RESUME ASET GRIYATON

PER : 29 MARET 2023


NILAI BUKU SCRAP/ PESERTA LELANG
NO NAMA/JENIS BARANG PEROLEHAN 31/12/2022 KJPP KILOAN KETERANGAN
EDELWEIS PUTRA RAJAWALI
Wokshop Line 1,2,3,Outdoor, Bangunan
1 Bangunan 20,884,600,000 19,554,388,568 19,527,340,000 1,431,204,230
Penunjang dan Sarana Pelengkap
Batching Plant, Mesin Trowel Ebawe, Meja
2 Mesin 66,159,328,583 2,596,337,195 9,783,900,000 1,055,232,618
Mould

3 Alat Utama 4,332,673,515 955,377,738 2,505,100,000 - 5,000,000,000 Loader, OHC, Forklift, Kepala Trailer, Truck Mixer

4 Alat Produksi (Pengadaan di atas 2012) 556,855,212 41,161,573 - - Mesin Las, Alat Survey, Vibrator, Vibrator, Lab

5 Kendaraan 967,826,897 - - 225,000,000 Tronton, Ekor Trailer, Motor, Lowbed

Komputer, Laptop, AC, CCTV, Printer, UPS,


6 Peralatan Kantor & Komputer 1,886,739,913 - - 85,000,000
Televisi

7 Furnitur 307,562,561 307,562,561 - 15,000,000 Meja, Kursi, Lemari, ATK

TOTAL 95,095,586,681 23,454,827,635 31,816,340,000 2,811,436,848 - 5,000,000,000 - -


KJPP BANGUNAN
PER : 29 MARET 2023
PUNG'S ZULKARNAIN & REKAN PP URBAN (SCRAP)
SIFAT BIAYA NILAI BUKU KONDISI
NO NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN LOKASI AKHIR KONDISI BERAT KONDISI
DEPRESIASI 31/12/2022 AKHIR LUAS NILAI KETERANGAN LUAS HARSAT NILAI KETERANGAN
AKHIR kg AKHIR

1 Lahan Pabrik 1981 m2 36,240 - - Baik Griyaton 36,240 - Cukup 36,240 Lantai : 80% Beton Baik

Pondasi : Batu kali Pondasi : Batu kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
2 Kantor Pabrik 1981 unit 1 1,830,555,000 1,713,960,764 Baik Griyaton 855 1,735,650,000 Dinding : Bata Merah Cukup 871 Dinding : Bata Merah Baik
Atap : Rangka Baja & Metal Atap : Rangka Baja & Metal
Lantai : Keramik Lantai : Keramik

Pondasi : Tapak & Mini Pile Pondasi : Tapak & Mini Pile
Struktur : Profil Baja Struktur : Profil Baja
3 Bangunan Pabrik Line 1 Pabrik 1981 unit 1 6,033,960,000 5,649,636,689 Baik Griyaton 3,624 5,653,440,000 Dinding : Bata Ringan + Spandek Cukup 3,625 76,452 6,000 458,711,798 Dinding : Bata Ringan + Spandek Baik
Atap : Profil Baja & Metal Atap : Profil Baja & Metal
Lantai : Beton Lantai : Beton

Pondasi : Tapak & Mini Pile Pondasi : Tapak & Mini Pile
Struktur : Profil Baja Struktur : Profil Baja
4 Bangunan Pabrik Line 2 Pabrik 1981 unit 1 Baik Griyaton 2,640 1,478,400,000 Dinding : Bata Ringan + Spandek Buruk 2,550 46,235 6,000 277,409,000 Dinding : Bata Ringan + Spandek Baik
Atap : Profil Baja & Metal Atap : Profil Baja & Metal
Lantai : Beton Lantai : Beton

8,271,480,000 7,744,641,476

Pondasi : Tapak & Mini Pile Pondasi : Tapak & Mini Pile
Struktur : Profil Baja Struktur : Profil Baja
5 Bangunan Pabrik Line 3 Pabrik 1981 unit 1 Baik Griyaton 3,900 6,240,000,000 Dinding : Bata Ringan + Spandek Cukup 1,875 67,673 6,000 406,037,366 Dinding : Bata Ringan + Spandek Baik
Atap : Profil Baja & Metal Atap : Profil Baja & Metal
Lantai : Beton Lantai : Beton

Pondasi : Tapak & Mini Pile Pondasi : Tapak & Mini Pile
Struktur : Profil Baja Struktur : Profil Baja
6 Bangunan Pabrik Outdoor Pabrik 1981 unit 1 962,280,000 900,989,134 Baik Griyaton 1,320 871,200,000 Dinding : Bata Ringan + Spandek Cukup 1,300 35,300 6,000 211,802,514 Dinding : Baik
Atap : Profil Baja & Metal Atap : Profil Baja & Metal
Lantai : Beton Lantai : Beton

Pondasi : Tapak & Mini Pile Pondasi : Tapak & Mini Pile
Struktur : Profil Baja Struktur : Profil Baja
7 Bangunan Gudang Dan Bengkel Pabrik 1981 unit 1 - - Baik Griyaton 900 369,000,000 Dinding : Bata Ringan Buruk 360 2,520 4,500 11,340,000 Dinding : Bata Ringan Baik
Atap : Profil Baja + Spandek Atap : Profil Baja + Spandek
Lantai : Beton Lantai : Beton

Pondasi : Tapak & Mini Pile Pondasi : Tapak & Mini Pile
Struktur : Profil Baja Struktur : Profil Baja
8 Bangunan Bengkel Las & Tulangan Pabrik 2011 unit 1 1,009,380,000 945,089,175 Baik Griyaton 420 575,400,000 Dinding : Bata Ringan Baik 840 7,724 6,000 46,341,603 Dinding : Profil Baja + Bata Ringan Baik
Atap : Profil Baja + Spandek Atap : Profil Baja + Spandek
Lantai : Beton Lantai : Beton

Pondasi : Tapak & Mini Pile Pondasi : Tapak & Mini Pile
Struktur : Beton Bertulang Struktur : Beton Bertulang
9 Bangunan Stock Material Alam Pabrik 1981 unit 1 20,370,000 19,071,912 Baik Griyaton 210 16,800,000 Dinding : Batako + Spandek Scrap 281 1,406 4,500 6,328,125 Dinding : Batako + Spandek Baik
Atap : Profil Baja + Seng Atap : Profil Baja + Seng
Lantai : Beton Lantai : Beton

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
Dinding : Batako + Spandek Dinding : Batako + Spandek
10 Bangunan Maintenance Pabrik 2014 unit 1 67,320,000 63,032,162 Baik Griyaton 72 66,240,000 Baik 66 Baik
Atap : Kayu + Genteng Metal Atap : Kayu + Genteng Metal
Plafond : Triplek Plafond : Triplek
Lantai : Keramik Lantai : Keramik

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
Dinding : Beton Bertulang Dinding : Beton Bertulang
11 Bengunan Toilet, Genset, Gardu PLN Diesel Pabrik 2004 unit 1 29,520,000 27,639,771 Baik Griyaton 115 66,700,000 Cukup 120 Baik
Atap : Dak Beton Atap : Dak Beton
Pintu : Besi Pintu : Besi
Lantai : Beton Lantai : Beton
PUNG'S ZULKARNAIN & REKAN PP URBAN (SCRAP)
SIFAT BIAYA NILAI BUKU KONDISI
NO NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN LOKASI AKHIR KONDISI BERAT KONDISI
DEPRESIASI 31/12/2022 AKHIR LUAS NILAI KETERANGAN LUAS HARSAT NILAI KETERANGAN
AKHIR kg AKHIR

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
Dinding : Beton Bertulang Dinding : Beton Bertulang
12 Bangunan Gardu PLN Pabrik 1984 unit 1 71,760,000 67,189,363 Baik Griyaton 30 28,800,000 Buruk 35 Baik
Atap : Dak Beton Atap : Dak Beton
Pintu : Besi Pintu : Besi
Lantai : Beton Lantai : Beton

