157,67 228,91 300,60 142,65 171,01 227,52 47,34 170,22 5,67 1,03 0,00 0,00 0,00 0,00 0,00 0,00 3,83 0,00 95,04 111,01 93,21 323,59

2 Hari Hujan (h) Data hari 11,00 13,00 8,00 11,00 7,00 12,00 12,00 5,00 6,00 10,00 2,00 1,00 0,00 0,00 0,00 0,00 0,00 0,00 2,00 0,00 4,00 4,00 9,00 13,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,11 0,08 0,15 0,11 0,17 0,09 0,09 0,20 0,18 0,12 0,24 0,26 0,27 0,27 0,27 0,27 0,27 0,27 0,24 0,27 0,21 0,21 0,14 0,08

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,87 4,48 8,08 4,90 7,57 4,41 4,56 9,89 8,48 6,03 9,68 10,29 11,26 12,01 12,43 13,26 14,46 14,46 13,79 16,55 13,32 13,32 7,84 4,64

7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,08 55,20 45,77 41,77 38,33 44,55 46,14 40,81 38,62 44,21 30,67 30,06 30,44 32,47 33,62 35,86 39,09 39,09 43,66 44,73 50,13 50,13 50,21 57,28

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 187,03 203,97 111,90 187,14 262,28 98,10 124,88 186,70 8,72 126,01 -25,00 -29,03 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -39,83 -44,73 44,91 60,88 43,00 266,32

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -25,00 -29,03 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -39,83 -44,73 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 175,00 145,97 115,53 83,06 49,44 13,58 -25,51 -64,60 -104,43 -149,16 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 187,03 203,97 111,90 187,14 262,28 98,10 124,88 186,70 8,72 126,01 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 44,91 60,88 43,00 266,32

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 149,62 163,18 89,52 149,71 209,82 78,48 99,90 149,36 6,98 100,81 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 35,93 48,71 34,40 213,05

13 0.5 (1 + k) In Hitungan - 134,66 146,86 80,57 134,74 188,84 70,63 89,91 134,43 6,28 90,73 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 32,34 43,84 30,96 191,75

14 k * V (n - 1) Hitungan - 420,58 444,20 472,84 442,73 461,97 520,65 473,03 450,35 467,82 379,28 376,01 300,81 240,65 192,52 154,01 123,21 98,57 78,85 63,08 50,47 40,37 58,17 81,60 90,05

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 555,24 591,05 553,41 577,47 650,81 591,28 562,94 584,78 474,10 470,01 376,01 300,81 240,65 192,52 154,01 123,21 98,57 78,85 63,08 50,47 72,71 102,01 112,56 281,80

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 29,51 35,81 -37,64 24,06 73,35 -59,53 -28,35 21,84 -110,67 -4,09 -94,00 -75,20 -60,16 -48,13 -38,50 -30,80 -24,64 -19,71 -15,77 -12,62 22,24 29,30 10,56 169,24

17 Aliran Dasar (BF) (12) - (16) mm/15hr 120,11 127,37 127,16 125,65 136,48 138,01 128,25 127,52 117,65 104,90 94,00 75,20 60,16 48,13 38,50 30,80 24,64 19,71 15,77 12,62 13,69 19,41 23,84 43,82

18 Aliran Langsung (DR) (11) - (12) mm/15hr 37,41 40,79 22,38 37,43 52,46 19,62 24,98 37,34 1,74 25,20 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 8,98 12,18 8,60 53,26

19 Aliran (R) (17) + (18) mm/15hr 157,51 168,16 149,54 163,08 188,93 157,63 153,22 164,86 119,40 130,10 94,00 75,20 60,16 48,13 38,50 30,80 24,64 19,71 15,77 12,62 22,67 31,59 32,44 97,08

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 10,736 10,745 10,192 12,825 12,877 10,072 10,443 11,236 8,138 8,313 6,407 5,125 4,100 3,075 2,624 1,968 1,680 1,344 1,075 0,806 1,545 2,153 2,211 6,203

22 Debit Aliran Sungai lt/det 10735,50 10744,79 10192,16 12824,92 12876,76 10072,00 10442,99 11236,48 8137,66 8313,13 6406,79 5125,44 4100,35 3075,26 2624,22 1968,17 1679,50 1343,60 1074,88 806,16 1545,01 2153,03 2210,98 6203,12

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 13,91 14,85 13,21 14,40 16,69 13,92 13,53 14,56 10,55 11,49 8,30 6,64 5,31 4,25 3,40 2,72 2,18 1,74 1,39 1,11 2,00 2,79 2,87 8,58
Sumber : Perhitungan

16
Tabel 3.8 Tabel Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2007
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 15,39 210,94 161,89 299,03 55,23 358,40 257,36 258,39 109,58 115,99 17,28 7,61 0,00 0,00 0,92 5,83 0,00 0,00 0,00 282,24 463,55 13,67 341,99 283,36

2 Hari Hujan (h) Data hari 1,00 6,00 11,00 12,00 8,00 12,00 12,00 8,00 6,00 8,00 6,00 2,00 0,00 0,00 1,00 2,00 0,00 0,00 0,00 8,00 13,00 3,00 15,00 11,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,26 0,18 0,11 0,09 0,15 0,09 0,09 0,15 0,18 0,15 0,18 0,24 0,27 0,27 0,26 0,24 0,27 0,27 0,27 0,15 0,08 0,23 0,05 0,11

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 14,27 10,74 5,65 4,20 6,89 4,41 4,56 7,61 8,48 7,54 7,26 9,68 11,26 12,01 11,74 11,79 14,46 14,46 15,51 9,19 4,76 14,28 2,61 6,50

7 Et = (ETo) - (E) (3) - (6) mm/15hr 41,68 48,94 48,20 42,47 39,02 44,55 46,14 43,10 38,62 42,70 33,09 30,67 30,44 32,47 34,31 37,33 39,09 39,09 41,94 52,09 58,69 49,17 55,44 55,42

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr -26,29 162,00 113,69 256,56 16,22 313,85 211,23 215,29 70,95 73,29 -15,81 -23,05 -30,44 -32,47 -33,39 -31,50 -39,09 -39,09 -41,94 230,16 404,86 -35,50 286,55 227,94

9 Kandungan Air Tanah mm/15hr -26,29 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -15,81 -23,05 -30,44 -32,47 -33,39 -31,50 -39,09 -39,09 -41,94 0,00 0,00 -35,50 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 184,19 161,14 130,70 98,23 64,84 33,34 -5,75 -44,84 -86,78 200,00 200,00 164,50 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 0,00 162,00 113,69 256,56 16,22 313,85 211,23 215,29 70,95 73,29 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 230,16 404,86 0,00 286,55 227,94

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 0,00 129,60 90,95 205,25 12,97 251,08 168,98 172,23 56,76 58,63 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 184,12 323,89 0,00 229,24 182,36

13 0.5 (1 + k) In Hitungan - 0,00 116,64 81,86 184,73 11,68 225,97 152,08 155,01 51,09 52,77 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 165,71 291,50 0,00 206,32 164,12

14 k * V (n - 1) Hitungan - 225,44 180,35 237,59 255,56 352,23 291,12 413,68 452,61 486,09 429,75 386,01 308,81 247,05 197,64 158,11 126,49 101,19 80,95 64,76 51,81 174,02 372,41 297,93 403,40

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 225,44 296,99 319,45 440,29 363,90 517,09 565,76 607,62 537,18 482,51 386,01 308,81 247,05 197,64 158,11 126,49 101,19 80,95 64,76 217,52 465,52 372,41 504,25 567,52

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -56,36 71,55 22,46 120,84 -76,38 153,19 48,66 41,86 -70,44 -54,67 -96,50 -77,20 -61,76 -49,41 -39,53 -31,62 -25,30 -20,24 -16,19 152,76 247,99 -93,10 131,84 63,27

17 Aliran Dasar (BF) (12) - (16) mm/15hr 56,36 58,05 68,49 84,41 89,35 97,89 120,32 130,38 127,20 113,30 96,50 77,20 61,76 49,41 39,53 31,62 25,30 20,24 16,19 31,36 75,89 93,10 97,41 119,09

18 Aliran Langsung (DR) (11) - (12) mm/15hr 0,00 32,40 22,74 51,31 3,24 62,77 42,25 43,06 14,19 14,66 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 46,03 80,97 0,00 57,31 45,59

19 Aliran (R) (17) + (18) mm/15hr 56,36 90,45 91,23 135,73 92,60 160,66 162,56 173,43 141,39 127,96 96,50 77,20 61,76 49,41 39,53 31,62 25,30 20,24 16,19 77,40 156,86 93,10 154,72 164,67

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 3,841 5,779 6,218 10,674 6,311 10,265 11,080 11,821 9,637 8,176 6,577 5,262 4,209 3,157 2,694 2,021 1,724 1,379 1,103 4,945 10,691 6,346 10,545 10,522

22 Debit Aliran Sungai lt/det 3841,24 5779,22 6217,97 10673,81 6311,05 10265,46 11079,58 11820,53 9636,61 8175,94 6577,20 5261,76 4209,41 3157,06 2694,02 2020,52 1724,17 1379,34 1103,47 4945,30 10691,25 6345,52 10544,89 10522,03

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 4,98 7,99 8,06 11,99 8,18 14,19 14,36 15,32 12,49 11,30 8,52 6,82 5,46 4,36 3,49 2,79 2,23 1,79 1,43 6,84 13,86 8,22 13,67 14,55
Sumber : Perhitungan

17
Tabel 3.9 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2008
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 69,91 258,57 324,60 234,74 174,32 222,51 158,52 52,15 95,52 2,44 2,11 0,00 0,00 0,00 2,70 0,00 0,00 0,00 112,86 221,47 394,33 196,65 48,08 81,67

2 Hari Hujan (h) Data hari 7,00 7,00 9,00 11,00 13,00 9,00 11,00 4,00 3,00 1,00 1,00 0,00 0,00 0,00 1,00 0,00 0,00 0,00 3,00 9,00 14,00 9,00 5,00 9,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,17 0,17 0,14 0,11 0,08 0,14 0,11 0,21 0,23 0,26 0,26 0,27 0,27 0,27 0,26 0,27 0,27 0,27 0,23 0,14 0,06 0,14 0,20 0,14

