ANGGOTA KELOMPOK :
1. AGUS IRWANTORO (3.11.19.0.01)
2. AKHMAD NUR RAFIK (3.11.19.0.02)
3. ALIQ SYAHBANA (3.11.19.0.03)
4. ANNAS MUQOROBIN (3.11.19.0.04)
5. ARDHIA SAFIRA F. (3.11.19.0.05)
6. CICI RAHMAWATI (3.11.19.0.07)
D3 KONSTRUKSI GEDUNG
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SEMARANG
TAHUN 2021
B C
PB1&2
P13a&b
PC
PB1&2
P19 PC PC
P12a&b P18
P5
P21
PB1&2
P11 P20 P3 P4
P8 P2 P1 P17
P9 P14 P15 P16
P6
Pipa ke saluran
PA Pipa saluran Air Bersih Ø2 1 2" PA
A Septictank Ø4"
dari Tandon Atas A
P10
P7
PA PA
B C KETERANGAN
P1 -P21 = PIPA GALVANIS Ø 3 4"
PA -PC = PIPA GALVANIS Ø 1 2"
DENAH INSTALASI AIR BERSIH & KOTOR LANTAI 1&2
SKALA 1:50
B C
P27
P30
P23 P25
P31
PD
A P29 P22 P24 P26
PD
A
P32 P28
Pipa Air Bekas ke Sumur
Resapan Ø2 1 2"
PD PD
B C KETERANGAN
3
P22 -P32 = PIPA GALVANIS Ø 4"
PD = PIPA GALVANIS Ø 1 2"
P34
SUMUR
RESAPAN
P37
KETERANGAN
P33 -P35 = PIPA GALVANIS Ø 4"
TAMAN P36-P37 = PIPA GALVANIS Ø2 1 2"
P33
P36
JALAN
PAVING
Pipa ke saluran
Pipa ke saluran Sumur
Septictank Ø4"
Resapan Ø2 1 2"
D
27
F1
28 D
24 26
23
25
30 22
29
D Pipa saluran air
31 bekas Ø2 12
D
32 D
27
F1
28 D
24 26
23
25
30 22
29
D
31
D
32
Pipa ke sumur
resapan Ø2
5
A
6
A
17 7
1
C C 18 16
4
B2 19 3 2
B1
B1 B2 15
21 20
Pipa saluran air
13B B2 14
B1 bersih Ø2 12
13A 8
12B
A
12A C
11
9 A
5
A
10
6
Pipa saluran air
A
kotor Ø4 17 7
1
C C 18 16
4
B2 19 3 2
B1
B1 B2 15
21 20
13B B2 14
B1
13A 8
12B
A
12A
11
9 A
10
Pipa ke
septictank Ø4
ISOMETRI SALURAN AIR
BERSIH & KOTOR LANTAI 1 & 2
Skala 1 : 500
+6.70
27
27
60
60
+3.45
+3.25
PA
27
27
60
60
±0.00
KETERANGAN:
-0.130
PE : PIPA GALVANIS Ø4 "
SUMUR PF : PIPA GALVANIS Ø2 1 2"
RESAPAN PG : PIPA GALVANIS Ø2 1 2"
+6.70 +6.70
114
83
83
58
50
+3.45 +3.45
+3.25 +3.25
114
83
83
58
50
±0.00 ±0.00
POTONGAN C-C
POTONGAN B-B
SKALA 1:50
SKALA 1:50