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
Dinding : Bata merah Dinding : Bata merah
13 Bangunan Kantin Pabrik 2014 unit 1 Baik Griyaton 88 143,440,000 Baik 121 607 4,500 2,733,750 Baik
Atap : Kayu + Spandek Atap : Kayu + Spandek
Plafond : Triplek Plafond : Triplek
Lantai : Keramik Lantai : Keramik

125,495,000 117,501,799

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
Dinding : Bata merah Dinding : Bata merah
14 Bangunan Loker Pabrik 2014 unit 1 Baik Griyaton 92 121,600,000 Baik 97 Baik
Atap : Kayu + Spandek Atap : Kayu + Spandek
Plafond : Triplek Plafond : Triplek
Lantai : Rabat Beton Lantai : Rabat Beton

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
Dinding : Bata merah Dinding : Bata merah
15 Bangunan Pos Jaga Pabrik 2004 unit 1 60,224,000 56,388,130 Baik Griyaton 32 56,640,000 Cukup 30 Baik
Atap : Kayu + Seng Atap : Kayu + Seng
Plafond : Gypsum Plafond : Gypsum
Lantai : Keramik Lantai : Keramik

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
Dinding : Bata Merah Dinding : Panel Precast
16 Bangunan Rumah Contoh Pabrik 2004 unit 1 62,208,000 58,245,762 Baik Griyaton 36 57,600,000 Cukup 36 Baik
Atap : Baja Ringan + Metal Atap : Baja Ringan + Metal
Plafond : Triplek Plafond : Gypsum
Lantai : Keramik Lantai : Keramik

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Rangka Baja
17 Bangunan Parkir Motor Pabrik 2016 unit 1 - - Baik Griyaton 50 20,500,000 Baik 56 281 4,500 1,263,600 Baik
Atap : Baja Ringan + Seng Atap : Baja Ringan + Seng
Lantai : Rabat beton Lantai : Rabat beton

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Beton Bertulang
18 Bangunan Panel Pabrik 2004 unit 1 - - Baik Griyaton 16 5,280,000 Dinding : Bata Merah Buruk 54 Dinding : Bata Merah Baik
Atap : Dak Beton Atap : Dak Beton
Lantai : Keramik Lantai : Keramik

Pondasi : Batu Kali Pondasi : Batu Kali


Struktur : Beton Bertulang Struktur : Rangka Baja
19 Bangunan Parkir Mobil Pabrik 2019 unit 1 - - Baik Griyaton 30 19,500,000 Sangat Baik 96 480 4,500 2,160,000 Baik
Atap : Baja Ringan + Seng Atap : Baja Ringan + Seng
Lantai : Rabat beton Lantai : Rabat beton

Penyambungan Listrik 950 KVA Penyambungan Listrik 950 KVA


20 Sarana Pelengkap Pabrik 1981 unit 1 2,134,906,000 1,998,926,619 Baik Griyaton 2,001,150,000 Pagar Beton Cukup Pagar Beton Baik
Perkerasan Beton Perkerasan Beton

Pondasi : Batu Kali


Struktur : Baja Ringan
21 Bangunan Gudang Alat Bantu Pabrik unit 1 - - Baik Griyaton 35 243 4,500 1,091,475 Dinding : GRC Baik
Atap : Rangka Baja + Seng
Lantai : Rabat Beton

Pondasi : Batu Kali


Struktur : Beton Bertulang
22 Bangunan Rumah Repair Pabrik unit 1 - - Baik Griyaton 24 Dinding : Bata merah Baik
Atap : Dak Beton
Lantai : Rabat Beton

Pondasi : Tapak
Struktur : Profil Baja
Dinding : GRC
23 Bangunan Mes Pekerja dan Parkir Pabrik unit 1 155,672,000 145,756,724 Baik Griyaton 95 665 4,500 2,992,500 Baik
Atap : Rangka Baja + Seng
Plafond : Triplek
Lantai : Beton + Plat
PUNG'S ZULKARNAIN & REKAN PP URBAN (SCRAP)
SIFAT BIAYA NILAI BUKU KONDISI
NO NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN LOKASI AKHIR KONDISI BERAT KONDISI
DEPRESIASI 31/12/2022 AKHIR LUAS NILAI KETERANGAN LUAS HARSAT NILAI KETERANGAN
AKHIR kg AKHIR

Pondasi : Tapak
Struktur : Profil Baja
Dinding : GRC
24 Loker 2 Pabrik unit 1 49,470,000 46,319,088 Baik Griyaton 95 665 4,500 2,992,500 Baik
Atap : Rangka Baja + Seng
Plafond : Triplek
Lantai : Beton + Plat

TOTAL 20,884,600,000.00 19,554,388,567.74 19,527,340,000.00 240,251 1,431,204,230.30


FOTO
FOTO
FOTO
KJPP MESIN
PER : 29 MARET 2023
JIMMY PRASETYO & REKAN PP URBAN
SIFAT BIAYA
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY SCRAP KONDISI BERAT KONDISI
DEPRESIASI QTY NILAI KETERANGAN QTY HARSAT NILAI KETERANGAN
AKHIR Kg AKHIR

Mixer 2, Silo 3, Hover 1, Coveyor 1, Vibrator Mixer 2, Silo 3, Hover 1, Coveyor 1, Vibrator Baik
1 Batching Plant Pabrik 2003 unit 1 Lelang 1 660,600,000 2, Buket 1, Kompresor 1, Tangki air 1, Biasa 1 2, Buket 1, Kompresor 1, Tangki air 1, Mixer Rusak
Pompa air 1 Pompa air 1 1

Bahan konstruksi plat baja, ukuran 1200 Bahan konstruksi plat baja, ukuran
2 Tilting Station Pabrik 2005 unit 2 Scrap 1 51,700,000 mm x 465 mm x 100 mm ,m dilengkapi Biasa 1 12000mm x 4000mm x 10mm ,m Baik
dengan 8 hydraulik meja tilting dilengkapi dengan 8 hydraulik meja tilting

Bahan konstruksi plat baja, digerakkan Bahan konstruksi plat baja, digerakkan
3 Cleaning Oiling and Plotter Pabrik 2005 unit 1 Scrap 1 592,400,000 Biasa 1 Rusak
motor listrik motor listrik

Bahan konstruksi pelat baja, digerakkan Bahan konstruksi pelat baja, digerakkan
4 Concreate distribution and Gladding machines Pabrik 2005 unit 1 Scrap 1 582,200,000 Biasa 1 Baik
motor listrik motor listrik

Bahan konstruksi pelat baja, ukuran 12,5 m Bahan konstruksi pelat baja, ukuran 12,5 m
5 Pallet for Production Pabrik 2005 unit 50 Scrap 42 1,181,900,000 P x 3,6 m L, dilengkapi dengan 80 unit Biasa 50 234,496 4,500 1,055,232,618 P x 4 m L, dilengkapi dengan 80 unit Baik
platform 20" platform 20"

Dilengkapi dengan 3 unit Transportable HF Dilengkapi dengan 3 unit Transportable HF


6 HF Vibrating Station Pabrik 2005 unit 20 Scrap 20 125,400,000 Biasa 20 Baik
Vibrating, 13 special magnet Vibrating, 13 special magnet

Bahan konstruksi pelat baja, digerakkan Bahan konstruksi pelat baja, digerakkan
7 Shaking Station Pabrik 2005 unit 2 Scrap 2 11,200,000 Biasa 2 Baik
motor listrik, ukuran meja kerja 3200 mm motor listrik, ukuran meja kerja 4900 mm