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 9,23 9,85 7,27 5,28 3,44 6,61 5,32 10,65 10,60 12,81 10,29 10,89 11,26 12,01 11,74 13,26 14,46 14,46 12,93 8,27 3,81 8,57 11,32 8,36

7 Et = (ETo) - (E) (3) - (6) mm/15hr 46,72 49,83 46,58 44,98 42,46 42,35 45,38 40,05 36,50 37,43 30,06 29,46 30,44 32,47 34,31 35,86 39,09 39,09 44,52 53,01 59,64 54,88 46,73 53,56

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 23,19 208,74 278,02 189,76 131,86 180,16 113,15 12,09 59,02 -34,99 -27,95 -29,46 -30,44 -32,47 -31,61 -35,86 -39,09 -39,09 68,34 168,46 334,68 141,77 1,35 28,11

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -34,99 -27,95 -29,46 -30,44 -32,47 -31,61 -35,86 -39,09 -39,09 0,00 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 165,01 137,05 107,60 77,16 44,69 13,08 -22,78 -61,87 -100,96 200,00 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 23,19 208,74 278,02 189,76 131,86 180,16 113,15 12,09 59,02 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 68,34 168,46 334,68 141,77 1,35 28,11

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 18,55 166,99 222,41 151,81 105,49 144,13 90,52 9,67 47,21 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 54,67 134,77 267,75 113,41 1,08 22,48

13 0.5 (1 + k) In Hitungan - 16,70 150,29 200,17 136,63 94,94 129,72 81,46 8,71 42,49 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 49,21 121,29 240,97 102,07 0,97 20,24

14 k * V (n - 1) Hitungan - 454,01 376,57 421,49 497,33 507,17 481,68 489,12 456,47 372,14 331,71 265,36 212,29 169,83 135,87 108,69 86,95 69,56 55,65 44,52 74,98 157,02 318,39 336,37 269,87

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 470,71 526,86 621,66 633,96 602,11 611,40 570,59 465,18 414,63 331,71 265,36 212,29 169,83 135,87 108,69 86,95 69,56 55,65 93,73 196,27 397,99 420,47 337,34 290,11

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -96,81 56,15 94,80 12,30 -31,85 9,30 -40,82 -105,41 -50,54 -82,93 -66,34 -53,07 -42,46 -33,97 -27,17 -21,74 -17,39 -13,91 38,07 102,55 201,72 22,47 -83,12 -47,23

17 Aliran Dasar (BF) (12) - (16) mm/15hr 115,36 110,84 127,61 139,51 137,34 134,83 131,33 115,08 97,76 82,93 66,34 53,07 42,46 33,97 27,17 21,74 17,39 13,91 16,60 32,22 66,03 90,94 84,20 69,72

18 Aliran Langsung (DR) (11) - (12) mm/15hr 4,64 41,75 55,60 37,95 26,37 36,03 22,63 2,42 11,80 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 13,67 33,69 66,94 28,35 0,27 5,62

19 Aliran (R) (17) + (18) mm/15hr 120,00 152,59 183,22 177,47 163,71 170,87 153,96 117,50 109,56 82,93 66,34 53,07 42,46 33,97 27,17 21,74 17,39 13,91 30,27 65,92 132,97 119,29 84,47 75,34

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 8,178 9,750 12,487 12,959 11,158 10,918 10,493 8,009 7,467 5,299 4,522 3,617 2,894 2,170 1,852 1,389 1,185 0,948 2,063 4,212 9,062 8,131 5,757 4,814

22 Debit Aliran Sungai lt/det 8178,49 9749,86 12487,29 12959,25 11157,98 10917,74 10493,36 8008,54 7467,12 5298,67 4521,53 3617,23 2893,78 2170,34 1852,02 1389,01 1185,29 948,23 2062,77 4211,71 9062,45 8130,51 5757,16 4813,81

23 Jumlah hari hari 15 16 15 14 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 10,60 13,48 16,18 15,68 14,46 15,09 13,60 10,38 9,68 7,32 5,86 4,69 3,75 3,00 2,40 1,92 1,54 1,23 2,67 5,82 11,74 10,54 7,46 6,65
Sumber : Perhitungan

18
Tabel 3.10 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2009
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 93,51 327,75 52,44 297,22 22,42 276,39 183,35 109,95 89,37 185,56 135,82 0,00 0,00 0,00 0,00 4,29 4,27 0,00 3,03 375,39 97,65 235,45 105,74 310,17

2 Hari Hujan (h) Data hari 11,00 14,00 6,00 9,00 5,00 11,00 13,00 6,00 5,00 7,00 4,00 0,00 0,00 0,00 0,00 1,00 1,00 0,00 1,00 5,00 7,00 9,00 7,00 9,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,11 0,06 0,18 0,14 0,20 0,11 0,08 0,18 0,20 0,17 0,21 0,27 0,27 0,27 0,27 0,26 0,26 0,27 0,26 0,20 0,17 0,14 0,17 0,14

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,87 3,58 9,69 6,30 8,95 5,14 3,80 9,13 9,18 8,29 8,47 10,89 11,26 12,01 12,43 12,53 13,66 14,46 14,65 11,95 10,47 8,57 9,58 8,36

7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,08 56,10 44,16 40,37 36,95 43,82 46,90 41,57 37,92 41,95 31,88 29,46 30,44 32,47 33,62 36,59 39,89 39,09 42,80 49,33 52,98 54,88 48,47 53,56

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 43,44 271,65 8,29 256,85 -14,53 232,57 136,45 68,38 51,46 143,61 103,95 -29,46 -30,44 -32,47 -33,62 -32,31 -35,63 -39,09 -39,77 326,06 44,67 180,57 57,27 256,61

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 -14,53 0,00 0,00 0,00 0,00 0,00 0,00 -29,46 -30,44 -32,47 -33,62 -32,31 -35,63 -39,09 -39,77 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 185,47 200,00 200,00 200,00 200,00 200,00 200,00 170,54 140,10 107,63 74,02 41,71 6,08 -33,01 -72,78 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 43,44 271,65 8,29 256,85 0,00 232,57 136,45 68,38 51,46 143,61 103,95 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 326,06 44,67 180,57 57,27 256,61

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 34,75 217,32 6,63 205,48 0,00 186,06 109,16 54,70 41,17 114,89 83,16 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 260,85 35,73 144,45 45,81 205,29

13 0.5 (1 + k) In Hitungan - 31,27 195,59 5,97 184,93 0,00 167,45 98,24 49,23 37,05 103,40 74,84 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 234,76 32,16 130,01 41,23 184,76

14 k * V (n - 1) Hitungan - 232,09 210,69 325,02 264,79 359,78 287,82 364,22 369,97 335,36 297,93 321,06 316,73 253,38 202,70 162,16 129,73 103,78 83,03 66,42 53,14 230,32 209,98 271,99 250,58

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 263,36 406,28 330,99 449,72 359,78 455,28 462,47 419,20 372,41 401,33 395,91 316,73 253,38 202,70 162,16 129,73 103,78 83,03 66,42 287,90 262,48 339,99 313,23 435,34

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -26,75 142,91 -75,29 118,74 -89,94 95,50 7,19 -43,26 -46,79 28,92 -5,42 -79,18 -63,35 -50,68 -40,54 -32,43 -25,95 -20,76 -16,61 221,48 -25,42 77,51 -26,77 122,12

17 Aliran Dasar (BF) (12) - (16) mm/15hr 61,50 74,40 81,92 86,75 89,94 90,56 101,97 97,96 87,96 85,97 88,58 79,18 63,35 50,68 40,54 32,43 25,95 20,76 16,61 39,37 61,15 66,94 72,58 83,17

18 Aliran Langsung (DR) (11) - (12) mm/15hr 8,69 54,33 1,66 51,37 0,00 46,51 27,29 13,68 10,29 28,72 20,79 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 65,21 8,93 36,11 11,45 51,32

19 Aliran (R) (17) + (18) mm/15hr 70,18 128,73 83,58 138,12 89,94 137,08 129,26 111,64 98,25 114,69 109,37 79,18 63,35 50,68 40,54 32,43 25,95 20,76 16,61 104,58 70,09 103,05 84,03 134,50

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 4,783 8,226 5,696 10,862 6,130 8,759 8,810 7,609 6,696 7,328 7,454 5,397 4,317 3,238 2,763 2,072 1,768 1,415 1,132 6,682 4,777 7,024 5,727 8,594

22 Debit Aliran Sungai lt/det 4783,45 8225,60 5696,16 10861,63 6130,25 8758,67 8809,92 7608,84 6696,23 7328,49 7454,29 5396,67 4317,33 3238,00 2763,09 2072,32 1768,38 1414,70 1131,76 6682,31 4776,85 ##### 5727,33 8593,82

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 6,20 11,37 7,38 12,20 7,94 12,11 11,42 9,86 8,68 10,13 9,66 6,99 5,60 4,48 3,58 2,86 2,29 1,83 1,47 9,24 6,19 9,10 7,42 11,88
Sumber : Perhitungan

19
Tabel 3.11 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2010
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 120,01 287,60 180,41 196,67 339,31 238,36 157,10 102,54 165,31 197,53 194,84 74,84 149,72 31,75 42,35 163,78 269,47 142,71 69,51 332,09 189,75 197,33 387,89 202,53

2 Hari Hujan (h) Data hari 9,00 14,00 12,00 8,00 6,00 13,00 8,00 8,00 13,00 10,00 5,00 4,00 8,00 2,00 3,00 6,00 10,00 11,00 8,00 15,00 11,00 9,00 14,00 8,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,14 0,06 0,09 0,15 0,18 0,08 0,15 0,15 0,08 0,12 0,20 0,21 0,15 0,24 0,23 0,18 0,12 0,11 0,15 0,05 0,11 0,14 0,06 0,15

