Harga Satuan
No URAIAN Volume Satuan Total Jumlah (Rp.)
(Rp.)
a b c d e=bxd
1. OPERASIONAL dan HONOR TPK (Max 3% X Sub Total 1+(2+3+4)
1 Administrasi Perencanaan (Desain RAB) 1 % 1 Paket 322,415 322,500
2 Honor Tim Pelaksana Kegiatan 2 % 1 Paket 644,830 644,900
Sub-Total (1) 967,400
2. UPAH
1 Pekerja 37.00 HOK 195,500 7,233,500
2 Tukang 11.00 HOK 287,500 3,162,500
3 Kepala Tukang 2.00 HOK 299,000 598,000
4 Mandor 6.00 HOK 230,000 1,380,000
Sub-Total (2) 12,374,000
3. BAHAN
1 Besi Beton 8 mm 86.00 m3 129,000 11,094,000
2 Kawat Bendrat 6.00 kg 32,250 193,500
3 Multiflex 12/18mm 9.00 lembar 251,550 2,263,950
4 Kaso 5/7 cm 0.40 m3 3,870,000 1,548,000
5 Paku 5 cm + 7 cm 15.00 kg 32,250 483,750
6 Semen 21.00 sak 129,000 2,709,000
7 Pasir 2.00 m3 322,500 645,000
8 Batu Pecah/Split 2.00 Buah 280,000 560,000
9 Air 1.00 Gran 90,300 90,300
10 Papan/Spanduk Kegiatan 1.00 paket 280,000 280,000
Sub-Total (3) 19,867,500
4. ALAT
Sub-Total (4) -
Sub-Total (2+3+4) 32,241,500
TOTAL 1+(2+3+4) 33,208,900
DIBULATKAN Rp 33,208,900.00
Terbilang :
a b
1 1.1.f (c) 1 m2 Pembersihan dan Pengupasan Permukaan Tanah (Striping) s.d. Tanaman ∅ 2cm
Volume 47 x 1 = 47.00 m2
A TENAGA
Pekerja OH 0.100 195,500 19,550 47.00
Mandor OH 0.050 230,000 11,500 47.00
Jumlah Harga Tenaga Kerja 31,050
B BAHAN
52 55 52 8 = 167 cm
p x banyaknya
(M) (btg)
47 x 10 470.00 m memanjang
167 x 293.75 = 49056.25 cm 490.56 m
960.56
80.05 batang dibulatkan 81 batang 383.94 kg
Harga Satuan Jumlah
KOEF. VOLUME
NO URAIAN SAT (Rp) Harga (Rp)
a b
Besi beton ukuran 8 mm
ukuran unit btg
4 x 0,7 1 x 81 = 81
berat/btg
81 x 4.74 384 kg
10
38
A TENAGA
Pekerja OH 0.070 195,500 13,685 38.39
Tukang OH 0.070 287,500 20,125 38.39
Kepala Tukang OH 0.007 299,000 2,093 38.39
Mandor OH 0.004 230,000 920 38.39
Jumlah Harga Tenaga Kerja 36,823
B BAHAN
Besi beton (polos/ulir) 8 mm batang 2.215 118,680.00 262,899 38.39
Kawat Bendrat kg 0.150 32,250.00 4,838 38.39
Jumlah Harga Bahan 267,736
C PERALATAN
A TENAGA
Pekerja OH 0.200 195,500 39,100 65.80
Tukang OH 0.100 287,500 28,750 65.80
Kepala Tukang OH 0.010 299,000 2,990 65.80
Mandor OH 0.020 230,000 4,600 65.80
Jumlah Harga Tenaga Kerja 75,440
B BAHAN
Multiflex 12/18mm lbr 0.128 251,550.00 32,198 65.80
Kaso 5/7 cm m3 0.005 3,870,000.00 19,350 65.80
Paku 5 cm + 7 cm kg 0.220 32,250.00 7,095 65.80
Minyak bekisting liter 0.200 - - 65.80
Jumlah Harga Bahan 58,643
C PERALATAN
a b
60+64+60