Bahan konstruksi pelat baja,kapasitas 21,5 Bahan konstruksi pelat baja,kapasitas 21,5
8 Pallet Storage device Pabrik 2005 unit 1 Scrap 1 238,200,000 Biasa 1 Baik
ton digerak kanmotor listrik 37,5 kW ton digerak kanmotor listrik 37,5 kW

Bahan konstruksi pelat baja,di gerakkan Bahan konstruksi pelat baja,di gerakkan
9 Side Shuttering Cleaning Machine Pabrik 2005 unit 1 Scrap 1 172,000,000 Biasa 1 Rusak
motor listrik 1,1 Hp motor listrik 1,1 Hp

Bahan konstruksi pelat baja,di gerakkan Bahan konstruksi pelat baja,di gerakkan
10 Storage Rack Side Shuttering Pabrik 2005 unit 2 Scrap 2 2,100,000 Biasa 2 Baik
motor listrik 1,1 Hp motor listrik 1,1 Hp

Bahan konstruksi pelat baja, ukuran 12,5 m Bahan konstruksi pelat baja, ukuran 12,5 m
11 Side Shuttering (Palet) Pabrik 2005 unit 42 Scrap 42 396,900,000 Biasa 42 Baik
P x 3,6 m L Px4mL
JIMMY PRASETYO & REKAN PP URBAN
SIFAT BIAYA
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY SCRAP KONDISI BERAT KONDISI
DEPRESIASI QTY NILAI KETERANGAN QTY HARSAT NILAI KETERANGAN
AKHIR Kg AKHIR

12 Pallet Transport System ( Panel kontrol ) Pabrik 2005 unit 1 Scrap 1 595,400,000 Biasa 1 Baik

Bahan konstruksi pelat baja, kapasitas 15 Bahan konstruksi pelat baja, kapasitas 15
13 Pallet Transport Lift ( Shutter Lift ) Pabrik 2005 unit 1 Scrap 1 28,300,000 Biasa 1 Baik
ton, dilengkapi dengan truck 4 ban ton, dilengkapi dengan truck 4 ban

Kapasitas 10 ton, lebar bentangan 24 Kapasitas 10 ton, lebar bentangan 24


14 Double Grider Gantry Crane Pabrik 2018 unit 1 Lelang 1 1,476,100,000 m, tinggi 9 m, kecepatan 0,83 m/menit, Biasa 1 m, tinggi 8 m, kecepatan 0,83 m/menit, Baik
digerakkan motor listrik 9 kW digerakkan motor listrik 9 kW

15 Electric control distribution center Pabrik 2005 unit 1 Scrap 1 620,600,000 3 phase , 50 hz, daya 1250 kVA Biasa 1 3 phase , 50 hz, daya 1250 kVA Baik

16 Steel bending & Cutter section Pabrik 2003 unit 1 Scrap 2 237,700,000 Biasa 2 Baik

Bahan konstruksi pelat baja ,dilengkapi Bahan konstruksi pelat baja ,dilengkapi
17 Curring Rack Pabrik 2005 unit 1 Scrap 1 18,200,000 dengan dengan 30 Pallet, digerakkan motor Cukup Baik 1 dengan dengan 30 Pallet, digerakkan motor Baik
listrik listrik

Bahan konstruksi pelat baja, ketebalan 100 Bahan konstruksi pelat baja, ketebalan 100
- 200 mm, kapasitas kerja 1200 - 1500 mm, - 200 mm, kapasitas kerja 1200 - 1500 mm,
18 Stair Mould Pabrik 2005 unit 1 Scrap 1 1,900,000 Biasa 1 Rusak
raising 150 - 200 mm, Tinggi kaki 220 - 320 raising 150 - 200 mm, Tinggi kaki 220 - 320
mm mm

19 Storage Rack Tower Pabrik unit 1 Scrap 1 1,300,000 Biasa 1 Baik

1 Flat ukuran 12 m x 4,5 m 1 Flat ukuran 12 m x 4,5 m


20 Flat Table Pabrik 2005 unit - 3 6,300,000 Biasa 3 Baik
2 Flat ukuran 12 m x 3,5 m 2 Flat ukuran 12 m x 3,5 m

Unit dilengkapi dengan Run Way dan portal Unit dilengkapi dengan Run Way dan portal
rangka baja dengan panjang ± 25 meter rangka baja dengan panjang ± 25 meter
21 Carpusel Extension / Smoothing Beton Pabrik 2018 unit 1 Lelang 1 2,239,500,000 dengan tinggi 2,5 meter, rel gerder, panel Baik 1 dengan tinggi 2,5 meter, rel gerder, panel Baik
kontrol dan peralatan standar lainnya kontrol dan peralatan standar lainnya
untuk operasi normal untuk operasi normal

1 - Altenator - Kapasitas 1256 KVA/1020 1 - Altenator - Kapasitas 1256 KVA/1020


22 Pembangkit Listrik Tenaga Diesel Pabrik 2003 unit 1 Lelang 1 483,900,000 kW , putaran 1500 rpm Biasa 1 kW , putaran 1500 rpm Baik
1- Engine - 12 silinder , putaran 1500 rpm 1- Engine - 12 silinder , putaran 1500 rpm

1 - Automatic Cutting 1 - Automatic Cutting


1 - Drilling Magnet 1 - Drilling Magnet
3 - Welding Machine 3 - Welding Machine
23 Bengkel Las Pabrik unit 1 Scrap 1 35,300,000 2 - Grinding Machine Cukup Baik 1 2 - Grinding Machine Baik
1 - Drilling Machine 1 - Drilling Machine
2 - Cutting Machine 2 - Cutting Machine
1 - Hoist SWF 1 - Hoist SWF
JIMMY PRASETYO & REKAN PP URBAN
SIFAT BIAYA
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY SCRAP KONDISI BERAT KONDISI
DEPRESIASI QTY NILAI KETERANGAN QTY HARSAT NILAI KETERANGAN
AKHIR Kg AKHIR

1 - Circullar saw squaring machine with 1 - Circullar saw squaring machine with
titling blade titling blade
1 - Circular saw squaring machine with 1 - Circular saw squaring machine with
24 Bengkel Kayu Pabrik unit 1 Lelang 1 24,800,000 Cukup Baik 1 Baik
titling blade titling blade
1 - Band saw 1 - Band saw
1 - Industrial Fan 1 - Industrial Fan

25 Control Center Pabrik 2005 unit 1 Scrap

26 Turn Over Table Pabrik 2005 unit 1 Scrap

27 Ruang Teknik Pabrik 2005 unit 1 Scrap

28 Carpenter Workshop Pabrik 2005 unit 1 Scrap

29 ME-186001 Perolehan s.d th 2000 Pabrik 1981 unit 1

30 ME-201003 Meja Hidraulik Pabrik 2001 unit -

31 ME-202004 Mesin Bor Magnit Pabrik 2002 unit 1 Scrap

32 ME-203005 Meja Gurinda 7" & 4" Pabrik 2003 unit 1 Scrap

33 ME-203006 Mesin Bor Magnit 2 unit Pabrik 2003 unit -

34 ME-204007 Mesin bor beton Pabrik 2004 unit -

35 ME-204008 Mesin Vibrator Pabrik 2004 unit -


JIMMY PRASETYO & REKAN PP URBAN
SIFAT BIAYA
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY SCRAP KONDISI BERAT KONDISI
DEPRESIASI QTY NILAI KETERANGAN QTY HARSAT NILAI KETERANGAN
AKHIR Kg AKHIR