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 7,55 3,58 4,85 7,00 8,26 3,67 7,61 7,61 3,53 6,03 7,87 8,47 6,26 10,68 10,36 8,84 6,43 5,62 8,62 2,76 6,66 8,57 3,48 9,29

7 Et = (ETo) - (E) (3) - (6) mm/15hr 48,40 56,10 49,00 39,67 37,64 45,29 43,10 43,10 43,57 44,21 32,48 31,88 35,45 33,80 35,69 40,28 47,12 47,93 48,83 58,52 56,79 54,88 54,57 52,63

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 71,62 231,50 131,41 157,00 301,67 193,07 114,00 59,45 121,74 153,32 162,36 42,97 114,27 -2,06 6,66 123,50 222,35 94,79 20,68 273,57 132,96 142,45 333,33 149,90

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -2,06 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 197,94 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 71,62 231,50 131,41 157,00 301,67 193,07 114,00 59,45 121,74 153,32 162,36 42,97 114,27 0,00 6,66 123,50 222,35 94,79 20,68 273,57 132,96 142,45 333,33 149,90

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 57,29 185,20 105,13 125,60 241,34 154,46 91,20 47,56 97,39 122,66 129,89 34,37 91,42 0,00 5,33 98,80 177,88 75,83 16,54 218,85 106,37 113,96 266,66 119,92

13 0.5 (1 + k) In Hitungan - 51,56 166,68 94,61 113,04 217,20 139,01 82,08 42,80 87,65 110,39 116,90 30,93 82,28 0,00 4,80 88,92 160,09 68,25 14,89 196,97 95,73 102,56 240,00 107,93

14 k * V (n - 1) Hitungan - 348,27 319,87 389,24 387,08 400,09 493,84 506,28 470,69 410,79 398,76 407,32 419,37 360,25 354,02 283,22 230,41 255,46 332,44 320,55 268,35 372,26 374,39 381,56 497,25

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 399,84 486,55 483,85 500,12 617,30 632,85 588,36 513,49 498,45 509,15 524,22 450,31 442,52 354,02 288,01 319,33 415,56 400,69 335,44 465,32 467,99 476,95 621,56 605,18

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -35,51 86,71 -2,70 16,27 117,18 15,55 -44,49 -74,87 -15,04 10,70 15,07 -73,91 -7,78 -88,50 -66,01 31,32 96,23 -14,86 -65,25 129,88 2,67 8,96 144,60 -16,38

17 Aliran Dasar (BF) (12) - (16) mm/15hr 92,80 98,49 107,82 109,33 124,16 138,91 135,69 122,43 112,44 111,96 114,82 108,28 99,20 88,50 71,34 67,48 81,65 90,69 81,79 88,97 103,70 104,99 122,06 136,30

18 Aliran Langsung (DR) (11) - (12) mm/15hr 14,32 46,30 26,28 31,40 60,33 38,61 22,80 11,89 24,35 30,66 32,47 8,59 22,85 0,00 1,33 24,70 44,47 18,96 4,14 54,71 26,59 28,49 66,67 29,98

19 Aliran (R) (17) + (18) mm/15hr 107,12 144,79 134,10 140,73 184,49 177,52 158,49 134,32 136,79 142,62 147,29 116,87 122,06 88,50 72,67 92,18 126,12 109,65 85,93 143,69 130,29 133,48 188,72 166,28

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 7,301 9,251 9,140 11,067 12,574 11,343 10,802 9,155 9,323 9,113 10,039 7,966 8,319 5,655 4,953 5,890 8,596 7,473 5,856 9,181 8,880 9,098 12,863 10,625

22 Debit Aliran Sungai lt/det 7300,9 9251,3 9139,9 11067,1 12574,2 11342,8 10802,1 9154,6 9322,8 9112,8 10038,7 7965,6 8319,0 5655,1 4952,8 5890,1 8596,1 7473,4 5856,5 9181,0 8880,3 9097,6 12862,5 10624,9

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 9,46 12,79 11,85 12,43 16,30 15,68 14,00 11,86 12,08 12,60 13,01 10,32 10,78 7,82 6,42 8,14 11,14 9,69 7,59 12,69 11,51 11,79 16,67 14,69
Sumber : Perhitungan

20
Tabel 3.12 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2011
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 227,55 205,06 147,75 243,69 107,76 211,84 198,83 230,44 270,23 18,47 16,15 3,78 2,70 15,48 0,00 0,00 0,00 0,00 0,00 119,38 268,61 255,95 76,23 323,82

2 Hari Hujan (h) Data hari 9,00 11,00 11,00 11,00 11,00 11,00 13,00 8,00 11,00 1,00 2,00 1,00 1,00 1,00 0,00 0,00 0,00 0,00 0,00 6,00 15,00 13,00 7,00 13,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,14 0,11 0,11 0,11 0,11 0,11 0,08 0,15 0,11 0,26 0,24 0,26 0,26 0,26 0,27 0,27 0,27 0,27 0,27 0,18 0,05 0,08 0,17 0,08

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 7,55 6,27 5,65 4,90 4,82 5,14 3,80 7,61 4,95 12,81 9,68 10,29 10,63 11,34 12,43 13,26 14,46 14,46 15,51 11,03 2,86 4,76 9,58 4,64

7 Et = (ETo) - (E) (3) - (6) mm/15hr 48,40 53,41 48,20 41,77 41,08 43,82 46,90 43,10 42,15 37,43 30,67 30,06 31,07 33,14 33,62 35,86 39,09 39,09 41,94 50,25 60,59 58,69 48,47 57,28

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 179,16 151,65 99,55 201,92 66,68 168,03 151,94 187,34 228,08 -18,96 -14,52 -26,28 -28,37 -17,66 -33,62 -35,86 -39,09 -39,09 -41,94 69,13 208,02 197,26 27,76 266,54

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -18,96 -14,52 -26,28 -28,37 -17,66 -33,62 -35,86 -39,09 -39,09 -41,94 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 181,04 166,52 140,24 111,88 94,22 60,60 24,75 -14,35 -53,44 -95,38 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 179,16 151,65 99,55 201,92 66,68 168,03 151,94 187,34 228,08 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 69,13 208,02 197,26 27,76 266,54

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 143,33 121,32 79,64 161,53 53,34 134,42 121,55 149,87 182,46 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 55,30 166,41 157,81 22,21 213,23

13 0.5 (1 + k) In Hitungan - 128,99 109,18 71,68 145,38 48,01 120,98 109,39 134,89 164,22 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 49,77 149,77 142,03 19,99 191,91

14 k * V (n - 1) Hitungan - 484,14 490,51 479,75 441,14 469,22 413,78 427,81 429,76 451,72 492,75 394,20 315,36 252,29 201,83 161,46 129,17 103,34 82,67 66,14 52,91 82,14 185,53 262,05 225,63

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 613,13 599,69 551,43 586,52 517,22 534,76 537,20 564,65 615,93 492,75 394,20 315,36 252,29 201,83 161,46 129,17 103,34 82,67 66,14 102,68 231,91 327,56 282,04 417,54

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 7,96 -13,44 -48,26 35,09 -69,30 17,53 2,44 27,45 51,29 -123,19 -98,55 -78,84 -63,07 -50,46 -40,37 -32,29 -25,83 -20,67 -16,53 36,54 129,23 95,65 -45,52 135,50

17 Aliran Dasar (BF) (12) - (16) mm/15hr 135,37 134,76 127,90 126,44 122,64 116,89 119,11 122,43 131,18 123,19 98,55 78,84 63,07 50,46 40,37 32,29 25,83 20,67 16,53 18,76 37,18 62,16 67,73 77,73

18 Aliran Langsung (DR) (11) - (12) mm/15hr 35,83 30,33 19,91 40,38 13,34 33,61 30,39 37,47 45,62 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 13,83 41,60 39,45 5,55 53,31

19 Aliran (R) (17) + (18) mm/15hr 171,20 165,09 147,81 166,82 135,97 150,49 149,49 159,90 176,79 123,19 98,55 78,84 63,07 50,46 40,37 32,29 25,83 20,67 16,53 32,58 78,78 101,62 73,28 131,04

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 11,668 10,548 10,074 13,119 9,267 9,616 10,189 10,898 12,049 7,871 6,717 5,373 4,299 3,224 2,751 2,063 1,761 1,409 1,127 2,082 5,369 6,926 4,995 8,373

22 Debit Aliran Sungai lt/det 11668,2 10548,4 10074,3 13119,1 9267,4 9615,9 10188,9 10897,8 12049,4 7871,2 6716,7 5373,4 4298,7 3224,0 2751,2 2063,4 1760,7 1408,6 1126,9 2081,9 5369,3 6925,7 4994,8 8372,9

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 15,12 14,58 13,06 14,74 12,01 13,29 13,20 14,12 15,62 10,88 8,70 6,96 5,57 4,46 3,57 2,85 2,28 1,83 1,46 2,88 6,96 8,98 6,47 11,57
Sumber : Perhitungan

21
Tabel 3.13 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2012
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 398,94 127,77 118,96 288,90 311,77 80,75 143,13 215,86 231,06 32,32 9,12 1,95 0,00 0,00 0,00 0,00 0,00 7,34 49,51 118,28 20,74 458,92 227,33 279,40

2 Hari Hujan (h) Data hari 14,00 12,00 8,00 13,00 10,00 7,00 13,00 3,00 11,00 5,00 5,00 1,00 0,00 0,00 0,00 0,00 0,00 1,00 4,00 6,00 6,00 15,00 14,00 14,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,06 0,09 0,15 0,08 0,12 0,17 0,08 0,23 0,11 0,20 0,20 0,26 0,27 0,27 0,27 0,27 0,27 0,26 0,21 0,18 0,18 0,05 0,06 0,06

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 3,36 5,37 8,08 3,77 5,51 8,08 3,80 11,41 4,95 9,80 7,87 10,29 11,26 12,01 12,43 13,26 14,46 13,66 12,06 11,03 11,42 2,86 3,48 3,72

7 Et = (ETo) - (E) (3) - (6) mm/15hr 52,59 54,31 45,77 46,49 40,39 40,88 46,90 39,29 42,15 40,44 32,48 30,06 30,44 32,47 33,62 35,86 39,09 39,89 45,39 50,25 52,03 60,59 54,57 58,20