47 x 1.84 x 0.15 = 12.972
3.102 m3
50+40+50
47 x 1.4 x 0.15 = 9.87
A TENAGA
Pekerja OH 1.650 195,500 322,575 3.10
Tukang OH 0.275 287,500 79,063 3.10
Kepala Tukang OH 0.028 299,000 8,372 3.10
Mandor OH 0.165 230,000 37,950 3.10
Jumlah Harga Tenaga Kerja 447,960
B BAHAN
Semen sak 6.520 129,000.00 841,080 3.10
Pasir m3 0.543 322,500.00 175,071 3.10
Batu Pecah/Split m3 0.572 999,750.00 571,524 3.10
Air m3 215.000 - - 3.10
Jumlah Harga Bahan 1,587,675
C PERALATAN
30,718,150
Roll 4 -
Batu
KEBUTUHAN Besi Beton Kawat Multiflex Kaso 5/7 Paku 5 cm Minyak Pecah/
- 8 mm Bendrat 12/18mm cm + 7 cm bekisting Semen Pasir Split Air Pekerja Tukang
c=axb (batang) (kg) (HOK) (HOK)
-
- - -
-
- - -
Batu
KEBUTUHAN Besi Beton Kawat Multiflex Kaso 5/7 Paku 5 cm Minyak Pecah/
- 8 mm Bendrat 12/18mm cm + 7 cm bekisting Semen Pasir Split Air Pekerja Tukang
c=axb (batang) (kg) (HOK) (HOK)
2.69 2.68758
2.69 2.69
0.27
0.15
85.05 85.05
5.76 5.76
13.16 13.16
6.58 6.58
0.66
1.32
8.42 8.42
0.33 0.33
14.48 14.48
13.16 13.16
Batu
KEBUTUHAN Besi Beton Kawat Multiflex Kaso 5/7 Paku 5 cm Minyak Pecah/
- 8 mm Bendrat 12/18mm cm + 7 cm bekisting Semen Pasir Split Air Pekerja Tukang
c=axb (batang) (kg) (HOK) (HOK)
5.12 5.1183
0.85 0.85
0.09
0.51
20.23 20.23
1.68 1.68
1.77 1.77
666.93 666.9
85.05 5.76 8.42 0.33 14.48 13.16 20.23 1.68 1.77 666.93 36.78 10.12
Pembulatan 86.00 6.00 9.00 0.40 15.00 14.00 21.00 2.00 2.00 667.00 37.00 11.00
-
Kep.
Tukang Mandor
(HOK) (HOK)
2.35
1.11
Kep.
Tukang Mandor
(HOK) (HOK)
0.27
0.15
0.66
1.32
Kep.
Tukang Mandor
(HOK) (HOK)
0.09
0.51
1.01 5.44
2.00 6.00
A6. Form harga Satuan Upah dan Bahan
DAFTAR HARGA SATUAN UPAH DAN BAHAN
Spare
NO URAIAN SAT HARGA DASAR PPN 11% PPH 22 3% Kenaikan HARGA DASAR Pembulatan KETERANGAN
TANPA PAJAK Harga 15% BERIKUT PAJAK
A UPAH TENAGA KERJA
1 Pekerja ( Buruh semi terlatih ) HOK 170,000 Rp 25,500 195,500.00
2 Tehnisi HOK 177,000 Rp 26,550 203,550.00
3 Tukang HOK 250,000 - Rp 37,500 287,500.00
4 Kepala Tukang HOK 260,000 - Rp 39,000 299,000.00
5 Mandor HOK 200,000 - Rp 30,000 230,000.00
B.I.2. ALAT
1 Cangkul Buah 25,000 25,000.00
2 Exavator Mini PC 5.0 Hm 550,000 Rp 60,500 Rp 16,500 627,000.00
3 Chainsaw Hari 100,000 100,000.00
Catatan :
1. Harga diatas adalah harga setempat dan sudah sampai dilokasi kegiatan
3. Harga sudah terrmasuk Pajak Galian C untuk jenis material lokal (Galian C)
Desa………………………………………………………
( ………………………………….)
Menyetujui ,