36 ME-205178 Accessories for formwork shelf for double wall formwork Pabrik 2005 unit -

37 ME-205184 Trestle roller, stationary;upper edge 460, incl. Prox. Switch Pabrik 2005 unit -

38 ME-205185 Trestle roller, lowerable, prox.switch holder Stop/Slow, dowell Pabrik 2005 unit -

39 ME-205186 Friction wheel drive, lowerable;upper edge 460. Dowelled : I.h. Pabrik 2005 unit -

40 ME-205187 Friction wheel drive, lowerable;upper edge 460. Dowelled : I.h. Pabrik 2005 unit -

41 ME-205188 Friction wheel drive, lowerable;upper edge 460. Dowelled : I.h. Pabrik 2005 unit -

42 ME-205189 Switching ruler, rail guard, sideways shifting carriage Pabrik 2005 unit -

43 ME-205410 Spare-Parts Stair Mould Pabrik 2005 unit 1 Scrap

44 ME-205411 Forks of The Forklift Pabrik 2005 unit -

45 ME-205412 Mesin Pabrik 2005 unit -

46 ME-206413 Internal Vibrator Pabrik 2006 unit -

47 ME-206414 Host Crane Pabrik 2006 unit -


JIMMY PRASETYO & REKAN PP URBAN
SIFAT BIAYA
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY SCRAP KONDISI BERAT KONDISI
DEPRESIASI QTY NILAI KETERANGAN QTY HARSAT NILAI KETERANGAN
AKHIR Kg AKHIR

48 ME-206415 Vibrator HBM-502 Pabrik 2006 unit -

49 ME-206416 Mesin Jack Hammer Pabrik 2006 unit -

50 ME-206417 Mesin BOSCH GSH Pabrik 2006 unit -

51 ME-206418 Exen /Hayashi Internal Vibrator Pabrik 2006 unit -

52 ME-206419 Hyster Forklift Pabrik 2006 unit -

53 ME-206420 Internal Vibrator Pabrik 2006 unit -

54 ME-207421 Mesin Bor Duduk Uk.32mm=1Unt Pabrik 2007 unit -

55 ME-207422 Barbender & Barcutter Pabrik 2007 unit -

56 ME-210423 Mesin las format M-250 Pabrik 2010 unit -

57 ME-210424 Mesin cutting & cutting wheel Pabrik 2010 unit -

58 ME-210425 Mesin cutting Pabrik 2010 unit -

59 ME-210426 Chain blok cap 3 ton Pabrik 2010 unit -


JIMMY PRASETYO & REKAN PP URBAN
SIFAT BIAYA
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY SCRAP KONDISI BERAT KONDISI
DEPRESIASI QTY NILAI KETERANGAN QTY HARSAT NILAI KETERANGAN
AKHIR Kg AKHIR

60 ME-210427 DP magnet tools Pabrik 2010 unit -

61 ME-210428 Wacker Shaft Pabrik 2010 unit -

62 ME-210429 Wacker Shaft Vibrator Pabrik 2010 unit -

63 ME-210430 Invoice No.11 Teodolit Pabrik 2010 unit -

64 ME-211431 Mesin Mixer & Deltamix Foam Generator Pabrik 2011 unit -

65 ME-211432 Kwt No.03098-Inverter Pabrik 2011 unit -

66 ME-211433 Inv No.11/UIXI-Theodolit Pabrik 2011 unit -

67 ME-211434 Pisau toyo Pabrik 2011 unit -

68 ME-211435 Circular mixer Pabrik 2011 unit -

69 ME-211436 Panel mixer, srapper Pabrik 2011 unit -

70 ME-211437 Moulding material Pabrik 2011 unit -

71 ME-211438 Mesin Plotter U/ Enginering Pabrik 2011 unit -


JIMMY PRASETYO & REKAN PP URBAN
SIFAT BIAYA
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY SCRAP KONDISI BERAT KONDISI
DEPRESIASI QTY NILAI KETERANGAN QTY HARSAT NILAI KETERANGAN
AKHIR Kg AKHIR

72 ME-213494 Genset "YANMAR" 15KVA 3 Phase japan Pabrik 2014 unit -

73 ME-215498 Lantai Mixer Batching Plant (SET) Pabrik 2015 unit -

74 ME-215499 Heavy Duty High Pressure Cleaner Lavor Pro Italy Hyper C2515LPabrik 2015 unit -

75 KD-213501 Wy160M-4 4 Pole 11 kw 15 HP B3 Food Mounted Wonder ( PartPabrik 2015 unit -

76 ME-213500 Mesin 8DC9 Mitsubhishi Pabrik 2015 unit 1 Scrap

77 ME-216499 Stick Vibrator dia. 45mm Pabrik 2016 unit -

78 ME-216500 Stick Vibrator dia. 38mm Pabrik 2016 unit -

79 ME-217001 Mesin Las Heavy Duty Merk OTC XD 3503 (350 Ampere) Pabrik 2017 unit -

CPU S7-300 (Siemen) GES7 315-2AG10-0AB0


80 ME-2018003 Memory Card (Siemen) GES7 953 8LF00-0AA0 Pabrik 2018 unit 1 Scrap
Encoder Seillangengeber SL 3010 - XI / GS 130/ k/f

81ME-2018004-ACCS002
Material & Jasa Pemasangan Pembuatan Runaway Smoothing Eq
Pabrik 2018 unit -

82 ME-2018003-ADDPenggantian / Perbaikan PLC Siemens S7-300 Pabrik 2018 unit -

TOTAL 9,783,900,000 234,496 1,055,232,618


FOTO
FOTO
FOTO
FOTO
FOTO
FOTO
FOTO
KJPP MESIN
PER : 29 MARET 2023
JIMMY PRASETYO & REKAN PP URBAN
SIFAT BIAYA
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY SCRAP KONDISI BERAT KONDISI
DEPRESIASI QTY NILAI KETERANGAN QTY HARSAT NILAI KETERANGAN
AKHIR Kg AKHIR

Kapasitas 3,5 Ton, transmisi Automatic, Kapasitas 3,5 Ton, transmisi Automatic,
1 ME-216501 HELI Loader 3.5 ton HL933II-WD Pabrik 2015 unit 1 Sadang 1 231,000,000 engine type Duetz Weichai- WP6 Baik 1 engine type Duetz Weichai- WP6 Baik
G125E22,bahan bakar solar G125E22,bahan bakar solar

Kapasitas 7000Kg / 600mm Load Center, Kapasitas 7000Kg / 600mm Load Center,
2 PE-2018004 Forklift 7 Ton TCM Pabrik 2018 unit 1 Sadang 1 395,000,000 Long Fork 1220mm (std), transmisi Baik 1 Long Fork 1220mm (std), transmisi Baik
Automatic, engine diesel, bahan Automatic, engine diesel, bahan

Sadang &
3 Unit Truck Tracktor Head Pabrik 2018 unit 3 3 1,440,000,000 Baik 3 Baik
Semarang

4 ME-2018001 Unit Truck Mixer (Hino) Pabrik 2018 unit 1 Sadang 1 385,000,000 Baik 1 Baik

12 Concrete Bucket ( Sylo ) Pabrik 2005 unit 2 Sadang 4 19,800,000 Kap 3.0 m3 Biasa 2 Kap 3.0 m3 Baik

1 - Sleve analysys 1 - Sleve analysys


1 - Compressive Strength Tes 1 - Compressive Strength Tes
1 - Table Vibrator 1 - Table Vibrator
1 - Stove 1 - Stove
14 Alat Laboratorium Pabrik 2005 unit 1 Sadang 1 34,300,000 Biasa 1 Baik
1 - Oxygen Contain Measurement 1 - Oxygen Contain Measurement
2 - Scale 2 - Scale
1 - Mixer 1 - Mixer
1 - Water Heater 1 - Water Heater