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 346,34 73,46 73,19 242,41 271,38 39,87 96,23 176,57 188,91 -8,12 -23,36 -28,11 -30,44 -32,47 -33,62 -35,86 -39,09 -32,55 4,12 68,03 -31,29 398,33 172,76 221,20

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -8,12 -23,36 -28,11 -30,44 -32,47 -33,62 -35,86 -39,09 -32,55 0,00 0,00 -31,29 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 191,88 168,52 140,41 109,97 77,49 43,88 8,02 -31,07 -63,62 200,00 200,00 168,71 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 346,34 73,46 73,19 242,41 271,38 39,87 96,23 176,57 188,91 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4,12 68,03 0,00 398,33 172,76 221,20

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 277,08 58,77 58,55 193,93 217,10 31,90 76,99 141,25 151,13 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3,30 54,42 0,00 318,66 138,21 176,96

13 0.5 (1 + k) In Hitungan - 249,37 52,89 52,70 174,53 195,39 28,71 69,29 127,13 136,01 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 2,97 48,98 0,00 286,80 124,39 159,26

14 k * V (n - 1) Hitungan - 334,03 466,72 415,69 374,71 439,39 507,83 429,23 398,82 420,76 445,41 356,33 285,07 228,05 182,44 145,95 116,76 93,41 74,73 59,78 50,20 79,34 63,47 280,22 323,68

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 583,40 519,61 468,39 549,24 634,79 536,54 498,52 525,94 556,77 445,41 356,33 285,07 228,05 182,44 145,95 116,76 93,41 74,73 62,75 99,18 79,34 350,27 404,60 482,95

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 165,86 -63,79 -51,23 80,86 85,54 -98,25 -38,02 27,42 30,82 -111,35 -89,08 -71,27 -57,01 -45,61 -36,49 -29,19 -23,35 -18,68 -11,98 36,43 -19,84 270,93 54,33 78,34

17 Aliran Dasar (BF) (12) - (16) mm/15hr 111,22 122,56 109,78 113,07 131,56 130,15 115,01 113,83 120,30 111,35 89,08 71,27 57,01 45,61 36,49 29,19 23,35 18,68 15,28 17,99 19,84 47,73 83,88 98,62

18 Aliran Langsung (DR) (11) - (12) mm/15hr 69,27 14,69 14,64 48,48 54,28 7,97 19,25 35,31 37,78 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,82 13,61 0,00 79,67 34,55 44,24

19 Aliran (R) (17) + (18) mm/15hr 180,48 137,25 124,42 161,55 185,83 138,12 134,25 149,14 158,08 111,35 89,08 71,27 57,01 45,61 36,49 29,19 23,35 18,68 16,10 31,60 19,84 127,40 118,43 142,86

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 12,301 8,770 8,480 11,797 12,666 8,825 9,150 10,165 10,774 7,115 6,072 4,857 3,886 2,914 2,487 1,865 1,592 1,273 1,097 2,019 1,352 8,683 8,071 9,128

22 Debit Aliran Sungai lt/det 12301,05 8769,70 8479,64 11797,15 12665,73 8825,44 9150,16 10164,95 10774,26 7115,06 6071,52 4857,21 3885,77 2914,33 2486,89 1865,17 1591,61 1273,29 1097,25 2018,94 1351,91 8683,11 8071,49 9127,95

23 Jumlah hari hari 15 16 15 14 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 15,94 12,12 10,99 14,27 16,41 12,20 11,86 13,17 13,96 9,84 7,87 6,29 5,04 4,03 3,22 2,58 2,06 1,65 1,42 2,79 1,75 11,25 10,46 12,62
Sumber : Perhitungan

22
Tabel 3.14 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2013
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 252,26 305,62 219,68 178,66 76,69 253,48 130,74 214,54 73,81 206,45 279,57 45,69 209,69 22,18 0,00 0,92 0,81 4,43 0,80 118,12 214,08 83,73 268,53 231,71

2 Hari Hujan (h) Data hari 13,00 12,00 10,00 10,00 9,00 9,00 10,00 8,00 9,00 12,00 9,00 7,00 8,00 2,00 0,00 1,00 1,00 1,00 1,00 8,00 11,00 4,00 11,00 7,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,08 0,09 0,12 0,12 0,14 0,14 0,12 0,15 0,14 0,09 0,14 0,17 0,15 0,24 0,27 0,26 0,26 0,26 0,26 0,15 0,11 0,21 0,11 0,17

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 4,20 5,37 6,46 5,60 6,20 6,61 6,08 7,61 6,36 4,52 5,45 6,66 6,26 10,68 12,43 12,53 13,66 13,66 14,65 9,19 6,66 13,32 6,10 10,22

7 Et = (ETo) - (E) (3) - (6) mm/15hr 51,75 54,31 47,39 41,07 39,70 42,35 44,62 43,10 40,74 45,72 34,90 33,69 35,45 33,80 33,62 36,59 39,89 39,89 42,80 52,09 56,79 50,13 51,95 51,70

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 200,51 251,31 172,29 137,59 36,98 211,13 86,13 171,45 33,07 160,73 244,66 12,00 174,24 -11,62 -33,62 -35,68 -39,08 -35,47 -42,00 66,03 157,30 33,61 216,58 180,00

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -11,62 -33,62 -35,68 -39,08 -35,47 -42,00 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 188,38 154,76 119,09 80,00 44,53 2,54 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 200,51 251,31 172,29 137,59 36,98 211,13 86,13 171,45 33,07 160,73 244,66 12,00 174,24 0,00 0,00 0,00 0,00 0,00 0,00 66,03 157,30 33,61 216,58 180,00

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 160,41 201,05 137,83 110,07 29,59 168,91 68,90 137,16 26,45 128,58 195,73 9,60 139,39 0,00 0,00 0,00 0,00 0,00 0,00 52,83 125,84 26,89 173,26 144,00

13 0.5 (1 + k) In Hitungan - 144,37 180,94 124,05 99,07 26,63 152,02 62,01 123,44 23,81 115,73 176,16 8,64 125,46 0,00 0,00 0,00 0,00 0,00 0,00 47,54 113,25 24,20 155,94 129,60

14 k * V (n - 1) Hitungan - 386,36 424,58 484,42 486,78 468,67 396,24 438,61 400,49 419,15 354,37 376,07 441,79 360,34 388,63 310,91 248,73 198,98 159,18 127,35 101,88 119,54 186,23 168,34 259,42

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 530,72 605,52 608,47 585,84 495,30 548,26 500,62 523,94 442,96 470,09 552,23 450,42 485,79 388,63 310,91 248,73 198,98 159,18 127,35 149,42 232,79 210,43 324,28 389,03

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 47,78 74,80 2,95 -22,63 -90,54 52,96 -47,64 23,32 -80,98 27,13 82,14 -101,81 35,37 -97,16 -77,73 -62,18 -49,75 -39,80 -31,84 22,07 83,37 -22,36 113,85 64,75

17 Aliran Dasar (BF) (12) - (16) mm/15hr 112,63 126,25 134,89 132,70 120,13 115,95 116,54 113,84 107,43 101,45 113,59 111,41 104,02 97,16 77,73 62,18 49,75 39,80 31,84 30,75 42,47 49,25 59,41 79,26

18 Aliran Langsung (DR) (11) - (12) mm/15hr 40,10 50,26 34,46 27,52 7,40 42,23 17,23 34,29 6,61 32,15 48,93 2,40 34,85 0,00 0,00 0,00 0,00 0,00 0,00 13,21 31,46 6,72 43,32 36,00

19 Aliran (R) (17) + (18) mm/15hr 152,73 176,51 169,35 160,22 127,52 158,18 133,77 148,13 114,05 133,60 162,52 113,81 138,87 97,16 77,73 62,18 49,75 39,80 31,84 43,96 73,93 55,97 102,73 115,26

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 10,410 11,278 11,542 12,600 8,691 10,107 9,117 10,096 7,773 8,536 11,077 7,757 9,465 6,208 5,298 3,973 3,390 2,712 2,170 2,809 5,039 3,815 7,001 7,364

22 Debit Aliran Sungai lt/det ###### 11278,40 11541,96 12599,86 8691,48 10106,94 9117,00 10095,82 ##### 8536,25 11076,98 7756,50 9464,99 6208,06 5297,55 3973,16 3390,43 2712,34 2169,88 2808,82 5038,58 3814,58 7001,49 7364,50

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 13,49 15,59 14,96 14,15 11,26 13,97 11,82 13,08 10,07 11,80 14,36 10,05 12,27 8,58 6,87 5,49 4,39 3,52 2,81 3,88 6,53 4,94 9,07 10,18
Sumber : Perhitungan

23
Tabel 3.15 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2014
DAS : Gintung
Luas DAS : 88,33 km2

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 420,38 215,77 145,21 186,21 153,41 156,47 137,67 154,22 180,90 34,68 4,83 187,09 183,02 75,47 10,60 24,35 0,00 0,00 0,00 43,15 165,42 381,14 254,56 322,12

2 Hari Hujan (h) Data hari 12,00 13,00 10,00 8,00 10,00 10,00 13,00 7,00 7,00 3,00 1,00 5,00 3,00 1,00 2,00 2,00 0,00 0,00 0,00 3,00 7,00 12,00 12,00 13,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,09 0,08 0,12 0,15 0,12 0,12 0,08 0,17 0,17 0,23 0,26 0,20 0,23 0,26 0,24 0,24 0,27 0,27 0,27 0,23 0,17 0,09 0,09 0,08

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,04 4,48 6,46 7,00 5,51 5,88 3,80 8,37 7,77 11,30 10,29 7,87 9,38 11,34 11,05 11,79 14,46 14,46 15,51 13,79 10,47 5,71 5,22 4,64

7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,91 55,20 47,39 39,67 40,39 43,08 46,90 42,33 39,33 38,94 30,06 32,48 32,32 33,14 35,00 37,33 39,09 39,09 41,94 47,49 52,98 57,74 52,83 57,28

