Anda di halaman 1dari 2

TEKNIK KONSTRUKSI

KS
DAN PERUMAHAN

T2 E2B
P3 TUGAS AKHIR
WC
TERINTEGRASI - APL - KUG - ESTIMASI
P3
Tahun Pelajaran 2023/2024
Pipa menuju inst. air kotor lt.2 E2B
E3B P2
P2 TY3
S2
FD
E2A

DPIB
E2B
T2 S2
S MC
P3
P3
P2 FD
P2 DESAIN PERMODELAN DAN
INFORMASI BANGUNAN
ST S2
S E2B

P2
S2
S Nomor Presensi:

P3 WC NOMOR 14
S2
S
P2
P2
Nama Siswa:
P3

E2A
E2B P2 S2
P2 S2 P2
FD
NAMA : DANIKA GUSTU Z.P
E2B
RS
Judul Gambar Skala

Kode Keterangan Jumlah


INSTALASI AIR KOTOR
MS Mesin Cuci 1 bh LANTAI 1
1:75

WC Water Closet 2 bh
KS Kitchen Sink 1 bh
ST Septic Tank 1 bh
Catatan :
RS Resapan 1 bh
FD Floor Drain 3 bh
E2B Elbow Pipa PVC 90° 2" 5 bh
E3B Elbow Pipa PVC 90° 3" 3 bh
P2 Pipa PVC 2" (4 Meter) 10 bh : 39,4 m
PB INST. AIR KOTOR LT.1
P3 Pipa PVC 3" (4 Meter) 5 bh : 18,2 m
1 Skala 1 : 100
KODE HAL JML
T2 Tee Pipa 2" 1 bh
TY3 Tee Type Y Pipa 3" 1 bh
S2 Shock Pipa PVC 2" 6 bh
Pb 1
TEKNIK KONSTRUKSI
DAN PERUMAHAN

TUGAS AKHIR
TERINTEGRASI - APL - KUG - ESTIMASI
WC Tahun Pelajaran 2023/2024

Kode Keterangan Jumlah


WC Water Closet 2 bh

FD
E3A
FD
E3A
Floor Drain
Elbow Pipa PVC 45° 3"
1 bh
2 bh
DPIB
E3A
P3
DESAIN PERMODELAN DAN
P2 Pipa PVC 2" (4 Meter) 1 bh : 4,3 m
INFORMASI BANGUNAN
P3 Pipa PVC 3" (4 Meter) 1 bh : 3,9 m

Nomor Presensi:
P3

NOMOR
P2

Nama Siswa:

NAMA

Pipa Menuju Inst. air Kotor lt.1


Judul Gambar Skala

SITE PLAN 1:500

Catatan :

PB INST. AIR KOTOR LT.2


1 Skala 1 : 100
KODE HAL JML

Pb 2

Anda mungkin juga menyukai