TOTAL 9 2,505,100,000 - -

Alat Utama
HELI Loader 3.5 ton HL933II-WD Self Loader 1 10,000,000
Forklift 7 Ton TCM Self Loader 1 10,000,000
Unit Truck Tracktor Head Jalan Sendiri 1 5,000,000
Unit Truck Mixer (Hino) Jalan Sendiri 1 5,000,000
Concrete Bucket ( Sylo ) 5,000,000
Tronton
Alat Laboratorium 1
35,000,000
Alat Produksi
Alat Survey, Vibrator, Bucket, Meisn Las Tronton 1 5,000,000
5,000,000
Stock Precast
Produk Precast Trailer 20 100,000,000
100,000,000
TOTAL 6 140,000,000
FOTO
ALAT PRODUKSI
PER : 29 MARET 2023
SIFAT BIAYA NILAI BUKU KONDISI LOKASI
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN SCRAP
DEPRESIASI 31/12/2022 AKHIR AKHIR

2 ME-212440 Alat Tes Pabrik 2012 unit 1 28,650,000 - Baik Griyaton Sadang

5 ME-212443 Inverter welding machine Pabrik 2012 unit 1 4,200,000 - Baik Griyaton Sadang

6 ME-212444 Wacker internal vibrator IREN 45 Pabrik 2012 unit 1 12,640,000 - Baik Griyaton Sadang

7 ME-212445 Wacker internal vibrator IREN 38 Pabrik 2012 unit 1 11,720,000 - Baik Griyaton Sadang

8 ME-212446 Theodolite digital - Aston Hotel Pabrik 2012 unit 1 14,000,000 - Baik Griyaton Sadang

9 ME-212447 Theodolite digital - Kebagusan Pabrik 2012 unit 1 14,000,000 - Baik Griyaton Sadang
SIFAT BIAYA NILAI BUKU KONDISI LOKASI
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN SCRAP
DEPRESIASI 31/12/2022 AKHIR AKHIR

10 ME-212448 Theodolite digital - Pakubuwono Pabrik 2012 unit 1 14,000,000 - Baik Griyaton Sadang

11 ME-212449 Wacker internal vibrator Pabrik 2012 unit 1 26,640,000 - Baik Griyaton Sadang

14 ME-212452 Alat lab Pabrik 2012 unit 1 5,177,000 - Baik Griyaton Sadang

18 ME-212456 Mesin las Pabrik 2012 unit 1 9,000,000 - Baik Griyaton Sadang

19 ME-212457 Pompa jet cleaner Pabrik 2012 unit 1 6,768,000 - Baik Griyaton Sadang

23 ME-213461 Wacker Vibrator Pabrik 2013 unit 1 96,712,200 - Baik Griyaton Sadang
SIFAT BIAYA NILAI BUKU KONDISI LOKASI
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN SCRAP
DEPRESIASI 31/12/2022 AKHIR AKHIR

48 ME-213486 Wacker Electric Pabrik 2013 unit 1 27,545,700 - Baik Griyaton Sadang

50 ME-213488 Bucket Cor u/ Line Outdoor (ME) Pabrik 2013 unit 1 26,198,150 - Baik Griyaton Sadang

55 ME-213493 Vibrator Pabrik 2013 unit 1 29,550,000 - Baik Griyaton Sadang

60 ME-215495 Stick Vibrator "Wacker" Type 042-200 Pabrik 2015 unit 1 32,154,336 8,574,490 Baik Griyaton Sadang

61 ME-213498 Inverter Merek Mitsubishi Jepang 2,2 KVA Pabrik 2015 unit 1 46,350,000 13,518,750 Baik Griyaton Sadang

70 ME-216019 Internal Vibrator IREN 38/042/200 (Set) Pabrik 2016 unit 1 34,400,000 11,753,333 Baik Griyaton Sadang

71 ME-216503 Meja Getar/Vibrator untuk pembuatan kubus (UnitPabrik 2016 unit 1 19,950,000 7,315,000 Baik Griyaton Sadang
SIFAT BIAYA NILAI BUKU KONDISI LOKASI
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN SCRAP
DEPRESIASI 31/12/2022 AKHIR AKHIR

72 ME-216506 Stick VIbrator Pabrik 2016 unit 1 34,772,727 0 Baik Griyaton Sadang

73 PK-216105 Stick Vibrator Pabrik 2016 unit 1 10,400,000 0 Rusak Griyaton Sadang

74 ME-216505 Mesin Vibrator FU 4/200 Merk WACKER Pabrik 2016 unit 1 52,027,099 - 0 Baik Griyaton Sadang

TOTAL 22 556,855,212 41,161,573

Sadang 1 Rit 5,000,000


FOTO
FOTO
FOTO
FOTO
KENDARAAN
PER : 29 MARET 2023
NILAI BUKU KONDISI LOKASI
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN DISTIBUTOR FOTO
31/12/2022 AKHIR AKHIR

1 KD-100020 Trailler 1986 unit - 10,031,518 - Griyaton


2 KD-186021 Ekor Trailler 1986 unit - 22,586,799 - Griyaton
3 KD-191001 Kijang Toyota B 7014 LR 1991 unit - 24,500,000 - Griyaton
4 KD-191002 Truck Mercedes Bends 1991 unit 1 87,750,000 - Griyaton
5 KD-191003 Truck Tronton Nisan B 9535 GF 1991 unit - 35,000,000 - Griyaton
6 KD-191004 Truck Tronton Isuzu B 9891 DA 1991 unit - 15,000,000 - Griyaton
7 KD-191005 Flate Bade U. Truk 1991 unit - 8,000,000 - Griyaton
8 KD-192006 Kepala trailler Mercedes B 9615 DA 1992 unit 109,000,000 - Griyaton
9 KD-202022 Kepala Trailer 1992 unit 95,000,000 - Griyaton
10 KD-204010 Panther Pick Up B 9795 NY 2004 unit 106,118,807 - Griyaton
11 KD-204011 Panther B 8133 YV 2004 unit 140,100,000 - Griyaton
12 KD-209012 Booking fee pembelian 1 Unit Mobil Grand Max 2009 unit 1,000,000 - Griyaton
13 KD-209013 DP Pembelian mobil 2009 unit 24,377,500 - Griyaton
14 KD-209014 Angsuran ke-1 mobil 2009 unit 5,520,000 - Griyaton
15 KD-209015 Angsuran ke-2 mobil 2009 unit 5,520,000 - Griyaton
16 KD-209016 Cicilan ke-3 Mobil 2009 unit 5,520,000 - Griyaton
17 KD-209017 Cicilan ke-4 Mobil 2009 unit 5,520,000 - Griyaton
18 KD-209018 Cicilan ke-6 mobil 2009 unit 5,520,000 - Griyaton
19 KD-209019 Cicilan Ke-7 mobil 2009 unit 5,520,000 - Griyaton
20 KD-216001 Mobil Suzuki APV3 1.5PS TRUCKS WDX TH 2015 Warna Hitam 2016 unit 106,767,273 - Griyaton
21 KD-216002 Sepeda Motor Matic Honda 2016 unit 14,475,000 - Griyaton
22 KD-217003 Lowbed 2017 unit 135,000,000 - Griyaton
Griyaton
TOTAL 1 967,826,897 -
FURNITUR
PER : 29 MARET 2023
LOKASI
NO KODE ASSET NAMA/JENIS BARANG KONDISI AKHIR DISTIBUTOR FOTO
AKHIR

4 PK-201004 UPS Back pro 1400 UPS 1 Rusak Griyaton


6 PK-201006 UPS Back pro 1400 UPS Tidak Terdeteksi Griyaton
15 PK-204007 UPS Pascal 1000VA UPS Tidak Terdeteksi Griyaton
16 PK-204008 UPS Pascal 600VA UPS Tidak Terdeteksi Griyaton
35 PK-206031 Printer HP. UPS Prin Tidak Jelas Typenya Griyaton
39 PK-206038 UPS Tidak Jelas Typenya Griyaton
51 PK-207050 Komputer=2Unit & UPS APC=2 Unit Kom Tidak Terdeteksi Griyaton
UPS APC 1 Unit + Battery APC 1 Unit PO-16010072
196 PK-216005 UPS Tidak Terdeteksi Griyaton
RR-16017740
201 PK-216009 UPS APC 1400V (Pcs) untuk Mesin Absen Tidak Terdeteksi Griyaton
0
NO NAMA/JENIS BARANG SAT QTY KONDISI