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 369,47 160,57 97,82 146,55 113,02 113,38 90,77 111,89 141,57 -4,26 -25,23 154,60 150,71 42,33 -24,39 -12,98 -39,09 -39,09 -41,94 -4,35 112,44 323,40 201,74 264,85

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -4,26 -25,23 0,00 0,00 0,00 -24,39 -12,98 -39,09 -39,09 -41,94 -4,35 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 195,74 170,52 200,00 200,00 200,00 175,61 162,63 123,53 84,44 42,50 38,16 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 369,47 160,57 97,82 146,55 113,02 113,38 90,77 111,89 141,57 0,00 0,00 154,60 150,71 42,33 0,00 0,00 0,00 0,00 0,00 0,00 112,44 323,40 201,74 264,85

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 295,58 128,45 78,26 117,24 90,42 90,70 72,62 89,51 113,26 0,00 0,00 123,68 120,57 33,86 0,00 0,00 0,00 0,00 0,00 0,00 89,95 258,72 161,39 211,88

13 0.5 (1 + k) In Hitungan - 266,02 115,61 70,43 105,51 81,38 81,63 65,36 80,56 101,93 0,00 0,00 111,31 108,51 30,48 0,00 0,00 0,00 0,00 0,00 0,00 80,96 232,85 145,25 190,69

14 k * V (n - 1) Hitungan - 311,22 461,79 461,92 425,88 425,11 405,19 389,46 363,85 355,53 365,97 292,78 234,22 276,43 307,95 270,74 216,59 173,27 138,62 110,90 88,72 70,97 121,54 283,52 343,01

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 577,24 577,40 532,35 531,39 506,49 486,83 454,82 444,41 457,46 365,97 292,78 345,54 384,94 338,43 270,74 216,59 173,27 138,62 110,90 88,72 151,93 354,39 428,77 533,70

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 188,21 0,16 -45,05 -0,96 -24,90 -19,66 -32,01 -10,41 13,05 -91,49 -73,19 52,76 39,40 -46,51 -67,69 -54,15 -43,32 -34,65 -27,72 -22,18 63,21 202,46 74,37 104,94

17 Aliran Dasar (BF) (12) - (16) mm/15hr 107,36 128,29 123,31 118,19 115,32 110,37 104,63 99,91 100,21 91,49 73,19 70,92 81,16 80,37 67,69 54,15 43,32 34,65 27,72 22,18 26,74 56,26 87,02 106,94

18 Aliran Langsung (DR) (11) - (12) mm/15hr 73,89 32,11 19,56 29,31 22,60 22,68 18,15 22,38 28,31 0,00 0,00 30,92 30,14 8,47 0,00 0,00 0,00 0,00 0,00 0,00 22,49 64,68 40,35 52,97

19 Aliran (R) (17) + (18) mm/15hr 181,26 160,41 142,87 147,50 137,92 133,04 122,78 122,29 128,52 91,49 73,19 101,84 111,31 88,84 67,69 54,15 43,32 34,65 27,72 22,18 49,23 120,94 127,37 159,91

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 12,354 10,249 9,737 11,600 9,400 8,501 8,368 8,335 8,760 5,846 4,989 6,941 7,586 5,676 4,613 3,460 2,952 2,362 1,890 1,417 3,355 8,243 8,681 10,218

22 Debit Aliran Sungai lt/det ###### 10249,37 9737,40 11599,82 9400,38 8501,04 8368,28 8334,90 8759,61 5846,02 4988,61 6941,29 7586,09 5676,48 4613,14 3459,85 2952,41 2361,93 1889,54 1417,16 3355,10 8242,69 8680,72 10217,64

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 16,01 14,17 12,62 13,03 12,18 11,75 10,85 10,80 11,35 8,08 6,47 9,00 9,83 7,85 5,98 4,78 3,83 3,06 2,45 1,96 4,35 10,68 11,25 14,12
Sumber : Perhitungan

24
Tabel 3.16 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2015
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 66,75 354,83 332,04 54,18 237,18 248,87 101,47 323,93 146,42 63,98 26,21 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 160,22 264,12 413,53 59,25

2 Hari Hujan (h) Data hari 5,00 12,00 10,00 6,00 13,00 9,00 10,00 11,00 4,00 2,00 1,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 8,00 7,00 14,00 7,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,20 0,09 0,12 0,18 0,08 0,14 0,12 0,11 0,21 0,24 0,26 0,27 0,27 0,27 0,27 0,27 0,27 0,27 0,27 0,27 0,15 0,17 0,06 0,17

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 10,91 5,37 6,46 8,40 3,44 6,61 6,08 5,32 9,89 12,06 10,29 10,89 11,26 12,01 12,43 13,26 14,46 14,46 15,51 16,55 9,52 10,47 3,48 10,22

7 Et = (ETo) - (E) (3) - (6) mm/15hr 45,04 54,31 47,39 38,27 42,46 42,35 44,62 45,38 37,21 38,18 30,06 29,46 30,44 32,47 33,62 35,86 39,09 39,09 41,94 44,73 53,93 52,98 54,57 51,70

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 21,71 300,52 284,65 15,91 194,72 206,52 56,85 278,55 109,21 25,79 -3,85 -29,46 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -41,94 -44,73 106,29 211,14 358,97 7,54

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -3,85 -29,46 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -41,94 -44,73 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 196,15 166,70 136,26 103,79 70,17 34,31 -4,78 -43,87 -85,81 -130,54 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 21,71 300,52 284,65 15,91 194,72 206,52 56,85 278,55 109,21 25,79 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 106,29 211,14 358,97 7,54

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 17,36 240,42 227,72 12,73 155,78 165,21 45,48 222,84 87,36 20,64 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 85,03 168,91 287,17 6,04

13 0.5 (1 + k) In Hitungan - 15,63 216,37 204,95 11,45 140,20 148,69 40,93 200,56 78,63 18,57 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 76,53 152,02 258,46 5,43

14 k * V (n - 1) Hitungan - 426,96 354,07 456,36 529,04 432,40 458,08 485,42 421,08 497,31 460,75 383,46 306,77 245,41 196,33 157,06 125,65 100,52 80,42 64,33 51,47 41,17 94,16 196,94 364,32

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 442,59 570,45 661,31 540,50 572,60 606,77 526,35 621,64 575,94 479,32 383,46 306,77 245,41 196,33 157,06 125,65 100,52 80,42 64,33 51,47 117,70 246,18 455,40 369,75

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr -91,11 127,86 90,86 -120,81 32,10 34,17 -80,42 95,29 -45,70 -96,62 -95,86 -76,69 -61,35 -49,08 -39,27 -31,41 -25,13 -20,10 -16,08 -12,87 66,23 128,48 209,22 -85,65

17 Aliran Dasar (BF) (12) - (16) mm/15hr 108,48 112,56 136,86 133,53 123,68 131,04 125,90 127,55 133,06 117,25 95,86 76,69 61,35 49,08 39,27 31,41 25,13 20,10 16,08 12,87 18,80 40,43 77,95 91,68

18 Aliran Langsung (DR) (11) - (12) mm/15hr 4,34 60,10 56,93 3,18 38,94 41,30 11,37 55,71 21,84 5,16 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 21,26 42,23 71,79 1,51

19 Aliran (R) (17) + (18) mm/15hr 112,82 172,66 193,79 136,72 162,62 172,34 137,27 183,26 154,91 122,41 95,86 76,69 61,35 49,08 39,27 31,41 25,13 20,10 16,08 12,87 40,05 82,66 149,75 93,19

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 7,689 11,033 13,208 10,752 11,084 11,012 9,356 12,491 10,558 7,822 6,534 5,227 4,182 3,136 2,676 2,007 1,713 1,370 1,096 0,822 2,730 5,634 10,206 5,955

22 Debit Aliran Sungai lt/det 7689,21 11032,55 13208,02 10751,52 11083,66 11012,16 9355,98 12490,56 ##### 7821,54 6533,74 5226,99 4181,59 3136,19 2676,22 2007,16 1712,78 1370,22 1096,18 822,13 2729,94 5633,66 10206,08 5954,61

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 9,97 15,25 17,12 12,08 14,36 15,22 12,13 16,19 13,68 10,81 8,47 6,77 5,42 4,34 3,47 2,77 2,22 1,78 1,42 1,14 3,54 7,30 13,23 8,23
Sumber : Perhitungan

25
Tabel 3.17 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2016
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 214,40 170,92 326,35 136,15 104,01 226,97 268,72 153,86 295,92 99,25 194,96 122,76 189,55 114,26 27,41 127,72 51,95 393,53 466,26 235,63 216,12 333,29 266,69 155,31

2 Hari Hujan (h) Data hari 11,00 11,00 11,00 9,00 9,00 14,00 15,00 9,00 14,00 9,00 8,00 8,00 6,00 7,00 1,00 4,00 2,00 10,00 13,00 13,00 13,00 12,00 13,00 8,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 50,26 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,11 0,11 0,11 0,14 0,14 0,06 0,05 0,14 0,06 0,14 0,15 0,15 0,18 0,17 0,26 0,21 0,24 0,12 0,08 0,08 0,08 0,09 0,08 0,15

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,87 6,27 5,65 6,79 6,20 2,94 2,28 6,84 2,83 6,78 6,05 6,05 7,51 7,34 11,74 10,32 12,85 6,43 4,31 4,60 4,76 5,71 4,35 9,29

7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,08 53,41 48,20 43,47 39,70 46,02 48,42 43,86 44,27 43,46 34,30 34,30 34,19 37,14 34,31 38,80 40,70 47,12 53,14 56,68 58,69 57,74 53,70 52,63

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 164,33 117,51 278,15 92,68 64,30 180,95 220,30 110,00 251,64 55,79 160,66 88,47 155,36 77,12 -6,90 88,91 11,25 346,41 413,12 178,95 157,43 275,55 212,99 102,68

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -6,90 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 193,10 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 164,33 117,51 278,15 92,68 64,30 180,95 220,30 110,00 251,64 55,79 160,66 88,47 155,36 77,12 0,00 88,91 11,25 346,41 413,12 178,95 157,43 275,55 212,99 102,68

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 131,46 94,01 222,52 74,14 51,44 144,76 176,24 88,00 201,31 44,63 128,53 70,77 124,29 61,70 0,00 71,13 9,00 277,13 330,49 143,16 125,95 220,44 170,39 82,14

13 0.5 (1 + k) In Hitungan - 118,32 84,61 200,27 66,73 46,30 130,28 158,62 79,20 181,18 40,17 115,68 63,69 111,86 55,53 0,00 64,02 8,10 249,41 297,44 128,84 113,35 198,40 153,35 73,93

14 k * V (n - 1) Hitungan - 295,80 331,29 332,72 426,39 394,50 352,63 386,33 435,96 412,13 474,65 411,86 422,03 388,58 400,35 364,70 291,76 284,62 234,18 386,88 547,46 541,04 523,51 577,53 584,70

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 414,12 415,90 532,99 493,12 440,79 482,92 544,95 515,16 593,31 514,82 527,53 485,72 500,44 455,88 364,70 355,78 292,73 483,59 684,32 676,30 654,39 721,91 730,88 658,63

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 44,37 1,78 117,09 -39,87 -52,33 42,12 62,03 -29,79 78,15 -78,49 12,71 -41,81 14,71 -44,56 -91,18 -8,92 -63,05 190,87 200,73 -8,02 -21,91 67,52 8,97 -72,25

17 Aliran Dasar (BF) (12) - (16) mm/15hr 87,10 92,22 105,43 114,01 103,77 102,63 114,21 117,79 123,16 123,13 115,82 112,58 109,57 106,26 91,18 80,05 72,06 86,26 129,77 151,18 147,85 152,92 161,42 154,39

18 Aliran Langsung (DR) (11) - (12) mm/15hr 32,87 23,50 55,63 18,54 12,86 36,19 44,06 22,00 50,33 11,16 32,13 17,69 31,07 15,42 0,00 17,78 2,25 69,28 82,62 35,79 31,49 55,11 42,60 20,54

19 Aliran (R) (17) + (18) mm/15hr 119,96 115,73 161,06 132,55 116,63 138,82 158,27 139,79 173,49 134,28 147,95 130,28 140,64 121,68 91,18 97,84 74,31 155,54 212,39 186,97 179,34 208,03 204,02 174,93

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 8,176 7,394 10,977 9,679 7,949 8,870 10,787 9,528 11,825 8,580 10,084 8,879 9,586 7,775 6,214 6,251 5,064 10,601 14,476 11,947 12,223 14,179 13,905 11,177

22 Debit Aliran Sungai lt/det 8176,10 7394,46 10977,41 9679,17 7948,93 8870,29 10786,89 9527,61 ##### 8580,22 10083,67 8879,15 9585,78 7774,96 6214,13 6251,33 5064,45 10600,93 14475,73 11946,67 12223,17 14178,63 13905,09 11177,12

23 Jumlah hari hari 15 16 15 14 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 10,60 10,22 14,23 11,71 10,30 12,26 13,98 12,35 15,32 11,86 13,07 11,51 12,42 10,75 8,05 8,64 6,56 13,74 18,76 16,52 15,84 18,38 18,02 15,45
Sumber : Perhitungan

26
Tabel 3.18 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2017
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 260,05 236,89 168,86 297,19 94,12 250,58 155,52 233,36 38,50 115,67 72,14 39,19 5,13 4,32 0,00 0,00 0,00 137,60 86,55 439,12 101,05 266,61 76,09 283,66

2 Hari Hujan (h) Data hari 12,00 11,00 10,00 10,00 8,00 9,00 7,00 13,00 5,00 4,00 5,00 6,00 1,00 1,00 0,00 0,00 0,00 6,00 5,00 6,00 9,00 14,00 9,00 10,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,09 0,11 0,12 0,12 0,15 0,14 0,17 0,08 0,20 0,21 0,20 0,18 0,26 0,26 0,27 0,27 0,27 0,18 0,20 0,18 0,14 0,06 0,14 0,12

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,04 6,27 6,46 5,60 6,89 6,61 8,37 3,80 9,18 10,55 7,87 7,26 10,63 11,34 12,43 13,26 14,46 9,64 11,20 11,03 8,57 3,81 7,84 7,43

7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,91 53,41 47,39 41,07 39,02 42,35 42,33 46,90 37,92 39,69 32,48 33,09 31,07 33,14 33,62 35,86 39,09 43,91 46,25 50,25 54,88 59,64 50,21 54,49

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 209,13 183,48 121,48 256,12 55,10 208,23 113,18 186,46 0,58 75,98 39,66 6,10 -25,94 -28,82 -33,62 -35,86 -39,09 93,69 40,30 388,87 46,17 206,97 25,88 229,17

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -25,94 -28,82 -33,62 -35,86 -39,09 0,00 0,00 0,00 0,00 0,00 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 174,06 145,25 111,63 75,77 36,68 200,00 200,00 200,00 200,00 200,00 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 209,13 183,48 121,48 256,12 55,10 208,23 113,18 186,46 0,58 75,98 39,66 6,10 0,00 0,00 0,00 0,00 0,00 93,69 40,30 388,87 46,17 206,97 25,88 229,17

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 167,31 146,78 97,18 204,90 44,08 166,58 90,55 149,17 0,47 60,79 31,73 4,88 0,00 0,00 0,00 0,00 0,00 74,95 32,24 311,10 36,93 165,57 20,70 183,34

13 0.5 (1 + k) In Hitungan - 150,58 132,10 87,46 184,41 39,67 149,92 81,49 134,25 0,42 54,71 28,55 4,39 0,00 0,00 0,00 0,00 0,00 67,46 29,02 279,99 33,24 149,01 18,63 165,00

14 k * V (n - 1) Hitungan - 526,91 541,99 539,27 501,39 548,64 470,65 496,46 462,36 477,29 382,17 349,50 302,44 245,47 196,38 157,10 125,68 100,54 80,44 118,31 117,87 318,28 281,22 344,19 290,26

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 677,48 674,09 626,74 685,80 588,31 620,57 577,95 596,61 477,71 436,88 378,06 306,84 245,47 196,38 157,10 125,68 100,54 147,89 147,33 397,85 351,52 430,23 362,82 455,26

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 18,85 -3,39 -47,36 59,06 -97,49 32,26 -42,62 18,66 -118,90 -40,83 -58,82 -71,22 -61,37 -49,09 -39,28 -31,42 -25,14 47,35 -0,56 250,52 -46,33 78,71 -67,41 92,44

17 Aliran Dasar (BF) (12) - (16) mm/15hr 148,46 150,18 144,54 145,84 141,57 134,32 133,17 130,51 119,37 101,62 90,55 76,10 61,37 49,09 39,28 31,42 25,14 27,60 32,80 60,58 83,26 86,86 88,12 90,90

18 Aliran Langsung (DR) (11) - (12) mm/15hr 41,83 36,70 24,30 51,22 11,02 41,65 22,64 37,29 0,12 15,20 7,93 1,22 0,00 0,00 0,00 0,00 0,00 18,74 8,06 77,77 9,23 41,39 5,18 45,83

19 Aliran (R) (17) + (18) mm/15hr 190,28 186,87 168,83 197,06 152,59 175,97 155,81 167,80 119,49 116,82 98,48 77,32 61,37 49,09 39,28 31,42 25,14 46,34 40,86 138,35 92,50 128,25 93,29 136,73

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 12,969 11,940 11,507 15,497 10,400 11,244 10,619 11,436 8,144 7,464 6,712 5,270 4,183 3,137 2,677 2,008 1,713 3,158 2,785 8,840 6,304 8,741 6,358 8,737

22 Debit Aliran Sungai lt/det ###### 11940,31 11506,85 15497,16 10399,71 11243,50 10619,08 11436,46 ##### 7464,18 6711,97 5269,79 4182,56 3136,92 2676,84 2007,63 1713,18 3158,50 2785,06 8840,07 6304,23 8741,31 6358,44 8736,61

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 16,81 16,51 14,91 17,41 13,48 15,54 13,76 14,82 10,55 10,32 8,70 6,83 5,42 4,34 3,47 2,78 2,22 4,09 3,61 12,22 8,17 11,33 8,24 12,08
Sumber : Perhitungan

27
Tabel 3.19 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2018
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 243,93 147,88 170,41 327,35 304,01 78,86 158,29 165,01 0,91 75,21 0,00 13,30 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4,97 436,92 93,19 473,79 37,61

2 Hari Hujan (h) Data hari 12,00 12,00 10,00 11,00 9,00 4,00 8,00 6,00 1,00 5,00 0,00 3,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 2,00 11,00 4,00 10,00 4,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,09 0,09 0,12 0,11 0,14 0,21 0,15 0,18 0,26 0,20 0,27 0,23 0,27 0,27 0,27 0,27 0,27 0,27 0,27 0,24 0,11 0,21 0,12 0,21

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 5,04 5,37 6,46 4,90 6,20 10,28 7,61 9,13 12,01 9,80 10,89 9,08 11,26 12,01 12,43 13,26 14,46 14,46 15,51 14,71 6,66 13,32 6,97 13,00

7 Et = (ETo) - (E) (3) - (6) mm/15hr 50,91 54,31 47,39 41,77 39,70 38,68 43,10 41,57 35,09 40,44 29,46 31,27 30,44 32,47 33,62 35,86 39,09 39,09 41,94 46,57 56,79 50,13 51,08 48,92

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 193,02 93,57 123,02 285,58 264,31 40,18 115,20 123,43 -34,18 34,77 -29,46 -17,97 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -41,94 -41,60 380,13 43,06 422,71 -11,31

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -34,18 0,00 -29,46 -17,97 -30,44 -32,47 -33,62 -35,86 -39,09 -39,09 -41,94 -41,60 0,00 0,00 0,00 -11,31

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 165,82 200,00 170,54 152,57 122,13 89,66 56,04 20,19 -18,91 -58,00 -99,94 -141,54 200,00 200,00 200,00 188,69