RUANG HRD
1 Komp HP 1 Unit Baik
2 Komp LG 2 Unit Baik
3 Komp Acer 1 Unit Baik
4 Printer Canon MX 497 1 Pcs Rusak
5 Printer Epson L1300 1 Pcs Baik
6 Printer HP Lacer Jet P1102 1 Pcs Rusak
7 Printer HP Lacer Jet P1005 1 Pcs Rusak
8 Meja 1/2 Biro UNO 1 Pcs Baik
9 Meja 1/2 Biro Arjuna 1 Pcs Baik
10 Meja 1/2 Biro UNO Sekat 4 1 Set Baik
11 Telpon Panasonic 3 Pcs Baik
12 Rak Besi Tingkat 4 2 Pcs Baik
13 Kursi Putar Savero 6 Pcs Baik
14 Ac Panasonic 1 PK 1 Unit Baik
15 Mesin Fotocopy Fuji Xerox 1 Unit Rusak
16 Box panel Panasonic 1 Unit Baik
17 Dispenser 1 Unit Baik
MEETING ROOM KECIL
1 Meja meating sesar 1 Set Baik
2 Kursi Putar Savero 4 Pcs Baik
3 Ac Panasonic 1 PK 1 Unit Baik
RUANG DIREKSI
1 Meja bulat UNO 1 Pcs Baik
2 Lemari Sleding kayu 1 Pcs Baik
3 Meja 1/2 Biro UNO 1 Pcs Baik
4 Meja kerja biasa UNO 1 Pcs Baik
5 Kursi Direksi 1 Pcs Baik
6 Kursi Putar Savero 4 Pcs Baik
7 Kursi Putar Carman 2 Pcs Baik
8 TV LG432 1 Pcs Rusak
9 Ac Sharp 1 PK 1 Set Baik
10 Telpon Panasonic 1 Pcs Baik
MEETING ROOM BESAR
1 Bangku Putar nforma 4 Pcs Baik
2 Kursi Putar Savero 2 Pcs Baik
3 Meja Meating Panjang 11 Bag 1 Set Baik
4 TV Changhong 45 in 1 Unit Baik
5 Ac Sharp 1 PK 1 Unit Baik
6 Ac Panasonic 1 PK 1 Unit Baik
7 Electrick bord Panasonic 1 Unit Baik
8 Layar proyektor 1 Pcs Baik
9 Lemari Geser Kayu 1 Pcs Baik
10 Mic Crimdon 1 Pcs Baik
RUANG KEBAKAR
1 Meja 1/2 Biro uno Sekat 6 UN 1 Set Rusak Terbakar
2 Rak Lemari 5 Pcs Rusak Terbakar
3 Meja 1/2 Biro Uno 3 Pcs Rusak Terbakar
4 Kursi Putar 3 Pcs Rusak Terbakar
5 Kursi Direksi 2 Pcs Rusak Terbakar
6 Monitor LG 1 Pcs Rusak Terbakar
7 Monitor Acer 1 Pcs Rusak Terbakar
8 Telpon Panasonic 1 Pcs Rusak Terbakar
9 Rak Besi Tingkat 4 1 Pcs Baik
10 Brangkas 1 Pcs Rusak
11 Ac Panasonic 1 PK 2 Unit Rusak
RUANG CCTV
1 Komp LG 16" 1 Unit Baik
2 Monitor Benq 2 Pcs Baik
3 Server CCTV 1 Pcs Rusak
4 Meja 1/2 Biro UNO 1 Pcs Baik
5 Monitor LG 16" 7 Pcs Rusak
6 Monitor Acer 16" 1 Pcs Rusak
7 Monitor GIC 17" 3 Pcs Rusak
8 Monitor LG 17" 1 Pcs Rusak
9 Monitor Flatron 17" 1 Pcs Rusak
10 Printer Epson L1300 2 Pcs Rusak
11 Lemari geser besi Barata 1 Pcs Baik
12 Lemari pintu besi 1 Pcs Baik
13 Scanner EPSON V39 1 Pcs Rusak
14 Telpon Panasonic 1 Pcs Baik
15 Ac Panasonic 1 PK 2 Unit Baik
16 UPS Back pro 1400 2 Pcs Rusak
17 UPS Back Pro 800 1 Pcs Rusak
18 Kursi Putar 4 Pcs 3 OK ,1 Rusak
RUANG PLAKSANA
1 Meja 1/2 Biro UNO 1 Pcs Baik
2 Lemari geser besi Barata 1 Pcs Baik
3 Ac Panasonic 1 PK 1 Unit Baik
4 Kursi Putar 2 Pcs Baik
5 Kursi Lipat 1 Pcs Baik
RUANG QS & QC
1 Telpon Panasonic 3 Pcs Baik
2 Rak Susun 4 tingkat 2 Pcs Baik
3 Meja 1/2 Biro Uno 16 Pcs Baik
4 Meja 1/2 Biro Arjuna 5 Pcs Baik
5 Lemari Besi Kaca Brodher 1 Pcs Baik
6 Lemari Besi Kaca VIP 1 Pcs Baik
7 Lemari Besi kaca Krisbow 1 Pcs Baik
8 Rak Susun 3 Atmi 3 Pcs Baik
9 Ac Panasonic 1 PK 6 Unit Baik
10 Ac Sharp 1 PK 1 Unit Baik
11 Printer P1102 1 Pcs Rusak
12 Meja Rapat modera 4 Meja 1 Set Baik
RUANG BU MARNI
1 Meja 1/2 Biro Modera 1 Pcs Baik
2 Meja 1/2 Biro Uno 5 Pcs Baik
3 Meja 1/2 Biro Arjuna 1 Pcs Baik
4 Komp LG 17" 1 Unit Baik
5 Komp Acer 16" 2 Unit Baik
6 Komp AOC 16" 2 Unit Baik
7 Lemari Besi Kaca Brodher 1 Pcs Baik
8 Telpon Panasonic 1 Pcs Baik
9 Ac Panasonic 1 PK 2 Unit Baik
10 Pemanas Air OXONE 1 Pcs Rusak
RUANG SERBAGUNA
1 Kursi Lipat Meja Futura 30 Pcs Baik
2 Ac Panasonic 1 PK 2 Unit Baik
3 Kursi Putar Savero 6 Pcs Baik
4 Layar proyektor 1 Pcs Baik
FURNITUR
PER : 29 MARET 2023
NILAI BUKU KONDISI LOKASI
NO KODE ASSET NAMA/JENIS BARANG TAHUN SAT QTY PEROLEHAN DISTIBUTOR FOTO
31/12/2022 AKHIR AKHIR