11 Kelebihan Air (WS) (8)- (9) mm/15hr 193,02 93,57 123,02 285,58 264,31 40,18 115,20 123,43 0,00 34,77 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 380,13 43,06 422,71 0,00

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 154,41 74,85 98,42 228,46 211,44 32,14 92,16 98,75 0,00 27,81 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 304,11 34,45 338,17 0,00

13 0.5 (1 + k) In Hitungan - 138,97 67,37 88,58 205,62 190,30 28,93 82,94 88,87 0,00 25,03 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 273,70 31,00 304,35 0,00

14 k * V (n - 1) Hitungan - 364,21 402,54 375,93 371,60 461,78 521,66 440,47 418,73 406,08 324,87 279,92 223,94 179,15 143,32 114,66 91,72 73,38 58,70 46,96 37,57 30,06 243,00 219,20 418,84

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 503,18 469,91 464,51 577,22 652,08 550,59 523,42 507,61 406,08 349,90 279,92 223,94 179,15 143,32 114,66 91,72 73,38 58,70 46,96 37,57 303,75 274,00 523,56 418,84

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 47,92 -33,27 -5,41 112,72 74,86 -101,49 -27,17 -15,81 -101,52 -56,19 -69,98 -55,98 -44,79 -35,83 -28,66 -22,93 -18,34 -14,68 -11,74 -9,39 266,18 -29,75 249,55 -104,71

17 Aliran Dasar (BF) (12) - (16) mm/15hr 106,49 108,12 103,82 115,75 136,59 133,63 119,33 114,56 101,52 84,00 69,98 55,98 44,79 35,83 28,66 22,93 18,34 14,68 11,74 9,39 37,92 64,20 88,62 104,71

18 Aliran Langsung (DR) (11) - (12) mm/15hr 38,60 18,71 24,60 57,12 52,86 8,04 23,04 24,69 0,00 6,95 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 76,03 8,61 84,54 0,00

19 Aliran (R) (17) + (18) mm/15hr 145,10 126,83 128,43 172,86 189,45 141,67 142,37 139,24 101,52 90,95 69,98 55,98 44,79 35,83 28,66 22,93 18,34 14,68 11,74 9,39 113,95 72,81 173,16 104,71

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 9,889 8,104 8,753 13,594 12,912 9,052 9,704 9,490 6,919 5,811 4,770 3,816 3,053 2,289 1,954 1,465 1,250 1,000 0,800 0,600 7,766 4,962 11,802 6,691

22 Debit Aliran Sungai lt/det 9889,15 8104,23 8753,17 13594,21 12912,12 9051,90 9703,64 9490,35 ##### 5811,45 4769,54 3815,63 3052,51 2289,38 1953,60 1465,20 1250,31 1000,25 800,20 600,15 7766,44 4962,23 11801,86 6690,63

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 12,82 11,20 11,34 15,27 16,73 12,51 12,58 12,30 8,97 8,03 6,18 4,95 3,96 3,16 2,53 2,03 1,62 1,30 1,04 0,83 10,07 6,43 15,30 9,25
Sumber : Perhitungan

28
Tabel 3.20 Perhitungan Debit Andalan dengan Metode F.J. Mock Tahun 2019
DAS : Gintung
2
Luas DAS : 88,33 km

Jan Feb Mar Apr Mei Jun Jul Agst Sept Okt Nov Des
No URAIAN Hitungan Satuan
I II I II I II I II I II I II I II I II I II I II I II I II

I DATA HUJAN

1 Curah Hujan (P) Data mm/15hr 274,16 227,81 169,99 221,55 188,21 282,07 110,41 157,77 121,17 0,00 0,00 0,00 3,19 0,97 0,00 0,00 0,00 0,00 1,24 0,00 59,20 8,05 103,12 189,42

2 Hari Hujan (h) Data hari 7,00 14,00 11,00 11,00 11,00 10,00 10,00 8,00 4,00 0,00 0,00 0,00 1,00 1,00 0,00 0,00 0,00 0,00 1,00 0,00 4,00 2,00 11,00 12,00

II EVAPOTRANSPIRASI TERBATAS (Et)

3 Evapotranspirasi Potensial (ETo) ETo mm/15hr 55,95 59,68 53,85 46,67 45,90 48,96 50,70 50,70 47,10 50,24 40,35 40,35 41,70 44,48 46,05 49,12 53,55 53,55 57,45 61,28 63,45 63,45 58,05 61,92

4 Permukaan Lahan Terbuka (m) Tentukan % 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00 30,00

5 (m/20) * (18 - h) Hitungan - 0,17 0,06 0,11 0,11 0,11 0,12 0,12 0,15 0,21 0,27 0,27 0,27 0,26 0,26 0,27 0,27 0,27 0,27 0,26 0,27 0,21 0,24 0,11 0,09

6 E = (ETo) * (m/20) * (18 - h) (3) * (5) mm/15hr 9,23 3,58 5,65 4,90 4,82 5,88 6,08 7,61 9,89 13,56 10,89 10,89 10,63 11,34 12,43 13,26 14,46 14,46 14,65 16,55 13,32 15,23 6,10 5,57

7 Et = (ETo) - (E) (3) - (6) mm/15hr 46,72 56,10 48,20 41,77 41,08 43,08 44,62 43,10 37,21 36,68 29,46 29,46 31,07 33,14 33,62 35,86 39,09 39,09 42,80 44,73 50,13 48,22 51,95 56,35

III KESEIMBANGAN AIR

8 Ds = P - Et (1) - (7) mm/15hr 227,45 171,71 121,79 179,78 147,13 238,98 65,80 114,67 83,96 -36,68 -29,46 -29,46 -27,87 -32,17 -33,62 -35,86 -39,09 -39,09 -41,56 -44,73 9,08 -40,18 51,16 133,07

9 Kandungan Air Tanah mm/15hr 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 -36,68 -29,46 -29,46 -27,87 -32,17 -33,62 -35,86 -39,09 -39,09 -41,56 -44,73 0,00 -40,18 0,00 0,00

10 Kapasitas Kelembaban Tanah (SMC) SMC mm/15hr 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 200,00 163,32 133,87 104,41 76,54 44,37 10,75 -25,11 -64,20 -103,29 -144,85 -189,58 200,00 159,82 200,00 200,00

11 Kelebihan Air (WS) (8)- (9) mm/15hr 227,45 171,71 121,79 179,78 147,13 238,98 65,80 114,67 83,96 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 9,08 0,00 51,16 133,07

IV ALIRAN DAN PENYIMPANAN

AIR TANAH

12 Infiltrasi (I) (11) * (i) mm/15hr 181,96 137,37 97,43 143,83 117,70 191,19 52,64 91,74 67,17 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 7,26 0,00 40,93 106,46

13 0.5 (1 + k) In Hitungan - 163,76 123,63 87,69 129,44 105,93 172,07 47,37 82,57 60,45 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 6,54 0,00 36,84 95,81

14 k * V (n - 1) Hitungan - 335,08 399,07 418,16 404,68 427,30 426,58 478,92 421,04 402,88 370,66 296,53 237,22 189,78 151,82 121,46 97,17 77,73 62,19 49,75 39,80 31,84 30,70 24,56 49,12

15 Volume Penyimpanan (Vn) (13) + (14) mm/15hr 498,84 522,70 505,85 534,12 533,23 598,65 526,29 503,60 463,33 370,66 296,53 237,22 189,78 151,82 121,46 97,17 77,73 62,19 49,75 39,80 38,37 30,70 61,40 144,93

16 Perubahan Volume Air (DVn) Vn - V(n-1) mm/15hr 79,99 23,87 -16,85 28,27 -0,89 65,42 -72,36 -22,69 -40,27 -92,67 -74,13 -59,31 -47,44 -37,96 -30,36 -24,29 -19,43 -15,55 -12,44 -9,95 -1,42 -7,67 30,70 83,53

17 Aliran Dasar (BF) (12) - (16) mm/15hr 101,96 113,50 114,28 115,55 118,59 125,76 124,99 114,43 107,44 92,67 74,13 59,31 47,44 37,96 30,36 24,29 19,43 15,55 12,44 9,95 8,69 7,67 10,23 22,93

18 Aliran Langsung (DR) (11) - (12) mm/15hr 45,49 34,34 24,36 35,96 29,43 47,80 13,16 22,93 16,79 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 1,82 0,00 10,23 26,61

19 Aliran (R) (17) + (18) mm/15hr 147,45 147,85 138,64 151,51 148,02 173,56 138,15 137,37 124,23 92,67 74,13 59,31 47,44 37,96 30,36 24,29 19,43 15,55 12,44 9,95 10,50 7,67 20,47 49,54

V DEBIT ALIRAN SUNGAI

21 Debit Aliran Sungai A * (19) m3/dtk 10,050 9,447 9,449 11,915 10,088 11,090 9,416 9,362 8,467 5,921 5,053 4,042 3,234 2,425 2,070 1,552 1,325 1,060 0,848 0,636 0,716 0,523 1,395 3,165

22 Debit Aliran Sungai lt/det ###### 9446,84 9449,27 11914,90 10088,42 11089,86 9415,96 9362,41 ##### 5921,00 5052,58 4042,07 3233,65 2425,24 2069,54 1552,15 1324,50 1059,60 847,68 635,76 715,73 523,09 1394,83 3165,37

23 Jumlah hari hari 15 16 15 13 15 16 15 15 15 16 15 15 15 16 15 16 15 15 15 16 15 15 15 16

24 Debit Aliran (dibaca : 10E^6) m3/15hr 13,02 13,06 12,25 13,38 13,07 15,33 12,20 12,13 10,97 8,19 6,55 5,24 4,19 3,35 2,68 2,15 1,72 1,37 1,10 0,88 0,93 0,68 1,81 4,38
Sumber : Perhitungan

29
Tabel 3.21 Rekapitulasi Perhitungan Debit Andalan dengan FJ. Mock Bendungan Gintung (Periode 2000 – 2019)
Debit (m3/dt) Rerata
Bulan Periode
Bulanan
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Jan I 17.63 7.75 7.13 5.94 8.06 12.82 10.74 3.84 8.18 4.78 7.30 11.67 12.30 10.41 12.35 7.69 8.18 12.97 9.89 10.05 9.48
II 13.84 10.06 11.02 9.70 11.11 12.17 10.74 5.78 9.75 8.23 9.25 10.55 8.77 11.28 10.25 11.03 7.39 11.94 8.10 9.45 10.02
Feb I 12.32 11.54 11.38 11.09 9.39 13.09 10.19 6.22 12.49 5.70 9.14 10.07 8.48 11.54 9.74 13.21 10.98 11.51 8.75 9.45 10.31
II 17.43 9.31 11.29 14.59 12.31 16.02 12.82 10.67 12.96 10.86 11.07 13.12 11.80 12.60 11.60 10.75 9.68 15.50 13.59 11.91 12.50
Maret I 14.53 10.39 7.71 13.37 12.73 12.19 12.88 6.31 11.16 6.13 12.57 9.27 12.67 8.69 9.40 11.08 7.95 10.40 12.91 10.09 10.62
II 12.50 12.22 9.28 12.55 9.65 14.93 10.07 10.27 10.92 8.76 11.34 9.62 8.83 10.11 8.50 11.01 8.87 11.24 9.05 11.09 10.54
April I 12.06 14.28 7.89 10.84 11.58 12.32 10.44 11.08 10.49 8.81 10.80 10.19 9.15 9.12 8.37 9.36 10.79 10.62 9.70 9.42 10.37
II 11.33 12.62 9.47 8.42 8.48 11.21 11.24 11.82 8.01 7.61 9.15 10.90 10.16 10.10 8.33 12.49 9.53 11.44 9.49 9.36 10.06
Mei I 11.17 9.76 9.89 11.09 6.70 9.14 8.14 9.64 7.47 6.70 9.32 12.05 10.77 7.77 8.76 10.56 11.82 8.14 6.92 8.47 9.21
II 8.88 8.18 6.53 7.14 10.93 8.05 8.31 8.18 5.30 7.33 9.11 7.87 7.12 8.54 5.85 7.82 8.58 7.46 5.81 5.92 7.65
Juni I 8.74 8.76 5.76 6.10 7.73 6.45 6.41 6.58 4.52 7.45 10.04 6.72 6.07 11.08 4.99 6.53 10.08 6.71 4.77 5.05 7.03
II 6.55 6.41 4.56 4.88 6.13 9.32 5.13 5.26 3.62 5.40 7.97 5.37 4.86 7.76 6.94 5.23 8.88 5.27 3.82 4.04 5.87
Juli I 5.24 5.13 3.65 3.90 5.67 7.62 4.10 4.21 2.89 4.32 8.32 4.30 3.89 9.46 7.59 4.18 9.59 4.18 3.05 3.23 5.23
II 3.93 3.85 2.73 2.93 4.05 5.35 3.08 3.16 2.17 3.24 5.66 3.22 2.91 6.21 5.68 3.14 7.77 3.14 2.29 2.43 3.85
Agust I 3.36 3.28 2.33 2.50 3.45 4.57 2.62 2.69 1.85 2.76 4.95 2.75 2.49 5.30 4.61 2.68 6.21 2.68 1.95 2.07 3.26
II 2.52 2.46 1.75 1.87 2.59 3.49 1.97 2.02 1.39 2.07 5.89 2.06 1.87 3.97 3.46 2.01 6.25 2.01 1.47 1.55 2.63
Sept I 2.15 2.47 1.49 1.60 2.21 2.96 1.68 1.72 1.19 1.77 8.60 1.76 1.59 3.39 2.95 1.71 5.06 1.71 1.25 1.32 2.43
II 2.10 1.87 1.19 1.28 1.77 2.59 1.34 1.38 0.95 1.41 7.47 1.41 1.27 2.71 2.36 1.37 10.60 3.16 1.00 1.06 2.42
Okt I 3.63 2.66 0.96 1.02 1.41 2.65 1.07 1.10 2.06 1.13 5.86 1.13 1.10 2.17 1.89 1.10 14.48 2.79 0.80 0.85 2.49
II 4.44 16.14 2.43 5.23 2.64 5.86 0.81 4.95 4.21 6.68 9.18 2.08 2.02 2.81 1.42 0.82 11.95 8.84 0.60 0.64 4.69
Nop I 11.40 12.59 4.66 3.10 3.29 5.13 1.55 10.69 9.06 4.78 8.88 5.37 1.35 5.04 3.36 2.73 12.22 6.30 7.77 0.72 6.00
II 9.46 13.66 5.98 7.76 12.45 9.28 2.15 6.35 8.13 7.02 9.10 6.93 8.68 3.81 8.24 5.63 14.18 8.74 4.96 0.52 7.65
Des I 11.76 10.41 5.30 14.42 8.35 7.98 2.21 10.54 5.76 5.73 12.86 4.99 8.07 7.00 8.68 10.21 13.91 6.36 11.80 1.39 8.39
II 8.41 8.78 6.85 9.44 13.32 10.06 6.20 10.52 4.81 8.59 10.62 8.37 9.13 7.36 10.22 5.95 11.18 8.74 6.69 3.17 8.42

Rerata 8.97 8.53 5.89 7.11 7.33 8.55 6.08 6.46 6.22 5.72 8.94 6.74 6.47 7.43 6.90 6.60 9.84 7.58 6.10 5.14 7.13

Sumber : Perhitungan

Gambar 3.22 Grafik Debit Bulanan Metode FJ. Mock Bendungan Gintung

30
3.2 Reablitas yang Dipakai di Bendungan Gintung
Dari hasil perhitungan debit andalan dengan metode FJ. Mock diperoleh debit bulanan
rerata sebesar 7,13 m3 /dt untuk DAS Sungai Gintung. Dalam analisis ini tampungan air akan
dimanfaatkan untuk pemenuhan kebutuhan air baku, air irigasi dan PLTMH. Maka keandalan
debit yang digunakan adalah keandalan 90%.
Probabilitas tersebut dihitung dengan persamaan sebagai berikut :
Pr = m / (n+1) * 100 %
Dimana :
Pr = probabilitas (%)
m = nomer data
n = jumlah data
Penentuan Debit Andalan 90% berdasarkan FJ. Mock Basic Year dapat dilihat pada
Tabel 3.22 sebagai berikut:
Tabel 3.23 Penentuan Debit Andalan 90% Berdasarkan Berdasarkan FJ. Mock Basic
Year
Debit (m3/dt)
No. Tahun P (%) Tahun
asli urut
1 2000 8.9744 9.8386 4.76 2016
2 2001 8.5250 8.9744 9.52 2000
3 2002 5.8853 8.9359 14.29 2010
4 2003 7.1142 8.5520 19.05 2005
5 2004 7.3340 8.5250 23.81 2001
6 2005 8.5520 7.5768 28.57 2017
7 2006 6.0789 7.4262 33.33 2013
8 2007 6.4574 7.3340 38.10 2004
9 2008 6.2223 7.1142 42.86 2003
10 2009 5.7192 6.8972 47.62 2014
11 2010 8.9359 6.7404 52.38 2011
12 2011 6.7404 6.5954 57.14 2015
13 2012 6.4725 6.4725 61.90 2012
14 2013 7.4262 6.4574 66.67 2007
15 2014 6.8972 6.2223 71.43 2008
16 2015 6.5954 6.1020 76.19 2018
17 2016 9.8386 6.0789 80.95 2006
18 2017 7.5768 5.8853 85.71 2002
19 2018 6.1020 5.7192 90.48 2009
20 2019 5.1353 5.1353 95.24 2019

Sumber: Hasil Perhitungan


Dari tabel diatas didapatkan debit keandalan 90% didapatkan pada Tahun 2009 dapat
dilihat pada Tabel 3.23 sebagai berikut:.
Tabel 3.24 Debit Keandalan 90% (Tahun Keandalan 2009)
Debit Debit
Bulan Periode Jmlh Hr
m3/dt m3/dt
Jan I 15 4.78 13.009054
II 16 8.23
Feb I 15 5.70 16.557787
II 13 10.86
Maret I 15 6.13 14.888918
II 16 8.76
April I 15 8.81 16.418758
II 15 7.61
Mei I 15 6.70 14.024726
II 16 7.33
Juni I 15 7.45 12.850962
II 15 5.40
Juli I 15 4.32 7.555335
II 16 3.24
Agust I 15 2.76 4.835414
II 16 2.07
Sept I 15 1.77 3.183084
II 15 1.41
Okt I 15 1.13 7.814069
II 16 6.68
Nop I 15 4.78 11.800614
II 15 7.02
Des I 15 5.73 14.321155
II 16 8.59
Sumber: Hasil Perhitungan
BAB IV
PENUTUP

4.1 Kesimpulan
Dari hasil analisis perhitungan debit andalan DAS Gintung yang telah dilakukan, ada
beberapa kesimpulan yang dapat diambil sebagai berikut :
1. Dari hasil analisis perhitungan debit andalan DAS Gintung menggunakan metode F.J.
Mock periode Tahun 2000-2019 didapatkan debit rerata bulanan sebesar 7,13 m3/dt.
2. Analisis ini tampungan air akan dimanfaatkan untuk pemenuhan kebutuhan air baku, air
irigasi dan PLTMH. Maka keandalan debit yang digunakan adalah keandalan 90%. Debit
Andalan 90% berdasarkan perhitungan FJ. Mock Basic Year didapatkan pada Tahun
2009.

4.2 Saran
` Untuk menunjang perhitungan pada DAS Gintung, maka perlu dilakukan updating data
yaitu data hujan, data klimatologi, dan data DAS untuk memperoleh hasil analisis yang sesuai
dengan kondisi saat.
DAFTAR PUSTAKA

BBWS Serayu Opak. 2019. Data Hujan. Yogyakarta.


BMKG Banjarnegara. 2019. Monthly ETo Penman-Monteith Data. Banjarnegara.
Dirjen Pengairan, 1985, Crop Water Requirement, Badan Penerbit Dirjen
Pengairan, Jakarta.
Goodman. (1984). A hierarchical approach to performance analysis. SPORTS.

Anda mungkin juga menyukai