1 PK-186001 Inventaris Golongan I 1986 unit 1 30,107,989 30,107,989 Griyaton


2 PK-186002 Perolehan s.d th 2000 1986 unit 1 160,783,172 160,783,172 Griyaton
3 PK-206021 Meja Kursi 2006 unit 1 1,450,000 1,450,000 Griyaton
4 PK-206023 Meja Kursi 2006 unit 1 1,225,000 1,225,000 Griyaton
5 PK-206026 Kursi Meeting Room 2006 unit 1 1,860,000 1,860,000 Griyaton
6 PK-206027 Kursi Putar 2006 unit 1 310,000 310,000 Griyaton
7 PK-206032 Kursi 2006 unit 1 3,016,000 3,016,000 Griyaton
8 PK-206033 Meja 1/2 biro & 1 Biro 2006 unit 1 1,234,500 1,234,500 Griyaton
9 PK-206034 Kursi & Meja 1/2 biro 2006 unit 1 1,754,500 1,754,500 Griyaton
10 PK-207046 Meja, Fold Chair, Energy Chair 2007 unit 1 1,543,750 1,543,750 Griyaton
11 PK-207051 Energy Chair,AC 1pk, Monitor, Desk 1Biro 2007 unit 1 5,426,750 5,426,750 Griyaton
12 PK-207052 1 Unit Ranjang 90x200 2007 unit 1 600,000 600,000 Griyaton
13 PK-207056 Desk 1 biro, Fold chair, Energy Chair 2007 unit 1 3,169,500 3,169,500 Griyaton
14 PK-207067 Kursi Lipat "Future" Type FTR 2007 unit 1 1,200,000 1,200,000 Griyaton
15 PK-210097 Kursi 2010 unit 1 3,195,000 3,195,000 Griyaton
16 PK-212135 Pembuatan meja moulding 2012 unit 1 14,000,000 14,000,000 Griyaton
17 PK-212136 Pembuatan meja kerja uk.6000 mmx 12000 mm 2012 unit 1 28,000,000 28,000,000 Griyaton
18 PK-212138 Faktur No. 110028; AC 2012 unit 1 3,400,000 3,400,000 Griyaton
19 PK-212139 ATK (ARJ-001 1 Biro) 2012 unit 1 1,904,000 1,904,000 Griyaton
20 PK-212140 ATK (ARJ-001 1/2Biro) 2012 unit 1 1,659,000 1,659,000 Griyaton
21 PK-212141 ATK (ARJ-001 1 Biro + Chair) 2012 unit 1 3,934,000 3,934,000 Griyaton
22 PK-212147 Biro Meja 2012 unit 1 3,318,000 3,318,000 Griyaton
23 PK-212148 ATK Chair Casanova 2012 unit 1 2,730,000 2,730,000 Griyaton
24 PK-212159 Lemari 2012 unit 1 1,900,000 1,900,000 Griyaton
25 PK-212160 MEJA KURSI 2012 unit 1 8,350,000 8,350,000 Griyaton
26 PK-212166 atk (fp. 63354) ~ Chair CO307A 2012 unit 1 1,709,400 1,709,400 Griyaton
27 PK-212167 atk (fp. 63354) ~ ARJ-001 1Biro 2012 unit 1 1,904,000 1,904,000 Griyaton
28 PK-212168 atk (fp. 63354) ~ Chair Casanova (Staff) 2012 unit 1 5,460,000 5,460,000 Griyaton
29 PK-212169 atk (fp. 63354) ~ ARJ-001 1/2Biro 2012 unit 1 3,318,000 3,318,000 Griyaton
30 PK-212176 ATK (fp.7245) 2012 unit 1 9,100,000 9,100,000 Griyaton

TOTAL 307,562,561 307,562,561


DAFTAR KENDARAAN PT. GRIYATON INDONESIA
PER : 29 MARET 2023

NO NAMA/JENIS BARANG TAHUN TAHUN SAT QTY PEROLEHAN NILAI BUKU KONDISI LOKASI AKHIR FOTO
PEMBUATAN PEMBELIAN 31/12/2022 AKHIR

1 Mitsubishi Xpander Sport 2019 2019 unit 1 - - Baik PP Pusat

2 Mitsubishi Xpander Sport 2019 2019 unit 1 - - Baik Proyek


Kembangan

3 Suzuki Ertiga 2018 2019 unit 1 - - Baik Proyek


Kembangan

4 Toyota Avanza 2018 2018 unit 1 - - Baik Griyaton


BED MEJA CETAKAN
PER : 29 MARET 2023

Sifat Biaya
No. Kode Asset Deskripsi
Depresiasi

Bed
1 Meja 1 (6m x 4,5m) - Line 2 & 3 Pabrik
2 Meja 2 (12,5m x 4,0m) - Line 3 Pabrik
3 Meja 3 (12,0m x 4,0m) - Line 3 Pabrik
4 Meja 4 (12,5m x 4,0m) - Line 1 Pabrik
5 Meja 5 (12,0m x 4,0m) - Line Outddor Pabrik

Total
Volume
Purchase Harsat Jumlah
Koef Qty Luas Berat
Date
ls unit m2 kg Rp Rp

1.10 26.00 27.00 90,180.38 4,500 405,811,692


1.10 3.00 50.00 32,243.29 4,500 145,094,796
1.10 8.00 48.00 67,020.80 4,500 301,593,600
1.10 13.00 50.00 45,051.67 4,500 202,732,530
1.10 - 50.00 - 4,500 -

50.00 234,496.14 1,055,232,618.00


Ket

Rangka Baja
Rangka Baja
Rangka Baja
Rangka Baja
Rangka Baja
Workshop Outdoor

A E

F (Reng)

D1
D3 D2
C

A : WF 200.100.5,5.8 = Tinggi x Berat permeter x Jumlah Btg


= 8.7 x 21.3 x 9
= 1,667.79 kg

B : WF 200.100.5,5.8 = Panjang x Berat permeter x Jumlah Btg


= 13 x 21.3 x 9
= 2,492.10 kg

C : CNP 100.50.5 = Tinggi x Berat permeter x Jumlah Btg


= 8.7 x 9.4 x 26
= 2,118.74 kg

D1 : CNP 100.50.5 = Panjang x Berat permeter x Jumlah Btg


= 12 x 9.4 x 52
= 5,844.80 kg

D2 : CNP 100.50.5 = Tinggi x Berat permeter x Jumlah Btg


= 0.5 x 9.4 x 390
= 1,826.50 kg

D3 : CNP 100.50.5 = Panjang x Berat permeter x Jumlah Btg


= 1.2 x 9.4 x 364
= 4,091.36 kg

E : CNP 100.50.5 = Panjang x Berat permeter x Jumlah Btg


= 100 x 9.4 x 2
= 1,873.33 kg
F : CNP 100.50.5 = Panjang x Berat permeter x Jumlah Btg
= 100 x 9.4 x 13
= 12,176.67 kg

TOTAL = 32,091.29 kg
KOEF = 1.10
TOTAL = 35,300.42 kg

Workshop 1

E
F (Reng) D

C
B G

A : Plat 350.175.7.11 = Panjang x Lebar x Tebal x Jumlah Btg


= 0.350 x 0.175 x 0.01 x 60
= 288.49 kg

B : WF 350.175.7.11 = Tinggi x Berat permeter x Jumlah Btg


= 8.7 x 49.6 x 30
= 12,945.60 kg

C : WF 175.90.5.8 = Panjang x Berat permeter x Jumlah Btg


= 12.5 x 18.1 x 60
= 13,575.00 kg

D : WF 150.75.5.7 = Tinggi x Berat permeter x Jumlah Btg


= 1 x 14.0 x 60
= 840.00 kg

E : WF 150.75.5.7 = Panjang x Berat permeter x Jumlah Btg


= 3 x 14.0 x 60
= 2,520.00 kg

F : CNP 100.50.5 = Panjang x Berat permeter x Jumlah Btg


= 145 x 5.5 x 27
= 21,532.50 kg

G : WF 400.200.8.13 = Tinggi x Berat permeter x Jumlah Btg


= 8.7 x 66.0 x 31
= 17,800.20 kg

TOTAL = 69,501.79 kg
KOEF = 1.10
TOTAL = 76,451.97 kg

Workshop 2

E
F (Reng) D

C
Tiang sisi kiri masuk ke line 1 Tiang sisi kanan masuk ke Line 3

C : WF 150.75.5.7 = Panjang x Berat permeter x Jumlah Btg


= 10 x 14.0 x 62
= 8,680.00 kg

D : WF 150.75.5.7 = Tinggi x Berat permeter x Jumlah Btg


= 1 x 14.0 x 62
= 868.00 kg

E : WF 150.75.5.7 = Panjang x Berat permeter x Jumlah Btg


= 3 x 14.0 x 62
= 2,604.00 kg

F : CNP 100.50.5 = Panjang x Berat permeter x Jumlah Btg


= 145 x 9.4 x 22
= 29,879.67 kg

TOTAL = 42,031.67 kg
KOEF = 1.10
TOTAL = 46,234.83 kg

Workshop 3

E
F (Reng) D

C
B
A

A : Plat 450.280.15 = Panjang x Lebar x Tebal x Jumlah Btg


= 0.450 x 0.28 x 0.015 x 62
= 919.86 kg

B : WF 400.200.8.13 = Tinggi x Berat permeter x Jumlah Btg


= 8.7 x 66.0 x 31
= 17,800.20 kg

C : WF 175.90.5.8 = Panjang x Berat permeter x Jumlah Btg


= 6.25 x 18.1 x 62
= 7,013.75 kg

D : WF 150.75.5.7 = Tinggi x Berat permeter x Jumlah Btg


= 1 x 14.0 x 62
= 868.00 kg

E : WF 150.75.5.7 = Panjang x Berat permeter x Jumlah Btg


= 3 x 14.0 x 62
= 2,604.00 kg

F : CNP 100.50.5 = Panjang x Berat permeter x Jumlah Btg


= 150 x 9.4 x 23
= 32,315.00 kg

TOTAL = 61,520.81 kg
KOEF = 1.10
TOTAL = 67,672.89 kg

Workshop Las

D (Reng)

C
B

A : Plat 200.100.10 = Panjang x Lebar x Tebal x Jumlah Btg


= 0.250 x 0.12 x 0.01 x 7
= 16.49 kg
B : WF 200.100.5,5.8 = Tinggi x Berat permeter x Jumlah Btg
= 8.7 x 21.3 x 7
= 1,297.17 kg

C : WF 175.90.5.8 = Panjang x Berat permeter x Jumlah Btg


= 7 x 18.1 x 14
= 1,773.80 kg

D : CNP 100.50.5 = Panjang x Berat permeter x Jumlah Btg


= 30 x 9.4 x 14
= 3,934.00 kg

TOTAL = 7,021.46 kg
KOEF = 1.10
TOTAL = 7,723.60 kg
anan masuk ke Line 3
Meja 1

F (Tiang) G (Plat t=8mm)

E (Pengaku)
D (Tiang)

A : UNP 220.80.9 = Panjang x Berat permeter x Jumlah Btg


= 6 x 30.92 x 1
= 185.50 kg

B : WF 100.50.5.7 = Panjang x Berat permeter x Jumlah Btg


= 4.5 x 9.30 x 15
= 627.75 kg

C : WF 300.150.6,5.9 = Panjang x Berat permeter x Jumlah Btg


= 6 x 36.70 x 2
= 440.40 kg

D : Siku 90.90.10 = Panjang x Berat permeter x Jumlah Btg


= 0.4 x 13.30 x 15
= 79.80 kg

E : Siku 50.50.6 = Panjang x Berat permeter x Jumlah Btg


= 1 x 4.60 x 15
= 68.95 kg

F : Siku 50.50.6 = Panjang x Berat permeter x Jumlah Btg


= 0.8 x 4.60 x 15
= 55.16 kg

G : Plat 6000.4500.8 = Panjang x Lebar x tebal


= 6.0 x 4.5 x 0.008
= 1,695.60 kg

TOTAL = 3,153.16 kg
KOEF = 1.10
TOTAL = 3,468.48 kg
Meja 2
F (Tiang) G (Dudukan) I (Plat t=10mm)

E B
C

A : UNP 280.95.10 = Panjang x Berat permeter x Jumlah Btg


= 12 x 41.67 x 2
= 1,000.00 kg

B : UNP 160.75.7,5 = Panjang x Berat permeter x Jumlah Btg


= 4 x 9.63 x 2
= 77.00 kg

C : WF 125.60.6.8 = Panjang x Berat permeter x Jumlah Btg


= 4 x 13.20 x 42
= 2,217.60 kg

D : UNP 180.70.8 = Panjang x Berat permeter x Jumlah Btg


= 12.5 x 22.58 x 2
= 564.58 kg

E : HB 150.150.7.10 = Panjang x Berat permeter x Jumlah Btg


= 12.5 x 31.67 x 1
= 395.83 kg

F : CNP 150.65.20.2.6 = Tinggi x Berat permeter x Jumlah Btg


= 0.5 x 4.82 x 21
= 50.61 kg

G : WF 100.50.5.7 = Panjang x Berat permeter x Jumlah Btg


= 12.5 x 9.30 x 6
= 4 x 9.30 x 14
= 1,218.30 kg

H : Siku 50.50.6 = Panjang x Berat permeter x Jumlah Btg


= 2 x 4.60 x 21
= 2 x 4.60 x 14
= 321.77 kg
I : Plat 12500.4000.1 = Panjang x Lebar x tebal
= 12.5 x 4.0 x 0.01
= 3,925.00 kg

TOTAL = 9,770.69 kg
KOEF = 1.10
TOTAL = 10,747.76 kg
Meja 3

E (Plat t=10mm)

B
C

A : UNP 260.90.10 = Panjang x Berat permeter x Jumlah Btg


= 12 x 38.00 x 1
= 456.00 kg

B : UNP 140.60.7 = Panjang x Berat permeter x Jumlah Btg


= 4 x 16.00 x 2
= 128.00 kg

C : WF 150.75.5.7 = Panjang x Berat permeter x Jumlah Btg


= 4 x 14.00 x 30
= 1,680.00 kg

D : WF 400.200.8.13 = Panjang x Berat permeter x Jumlah Btg


= 12 x 66.00 x 2
= 1,584.00 kg

E : Plat 12000.4000.1 = Panjang x Lebar x tebal


= 12.0 x 4.0 x 0.01
= 3,768.00 kg

TOTAL = 7,616.00 kg
KOEF = 1.10
TOTAL = 8,377.60 kg
Meja 4
D (Plat t=10mm)

B
C

A : UNP 280.95.10 = Panjang x Berat permeter x Jumlah Btg


= 12.5 x 41.67 x 2
= 1,041.67 kg

B : UNP 160.65.7,5 = Panjang x Berat permeter x Jumlah Btg


= 4 x 19.25 x 2
= 154.00 kg

C : WF 175.90.5.8 = Panjang x Berat permeter x Jumlah Btg


= 4 x 18.10 x 27
= 1,954.80 kg

D : Plat 12500.4000.1 = Panjang x Lebar x tebal


= 12.5 x 4.0 x 0.01
= 3,925.00 kg

TOTAL = 3,150.47 kg
KOEF = 1.10
TOTAL = 3,465.51 kg
Meja 5

F (Tiang) D (Plat t=10mm)

E
B
C

D
A

A : UNP 150.75.6,5 = Panjang x Berat permeter x Jumlah Btg


= 7 x 18.67 x 2
= 261.33 kg

B : UNP 150.75.6,5 = Panjang x Berat permeter x Jumlah Btg


= 4 x 18.67 x 2
= 149.33 kg

C : WF 200.100.5,5.8 = Panjang x Berat permeter x Jumlah Btg


= 4 x 21.30 x 4
= 340.80 kg

D : WF 200.100.5,5.8 = Panjang x Berat permeter x Jumlah Btg


= 7 x 21.30 x 3
= 447.30 kg

E : UNP 65.42.5,5 = Tinggi x Berat permeter x Jumlah Btg


= 0.5 x 7.08 x 12
= 42.50 kg

F : Plat 7000.4000.8 = Panjang x Lebar x tebal


= 7.0 x 4.0 x 0.008
= 1,758.40 kg

TOTAL = 2,999.67 kg
KOEF = 1.10
TOTAL = 3,299.63 kg